HomeMy WebLinkAbout19-36 CC Resolution RESOLUTION NO. 19-36
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TEMECULA APPROVING THE CAPITAL
IMPROVEMENT PROGRAM FOR FISCAL YEARS 2020-24
AND ADOPTING THE CAPITAL IMPROVEMENT
PROGRAM BUDGET FOR FISCAL YEAR 2019-20
THE CITY COUNCIL OF THE CITY OF TEMECULA DOES HEREBY RESOLVE AS
FOLLOWS:
Section 1. Adoption of this Program is categorically exempt from environmental
review under the California Environmental Quality Act(CEQA).Pursuant to Section 15262 of the
State Guidelines for Implementation of CEQA, a project involving only feasibility or planning
studies for possible future actions, which actions the City Council has not approved, adopted, or
funded, does not require preparation of an EIR or Negative Declaration, but does require
consideration of environmental factors. In reviewing this Program and conducting public hearings
on it, the City Council has considered relevant environmental factors. This City Council, as the
lead agency for environmental review, pursuant to the California Environmental Quality Act and
the Guidelines promulgated there under(collectively"CEQA),has reviewed the scope and nature
of this Capital Improvement Program and has concluded that the planning and prioritization
process comprising this activity is not a project pursuant to CEQA because it does not order or
authorize the commencement of any physical or other activity that would directly or indirectly
have a significant effect upon the environment. The Capital Improvement Program merely
establishes a listing of priority and allocates funds for the City to commence the necessary planning
studies, including review pursuant to CEQA, at a future unspecified date. The future planning
studies will be conducted at the earliest possible time so as to ensure thorough review pursuant to
CEQA. Recognizing that the protection of the environment is a key factor in the quality of life
within the City of Temecula and to further the City's strict adherence to both the spirit and letter
of the law as regards to CEQA, this City Council has also considered this Capital Improvement
Program as if it were a Project pursuant to CEQA. Reviewing this Program as a Project, this City
Council concludes the Project would be exempt from review under CEQA, both pursuant to
Section 15061(b)(3)and to the categorical exemption set forth in Section 15262 of CEQA. Section
15061(b)(3) would apply because it can be seen with certainty that this prioritizing and fund
allocation program cannot and does not have the potential to cause a significant effect on the
environment. No physical activity will occur until all required CEQA review is conducted at the
time the physical improvements prioritized in the Program are undertaken. Section 15262 provides
a categorical exemption to actions that are feasibility or planning studies related to possible future
actions.This Council is aware of and has considered the current and relevant environmental factors
as an integral component of the review of this Program. This Council, as lead agency, hereby
determines and decides that the exemption provided in both Sections 15061(b)(3)and 15262 apply
in the event this is deemed a Project pursuant to CEQA.
Section 2. On June 5,2019,the Planning Commission found the Capital Improvement
Program consistent with the General Plan in accordance with Government Code Section 65401 of
State Planning and Zoning Law.
Section 3. The City Council hereby finds and declares that the requirements of
Government Code Section 65402(a) shall not apply to: (1) the disposition of the remainder of a
larger parcel which was acquired and used in part for street purposes;(2)acquisitions,dispositions,
or abandonments for street widening; or (3) alignment projects, provided such dispositions for
street purposes, acquisition, dispositions, or abandonments for street widening, or alignment
projects are of a minor nature.
Section 4. The City Council hereby finds that the acquisition of land necessary for the
City of Temecula Capital Improvement Program Fiscal Years 2020-24 is consistent with the
General Plan.
Section 5. That a certain document now on file in the office of the City Clerk of the
City of Temecula, entitled "City of Temecula Capital Improvement Program Fiscal Years 2020-
24" include herein appropriations for Fiscal Year 2019-20, and are hereby adopted. The CIP
appropriations for the Fiscal Year 2018-19 which have not been completed, encumbered, nor
included in the Fiscal Years 2020-24 CIP, are hereby carried over for each applicable project to
the Fiscal Year 2019-20. Certain Development Impact Fees from future revenue may be used to
replace the expenditure of current capital reserve funds in the CIP.
Section 6. That the following controls are hereby placed on the use and transfers of
budget appropriations:
A. No expenditures of funds shall be made unless there is an unencumbered
appropriation available to cover the expenditure.
B. The City Manager may authorize expenditures of funds in amounts up to
sixty thousand dollars ($60,000.00). Any expenditure of funds in excess of
$60,000 requires City Council action.
C. The City Manager may approve change orders on Public Works contracts
in amounts up to sixty thousand dollars ($60,000.00), if sufficient
appropriated funds are available.
D. The City Manager may authorize transfers up to sixty thousand dollars
($60,000.00)between approved Capital Improvement Program projects.
E. Notwithstanding Section 6.B. above, pursuant to Section 3.32.050 of the
Municipal Code, the City Manager may authorize Public Works contracts
in amounts up to sixty thousand dollars ($60,000.00). Any expenditures of
Public Works funds in excess of sixty thousand dollars($60,000.00)require
City Council action, except that the City Manager may approve change
orders on Public Works contracts approved by the Council in amounts up
to project contingency established by Council.
Section 7. Certification: The City Clerk shall certify the adoption of this resolution.
2
PASSED,APPROVED,AND ADOPTED by the City Council of the City of Temecula this
11 th day of June, 2019.
PK
Michael S. Naggar,Mayor
ATTEST.
Randi Johl, City Clerk
[SEAL]
3
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss
CITY OF TEMECULA )
I, Randi Johl, City Clerk of the City of Temecula, do hereby certify that the foregoing
Resolution No. 19-36 was duly and regularly adopted by the City Council of the City of Temecula
at a meeting thereof held on the 11t'day of June,2019,by the following vote:
AYES: 5 COUNCIL MEMBERS: Edwards, Rahn, Schwank, Stewart,
Naggar
NOES: 0 COUNCIL MEMBERS: None
ABSTAIN: 0 COUNCIL MEMBERS: None
ABSENT: 0 COUNCIL MEMBERS: None
411111110
Randi Johl, City Clerk
4
CITY OF TEMECULA
CALIFORNIA
Capital Improvement Program
Fiscal Years 2020-2024
Capital Improvement Program
Fiscal Years 2020-2024 City of Temecula
City Council City Management
Mike Naggar, Mayor Aaron Adams, City Manager
James Stewart, Mayor Pro Tem Greg Butler, Assistant City Manager
Maryann Edwards, Council Member
Matt Rahn, Council Member
Zak Schwank, Council Member
City of Temecula
41000 Main Street
Temecula, California 92590
(951)694-6430
TemeculaCA.gov
Capital ImprovementProgram
Fiscal Years 2020-24
TABLE OF CONTENTS
INTRODUCTION
Transmittal Message............................................................................................................................... 7
Resolution of the City Council ............................................................................................................... 12
California Society of Municipal Finance Officers (CSMFO) Certificate of Award .................................. 16
City Organizational Chart ...................................................................................................................... 17
Description of Levels ............................................................................................................................. 18
Parameters for CIP Budget Cost Estimates ........................................................................................... 19
Description of Revenue Sources ........................................................................................................... 20
SUMMARIES
Projected Revenue Summary ................................................................................................................ 25
Project Summary by Type of Project .................................................................................................... 26
Expenditure Summary by Project Graph .............................................................................................. 34
CIP Major Revenue Sources Graph ....................................................................................................... 35
Comparison Between Projected Revenue and Costs ............................................................................ 36
CIRCULATION PROJECTS
Abbott Corporation Roadway Improvements ...................................................................................... 44
Butterfield Stage Road Extension ......................................................................................................... 46
Cherry Street Extension and Murrieta Creek Low-Flow Crossing to Diaz Road.................................... 48
Citywide Buffered Bike Lane Striping .................................................................................................... 50
Diaz Road Expansion (Rancho California Road to Cherry Street) ......................................................... 52
Emergency Vehicle Pre-Emption Upgrade Program – Citywide ........................................................... 54
Flashing Beacons and Speed Advisory Signs ......................................................................................... 56
French Valley Parkway / Interstate 15 Improvements – Phase II ......................................................... 58
French Valley Parkway / Interstate 15 Improvements – Phase III ........................................................ 60
Interstate 15 Congestion Relief ............................................................................................................ 62
Interstate 15 / State Route 79 South Ultimate Interchange ................................................................. 64
Medians and Parkways - Citywide ........................................................................................................ 66
Murrieta Creek Bridge at Overland Drive ............................................................................................. 68
Nicolas Road Extension and Improvement ........................................................................................... 70
3
TABLE OF CONTENTS (continued)
CIRCULATION PROJECTS (continued)
Overhead Street Name Sign Replacement Program - Citywide...........................................................72
Pavement Rehabilitation Program - Citywide ....................................................................................... 74
Pechanga Parkway Widening ................................................................................................................ 76
Traffic Signal Equipment Enhancement Program – Citywide ............................................................... 78
Traffic Signal Installation – Citywide ..................................................................................................... 80
Traffic Signal – Park and Ride Access Improvements ........................................................................... 82
Traffic Signal System Upgrade .............................................................................................................. 84
Ynez Road Improvements ..................................................................................................................... 86
INFRASTRUCTURE / OTHER PROJECTS
Americans with Disabilities Act (ADA) Transition Plan Implementation .............................................. 92
Bike Lane and Trail Program – Citywide ............................................................................................... 94
Bike Lane and Trail Program – Pump Track .......................................................................................... 96
Bike Lane and Trail Program – Temecula Creek South Side Trail ......................................................... 98
City Facilities Rehabilitation ................................................................................................................ 100
Citywide Drainage Master Plan ........................................................................................................... 102
Citywide Financial System Upgrade .................................................................................................... 104
Citywide Streetlight Acquisition and Light Emitting Diode (LED) Retrofit .......................................... 106
Citywide Surveillance Cameras ........................................................................................................... 108
Community Recreation Center (CRC) Renovations ............................................................................. 110
Comprehensive General Plan Update ................................................................................................. 112
Electric Vehicles Charging Station ....................................................................................................... 114
Expanded Recycled Water Conversion Project ................................................................................... 116
Fiber Optic Communication System Upgrade ..................................................................................... 118
Fire Station 73 Gym/Garage ............................................................................................................... 120
Fire Station 84 Training Room Renovation ......................................................................................... 122
History Museum .................................................................................................................................. 124
Interstate 15 / State Route 79 South Interchange Enhanced Landscaping ........................................ 126
Library Parking – Phase II .................................................................................................................... 128
4
Capital ImprovementProgram
Fiscal Years 2020-24
TABLE OF CONTENTS (continued)
INFRASTRUCTURE / OTHER PROJECTS
(continued)
Main Street Property Improvements..................................................................................................130
Margarita Recreation Center .............................................................................................................. 132
Medians and Traffic Calming Improvements – Citywide .................................................................... 134
Murrieta Creek Improvements ........................................................................................................... 136
Old Town Parking Structure ................................................................................................................ 138
Pechanga Parkway Environmental Mitigation .................................................................................... 140
Pedestrian Signal Equipment Upgrade – Citywide ............................................................................. 142
Public Safety Monument .................................................................................................................... 144
Santa Gertrudis Creek Pedestrian/Bicycle Trail Extension and Interconnect ..................................... 146
Santa Gertrudis Creek Phase II – Margarita Under-Crossing .............................................................. 148
Sidewalks – Citywide ........................................................................................................................... 150
Sidewalks – DLR Drive ......................................................................................................................... 152
Sidewalks – Old Town Boardwalk Enhancement ................................................................................ 154
Temecula Elementary School (TES) Pool Renovation ......................................................................... 156
Utility Undergrounding – Citywide ..................................................................................................... 158
PARKS and RECREATION PROJECTS
Children’s Museum Enhancement Project ......................................................................................... 162
Community Services Master Plan ....................................................................................................... 164
Eagle Soar Splash Pad Control System Renovation ............................................................................ 166
Flood Control Channel Reconstruction and Repair............................................................................. 168
Parks Improvement Program .............................................................................................................. 170
Park Restrooms Renovations, Expansion, and Americans with Disabilities Act (ADA) Improvements............. 172
Playground Equipment Enhancement and Safety Surfacing .............................................................. 174
Ronald Reagan Sports Park Restroom Expansion and Renovation ..................................................... 176
Ronald H. Roberts Temecula Public Library Enhancement and Renovation ...................................... 178
Sports Court Resurfacing .................................................................................................................... 180
Sports Field Lighting Light Emitting Diode (LED) Conversion .............................................................. 182
5
Capital Improvement Program
Fiscal Years 2020-24
TABLE OF CONTENTS (continued)
SARDA / HOUSING PROJECTS
Affordable Housing ............................................................................................................................. 186
FUTURE YEARS PROJECTS
Circulation...........................................................................................................................................189
Infrastructure/Other ........................................................................................................................... 189
Parks and Recreation .......................................................................................................................... 189
APPENDIX
Glossary of Terms................................................................................................................................19
Index....................................................................................................................................................1
.......................................................................................1
6
Capital Improvement Program
Fiscal Years 2020-24
T
RANSMITTAL MESSAGE
Honorable Mayor and Members of the City Council:
It is with great pleasure that I submit the City of Temecula’s Capital Improvement Program (CIP)
Budget for Fiscal Years 2019-20through 2023-24. This document is the result of several
internal CIP review meetings, which incorporates previous City Council direction, and analyzes
each project for feasibility, necessity, funding sources, and timing. All departments were
involved in the process and contributed significantly to the discussions, resulting in a
comprehensive proposed Five-Year Capital Improvement Program. All projects presented in
this five-year budget have been carefully programmed to ensure the community’s capital
improvement needs are met both now and in the future.
CITY OF TEMECULA PROFILE AND DEMOGRAPHICS
The City of Temecula is a dynamic, fast growing community, which extends across 30 square
miles of gently rolling hills and comprises approximately 113,826 residents of various cultural
backgrounds. The City maintains approximately 90% of the 345 total miles of streets within its
boundaries. Additionally, the City has 41 parks on 330 developed acres, providing extensive
recreational opportunities for both Temecula citizens and surrounding communities. The
Temecula Valley Unified School District provides 32 schools for 27,991 students in Kindergarten
th
grade. The City of Temecula focuses on community needs and quality of life
through 12
through its day-to-day operations, a proactive economic development element, and by meeting
the City’s capital improvement needs. Temecula’s residentsenjoy one of the finest lifestyles
SouthernCaliforniahas to offer. Environmental and residential factors produce a beautiful
setting that attracts young, well-educated families to fashionablehomes that are inexpensive
by Southern California standards. Geography contributes to the City’s population and retail
growth from San Diego and Orange Counties.Temecula’s leadership has approached economic
growth from qualitative standpoint, providing Temecula with a favorable share of the region’s
higher paying and high technology career opportunities. The City’s average income levels are
higher than the surrounding region, the educational performance of its young people is above
the State average, and Temecula has been recognized as one of Nation’s safest cities.
ECONOMIC DEVELOPMENT POLICY
Temecula has experienced solid economic growth over the past year with steady expansion of
several major circulation, infrastructure, and parks and recreation projects. The City continues
its efforts to grow and sustain the economy of Temecula through business attraction, retention,
workforce development, higher education, and tourism. The City partners with the Temecula
Valley Chamber of Commerce, Temecula Valley Convention and Visitors Bureau (Visit Temecula
7
Capital Improvement Program
Fiscal Years 2020-24
Valley), Small Business Development Center, Riverside County Economic Development Agency,
Riverside County Workforce Development Agency, and the Economic Development Coalition of
Southwest California. These alliances leverage the assets and resources necessary to reinforce
our market. The City’s economic development policy centers on providing a broad range of
infrastructure improvements to encourage both tourism and businessinvestment in the City of
Temecula. Some of the more favorable attributes of Temecula includes a business friendly
atmosphere, a high standard of living and high quality of life, a well-educated workforce,
competitive housing prices, access to the major ports of Southern California, convenient
freeway access, and centralized location between Los Angeles, San Diego, and Orange counties.
By providing a commercial and residential core that is attractive, of high quality, and possesses
adequate infrastructure to support the residential, business and tourist population, Temecula
has quickly become a destination location for a broad spectrum of the population.
Measure S was approved by the voters onNovember 2016 (one-cent Transactions and Use Tax
for the City). The measure was approved based on the commitment to maintain 9-1-1
emergency response times, prevent cuts to local paramedic/police/fire protection, school
safety patrols, youth/after-school, senior and disabled services; improvement freeway
interchanges/reduce traffic and provide for other general services.
CAPITAL BUDGET POLICY
The purpose of the CIP Budget document is to serve as a planning tool, which coordinates the
financing and scheduling of major projects undertaken by the City. The CIP Budget document
has been prepared in accordance with generally accepted accounting principles. This document
is dynamic and, consequently, must be revised annually to address changing needs, priorities,
and financial conditions. The capital improvements presented in this document are theCity’s
major projects, which exceed $30,000 in cost, have long-term life spans, and are generally non-
recurring. Each project cost is identified based on current year estimates, and future projected
costs appropriations are increased by a 2% inflationary index. Future operating and
maintenance costs necessary to staff or maintain the capital project are included in the City of
Temecula’s Annual Operating Budget. These project types include land and right-of-way
acquisition, design, construction or rehabilitation of public buildings or facilities, public
infrastructure design and construction, park design and construction, and redevelopment
projects.
The City’s goal in providing a CIP Budget is to develop a multi-year plan for capital
improvements, update it annually, and follow through with all capital improvements in
accordance with the plan. In determining the relative merit of a proposed project, key
management team members evaluate projects for feasibility, community enhancement,
infrastructure, historic preservation, and safety.
8
Capital Improvement Program
Fiscal Years 2020-24
PLAN DEVELOPMENT
The City Council adopted the Temecula 2030 Quality of Life Master Plan (QLMP) in October
2011. The QLMP defines the strategic priorities of Temecula’s residents, and partners for the
City‘s next twenty years. It reflects the vision for the City’s future, and commits the City to a
performance-based process to accomplish those goals. This plan was developed by engaging
residents, businesses, local institutions and regional partners in an inclusive process. The QLMP
provides the framework for the City’s Strategic Budgeting activities. The City Council has set
priorities and guided staff in developing six Core Values upon which to focus time and resources
(as identified in the QLMP). These areas include:
1.Healthy and Livable City
2.Economic Prosperity
3.A Safe and Prepared Community
4.A Sustainable City
5.Transportation Mobility and Connectivity
6.Accountable and Responsive City Government
All projects presented in the CIP are carefully programmed in concurrence with the City’s
Quality of Life Master Plan to ensure the community’s capital improvement needs are met both
now and in the future. The project sheets include the specific Core Value(s) each project
satisfies. The framework for the CIP is further defined in the City’s CIP fiscal policy to provide a
structure within which fiscal decisions can be made and to optimize all available resources
toward the accomplishment of the City’s Core Values as defined in the QLMP.
This CIP budget document was developed by incorporating input from key management team
members based on community comments and feedback received throughout the year.
Through severalinternal CIP reviewmeetings, the team then identified and evaluated
community needs in the areas of roads/streets, bridges, public buildings, and parks and
recreation facilities. Each proposed project was reviewed and discussed to ensure funding,
timing, and necessity.All projects areevaluated by the City’s Planning Commission to ensure
consistency with the provisions of the City of Temecula General Plan, while considering the
City’s long-term vision as developed by the City Council. The Circulation, Infrastructure, and
Parks and Recreation projects are alsoreviewed by the Public/Traffic Safety Commissionand
the Parks and Recreation Commission.
Projects in this document have been scheduled in each of the five fiscal years based on
community needs, as determined by the City Council and availability of funding. Priority
rankings in each major category (Circulation, Infrastructure/Other, Parks and Recreation, and
9
Capital Improvement Program
Fiscal Years 2020-24
Successor Agency to the Temecula Redevelopment Agency/Housing) have been assigned in
accordance with the priority guidelines as shown on the Description of Priorities page herein.
Additionally, since many projects in the CIP are conceptual in nature, the general outline for
cost estimates provided in last year’s CIP document wererevised and utilized as shown on the
Parameters for CIP Budget Cost page herein.
The Fiscal Years 2020-24 CIP identifies a total of sixty eight (68) projects, consisting of twenty
two (22) Circulation projects with cost to complete totaling $345,956,136; the
Infrastructure/Other section consists of thirty four (34) projects totaling $61,363,635; the Parks
and Recreation section consists of eleven (11) projects totaling $15,097,397; and the Successor
Agency to the Temecula Redevelopment Agency (SARDA)/Housing) section consists of one (1)
project totaling $12,853,720. The total cost to complete all of the projects is $435,270,888 of
which $118,035,382 is programmed for Fiscal Year 2019-20. Also of note, in this document, is
$102,797,737 in projects with unspecified funding sources. These projects have been identified
as necessary infrastructure for the City, and will require that funding sources be identified
before the projects can commence.
Type of Total Costto
Number of
Projects Project Complete
22 Circulation $345,956,136
34Infrastructure/Other61,363,635
11Parks and Recreation 15,097,397
1SARDA/Housing 12,853,720
68 $435,270,888
CIP BUDGET INFORMATION PROVIDED
Information included in this document isas follows:
Description of Levels provides the guidelines used in prioritizing projects.
Parameter for CIP Budget Cost Estimates providesstandard estimating criteria for
project costs.
Description of Revenue Sources provides a general description of sources of revenue for
the CIP.
Projected Revenue Summary provides five-year projections for each of the major
sources of funds to be utilized for capital improvements.
10
Capital Improvement Program
Fiscal Years 2020-24
Project Summary by Type of Project provides summary information of the Capital
Improvement projects by the type of project and priority.
Comparison Between Projected Revenue and Costs provides summary information of
costs versus revenue in each Fiscal Year by source of funds.
Project Description Sheets provides a Project Description, Benefit/Core Value, Project
Status, Department, Level, Project Cost (including the fiscal year or years in which the
project is anticipated to be constructed), Source of Funds, Future Operation &
Maintenance Costs, and a location map. Project description categories include
Circulation, Infrastructure/Other, Parks and Recreation, and SARDA/Housing.
Future Years Projects provide an opportunity for long range planning that exceeds the
five-year period in each of the major groupings (Circulation, Infrastructure, Parks and
Recreation, Redevelopment and Affordable Housing).
CONCLUSION
The revenue estimates, although conservative, are strictly estimates. The actual amount of
funds available for construction will vary based upon the state of the economy. The City’s
major revenue sources are primarily received from various County programs, State grant
programs, and Special Districts. The City Council will be updated throughout the year on the
status of projects and corresponding revenue sources.
T
he Fiscal Years 2020-24 Capital Improvement Program is a result of a total team effort of both
City staff and City Council. There are forty (40) projects which are scheduled to begin design
and twenty eight (28) to begin construction and/or be completed in Fiscal Year 2019-20. These
projects are intended to enhance the safety and quality of life for all citizens in the City of
Temecula. I would like to thank staff and the City Council for all of the contributions that were
made in developing the capital budget that will serve as the footprint for Temecula’s future.
Sincerely,
Aaron Adams
City Manager
11
RESOLUTION OF THE CITY COUNCIL
12
RESOLUTION OF THE CITY COUNCIL (CONT.)
13
RESOLUTION OF THE CITY COUNCIL (CONT.)
14
RESOLUTION OF THE CITY COUNCIL (CONT.)
15
Capital Improvement Program
Fiscal Years 20-2
CSMFO CERTIFICATE OF AWARD
16
Capital Improvement Program
Fiscal Years 2020-24
CITY ORGANIZATIONAL CHART
Citizens of Temecula
City Council
Commissions
City Attorney
City Manager
Community
City Clerk
Development
Information
Technology/Support
Finance
Services
Community
Public Works
Services
Human ResourcesPolice / Fire
\[Contract\]
Emergency
Economic
Management
Development
17
Capital Improvement Program
Fiscal Years 2020-24
DESCRIPTION OF LEVEL RANKING
AND FUTURE YEARS PROJECTS
LEVEL I:T
he project is urgent and must be completed as soon as feasible. Failure
to address the project may impact the health, safety, or welfare of the
community or have a potential significant impact on the financial well-
being of the City. The project must be initiated or financial opportunity
losses may result.
LEVEL II: The project is important and addressing it is necessary. The project
impacts safety, law enforcement, health, welfare, economic base, quality
of life, and has been identified as a priority in the Quality of Life Master
Plan.
LEVEL III: The project will enhance quality of life and will provide a benefit to the
community. Completion of the project will improve the community by
providing cultural, recreational, and/or aesthetic value, or is deemed as a
necessary improvement to a public facility.
FUTURE YEARS
PROJECTS:The project will be an improvement to the community, but does not
necessarily need to be completed within a five-year capital improvement
program time frame.
18
Capital Improvement Program
Fiscal Years 2020-24
PARAMETERS FOR CIP BUDGET COST ESTIMATES
ADMINISTRATION COSTS AS A PERCENTAGE OF ACQUISITION COSTS
ESTIMATED TOTAL PROJECT COSTS (vacant, per square foot)
Estimated Total Project Administration Costs
Estimated Cost
Property Zoning
(vacant, per sq. ft.)
CostsPercentage
Over $10 Million 7% Industrial Property $12.00
$5 Million to $10 Million10%Commercial/Retail/Office$20.00
$1 Million to $5 Million 15%Commercial – Old Town $50.00
$500,000 to $1 Million20%Rural/Residential$0.50 - $2.00
$100,000 to $500,00025%Flood Plain $0.57
Less than $100,000 30%Multi-Family Residential $5.00
Single Family Residential $3.00
DESIGN COSTS AS A PERCENTAGE OF
CONSTRUCTION COSTS
TOTAL CONSTRUCTION COSTS
Estimated Total Design Costs
Building Type Estimated Cost
Construction Costs Percentage
Over $10 Million 7% Assembly Use Building (per sq. ft.) $300
$5 Million to $10 Million 10% Office (per sq. ft.) $300
$1 Million to $5 Million 15% Multi-Family Housing (per sq. ft.) $175
$500,000 to $1 Million18%Community Parks (per acre)$340,000
$100,000 to $500,00020% Neighborhood Parks (per acre) $250,000
Less than $100,000 25%
Parameters for the CIP cost estimates are adjusted annually to reflect current economic
conditions and cost of living increases. Future projected cost appropriations are increased by 2%
inflationary index. Future operating and maintenance costs are estimated based on the potential
staffing levels and/or the ongoing maintenance needs of the project and are included in the City
of Temecula’s Annual Operating Budget.
19
Capital Improvement Program
Fiscal Years 2020-24
DESCRIPTION OF REVENUE SOURCES
Assembly Bill 2766 (AB 2766)
State funds that are available to implement programs and projects that reduce air pollution from
motor vehicles.
Capital Financing
Funding available through financing proceeds to be used for Capital Improvements.
Community Development Block Grant (CDBG)
The Federal Department of Housing and Urban Development (HUD) provides funds through the
Community Development Block Grant Program (CDBG) for local community development, housing
activities, and public services. The primary objective of the CDBG Program is the development of
viable communities by providing decent housing, a suitable living environment, and expanded
economic opportunities primarily benefitting low- and moderate-income persons and
neighborhoods.
Community Facilities District (CFD)
A tool that allows the City to construct desired and authorized public improvements with costs of
the projects paid for by the benefitting properties within the boundaries of a designated area. The
costs are then financed through the issuance of bonds payable over a period of years.
Department of Water Resources (DWR) Proposition 84
Funding made available from the State of California Department of Water Resources funding from
the Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection
Bond Act of 2006. Proposition 84 Integrated Regional Water Management (IRWM) Implementation
Grant, California Public Resources Code Section 75026 of Divisions 26.5 of the California Water Code
(CWC).
Development Impact Fees (DIF)
Fees generated by development applications to offset the effect of development to include
infrastructure, fire protection, public facilities and services, libraries, roads, schools, parks, traffic
signal mitigation and open space. Fees are determined by the cost of the project at the time of
application.
Facilities Replacement Fund
This Fund was established to accumulate resources necessary to replace future facilities,
systems, equipment and fixtures.
General Fund
City General Funds retained for capital improvement projects.
20
Capital Improvement Program
Fiscal Years 2020-24
DESCRIPTION OF REVENUE SOURCES (continued)
ighway Safety Improvement Program
H
The Highway Safety Improvement Program (HSIP), codified as Section 148 of Title 23, United
States Code (23 U.S.C §148), is a core federal-aid program to States for the purpose of achieving
a significant reduction in fatalities and serious injuries on all public roads.
Highway Bridge Program
This program is funded by Federal Highway Administration (FHWA) and authorized by United
States Code (USC) Title 23, Section 144. The purpose of the Program is to replace or rehabilitate
public highway bridges over waterways, other topographical barriers, other highways, or railroads
when the State and the Federal Highway Administration determine that a bridge is significantly
important and is unsafe because of structural deficiencies, physical deterioration, or functional
obsolescence.
Infrastructure For Rebuilding America (INFRA)
The INFRA program provides dedicated, discretionary funding for projects that address critical
issues facing our nation’s highways and bridges.
Measure A (Local Streets and Roads)
Riverside County’s half-cent sales tax to fund transportation projects to improve local streets and
roads, major highways, commuter rail, and public transit throughout Riverside County.
Measure S
Pursuant to Ordinance 16-06, on November 8, 2016, the people of Temecula approved a local 1%
Transactions and Use Tax, effective on April 1, 2017, to maintain 9-1-1 emergency response times,
prevent cuts to local paramedic, police, fire protection, school safety patrols, youth/after-school,
senior, disabled services, improve freeway interchanges, reduce traffic and provide for other
general services.
Mobile Source Air Pollution Reduction Review Committee (MSRC)
The MSRC is the Mobile Source Air Pollution Reduction Review Committee, established under
state law (AB 2766) whose sole mission is to fund projects that reduce air pollution from motor
vehicles within the South Coast Air District in Southern California.
Public Art Fund
Public Artwork enhances the quality of life for individuals living and working in the Temecula. This
fund was adopted by City Council for design, acquisition, installation, improvement, maintenance
and insurance of public artwork displayed on City property; offering of performing arts programs
on City property for the community; and art education programs on City property for the
community (provided, however, that not more than five percent of the fund’s annual budget shall
be used for this purpose).
21
Capital Improvement Program
Fiscal Years 2020-24
DESCRIPTION OF REVENUE SOURCES (continued)
Quimby
The City’s park-in-lieu or park development fee is assessed under provisions of the Subdivision
Map Act which allows the City to require the dedication of land or the payment of a fee in lieu of
land to be used for the purchase (or development) of park property.
Reimbursements/Other
Funding made available from other agencies or sources on a reimbursement, donation, and
contribution basis. The actual agreement states the conditions of monies specific to a particular
project.
Safe, Accountable, Flexible, Efficient, Transportation Equity Act - Legacy for Users
(SAFETEA–LU)
Signed into law on August 10, 2005, and provides for highways, highway safety, and public
transportation to improve safety, reduce traffic congestion, and other activities related to solving
transportation problems. This new program takes off where STP, TEA-21, and ISTEA left off.
Senate Bill 1 (SB1)/Road Repair and Accountability Act (RMRA)/Active Transportation Program
(ATP)
The State of California imposes per gallon excise and sales taxes on fuel sales, as well as
registration taxes on motor vehicles, for allocation to agencies for transportation purposes. In
2017, the State established the Road Repair and Accountability Act (RMRA) to allocate a greater
share of additional monies for transportation purposes.
Senate Bill 621
Represents a regional organization made up of tribal governments primarily within Riverside and
San Bernardino counties. Tribal Alliance of Sovereign Indian Nations (TASIN) member tribes
contribute a percentage of their gaming revenues to the Indian Gaming Special Distribution Fund
(SDF), as established by the State Legislature, to offset the impacts of Indian gaming on public
services and infrastructure.
Senate Bill 821
SB 821, the Bicycle and Pedestrian Facilities Program, is provided through the Transportation
Development Act (TDA), funded through a ¼ cent of the general sales tax collected statewide.
The TDA provides two major sources of funding for public transportation: the Local
Transportation Fund (LTF) and the State Transit Assistance (STA). The LTF provides funding for
essential transit and commuter rail services, SB 821 and planning. Each year, two percent of the
LTF revenue is made available for use on bicycle and pedestrian facility projects through the SB
821 program.
22
Capital Improvement Program
Fiscal Years 2020-24
DESCRIPTION OF REVENUE SOURCES (continued)
State Transportation Improvement Program (STIP)
The State Transportation Improvement Program (STIP) is the biennial five-year plan adopted by
the California Transportation Commission (CTC) for future allocations of certain State
transportation funds for State highway improvements, intercity rail, and regional highway and
transit improvements. State law requires the Commission to update the STIP biennially, in even-
numbered years, with each new STIP adding two new years to prior programming commitments.
State Highway Operation Protection Program & Minor Program (SHOPP)
State Highway System’s Program that funds repair and preservations, emergency repairs, safety
improvements and some highway operational improvements.
Surface Transportation Program (STP)
Federal funds available for local agencies to improve the safety and efficiency of the local
transportation system.
Tax Allocation Refunding Bonds Series 2017A and 2017B
As of January 31, 2012, the Redevelopment Agency of the City of Temecula has been dissolved
and the City has elected to become the Successor Agency. The Successor Agency will be
responsible for the winding down of the remaining activities of the dissolved Redevelopment
Agency. These remaining activities include completing affordable housing and infrastructure
projects that are funded with tax allocation bonds issued by the former redevelopment agency.
The Series 2017A and 2017B Refunding Bonds were issued in 2017 to refinance 2002, 2006, 2007,
2010, and 2011 Tax Allocation Bonds to provide financing for low and moderate income housing
projects. The outstanding bonds will be repaid in full in 2038. Monies to pay bond debt service
is requested from the State and disbursed by the County from the Trust Fund established to
accumulate tax increment generated by the former Temecula Redevelopment Agency area.
Technology Replacement Fund
This fund is used for the replacements of computers, system Software and all other Information
Technology equipment.
Transportation Uniform Mitigation Fee (TUMF)
Multi-jurisdictional development impact fee paid for by new development to provide the
transportation infrastructure necessary to accommodate new development.
WRCOG-BEYOND Framework Fund Program
Local assistance funding program for Economic Development and Sustainability Projects.
23
Capital Improvement Program
Fiscal Years 2020-24
PROJECTED REVENUE SUMMARY
Available Projected Projected Projected Projected Projected Projected
Fund2019-20202020-20212021-20222022-20232023-2024Funds
FUNDING SOURCEBalanceRevenueRevenueRevenueRevenueRevenueAvailable
Assembly Bill 2766
$ 133,576267,322$ 136,245$ 138,967$ 141,743$ 144,575$ 962,428$
Capital Financing
6,405,000$6,405,000
Community Development Block Grant (CDBG)
323,660943,361 323,660 323,660 323,660 2,238,001$
Facilities Replacement Fund
300,000300,000 300,000 300,000 300,000 1,500,000$
General Fund
642,0778,426,877 100,000 1,000,000 1,000,000 11,168,954$
Measure S
13,109,72815,403,001 4,558,640 7,574,577 2,052,000 1,842,000 44,539,946$
Public Art
128,99227,280 70,823 41,138 9,255 8,127 285,615$
Road Maintenance and Rehabilitation Account(RMRA)
1,873,3311,105,403 1,918,154 1,956,517 1,995,647 2,034,777 10,883,829$
Technology Replacement
763,534$763,534
Community Facilities Districts
Roripaugh Community Facilities District #03-02
15,940,793$15,940,793
Roripaugh Community Facilities District #16-01
6,585,898$6,585,898
Wolf Creek Community Facilities District
268,073$268,073
Development Impact Fees (DIF)
Corporate Facilities
-307,416210,033141,37750,11044,103$753,039
Fire Facilities
46,734185,321154,944105,76126,97826,809$546,547
Library Facilities
937,040172,005230,000179,06980,73871,458$1,670,310
Open Space and Trails
576,556137,453200,919145,18337,57637,576$1,135,263
Parks and Recreation
496,485471,570689,310498,092128,918128,918$2,413,293
Police Facilities
68,495176,135155,41196,04511,38611,288$518,760
Quimby
1,466,962211,412321,9358,8358,835-$2,017,979
Street Improvements
2,103,7173,902,7411,864,0751,008,26184,90978,111$9,041,814
Traffic Signals
198,979317,968266,717144,14112,01111,057$950,873
Measure A Programs
Measure A (Local Streets and Roads)
1,242,4604,459,049 1,283,089 1,325,135 1,368,387 1,412,829 11,090,949$
Grants
Department Water Resources Grant Prop 84 (DWR)
426,029$426,029
Highway Bridge Program(HBP)
88,530575,445 7,543,641 8,207,616$
Highway Safety Improvement Program(HSIP)
2,605,910$2,605,910
Infrastructure For Rebuilding America (INFRA)
50,000,00050,000,000$
Mobile Source Air Pollution Reduction Review Committee
141,000$141,000
SAFETEA-LU
931,360931,360$
SB1 ATP Augmentation
1,502,0004,430,000 5,932,000$
StateHighwayOperation Protection Program&Minor Program
(SHOPP)
1,250,000$1,250,000
State Transportation Improvement Program (STIP)
47,600,00047,600,000$
Surface Transportation Program (STP)
1,810,302$1,810,302
Successor Agency to the Temecula
Redevelopment Agency
Tax Allocation Refunding Bonds Series 2017B
12,853,720$12,853,720
Redevelopment Property Tax Trust Fund750,000$750,000
Reimbursements/Other
Developer Contribution
-934,129144,649$1,078,778
Lease Agreement
737,700$737,700
Pechanga Tribe Contributions4,225,519$4,225,519
Rancho California Water District (RCWD)
518,322$518,322
Riverside County164,904$164,904
Settlement Proceeds
500,000$500,000
Shea Homes Reimbursement
92,510$92,510
Senate Bills
Senate Bill 621 1,426,783$1,426,783
Senate Bill 821223,300$223,300
Transportation Uniform Mitigation Fee (TUMF)
Community and Environmental Transportation Accountability
Program (CETAP/RCTC)
681,514$681,514
Western Riverside Council of Governments (WRCOG)
6,668,036495,923 53,302,980 60,466,939$
TOTAL REVENUE
$ 51,003,70079,814,167$ 61,403,845$ 74,528,322$ 60,935,133$ 6,619,937$ 334,305,104$
25
Fiscal Years 2020-24
Capital Improvement Program
26
Fiscal Years 2020-24
Capital Improvement Program
27
Fiscal Years 2020-24
Capital Improvement Program
28
Fiscal Years 2020-24
Capital Improvement Program
29
Fiscal Years 2020-24
Capital Improvement Program
30
Fiscal Years 2020-24
Capital Improvement Program
31
Fiscal Years 2020-24
Capital Improvement Program
32
Fiscal Years 2020-24
Capital Improvement Program
33
Capital Improvement Program
Fiscal Years 2020-24
EXPENDITURE SUMMARY BY PROJECT
PARKS and
RECREATION
2%
SARDA / HOUSING
2%
INFRASTRUCTURE
9%
CIRCULATION
87%
PROJECTED EXPENDITURES: $435,270,888
34
Capital Improvement Program
Fiscal Years 2020-24
CIP MAJOR REVENUE SOURCES
SARDA
STATE
3%
21%
FEDERAL
SPECIAL
7%
DISTRICTS
7%
OTHER
0%
DIF
7%
GENERAL &
MEASURE S
FUNDS
11%
COUNTY
44%
PROJECTED REVENUES:$334,305,104
35
Fiscal Year 2020-24
Capital Improvement Program
36
Fiscal Year 2020-24
Capital Improvement Program
37
Fiscal Year 2020-24
Capital Improvement Program
38
Fiscal Year 2020-24
Capital Improvement Program
39
Fiscal Year 2020-24
Capital Improvement Program
40
Fiscal Year 2020-24
Capital Improvement Program
41
42
Capital Improvement Program
FiscalYears 2020-24
CIRCULATION PROJECTS
Table of Contents
Abbott Corporation Roadway Improvements.......................................................................4
Butterfield StageRoad Extension........................................................................................4
Cherry Street Extensionand Murrieta Creek Low-Flow Crossing to Diaz Road...................4
CitywideBuffered Bike Lane Striping …………………………………………………………….
Diaz Road Expansion (Rancho California Roadto Cherry Street).......................................
Emergency Vehicle Pre-Emption Upgrade Program–Citywide..........................................5
Flashing Beaconsand Speed Advisory Signs.....................................................................5
French Valley Parkway / Interstate15 Improvements–Phase II.........................................5
French Valley Parkway / Interstate15 Improvements–Phase III........................................
Interstate 15 Congestion Relief...........................................................................................
Interstate15 / State Route79 SouthUltimate Interchange..................................................6
Mediansand Parkways–Citywide......................................................................................6
Murrieta Creek BridgeatOverland Drive.............................................................................6
Nicolas Road Extension and Improvement..........................................................................
Overhead Street NameSign Replacement Program-Citywide..........................................
PavementRehabilitation Program-Citywide......................................................................7
PechangaParkway Widening.............................................................................................7
Traffic Signal Equipment Enhancement Program–Citywide...............................................7
Traffic Signal Installation–Citywide....................................................................................
Traffic Signal–Park andRide AccessImprovements.........................................................
Traffic Signal System Upgrade............................................................................................8
Ynez Road Improvements...................................................................................................8
43
Abbott Corporation Roadway Improvements
Circulation Project Location
79
15
79
15
Legend
CIP Area
0420000Feet
The map AbbottCorp.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
44
Capital ImprovementProgram
Fiscal Years2020-24
ABBOTT CORPORATION ROADWAY IMPROVEMENTS
Circulation Project
ProjectDescription:InaccordancewiththeOwnerParticipationAgreement(OPA)betweenAbbottandCityofTemecula,initially
recordedin2002,thisprojectincludesthedesignandconstructionofroadwayimprovementsonMotorCarParkway,YnezRoad,
MargaritaRoad,andSolanaWay.ThisprojecthasbeenincludedontheCityofTemecula'sRecognizedObligationPayment
Schedule (ROPS) for the Successor Agency to the Redevelopment Agency (SARDA).
Benefit/CoreValue:ThisprojectimprovestrafficcirculationonMotorCarParkway,YnezRoad,MargaritaRoad,andSolanaWay.
In addition, this project satisfies the City’s Core Values of Transportation Mobility and Connectivity and Economic Prosperity.
Project Status: This project has not yet started.
Department: Public Works/Planning - Account No. 210.65.620Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Construction $750,000
$750,000
Totals$-$-$-$-$-$-$ 750,000$750,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
RPTTF- Redevelopment Property
Tax Trust Fund
$ 750,000$750,000
Total Funding:$-$-$-$-$-$-$ 750,000$750,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
45
Butterfield Stage Road Extension
Circulation Project Location
79
15
79
U
DR
A
Legend
CIP Area
City Boundary
0420000Feet
The map ButterfieldStage.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
46
Capital ImprovementProgram
Fiscal Years2020-24
BUTTERFIELD STAGE ROAD EXTENSION
Circulation Project
ProjectDescription:ThisprojectincludesthecompletedesignandconstructionoffourlanesonButterfieldStageRoad(fromRancho
CaliforniaRoadtoMurrietaHotSpringsRoad),fourlanesonMurrietaHotSpringsRoad(fromButterfieldStageRoadtotheCitylimits),and
two lanes on Calle Chapos (from Butterfield Stage Road to Walcott Road), totaling approximately 3.2 miles of road.
Benefit/CoreValue:Thisprojectimprovestrafficcirculationbyprovidingacrucialnorthandsoutharterialroadontheeasternsideofthe
City. In addition, this project satisfies the City’s Core Values of Transportation Mobility and Connectivity.
ProjectStatus:PhaseIandPhaseIIofthisproject(MurrietaHotSpringsRoadtoLaSerena)havebeencompleted.PhaseIII(LaSerenato
Rancho California Road) is scheduled to be completed during Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.723PW09-02 & PW15-11Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$2,391,135$131,927$2,523,062
Acquisition
$ 15,006,728$1,193,936$16,200,664
Construction
$ 13,137,631$9,480,698$22,618,329
Construction Engineering
$468,762$749,215$1,217,977
Design/Environmental
$782,838$106,066$888,904
Utilities$203$797$1,000
Totals$ 31,787,297$ 11,662,639$-$-$-$-$-$43,449,936
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
CFD #03-02 (Roripaugh Ranch)
$ 30,217,838$ 10,886,903$41,104,741
Reimbursement/Other (EMWD)
$11,622$11,622
Reimbursement/Other (RCWD)
$30,002$518,322$548,324
Reimbursement/Other (Shea
Homes)
$81,298$92,510$173,808
Reimbursement/Other (SCE)
$8,537$8,537
Reimbursement/Other (County of
Riverside)
$164,904$164,904
TUMF
$1,438,000$1,438,000
Total Funding:$ 31,787,297$ 11,662,639$-$-$-$-$-$43,449,936
Future Operation & Maintenance Costs:
2019-202020-212021-222022-232023-24
Note: Assumes that only minor right-of-way acquisitions would be necessary and that all major right-of-way dedications are voluntary.
47
Cherry Street Extension and Murrieta Creek Low Flow Crossing to Diaz Road
Circulation Project Location
48
Capital ImprovementProgram
Fiscal Years2020-24
CHERRY STREET EXTENSION AND MURRIETA CREEK LOW-FLOW CROSSING TO DIAZ ROAD
Circulation Project
ProjectDescription:ThisprojectincludesthedesignandconstructionoftheextensionofCherryStreetfromAdamsAvenuetoDiazRoad,
includinganewlow-flowcrossingofMurrietaCreekatthenortherlyCitylimits.Thisprojectalsoincludesenvironmentalstudiesandpermits,
Encroachment Permit from Riverside County Flood Control and potential for mitigation.
Benefit/CoreValue:ThisprojectimprovestrafficcirculationandaccesstothenortherlyindustrialareawestofMurrietaCreek.Inaddition,this
projectsatisfiestheCity’sCoreValuesofTransportationMobilityandConnectivity.
Project Status: This is a new project
Department: Public Works - Account No. 210.265.524 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 50,000$50,000$ 202,000$ 302,000
Construction
$ 1,364,000$ 1,364,000
Construction Engineering
$ 86,800$ 86,800
Design/Environmental
$ 130,000$ 266,000$ 100,000$ 496,000
MSHCP
$ 68,200$ 68,200
Totals$ -$ -$ 180,000$ 316,000$ 1,821,000$ -$ -$ 2,317,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$ 180,000$ 316,000$ 496,000
(1)
Unspecified
$ 1,821,000$ 1,821,000
Total Funding:$ -$ -$ 180,000$ 316,000$ 1,821,000$ -$ -$ 2,317,000
Future Operation & Maintenance Costs:
2019-202020-212021-222022-232023-24
(1) Project cannot be constructed until a funding source is identified
49
50
Capital ImprovementProgram
Fiscal Years2020-24
CITYWIDE BUFFERED BIKE LANE STRIPING
Circulation Project
ProjectDescription:TheCitywideBufferedBikeLanestripingprojectwillincludedtheinstallationofbufferedbikelinesandgreen
thermoplastic bike legends along various streets and roads throughout the City.
Benefit/CoreValue:Thisprojectwillsupporttheoverallgoalsandobjectives,aspartofourMulti-UseTrailsandBikewaysMasterPlan,
and expand the City's bicycle trail network. This project satisfies the City’s Core Values of Transportation Mobility and Connectivity.
Project Status: This project is estimated to be complete by Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.526Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$35,000$35,000
Construction
$154,000$154,000
Totals$-$-$189,000$-$-$-$-$189,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
AB2766
$56,700$56,700
(1)
Senate Bill 821
$132,300$132,300
Total Funding:$-$-$189,000$-$-$-$-$189,000
Future Operation & Maintenance Costs:
2019-202020-212021-222022-232023-24
(1) SB 821 application in process, project needs to be completed February 2020.
51
Diaz Road Expansion
Circulation Project Location
79
15
79
15
R
A
I
N
R
HOCALIFO
RANC
Legend
CIP Area
City Boundary
0840000Feet
The map DiazRoad.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
52
Capital ImprovementProgram
Fiscal Years2020-24
DIAZ ROAD EXPANSION
(Rancho California Road to Cherry Street)
Circulation Project
Project Description: Converts Diaz Road into a Major Arterial (4 Lanes Divided) classification, between Cherry Street and Rancho California
Road. Improvements will be added to Diaz Road on its current alignment as shown in the Roadway Plan of the General Plan's Circulation
Element. This project includes the design, environmental clearance, right of way acquisition, and construction necessary to complete the 2.2
mile segment.
Benefit / Core Value: This project improves traffic circulation by expanding an important north-south arterial on the west side of the City and
completes a portion of the designated Western Bypass. In addition, this project satisfies the City's Core Value of Transportation Mobility &
Connectivity.
Project Status: This project is estimated to be complete by Fiscal Year 2021-22.
Department: Public Works - 210.265.521 PW17-25 Level: III
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 1,011$ 82,502$ 80,000$ 208,000$ 371,513
Construction
$3,085,000$ 3,085,000
Construction Engineering
$ 385,000$ 385,000
Design/Environmental
$ 1,749$ 568,251$ 570,000
MSHCP
$ 155,000$ 155,000
Totals$ 2,760$ 650,753$ 80,000$-$3,833,000$ -$ -$ 4,566,513
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Street Improvements)
$ 590$ 590
Measure S
$ 2,170$ 80,753$ 80,000$3,337,077$ 3,500,000
(1)
TUMF (WRCOG)
$ 570,000$ 495,923$ 1,065,923
Total Funding:$ 2,760$ 650,753$ 80,000$-$3,833,000$ -$ -$ 4,566,513
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
(1)TUMFZonefundingispursuanttoapprovalofthePublicWorksCommitteetoprogramPAEDandENGtoDiazRoad(designatedWesternBypass).Aftertheapproval
oftheWRCOGExecutiveCommittee,anagreementbetweentheCityandWRCOGwillneedtobeexecuted.AfterthePAEDandENGphasesarecomplete,Citywill
request that any unused funds be reprogrammed to the CON phase.
53
54
Capital ImprovementProgram
Fiscal Years2020-24
EMERGENCY VEHICLE PRE-EMPTION UPGRADE PROGRAM -CITYWIDE
Circulation Project
ProjectDescription:Thisprojectincludestheenhancementandupgradeofemergencyvehiclepre-emptionequipmentat
twenty(20)signalizedintersectionsCitywide.Theprojectincludesupgradeofpre-emptionopticaldetectors,wiring,and
opticalprocessorcards.TherequestedappropriationforFiscalYear2019-20isforupgradingthegateonKahweaRoadto
include pre-emption equipment to allow emergency vehicle access.
Benefit/CoreValue:Thisprojectenhancestrafficsafetyandsupportsthelong-termmaintenanceandrehabilitationofCity
assetsandinfrastructure.Inaddition,thisprojectsatisfiestheCity’sCoreValuesofaHealthyandLivableCity,ASafeand
Prepared Community, and Transportation Mobility and Connectivity.
ProjectStatus:Aprioritylistofprojectlocationshasbeendeveloped,andtheprojectisanticipatedtobecompletedin2020.
The Kahwea Road gate upgrade will be done in Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.522 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 12,000$ 12,000
Construction
$ 196,455$ 143,545$ 340,000
Totals$ 196,455$ 155,545$ -$ -$ -$ -$ -$ 352,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Police Facilities)
$ 196,455$ 155,545$ 352,000
Total Funding:$ 196,455$ 155,545$ -$ -$ -$ -$ -$ 352,000
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
55
56
Capital ImprovementProgram
Fiscal Years2020-24
FLASHING BEACONS AND SPEED ADVISORY SIGNS
Circulation Project
ProjectDescription:ThisprojectmaintainstheCity’sNeighborhoodTrafficCalmingProgram,SchoolAreaSafety,and
ArterialTrafficCalmingbyinstallingflashingbeacons,rectangularrapidflashingbeacons(RRFB)andspeedadvisorysignsto
advisemotoristsoftheschoolzone,crosswalksandspeedlimits.Thisprojectincludessolarpoweredpanels,programmable
timers, chargeable batteries, aluminum poles, and pull boxes.
Benefit/CoreValue:Thisprojectimprovestrafficsafetyonroadways,neighborhoods,andschoolzones.Inaddition,this
projectsatisfiestheCity’sCoreValuesofaHealthyandLivableCity,ASafeandPreparedCommunity,andTransportation
Mobility and Connectivity.
Project Status: The installation of flashing beacons and LED speed limit display signs is ongoing.
Department: Public Works - Account No. 210.265.670 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 2,000$ 1,000$ 1,000$ 1,000$ 1,000$ 1,000$ 7,000
Construction
$ 86,811$ 52,473$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 289,284
Design
$ 2,000$ 1,000$ 1,000$ 1,000$ 1,000$ 1,000$ 7,000
Totals$ 86,811$ 56,473$ 32,000$ 32,000$ 32,000$ 32,000$ 32,000$ 303,284
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Traffic Signals)
$ 81,284$ 81,284
Measure S
$ 5,527$ 56,473$ 32,000$ 32,000$ 32,000$ 32,000$ 32,000$ 222,000
Total Funding:$ 86,811$ 56,473$ 32,000$ 32,000$ 32,000$ 32,000$ 32,000
$303,284
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
57
French Valley Parkway/I-15 Improvements - Phase II
Circulation Project Location
79
O
A
215
CS
T
15
79
15
N
L
H
C
R
15
Legend
CIP Area
City Boundary
0800400Feet
The map FrenchValleyParkway_PhaseII.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
58
Capital ImprovementProgram
Fiscal Years2020-24
FRENCH VALLEY PARKWAY / I -15IMPROVEMENTS -PHASE II
Circulation Project
ProjectDescription:Thisprojectincludesthedesignandconstructionofthetwolanenorthboundcollector/distributerroadsystembeginningnorthof
the Winchester Road Interchange on-ramps and ending just north of the I-15/I-215 junction with connectors to I-15 and I-215.
Benefit/CoreValue:ThisprojectwilladdressandimprovetrafficcirculationintheCity’snorthernareabyprovidingthenorthbound
collector/distributer road system. In addition, this project satisfies the City's Core Value of Transportation Mobility and Connectivity.
Project Status: The environmental re-evaluation and design are estimated to be completed in Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.726 PW16-01 (Ref: PW02-11)Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Administration
$2,346,778$108,306$431,715$227,000$227,000$133,000$3,473,799
Acquisition
$9,393,251$4,039,870$1,540,130$990,000$15,963,251
Caltrans Oversight
$671,000$8,900,000$9,571,000
Construction
$38,950,000$50,000,000$88,950,000
Construction Engineering
$1,330,000$1,330,000
Design/Environmental
$16,061,518$2,004,685$18,066,203
Utilities$1,993$1,993
Totals$27,803,540$6,823,861$1,971,845$50,397,000$50,227,000$ 133,000$-$137,356,246
Prior Years FYE 2019 2019-20
Source of Funds:Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
(1)
General Fund
$3,674,862$561,312$4,236,174
CFD (Harveston)
$1,005,840$1,005,840
DIF(Street Improvements)
$75,360$75,360
Federal Highway
Administration$8,000$8,000
Measure A(Local Streetsand
Roads)
$1,627,914$1,627,914
Measure S
$193,629$260,371$1,971,845$1,865,640$4,291,485
Reimbursements/
$6,000,000$6,000,000
Other(Land Donation)
$671,000$931,360$1,602,360
SAFETEA-LU
$37,600,000$37,600,000
STIP Augmentation
(2)
STIP$10,000,000$10,000,000
(3)
TUMF(RCTC)$2,343,000$2,343,000
(4)
TUMF(WRCOG)$8,552,988$2,536,872$11,089,860
(5)
TUMF(WRCOG)
$3,471,937$246,807$3,718,744
(6)
TUMF(WRCOG)
$59,015$1,865,985$1,925,000
(7)
TUMF (CETAP/)$790,995$681,514$1,472,509
(8)
INFRA$50,000,000$50,000,000
(9)
Unspecified
$227,000$ 133,000$360,000
Total Funding:$27,803,540$6,823,861$1,971,845$50,397,000$50,227,000$ 133,000$-$137,356,246
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
GeneralFund Includes Required Contribution match for TUMF(CETAP/RCTC) funds.
State Transportation Improvement Program -2014 RCTC Call for projectsas approved by the Commission on November 13, 2013($10,000,000).
TUMF (RCTC)- Regional funding is pursuant to RCTC Agreement No. 06-72-048-00 fora total of $7,517,000($5,517,000-ROW; $2,000,000-PS&E). $200,000 City Match,
Phase I expended $3,174,000-ROW; $2,000,000 PS&E; $200,000 City Match. Phase II expended $2,343,000 ROW.
TUMF (WRCOG) - TUMF Zone funding is pursuant to WRCOG AgreementNo. 06-SW-TEM-1079 fora total of $11,575,000 reduced to $11,451,875($975,752-PA&ED;
$8,801,875-PS&E; $1,674,248-ROW) for Phase I and Phase II.
TUMF (WRCOG) - TUMF Zone funding is pursuant to WRCOG AgreementNo. 05-SW-TEM-1064 for $4,078,000 reducedto $4,043,000 ($108,724 PA&ED;3,934,296 PS&E) for
Phase I and Phase II.
TUMF (WRCOG) - TUMF Zone Funding is pursuant to WRCOG Agreement No. 05-SW-TEM-1064 for $1,925,000-ROW. No expenditures for Phase I.
TUMF (CETAP/RCTC) - Funding is pursuant to the RCTC Agreement No. 17-73-007-00 in the amount of $1,472,509($673,562 ROW; $798,947 DESIGN; $106,603 City
Applied for U.S. Department of Transportation Infrastructure for Rebuilding America (INFRA) Grant.
Project cannot be constructed until a funding source is identified.
59
French Valley Parkway/I-15 Improvements - Phase III
Circulation Project Location
R
B
P
S
79
C
A
215
15
15
79
C
R
I
15
E
S
Legend
D
D
R
CIP Area
City Boundary
0800400Feet
The map FrenchValleyParkway_PhaseIII.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
60
Capital ImprovementProgram
Fiscal Years2020-24
FRENCH VALLEY PARKWAY / I -15IMPROVEMENTS -PHASE III
Circulation Project
ProjectDescription:ThisprojectincludesthedesignandconstructionoftheFrenchValleyParkwayInterchangeandthesouthbound
collector/distributor road system.
Benefit/CoreValue:ThisprojectwilladdressandimprovetrafficcirculationintheCity’snorthernareabyprovidingafullservice
interchangewithonandofframpsinbothdirections.Inaddition,thisprojectsatisfiestheCity’sCoreValueofTransportationMobilityand
Connectivity.
Project Status: Based on funding availability, the design will begin once construction is complete for Phase II of the project.
Department: Public Works - Account No. 210.265.728 Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsTotal Project Cost
Administration
$100,000$1,268,000$1,368,000
Acquisition
$ 80,000$ 8,400,000$8,480,000
Caltrans Oversight
$ 15,200,000$15,200,000
Construction
$ 102,500,000$102,500,000
Engineering
$ 2,050,000$ 2,050,000
Design/Environmental
$ 10,460,000$10,460,000
Totals$-$180,000$-$-$-$ 139,878,000$-$140,058,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedTotal Project Cost
General Fund
$ 30,000$30,000
Measure S
$150,000$150,000
(1)
TUMF (WRCOG)
$ 9,822,980$9,822,980
(2)
TUMF (WRCOG)
$ 43,480,000$43,480,000
(3)
Unspecified
$ 86,575,020$86,575,020
Total Funding:$-$180,000$-$ -$ -$ 139,878,000$-$ 140,058,000
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
(1)TUMF (WRCOG) - TUMF Zone Funding is eligible for construction of Winchester Interchange pursuant to 2009 Nexus-$9,822,980.00
(2)TUMF (WRCOG) - TUMF Zone Funding is eligible for construction of French Valley Interchange pursuant to 2009 Nexus-$43,480,000.00.
(3)The implementation for this project extends beyond FY 2022-23. Project cannot be constructed until a funding source is identified.
61
I-15 Congestion Relief
Circulation Project Location
79
15
79
15
S
15
Legend
CIP Area
City Boundary
0840000Feet
The map I-15CongestionRelief.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
62
Capital ImprovementProgram
Fiscal Years2020-24
I-15 CONGESTION RELIEF
Circulation Project
ProjectDescription:Thisprojectincludesthedesignandconstructionofasingleauxiliarylane,northboundInterstate15(I-15)connectingthe
Temecula Parkway on-ramp to the Rancho California Road off-ramp.
Benefit/CoreValue:ThisprojectprovidesanoperationalimprovementtorelievecongestiononnorthboundI-15.Itrepresentsoneofseveral
operationalimprovementsidentifiedbytheMoveI-15RegionalTaskForcetoaddresscongestiononI-15.ThisprojectalsosatisfiestheCity's
Core Value of Transportation Mobility and Connectivity
Project Status: Project development is set to commence in Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.609 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 50,000$ 200,000$ 100,000$ 200,000$ 550,000
Construction
$ 1,250,000$ 2,528,500$ 3,778,500
Construction Engineering
$ 321,500$ 321,500
Design/Environmental
$ 350,000$ 350,000
Totals$ -$ 400,000$ 1,450,000$100,000$ 3,050,000$ -$ -$ 5,000,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$ 400,000$ 200,000$ 100,000$ 700,000
(1)
SHOPP
$ 1,250,000$ 1,250,000
(2)
Unspecified
$ 3,050,000$ 3,050,000
Total Funding:$ -$ 400,000$ 1,450,000$100,000$ 3,050,000$ -$ -$ 5,000,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
(1) SHOPP - State Highway Operation and Protection Program and Minor Program
(2) Project cannot be constructed until a funding source is identified.
63
Interstate-15/State Route 79 South Ultimate Interchange
Circulation Project Location
79
IA
NT
SA
15
15
79
15
Legend
CIP Area
City Boundary
0400200Feet
The map Interstate15_StateRoute79.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
64
Capital ImprovementProgram
Fiscal Years2020-24
INTERSTATE 15 / STATE ROUTE 79 SOUTH ULTIMATE INTERCHANGE
Circulation Project
ProjectDescription:Thisprojectincludesright-of-wayacquisition,design,environmentalclearance,andconstructionofarampsystemthatwill
improveaccesstoInterstate15fromTemeculaParkway/StateRoute79South.Theinterchangewillaccommodatetrafficgeneratedbyfuture
developmentoftheCity’sGeneralPlanlanduseaswellasregionaltrafficvolumeincreasesforecastedfortheyear2037.Thisprojectiscrucial,
astheprojectedtrafficvolumeincreasescurrentlyexceedthecapacityoftheexistinginterchangeimprovementsconstructedbytheRiverside
County Transportation Department.
Benefit/CoreValue:Thisprojectwillimprovecirculation,freewayaccess,andlevelofserviceattheInterstate15andTemeculaParkway/
State Route 79 South intersection. In addition, this project satisfies the City’s Core Value of Transportation Mobility and Connectivity.
ProjectStatus:Environmentalclearancewascompletedin2010.Right-of-Wayacquisitionandutilityeasementswerecompletedin2013.
DesignandpreparationofconstructionPlans,Specifications,andEstimatewascompletedin2016.Theconstructioncontractwasadvertised
andawardedin2016-17.ConstructionoftheinterchangeimprovementsstartedinJune2016andweresubstantiallycompletedinDecember
2018.SubstantialProjectcompletionisfollowedbyaone(1)yearplantestablishmentperiodFebruary2019throughJanuary2020andathree
(3)year maintenance period February 2020 through January 2023.
Department: Public Works - Account No. 210.265.662 PW04-08 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 1,310,715$ 135,816$ 120,000$ 80,000$ 80,000$1,726,531
Acquisition
$ 13,032,881$ 150,847$ 13,183,728
Construction
$ 24,542,298$ 3,965,895$ 28,508,193
Construction Engineering
$ 3,540,372$ 760,906$4,301,278
Design/Environmental
$ 4,107,505$ 120,422$4,227,927
Utilities$ 729$ 9,271$ 10,000
Totals$ 46,534,500$ 5,143,157$ 120,000$ 80,000$ 80,000$ -$ -$ 51,957,657
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
CFD (Crowne Hill)
$ 502,211$ 502,211
Reimbursement/
Other (Morgan Hill)
$ 1,190,582$ 1,190,582
(1)
SAFETEA-LU
$ 1,439,840$ 1,439,840
Senate Bill 621
$ 13,111,737$ 1,146,783$ 120,000$ 80,000$ 80,000$ 14,538,520
(2)
STP (RCTC)
$ 11,165,698$ 1,810,302$ 12,976,000
(3)
TUMF (RCTC/Region)
$ 4,452,000$ 4,452,000
(4)
TUMF (RCTC/CETAP)
$ 5,400,000$ 5,400,000
(5)
TUMF (WRCOG)
$ 8,576,872$ 1,448,372$ 10,025,244
(6)
Reimbursement/RCWD
$ 280,560$ 280,560
(7)
Reimbursement/EMWD
$ 415,000$ 415,000
(8)
Reimbursement/Lease
$ 737,700$ 737,700
Total Funding:$ 46,534,500$ 5,143,157$ 120,000$ 80,000$ 80,000$ -$ -$ 51,957,657
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
(1) SAFETEA-LU - Funding is pursuant to Authorization/Agreement Summary (E-76) (63.51% of Federal Participating Costs, up to $1,439,840)
(2) STP(RCTC) - Funding is pursuant to Authorization/Agreement Summary (E-76)(63.51% of Federal Participating Costs, up to $12,976,000)
(3) TUMF (RCTC/Region) - Funding is pursuant to RCTC Agreement No. 06-72-506 ($4,452,000 Total)
(4) TUMF (RCTC/CETAP) - Funding is pursuant to RCTC Agreement No. 11-72-041-00 ($5,400,000 Total;$1,400,000 ROW;$4,000,000 CON).
(5) TUMF (WRCOG) - Funding is pursuant to WRCOG Agreement 13-SW-TEM-1163($10,025,244 CON)
(6) Pursuant to RCWD UA 23316 - RCWD shall reimburse City for actual costs of Additive Bid No. 01 ($280,560)
(7) Pursuant to EMWD UA 23317 - EMWD shall reimburse City for actual costs of Additive Bid No. 02 ($415,000)
(8) Revenues collected on Lease Agreement with Front Street - Service Station, LP dated September 11, 2013 (est. $740,000)
65
66
Capital ImprovementProgram
Fiscal Years2020-24
MEDIANS AND PARKWAYS -CITYWIDE
Circulation Project
ProjectDescription:PursuanttoConditionsofApproval,thisprojectcompletesthemissingportionsoftheraisedlandscapedmedian
islandon(a)RanchoCaliforniaRoadbetweenMoragaRoadtoLyndieLane($188,000),and(b)YnezRoadfromDateStreettotheCity
boundary ($100,000).
Benefit/CoreValue:Thisprojectimprovestrafficcirculationbyeliminationpotentialconflictsbetweenleftturnmovementsandthrough
trafficoncirculationelementstreetswithaclassificationofmajorarterialorhigher.Inaddition,thisprojectsatisfiestheCity’sCoreValue
of A Safe and Prepared Community and Transportation Mobility and Connectivity.
Project Status: This project will reimburse developers for eligible improvements upon project completion.
Department: Public Works - Account No. 210.265.622 PW02-15Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Construction
$ 666,838$188,000$100,000$ 954,838
Totals$ 666,838$ 188,000$ 100,000$-$-$ -$ -$ 954,838
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Street Improvements)
$ 666,838$188,000$100,000$ 954,838
Total Funding:$ 666,838$ 188,000$ 100,000$-$-$ -$ -$ 954,838
Future Operation &
Maintenance Costs:
2019-202020-212021-222022-232023-24
67
Murrieta Creek Bridge at Overland Drive
Circulation Project Location
79
15
79
Legend
CIP Area
0200100Feet
The map MurrietaCreekBridge.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
68
Capital ImprovementProgram
Fiscal Years2020-24
MURRIETA CREEK BRIDGE AT OVERLAND DRIVE
Circulation Project
ProjectDescription:ThisprojectincludesthedesignandconstructionofanewbridgecrossingoverMurrietaCreekbetweenRancho
CaliforniaRoadandWinchesterRoad.Thisprojectalsoincludesenvironmentalstudies,mitigation,acquisitionofright-of-way,and
installation of new traffic signals at Overland Drive intersections with Diaz Road and Enterprise Circle West and Commerce.
Benefit/CoreValue:ThisprojectimprovestrafficcirculationandaccesstoOverlandDrivefreewayover-crossing.Inaddition,thisproject
satisfies the City’s Core Value of Transportation Mobility and Connectivity.
ProjectStatus:ThisprojectiscurrentlyindesignandispartiallyfundedbytheFederalHighwayBridgeProgram(HBP).Duringdesign
phase staff will continue seeking additional programming and allocation of more HBP funds for the project.
Department: Public Works - Account No. 210.265.648 PW16-05Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$38,751$201,249$240,000$480,000
Acquisition
$150,000$150,000
Construction
$1,034,965$9,465,035$10,500,000
Construction Engineering
$610,000$610,000
Design/Environmental
$1,688,274$265,590$88,530$2,042,394
MSHCP
$473,550$51,450$525,000
Totals$38,751$2,039,523$1,774,105$938,530$9,516,485$-$-$14,307,394
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Street Improvements)
$38,751$1,729,668$1,508,515$850,000$4,126,934
(1)
HBP
$309,855$265,590$88,530$7,543,641$8,207,616
(2)
Unspecified
$1,972,844$1,972,844
Total Funding:$38,751$2,039,523$1,774,105$938,530$9,516,485$-$-$14,307,394
Future Operation & Maintenance
Costs:2019-202020-212021-222022-232023-24
(1) Highway Bridge Program (HBP) Funding is 88.53% HBP and 11.47% City Matching Funds. Design will not move forward until project is federally programmed.
(1)HBP Capacity is not Available for FY2018-19,Some City local match funds being allocated for that year in event funds become available.
(2) Project cannot be constructed until a funding source is identified.
69
Nicolas Road Extension and Improvements
Circulation Project Location
79
15
79
D
Legend
CIP Area
0420000Feet
The map NicolasRoadExtension_Improvements.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
70
Capital ImprovementProgram
Fiscal Years2020-24
NICOLAS ROAD EXTENSION AND IMPROVEMENTS
Circulation Project
ProjectDescription:Thisprojectincludesthedesign,environmentaldocumentsandpermits,construction,improvementsandextensionof
NicolasRoadfromRoripaughRanchPhaseIIwesterlyboundarytoCalleGirasol/LieferRoad.Theimprovementsincludeapproximately4,000
LFroadimprovementsandculvertcrossingatSantaGertrudisCreek.ThedeveloperoftheRoripaughRanchwilltaketheleadincompleting
the design and the environment document while the City will take the lead in the construction Phase.
Benefit/CoreValue:ThisprojectimprovestrafficcirculationontheeasternsideoftheCity.Inaddition,thisprojectsatisfiestheCity’sCore
Value of Transportation Mobility and Connectivity.
ProjectStatus:Thedesignisalmostcompleteandtheenvironmentaldocumentandpermitsarebeingprocessed.Constructionprocessis
anticipated to begin in late Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.604Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$581,989$581,989
Acquisition
$1,440,000$1,440,000
Construction
$8,700,000$8,700,000
Construction Engineering
$232,796$232,796
Design/Environmental
$250,003$250,003
MSHCP
$435,000$435,000
Totals$-$ 11,639,788$-$-$-$-$-$11,639,788
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
CFD #03-02 (Roripaugh Ranch)
$5,053,890$5,053,890
CFD #16-01 (Roripaugh Ranch)
$6,585,898$6,585,898
Total Funding:$-$ 11,639,788$-$-$-$-$-$11,639,788
Future Operation & Maintenance
Costs:
2019-202020-212021-222022-232023-24
71
72
Capital ImprovementProgram
Fiscal Years2020-24
OVERHEAD STREET NAME SIGN REPLACEMENT PROGRAM -CITYWIDE
Circulation Project
ProjectDescription:ThisprojectincludestheconversionofexistingInternallyIlluminatedStreetNameSigns(IISNS)from
fluorescenttubestoaReflectiveNon-IlluminatedStreetNameSignpanelincludingsignbracketsandremovalofelectrical
service wiring.
Benefit/CoreValue:ThisprojecteliminatesenergyconsumptionandcostsassociatedwithilluminatedStreetNameSigns
andsupportsthelong-termmaintenanceandrehabilitationofCityassetsandinfrastructure.Inaddition,thisprojectsatisfies
the City’s Core Value of Transportation Mobility and Connectivity and a Sustainable City.
Project Status: This project is estimated to be completed in fiscal year 2019-20.
Department: Public Works - Account No. 210.265.603 Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 10,000$ 10,000$ 20,000
Fixtures/Furn/Equip
$ 90,000$ 90,000$ 180,000
Totals$-$ 100,000$ 100,000$ -$ -$ -$ -$ 200,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$ 100,000$ 100,000$ 200,000
Total Funding:$-$ 100,000$ 100,000$ -$ -$ -$ -$ 200,000
Future Operation &
Maintenance Costs:
2019-202020-212021-222022-232023-24
73
Capital ImprovementProgram
Fiscal Years2020-24
PAVEMENT REHABILITATION PROGRAM -CITYWIDE
Circulation Project
Anticipated Year of
Useful Construction/Estimated
Life(Years)Project Cost
Street and LimitsFunding Source
Prior Years Actual Expenditures$23,483,532
Meadowview Loop (Via Norte/Del Rey)(10-20)
FY 2019 Carryover Budget
Commerce Center Drive/Rider Way/Enterprise Circle (10-20)
West and South$3,307,202General Fund
( 1 )
(10-20)RMRA
Rancho Vista Road(Paseo Goleta to Butterfield Stage Rd)$1,105,403
Ynez Road (Winchester Rd to Equity Drive)/Equity Drive/
(10-20)$2,304,196Measure A
County Center Drive$6,716,801
Pauba Road(Margarita Rd to Via Rami)(10-20)
2019-20
(10-20)
Avenida Alvarado/Rio Nedo/Aqua Vista Way/
Tierra Alta Way
Winchester Road (Nicolas Rd to Eastern City Limits)/(10-20)
( 1 )
Nicolas Road (Winchester Rd to North General Kearny Rd)$1,873,331RMRA
(10-20)
Rancho California Road(Humber Drive to Margarita Rd)$3,397,313Measure A
(10-20)
Santiago Road(I-15 to Ynez Rd)$5,270,644
(10-20)
Business Park Drive/Single Oak Drive/Diaz Road2020-21
(Rancho California Rd to Rio Nedo)
(10-20)
Del Rio Road/Via Montezuma/Las Haciendas Street/
(10-20)
Calle Cortez
( 1 )
Pauba Road(Meadows Pkwy to Butterfield Stage Rd)/(10-20)RMRA
$1,918,154
Meadows Parkway (Pauba Rd to Rancho California Rd)
$1,283,089Measure A
Butterfield Stage Road(Pauba Rd to Rancho California Rd)(10-20)
$3,201,243
Solana Way (Ynez Rd to Margarita Rd)/Ynez Road
(10-20)2021-22
(Rancho California Rd to Solana Way)
Jedediah Smith Road (Temecula Pkwy to Margarita Rd)(10-20)
Enterprise Circle North(Winchester Rd to Winchester Rd)
(10-20)
Winchester Road(Dendy Pkwy to Diaz Rd)/Dendy Parkway(10-20)
(Winchester Rd to Diaz Rd)/Diaz Road (Rancho California
( 1 )
RMRA
Rd to Diaz Rd)/(Rio Nedo to Winchester Rd)$1,956,517
N General Kearny Road(Margarita Rd to Calle Pina Colada)
(10-20)$1,325,135Measure A
Margarita Road(Solana Way to Date St)$3,281,652
Rancho Vista Road (Ynez Rd to Margarita Rd)/Ynez Road(10-20)2022-23
(Pauba Rd to Rancho California Rd)
Ridge Park Drive(Rancho California Rd to Vincent Moraga Drive(10-20)
Vincent Moraga Drive(Rancho California Rd to Ridge Park Driv
(10-20)
( 1 )
RMRA
Old Town Front Street (Moreno Rd to Rancho California Rd)(10-20)$1,995,647
Butterfield Stage Road(Temecula Pkwy to Pauba Rd)
(10-20)
De Portola Road (Margarita Rd to Butterfield Stage Rd)(10-20)
Moraga Road (Rancho California Rd to Margarita Rd)
(10-20)$1,368,387Measure A
Ynez Road (Equity Drive to City Limit)(10-20)
La Paz Street (Temecula Pkwy to Ynez Rd)
(10-20)$3,364,034
Meadows Parkway (Temecula Pkwy to Pauba Rd)
(10-20)2023-24
Pauba Road (Ynez Rd to Margarita Rd)(10-20)
( 1 )
Rainbow Canyon Road (Pechanga Pkwy to City Limit)RMRA
(10-20)$2,034,777
Deer Hollow Way (Pechanga Pkwy to Peppercorn Drive)(10-20)$1,412,829Measure A
Nicolas Road (North General Kearny Rd to Joseph Rd)
(10-20)$3,447,606
Total$48,765,512
(1) Road Repair and Accountability Act of 2017 (SB1) - Road Maintenance and Rehabilitation Account (RMRA)
* For Fiscal Year 2019-20 and beyond, the list of Streets are subject to change based on the updated Pavement Management Program.
74
PAVEMENT REHABILITATION PROGRAM -CITYWIDE
Circulation Project
ProjectDescription:Thisprojectincludestheenvironmentalprocessing,design,constructionofpavementrehabilitation,andreconstructionof
major streets as recommended in the Pavement Management Program update.
Benefit/CoreValue:Thisprojectimprovespavementconditionssothatthetransportationneedsofthepublic,businessindustry,and
government can be met. In addition, this project satisfies the City’s Core Value of Transportation Mobility and Connectivity.
ProjectStatus:AprioritylistofrehabilitationprojectsfromthePavementManagementProgramisusedtodeterminetheprojectstobeundertaken.
Construction is completed annually based on the allocated funds.
Department: Public Works - Account No. 210.265.655Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$2,436,294$861,766$841,860$848,230$840,970$855,000$855,000$7,539,120
Construction
$19,960,210$4,839,262$3,867,544$1,787,526$1,880,035$1,939,034$2,022,606$36,296,217
Construction Engineering
$305,979$498,780$561,240$565,487$560,647$570,000$570,000$3,632,133
Design/Environmental
$781,049$516,993$1,298,042
Totals$23,483,532$6,716,801$5,270,644$3,201,243$3,281,652$3,364,034$3,447,606$48,765,512
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$2,385,412$3,307,202$5,692,614
Gas Tax
$1,200,000$1,200,000
(1) - SB1
RMRA
$1,251,263$1,105,403$1,873,331$1,918,154$1,956,517$1,995,647$2,034,777$12,135,092
Measure A
$16,646,857$2,304,196$3,397,313$1,283,089$1,325,135$1,368,387$1,412,829$27,737,806
Measure S
$2,000,000$2,000,000
Total Funding:$23,483,532$6,716,801$5,270,644$3,201,243$3,281,652$3,364,034$3,447,606$48,765,512
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
(1) Road Repair and Accountability Act (RMRA)
75
Pechanga Parkway Widening
Circulation Project Location
79
15
79
Legend
CIP Area
City Boundary
0420000Feet
The map PechangaParkwayWidening.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
76
Capital ImprovementProgram
Fiscal Years2020-24
PECHANGA PARKWAY WIDENING
Circulation Project
ProjectDescription:ThisprojectincludesthewideningofPechangaParkwayfromViaGilbertotoNorthCasinoDrivetoprovidea
PrincipalArterialRoadwithsix(6)lanesoftraffic.Thisprojectwillbedesigned,environmentallyclearedandconstructedtomitigate
the traffic impacts related to the recently completed expansion of the adjacent Pechanga Resort & Casino Project.
Benefit/CoreValue:Thisprojectimprovespavementconditionssothatthetransportationneedsofthepublic,businessindustry,
and government can be met. In addition, this project satisfies the City’s Core Value of Transportation Mobility and Connectivity.
Project Status: Construction is scheduled to start in Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.530PW15-14Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$409,192$110,703$519,895
Construction
$3,820,000$3,820,000
Construction Engineering
$210,000$210,000
Design/Environmental
$365,289$4,816$370,105
MSHCP
$80,000$80,000
Totals$774,481$4,225,519$-$-$-$-$-$5,000,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Pechanga Tribe
Contributions(1)
$774,481$4,225,519$5,000,000
Total Funding:$774,481$4,225,519$-$-$-$-$-$5,000,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
(1)In accordance with the Intergovernmental Agreement Approved by the City Council on 11/17/2015.
77
78
Capital ImprovementProgram
Fiscal Years2020-24
TRAFFIC SIGNAL EQUIPMENT ENHANCEMENT PROGRAM -CITYWIDE
Circulation Project
ProjectDescription:Thisprojectincludestheenhancementandupgradeofexistingtrafficsignalequipment,includingbattery
back-upsystems,LightEmittingDiode(LED)trafficsignalindications,trafficsignalcontrollercabinets,servicecabinets,safety
streetlighting,replacementoftrafficsignalcontrollers,signalcommunicationequipment,closedcircuittelevision(CCTV)camera
equipmentandfiberopticcable.Thisprojectwillalsoincludeanupgradeofexistingtrafficsignalconductorsincludingconduit,
service conductors, and detector cable to comply with current standards.
Benefit/CoreValue:Thisprojectenhancestrafficsafetyandsupportsthelong-termenhancementsandrehabilitationofCity
assetsandinfrastructure.Inaddition,thisprojectsatisfiestheCity’sCoreValuesofaHealthyandLivableCity,ASafeand
Prepared Community, and Transportation Mobility and Connectivity.
Project Status: Enhancements will be completed on an ongoing basis when funding becomes available.
Department: Public Works - Account No. 210.265.680Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration $ 10,000
$10,747$10,000$10,000$10,000$10,000$60,747
Construction
$456,237$358,763$50,000$865,000
Fixtures/Furn/Equip $250,000
$525,284$105,757$375,000$275,000$200,000$140,000$1,871,041
Totals$981,521$475,267$435,000$285,000$210,000$150,000$260,000$2,796,788
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Traffic Signals)
$525,284$16,504$541,788
Measure S
$456,237$458,763$435,000$285,000$210,000$150,000$260,000$2,255,000
Total Funding:$981,521$475,267$435,000$285,000$210,000$150,000$260,000$2,796,788
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs
79
Capital ImprovementProgram
Fiscal Years2020-24
TRAFFIC SIGNAL INSTALLATION -CITYWIDE
Circulation Project
Total Project
Cost Year Funding Source
Signal Location
Prior Year Actual Expenditures
$778,415DIF(Traffic)/Developer
De Portola Road at Campanula Way (East)(1)$ 260,0002019-20DIF(Traffic)
Future Traffic Signals$ 300,0002019-20Measure S
Meadows Parkway at Pauba Road (1)$ 237,4232019-20DIF(Traffic)
Total$ 797,423
Meadows Parkway at Campanula Way (West) (1)$ 280,0002020-21DIF(Traffic)
Future Traffic Signals$ 300,0002020-21Measure S
Total$ 580,000
Future Traffic Signals$ 300,0002021-22Measure S
Total$ 300,000
Future Traffic Signals$ 300,0002022-23Measure S
Total$ 300,000
Future Traffic Signals$ 300,0002023-24Measure S
Total$ 300,000
$ 3,055,838
(1)DIF Traffic Developer Reimbursement
$ 778,415
Prior Year Actual Expenditures
$ 797,423
Fiscal Year 2019-20
$ 580,000
Fiscal Year 2020-21
Fiscal Year 2021-22$ 300,000
Fiscal Year 2022-23$ 300,000
Fiscal Year 2023-24$ 300,000
TOTAL:$ 3,055,838
80
Capital ImprovementProgram
Fiscal Years2020-24
TRAFFIC SIGNAL INSTALLATION -CITYWIDE
Circulation Project
ProjectDescription:Thisprojectincludesthedesign,construction,installationandmodificationoftrafficsignalsatvariouslocationsthroughout
the City. The project also includes reimbursement for developer installed traffic signals.
Benefit/CoreValue:ThisprojectimprovestrafficsafetyandcirculationthroughouttheCity.Inaddition,thisprojectsatisfiestheCity’sCore
Values of a Healthy and Livable City, A Safe and Prepared Community, and Transportation Mobility and Connectivity.
ProjectStatus:Aprioritylistoftrafficsignalshasbeendeveloped.Thetrafficsignalsscheduledforinstallationwillbedesignedandconstructed
inthescheduledfiscalyearwhenfundingbecomesavailable.Reimbursementsfordeveloperinstalledtrafficsignalswillbemadeas
Development Impact Fee (DIF) traffic become available.
Department: Public Works - Account No. 210.265.682 Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Administration
$ 44,480$ 72,670$ 117,150
Construction $ 300,000
$ 732,223$ 113,465$ 600,000$ 580,000$ 300,000$ 300,000$ 2,925,688
Design/Environmental
$ 1,712$ 11,288$ 13,000
Totals$ 778,415$ 197,423$ 600,000$ 580,000$ 300,000$ 300,000$ 300,000$ 3,055,838
Source of Funds:
Prior Years FYE 2018 2018-19
Actual Carryover Adopted 2019-20 2020-21 2021-22 2022-23 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Developer Contributions
$ 250,000$ 250,000
DIF (Traffic Signals)
$ 528,415$ 197,423$ 300,000$ 280,000$ 1,305,838
Measure S
$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$ 1,500,000
Total Funding:$ 778,415$ 197,423$ 600,000$ 580,000$ 300,000$ 300,000$ 300,000$ 3,055,838
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
81
Traffic Signal Park and Ride Access Improvements
Circulation Project Location
79
15
79
Legend
CIP Area
0420000Feet
The map TrafficSignal_ParkandRide.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
82
Capital ImprovementProgram
Fiscal Years2020-24
TRAFFIC SIGNAL PARK AND RIDE ACCESS IMPROVEMENTS
Circulation Project
ProjectDescription:ThisprojectincludestheinstallationofatrafficsignalonTemeculaParkwayatWabashLane.Theprojectalso
includes relocating the access of the Park and Ride facility on Temecula Parkway at La Paz Road from Vallejo Avenue to Wabash Lane.
Benefit/CoreValue:ThisprojectimprovestrafficsafetyandcirculationthroughouttheCity.Inaddition,thisprojectsatisfiestheCity’s
Core Values of a Healthy and Livable City, A Safe and Prepared Community, and Transportation Mobility and Connectivity.
Project Status: Design will be initiated during Fiscal Year 2019-20 and construction is to follow.
Department: Public Works - Account No. 210.265.605Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Administration
$ 147,125$147,125
Construction
$ 588,500$62,269$ 650,769
Construction Engineering
$ 17,655$17,655
Design/Environmental
$ 187,700$187,700
MSHCP
$ 11,250$ 18,175$29,425
Totals$-$ 952,230$80,444$-$-$-$-$1,032,674
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
(1)
Developer Contributions
$ 175,000$175,000
General Fund
$ 226,725$226,725
Measure S
$ 50,505$ 80,444$ 130,949
Settlement Proceeds
$ 500,000$500,000
Total Funding:$-$ 952,230$80,444$-$-$-$-$1,032,674
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
(1)Temecula Hospitality Group, also known as Fine Hospitality Group
83
84
Capital ImprovementProgram
Fiscal Years2020-24
TRAFFIC SIGNAL SYSTEM UPGRADE
Circulation Project
ProjectDescription:Thisprojectwillinstallprotected/permissivetrafficsignalheads,onnewsignalpolesandsignalmastarms,
relocateexistingequipmentandmodifyexistingstripingandraisedmediansatthefollowingfive(5)intersections:MargaritaRoadat
VerdesLane,YnezRoadatTownCenterNorthandTownCenterSouth,RedhawkParkwayatPaseoParallon/OverlandTrail,and
Winchester Road at Enterprise Circle.
Benefit/CoreValue:ThisprojectimprovestrafficsafetyandcirculationthroughouttheCity.Inaddition,thisprojectsatisfiestheCity’s
Core Values of A Safe and Prepared Community, and Transportation Mobility and Connectivity.
Project Status: This project is estimated to be complete by Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.610Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Administration
$ 5,000$ 5,000
Construction
$ 481,900$481,900
Construction Engineering
$ 62,000$62,000
Design/Environmental
$ 33,000$ 33,000
Totals$-$38,000$543,900$ -$-$-$-$581,900
Prior Years FYE 2019 2019-20 2023-24
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
(1)
HSIP
$ 489,510$ 489,510
Measure S
$ 38,000$54,390$92,390
Total Funding:$-$38,000$543,900$ -$-$-$-$581,900
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
(1) Highway Safety Improvement Program
85
Ynez Road Improvements
Circulation Project Location
79
15
79
ERAE
I
15
N
Legend
CIP Area
0840000Feet
The map YnezRoadImprovements.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
86
Capital ImprovementProgram
Fiscal Years2020-24
YNEZ ROAD IMPROVEMENTS
Circulation Project
ProjectDescription:ThisprojectincludeswideningYnezRoad,fromRanchoVistaRoadtoLaPazStreet,totwolanesineachdirection,and
thecompletionofmissingsegmentsofcurb&gutter,sidewalk,landscapedmedians,streetlightsandmodifythetrafficsignalatSantiago
Road.
Benefit/CoreValue:ThisprojectimprovestrafficcirculationbywideninganimportantarterialroadinthispartoftheCity.Inaddition,this
project satisfies the City's Core Value of Transportation Mobility and Connectivity.
Project Status: The project will be completed by Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.535Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$21,841$150,874$322,285$495,000
Construction
$3,135,000$3,135,000
Construction Engineering
$165,000$165,000
Design/Environmental
$93,256$353,510$165,000$611,766
MSHCP
$165,000$165,000
Totals$115,097$504,384$3,952,285$-$-$-$-$4,571,766
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Street Improvements)
$115,097$504,384$3,952,285$4,571,766
Total Funding:$115,097$504,384$3,952,285$-$-$-$-$4,571,766
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
87
88
Capital Improvement Program
FiscalYears 2020-24
INFASTRUCTURE / OTHER PROJECTS
Table of Contents
Americans with Disabilities Act (ADA)TransitionPlanImplementation...............................
Bike LaneandTrail Program – Citywide.............................................................................
Bike LaneandTrail Program–Pump Track........................................................................9
Bike LaneandTrail Program – Temecula Creek South SideTrail.......................................9
City Facilities Rehabilitation................................................................................................
Citywide Drainage Master Plan...........................................................................................
Citywide Financial System Upgrade....................................................................................
Citywide Streetlight Acquisition and Light EmittingDiode(LED) Retrofit...........................10
Citywide Surveillance Cameras.........................................................................................10
CommunityRecreation Center (CRC)Renovations..........................................................1
ComprehensiveGeneralPlan Update...............................................................................1
Electric Vehicles Charging Station....................................................................................1
Expanded RecycledWater Conversion Project.................................................................11
Fiber Optic Communication System Upgrade...................................................................11
Fire Station 73Gym/Garage.............................................................................................1
FireStation84 Training RoomRenovation........................................................................1
History Museum................................................................................................................1
Interstate15 / State Route79 SouthInterchange EnhancedLandscaping........................12
Library Parking–Phase II................................................................................................. 12
Main Street Property Improvements..................................................................................1
Margarita Recreation Center.............................................................................................1
MediansandTraffic Calming Improvements–Citywide....................................................1
MurrietaCreek Improvements...........................................................................................13
Old Town Parking Structure..............................................................................................13
Pechanga Parkway Environmental Mitigation...................................................................1
Pedestrian Signal Equipment Upgrade–Citywide............................................................1
Public Safety Monument...................................................................................................1
89
Capital Improvement Program
FiscalYears 20-2
INFASTRUCTURE / OTHER PROJECTS
Table of Contents (continued)
SantaGertrudis Creek Pedestrian/BicycleTrail Extension and Interconnect.....................14
SantaGertrudis Creek Phase II–Margarita Under-Crossing............................................14
Sidewalks–Citywide........................................................................................................1
Sidewalks–DLR Drive.....................................................................................................1
Sidewalks–OldTown Boardwalk Enhancement..............................................................1
Temecula Elementary School (TES) Pool Renovation......................................................15
Utility Undergrounding–Citywide.....................................................................................15
90
91
92
Capital ImprovementProgram
Fiscal Years2020-24
AMERICANS WITHDISABILITIESACT (ADA)TRANSITIONPLAN
IMPLEMENTATION
Infrastructure/ Other Project
ProjectDescription:TheAmericanwithDisabilitiesAct(ADA)TransitionPlanImplementationwillutilizetherecentlycompleted
TransitionPlanandimplementitsrecommendationsbasedontheestablishedpriorities.Theimplementationwillincludeimprovements
to public facilities, programs, and public right of ways to modify/remove identified barriers over a fiscally constrained framework.
Benefit/CoreValue:ThisprojectfurtherstheCity’sCoreValuesofASafeandPreparedCommunity,AccountableandResponsive
City Government, as well as Transportation Mobility and Connectivity.
ProjectStatus:TheAmericanWithDisabilitiesAct(ADA)TransitionPlanUpgradewascompletedinFiscalYear2017-18.The
implementation of the Transition Plan recommendation has become an ongoing program.
Department: Public Works / Building Safety - Account No. 210.265.612Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 79$ 78,581$77,987$78,660$78,660$78,660$78,660$471,287
Construction
$ 245,000$245,000$245,000$ 245,000$245,000$ 245,000$1,470,000
Totals$ 79$323,581$322,987$323,660$ 323,660$323,660$ 323,660$1,941,287
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
CDBG(1)
$ 79$323,581$322,987$323,660$ 323,660$323,660$ 323,660$1,941,287
Total Funding:$ 79$ 323,581$ 322,987$ 323,660$ 323,660$ 323,660$ 323,660$ 1,941,287
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
(1) Community Development Block Grant- Action Plan Fiscal Year 2019-20
93
Capital ImprovementProgram
Fiscal Years2020-24
BIKE LANE AND TRAIL PROGRAM -CITYWIDE
Infrastructure / Other Project
Actuals To Cost to
Date Complete Year Funding Source
Bike Lane and Trail Program
Bike Lane and Trail ProgramDIF (Open Space and Trails)
$203,359$250,0002019-20
AB2766
DIF (Open Space and Trails)
Lake Skinner Trail$200,0002019-20
AB2766
DIF (Open Space and Trails)
Rancho California Bicycle Lane and Cycle Track$200,0002021-22
AB2766
DIF (Open Space and Trails)
Yukon to Ynez$115,7242022-23
AB2766
$338,392
Unspecified
Unspecified
Long Canyon Creek Trail$666,6412023-24
Unspecified
North General Kearney Trail$150,0002023-24
Total
$203,359$2,124,116$2,327,475
94
Capital ImprovementProgram
Fiscal Years2020-24
BIKE LANE AND TRAIL PROGRAM -CITYWIDE
Infrastructure / Other Project
ProjectDescription:TheMulti-UseTrailsandBikewaysMasterPlanwascompletedinFiscalYear2015-16.TheMasterPlanincludes
newandpotentialtrailandbikewaysegmentinformationsheetsthatdetailconstraints,solutions,surfacetypesandwidths,andestimated
constructioncosts.Theplanalsodetailsmultiplerecommendationsincluding,butnotlimitedto:newsigns,gates,fenceopenings,
sharrows,greenpaint,bikeboxes,separatedbikeways,bicycleboulevards,striping,maps,bikeracks,fix-itstations,bikeshares,bike
corrals,bikelockers,cycletracks,rapidflashingbeacons,crossings,bicycledetectionandactuationatsignalizedintersections,pedestrian
andbicyclecounts,accessandmaintenanceagreements,andtrailheads.TheCityisaBronzeLevelBicycleFriendlyCommunityandthis
programisintendedtoallowforcontinuedimplementationoffacilitiesandprograms,whichfurthertheCity'scommitmenttoprovingasafe
and convenient network that connects schools, parks, open space, shopping, and employment centers.
Benefit/CoreValue:ThisprojectprovidesalternativemodesoftransportationandincreasesconnectivityandaccessibilitytoOldTown,
WineCountry,andtheCity’smanyschools,parks,trails,andopenspaceareas.Inaddition,thisprojectsatisfiestheCity’sCoreValuesofA
Sustainable City and Transportation Mobility and Connectivity.
ProjectStatus:TheMasterPlanwascompletedinFiscalYear2015-16andincludesalistofcapitalimprovementsthroughouttheCity.
Improvements will be made on an ongoing basis as funding becomes available.
Department: Planning / Public Works - Account No. 210.265.703 Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Administration $ 25,000
$6,452$25,000$5,000$5,000$5,000$25,000$96,452
Construction $ 895,000
$49,763$203,028$95,000$95,000$95,000$411,088$1,843,879
Design/Environmental $ 100,000
$147,144$90,000$50,000$387,144
Totals$203,359$318,028$100,000$ 100,000$ 100,000$486,088$1,020,000$2,327,475
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
AB 2766
$179,353$50,000$ 100,000$ 100,000$216,955$144,575$790,883
BEYOND Grant
$19,857$19,857
DIF (Open Space and Trails) $ 242,552
$183,502$138,675$50,000$614,729
Unspecified*
$269,133$632,873$902,006
Total Funding:$203,359$318,028$100,000$ 100,000$ 100,000$486,088$1,020,000$2,327,475
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
*Project cannot be constructed until a funding source is identified
95
Bike Lane and Trail Program - Pump Track
Infrastructure/Other Project Location
79
15
79
Legend
CIP Area
0210000Feet
The map PumpTrack.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
96
Capital ImprovementProgram
Fiscal Years2020-24
BIKE LANE AND TRAIL PROGRAM -PUMP TRACK
Infrastructure / Other Project
ProjectDescription:ThisprojectwillincludethedesignandconstructionofaBicyclePumpTrackatRonaldReaganSportsParklocated
justnorthoftheexistingskatepark.Thepumptrackwillconsistofhardpackeddirtwithanasphaltcapsculptedintoaseriesofrollers,
berms,bankedturns,andtransitions.Thesefeaturesaredesignedtopermitaridertotraversealoopedcoursewithminimalpedalingusing
gravitytoflowthroughthecourse.Thepumptrackareawillalsoincludeaninfieldmaterialtoallowfordrainage,hardscapepavedentryarea
with signage, bench seating, shade structure, landscaping, and bike racks.
Benefit/CoreValue:Thisprojectsupportshealthyandactivelifestylesbypromotingrecreationprograms,parks,trails,andfacilities.In
addition, this project satisfies the City’s Core Values of A Sustainable City and Transportation Mobility and Connectivity.
Project Status: This project is estimated to be complete by Fiscal Year 2019-20.
Department: Planning/Public Works - Account No. 210.265.718Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Administration
$2,453$22,547$24,000$49,000
Construction
$175,500$69,000$244,500
Construction Engineering
$12,000$12,000
Design/Environmental
$4,213$70,287$74,500
Totals$6,666$268,334$105,000$-$-$-$-$380,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Open Space and Trails)
$6,666$268,334$105,000$380,000
Total Funding:$6,666$268,334$105,000$-$-$-$-$380,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
97
98
Capital ImprovementProgram
Fiscal Years2020-24
BIKE LANE AND TRAIL PROGRAM -TEMECULA CREEK SOUTH SIDE TRAIL
Infrastructure / Other Project
ProjectDescription:ThisprojectincludesanagreementwithRiversideCountyFloodControltoinstallnewgates,paveandstripean
existingmaintenanceroadforaClassITrail.TheroutewouldparallelTemeculaCreekontheSouthside,connectingButterfieldStageRoad
toLomaLindaRoad,terminatingatthealignmentwithAvenidadeMissiones.Thissectionoftrailispartoftheproposedseventeen(17)mile
Temecula Loop Trail identified in the Multi-Use Trails and Bikeways Master Plan.
Benefit/CoreValue:ThissectionoftrailwouldsatisfytheCity’sCoreValuesofaHealthyandLivableCity,TransportationMobilityand
Connectivity, and A Sustainable City.
Project Status: This project is estimated to be complete in Fiscal Year 2019-20.
Department: Planning/Public Works - Account No. 210.265.720Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Administration
$50,000$50,000
Construction
$600,000$600,000
Design/Environmental
$150,000$150,000
Totals$-$-$800,000$-$-$-$-$800,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
AB2766
$67,845$67,845
DIF (Open Space and Trails)
$161,155$161,155
Measure S
$571,000$571,000
Total Funding:$-$-$800,000$-$-$-$-$800,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
99
100
Capital ImprovementProgram
Fiscal Years2020-24
CITY FACILITIES REHABILITATION
Infrastructure / Other Project
ProjectDescription:ThisprojectfacilitatesrehabilitationprojectsatCityownedandoperatedfacilitiessuchastheMary
PhillipsSeniorCenter,CommunityRecreationCenter,TemeculaElementarySchoolpoolandlockerroom,CivicCenter,Field
OperationsCenter,MaintenanceFacility,TVE2,EscallierHouse&Barn,MercantileBuilding,OldTownParkingGarage,Old
TownSixthStreetParkingLot,S.A.F.E.,TemeculaChildren’sMuseum,TemeculaCommunityCenter,TemeculaPublicLibrary,
TemeculaValleyMuseumandtheChapelofMemories.Therehabilitationprojectscouldinclude,butisnotlimitedto,parking
lotrehabilitationandlightreplacements,heatingventilationandairconditioner(HVAC)upgrades,roofrepairs,carpetand
flooring replacement, cabinet re-facing/replacement, concrete repairs, replacement of fencing and repair of swimming pools.
Benefit/CoreValue:Thisprojectminimizesemergencyrepaircosts,prolongstheservicelifeoffacilities,andupgrades
agingfacilitycomponents.Inaddition,thisprojectsatisfiestheCity’sCoreValuesofaHealthyandLivableCityandASafeand
Prepared Community.
ProjectStatus:Aprioritylistofrehabilitationprojectshasbeendeveloped.Rehabilitationprojectsarecompletedonan
ongoing basis as funding becomes available.
Department: Public Works - Account No. 210.265.701 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 158,660$ 49,788$ 25,000$25,000$25,000$25,000$25,000$ 333,448
Construction
$1,767,460$ 109,555$ 250,000$ 250,000$250,000$ 250,000$250,000$3,127,015
Design/Environmental
$ 43,727$ 14,474$ 25,000$25,000$25,000$25,000$25,000$ 183,201
Totals$1,969,847$ 173,817$ 300,000$ 300,000$300,000$ 300,000$300,000$3,643,664
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$1,576,183$ 173,817$1,750,000
DIF (Corporate Facilities)
$ 250,000$ 250,000
Facilities
Replacement Fund
$ 143,664$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$1,643,664
Total Funding:$1,969,847$ 173,817$ 300,000$ 300,000$ 300,000$ 300,000$ 300,000$3,643,664
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs
101
102
Capital ImprovementProgram
Fiscal Years2020-24
CITYWIDE DRAINAGE MASTER PLAN
Infrastructure / Other Project
ProjectDescription:PrepareareportthatshowsalldrainagecourseswithintheCityandexistingdrainageimprovementsthat
havebeenconstructedtocontrolstormrunoff.Inaddition,thestudywillincludeamasterhydrologystudyandahydraulicstudy
for the City showing the anticipated storm flows at build-out.
Benefit/CoreValue:TheMasterDrainagePlanwillprovidetheCitywithsufficientup-to-dateandaccurateinformationto
systematicallyplanandmanageitsdrainagesystemsandprovidehigherleveloffloodprotectiontoitsresidents,communities,
properties,andinfrastructureinvestments.Inaddition,thisprojectsatisfiestheCity’sCoreValuesofASafeandPrepared
Community and A Sustainable City.
Project Status: This project will start in Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.722 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$120,000$120,000
Design/Environmental
$600,000$600,000
Totals$ -$ -$720,000$-$-$-$-$720,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$720,000$720,000
Total Funding:$ -$ -$720,000$ -$ -$ -$ -$720,000
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs
103
104
Capital ImprovementProgram
Fiscal Years2020-24
CITYWIDE FINANCIAL SYSTEM UPGRADE
Infrastructure / Other Project
ProjectDescription:ThisprojectincludestheimplementationcostsassociatedwiththeupgradeoftheCity'sFinancialAccounting
System.TheCity'scurrentsystemwasimplementedin2001,andasuccessorEnterpriseResourcePlanning(ERP)solutionis
available.TheERPsystemwillintegratewithexistingsoftwareplatformusedCitywideandwillprovideupgradedcoreapplicationsfor
financial management and human resource management.
Benefit/CoreValue:Thisprojectincreasesefficiencies,accountabilityandtransparencyoftheCity'sfinancial,accountingand
humanresourceinformation.Inaddition,thisprojectsatisfiestheCity'sCoreValuesofAccountableandResponsiveCity
Government.
Project Status: This project is estimated to be complete by Fiscal Year 2021-22.
Department: Public Works - Account No. 210.265.724 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Information Technology
$1,376,718$1,376,718
Totals$-$-$1,376,718$-$-$-$-$1,376,718
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$613,184$613,184
Technology Replacement
$763,534$763,534
Total Funding:$-$-$1,376,718$-$-$-$-$1,376,718
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
$66,934$66,934$66,934$66,934
105
106
Capital ImprovementProgram
Fiscal Years2020-24
CITYWIDESTREETLIGHT ACQUISITIONANDLIGHT EMITTINGDIODE (LED) RETROFIT
Infrastructure/ Other Project
ProjectDescription:PhaseIofthisprojectistopurchasetheSouthernCaliforniaEdison(SCE)ownedstreetlightswithintheCity's
boundary,includingthelightpoles,mastarms,andlightfixtures.PhaseIIofthisprojectincludesretrofittingthepurchasedlightswitha
Light Emitting Diode (LED) lighting system.
Benefit/CoreValue:Thisprojectprovidesfortheopportunitytoreducefacilitiescosts,reduceenergyusage,andextendthelifeof
lighting infrastructure. This project satisfies the City's Core Value of A Sustainable City.
Project Status: This project is estimated to be completed in Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.688Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$104,305$104,305
Fixtures/Furn/Equip
$7,099,006$800,000$7,899,006
Totals$-$7,203,311$800,000$-$-$-$-$8,003,311
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$2,503,311$2,503,311
Measure S
$4,700,000$800,000$5,500,000
Total Funding:$-$7,203,311$800,000$-$-$-$-$8,003,311
Future Operation &
Maintenance Costs
2019-202020-212021-222022-232023-24
$(600,000)$(618,000)$ (636,540)$(655,636)
107
108
Capital ImprovementProgram
Fiscal Years2020-24
CITYWIDE SURVEILLANCE CAMERAS
Infrastructure / Other Project
ProjectDescription:TheCitywideCameraSurveillancesystemwillbeutilizedbytheCitytosupportpublicsafety,traffic
management,andassetprotectionactivitiesinservicetoitscitizens.TheCity’sgoalforthesystemistostandardizeandintegrate
existingandnewvideomanagementsystemstoprovidevideotechnologytoimproveoverallsafetyandsecuritytotheresidentsofthe
City.
Benefit/CoreValue:Toprotectpropertyandlife.ThisprojectprovidesPolicetheabilitytoperformvirtualpatrols,maximizingstaff
efficiencyandresources.Inaddition,thisprojectsatisfiestheCity’sCoreValuesofaHealthyandLivableCity,ASafeandPrepared
Community and A Sustainable City.
Project Status: This project is estimated to be complete by the end of Fiscal Year 2020-21.
Department: Information Technology - Account No. 210.265.711 PW17-01Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$2,593$2,593
Construction*
$1,723,344$114,980$1,373,386$150,000$3,361,710
Design
$138,347$31,736$170,083
Totals$1,864,284$146,716$1,373,386$150,000$-$-$-$3,534,386
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Corporate Facilities)
$549,048$653,039$1,202,087
DIF (Police Facilities)
$566,998$146,716$713,714
Measure S
$748,238$720,347$150,000$1,618,585
Total Funding:$1,864,284$146,716$1,373,386$150,000$-$-$-$3,534,386
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
$160,000$260,000$260,000$ 260,000$260,000
*Construction includes camera purchase and installation to facilities
109
Community Recreation Center (CRC) Renovation
Infrastructure/Other Project Location
79
15
79
RD
Legend
CIP Area
0420000Feet
The map CRCrenovation.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
110
Capital ImprovementProgram
Fiscal Years2020-24
COMMUNITY RECREATION CENTER (CRC) RENOVATIONS
Infrastructure/ Other Project
ProjectDescription:Thisprojectfacilitatestherehabilitation,improvement,andreconfigurationoftheCommunityRecreationCenter.
Projectsinclude:expansionandreconfigurationofteencenter;conversionofofficespacetoaccommodateadedicatedpolicesubstation;
renovationofkeycomponentsofthebuildingincludingsafetyfeatures,flooring,roof,andrestroomfacilityaccess;ADAcompliance;
renovationandexpansionofexistingofficespaceandrecroomsincludingAVupgrades;expandedstoragespaceandupgradedkitchen
equipment.
Benefit/CoreValue:Thisprojectwillcreateasafe,engagingplaceforteenstoparticipateinindividualandgroupsocial,recreational,
physical,andeducationalactivities,whilealsoprovidingnecessaryrenovationstotheCRCfacility.Inaddition,thisprojectsatisfiestheCity’s
Core Value of a Healthy and Livable City.
Project Status: Planning and preliminary design will beging in Fiscal Year 2019-20.
Department: Public Works/TemeculaCommunity Services - Account No. 210.265.730Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$75,000$150,000$187,000$412,000
Construction
$1,850,000$2,313,000$4,163,000
Design/Environmental
$425,000$425,000
Totals$-$-$500,000$2,000,000$2,500,000$-$-$5,000,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Parks & Recreation)
$806,048$400,000$1,206,048
DIF (Quimby)
$1,193,952$500,000$1,693,952
Measure S
$500,000$1,600,000$2,100,000
Total Funding:$-$-$500,000$2,000,000$2,500,000$-$-$5,000,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
111
112
Capital ImprovementProgram
Fiscal Years2020-24
COMPREHENSIVE GENERAL PLAN UPDATE
Infrastructure / Other Project
ProjectDescription:CaliforniaStateLawrequiresthateachcityprepareandadoptacomprehensive,long-termGeneralPlanforitsfuture
development.TheGeneralPlanisthefundamentalpolicydocumentoftheCityofTemecula.Itprovidestheframeworkformanagementand
utilizationoftheCity'sphysical,economic,andhumanresources.Thisdocumentguidescivicdecisionsregardinglanduse,conservationof
existinghousingandtheprovisionofnewdwellingunits,theprovisionsofsupportinginfrastructureandpublicservices,theprotectionof
environmental resources, the allocation of fiscal resources, and the protection of residents from natural and human-caused hazards.
TheCity'sGeneralPlanwaslastupdatedin2005.TheGeneralPlanwillserveastheblueprintforthecommunityforapproximatelythenext
fifteenyears.ThisprojectwillupdatealloftheelementsoftheGeneralPlanandwillalsoincludetheimplementationofnewlegislationtoensure
compliance with State Law.
Benefit/CoreValue:TheGeneralPlanupdatesatisfiesallsixoftheCity'scorevalues:HealthyandLivableCity;EconomicProsperity;Safe
and Prepared Community; Sustainable City; Transportation, Mobility, and Connectivity; and Accountable and Responsive Local Government.
Project Status: This project is estimated to start in Fiscal Year 2021-22.
Department: Community Development - Account No. 210.265. Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsTotal Project Cost
Administration
$ 1,000,000$ 500,000$ 1,500,000
Design/Environmental
$ 500,000$ 500,000
Totals$ -$ -$ -$ -$ 1,000,000$ 1,000,000$ -$ 2,000,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedTotal Project Cost
General Fund
$ 1,000,000$ 1,000,000$ 2,000,000
Total Funding:$ -$ -$ -$ -$ 1,000,000$ 1,000,000$ -$ 2,000,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
113
114
Capital ImprovementProgram
Fiscal Years2020-24
ELECTRIC VEHICLESCHARGINGSTATION
Infrastructure/ Other Project
ProjectDescription:Thisprojectincludesthedesignandconstructionofimprovementstoaccommodateelectricvehiclecharging
stationinstallationsatvariousCityfacilities.Theprojectalsoincludesaccommodatingfourchargingstationsateachofthefollowing
facilities:1)Park&RideonTemeculaParkwayatLaPaz;2)SixthStreetParkingLotatMercedesStreet;3)ParkingStructureon
MercedesStreet.Theimprovementsincludeextendingthenecessarypower,upgradingelectricalpanels,ifnecessary,concretebase,
and Dual Port Bollard USA Gateway Station with concrete mounting kit.
Benefit/CoreValue:Thisprojectencouragesalternativetransportationoptions.Inaddition,thisprojectsatisfiestheCity’sCore
Value of A Sustainable City.
Project Status: Project must be complete by Fiscal year 2023 per grant program guidelines.
Department: Public Works - Account No. 210.265.683 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Construction
$188,000$188,000
Totals$-$188,000$-$-$-$-$-$188,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
AB2766
$47,000$47,000
MSRC Grant(1)
$141,000$141,000
Total Funding:$-$188,000$-$-$-$-$-$188,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
(1) Mobile Source Air Pollution Reduction Review Committee
115
116
Capital ImprovementProgram
Fiscal Years2020-24
EXPANDED RECYCLED WATER CONVERSION PROJECT
Infrastructure / Other Project
ProjectDescription:Thisprojectincludestheadministration,designandconstructionofsix(6)siteswithintheCityfortheconversion
ofwaterfacilitiesfrompotabletorecycledwater.ThiseffortisincooperationwithRanchoCaliforniaWaterDistrict(RCWD)to
administertheimplementationofimprovementsinassociationwiththeStateofCaliforniaDepartmentofWaterResourcesProposition
84 Grant Agreement.
Benefit/CoreValue:Thisprojectwillreduceuseofpotablewater,increaseoverallwatersavingsandenhanceenergyefficiencies
andpotentiallyreducegreenhousegasemissions.ThisprojectsatisfiestheCity’sCoreValueofASustainableCity,aHealthyand
Livable City and Accountable and Responsive City Government.
Project Status: Project is estimated to be complete by Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.689PW17-29 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$21,998$21,998
Construction
$460,562$460,562
Design/Environmental
$85,479$85,479
Totals$-$568,039$-$-$-$-$-$568,039
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DWR Grant(1)
$426,029$426,029
Measure S
$142,010$142,010
Total Funding:$-$568,039$-$-$-$-$-$568,039
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
(1) Department of Water Resources Proposition 84 Grant Agreement
117
118
Capital ImprovementProgram
Fiscal Years2020-24
FIBER OPTIC COMMUNICATION SYSTEM UPGRADE
Infrastructure / Other Project
ProjectDescription:Thisprojectwillinstallopticcommunicationsystemupgradesincludingconduit,cable,trafficsignal
controllersandrelatedcommunicationequipmenttoimprovesafetyandoperationswithoptimizedtrafficsignaltiming
coordination.SignalizedintersectionswillbeimprovedalongtheWinchesterRoad,RanchoCaliforniaRoadandTemecula
Parkway corridors.
Benefit/CoreValue:ThisprojectwillupgradetheCity'scommunicationsystemequipment.Inaddition,thisprojectsatisfiesthe
City’s Core Value of A Safe and Prepared Community.
Project Status: A request for proposal (RFP) for design is in process.
Department: Public Works - Account No. 210.265.550 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Construction
$1,218,200$1,218,200
Design/Environmental
$40,209$62,791$103,000
Totals$40,209$1,280,991$-$-$-$-$-$1,321,200
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
(1)
HSIP
$1,208,200$1,208,200
Measure S
$40,209$72,791$113,000
Total Funding:$40,209$1,280,991$-$-$-$-$-$1,321,200
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
(1) Highway Safety Improvement Program
119
Fire Station 73 Gym/Garage
Infrastructure/Other Project Location
79
15
79
Legend
CIP Area
0210000Feet
The map FireStation73Gym_Garage.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
120
Capital ImprovementProgram
Fiscal Years2020-24
FIRE STATION 73 GYM/GARAGE
Infrastructure / Other Project
ProjectDescription:ThisprojectwillconsistofaddingastructureintherearofthepropertytoparkthesquadandUrbanSearchand
Rescue (USR) vehicle as well as adding a gym to the facility.
Benefit/CoreValue:Thisimprovementtothestationwillallowforthestationcrewtostayatthefacilitytoworkoutonadailybasis.
TheadditionofthegaragewillofferanoutsidestoragewithrooftohousethesquadUSRtoreducethewearandtearonthesevehicles.
ThisprojectsatisfiestheCity’sCoreValuesofaSafeandPreparedCommunity,asaSustainableCityandAccountableandResponsive
City Government.
Project Status: This project is estimated to be complete in Fiscal Year 2019-20.
Department: Fire Services - Account No. 210.265.697 Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 75,000$ 75,000
Construction
$ 125,000$ 125,000
Design/Environmental
$ 54,000$ 54,000
Totals$-$-$254,000$-$-$-$-$254,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$ 254,000$ 254,000
Total Funding:$-$-$254,000$-$-$-$-$254,000
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
121
Fire Station 84 Training Room Renovation
Infrastructure/Other Project Location
79
15
79
Legend
CIP Area
0210000Feet
The map FireStation84TrainingRm.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
122
Capital ImprovementProgram
Fiscal Years2020-24
FIRE STATION 84 TRAINING ROOM RENOVATION
Infrastructure / Other Project
ProjectDescription:Thisprojectincludesthedesign,constructionandrenovationofFireStation84,includingupgradestothe
trainingroom.ThisfirestationservesastheheadquarterstationfortheCityofTemeculaFireDepartment.Thisrenovationwillgivea
freshlooktothestationaswellasupdatethefacilitytobemoreenergyefficient.Therenovationwilladdagymtothefacility,upgrade
electrical,upgradethewindows,andre-painttheexteriorandinteriorofthestation.Thelivingquarterswillalsoreceivesome
renovations to the bathrooms, kitchen and day room.
Benefit/CoreValue:ThisprojectsatisfiestheCity’sCoreValuesofaSafeandPreparedCommunity,asaSustainableCityand
AccountableandResponsiveCityGovernment.Thisimprovementwillcreateabetterlearningexperienceforourcommunitymembers
that attend these classes for training.
Project Status: This project is estimated to be complete in Fiscal Year 2019-20.
Department: Fire Services - Account No. 210.265.687 Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 168,750$ 168,750
Construction
$ 349,000$ 349,000
Design/Environmental
$ 149,000$ 149,000
Totals$-$666,750$-$-$-$-$-$666,750
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$ 666,750$ 666,750
Total Funding:$-$666,750$-$-$-$-$-$666,750
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
123
124
Capital ImprovementProgram
Fiscal Years2020-24
HISTORY MUSEUM
Infrastructure / Other Project
ProjectDescription:Thisprojectfacilitatestherehabilitation,improvement,reconfiguration,andrebrandingoftheTemeculaValley
MuseumastheTemeculaMuseumofArtsandCulture.Projectsinclude:reconfigurationandrelocationofpermanentexhibits;anupdateof
downstairsspacetoofferaflexiblespacethatcanbeusedforeventsandrentals,accommodaterotatingexhibits,andallowforeasier
installation; and renovation of key components of the building including safety features, flooring, and restroom facility access
Benefit/CoreValue:Thisprojectwillincreasesafetyforstaffandpatrons,byimprovinginstallationprocessesandaccesstorestroom
facilities;elevateoverallqualityandexperienceforpatronsthroughreconfiguration;andattractmoreartistsandvisitorsthroughthe
increasedcapacityforexhibitionandrebranding.Inaddition,thisprojectcontinuestopromotetheTemeculaValleyasadestination.In
addition, this project satisfies the City’s Core Value of Economic Prosperity.
Project Status: This project is estimated to be complete in fiscal year 2021-22.
Department: TCSD - Account No. 210.290Level: I
Prior Years FYE 2019 2019-20 2023-24
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
Project Cost:
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Construction
$304,000$304,000
Totals$-$-$-$-$304,000$-$-$304,000
Prior Years FYE 2019 2019-20
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
Source of Funds:
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Unspecified*
$304,000$304,000
Total Funding:$-$-$-$-$304,000$-$-$304,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
*Project cannot be constructed until a funding source is identified.
125
I15/SR 79 South Interchange Enhanced Landscaping
Infrastructure/Other Project Location
79
15
79
15
79
Legend
CIP Area
City Boundary
0420000Feet
The map I15_SR79Landscaping.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
126
Capital ImprovementProgram
Fiscal Years2020-24
I15/SR 79 SOUTH INTERCHANGEENHANCEDLANDSCAPING
Infrastructure/ Other Project
ProjectDescription:TheprojectincludesthelandscapebeautificationoftheInterstate15/StateRoute79South(TemeculaParkway)
interchangetoimplementtheInterstate15inassociationwithVisit
TemeculaValley and the Pechanga Tribe.
Benefit/CoreValue:ThisprojectmeetstheCity-widelong-termgoalsasidentifiedintheQualityofLifeMasterPlantoincludeaHealthy
and Livable Cityand Economic Prosperity.
Project Status: This project is in the design phase.
Department: Public Works - Account No. 210.265.690 PW17-19Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Administration
$14,578$60,867$47,133$61,200$183,778
Construction
$2,952,867$2,952,867
Construction Engineering
$235,000$235,000
Design/Environmental
$29,915$335,990$365,905
MSHCP
$150,000$150,000
Totals$44,493$396,857$47,133$-$3,399,067$-$-$3,887,550
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$44,493$396,857$47,133$446,200$934,683
Unspecified*
$2,952,867$2,952,867
Total Funding:$44,493$396,857$47,133$-$3,399,067$-$-$3,887,550
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
$50,000$52,020
*Project cannot be constructed until a funding source is identified.
127
Library Parking - Phase II
Infrastructure/Other Project Location
79
15
79
Legend
CIP Area
0210000Feet
The map LibraryParking_PhaseII.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
128
Capital ImprovementProgram
Fiscal Years2020-24
LIBRARY PARKING -PHASE II
Infrastructure / Other Project
ProjectDescription:Thisprojectincludesthestudy,design,andconstructionofalternativestoprovideadditionalparkingforthe
RonaldH.RobertsTemeculaPublicLibrary.PhaseIIcoversthedesignandconstructionofanexpansionofthecurrenton-site
parkingfacility.TheFurniture,FixturesandEquipment(FF&E)coverscamerasysteminfrastructure,PublicWi-Fiandotheridentified
Information Technology needs.
Benefit/CoreValue:ThisprojectprovidesadditionalparkingforLibrarypatrons,meetings,andspecialprograms.Inaddition,this
project satisfies the City’s Core Value of a Healthy and Livable City.
Project Status: Phase II Design is complete and construction of the expansion will start in Fiscal Year 2019-20.
Department: Public Works / Temecula Community Services - Account No. 210.290.153 PW13-09 Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$288,394$145,095$433,489
Construction
$230,160$1,973,753$2,203,913
Construction Engineering
$54,288$210,490$264,778
Design/Environmental
$230,690$14,310$245,000
Information Technology
$10,346$49,654$60,000
MSHCP
$89,716$89,716
Totals$813,878$2,483,018$-$-$-$-$-$3,296,896
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$37,628$37,628
DIF (Library Facilities)
$765,904$1,496,022$2,261,926
DIF (Police Facilities)
$10,346$39,654$50,000
Measure S
$947,342$947,342
Total Funding:$813,878$2,483,018$-$-$-$-$-$3,296,896
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
129
Main Street Property Improvements
Infrastructure/Other Project Location
79
15
79
Legend
CIP Area
0210000Feet
The map MainStreetProperty.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
130
Capital ImprovementProgram
Fiscal Years2020-24
MAIN STREET PROPERTY IMPROVEMENTS
Infrastructure / Other Project
ProjectDescription:Thisprojectincludessiteimprovementsonparcel922-036-045,adjacenttotheTemeculaCommunityTheater
andPennypicklesWorkshoptoincludegeneralplumbingandelectricalrelocationsandrepairs,installationoflandscapingandvarious
hardscape components.
Benefit/CoreValue:ThisprojectwillenhancethenewlyacquiredCityproperty.Inaddition,thisprojectsatisfiestheCity’sCoreValue
of a Healthy and Livable City.
Project Status: This project is scheduled to be complete by Fiscal Year 2019-20.
Department: Public Works/Temecula Community Services - Accounts No. 210.265.691 PW17-20 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 8,284$ 16,716$25,000
Construction
$ 66,069$48,931$ 115,000
Construction Engineering
$10,000$10,000
Design/Environmental
$ 50,000$50,000
Totals$ 74,353$ 125,647$-$-$-$-$-$ 200,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$ 74,353$ 125,647$200,000
Total Funding:$ 74,353$ 125,647$-$-$-$-$-$ 200,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
131
Margarita Recreation Center
Infrastructure/Other Project Location
79
15
79
Legend
CIP Area
0210000Feet
The map MargaritaRecCenter.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
132
Capital Improvement
ProgramFiscal Years2020-24
MARGARITA RECREATION CENTER
Infrastructure / Other Project
ProjectDescription:ThisprojectconsistsofconstructionofanewrecreationcenterinMargaritaCommunityParkinplaceoftheformer
YMCAbuilding.Theprojectincludesthedemolitionoftheexistingbuildingandpool,constructinganewbuildingandpoolasdeterminedbya
CommunityNeedsAssessmentandavailablebudget.TheInformationTechnologyEquipmentcoverscamerasysteminfrastructure,access
control, Public Wi-Fi and other identified Information Technology needs.
Benefit/CoreValue:ThisprojectwillprovidetheCityanewfacilitytomeettheincreasingdemandsofrecreationalprograms.Inaddition,
this project satisfies the City’s Core Value of a Healthy and Livable City and A Safe and Prepared Community.
Project Status: Concept Design started in FY17/18. Final design and environmental approval anticipated in 2019.
Department: Public Works/Temecula Community Services- Account No. 210.265.692 Level: I
Prior Years FYE 2019 2019-20
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Administration
$23,747$485,571$509,318
Construction
$5,918,788$5,918,788
Construction Engineering
$508,535$520,000$1,028,535
Design/Environmental
$459,867$459,867
Information Technology
$15,634$524,366$200,000$740,000
Totals$39,381$7,897,127$720,000$-$-$-$-$8,656,508
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Capital Financing
$6,405,000$6,405,000
DIF (Police Facilities)
$15,634$121,366$137,000
Measure S
$23,747$1,370,761$720,000$2,114,508
Total Funding:$39,381$7,897,127$720,000$-$-$-$-$8,656,508
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
$744,600$759,492$ 774,682$790,175
133
Medians and - Citywide
Infrastructure/Other Project Location
79
BUCK RD
15
S
R
D
79
N
U
A
P
ELG
IN C
T
DMA
DR RGAR
OITARD
O
W
OEN
ST
R
D
DEPORTOLAR
R
Legend
CIP Area
City Boundary
042,400,800Feet
The map MediansOrnamentalPed.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
134
Capital ImprovementProgram
Fiscal Years2020-24
MEDIANS AND TRAFFIC CALMING IMPROVEMENTS -CITYWIDE
Infrastructure / Other Project
ProjectDescription:Thisprojectincludesthedesignandconstructionofraisedconcretemedians(withstampedconcrete),
neighborhoodidentificationmedians,pedestrianbulb-outs,andotherfeaturestoprovideneighborhoodtrafficcalmingatlocations
suchasSeraphinaRoad,NighthawkPass,RoripaughRoad,SuziLane,ChandlerDrive,ChannelStreet,DelReyRoad,ViaNorte
and other traffic calming program locations throughout the City.
Benefit/CoreValue:Thisprojectprovidesneighborhoodtrafficcalming,enhancespedestrian,bicyclesafetyandthequalityoflife
atvariouslocationswithintheCity.ThisprojectsatisfiestheCity’sCoreValuesofASafeandPreparedCommunity,ASustainable
City, and Transportation Mobility and Connectivity.
Project Status: This project has a priority list of locations and will be constructed in priority order.
Department: Public Works - Account No. 210.265.704 Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$25,000$10,000$10,000$45,000
Construction
$41,752$165,148$ 220,000$ 230,000$656,900
Construction Engineering
$10,000$10,000$10,000$30,000
Design/Environmental
$29,900$25,100$20,000$20,000$95,000
Totals$71,652$225,248$-$ 260,000$-$ 270,000$-$826,900
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Street Improvements)
$40,000$40,000
Measure S
$31,652$200,248$ 260,000$ 270,000$761,900
Reimbursements
(TVUSD) (1)
$25,000$25,000
Total Funding:$71,652$225,248$-$ 260,000$-$ 270,000$-$826,900
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
(1) Temecula Valley Unified School District Contribution
135
Murrieta Creek Improvements
Infrastructure/Other Project Location
79
15
15
79
A
K
15
R
KDR
Legend
CIP Area
City Boundary
01600,200Feet
The map MurrietaCreekImprove.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
136
Capital ImprovementProgram
Fiscal Years2020-24
MURRIETA CREEK IMPROVEMENTS
Infrastructure / Other Project
ProjectDescription:ThisprojectincludesthedesignandconstructionoftheproposedUnitedStatesArmyCorpsof
EngineersandRiversideCountyFloodControlimprovementstotheMurrietaCreekwithintheCitylimits.Thisprojectalso
includesthestudy,design,andconstructionofalternativestoreconfiguretheexistingSouthsideParkingLotwhichhasbeen
impacted by the Riverside County Flood Control's acquisition of a portion of the parking lot.
Benefit/CoreValue:ThisprojecthelpspreventfloodingofOldTownTemeculaandmitigatethepropertyacquisitionimpacts
totheSouthSideParkingLot.Inaddition,thisprojectsatisfiestheCity’sCoreValuesofASafeandPreparedCommunityand
A Sustainable City.
ProjectStatus:TheCityisworkingwithRiversideCountytoformaJointPowersAuthoritytofurthertheimplementationofthis
project.ConstructionofPhaseII,justsouthofRanchoCaliforniaRoadtosouthofFirstStreetbridge,startedFall2015andis
almostcomplete.DesignfortheparkinglotreconfigurationhasbegunandtheCityisworkingwiththeadjacentpropertyowners
to ensure that the new parking design will maximize the number of parking spaces.
Department: Public Works - Account No. 210.265.735 PW15-07 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration $144,649
$ 35,196$ 87,432$ 267,277
Construction
$ 5,000$ 144,000$ 449,000$ 598,000
Design/Environmental
$ 151,460$ 53,697$ 205,157
Totals$ 191,656$ 285,129$ 449,000$ -$ -$ -$ 144,649$1,070,434
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$ 135,858$ 135,858
(1)
Reimbursements
$ 55,798$ 285,129$ 449,000$ 144,649$ 934,576
Total Funding:$ 191,656$ 285,129$ 449,000$ -$ -$ -$ 144,649$1,070,434
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
(1)
Construction of the Southside Parking Lot Reconfiguration will not occur until the Purchase and Sale Agreement with Riverside County Flood
Control is executed and the proceeds are received. Frontier Sale of Utility Easement.
137
138
Capital ImprovementProgram
Fiscal Years2020-24
OLD TOWN PARKING STRUCTURE
Infrastructure / Other Project
ProjectDescription:ThisprojectwillincludethedesignandeventualconstructionofanewparkingstructureinOldTown.
TheOldTownParkingManagementPlanoutlinesanumberofparkingstrategiesthatcanbeimplementedinOldTownover
time. Additional parking structures are anticipated to be constructed as part of the long term parking management strategy.
Benefit / Core Value: This project will satisfy the City's Core Values of a Healthy and Livable City and Economic Prosperity.
Project Status: This project is estimated to be complete in Fiscal Year 2018-19.
Department: Public Works - Account No. 210.265.694 PW17-15 Level: III
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 90,759$ 14,241$ 105,000
Design/Environmental
$ 13,750$ 881,250$ 895,000
Totals$ 104,509$ 895,491$ -$ -$ -$ -$ -$1,000,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$ 104,509$ 895,491$1,000,000
Total Funding:$ 104,509$ 895,491$ -$ -$ -$ -$ -$1,000,000
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs
139
Pechanga Parkway Environmental Mitigation
Infrastructure/Other Project Location
79
15
79
O
A
KY
G
A
B
R
I
SAMA
R
E
PL
LU
Legend CT
CIP Area
0840000Feet
The map PechangaPkwyEnviro.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
140
Capital ImprovementProgram
Fiscal Years2020-24
PECHANGA PARKWAY ENVIRONMENTAL MITIGATION
Infrastructure / Other Project
ProjectDescription:Thisprojectincludesthedesign,construction,andimplementationofanenvironmentalmitigationsite
requiredforthePechangaParkwayProject,includingacquisitionandplantingofthemitigationsiteinTemeculaCreek.In
addition, this project provides water to plant material and monitoring the mitigation site for five (5) years.
Benefit/CoreValue:Thisprojectincreasesenvironmentalmitigationareas.Inaddition,thisprojectsatisfiestheCity’sCore
Value of A Sustainable City.
ProjectStatus:ThedesignandconstructionofnewwetlandswascompletedduringFiscalYear2014-15.Upontheapprovalof
the resource agencies, the maintenance of the created area is estimated to be completed by the end of Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.516 PW11-01 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$323,995$199,832$523,827
Acquisition
$20,442$5,000$25,442
Construction
$164,684$49,865$214,549
Construction Engineering
$ 1,710$8,290$10,000
Design/Environmental
$271,079$5,086$276,165
Utilities$ 1,023$1,023
Totals$782,933$268,073$ -$-$-$ -$ 1,051,006
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
CFD (Wolf Creek)
$782,933$268,073$ 1,051,006
Total Funding:$782,933$268,073$ -$ -$ -$ -$ -$ 1,051,006
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
141
142
Capital ImprovementProgram
Fiscal Years2020-24
PEDESTRIAN SIGNAL EQUIPMENT UPGRADE -CITYWIDE
Infrastructure / Other Project
ProjectDescription:Thisprojectwillinstallpedestriancountdownsignalheads,ADAcompliantpedestrianpushbutton
equipmentandupgradetrafficsignalcontrollerstoimprovesafetyandoperationsatsignalizedintersectionsCitywideincludingthe
ButterfieldStageRoad,JeffersonAvenue,MargaritaRoad,RedhawkParkway,PechangaParkway,RanchoCaliforniaRoad,
Temecula Parkway and Ynez Road corridors.
Benefit/CoreValue:ThisprojectimprovespedestriansafetyandtrafficcirculationthroughouttheCity.Inadditionthisproject
satisfies the City's Core Values of a Healthy and Livable Community and A Safe and Prepared Community.
Project Status: This project is estimated to be complete by June 30, 2020.
Department: Public Works - Account No. 210.265.518Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$5,000$5,000
Construction
$803,200$803,200
Construction Engineering
$105,000$105,000
Design/Environmental
$33,000$33,000
Totals$-$38,000$908,200$-$-$-$946,200
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
(1)
HSIP
$908,200$908,200
Measure S
$38,000$38,000
Total Funding:$-$38,000$908,200$-$-$-$-$946,200
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
(1) Highway Safety Improvement Program
143
144
Capital ImprovementProgram
Fiscal Years2020-24
PUBLIC SAFETY MONUMENT
Infrastructure / Other Project
ProjectDescription:Toidentifysuitablelocationinparkspace/publicforanacknowledgementandtributetothemenand
womenwhoserveasfirstrespondersinPolice,Fireandemergencyserviceoccupations.Thedesignofsuchatributewouldbe
inpartnershipwithpublicsafetypersonnelandserveasaremindertoresidentsoftheirdedicationandsacrificetomaintaining
the safety of our community.
Benefit/CoreValue:TohonorFireandPolice.Inaddition,thisprojectsatisfiestheCity’sCoreValuesofASustainableCity,
and Accountable and Responsive City Government.
Project Status: Project will be funded as funding becomes available.
Department: Public Works/Temecula Community Services - Account No. 210.265 Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 5,000$ 5,000
Design/Environmental
$ 25,000$ 25,000
Totals$-$ -$ -$ -$30,000$ -$ -$ 30,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Unspecified*
$ 30,000$ 30,000
Total Funding:$-$ -$ -$ -$30,000$ -$ -$ 30,000
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs
*Project cannot be constructed until a funding source is identified.
145
Santa Gertrudis Creek Pedestrian/Bicycle Trail Extension and Interconnect
Infrastructure/Other Project Location
79
15
79
15
Legend
CIP Area
City Boundary
0420000Feet
The map SantaGertrudisCreek.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
146
Capital ImprovementProgram
Fiscal Years2020-24
SANTA GERTRUDIS CREEK PEDESTRIAN/BICYCLE TRAIL EXTENSION
AND INTERCONNECT
Infrastructure / Other Project
ProjectDescription:Thisprojectincludesthedesign,environmental,andconstructionoftheextensionandinterconnectofthe
existingSantaGertrudisCreekPedestrian/BicycleTrailfromYnezRoadtotheMurrietaCreekMulti-PurposeTrail.Theextensionand
interconnectwillprovideaccessandunder-crossingsatYnezRoad,Interstate15andJeffersonAvenue,andacontinuouspavedtrail
along the Santa Gertrudis Creek to interconnect with the Murrieta Creek Multi-Purpose Trail.
Benefit/CoreValue:Theprojectprovidesadditionalpedestrianandbicycletrailsforthecommunity.Inaddition,thisprojectsatisfies
the City’s Core Values of Transportation Mobilityand Connectivity.
Project Status: The design and environmental document is expected to be complete by the end of Fiscal Year 2019-20.
Department: Public Works - Account No. 210.265.739 PW08-04 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$170,397$394,277$278,313$842,987
Construction
$3,570,000$647,043$4,217,043
Construction Engineering
$265,600$265,600
Design/Environmental
$410,043$342,069$752,112
MSHCP
$178,500$32,353$210,853
Totals$580,440$4,750,446$957,709$-$-$-$-$6,288,595
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
AB2766
$58,683$58,683
(1)
BTA
$223,311$223,311
General Fund
$78,920$78,920
DIF (Open Space and Trails)
$219,526$169,547$389,073
Measure S
$821,899$957,709$1,779,608
(2)
SB1 ATP Augmentation
$3,759,000$3,759,000
Total Funding:$580,440$4,750,446$957,709$-$-$-$-$6,288,595
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
1) Bicycle Transportation Account
2)California Transportation Commission (CTC) adopted the 2017 Active Transportation Program Augmentation on October 18,2017 and allocated the funds at
their December 6, 2017 meeting.
147
Santa Gertrudis Creek Phase II - Margarita Undercrossing
Infrastructure/Other Project Location
79
15
79
Legend
CIP Area
0420000Feet
The map SantaGertrudisCreekPhaseII.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
148
Capital ImprovementProgram
Fiscal Years2020-24
SANTA GERTRUDIS CREEK PHASE II -MARGARITA UNDER-CROSSING
Infrastructure / Other Project
ProjectDescription:Thisprojectincludesthedesign,environmental,andconstructionoftheunder-crossinginSantaGertrudisCreek
atMargaritaRoadtoconnecttothepedestrian/bicycletrail.Theunder-crossingatMargaritaRoadwillprovideacontinuouspavedtrail
along the Santa Gertrudis Creek at this location.
Benefit/CoreValue:Theprojectprovidesasafepedestrianandbicycletrailconnectionforthecommunity.Inaddition,thisproject
satisfies the City’s Core Values of Transportation Mobility and Connectivity.
Project Status: This is a new project.
Department: Public Works - Account No. 210.265.732 PW19-04Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 110,000$50,000$ 146,200$ 306,200
Construction
$ 1,462,000$ 1,462,000
Construction Engineering
$ 220,000$ 220,000
Design/Environmental
$ 323,000$ 323,000
MSHCP
$ 73,100$ 73,100
Totals$-$-$433,000$50,000$ 1,901,300$-$-$2,384,300
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$ 433,000$50,000$ 399,300$ 882,300
(1)
2019 ATP(SB1)
$ 1,502,000$ 1,502,000
Total Funding:$-$-$433,000$50,000$ 1,901,300$-$-$2,384,300
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
1) California Transportation Commission (CTC) adopted the 2019 Active Transportation Program Augmentation on January 30 - 31, 2019.
149
150
Capital ImprovementProgram
Fiscal Years2020-24
SIDEWALKS -CITYWIDE
Infrastructure / Other Project
Project Description: This project will include the construction of sidewalks at various locations throughout the City.
Benefit/CoreValue:Thisprojectwillprovidewalkingsurfacesforpedestrians.Inaddition,thisprojectsatisfiestheCity’sCoreValueof
Transportation Mobility and Connectivity and A Sustainable City.
ProjectStatus:AstudytoidentifyareaswithmissingsidewalksandprioritizethemwascompletedaspartoftheTrailsandBikewaysMasterPlan
UpdateinFiscalYear2015-16.Basedonthestudyandtheavailableresources,sidewalkswillbeconstructedintheselectedareasconsidering
economy of scale and proximity to private development.
Department: Public Works - Account No. 210.265.708 PW17-24, PW17-27 & PW17-28 Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Administration
$ 179,912$ 1,493$ 150,000$ 50,000$ 50,000$ 50,000$ 50,000$ 531,405
Construction
$ 109,462$ 233,204$ 540,596$ 320,000$ 320,000$ 320,000$ 320,000$2,163,262
Construction Engineering
$ 4,412$ 37,588$ 13,000$ 60,000$ 60,000$ 60,000$ 60,000$ 295,000
Design/Environmental
$ 96,787$ 62,142$ 46,000$ 70,000$ 70,000$ 70,000$ 70,000$ 484,929
Totals$ 390,573$ 334,427$ 749,596$ 500,000$ 500,000$ 500,000$ 500,000$3,474,596
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$ 375,000$ 375,000
Measure S
$ 15,573$ 334,427$ 658,596$ 500,000$ 500,000$ 500,000$ 500,000$3,008,596
Senate Bill 821/RCTC
$ 91,000$ 91,000
Total Funding:$ 390,573$ 334,427$ 749,596$ 500,000$ 500,000$ 500,000$ 500,000$3,474,596
Future Operation & Maintenance
Costs
2019-202020-212021-222022-232023-24
151
Sidewalks - DLR Dr
Infrastructure/Other Project Location
79
15
79
15
Legend
CIP Area
0420000Feet
The map Sidewalks_DLR.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
152
Capital ImprovementProgram
Fiscal Years2020-24
SIDEWALKS -DLR DRIVE
Infrastructure / Other Project
ProjectDescription:Thisprojectwillincludetheconstructionofsidewalksonthenorthsideofnortherlyleg,westside,andsouthsideofthe
southerly leg of DLR Drive.
Benefit/CoreValue:ThisprojectwillprovidewalkingsurfacesforpedestriansandwillfacilitatetheconstructionoftheLexusdealership.In
addition, this project satisfies the City’s Core Value of Transportation Mobility and Connectivity, A Sustainable City, and Economic Prosperity.
Project Status: This is a new project
Department: Public Works - Account No. 210.265.721 Level: I
Prior Years FYE 2019 2019-20 2023-24
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 Projected and Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedFuture YearsCost
Administration
$ 74,000$ 74,000
Construction
$ 284,130$ 284,130
Construction Engineering
$ 18,081$ 18,081
Design/Environmental
$ 51,660$ 51,660
MSHCP
$ 14,206$ 14,206
Totals$ -$ -$ 442,077$ -$ -$-$ -$ 442,077
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$ 442,077$ 442,077
Total Funding:$ -$ -$ 442,077$ -$ -$-$ -$ 442,077
Future Operation & Maintenance
Costs
2019-202020-212021-222022-232023-24
153
Sidewalks - Old Town Boardwalk Enhancements
Infrastructure/Other Project Location
79
15
79
15
Legend
CIP Area
0420000Feet
The map Sidewalks_OldTown.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
154
Capital ImprovementProgram
Fiscal Years2020-24
SIDEWALKS -OLD TOWN BOARDWALK ENHANCEMENT
Infrastructure / Other Project
ProjectDescription:Thisprojectwillestablishprogramsthatwillremoveboardwalkplankboardsandreplacethemwithcolored
concrete sidewalks stamped with wood grain finish similar to what was installed with the new Main Street bridge.
Benefit/CoreValue:Thisprojectpromotesasustainablewalkablesurfacethatwillrequirelittlemaintenance.Newsidewalkswill
enhanceAmericanwithDisabilitiesAct(ADA)access.Itwillalsopromotea"walkable"communitybyconnectingtheCity.In
addition,this project satisfies the City’s Core Values of a Healthy and Livable City and Transportation Mobility and Connectivity.
Project Status: Design is complete, construction to follow.
Department: Public Works - Account No. 210.265.696PW17-16Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$144,845$30,000$50,000$224,845
Construction
$46,624$666,567$86,375$799,566
Construction Engineering
$60,000$28,152$88,152
Totals$191,469$756,567$164,527$-$-$-$-$1,112,563
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
(1) (2)
CDBG
$91,243$296,793$388,036
Measure S
$100,226$459,774$164,527$724,527
Total Funding:$191,469$756,567$164,527$-$-$-$-$1,112,563
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
(1) Community Development Block Grant- Action Plan Fiscal Year 2017-18
155
Temecula Elementary School (TES) Pool Renovation
Infrastructure/Other Project Location
79
15
79
L
Legend
CIP Area
0210000Feet
The map TESPoolRenovation.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
156
Capital ImprovementProgram
Fiscal Years2020-24
TEMECULAELEMENTARYSCHOOL (TES)POOL RENOVATION
Infrastructure Project
ProjectDescription:ThisprojectincludestherenovationoftheTemeculaElementarySchool(TES)poolbuilding,includingroof
replacement and the reconstruction of the pool deck. The City of Temecula maintains and operates this pool facility.
Benefit/CoreValue:ThisprojectprotectstheCity'svastinvestmentinfacilities.ThisprojectsatisfiestheCity’sCoreValueofa
Healthy and Livable City, A Safe and Prepared Community and Accountable and Responsive City Government.
Project Status: Land surveying is currently in progress. Design will be initiated during this fiscal year and construction is to follow.
Department: Public Works/Temecula Community Services - Account No. 210.290.143 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$39,600$39,600
Construction
$247,500$247,500
Design/Environmental
$48,000$48,000
Totals$-$335,100$-$-$-$-$-$335,100
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Parks & Recreation)
$335,100$335,100
Total Funding:$-$335,100$-$-$-$-$-$335,100
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
157
158
Capital ImprovementProgram
Fiscal Years2020-24
UTILITY UNDERGROUNDING -CITYWIDE
Infrastructure / Other Project
ProjectDescription:ThisprojectincludestheundergroundingofutilitiesatvariouslocationsthroughouttheCitytoextendthe
undergroundingdonebythedevelopersbeyondthelimitsoftheirdevelopments.Therequestedfundingcoversthefollowingtwolocations:
1)approximately600LFinfrontofJulianCharterSchool(locatedat29141VallejoAvenue)betweentwoprivatedevelopments(theGateway
DevelopmentandHopeLutheranChurch);2)approximately250LFonThirdStreetjusteastofOldTownFrontStreetandwestofthe
proposed hotel.
Benefit/CoreValue:Undergroundingofthis600LFsegmentofexistingoverheadutilitylinesalongVallejoAvenuewillresultinatotalof
2,000LFofutilityundergroundingasthetwoadjacentprivatedevelopmentswillimprovetheirfrontageoverheadutilitiesaswell.Also,the
utilitiesonThirdStreet,betweenMercedesandOldTownFrontwillbeundergroundedasaresultoftheproposedhotelandthisproject.In
addition, this project satisfies the City’s Core Value of A Sustainable City.
Project Status: This project was initiated in Fiscal Year 2017-18. Implementation is contingent on adjacent developments.
Department: Public Works - Account No. 210.265.776 Level: II
2022-23
Prior Years FYE 2018 2018-19 Projected
Project Cost:
Actual Carryover Adopted 2019-20 2020-21 2021-22 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$31,875$31,875
Construction
$89,061$123,439$212,500
Totals$89,061$155,314$-$-$-$-$-$244,375
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$89,061$155,314$244,375
Total Funding:$89,061$155,314$-$-$-$-$-$244,375
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs:
159
160
Capital Improvement Program
FiscalYears 2020-24
PARKS and RECREATION PROJECTS
Table of Contents
Children’s Museum Enhancement Project.........................................................................1
Community Services Master Plan.....................................................................................1
Eagle Soar Splash PadControl System Renovation.........................................................16
Flood Control Channel Reconstruction andRepair...........................................................16
Parks ImprovementProgram............................................................................................1
Park Restrooms Renovations, Expansion, and Americans with Disabilities Act (ADA)
Improvements...................................................................................................................1
Playground Equipment Enhancement and SafetySurfacing.............................................1
Ronald Reagan Sports Park Restroom Expansion and Renovation..................................17
Ronald H. RobertsTemecula Public LibraryEnhancementand Renovation.....................17
Sports Court Resurfacing..................................................................................................1
Sports Field Lighting Light Emitting Diode(LED)Conversion............................................1
161
Capital ImprovementProgram
Fiscal Years2020-24
CHILDREN'S MUSEUM ENHANCEMENTPROJECT
ParksandRecreation Project
Total
Prior Project
Year Cost
Children's Museum
Actuals 2019-20 Funding Source
DIF (Parks & Recreation)
Basement (Recycling Room) - Remove & Replace entire room with new theme$63,572
Library(Travel & Time) - New Exhibit(Time/Geography);new Book Worm Exhibit; Refresh
BookshelvesMeasure S
$21,518
Dining Room (Power & Electricity) - Upgrade Electrical Wall ExhibitMeasure S
$20,000
Hallway & Museum Wide - Sound System Upgrade; New sound effects throughout; Puzzling
Predicaments (Escape Room Concept)Measure S
$20,000
Measure S
Maze Room - Refresh entire Room$25,000
Basement (Recycling Room) - Remove & Replace entire room with new themeMeasure S
$200,000
Measure S
Bedroom (Perception/Illusion Room) - Refresh entire room; add themed exhibit$50,000
DIF (Parks & Recreation)
Foyer (Flight Room) - Refresh/Renovate$50,000
DIF (Parks & Recreation)
Bathroom (Hydroelectric room) - New toilet exhibit; refresh balance$50,000
Measure S
Music Room - Wall Exibits use existing Organ Ambiance update$25,000
Measure S
Play Room - Computer upgrades$10,000
Measure S
Life Science Hallway - Refresh$10,000
Total $63,572$481,518$545,090
162
Capital ImprovementProgram
Fiscal Years2020-24
CHILDREN’S MUSEUM ENHANCEMENT PROJECT
Parks and Recreation Project
ProjectDescription:AsexhibitsandplayexperiencesintheChildren’sMuseumbecomeoutdated,thisprojectallowsforthe
re-designandreplacementofexhibitareasorrefurbishmentofexistingexhibits.Thisprocessprovidesthemuseumvisitors
new and updated play experiences.
Benefit/CoreValue:ThisprojectenhancesexistingexhibitareasoftheChildren’sMuseum.Inaddition,thisprojectsatisfies
the City’s Core Value of a Healthy and Livable City.
ProjectStatus:Aprojectlisthasbeendeveloped.Projectsarecompletedonanon-goingbasisasfundingbecomes
available.
Department: Temecula Community Services - Account No. 210.290.125 Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 432$ 9,568$ 10,000
Construction
$ 63,140$ 457,950$ 521,090
Design/Environmental
$ 14,000$ 14,000
Totals$ 63,572$ 481,518$ -$ -$ -$ -$ -$ 545,090
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Parks & Recreation)
$ 63,572$ 81,518$ 145,090
Measure S
$ 400,000$ 400,000
Total Funding:$ 63,572$ 481,518$ -$ -$ -$ -$ -$ 545,090
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs
163
164
Capital ImprovementProgram
Fiscal Years2020-24
COMMUNITY SERVICES MASTER PLAN
Parks and Recreation Project
ProjectDescription:TheCommunityServicesDepartment'spriorMasterPlans(Youth,2008;CulturalArts,1999;andParks
andRecreation,1993)nolongeradequatelyaddresstheservices,facilities,andparkscurrentlymanagedbytheCity;nordo
thesedocumentsreflectcurrentdemographic,statutory,financial,andsocialfactors.TheCommunityServicesMasterPlanwill
provideapathwayforthefuture,takingintoaccounttheexistingcapacity,location,andconditionoffacilities,programs,andparks
as well as the needs and desires of City residents.
Benefit/CoreValue:ThisprojectwillcreateacomprehensiveMasterPlantoenabletheorderlyandconsistentplanning,
acquisition,development,andadministrationoftheCity'sCommunityServicesfacilities,programs,andparks.Itwillalsoprotect
theCity'sexistinginvestmentintheseresources.Inaddition,thisprojectsatisfiestheCity’sCoreValueofaHealthyandLivable
City, A Safe and Prepared Community and Accountable and Responsive City Government.
Project Status: The Community Services Master Plan will be conducted as resources are identified.
Department: Public Works/Temecula Community Services - Account No. 210.290.117 Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$125,000$125,000
Design/Environmental
$151,200$151,200
Totals$ -$276,200$ -$-$-$-$-$276,200
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$276,200$276,200
Total Funding:$ -$276,200$ -$-$-$-$-$276,200
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
165
Eagle Soar Splash Pad Control System Renovation
Parks and Recreation Project Location
79
15
79
Legend
CIP Area
0210000Feet
The map EagleSoarSplashPad.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
166
Capital ImprovementProgram
Fiscal Years2020-24
EAGLE SOAR SPLASH PAD CONTROL SYSTEM RENOVATION
Parks and Recreation Project
ProjectDescription:ThisprojectprovidesfortherenovationandupdatingofthesplashpadcontrolsystemtomeetcurrentHealth&
Safety requirements.
Benefit/CoreValue:Thisprojectenhancesthesafetyforthesplashdeckusersandreducestheriskofexposuretounsanitarywater.
Inaddition,thisprojectsatisfiestheCity’sCoreValueofaHealthyandLivableCity,ASafeandPreparedCommunityandAccountable
and Responsive City Government.
Project Status: This project is estimated to be complete in Fiscal Year 2019-20
Department: Public Works/Temecula Community Services - Account No. 210.290.145Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 20,000$20,000
Construction
$ 280,000$280,000
Totals$-$-$ 300,000$-$-$ -$ -$ 300,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$ 300,000$300,000
Total Funding:$-$-$ 300,000$-$-$ -$ -$ 300,000
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
167
168
Capital ImprovementProgram
Fiscal Years2020-24
FLOOD CONTROL CHANNEL RECONSTRUCTION AND REPAIR
Parks and Recreation Project
ProjectDescription:Thisprojectrepairsandreinforcestheearthandbermsbetweenspecificparksitesandfloodcontrolchannels,
andfortifiesthebankstopreventfurthererosionintotheparksites.AreportforPalaCommunityPark,MargaritaCommunityPark,and
LongCanyonCreekParkwasdeveloped.ThefundingidentifiedthroughFiscalYear2019-20coverstheconstructionworkrequiredto
protect Pala Park. The Future Years funding is to protect Margarita and Long Canyon Community Parks.
Benefit/CoreValue:Thisprojectpreventsfurthererosionintospecificparksites.Inaddition,thisprojectsatisfiestheCity’sCore
Value of a Healthy and Livable City.
ProjectStatus:AstudyoftheaffectedparkswascompletedinFiscalYear2014-15.Designandconstructionoftherecommended
fixeswillbeimplementedbasedonavailablefunds.DesignforPalaParkwascompletedinFiscalYear2015-16.Environmental
process commenced in Fiscal Year 2017-18 and will conclude in Fiscal Year 2019-20.
Department: Public Works / Temecula Community Services - Account No. 210.290.127 PW11-10 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 159,907$ 131,053$ 220,000$510,960
Construction
$ 45,531$665,000$ 426,672$3,900,000$5,037,203
Construction Engineering
$ 78,500$160,000$238,500
Design/Environmental
$ 241,474$89,219$550,000$880,693
MSHCP
$ 37,027$ 15,377$52,404
Totals$ 446,912$1,000,799$ 442,049$-$ -$4,830,000$-$ 6,719,760
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$ 446,912$ 203,372$ 650,284
Measure S
$ 797,427$ 442,049$1,239,476
Unspecified*
$4,830,000$4,830,000
Total Funding:$ 446,912$1,000,799$ 442,049$-$ -$4,830,000$-$ 6,719,760
Future Operation & Maintenance
2019-202020-212021-222022-232023-24
Costs
*Project cannot be constructed until a funding source is identified
169
170
Capital ImprovementProgram
Fiscal Years2020-24
PARKS IMPROVEMENT PROGRAM
Parks and Recreation Project
ProjectDescription:ThisprojectfacilitatesrehabilitationandimprovementprojectsatvariousCityparksTherehabilitation
andimprovementprojectscouldinclude,butarenotlimitedto,parkinglotrepairsandresurfacing,landscapemedians,raised
andcrackedconcretesidewalkreplacement,fencingrepairandreplacement,landscapingandirrigationsystemefficiency
upgrades, lighting system repairs and efficiency upgrades, on-site drainage improvements and other similar projects.
Benefit/CoreValue:ThisprojectprotectstheCity’svastinvestmentinparksandopenspacefacilities.Inaddition,this
projectsatisfiestheCity’sCoreValuesofaHealthyandLivableCity,ASafeandPreparedCommunity,andAccountableand
Responsive City Government.
ProjectStatus:Aprioritylistofrehabilitationprojectshasbeendeveloped.Rehabilitationsarecompletedonanon-going
basis.
Department: Public Works / Temecula Community Services - Account No. 210.290.130 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 21,400$ 23,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 144,400
Construction
$1,563,181$ 102,419$ 230,000$ 230,000$ 230,000$ 230,000$ 230,000$2,815,600
Totals$1,584,581$ 125,419$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$2,960,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
General Fund
$1,060,000$1,060,000
Measure S
$ 274,581$ 125,419$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$1,650,000
DIF (Quimby)
$ 250,000$ 250,000
Total Funding:$1,584,581$ 125,419$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$2,960,000
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs
171
Capital ImprovementProgram
Fiscal Years2020-24
PARK RESTROOMS RENOVATIONS, EXPANSION AND
AMERICANS WITH DISABILITY ACT(ADA) IMPROVEMENTS
Parks and Recreation Project
Prior
Year Project Fiscal Funding
Park Restrooms
Actuals Cost Year Source
Measure S
Prior Year Actuals$39,094$39,094
Measure S
$2019-20
Measure S
$2019-20
Butterfield Stage Park - New Restroom Facility
Measure S
$0,0002019-20
Vail Ranch Park - New Restroom Facility
Measure S
Restroomenovation - Various sites ADA Compliance Enhancements$10,0002019-20
Total$39,094$1,127,800
Prior Year$39,094
FY 2019-20$1,088,706
FY 2020-21
TOTAL:$1,127,800
172
Capital ImprovementProgram
Fiscal Years2020-24
PARK RESTROOMS RENOVATIONS, EXPANSION AND
AMERICANS WITH DISABILITY ACT(ADA) IMPROVEMENTS
Parks and Recreation Project
ProjectDescription:Thisprojectprovidesforthedesignandconstructionofnewparkrestroomfacilitiesandtherenovation,expansion
andAmericanswithDisabilitiesAct(ADA)improvementsofexistingrestroomfacilitiesatvariousParks.Therestroomexpansionincludes
addingadditionalrestroombuildings,renovatingconcessionandbringingrestroomfacilitiestomeetcurrentADAaccessibilitycompliance
standards.
Benefit/CoreValue:Thisprojectprovidesadditionalrestroomsforparkpatronsandbringsfacilitytoaccessibilitycompliance.In
addition, this project satisfies the City’s Core Values of a Healthy and Livable City, and A Safe and Prepared Community.
Project Status: This project is estimated to be complete by Fiscal Year 2021-22.
Department: Public Works/Temecula Community Services - Account No. 210.290.155 PW17-06Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 40,000$ 40,000$ 80,000
Construction
$ 39,094$208,706$ 685,000$ 932,800
Construction Engineering
$ 20,000$ 30,000$ 50,000
Design/Environmental
$ 25,000$ 10,000$ 35,000
Information Technology
$ 15,000$ 15,000$ 30,000
Totals$ 39,094$308,706$ 780,000$-$ -$-$ -$ 1,127,800
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$ 39,094$308,706$ 780,000$1,127,800
Total Funding:$ 39,094$308,706$ 780,000$-$ -$-$ -$ 1,127,800
Future Operation & Maintenance
Costs
2019-202020-212021-222022-232023-24
$ 25,000$ 25,500$26,010$ 26,530
173
Capital ImprovementProgram
Fiscal Years2020-24
PLAYGROUND EQUIPMENT ENHANCEMENT AND SAFETY SURFACING
Parks and Recreation Project
Prior
Year Project Fiscal Funding
Actuals Cost Year Source
Park Playground
DIF (Quimby)
Riverton Park, Temeku Resurfacing, Rotary Park$1,440,992$889,0082019-20
Measure S
Park Playground Enhancement$86,905$294,1942019-20
Measure S
Future Playgrounds Enhancements$500,0002019-20
Measure S
Future Playgrounds Enhancements$500,0002020-21
Measure S
Future Playgrounds Enhancements$500,0002021-22
Measure S
Future Playgrounds Enhancements$500,0002022-23
Measure S
$500,0002023-24
Total$1,527,897$ 3,683,202$ 5,211,099
Prior Years$ 1,527,897
FYE 2019 $ 1,183,202
FY 2019-20$500,000
FY 2020-21$500,000
FY 2021-22$500,000
FY 2022-23$500,000
FY 2023-24$500,000
TOTAL:$ 5,211,099
174
Capital ImprovementProgram
Fiscal Years2020-24
PLAYGROUND EQUIPMENT ENHANCEMENT AND SAFETY SURFACING
Parks and Recreation Project
ProjectDescription:Thisprojectincludesthere-design,enhancementofplaygroundequipment,andsafetysurfacingatexisting
Cityparkstocomplywithcurrentstateandfederalregulationsandenhancethequalityoftheparks.Theprojectsincludeplayground
safetyassessments,planningandevaluation,playgroundqualityenhancementssuchasfencing,surfacing,accessibilityandornew
equipment.
Benefit/CoreValue:ThisprojectprotectstheCity’svastinvestmentinparksandopenspacefacilities.Inaddition,thisproject
satisfiestheCity’sCoreValuesofaHealthyandLivableCity,ASafeandPreparedCommunity,andAccountableandResponsive
City Government.
ProjectStatus:Theenhancementofplaygroundequipmentandsafetysurfacingwillbeperformedatonetotwositesperyear.A
priority list has been developed and enhancement will be completed on an ongoing basis.
Department: Public Works / Temecula Community Services - Account No. 210.290.120 PW18-17 Level: II
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration $ 20,000
$1,965$23,000$20,000$20,000$20,000$20,000$124,965
Construction $480,000
$1,496,029$1,000,681$480,000$ 480,000$ 480,000$ 480,000$4,896,710
Design/Environmental
$444$135,530$135,974
Information Technology
$29,459$23,991$53,450
Totals$1,527,897$1,183,202$500,000$ 500,000$ 500,000$ 500,000$ 500,000$5,211,099
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
DIF (Parks & Recreation)
$1,040,000$-$1,040,000
DIF (Police Facilities)
$29,459$23,991$53,450
DIF (Quimby)
$200,000$240,000$440,000
Measure S
$258,438$919,211$500,000$ 500,000$ 500,000$ 500,000$ 500,000$3,677,649
Total Funding:$1,527,897$1,183,202$500,000$ 500,000$ 500,000$ 500,000$ 500,000$5,211,099
Future Operation & Maintenance
Costs
2019-202020-212021-222022-232023-24
175
Ronald Reagan Sports Park Restroom Expansion and Renovation
Parks and Recreation Project Location
79
15
79
Legend
CIP Area
0420000Feet
The map RonaldReaganRestroom.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
176
Capital ImprovementProgram
Fiscal Years2020-24
RONALD REAGAN SPORTS PARK RESTROOM EXPANSION AND RENOVATION
Parks and Recreation Project
ProjectDescription:ThisprojectprovidesforthedesignandconstructionoftherestroombuildingexpansionatRonaldReagan
SportsPark.Therestroomexpansionincludesaddingadditionalrestroomstallsandurinals,renovatingthesnackbar,andenlarging
the storage case.
Benefit/CoreValue:Thisprojectprovidesadditionalfacilitiesforparkpatrons.Inaddition,thisprojectsatisfiestheCity’sCore
Values of a Healthy and Livable City, A Safe and Prepared Community and Accountable and Responsive City Government.
Project Status: This project is estimated to be complete in Fiscal Year 2019-20.
Department: Public Works/Temecula Community Services - Account No. 210.290.114 PW18-03 Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$40,000$40,000
Construction
$50,000$50,000
Construction Engineering
$75,000$75,000
Design/Environmental
$30,000$30,000
Fixtures/Furn/Equip
$30,000$30,000
Totals$-$725,000$-$-$-$-$-$725,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$725,000$725,000
Total Funding:$-$725,000$-$-$-$-$-$725,000
Future Operation & Maintenance
Costs
2019-202020-212021-222022-232023-24
177
178
Capital ImprovementProgram
Fiscal Years2020-24
RONALD H. ROBERTS TEMECULA PUBLIC LIBRARY ENHANCEMENT AND RENOVATION
Parks and Recreation Project
ProjectDescription:TheRonaldH.RobertsTemeculaPublicLibraryopenedin2006withover5millionvisitorssincethen,the
carpetandchairshaveexperiencedsignificantwear.Thisprojectallowsfortheinstallationofnewcarpetingforthe34,000square
foot facility, and also the reupholster of the final twelve chairs that were not included as part of the previous Capital Project.
Benefit/CoreValue:Thisprojectupdatesandenhancestheappearanceofthefacility.Inaddition,thisprojectsatisfiestheCity’s
Core Values of a Healthyand Livable City.
Project Status: This project is estimated to be complete in Fiscal Year 2019-20.
Department: Temecula Community Services - Account No. 210.290.146Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Equipment
$21,504$21,504
Installation
$143,000$143,000
Totals$-$-$164,504$-$-$-$-$164,504
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$164,504$164,504
Total Funding:$-$-$164,504$-$-$-$-$164,504
Future Operation & Maintenance
Costs
2019-202020-212021-222022-232023-24
179
180
Capital ImprovementProgram
Fiscal Years2020-24
SPORTS COURT RESURFACING
Parks and Recreation Project
ProjectDescription:Thisprojectincludesrepairsandresurfacingofsportcourtsurfacingatvariousparksandfacilities.
Surfacing includes tennis courts, basketball courts, and hockey rinks at various parks.
Benefit/CoreValue:ThisprojectprotectstheCity’svastinvestmentinparksandopenspacefacilities.Inaddition,this
projectsatisfiestheCity’sCoreValuesofaHealthyandLivableCity,ASafeandPreparedCommunity,andAccountableand
Responsive City Government.
Project Status: Projects will be completed on an on-going basis as funding becomes available.
Department: Public Works/Temecula Community Services - Account No. 210.290.141
Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Construction
$ 100,000$ 50,000$50,000$ 200,000
Totals$ -$ 100,000$ -$50,000$ -$50,000$ -$200,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$ 100,000$ 50,000$50,000$ 200,000
Total Funding:$ -$ 100,000$ -$50,000$ -$50,000$ -$ 200,000
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
181
Capital ImprovementProgram
Fiscal Years2020-24
SPORTS FIELD LIGHTING -LIGHT EMITTING DIODE (LED) CONVERSION
Parks and Recreation Project
Prior
Year Project Funding
Actuals Cost Year Source
Sports Parks
Paloma Del Sol - Sports Light LED Upgrade - Soccer and Softball FieldsMeasure S
$250,0002019-20
Ronald Reagan North/South Fields/Hockey Rink/Skate ParkMeasure S
$280,0002019-20
$530,000
FY 2019-20$530,000
TOTAL:$530,000
182
Capital ImprovementProgram
Fiscal Years2020-24
SPORTS FIELD LIGHTING -LIGHT EMITTING DIODE (LED) CONVERSION
Parks and Recreation Project
ProjectDescription:ThisprojectprovidesforthereplacementoftheagingsportsfieldlightingcomponentswithnewLED
technologyat varioussportsparks.
Benefit/CoreValue:Thisprojectenhancesthesafetyofsportfieldusers,reducesunnecessarylightpollutionandincreases
energyefficiencyatCityparks.Inaddition,thisprojectsatisfiestheCity’sCoreValueofaHealthyandLivableCity,ASafeand
Prepared Community, and Accountable and Responsive City Government.
Project Status: Project will be completed on an on-going basis as funding becomes available.
Department: Public Works/Temecula Community Services - Account No. 210.290.113
Level: I
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedYearsCost
Administration
$ 25,000$ 10,000$ 35,000
Construction
$ 225,000$ 270,000$ 495,000
Totals$ -$ 250,000$ 280,000$ -$ -$ -$ -$ 530,000
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudgetAppropriationProjectedProjectedProjectedProjectedCost
Measure S
$ 250,000$ 280,000$ 530,000
Total Funding:$ -$ 250,000$ 280,000$ -$ -$ -$ -$ 530,000
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
183
184
Capital Improvement Program
FiscalYears 2020-24
SUCCESSOR AGENCY TO THE
TEMECULA REDEVLOPMENT AGENCY
(SARDA)
Table o Contents
Affordable Housing...........................................................................................................18
185
Affordable Housing
Successor Agency to the Temecula Redevelopment Agency (SARDA)/Housing Project Location
79
15
79
D
15
Legend
CIP Area
City Boundary
0420000Feet
The map AffordableHousing_SARDA.mxd is maintained by City of Temecula GIS. Data and information represented on this map are subject to update
and modification. The City of Temecula assumes no warranty or legal responsibility for the information contained on this
map. This map is not for reprint or resale. Visit the City of Temecula GIS online at https://temeculaca.gov/gis
2018 Aerial Data
186
Capital ImprovementProgram
Fiscal Years2020-24
AFFORDABLE HOUSING
Successor Agency to the Temecula Redevelopment Agency (SARDA)/ Housing Project
ProjectDescription:Thisprojectservesasaplaceholderfortheproceedsremainingfromthe2017Aand2017BTaxAllocation
RefundingBondsSeriesissuedbytheformerTemeculaRedevelopmentAgency.Onceaspecificprojectisidentified,staffwillbring
forward a recommendation to the Oversight Board and SARDA for formal approval.
Benefit / Core Value: The specific Benefit/Core Value will be identified when the funds are appropriated to a specific capital project.
ProjectStatus:TheCityiscurrentlyinnegotiationwiththedeveloperofVineCreekApartments,a100%affordable,60unit
development,foraportionoftheTaxAllocationBondproceeds.Theproject'sentitlementswereapprovedinFebruary2019,anda
DispositionandDevelopmentAgreement(DDA)isexpectedtobefinalizedbySummer2019,outliningthebusinesstermsandfinancial
contribution from the City.
tment: SARDA - Account No. 380.800.815 Level: I
Depar
2023-24
Prior Years FYE 2019 2019-20 Projected
Project Cost:
Actual Carryover Adopted 2020-21 2021-22 2022-23 and Future Total Project
ExpendituresBudgetYearsCost
AppropriationProjectedProjectedProjected
Construction
$ 12,853,720$ 12,853,720
Totals$-$-$-$ 12,853,720$-$-$-$ 12,853,720
Prior Years FYE 2019 2019-20
Source of Funds:
Actual Carryover Adopted 2020-21 2021-22 2022-23 2023-24 Total Project
ExpendituresBudget
AppropriationProjectedProjectedProjectedProjectedCost
Tax Allocation
Refunding Bonds
Series 2017B
$ 12,853,720$ 12,853,720
Total Funding:$-$-$-$ 12,853,720$-$-$-$ 12,853,720
Future Operation &
2019-202020-212021-222022-232023-24
Maintenance Costs:
(1) $4million 2010 TABS have already been spent on Front Street Plaza.
187
188
Capital ImprovementProgram
Fiscal Years2020-24
FUTURE YEARS PROJECTS
CIRCULATION
Project
DepartmentEstimate*
11,180,000
Cherry Street Extension Diaz Road to Jefferson AvenuePublic Works
La Paz Street Widening from Ynez Road to Temecula ParkwayPublic Works2,500,000
4,088,508
Nicolas Valley - Community Facilities District (Liefer Road)Public Works
Pauba Road Improvements - east of Margarita Road on the north sidePublic Works130,000
8,000,000
Rainbow Canyon Road Widening from Pechanga Parkway to City LimitPublic Works
Rancho California Road East of Meadows ParkwayPublic Works470,000
28,337,000
Rancho Way Extension from Diaz to Margarita RoadPublic Works
Temecula Creek CrossingPublic Works16,777,300
580,000
Ynez Road Widening from Tierra Vista Road to Rancho Vista Road Public Works
TOTAL
$72,062,808
INFRASTRUCTURE / OTHER
Project
DepartmentEstimate*
Corporate Meeting and Event SpaceCommunity Services625,000
200,000
Fire Station 92 and 95 Bay Door ReplacementFire Services
Pedestrian and Bicycle Bridge Overcrossing into Old TownPlanning1,890,000
4,630,000
Old Town GymnasiumCommunity Services
Southside Branch LibraryCommunity Services6,640,000
4,500,000
Southside Recreation CenterCommunity Services
TOTAL
$18,485,000
PARKS and RECREATION
Project
DepartmentEstimate*
Ronald Reagan Sports Park North/South Fields Back Stops, Dugout, Community Services857,000
and Parking Lot with Trash Enclosures
Ronald Reagan Sports Park Upper Soccer Paving and
Community Services481,250
Materials/Equipment Storage Bays
8,250,000
Sports Complex - Joint Use (Riverside County Flood Control District)Community Services
Vail Ranch Park Site DCommunity Services1,843,000
200,000
Ynez Road and Overland LandscapingCommunity Services
TOTAL
$11,631,250
*Estimates are planning level at the time the project was reviewed and they do not account for inflation and economic conditions
189
190
Capital ImprovementProgram
Fiscal Years 2020-24
GLOSSARY OF TERMS
Abatement – Abatement usually applies to tax levies, special assessments, and service charges.
Accounting System – The methods and records established to identify, assemble, analyze, classify, record,
and report a government’s transactions and to maintain accountability for the related assets and
liabilities.
Adoption – Formal action by the City Council that sets the spending limits for the fiscal year.
Appropriation – A legal authorization granted by the City Council to make expenditures and incur
obligations for specific purposes.
Americans with Disabilities Act of 1990 (ADA) – A federal law providing for a wide range of protection to
individuals which directly benefit District members.
Assessment District – A separate local government agency formed to provide specific local public
improvements that directly benefit District members.
Audit – A systematic collection of the sufficient, competent evidential matter needed to attest to fairness
of management’s assertions in the financial statements or to evaluate whether management has
efficiently and effectively carried out its responsibilities.
Budget – A plan of financial operation embodying an estimate of proposed expenditures for a given period
and the proposed means of financing them. Used without any modifier, the term usually indicates a
financial plan for a single fiscal year.
Budgetary Control – The control or management of a government or enterprise in accordance with an
approved budget for the purpose of keeping expenditures within the limitations of available
appropriations and revenues.
Capital Improvement – Construction or major repair of City buildings, infrastructure, and facilities such as
streets, roads, highways, bridges, curbs, gutters, sidewalks, storm drains, traffic signals, streetlights,
gas and water distribution facilities, and parks.
Capital Improvement Program (CIP) – Annual appropriations in the City’s budget for capital purposes such
as street improvements, building construction, and park improvements.
Capital Expenditures – Expenditures resulting in the acquisition of or addition to the government’s
general fixed assets having a unit cost of $5,000 or more and a useful life of greater than one year.
Infrastructure assets of $100,000 or more are also recorded capital expenditures.
Capital Outlay – Expenditures which qualify as capital costs according to accounting standards. This
includes furniture, fixtures, machinery, equipment, and other relatively minor fixed assets.
Capital Project – A specific undertaking involving the procurement, construction or installation of facilities
and related equipment which improves, preserves, enhances, or modernizes the City’s provision of
municipal services, has a long-term useful life, and for which costs exceed $25,000.
191
Capital ImprovementProgram
Fiscal Years 2020-24
GLOSSARY OF TERMS (continued)
Construction Engineering – Engineering work during the construction process that ensures projects are
constructed in accordance with design parameters and specifications. The primary construction
engineering functions are construction inspections, laboratory services, field surveys and design plan
updates or interpretations.
Contingency – A budgetary reserve set-aside for emergency or unanticipated expenditures.
Contractual Services – Contracts for professional services.
Core Value: The Quality of Life Master Plan (QLMP) provides the framework for the City’s Strategic
Budgeting activities. The City Council has set priorities and guided staff in developing six (6) Core
Values upon which to focus time and resources (as identified in the QLMP). These areas include:
1.Healthy and Livable City
2.Economic Prosperity
3.A Safe and Prepared Community
4.A Sustainable City
5.Transportation Mobility and Connectivity
6.Accountable and Responsive City Government
Department – An organizational unit comprised of programs and program managers. A single director
manages each department.
Encumbrances – An amount of money committed for the payment of goods and services not yet received
or paid for.
Expenditures – Decreases in net current assets.
Fiscal Year – The period designated by the City signifying the beginning and ending period for recording
financial transactions. The City of Temecula has a fiscal year of July 1 through June 30.
Fund – An accounting entity with a set of self-balancing accounts recording revenues and expenditures
and transactions for specific activities.
Fund Balance – The difference between the assets (revenues and other resources) and liabilities
(expenditures incurred or committed to) for a particular fund.
Future Years – The intent of the future period is to project out to ten (10) years, projects that are
anticipated by staff and the City Council that will ultimately have a very large impact on the City and
surrounding area.
General Fund – Accounts for tax and other general fund revenues (e.g., sales taxes, property taxes, fines
and forfeitures, investment interest, etc.) and records the transactions of general governmental
services (e.g., police, fire, library, parks and recreation, public service, etc.).
Goals – The desired result of accomplishments within a given time frame, usually a fiscal year.
Grants – Contributions or gifts of cash or other assets from another government to be used or expended
for a specified purpose.
192
Capital ImprovementProgram
Fiscal Years 2020-24
GLOSSARY OF TERMS (continued)
Objectives – The necessary steps to achieve a desired goal.
Operations & Maintenance – Office supplies and other materials used in the normal operations of City
departments. Includes items such as books, maintenance materials, and contractual services.
Organization – A unit of operation having specific responsibilities and duties and collectively form an
Agency. The terms organization and division is used interchangeably throughout the budget
document (i.e., Accounting Organization, Traffic Division, etc.).
Resources – Total amounts available for appropriation including estimated revenues, fund transfers, and
beginning balances.
Revenues – The yield of taxes and other sources of income that a governmental unit collects and receives
for public use.
Special Assessment – A compulsory levy made against certain properties to defray all or part of the cost
of a specific capital improvement or service deemed to benefit primarily those properties.
Taxes – Compulsory charges levied by a government to finance services performed for the common
benefit. This term does not include specific charges made against particular persons or property for
current or permanent benefits, such as special assessments; nor does the term include charges for
services rendered only to those paying such charges (i.e., sewer service charges).
Transfers In/Out – Payments from one fund to another fund primarily for work or services provided.
Unspecified – Funds that have not been identified for various proposed projects.
193
Capital ImprovementProgram
Fiscal Years 2020-24
INDEX
Abbott Corporation Roadway Improvements ...................................................................................... 44
Affordable Housing ............................................................................................................................. 186
Americans with Disabilities Act (ADA) Transition Plan Implementation .............................................. 92
Bike Lane and Trail Program – Citywide ............................................................................................... 94
Bike Lane and Trail Program – Pump Track .......................................................................................... 96
Bike Lane and Trail Program – Temecula Creek South Side Trail ......................................................... 98
Butterfield Stage Road Extension ......................................................................................................... 46
California Society of Municipal Finance Officers (CSMFO) Certificate of Award .................................. 16
Cherry Street Extension and Murrieta Creek Low-Flow Crossing to Diaz Road.................................... 48
Children’s Museum Enhancement Project ......................................................................................... 162
CIP Major Revenue Sources Graph ....................................................................................................... 35
Circulation Projects ............................................................................................................................... 43
City Facilities Rehabilitation ................................................................................................................ 100
City Organizational Chart ...................................................................................................................... 17
Citywide Buffered Bike Lane Striping .................................................................................................... 50
Citywide Drainage Master Plan ........................................................................................................... 102
Citywide Financial System Upgrade .................................................................................................... 104
Citywide Streetlight Acquisition and Light Emitting Diode (LED) Retrofit .......................................... 106
Citywide Surveillance Cameras ........................................................................................................... 108
Community Recreation Center (CRC) Renovations ............................................................................. 110
Community Services Master Plan ....................................................................................................... 164
Comparison Between Projected Revenue and Costs ............................................................................ 36
Comprehensive General Plan Update ................................................................................................. 112
Description of Levels ............................................................................................................................. 18
Description of Revenue Sources ........................................................................................................... 20
Diaz Road Expansion (Rancho California Road to Cherry Street) ......................................................... 52
Eagle Soar Splash Pad Control System Renovation ............................................................................ 166
Electric Vehicles Charging Station ....................................................................................................... 114
Emergency Vehicle Pre-Emption Upgrade Program – Citywide ........................................................... 54
Expanded Recycled Water Conversion Project ................................................................................... 116
Expenditure Summary by Project Graph .............................................................................................. 34
194
Capital ImprovementProgram
Fiscal Years 2020-24
INDEX (continued)
Fiber Optic Communication System Upgrade ..................................................................................... 118
Fire Station 73 Gym/Garage ............................................................................................................... 120
Fire Station 84 Training Room Renovation ......................................................................................... 122
Flashing Beacons and Speed Advisory Signs ......................................................................................... 56
Flood Control Channel Reconstruction and Repair............................................................................. 168
French Valley Parkway / Interstate 15 Improvements – Phase II ......................................................... 58
French Valley Parkway / Interstate 15 Improvements – Phase III ........................................................ 60
Future Years Projects .......................................................................................................................... 183
Glossary of Terms................................................................................................................................ 1
History Museum .................................................................................................................................. 124
Infrastructure/Other Projects ...............................................................................................................
Interstate 15 / State Route 79 South Interchange Enhanced Landscaping ........................................ 126
Interstate 15 / State Route 79 South Ultimate Interchange ................................................................. 64
Interstate 15 Congestion Relief ............................................................................................................ 62
Library Parking – Phase II .................................................................................................................... 128
Main Street Property Improvements .................................................................................................. 130
Margarita Recreation Center .............................................................................................................. 132
Medians and Parkways - Citywide ........................................................................................................ 66
Medians and Traffic Calming Improvements – Citywide .................................................................... 134
Murrieta Creek Bridge at Overland Drive ............................................................................................. 68
Murrieta Creek Improvements ........................................................................................................... 136
Nicolas Road Extension and Improvement ........................................................................................... 70
Old Town Parking Structure ................................................................................................................ 138
Overhead Street Name Sign Replacement Program - Citywide ........................................................... 72
Parameters for CIP Budget Cost Estimates ........................................................................................... 19
Park Restrooms Renovations, Expansion, and Americans with Disabilities Act (ADA) Improvements172
Parks and Recreation Projects ............................................................................................................ 161
Parks Improvement Program .............................................................................................................. 170
Pavement Rehabilitation Program - Citywide ....................................................................................... 74
Pechanga Parkway Environmental Mitigation .................................................................................... 140
Pechanga Parkway Widening ................................................................................................................ 76
195
Capital ImprovementProgram
Fiscal Years 2020-24
INDEX (continued)
Pedestrian Signal Equipment Upgrade – Citywide ............................................................................. 142
Playground Equipment Enhancement and Safety Surfacing .............................................................. 174
Project Summary by Type of Project .................................................................................................... 26
Projected Revenue Summary ................................................................................................................ 25
Public Safety Monument .................................................................................................................... 144
Resolution of the City Council ............................................................................................................... 12
Ronald H. Roberts Temecula Public Library Enhancement and Renovation ...................................... 178
Ronald Reagan Sports Park Restroom Expansion and Renovation ..................................................... 176
Santa Gertrudis Creek Pedestrian/Bicycle Trail Extension and Interconnect ..................................... 146
Santa Gertrudis Creek Phase II – Margarita Under-Crossing .............................................................. 148
Sidewalks – Citywide ........................................................................................................................... 150
Sidewalks – DLR Drive ......................................................................................................................... 152
Sidewalks – Old Town Boardwalk Enhancement ................................................................................ 154
Sports Court Resurfacing .................................................................................................................... 180
Sports Field Lighting Light Emitting Diode (LED) Conversion .............................................................. 182
Temecula Elementary School (TES) Pool Renovation ......................................................................... 156
Traffic Signal – Park and Ride Access Improvements ........................................................................... 82
Traffic Signal Equipment Enhancement Program – Citywide ............................................................... 78
Traffic Signal Installation – Citywide ..................................................................................................... 80
Traffic Signal System Upgrade .............................................................................................................. 84
Transmittal Message ............................................................................................................................... 7
Utility Undergrounding – Citywide ..................................................................................................... 158
Ynez Road Improvements ..................................................................................................................... 86
196
City of Temecula
Capital Improvement Program
Fiscal Years 2020-2024
Major Capital Improvement Projects
66
!!
((
GG
")")
15
"
!$#
33
!!
((
CC
""
))
GG
")")
11
!!
((
NN
AA
55
!!
((
MM
AA
22
!!
((
BB
EE
""
))
""
))
DD
TT
SS
II
VV
HH
""
))
AA
DD
""
")")))
FF
""
))
AA
GG
88
!(!(
44
!!
((
79
}þ
|
·
GG
""
))
HH
")")
FF
")")
15
"$
!#
KK
WW
Legend
Circulation Projects
!(
All Other Projects
77
"
)
!!
((
Circulation ProjectsAll Other Projects
Map NumberPage NumberDescriptionMap NumberPage NumberDescription
146Butterfield Stage Road ExtensionA128Library Parking - Phase II
252Diaz Road ExpansionB132Margarita Recreation Center
358,60French Valley Pky/I-15 Interchange Improvements - Phase II, IIIC146Santa Gertrudis Creek Pedestrian/Bicycle Trail Extension
462I-15 Congestion ReliefD154Sidewalks - Old Town Boardwalk Enhancement
568Murrieta Creek Bridge at Overland DriveE166Eagle Soar Splash Pad
670Nicolas Road Extension and ImprovementF172Parks Restrooms Renovations and ADA Improvements
776Pechanga Parkway WideningG174Playground Equipment Enhancement and Safety Surfacing
886Ynez Road ImprovementsH182Sports Field Lighting LED Conversion
197
198