Loading...
HomeMy WebLinkAboutLot A-L Precise Grading ........ ... ....... PRECISE GRADING PLANS FOR : PAD PAD ELEVATION FF FINISH FLOOR CHARDONNAY HILLS TRACT 23101 2 GRADING NOTES: GFF GARAGE FINISHED FLOOR FL FLOW LINE I . ALL GRADING SHALL CONFORM TO THE UNIFORM BUILDING CODE. CHAPTER 70, AS AMENDED BY ORDINANCE 457. HP HIGH POINT PHASE FOUR LOTS A - M 2. MINIMUM = FS FINISHED SURFACE BUILDING PAD AND DRAINAGE SWALE SLOPE SHALL BE 1%. TC TOP OF CURB DRAINAGE SWALES SHALL BE A MINIMUM OF 0.2' DEEP AND BE 22 LOT NUMBER CONSTRUCTED A MINIMUM OF 2' FROM THE TOP OF CUT OR FILL SLOPES. 3 - PLAN NUMBER 3. MAXIMUM CUT AND FILL SLOPE - 2:1. ED A = ELEVATION R - REVERSE PLAN 4. PROVIDE 5' WIDE BY 1' HIGH BERM OF EQUIVALENT ALONG THE TOP OF DEEPENED FOOTING ALL FILL SLOPES OVER 5' HIGH. cl-la STREET LIGHT 5. ALL GRADING SHALL BE DONE UNDER THE SUPERVISION OF A �a FIRE HYDRANT COMPETENT SOILS ENGINEER WHO SHALL CERTIFY THAT ALL FILL HAS RETAINING WALL (BY SEPARATE PERMIT) BEEN PROPERLY PLACED AND WHO SHALL SUBMIT A FINAL COMPACTION (ALL WALLS ARE TYPE I-B, PER CITY OF FOR ALL FILLS OVER 1' DEEP. TEMECULA STANDARDS UNLESS NOTED ' MIN 6. A REGISTERED CML ENGINEER SHALL SUBMIT TO THE CITY OF OTHERWISE ON PLANS) IL. TEMECULA ENGINEERING DEPARTMENT A WRITTEN CERTIFICATION OF m ELECTRICAL VAULT 3' 2' COMPLETION OF ROUGH GRADING IN ACCORDANCE WITH THE APPROVED -� SEWER LATERAL MIN. MIN. ELEV. I EQUAL TO OR GREATER GRADING PLAN PRIOR TO ISSUANCE OF THE BUILDING PERMIT. DEEPENED THAN BLDG. PAD ELEV. CERTIFICATION SHALL BE TO LINE, GRADE, ELEVATION AND LOCATION -8 WATER LATERAL FOOTING M OF CUT/FILL SLOPES. INDICATES LOWERED GARAGE WHEN ' MIN. FINISHED FLOOR REQUIRED PAD Eby. 7. PROVIDE A BROW DITCH, DESIGNED TO HANDLE 100 YEAR Q STORM B INDICATES BACKFLOW PREVENTER REO'D 2:1 MAX. FL �,`c`' 7&1 . FLOWS, ALONG THE TOP OF CUT SLOPES. .*I 3' 8. FINAL COMPACTION REPORT WILL BE REQUIRED FOR ALL FILLS GREATER 12 MIN, 2% MIN. MIN. COURT „ THAN ONE FOOT. 21 X MAX. MIN. : w 9. ALL GRADING SHALL BE DONE IN CONFORMANCE WITH RECOMMENDATIONS OF THE PRELIMINARY SOILS INVESTIGATION BY - - PAD ELEV. _ Fj- PHASE FOUR LEIGHTON & ASSOCIATES DATED MARCH 25, 1991. TWO SETS OF THE LOT NO. " T FINAL COMPACTION REPORT SHALL BE SUBMITTED TO THE ENGINEERING 6' MIN. DEPARTMENT WHICH SHALL INCLUDE FOUNDATION DESIGN x CN. RECOMMENDATIONS AND CERTIFICATION THAT GRADING HAS BEEN C3, SECTION „A-A" 2X MIN ' �> w " DONE IN CONFORMANCE WITH THE RECOMMENDATIONS OF THE PRELIMINARY SOILS REPORT. N.T.S. 21 X MAX. y x 'f _► 10. THE CONTRACTOR SHALL NOTIFY THE ENGINEERING DEPARTMENT AT REN P cr LEAST 24 HOURS IN ADVANCE REQUESTING FINISH LOT GRADE AND DRAINAGE INSPECTION. THIS INSPECTION MUST BE APPROVED PRIOR TO 1 SCALE. ( )BUILDING PERMIT FINAL INSPECTION FOR EACH LOT. PHONE: 909 694- n • = ?Oi0' 6411. F.F. ELEV. I < y�. >: �� . " w Q- 11. CUT SLOPES EQUAL TO OR GREATER THAN 5' IN VERTICAL HEIGHT AND PAD ELEV. Q aY4 <r BRI1 cFILL SLOPES EQUAL TO OR GREATER THAN 3 IN VERTICAL HEIGHT SHALL TT I Q 2 t CSR . Y BE PLANTED WITH GRASS OR GROUND COVER TO PROTECT THE SLOPE FROM EROSION AND INSTABILITY IN ACCORDANCE WITH ORDINANCE NO. AFTER FINE Y •�z CCE v e 457 PRIOR TO THE APPROVAL OF FINAL INSPECTION. GRADE, PROVIDE Z Y t. > ': f x�1`.; . P P 5'WiDE BY 1' S' 10' MIN. ` '' ''' ' Y - •' w G.F. ELJtII HIGH BERM p • e 12. NO FILL SHALL BE PLACED ON EXISTING GROUND UNTIL THE GROUND i z OR EQUIV. jm�u : _ w HAS BEEN CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND OTHER D SILL Q w w e DELETERIOUS MATERIAL �t 1 t MIN. w 10 HEINTZ LANE ] 13. IF STEEP SLOPING TERRAIN OCCURS UPON WHICH FILL IS TO BE PLACED, - w d�' w e THE TERRAIN MUST BE CLEARED, KEYED, AND BENCHED INTO FIRM CURB FACE SIDEWALK MIN w NATURAL SOIL FOR FULL SUPPORT. PREPARATION SHALL BE APPROVED w w ., ,. '_ 72 r • BY A REGISTERED ENGINEER PRIOR TO PLACEMENT OF FILL MATERIAL. DIRE ON OF FLOW 2X MIN.-' 12" MIN. W " '• • NOTE: G.F. ELEV. IS AT THE FRONT EDGE 21 X MAX- 49 "' Q wy ' 14. DURING ROUGH GRADING OPERATIONS AND PRIOR TO CONSTRUCTION OF Z '•• ' w ,. „ e 4 PERMANENT DRAINAGE STRUCTURES, TEMPORARY DRAINAGE CONTROL TYPICAL LOT FINISH GRADING - " � w 7e w w • _ �. SHOULD BE PROVIDED TO PREVENT PONDING WATER AND DAMAGE TO G ADJACENT PROPERTIES. N.T.S. N.T.S. "' ir SONOMA w w = Gj� �d( IMF a " wt.1� 15. DUST SHALL BE CONTROLLED BY WATERING OF OTHER APPROVED P w 'w w w w w w CNF w ~ A� �Cr� • �P » METHODS. U w , N,q � * 16. ALL EXISTING DRAINAGE COURSES ON THE PROJECT SITE MUST 50.00' CONTINUE TO FUNCTION, ESPECIALLY DURING STORM CONDITIONS. 0 Y, w e • 7 M = e- w , PROTECTIVE MEASURES AND TEMPORARY DRAINAGE PROVISIONS MUST w ' _ . �OF BE USED TO PROTECT ADJOINING PROPERTIES DURING GRADING 50.00' U • w qC/,f. + OPERATIONS. Cn COURT w w 17. STABILITY CALCULATIONS WITH A FACTOR OF AT LEAST ONE AND FIVE- 50.00' IVE- O a J . " , ,. +� • " � TENTHS (1.5) SHALL BE SUBMITTED BY SOILS ENGINEER TO THE 50.00 = � 3 ,. \�E,\- ENGINEERING DEPARTMENT FOR CUT AND FILL SLOPES OVER 30' IN r : w VERTICAL HEIGHT. s Z . a r w : ' 18. A REGISTERED CML ENGINEER SHALL SUBMIT CERTIFICATION OF ,3 co BUILDING PAD ELEVATIONS. WHERE SPECIFIC ELEVATIONS ARE Z ■ . p ., . REQUIRED, THE ELEVATION (WITH RESPECT TO MEAN SEA LEVEL) SHALL irBE°f O Q ' s SURFACE IS N. IF AN REQUI ED,ELEVATION RESPECT ACTUAL DISTANCE ABOVEADJACENT THE ADJACENT co to IS u ANE " w _ • s GROUND SHALL BE GIVEN. 0 INDEX MAP 19. EROSION CONTROL: ALL GRADED SLOPES SHALL BE PLANTED WITH SCALE: 1" = 200' ROSEA ICE PLANT AT If ON CENTERS OR ANOTHER APPROVED GROUND t PROJECT COVER. SLOPES OVER 15" IN VERTICAL HEIGHT. IN ADDITION TO GROUND COVER. SHALL BE Y SITE COMBINATION THEREOF..PLANTED RUBS SHALL BE PLANTED ATWITH APPROVED TREES, U 110' ON CENTERS; TREES, 20' ON CENTERS; COMBINATIONS. 15' ON CENTERS. rl ad QUANTITIES: SLOPES OVER 4' IN VERTICAL HEIGHT SHALL HAVE PERMANENT S IRRIGATION SYSTEMS WITH BACKFLOW PREVENTION DEVICES PER U.P.C.. Lam_ QUANTITY,TITY, ?j� _ 4 CHAPTER 10.r. FINISH GRADING 195 CY 20. FINISH GRADE SHALL BE SLOPED AWAY FROM ALL EXTERIOR WALLS AT NOT LESS THAN 1/47 PER FOOT FOR A MINIMUM OF 3 FEET. ` N S21.HALL O OBSTRUDON OF FLOOD PLAINS OR NATURAL WATER COURSES 22. ALL PROPERTY CORNERS SHALL BE CLEARLY DELINEATED IN THE FIELD CHARDONNAY HILLS MODEL FOOTPRINTPRIOR TO COMMENCEMENT OF ANY CONSTRUCTION/GRADING. S '�- 23. APPROVAL OF THESE PLANS BY THE CITY OR ITS AGENTS DOES NOT RELIEVE THE APPLICANT AND HIS ENGINEER FROM THE RESPONSIBILITY tv FOR THE CORRECTION OF ERRORS OR OMISSIONS DISCOVERED DURING Underground $@rviC@ Alert SOILS ENGINEER: PLANS PREPARED BY: PLANS PREPARED FOR: PRIVATE ENGINEER'S NOTE: of CONSTRUCTION. UPON REQUEST. THE APPROPRIATE PLAN REVISIONS 9 SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR REVIEW THE PRIVATE ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR AND APPROVAL. Call: TOLL FREE 1LENNAR HOMES ASSURING THE ACCURACY AND ACCEPTABILITY OF THE DESIGN HEREON. LEIGHTON & ASSOCIATES a OF CALIFORNIA, INC. IN THE EVENT OF DESCREPANCIES ARISING AFTER CITY APPROVAL OR 1 -800 JL DURING CONSTRUCTION. THE PRIVATE ENGINEER SHALL BE RESPONSIBLE 3934 MURPHY CANYON ROAD GROUP 123333 AVENIDA LA CAZA FOR DETERMINING AN ACCEPTABLE SOLUTION AND REVISING THE PLANS VICINITY MAP 422-4133 SUITE B 205 PLOOMG • KKGINE=G • 3URVZMG SAN JUAN CAPISTRANO, CA 92675 FOR APPROVAL BY THE CITY. N.T.S. SAN DIEGO, CA 92123 OWlsik Boulevard a suite c-225 • s'n Dieso. CA 92121 (714) 488-8850 LD96-016GR TWO WORKING DAYS BEFORE YOU DIG (619) 292-8030 (619) 560-9ml CONSTRUCTION RECORD BY DATE REVISIONS ACC'D DATE BENCH MARK SCALE SEAL: ESS Designed By Drawn By Checked By l0 �7 CITY Or TEM ECU LA Drawing No. 1l I REtrbd� I,cT M O. OF RIVERSIDE B.M. NO. T-29-81 A• RECOMMENDED BY: DATE: DEPARTMENT OF PUBLIC WORKS Contractor .5' BRASS DlSC IN CONC, CYLINDER LOCATED FROM " Plans Prepared Under Supervision Of INT. OF FRONT�SoT t RANCHO CALK. RD., 1.8 Horizontal �t� , Inspector ARcnieETA�R IN �'-'1E NX OF WITH WT. N/A 8 NO. 43217 ACCEPTED BY: Ate: /o- 0 - 14 PRECISE GRADING PLANS FOR: E OF A 7' CNAP&MiK FEKE. 21' = 16' AROUND EXP. 3/31/00 ; Date 9 Z S-9 PRINCIPAL EN oR CITY ENGINEER C H A R DO N N AY H I LLS CALIF. (fA5 V&VES. 40' N. OF P.P. (110. 94' DON SPAGNOL Date Completed OF WITNESST S�� w CALF. TR- V��d `�,� , V ,�' ,r MARWAN A. OUNIS TRACT 23101 -2 DATE 9-13-82 ELEV. 1128.4110N/A Or �L` R.C.E. No. 43217 Expires March 31, 2000 Expires MARCH 31. 2000 Sheet of R.C.E. No. 42993 PHASE FOUR - LOTS A-M 1 2 T T T ........ ..... ---- -- .... ... ..... ..... .... - --- -- .. ...... .... ... . ....... ........ .. .... ...... / 22.82 60-08' 45 55-11 .47' L=82. 18' 2.84 k- k- Ly$4 ..'' E �'r� G r FG T j o �k Q H 1284.1 ................................ PAD-1284.5 2CR PAD-1284.2 FF =1285.00 FF- =1284.70 6,4.1 o ��� PAD=128J.7 PAD-128J.9 NP FF -1284.20 FF- 1284.40 f%A 1283 76 f-5 D J ry1284.06 f-S 1284.36 FS Y N JAP DROP t4� � J a DROP 6" S700P 4� J: DROP 0.X DF In 6 STOOP 6" 57'00P 1284.76 FS 128J 56 FS st 0.4 Df- 4:3 O.5' DF 3 J' DROP �.3" DROP GFF--1246-1 N 6" sroop 6' Sroop0.4' DF 0 0 4' Df- 20 PAD-1284.9 if GFF-1284. FF -1285-40 %9 -)J- GnFrrF- .50 Col. to 01 Lr- -qr\, 2.6 k- 9 L-3 0 11 vo,I .%.P- FL 7' &Y 3 *6 .79 yn HP 0.1', 11� ..ezy 1 .36 FS 6 21.32' J_ DROP j FL 6- P 0.XS7Df-00N 81 1A Ir L 8T. ?F 28 PAD=128-T 5 ---- --- 0.4 1 0 FF 1284.00 61. N. 1285-06 FS - -'A D l'-,1 6.' FS 10 / �� fS 0 6' DROPsroop 0 0.X DF ---- ----------- -- PAD-1285.2 94 95' FF =1285.70 T- 'Its C 20 LF '04' Df *6 20 Lr 0.4 DF 22'.t C :.- -j 3.10' a44 Ss, 49 124.25' -&A - PAD-128J. 20 1 OEM- �61 9 FF- -128J.60 010 Lf- O. 1' DF_ 7-5X 41 t 128296 FS Ir 4b 'so Jw DROP N 00- _U 6` STOOP 0.4' DF_ ft"Or 12-56 49 LF O. Df -.40- N PAD-1285.2 85 NP FF =1285.70 100. d 42' FG rr 1 1285-06 FS L F 0.3 Of cj /lJit 20 LF 8.3.0 J" DROP 60 STOOP by�\, ­& � 7.5X N' PAD-128J2 FF- -128J.70 2` ,W 14 0.5 DF DF 41 It 6.7'1 .0 N I 1282.76 FS it J" DROP 20# 16J.74' 6- ST" 128J.06 f-S A L 4 0.X DF -6•'S k-. d1l PAD1282.9 - Ll J C y / FF 128J.40 2n ..In C', 102-76" 23O 1282-26 FS C,�J M p / W 60 LF 0. N 6 .5 7WP 6' DF 66. 1 10.- 4- lop 1282-26 FS 120' 1 20' 11, 14, D=1282.4 Z ' J" DROP 20 7 ox 1282.190 52.2 Z_ A,- 6'p STOOP HP Z PAD-1282.4 FF =1282.90 ✓A D 1 74.4 C M 49't 1J.50 LF 0.4 Df- C4 t�Ylxlj -.000r, -------------- SIMI C R T Underground Service Alert SOILS ENGINEER: PLANS PREPARED BY: PLANS PREPARED FOR: NOTES: RETAINING WALLS SHOWN ON THESE PLANS REQUIRE A SEPARATE PERMIT Call: TOLL FREE LENNAR HOMES FROM THE DEPARTMENT OF BUILDING AND SAFETY. 0 20 40 60 80 100 LEIGHTON & ASSOCIATES OF CALIFORNIA, INC. SEPARATE PERMIT REQUIRED FROM ENGINEERING DEPT. TO REMOVE EXIST. 1 -800 DRIVEWAY OPENINGS. REPLACE WITH FULL HEIGHT CURB, GUTTER AND 422-4133 393* MURPHY CANYON ROAD GROUP 23333 AVENIDA LA CAZA SIDEWALK AND TO CONSTRUCT NEW DRIVEWAY OPENINGS. SUITE B 205 PLANNING • ENGINEERING 9 SURVEYING SAN JUAN CAPISTRANO, CA 92675 SCALE- 1 20 ' SAN DIEGO, CA 92123 0540 Lusk Boulevard e Suite C-Z25 a San Diego, CA 92121 (714) 488-8850 INSTALL TRAFFIC PROOF COVERS ON ALL SEWER CLEAN-OUTS AND WATER TWO WORKING DAYS BEFORE YOU DIG (619) 292-8030 (0 19) 550-ON 1 METERS IN DRIVEWAYS. LD 9 6-016 G R CONSTRUCTION RECORD BY DATE REVISIONS ACC'D DATE BENCH MARK SEAL.- Designed By Drawn By Checked By V E L07 F0 SCALE ESS/ RECOMMENDED B DATE: 7 CITY OF TEM ECU LA DEPARTMENT OF PUBLIC WORKSII I Drawing No. Contractor 0. OF RIVEM)E R.M. NO. T-29-1111 A. .5* BRASS DISC IN COW. CYLINDER LOCATED FROM INT. OF FRONT ST. a RANCHO CALIF. RD., I.a Horizontal Plans Prepared Under Supervision Of .*S N.E. ON RANCHO cALw. RD. TO iNT. w7m Io - t; . 2C PRECISE GRADING PLANS FOR: Inspector ARITA RD., IN THE NX CORNER OF THE INT. NO. 4 2 ACCEPTED BY: &V 'Fac DATE: IV E. OF A 7' CHAWLPW FENCE. 21' x 16' AROUND 1 20' (P. FFRIqCIPAL ENONEEP FOR CITY ENGINEER CALIF. GAS VALVES, 44Y N. OF P.P. (RO- 94' E 3/31/00Date 9-7-c -cl(, DON SPAGNOEO CHARDONNAY HILLS Date Completed OF OENTERLINE OF RAN(M CALF. RD. A&- vertical 0 V % MARWAN A"�OUNIS WITNESS POST SET 1' W. OF MONUMENT. N/A % TRACT NO. 23101 - I DATE 9-13-0 ELEV. 112&410 R.C.E. No. 43217 Expires March 31, 2000 R.C.E. No. 42993 Expires MARCH 31, 2000 PHASE FOUR LOTS A L Sheet 2 of 2