HomeMy WebLinkAboutTract Map 17688 Parcel 3-4 Preliminary Soils Report � • 1
•
•
WAC OEOTECNNICAL
INC.
•
•
•
PRELIMINARY SOILS REPORT
•
PROJECT DATE: AUGUST 18, 2014
PROJECT NUMBER: 14-933
• PREPARED FOR:
KTW INVESTMENTS, LLC
MR. KEITH WHITEHEAD (951)201-4396
39252 WINCHESTER RD. SUITE 107-289
MURRIETA, CA. 92563
• VIA E-MAIL: ktwinvestments(cDverizon.net
SUBJECT: SUBSURFACE SOILS ENGINEERING INVESTIGATION AND FOUNDATION EVALUATION
FOR THE PROPOSED SINGLE FAMILY RESIDENTIAL STRUCTURE TO BE CONSTRUCTED ON THE
PARCEL NOTED BELOW.
• JOB SITE LOCATION:
PAULITA ROAD TEMECULA, CA. ��IG�NAL
A.P.N. : 945-180-023
LONGITUDE: -117.123893 W, LATITUDE: 33.487471 N
•
SITE ELEVATION: 1220 FEET ABOVE SEA LEVEL
• P.O. BOX 545 • NORCO, CA 92860
OFC: (951) 354-6500 • FAX: (951) 354-8600
WAC OEOTECHNICAL
ADDENDUI 40 REPORT
PROJECT DATE: AUGUST 18, 2014
PROJECT NUMBER: 14-933
ADDENDUM DATE: FEBRUARY 2, 2015
PREPARED FOR:
KTW INVESTMENTS, LLC
MR. KEITH WHITEHEAD (951)201-4396
39252 WINCHESTER RD. SUITE 107-289
MURRIETA, CA. 92563
VIA E-MAIL: ktwinveslments(")a verizon.net
SUBJECT: REVISION OF THE FOOTING REQUIREMENTS FOR THE ORIGINAL SOILS REPORT.
JOB SITE LOCATION:
PAULITA ROAD TEMECULA, CA.
A.P.N. : 945-180-023
MR. KEITH WHITEHEAD,
THE FOLLOWING MINIMUM FOOTING REQUIREMENTS ARE NOTED TO BE THE REVISED AND
CORRECT MINIMUM FOOTING SIZES AND DIMENSIONS FOR THIS PROJECT. PLEASE REVISE
YOUR ORIGINAL REPORT ACCORDINGLY.
FOOTING DEPTH
EXTERIOR - 12-INCHES BELOW LOWEST ADJACENT GRADE FOR A ONE-STORY STRUCTURE.
18-INCHES FOR A TWO-STORY STRUCTURE, ALL (IN APPROVED COMPACTED
FILL MATERIALS)
INTERIOR - 12-INCHES BELOW LOWEST ADJACENT GRADE FOR A ONE-STORY STRUCTURE.
18-INCHES BELOW LOWEST ADJACENT GRADE FOR A TWO-STORY STRUCTURE
ALL (IN APPROVED DENSE COMPACTED FILL MATERIALS)
FOOTING WIDTH
EXTERIOR- 12-INCHES MINIMUM FOR ONE-STORY, 18-INCHES MINIMUM FOR 2-STORY.
INTERIOR - 12-INCHES MINIMUM FOR ONE-STORY, 18-INCHES MINIMUM FOR A TWO-STORY.
P.O. BOX 545 • NORCO, CA 92860
OFC: (951) 354-6500 9 FAX: (951) 354-8600
•FOOTING REINFORCEMENT
EXTERIOR & INTERIOR - ALL CONTINUOUS; FOUR NO. 4 BARS, TWO NEAR THE TOP, TWO NEAR
THE BOTTOM FOR EXTERIOR AND TWO NO. 4 BARS ONE NEAR THE TOP AND ONE NEAR THE
BOTTOM FOR INTERIOR.
CONCRETE SLABS:
SLAB THICKNESS: 4-INCHES REINFORCED WITH NO. 3 BARS AT 24-INCH ON CENTER EACH WAY.
UNDER-SLAB TREATMENT
10-MIL VISQUEEN, LAPPED AND SEALED, COVER WITH AT LEAST 2 INCHES OF SAND. SUB-GRADE
SOILS SHOULD BE PRESOAKED TO CONTAIN AT LEAST OPTIMUM MOISTURE CONTENT
IMMEDIATELY PRIOR TO PLACING VISQUEEN AND TO BE VERIFIED BY THE SOILS ENGINEERING
CONSULTANT.
THE FILL/CUSHION SAND COVER SHOULD BE MOISTENED PRIOR TO PLACING CONCRETE.
OPTIMUM MOISTURE CONTENT IN SUB-GRADE SOIL IS TO BE VERIFIED BY THE SOILS
ENGINEERING CONSULTANT.
THE SETTLEMENT OF PROPERLY DESIGNED AND CONSTRUCTED FOUNDATIONS SUPPORTED ON
APPROVED EARTH MATERIALS, CARRYING MAXIMUM ANTICIPATED VERTICAL LOADINGS, ARE
EXPECTED TO BE WITHIN TOLERABLE LIMITS. ESTIMATED TOTAL AND DIFFERENTIAL
SETTLEMENTS SHOULD BE NO MORE THAN 3/4 AND 1/2-INCH, RESPECTIVELY.
THANK YOU FOR THE OPPORTUNITY TO BE OF SERVICE ON YOUR PROJECT. SHOULD YOU HAVE
ANY QUESTIONS REGARDING THIS REPORT, PLEASE CALL THE UN ERSIGNED AT YOUR
CONVENIENCE.
RESPECTFULLY SUBMITTED,
WAC GEOTECHNICAL, INC.
AV i
R, PRESIDENT FOR E E. HAW ES, VICE PRESIDENT
W CAL, INC RCE C034779, STATE OF CALIFORNIA
LIC. EXP. 9-30-15
DATE: Z 2-
THIS OFFICIAL STAMP IS IN BLUE INK,
OTHERWISE A COPY
QapFESSiO&
Ne�o�GE E.yq�y
w
No.GOMM
6> �?
arF OF CALIF
APN: 919-240-001 2
WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
LADIES & GENTLEMEN:
THE RESULTS OF OUR INVESTIGATION INDICATE THAT THE SOILS UNDERLYING THE PROPOSED
BUILDING AREA ARE COMPRISED OF (S/M) OLIVE TAN SANDS, SILTY- FINE TO MEDIUM GRAINED
AND DRY. BASED UPON INFORMATION SUPPLIED TO THIS OFFICE (VERBALLY AND PRELIMINARY
PLANS), IT IS PROPOSED TO CONSTRUCT A TWO-STORY, WOOD FRAMED, STUCCO EXTERIOR,
RESIDENTIAL STRUCTURE ON THE PROPERTY TESTED.
• THE PROPERTY IS LOCATED IN A WELL DEVELOPED, NEIGHBORHOOD IN TEMECULA, CA. IT IS
PROPOSED TO CONSTRUCT THE STRUCTURE AS A SINGLE FAMILY RESIDENCE. EXISTING
TOPOGRAPHY IS NOTED AS FAIRLY LEVEL TO GENTLY ROLLING.
CONVENTIONAL SPREAD FOOTINGS AND SLAB ON GRADE CONSTRUCTION IS PROPOSED FOR
THE PROJECT. THE AREA PROGRAMMED FOR THE CONSTRUCTION OF THE BUILDING IS NOTED
TO BE UNDERLAIN WITH TAN, SILTY-FINE TO MEDIUM GRAINED SANDS, IN A FIRM AND DRY
STATE.
IT IS OUR OPINION THAT THE SITE SHOULD BE CONSIDERED SUITABLE FOR THE PLANNED
DEVELOPMENT, PROVIDED THE RECOMMENDATIONS PRESENTED HEREIN ARE INCORPORATED
INTO THE DESIGN AND IN CONSTRUCTION. ADEQUATELY CONSTRUCTED SPREAD FOOTINGS
FOUNDED INTO COMPETENT, FIELD APPROVED DENSE COMPACTED FILL ARE EXPECTED TO
PROVIDE NECESSARY SUPPORT FOR THE PLANNED RESIDENTIAL STRUCTURE.
THE FINAL FOUNDATION PLANS AND DETAILS MUST BE REVIEWED BY THE UNDERSIGNED. THE
GEOTECHNICAL ENGINEER SHALL INSPECT THE FOOTINGS PRIOR TO INSPECTION BY THE
RIVERSIDE COUNTY BUILDING AND SAFETY INSPECTOR
THIS REPORT HAS BEEN PREPARED IN ACCORDANCE WITH THE GENERALLY ACCEPTED
ENGINEERING STANDARDS CONSIDERED NECESSARY FOR THE PROPOSED DEVELOPMENT.
DESIGN PARAMETERS AND RECOMMENDATIONS ARE BASED ON AND DERIVED FROM THE 2013
CBC/IBC.
THANK YOU FOR THE OPPORTUNITY TO BE OF SERVICE ON YOUR PROJECT. SHOULD YOU HAVE
ANY QUESTIONS REGARDING THIS REPORT, PLEASE CALL THE UNDERSIGNED AT YOUR
CONVENIENCE.
RESPECTFULLY SUBMITTED,
WA OTECHNICAL, INC.
)A n
• I RPRP ESIDENT `'`O�G�E.
Hq�2�`Z GEO E A S, VICE PRESIDENT
«,
E T CAL, INC ,; c� ° a. RCE CO 779, STATE OF CALIFORNIA
Ix* No. C034779 % LIC. EXP./9-330-15
'' ? DATE: 'f�
• THIS OIv .- S_ � IN BLUE INK,
O;THERNA E A COPY
APN: 945-180-023 2
.l ;,�, -ram � ,�► �� r � � � -'"�
Paulita Rd; Temecula, C-A 92592,,U.SA
�.. .l1 . ,I ,•� b( "0 p .F
'.A
Goo( c
r) 2014 Google `
' � ► . 111
• Go: Address Paulita Rd
Temecula, CA 92592
--- atis, -_ _� F'�•�
�qa
"garita,- K
Perk n nk.
R;1 `and otl
unity ` �, �o f
v
flanchp California Rd oGa\\tp
flanch
l v�JbaPd
Prr
P
oe
Ronald Reagan PA �aqd -...'a Sports Park lee pao
P a�ba{id ga�ba Rd
' I O
g
p <
'Ad"0, r'tar9a o Oz
L to d m
F
. NET o• peppnaa
Rose Haven
Heritage Garden re
Y�etH +,p�aP� ten�ec�r�a pkwY
o TN Ilk
d peed ' Rancho
anCommunity
9e
Church uha•
4 w� ® icmecula p}cWY
16
I�
A
NC��7
I6 y
Map data 6244-Google
ralS MAP IS FOR TR.A.aJ-004 9��-1a
ASSESSMENT PURPoSES ONLY POR TEMECULA RANCHO, POR.RANCHO CAL/F.
POR. SE 1/4,SEC. 7, T. 8S.,R.2W.
(FOR. SECS 7 8,/7,/8, T 8S,R.2W/
j4 (PROJECTED)
11 I'i{���NS �R< Y� •-R of Jae Ca.df jB$`4ir xr..//e 9•�P -r+'
. 2 V
°R PAR,-
R 2 oyac u PAR I PAp.2
aw �.RL
2.3ARI. T2O
O y
plIt R
Y 1
u� �� 6Ac RI' rP o es:.A a 11
I
o „• Q 'n /�i O d
12 I E PAR. 46 NL 0
Vo Po•2 2 B5 fl ` 0 i
I n POR.PAR.22 O n .5d� . O V4
N
l P t.R9' AC10 2 76<c P � \� ga.A
�p aA
• .� B • $' /�se.I��/ dp' 24
u
• �s.A. 13 a \ PAR.
/ P ar PAR.
/J A6.NI.
/, • 11 NI iA A.`, PA,.I _ 2 40Ac 5�4 ��a
3 i \'
�•�• 2.99ACN�
,1 i• 344 A03
w
ems` 4v
9
O 1 13 D poR. PAR. e
,. ".m ro uw
IOO9
O e O
6
0
h
PM.2//6/-67 Porce/Mop 6607
" //3156.57 r /7688
P.M./4/722-23 21385 "- L
Yj
ASSESSORS MAP 8K.945 PG./8
RIVERSIDE COUNTY. CALIF
• WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
1.0 INTRODUCTION
• THE PURPOSE OF THIS STUDY IS TO EVALUATE THE NATURE AND ENGINEERING PROPERTIES
OF THE SUBSURFACE SOILS, AND TO PROVIDE NECESSARY GEOTECHNICAL
RECOMMENDATIONS FOR FOUNDATION DESIGN, BUILDING PAD GRADING, UTILITY TRENCH
BACKFILL, AND FIELD REVIEW DURING CONSTRUCTION. THE FINDINGS AND
RECOMMENDATIONS HEREIN ARE BASED ON THE 2013 CALIFORNIA BUILDING CODE, TITLE 24
AND 2013 IBC.
• OUR EVALUATION INCLUDED SUBSURFACE EXPLORATION, SOIL SAMPLING, LABORATORY
TESTING, ENGINEERING ANALYSES AND PREPARATION OF THIS REPORT. THE
RECOMMENDATIONS CONTAINED HEREIN REFLECT OUR PROFESSIONAL OPINIONS FOR THE
SUBSURFACE SOIL CONDITIONS ENCOUNTERED DURING FIELD INVESTIGATION.
1.1 PROPOSED DEVELOPMENT
•
BASED ON THE INFORMATION SUPPLIED TO THIS OFFICE, IT IS PROPOSED TO CONSTRUCT A
TWO-STORY, WOOD FRAME, STUCCO EXTERIOR SINGLE FAMILY RESIDENTIAL STRUCTURE ON A
GRADED/PREPARED BUILDING PAD. CONVENTIONAL SPREAD FOOTINGS ARE EXPECTED FOR
THE BUILDING. IT IS OUR OPINION THAT THE SITE SHOULD BE CONSIDERED SUITABLE FOR THE
PLANNED DEVELOPMENT, PROVIDED THE RECOMMENDATIONS PRESENTED HEREIN ARE
• INCORPORATED INTO DESIGN AND IN CONSTRUCTION. ADEQUATELY CONSTRUCTED SPREAD
FOOTINGS FOUNDED INTO COMPETENT, FIELD APPROVED, DENSE COMPACTED FILL ARE
EXPECTED TO PROVIDE NECESSARY SUPPORT FOR THE PLANNED.RESIDENTIAL STRUCTURE.
1.2 SITE DESCRIPTION
• THE SUBJECT PROPERTY IS LOCATED AT _ PAULITA ROAD TEMECULA, CA. THE PARCEL
FRONTS PAULITA ROAD ALONG THE WESTERLY PROPERTY LINE AT THE CUL-DE-SAC END OF
THE STREET. THIS IS A WELL DEVELOPED, SEMI-RURAL, CUSTOM HOME TRACT. A GRADING
PLAN AND BUILDING PLANS ARE CURRENTLY BEING PREPARED BY OTHERS. NO• ROCK
OUTCROPS WERE NOTED ON THE PARCEL. TOPOGRAPHY IS NOTED AS GENTLY ROLLING. NO
TREES, OUTBUILDINGS, POOLS OR SEASONAL DRAINAGES WERE NOTED ON THE PROPERTY.
• 2.0 SCOPE OF WORK
GEOTECHNICAL INVESTIGATION FOR THE SUBJECT SITE INCLUDED SUBSURFACE EXPLORATION
UTILIZING A TRUCK MOUNTED MOBILE DRILL B-34 AUGER DRILL RIG, SOIL SAMPLING,
LABORATORY TESTING, ENGINEERING ANALYSES AND PREPARATION OF THIS REPORT. IN
GENERAL, THE SCOPE OF WORK INCLUDED THE FOLLOWING TASKS:
•
TWO EXPLORATORY BORINGS WERE EXCAVATED USING A B-34 DRILL RIG, ADVANCED TO A
MAXIMUM DEPTH OF 15 FEET BELOW THE EXISTING GRADE (SEE ATTACHED PLANS AND BORING
LOGS, APPENDIX SECTION). DURING EXPLORATION, ENCOUNTERED SUBSURFACE SOILS WERE
LOGGED BASED UPON VISUAL AND TACTILE METHODS WITH BULK SAMPLES AND IN-PLACE RING
SAMPLES OBTAINED AT SUBSURFACE ZONES AT OR NEAR THE PROPOSED PAD GRADE.
• COLLECTED SAMPLES WERE TRANSFERRED TO A GEOTECHNICAL LABORATORY FOR TESTING
AND ANALYSES. DESCRIPTIONS OF ENCOUNTERED SUBSURFACE SOILS ARE PROVIDED ON THE
BORING LOGS IN THE APPENDIX SECTION. THE APPROXIMATE LOCATIONS OF THE TEST
BORINGS ARE SHOWN ON THE ATTACHED PLANS.
•
• APN: 945-180-023 5
• WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
LABORATORY TESTING WAS CONDUCTED ON SELECTED BULK, REMOLDED AND IN-PLACE RING
SAMPLES ACCORDING TO THE PROJECT REQUIREMENTS. THE LABORATORY TESTING
• INCLUDED EVALUATIONS OF MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT AND
SOIL SHEAR STRENGTH (BASED UPON REMOLDED BULK AND IN-SITU RING SAMPLES) UNDER
ANTICIPATED STRUCTURAL LOADINGS AND EXPANSION INDEX. DESCRIPTIONS OF THE TEST
PROCEDURES USED AND TEST RESULTS ARE PROVIDED IN APPENDIX SECTION.
BASED ON OBTAINED DATA RESULTING FROM OUR FIELD INVESTIGATION, LABORATORY
TESTING AND ENGINEERING ANALYSES, THIS REPORT PRESENTS THIS FIRMS
• RECOMMENDATIONS FOR FOUNDATION DESIGN, SITE PREPARATION, GRADING AND FIELD
REVIEWS NECESSARY DURING SITE CONSTRUCTION. CALCULATIONS ARE BASED ON THE
MINIMUM RECOMMENDATIONS SET FORTH IN THE 2013 CALIFORNIA BUILDING CODE, TITLE 24
AND THE 2013 IBC.
3.0 SUBSURFACE CONDITIONS
•
OUR EVALUATION OF THE SITE SUBSOIL CONDITIONS IS BASED UPON SUBSURFACE SOIL
EXPLORATION AND NOTED LABORATORY TESTING. BASED UPON OUR FIELD INVESTIGATION,
SOIL SAMPLING AND SUBSEQUENT LABORATORY AND ENGINEERING ANALYSES, THE
FOLLOWING CHARACTERISTICS FOR THE SITE SOILS ARE OBSERVED:
• IN GENERAL, THE UPPER 2-4 FEET OF THE SITE SOILS APPEARS TO BE LOOSE, POROUS AND
MAY BE COMPRESSIBLE. THE SUPPORTING SOIL, TAN SILTY-FINE TO MEDIUM GRAINED SANDS,
IS GENERALLY FIRM TO VERY FIRM. THIS NATIVE SOIL IS CLASSIFIED AS SITE CLASS D, PER THE
2013 CALIFORNIA BUILDING CODE TABLE 1613.5.2.
THESE SUB-SOILS WILL REQUIRE REMOVAL TO COMPETENT BEARING SUB-GRADE FOR
• FOUNDATION SUPPORT. SEE SECTION 4.1.1 FOR SPECIFIC REQUIREMENTS. THESE IN PLACE
SUB-SOILS MAY BE CONSIDERED SUITABLE FOR USE AS STRUCTURAL FILLS INTENDED TO
SUPPORT PROPOSED STRUCTURE OR FILL SLOPES. AT TIME OF CONSTRUCTION,ACTUAL FIELD
EXPOSURES WILL DICTATE SITE SUITABILITY BASED UPON FIELD REVIEW-BY THE PROJECT
SOILS ENGINEERING CONSULTANT I REPRESENTATIVE.
LABORATORY SHEAR TESTS CONDUCTED ON THE IN-SITU RING SAMPLES INDICATE GOOD
• SHEAR STRENGTHS UNDER INCREASED MOISTURE CONDITIONS. IF IMPORT SOILS ARE
PROPOSED FOR THIS CONSTRUCTION AND FILL, THE MOST CONSERVATIVE TEST RESULT WILL
APPLY TO DESIGNS. THE SOIL IS CONSIDERED MODERATELY CORROSIVE. THUS, ALL METAL
SHOULD BE PROTECTED FROM THE SOIL. RESULTS OF THE LABORATORY SHEAR TESTS ARE
PROVIDED IN THE APPENDIX SECTION.
• 3.1 EXCAVATIBILITY
CONSIDERING THE MINIMAL REMOVAL DEPTH AND ABSENCE OF SURFICIAL BEDROCK, IT IS OUR
OPINION THAT GRADING AND EXCAVATION REQUIRED FOR THE PROJECT MAY BE
ACCOMPLISHED USING CONVENTIONAL CONSTRUCTION EQUIPMENT TO THE PROPOSED
DESIGN GRADES AND RECOMMENDED REMOVAL DEPTHS. HOWEVER, HEAVY RIPPING AND JACK
• HAMMERING COULD BE REQUIRED.
3.2 GROUND WATER
GROUND WATER WAS NOT ENCOUNTERED IN OUR SUBSURFACE DRILLING EXCAVATION TO THE
DEPTH OF 15.0' BELOW THE EXISTING GRADE. GROUND WATER IS NOT EXPECTED TO BE A
• PROBLEM FOR PROPOSED DEVELOPMENT.
• APN: 945-180-023 6
WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
3.3 SUB-SURFACE VARIATIONS
BASED UPON THE RESULTS OF OUR SUBSURFACE INVESTIGATION AND ON PAST EXPERIENCE,
IT IS THE OPINION OF THIS FIRM THAT VARIATIONS IN THE CONTINUITY AND DEPTHS OF
SUBSOIL DEPOSITS MAY BE EXPECTED. DUE TO THE NATURE AND CHARACTERISTICS OF THE
SOILS UNDERLYING THE SUBJECT SITE, CARE SHOULD BE EXERCISED IN INTERPOLATING OR
EXTRAPOLATING THE CONDITIONS AND PROPERTIES OF THE SUB-SOILS BEYOND THE BORING
LOCATIONS.
3.4 LIQUEFACTION
LIQUEFACTION IS CAUSED BY THE BUILD UP OF EXCESS HYDROSTATIC PRESSURE IN
SATURATED COHESIONLESS SOILS DUE TO CYCLIC STRESS GENERATED BY GROUND SHAKING
DURING AN EARTHQUAKE. THE SIGNIFICANT FACTORS ON WHICH LIQUEFACTION POTENTIAL OF
A SOIL DEPOSIT DEPENDS, AMONG OTHERS INCLUDE, SOIL TYPE, RELATIVE SOIL DENSITY,
INTENSITY OF EARTHQUAKE,.DURATION OF GROUND SHAKING, AND DEPTH OF GROUND WATER.
LIQUEFACTION POTENTIAL IS CONSIDERED VERY LOW FOR THIS PARCEL. GROUND WATER WAS
NOT ENCOUNTERED IN OUR SUBSURFACE EXPLORATION PROGRAM AND THE SOIL IS NOTED AS
HAVING AN AVERAGE COHESION RATING OF 100'. THE RIVERSIDE GIS STATES THAT -THE
POTENTIAL FOR LIQUEFACTION IS VERY LOW".
3.5 POTENTIAL SEISMIC HAZARDS
SEISMIC.DESIGN PARAMETERS ARE BASED UPON THE 2013 CBC. THIS PROJECT IS LOCATED IN
SEISMIC REGION 1. PER THE RIVERSIDE COUNTY GIS SYSTEM PAGES; THIS PARCEL IS WITHIN Y2
MILE OF A FAULT. THE SITE IS NOTED TO BE SUSCEPTIBLE TO SUBSIDENCE.
PER THE CDC/DMG MAP THE SITE IS LOCATED APPROXIMATELY 5 KM .NORTHEAST OF THE
ELSINORE FAULT, GLEN IVY AND WILDOMAR SEGMENTS. THIS IS A TYPE B FAULT. THE SLIP
RATE IS NOTED TO BE 5 AND THE MG MAX IS 6.8.
FOR CALCULATIONS, THE SEISMIC DESIGN PARAMETERS ARE PER TABLE 1613.5.2 OF THE 2013
CBC. THE SOILS UNDERLYING THE SUBJECT SITE, OLIVE-TAN, SILTY-FINE TO MEDIUM GRAINED
SLIGHTLY SANDS, IN A FIRM AND DRY STATE, IS ASSIGNED THE SOIL TYPE PROFILE D. THAT
SOIL IS UNDERLAIN BY TAN, FINE TO MEDIUM GRAINED SANDS, VERY FIRM TO DENSE AND DRY.
FOR CALCULATIONS THE SEISMIC DESIGN PARAMETERS ARE PER USGS -DESIGN MAP"
ATTACHED. THE DESIGN CRITERIA IS BASED ON SITE CLASS D SOILS AND THE 2013 CBC & 2013
IBC.
THE USGS SEISMIC HAZARDS MAPPING GROUND MOTION PAGE IS ATTACHED TO THIS REPORT.
A COPY OF THE CDC, DMG ACTIVE FAULT NEAR-SOURCE ZONE MAP IS ALSO ATTACHED TO THIS
REPORT. THIS INFORMATION IS PROVIDED BY THE CALIFORNIA GEOLOGICAL SURVEY AND IS
DESIGNED TO COMPLIMENT THE 2013 UBC 2013 IBC CRITERIA. THE DATA SHEETS ARE FOUND IN
THE APPENDIX PORTION OF THIS REPORT.
Ss, BSE-2N = 1.905(g) SXs, BSE-2N = 1.905 (g)
S1, BSE-2N = 0.777(g) SX1, BSE-2N = 1.166(g)
•
APN: 945-180-023 7
• WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
4.0 EVALUATIONS AND RECOMMENDATIONS
4.1 GENERAL EVALUATIONS
BASED ON THIS FIRM'S FIELD INVESTIGATION, LABORATORY TESTING AND SUBSEQUENT
ENGINEERING ANALYSIS, IT IS OUR OPINION THAT, FROM A GEOTECHNICAL VIEWPOINT, THE
SITE SHOULD BE CONSIDERED SUITABLE FOR THE PLANNED DEVELOPMENT, PROVIDED THE
RECOMMENDATIONS PRESENTED HEREIN, ARE INCORPORATED INTO FINAL DESIGN AND IN
• CONSTRUCTION.
SITE PREPARATION AND GRADING SHOULD BE PERFORMED IN ACCORDANCE WITH THE
ENCLOSED RECOMMENDATIONS OF SECTION 5, EARTHWORK/GENERAL GRADING
RECOMMENDATIONS OF THIS REPORT, EXCEPT AS MODIFIED IN THE MAIN TEXT AND WITH THE
APPLICABLE PORTIONS OF APPENDIX CHAPTER 33 OF THE CURRENT UBC OR APPLICABLE
LOCAL ORDINANCE.
•
STRUCTURAL DESIGN CONSIDERATIONS SHOULD INCLUDE THE PROBABILITY OF MODERATE
PEAK GROUND ACCELERATIONS FROM RELATIVELY ACTIVE REGIONAL EARTHQUAKE FAULTS,
AS NOTED IN SECTION 4.2, CHEMICAL TEST RESULTS INDICATE THE SOIL /S LOW TO
MODERATELY CORROSIVE; THUS, ALL METAL SHOULD BE PROTECTED FROM THE CORROSIVE
SOIL.
•
4.1.1 SUB-GRADE PREPARATIONS FOR STRUCTURAL PADS
PROGRAMMED AREAS FOR RESIDENTIAL BUILDING SUPPORT WILL REQUIRE A MINIMUM
REMOVAL OF SOIL AND MATERIALS IN THE UPPER 2-4 FEET TO A COMPETENT IN-PLACE SUB-
GRADE. REMOVAL SHALL BE VERIFIED AND APPROVED IN THE FIELD BY A REPRESENTATIVE OF
• WAC GEOTECHNICAL, INC. PRIOR TO REPLACING AND COMPACTING REMOVED MATERIAL. A
REPRESENTATIVE OF WAC GEOTECHNICAL, INC. SHALL VERIFY THAT ALL REPLACED MATERIAL
HAS BEEN COMPACTED TO AT LEAST 90% RELATIVE COMPACTION PER ASTM D-1557-91 FOR
STRUCTURAL SUPPORT OF THE PROPOSED FILL AND FOUNDATIONS.
IT IS ANTICIPATED REMOVAL DEPTHS WILL AVERAGE APPROXIMATELY.3 FEET. BASEMENT SOIL
SHOULD BE SCARIFIED 6-INCHES AND MOISTURE CONDITIONED TO INSURE A UNIFORM FILL MAT
FOR BUILDING SUPPORT. OVER EXCAVATION SHOULD INCLUDE THE AREA 5-FEET OUTSIDE THE
BUILDING FOOTPRINT. ACTUAL DEPTH OF REMOVALS WILL BE PREDICATED ON EXPOSED FIELD
CONDITIONS AND APPROVAL BY A REPRESENTATIVE OF WAC GEOTECHNICAL, INC.
ALL FILLS SHALL BE PLACED IN 6 TO 8 INCH LAYERS, MOISTURE CONDITIONED TO AT LEAST
OPTIMUM MOISTURE CONTENT AND COMPACTED TO 90% OF MAXIMUM DRY DENSITY PER ASTM
• D-1557-91. FILL PLACEMENT SHALL BE OBSERVED BY AND COMPACTION TESTING PERFORMED
BY A REPRESENTATIVE OF THE PROJECT SOILS ENGINEERING CONSULTANT AND AS NOTED IN
.SECTION 5.0 °EARTH WORK I GENERAL GRADING RECOMMENDATIONS".
4.2 SPREAD FOUNDATION
• FOR ADEQUATE SUPPORT, THE PROPOSED STRUCTURES MAY BE CONSTRUCTED ON
CONTINUOUS AND/OR ISOLATED SPREAD FOOTINGS FOUNDED EXCLUSIVELY INTO FIELD
APPROVED COMPACTED FILL MATERIALS.
CONVENTIONAL SHALLOW FOUNDATION SYSTEM IS CONSIDERED SUITABLE FOR THE PLANNED
COMMERCIALIINDUSTRIAL STRUCTURE. TYPE II CEMENT IS ACCEPTABLE FOR CONSTRUCTION.
• ALL METAL SHOULD BE PROTECTED FROM THE CORROSIVE SOIL.
• APN: 945-180-023 8
WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
FOUNDATIONS MAY BE DESIGNED BASED UPON THE FOLLOWING VALUES:
ALLOWABLE BEARING: 2500 LBS./SQ. FT.
LATERAL BEARING: 200 LBS./SQ. FT. PER FT. OF DEPTH TO A MAXIMUM OF 300 LBS./SQ. FT.
SLIDING COEFFICIENT: 0.31
ALLOWABLE BEARING MAY BE INCREASED TO 20 % OF THE ABOVE DESIGNATED VALUE FOR
• EACH ADDITIONAL FOOT OF DEPTH, UP TO THREE TIMES THE DESIGNATED VALUE.
ADDITIONALLY, AN INCREASE OF 113 SHALL BE PERMITTED WHEN CONSIDERING LOAD
COMBINATIONS, INCLUDING WIND OR EARTHQUAKE LOADS, AS PERMITTED BY 2013 CBC,
SECTION 1613.
2. OTHER DESIGN RECOMMENDATIONS
• FOOTING DEPTH
EXTERIOR - 18-INCHES BELOW LOWEST ADJACENT GRADE FOR A ONE-STORY STRUCTURE
18-INCHES FOR A TWO-STORY STRUCTURE, ALL (IN APPROVED COMPACTED
FILL MATERIALS)
INTERIOR - 18-INCHES BELOW LOWEST ADJACENT GRADE FOR A ONE-STORY STRUCTURE
18-INCHES BELOW LOWEST ADJACENT GRADE FOR A TWO-STORY STRUCTURE
ALL (IN APPROVED DENSE COMPACTED FILL MATERIALS)
• FOOTING WIDTH
EXTERIOR - 18-INCHES MINIMUM FOR ONE-STORY, 18-INCHES MINIMUM FOR 2-STORY
INTERIOR - 18-INCHES MINIMUM FOR ONE AND 18-INCHES FOR 2-STORY, RESPECTIVELY.
• FOOTING REINFORCEMENT
EXTERIOR & INTERIOR - ALL CONTINUOUS; FOUR NO. 4 BARS, TWO NEAR THE TOP, TWO
NEAR THE BOTTOM FOR EXTERIOR AND TWO NO. 4 BARS ONE NEAR THE TOP AND ONE
NEAR THE BOTTOM FOR INTERIOR.
CONCRETE SLABS - SLAB THICKNESS: 4-INCHES REINFORCED WITH NO. 3 BARS AT 24-
INCH ON CENTER EACH WAY.
UNDER-SLAB TREATMENT
10-MIL VISQUEEN, LAPPED AND SEALED, COVER WITH AT LEAST 2 INCHES OF SAND. SUB-GRADE
SOILS SHOULD BE PRESOAKED TO CONTAIN AT LEAST OPTIMUM MOISTURE CONTENT
IMMEDIATELY PRIOR TO PLACING VISQUEEN AND TO BE VERIFIED BY THE SOILS ENGINEERING
CONSULTANT.
THE FILUCUSHION SAND COVER SHOULD BE MOISTENED PRIOR TO PLACING CONCRETE.
OPTIMUM MOISTURE CONTENT IN SUB-GRADE SOIL VERIFIED BY THE SOILS ENGINEERING
CONSULTANT.
THE SETTLEMENT OF PROPERLY DESIGNED AND CONSTRUCTED FOUNDATIONS SUPPORTED ON
APPROVED EARTH MATERIALS, CARRYING MAXIMUM ANTICIPATED VERTICAL LOADINGS, ARE
EXPECTED TO BE WITHIN TOLERABLE LIMITS. ESTIMATED TOTAL AND DIFFERENTIAL
SETTLEMENTS SHOULD BE NO MORE THAN 3/4 AND 1/2-INCH, RESPECTIVELY.
APN: 945-180-023 9
• WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
4.3 RESISTANCE TO LATERAL LOADS
• RESISTANCE TO LATERAL LOADS CAN BE RESTRAINED BY FRICTION ACTING AT THE BASE OF
FOUNDATIONS AND BY PASSIVE EARTH PRESSURE. REFER TO SECTION 4.2 FOR VALUES.
THE MAXIMUM LATERAL PASSIVE EARTH PRESSURE IS RECOMMENDED NOT TO EXCEED 300
POUNDS. FOR DESIGN, LATERAL EARTH PRESSURES OF LOCAL SOILS WHEN USED AS LEVEL
• BACKFILL MAY BE ESTIMATED FROM THE FOLLOWING EQUIVALENT FLUID DENSITY:
ACTIVE: 35 PCF
PASSIVE: 200 PCF
AT REST: 55 PCF
4.5 CONSTRUCTION CONSIDERATIONS
•
4.5.1 UNSUPPORTED EXCAVATION
TEMPORARY CONSTRUCTION EXCAVATION UP TO A MAXIMUM DEPTH OF 5 FEET MAY BE MADE
WITHOUT ANY LATERAL SUPPORT. IT IS RECOMMENDED THAT NO SURCHARGE LOADS SUCH AS
CONSTRUCTION EQUIPMENT, BE ALLOWED WITHIN A LINE DRAWN UPWARD AT 45 DEGREE
• FROM THE TOE OF EXCAVATION. USE OF SLOPING FOR DEEP EXCAVATION MAY BE APPLICABLE
WHERE PLAN DIMENSIONS OF THE EXCAVATION ARE NOT CONSTRAINED BY ANY EXISTING
STRUCTURE.
4.5.2 SUPPORTED EXCAVATIONS
• IF VERTICAL EXCAVATIONS EXCEEDING 5 FEET IN DEPTH BECOME WARRANTED, USE OF
SHORING TO SUPPORT SIDE WALLS IS RECOMMENDED.
4.6 SITE PREPARATION -
SITE PREPARATIONS SHOULD INCLUDE CUT SUB-EXCAVATIONS, IMPORT SOILS, AND
• PLACEMENT OF SOILS AS ENGINEERED FILL. SUCH EARTH WORK SHOULD BE IN ACCORDANCE
WITH THE APPLICABLE GRADING RECOMMENDATIONS PROVIDED IN THE 2013 CBC AND AS
RECOMMENDED IN SECTION 5.0 OF THIS REPORT.
THIS OFFICE SHOULD BE NOTIFIED 72 HOURS IN ADVANCE OF IMPORTING SOILS TO SITE FOR
PLACEMENT AS COMPACTED FILL. IT WILL BE NECESSARY FOR THE PROJECT SOILS
ENGINEERING CONSULTANT TO SAMPLE IMPORT SOILS WITH SUBSEQUENT LABORATORY
• TESTING TO ASSESS THE SUITABILITY OF IMPORT SOILS FOR PROJECT CONSTRUCTION. IT IS
STRONGLY RECOMMENDED THAT IMPORT SOILS BE SIMILAR TO SITE SOILS. THE USE OF
CLAYEY SOILS FOR PAD CONSTRUCTION IS PROHIBITED WITHOUT PRIOR APPROVAL OF THE
SOILS ENGINEERING CONSULTANT.
4.7 SOIL CAVING
•
DURING EXCAVATIONS FOR DEEP UTILITY TRENCHES, 'SOME' CAVING MAY BE EXPECTED. ALL
TEMPORARY DEEP EXCAVATIONS SHOULD BE MADE AT A 2:1 (HORIZONTAL TO VERTICAL)
SLOPE RATIO OR FLATTER, AND/OR AS PER THE CONSTRUCTION GUIDELINES PROVIDED BY
CAL-OSHA.
•
• APN: 945-180-023 10
WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
4.8 RETAINING WALL
RETAINING STRUCTURES, IF PLANNED, SHOULD BE DESIGNED USING THE FOLLOWING
EQUIVALENT FLUID DENSITY:
SLOPE SURFACE OF RETAINED MATERIAL EQUIVALENT FLUID DENSITY(PCF)
(HORIZONTAL TO VERTICAL) IMPORTED LOCAL
CLEAN SAND SITE SOIL
LEVEL 30 40
�- 2:1 35 45
ONLY FREE-DRAINING GRANULAR MATERIALS (SAND OR GRAVEL) ARE TO BE USED AS
• RETAINING WALL BACKFILL. BACK-DRAINS-AND / OR OMISSION OF HEAD JOINTS @ 32- O.C. IN
THE FIRST COURSE ABOVE GRADE ARE REQUIRED BEHIND ALL RETAINING WALLS:
4.9 UTILITY TRENCH BACKFILL
UTILITY TRENCH BACKFILL WITHIN THE STRUCTURAL PAD AND BEYOND, SHOULD BE PLACED IN
ACCORDANCE WITH THE FOLLOWING RECOMMENDATIONS:
' EXTERIOR TRENCHES ALONG A FOUNDATION OR A TOE OF A SLOPE AND EXTENDING BELOW A
1:1 IMAGINARY LINE PROJECTED FROM THE OUTSIDE BOTTOM EDGE OF THE FOOTING OR
TOE OF THE SLOPE, SHOULD. BE COMPACTED TO A-MINIMUM 90 PERCENT.
ALL EXCAVATED TRENCHES SHOULD CONFORM TO THE REQUIREMENTS AND SAFETY AS
SPECIFIED BY CAL-OSHA.
4.10 PRE-CONSTRUCTION MEETING
IT IS RECOMMENDED THAT NO CLEARING OF THE SITE OR ANY GRADING OPERATION BE
PERFORMED WITHOUT THE PRESENCE OF A REPRESENTATIVE OF THIS OFFICE. AN ON-SITE
PRE-GRADING MEETING SHOULD BE ARRANGED BETWEEN THE SOILS ENGINEERING
CONSULTANT AND THE GRADING CONTRACTOR PRIOR TO ANY CONSTRUCTION.
4.11 SEASONAL LIMITATIONS
NO STRUCTURAL FILL SHALL BE PLACED, SPREAD OR ROLLED DURING UNFAVORABLE
• WEATHER CONDITIONS. WHERE THE WORK IS INTERRUPTED BY HEAVY RAINS, FILL
OPERATIONS SHALL NOT BE RESUMED UNTIL MOISTURE CONDITIONS ARE CONSIDERED
FAVORABLE BY THE SOILS ENGINEERING CONSULTANT.
4.12 PLANTERS
TO MINIMIZE POTENTIAL SETTLEMENT TO FOUNDATIONS DUE TO MIGRATING IRRIGATION
WATER, PLANTERS REQUIRING IRRIGATION SHOULD BE RESTRICTED FROM USE IF ADJACENT
TO FOOTINGS. IF UNAVOIDABLE, PLANTER BOXES WITH SEALED BOTTOMS AND DRAIN OUTLETS
TO APPROVED AREAS AWAY FROM THE FOUNDATION, SHOULD BE CONSTRUCTED.
APN: 945-180-023 I I
• WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
4.13 LANDSCAPE MAINTENANCE/DRAINAGE
• ONLY THE AMOUNT OF IRRIGATION NECESSARY TO SUSTAIN PLANT LIFE SHOULD BE PROVIDED.
PAD DRAINAGE SHOULD BE DIRECTED TOWARDS STREETS AND/OR TO OTHER APPROVED
AREAS AWAY FROM FOUNDATIONS. SLOPE AREAS, WHEN APPLICABLE, SHOULD BE PLANTED
WITH DRAUGHT RESISTANT VEGETATION.
4.14 OBSERVATIONS AND TESTING DURING CONSTRUCTION
• RECOMMENDATIONS PROVIDED IN THIS REPORT ARE BASED UPON THE ASSUMPTION THAT ALL
FOUNDATIONS WILL BE PLACED UPON FIELD APPROVED FILL MATERIALS FOR STRUCTURES.
EXCAVATED FOOTINGS SHALL BE FIELD REVIEWED, VERIFIED AND CERTIFIED BY SOILS
ENGINEERING CONSULTANT PRIOR TO FORMING, STEEL AND CONCRETE PLACEMENT TO
ENSURE THEIR SUFFICIENT EMBEDMENT AND PROPER BEARING ON APPROVED DENSE
COMPACTED FILL MATERIALS.
•
ADDITIONAL FIELD REVIEWS BY SOILS ENGINEERING CONSULTANT IS RECOMMENDED TO
VERIFY FOOTING EXCAVATIONS BEING FREE, OF LOOSE AND DISTURBED MATERIAL. ALL
STRUCTURAL BACKFILL SHALL BE PLACED AND COMPACTED UNDER DIRECT OBSERVATION AND
TESTING BY THIS FACILITY. EXCESS SOILS GENERATED FROM FOOTING EXCAVATIONS SHOULD
BE REMOVED FROM PAD AREAS AND SHOULD NOT BE ALLOWED ON SUB GRADES AS
• UNCOMPACTED FILL FOR AREAS PROGRAMMED TO RECEIVE CONCRETE SLAB-ON=GRADE.
5.0 EARTH WORK/GENERAL GRADING RECOMMENDATIONS
STRUCTURAL BACKFILL:
• DURING GRADING, EXCAVATED SITE SOILS MAY BE CONSIDERED SUITABLE FOR REUSE AS
BACKFILL MATERIAL. LOOSE SOILS, FORMWORK.AND DEBRIS SHOULD BE REMOVED PRIOR TO
BACKFILLING THE WALLS. ON-SITE SAND BACKFILL SHOULD BE PLACED AND COMPACTED IN
ACCORDANCE WITH THE RECOMMENDED SPECIFICATIONS PROVIDED BELOW. -WHERE SPACE
LIMITATIONS DO NOT ,ALLOW- CONVENTIONAL-BACKFILLING OPERATIONS, SPECIAL BACKFILL
MATERIALS AND PROCEDURES MAY BE REQUIRED. PEA GRAVEL OR OTHER SELECT BACKFILL
CAN BE USED IN LIMITED SPACE AREAS. RECOMMENDATIONS FOR PLACEMENT AND
• DENSIFICATION OF PEA GRAVEL OR OTHER SPECIAL BACKFILL CAN BE PROVIDED DURING
CONSTRUCTION.
SITE DRAINAGE:
ADEQUATE POSITIVE DRAINAGE SHOULD BE PROVIDED AWAY FROM THE STRUCTURE TO
• PREVENT WATER FROM PONDING AND TO REDUCE PERCOLATION OF WATER INTO SUBSOIL AT
FOUNDATION AREAS. A DESIRABLE SLOPE FOR SURFACE DRAINAGE SHOULD BE A MINIMUM OF
2 PERCENT IN LANDSCAPE AREAS AND 1 PERCENT IN PAVED AREAS. PLANTERS AND
LANDSCAPED AREAS ADJACENT TO BUILDING PERIMETER SHOULD BE AVOIDED OR DESIGNED
BY A QUALIFIED LANDSCAPE ARCHITECT UTILIZING A SEALED PLANTER BOX WITH DRAINS AWAY
FROM FOOTINGS TO MINIMIZE WATER FILTRATION INTO SUB-SOILS.
• UTILITY TRENCHES:
BURIED UTILITY CONDUITS SHOULD BE BEDDED AND BACKFILLED AROUND THE CONDUIT IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS. WHERE CONDUIT UNDERLIES CONCRETE
SLAB-ON-GRADE AND PAVEMENT, THE REMAINING TRENCH BACKFILL ABOVE THE PIPE SHOULD
• BE PLACED AND COMPACTED IN ACCORDANCE WITH THE FOLLOWING GRADING
SPECIFICATIONS.
• APN: 945-180-023 12
• WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
GENERAL GRADING RECOMMENDATIONS:
• RECOMMENDED GENERAL SPECIFICATIONS FOR SURFACE PREPARATION TO RECEIVE FILL AND
COMPACTION FOR STRUCTURAL AND UTILITY TRENCH BACKFILL AND OTHERS, ARE PRESENTED
BELOW.
1. AREAS TO BE GRADED, BACKFILLED OR PAVED, SHALL BE GRUBBED, STRIPPED AND
CLEANED OF ALL BURIED AND UNDETECTED DEBRIS, STRUCTURES, CONCRETE, VEGETATION
• AND OTHER DELETERIOUS MATERIALS PRIOR TO GRADING.
2. WHERE COMPACTED FILL IS TO PROVIDE VERTICAL SUPPORT FOR FOUNDATIONS, ALL
LOOSE, SOFT AND OTHER INCOMPETENT SOILS SHOULD BE REMOVED TO FULL DEPTH AS
APPROVED BY SOILS ENGINEERING CONSULTANT, OR AT LEAST UP TO THE DEPTH AS
PREVIOUSLY DESCRIBED IN THIS REPORT. THE AREAS OF SUCH REMOVAL SHOULD EXTEND AT
LEAST 5 FEET•BEYOND THE PERIMETER OF EXTERIOR FOUNDATION LIMIT OR TO THE EXTENT
• AS APPROVED BY SOILS ENGINEERING CONSULTANT DURING GRADING.
3. THE REQUIRED COMPACTION FOR FILL TO SUPPORT FOUNDATIONS AND SLAB-ON-GRADE IS
90% OF THE MAXIMUM DRY DENSITY AT OR NEAR-OPTIMUM MOISTURE CONTENT. TO MINIMIZE
ANY POTENTIAL DIFFERENTIAL SETTLEMENT FOR FOUNDATIONS AND SLAB-ON-GRADE
STRADDLING OVER DAYLIGHT LINES, THE CUT PORTION SHOULD BE OVER EXCAVATED A
MINIMUM OF 3 FEET AND REPLACED AS COMPACTED FILL, COMPACTED TO AT LEAST 90% OF
• THE MAXIMUM DRY DENSITY AS DESCRIBED IN THIS REPORT.
4. UTILITY TRENCHES WITHIN BUILDING PAD AREAS AND BEYOND, SHOULD BE BACKFILLED
WITH GRANULAR MATERIAL AND SUCH SHOULD BE COMPACTED TO AT LEAST 90% OF THE
MAXIMUM DENSITY FOR THE MATERIAL USED.
• 5. FIELD DENSITY FOR ALL STRUCTURAL FILLS SHALL BE COMPARED TO THE MAXIMUM DRY
DENSITY AS EVALUATED BY ASTM D1557-90 COMPACTION METHODS. ALL IN-SITU FIELD
DENSITY OF COMPACTED FILL SHALL BE DETERMINED BY THE ASTM D1556 STANDARD
METHODS OR BY OTHER APPROVED PROCEDURES.
6. ALL NEW IMPORTED SOILS, IF REQUIRED, SHALL BE CLEAN, GRANULAR, NON-EXPANSIVE
MATERIAL OR AS APPROVED BY THE SOILS ENGINEERING CONSULTANT.
•
7. ALL FILLS SHALL BE PLACED IN 6 TO 8 INCH LAYERS, MOISTURE CONDITIONED TO AT LEAST
OPTIMUM MOISTURE CONTENT AND COMPACTED TO 90% OF MAXIMUM DRY DENSITY PER ASTM
D 1557-91
8. NO ROCKS OVER EIGHT INCHES IN DIAMETER, SHALL BE PERMITTED IN FILL SLOPES OR
• WITHIN 3 FEET OF THE SURFACE WITHOUT PRIOR APPROVAL OF THE SOILS ENGINEERING
CONSULTANT.
9. NO JETTING AND/OR WATER TAMPING MAY BE CONSIDERED FOR BACKFILL COMPACTION
FOR UTILITY TRENCHES WITHOUT PRIOR APPROVAL OF THE SOILS ENGINEERING CONSULTANT.
FOR SUCH BACKFILL, HAND TAMPING WITH FILL LAYERS OF 8 TO 12 INCHES IN THICKNESS, OR
• AS APPROVED BY THE SOILS ENGINEERING CONSULTANT IS RECOMMENDED.
10. ANY AND ALL UTILITY TRENCHES AT DEPTH, AS WELL AS CESSPOOL AND ABANDONED
SEPTIC TANKS WITHIN BUILDING PAD AREA AND BEYOND, SHOULD EITHER BE COMPLETELY
EXCAVATED AND REMOVED FROM THE SITE, OR SHOULD BE BACKFILLED WITH GRAVEL,
SLURRY OR BY OTHER MATERIAL, AS APPROVED BY SOILS ENGINEERING CONSULTANT.
•
• APN: 945-180-023 13
WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
11. ANY AND ALL IMPORT SOILS IF REQUIRED DURING GRADING, SHALL BE EQUIVALENT TO THE
SITE SOILS OR BETTER. SUCH SHOULD BE APPROVED BY THE SOILS ENGINEERING
CONSULTANT PRIOR TO IMPORT. AT LEAST 72 HOURS OF ADVANCE NOTICE IS REQUIRED PRIOR
TO IMPORTING SOILS FOR SITE USE TO ALLOW THE SOILS ENGINEERING CONSULTANT TIME TO
SAMPLE AND ANALYZE THE IMPORT SOILS.
12. ANY AND ALL GRADING REQUIRED FOR PAVEMENT, SIDEWALK OR OTHER FACILITIES TO BE
USED BY GENERAL PUBLIC, SHOULD BE CONSTRUCTED UNDER DIRECT OBSERVATION OF SOILS
ENGINEERING CONSULTANT, OR AS REQUIRED BY THE LOCAL PUBLIC AGENCIES.
13. A SITE MEETING (PRE-GRADE MEETING) SHALL BE HELD BETWEEN THE GRADING
CONTRACTOR AND SOILS ENGINEERING CONSULTANT PRIOR TO ACTUAL CONSTRUCTION.
THREE DAYS OF PRIOR NOTICE WILL BE REQUIRED FOR SUCH MEETING.
14. ALL FILL SLOPES ARE TO BE KEYED INTO FIELD APPROVED DENSE EARTH MATERIALS AND
APPROVED .BY-THE PROJECT SOILS CONSULTANTS. KEYWAY IS TO BE 1/2 THE SLOPE HEIGHT IN
WIDTH OR 15 FEET, WHICHEVER IS GREATER. HEEL SHALL HAVE A 1-FOOT DIFFERENTIAL FROM
TOE (SLOPING TO HEEL).
15. FILL OVER CUT SHALL BE BENCHED INTO APPROVED DENSE EARTH MATERIALS AND
FOUNDED UPON A KEYWAY, A MINIMUM WIDTH OF 10=FEET WITH THE HEEL 1-FOOT DEEPER
THAN TOE (SLOPING TO HEEL).
16. FOR GRADIENTS STEEPER THAN 5:1, FILL SHALL BE BENCHED A MINIMUM OF 4-FEET
HORIZONTALLY INTO NATIVE EARTH MATERIALS FOR EVERY 4 VERTICAL FEET OF FILL PLACED.
APN: 945-180-023 14
• WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
6.0 CLOSURE
• THE CONCLUSIONS AND RECOMMENDATIONS CONTAINED HEREIN, ARE BASED UPON THE
FINDINGS AND OBSERVATIONS MADE AT THE TIME OF THE SUBSURFACE INVESTIGATION. THE
RECOMMENDATIONS PRESENTED, SHOULD BE CONSIDERED "PRELIMINARY" SINCE THEY ARE
BASED ON SOIL SAMPLES ONLY. IF DURING CONSTRUCTION, THE SUBSOIL CONDITIONS
APPEAR TO BE DIFFERENT FROM THOSE DISCLOSED DURING FIELD INVESTIGATION, THIS
OFFICE SHOULD BE NOTIFIED TO CONSIDER ANY POSSIBLE NEED FOR MODIFICATION FOR THE
GEOTECHNICAL RECOMMENDATIONS PROVIDED IN THIS REPORT.
•
RECOMMENDATIONS PROVIDED ARE BASED ON THE ASSUMPTIONS THAT STRUCTURAL
FOOTINGS WILL BE ESTABLISHED EXCLUSIVELY INTO FIELD APPROVED COMPACTED FILL.
IT IS RECOMMENDED THAT FINAL PRECISE GRADING AND/OR FOUNDATION PLANS SHOULD BE
REVIEWED BY THIS OFFICE WHEN THEY BECOME AVAILABLE (IF DIFFERENT THAN NOTED PLAN
• REVIEW UTILIZED FOR THIS REPORT). SITE GRADING MUST BE PERFORMED UNDER REVIEW BY
GEOTECHNICAL REPRESENTATIVES OF THIS OFFICE. ALL FOOTING EXCAVATIONS SHOULD BE
FIELD REVIEWED (BY THIS OFFICE) PRIOR TO FORMING, STEEL AND CONCRETE PLACEMENT TO
ENSURE THAT FOUNDATIONS ARE FOUNDED INTO SATISFACTORY SOILS AND EXCAVATIONS
ARE.FREE OF LOOSE AND DISTURBED MATERIALS.
• THIS REPORT HAS BEEN PREPARED EXCLUSIVELY FOR THE USE OF THE ADDRESSEE FOR THE
PROJECT REFERENCED IN CONTEXT: IT SHALL NOT BE TRANSFERRED OR BE USED BY OTHER
PARTIES WITHOUT WRITTEN CONSENT BY WAC GEOTECHNICAL, INC. WE CANNOT BE
RESPONSIBLE FOR USE OF THIS REPORT BY OTHERS WITHOUT REVIEW OF THE GRADING
OPERATION BY OUR PERSONNEL.
• SHOULD THE PROJECT BE DELAYED BEYOND ONE YEAR AFTER THE DATE OF THIS REPORT, THE
RECOMMENDATIONS PRESENTED SHALL BE REVIEWED TO CONSIDER ANY POSSIBLE CHANGE
IN SITE CONDITIONS OR CODE REQUIREMENTS.
THE RECOMMENDATIONS PRESENTED ARE BASED ON'THE ASSUMPTION THAT THE NECESSARY
GEOTECHNICAL OBSERVATIONS AND TESTING DURING CONSTRUCTION WILL BE PERFORMED
BY A REPRESENTATIVE OF THIS OFFICE. THE FIELD OBSERVATIONS ARE CONSIDERED A
• CONTINUATION OF THE GEOTECHNICAL INVESTIGATION PERFORMED.' IF ANOTHER FIRM IS
RETAINED FOR.GEOTECHNICAL OBSERVATIONS AND TESTING, OUR PROFESSIONAL LIABILITY
AND RESPONSIBILITY SHALL BE DEEMED TO HAVE BEEN ASSUMED BY THE FIRM REPLACING
WAC GEOTECHNICAL, INC. EXCEPT FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF
WAC GEOTECHNICAL, INC.
•
•
•
0 APN: 945-180-023 15
• WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
7.0 APPENDIX SECTION
• BORING LOGS
B-1
• 0-5' SIM OLIVE-TAN SANDS, SILTY-FINE TO MEDIUM GRAINED, LOOSE TO FIRM AND DRY
5-10' S/W TAN SANDS, FINE TO COARSE GRAINED FIRM TO VERY FIRM AND
DRY
• 10-15' S/W TANNISH GRAY, FINE TO COARSE GRAINED SANDS, VERY FIRM TO DENSE AND
DRY.
B-2
w 0-5' SIM OLIVE-TAN SANDS, SILTY-FINE TO MEDIUM GRAINED, LOOSE TO FIRM AND DRY
4-11' S/W TANNISH BROWN SANDS, FINE TO COARSE GRAINED FIRM AND DRY
11-15' S/W TANNISH GRAY, FINE TO COARSE GRAINED SANDS, VERY FIRM TO DENSE
AND DRY.
NO GROUNDWATER OR BEDROCK WAS ENCOUNTERED TO THE DEPTH OF 15' IN EITHER TEST
• BORING.
•
•
•
• APN: 945-180-023 16
WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
8.0 APPENDIX B
LABORATORY TESTING
LABORATORY TESTS WERE CONDUCTED ON REPRESENTATIVE SOILS FOR THE PURPOSE OF
CLASSIFICATION AND FOR THE ASSESSMENT OF THE PHYSICAL PROPERTIES AND
ENGINEERING CHARACTERISTICS. THE NUMBER AND SELECTION OF THE TYPES OF TESTING
FOR A GIVEN STUDY ARE BASED ON THE GEOTECHNICAL CONDITIONS OF THE SITE. A
. SUMMARY OF THE VARIOUS LABORATORY TESTS PERFORMED FOR THE PROJECT IS
PRESENTED BELOW.
MAXIMUM DENSITY OPTIMUM MOISTURE CONTENT(ASTM D1557)
SOILS SAMPLES WERE OBTAINED USING A SPLIT SPOON SAMPLER. BULK SAMPLES WERE ALSO
RETRIEVED AND TESTED IN OUR LABORATORY
MOISTURE CONTENT AND DRY DENSITY(ASTM D4643)
SOILS SAMPLES WERE OBTAINED USING A SPLIT SPOON SAMPLER. BULK SAMPLES WERE ALSO
RETRIEVED AND TESTED IN OUR LABORATORY.
DIRECT SHEAR(ASTM D3080)
DATA OBTAINED FROM THIS TEST PERFORMED AT INCREASED MOISTURE CONDITIONS ON IN-
SITU SOIL SAMPLES WERE USED TO EVALUATE SOIL SHEAR STRENGTHS. SAMPLES
CONTAINED IN BRASS SAMPLER RINGS, PLACED DIRECTLY ON TEST APPARATUS ARE SHEARED
AT A CONSTANT STRAIN RATE UNDER A NORMAL LOAD, APPROPRIATE TO REPRESENT
• ANTICIPATED STRUCTURAL LOADINGS. SHEARING DEFORMATIONS ARE RECORDED TO
FAILURE. PEAK AND/OR RESIDUAL SHEAR STRENGTHS ARE OBTAINED FROM THE MEASURED
SHEARING LOAD VERSUS DEFLECTION CURVE. TEST RESULTS, PLOTTED ON GRAPHICAL FORM,
ARE PRESENTED ON PLATE A-1 OF THIS SECTION.
.EXPANSION INDEX(ASTM 04829)
MAXIMUM DRY DENSITY/OPTIMUM MOISTURE CONTENT RELATIONSHIP(ASTM D1557-91)
SAMPLE LOCATION MAX. DRY DENSITY OPT. MOISTURE CONTENT
B-1, 1-4' (BULK SAMPLE) 132.5 (PCF) 8.0 %
r
SHEAR ANGLE OF INTERNAL FRICTION
B-2, 2' = 32 DEGREES
COHESION (PSF) : 100.0
EXPANSION INDEX =0.0 (NO POTENTIAL FOR EXPANSION)
CORROSION SERIES
.PH =6.1 SOLUBLE SULFATES PPM = 95 SOLUBLE CHLORIDES PPM = 104
MIN. RESISTIVITY=8,200
SEE ATTACHED LAB TEST RESULTS:
APN: 945-180-023 17
WAC GEOTECHNICAL, INC. PROJECT# 14-933 DATE: AUGUST 18, 2014
PROFESSIONAL LIMITATIONS
OUR INVESTIGATION WAS PERFORMED USING THE DEGREE OF CARE AND SKILL ORDINARILY
EXERCISED, UNDER SIMILAR CIRCUMSTANCES BY OTHER REPUTABLE SOILS ENGINEERS
PRACTICING IN THESE GENERAL OR SIMILAR LOCALITIES. NO OTHER WARRANTY, EXPRESSED
OR IMPLIED, IS MADE AS TO THE CONCLUSIONS AND PROFESSIONAL ADVICE INCLUDED IN THIS
REPORT.
THE INVESTIGATIONS ARE BASED ON SOIL SAMPLES ONLY; CONSEQUENTLY THE
RECOMMENDATIONS PROVIDED SHALL BE CONSIDERED 'PRELIMINARY'. THE SAMPLES TAKEN
AND USED FOR TESTING AND THE OBSERVATIONS MADE ARE BELIEVED REPRESENTATIVE OF
SITE CONDITIONS; HOWEVER, SOIL AND GEOLOGIC CONDITIONS CAN VARY SIGNIFICANTLY
BETWEEN TEST BORINGS. AS IN MOST MAJOR PROJECTS, CONDITIONS REVEALED BY
EXCAVATIONS MAY VARY WITH PRELIMINARY FINDINGS. IF THIS OCCURS, THE CHANGED
CONDITIONS MUST BE EVALUATED BY THE PROJECT SOILS ENGINEERING CONSULTANT AND
S DESIGNS ADJUSTED AS REQUIRED OR ALTERNATE DESIGN RECOMMENDED.
THE REPORT IS ISSUED WITH THE UNDERSTANDING THAT IT IS THE RESPONSIBILITY OF THE
OWNER, OR OF HIS REPRESENTATIVE, TO ENSURE THAT THE INFORMATION AND
RECOMMENDATIONS CONTAINED HEREIN ARE BROUGHT TO THE ATTENTION OF THE PROJECT
ARCHITECT AND ENGINEERS. APPROPRIATE RECOMMENDATIONS SHOULD BE INCORPORATED
INTO STRUCTURAL PLANS. THE NECESSARY STEPS SHOULD BE TAKEN TO SEE THAT THE
CONTRACTOR AND SUBCONTRACTORS CARRY OUT SUCH RECOMMENDATIONS IN THE FIELD.
THE FINDINGS OF THIS REPORT ARE VALID AS OF THIS PRESENT DATE. HOWEVER, CHANGES IN
THE CONDITIONS OF A PROPERTY CAN OCCUR WITH THE PASSAGE OF TIME, WHETHER THEY
DUE TO NATURAL PROCESS OR THE WORKS OF MAN ON THIS OR ADJACENT PROPERTIES. IN
ADDITION, CHANGES IN APPLICABLE OR APPROPRIATE STANDARDS MAY OCCUR FROM
LEGISLATION OR BROADENING OF KNOWLEDGE. ACCORDINGLY, THE FINDINGS OF THIS
REPORT MAY BE INVALIDATED WHOLLY OR PARTIALLY BY CHANGE OUTSIDE OF OUR CONTROL.
THEREFORE, THIS REPORT IS SUBJECT TO REVIEW AND SHOULD BE UPDATED AFTER A PERIOD
OF ONE YEAR..
RECOMMENDED SERVICES
THE REVIEW OF GRADING PLANS AND SPECIFICATIONS, FIELD OBSERVATIONS AND TESTING BY
THE GEOTECHNICAL REPRESENTATIVE IS AN INTEGRAL PART OF THE CONCLUSIONS AND
RECOMMENDATIONS MADE IN THIS REPORT. IF WAC GEOTECHNICAL, INC. IS NOT RETAINED FOR
THESE SERVICES, THE CLIENT AGREES TO ASSUME WAC GEOTECHNICAL, INC. RESPONSIBILITY
FOR ANY POTENTIAL CLAIMS THAT MAY ARISE DURING AND AFTER CONSTRUCTION, OR DURING
THE LIFETIME USE OF THE STRUCTURE AND ITS APPURTENANT. THE REQUIRED TESTS,
OBSERVATIONS AND CONSULTATION BY THE GEOTECHNICAL CONSULTANT DURING
CONSTRUCTION INCLUDES, BUT NOT BE LIMITED.TO:
A. CONTINUOUS OBSERVATION AND TESTING DURING SITE PREPARATION AND GRADING, AND
PLACEMENT OF ENGINEERED FILL.
B. OBSERVATION AND INSPECTION OF FOOTING TRENCH PRIOR TO STEEL AND CONCRETE
PLACEMENT,
C. CONSULTATIONS AS REQUIRED DURING CONSTRUCTION, OR UPON YOUR REQUEST.
• APN: 945-180-023 18
•
Converse Consultants
Geotechnical Engineering,Environmental and Groundwater Science, Inspection and Testing Services
•
August 18, 2014
Mr. David E. Ballinger
WAC Geotechnical, Inc.
• 2900 Adams St. Suite C-35
Riverside, CA 92504
Subject: LABORATORY TEST RESULTS
WAC Project No. 14-933
• Paulita Road
Converse Project No. 14-81-127-17
Dear Mr. Ballinger:
Enclosed are the results of the laboratory tests that you requested for the above-
referenced project. We received the samples from your office on August 6, 2014. The
following tests were performed in accordance with the relevant standards:
• One (1) Maximum Dry Density and Optimum Moisture Content (ASTM D1557)
• One (1) Direct Shear Test (ASTM D3080)
• One (1) Expansion Index Test (ASTM D4829)
We appreciate the opportunity to be of continued service to WAC Geotechnical, Inc. If
you should have any questions or need additional information, please feel free to contact
us at (909) 896-3104.
• CONVERSE CONSULTANTS
��»
• V
Jordan Roper, E.I.T.
Staff Engineer
End: Table No. 1, Optimum Moisture-Density Relationship Test Result
• Table No. 2, Direct Sheer Test Result
Table No. 3, Expansion Index Test Result
Drawing No. 1 Moisture-Density Relationship Results
Drawing No. 2 Direct Shear Test Results
•
10391 Corporate Drive,Redlands, California 92374
Telephone: (909)796-0544 • Facsimile: (909)796-7675 ♦ www.converseconsultanls.com
•
•
Table No. 1, Moisture--Den ity Relationship Test Result
• Sample Depth Maximum Optimum
Location (feet) Soil Classification Dry Density Water
c Content
B-1 1 4 Silty Sand(SM), Fine to Coarse 132.5 8.0
Grained,Olive-Brown
•
Table No. 2 Direct Shear Test Results
E0B2
Depth Soil Description Cohesion Friction Angle
feet 2 Silt Sand(SM), Fine to Medium Grained, 100.0 32.0
Yellow-Brown
•
Table No. 3 6r ansion Index Test Result,
Sample Soil Description Expansion Expansion
Location Index Potential
• &1 Silty Sand(SM), Fine to Coarse 0.0 Very Low
Grained, Olive-Brown
•
•
•
•
•
•
150
Curw;of 100%Satui hon
• 145 for SpoclOc Gravity Ec ual to:
2.80
2.70
2.60
140
• 135
130
• 125
E_
z 120
w
0
IX
z
115 —
110
• 105
100
95
•
90
0 5 10 15 20 25 30
WATER CONTENT,%
•
ASTM OPTIMUM MA>GMUM DRY
SYMBOL BORING NO. DEPTH(0) DESCRIPTION TEST METHOD WATER,% DENSITY,pd
61 1 4 BGrj'anA ISM),Fine to Coene Grelrrod,OlNa D1S57 1AeihotlA 8.0 1728
•
• MOISTURE-DENSITY RELATIONSHIP RESULTS
WACGeaea"wl Project No. Drawing No.
�vi►� Converse Consultants W'C�°d No.14-933 14-81-127-17 1
PaWita Road
•
•
4,000
•
3,500
• 3,000
r. 2,500
• z
w
s
N 2,000
N
• 1,500
1,000
•
500
0
• 0 1,000 2.000 3.000 4,000
SURCHARGE PRESSURE,psi
• BORING NO, B-2 DEPTH(0) 2
DESCRIPTION Silty Send(SM),Fine to Medium Grained.Yellow-Brown
COHESION(psQ 100.0 FRICTION ANGLE(degrees) : 32.0
• MOISTURE CONTENT(%) 9.3 DRY DENSITY(pd) 97.5
NOTE:Ultimate SVenp.
• DIRECT SHEAR TEST RESULTS
WAC CiB01echnIcal Project No. Drawing No.
Converse Consultants WAC ulitaR ed No,14933 1481-127-17 2
PaNiq Road
Prof pID:1"1.127-17 WIC 1C-9M.GPJ;Templete:DIRECTSHIWI
•
•
ANAHEIM TEST LAB, INC
3008 ORANGE AVENUE
SANTA ANA, CALIFORNIA 92707
• PHONE (714( 549-7267
TO:
DATE: 8/I1/14
WAC GEOTECHNICAL
2900 ADAMS STREET,STE. C-35 P.O. NO: TRANSMITTAL
RIVERSIDE. CA 92504
• LAB NO: B-7506
SPECIFICATION: CA-417/422/643
ATTN: DAVE BALLINGER MATERIAL: SOIL
• Project#: 14-933
ApnR: 919-240-001,
Location: Poulito Road
Temecula, CA
Client: K.W.H. Investments
• ANALYTICAL REPORT
CORROSION SERIES
SUMMARY OF DATA
• pH SOLUBLE SULFATES SOLUBLE CHLORIDES MIN. RESISTIVITY
per CA. 417 per CA. 422 per CA. 643
ppm ppm ohm-cm
•
6.1 95 104 8,200
•
RESPECTFULLY SUBMITTED
• ,o. 1
om®mm�ana
WES BRIDGER CHEMIST
•
•
8/19/2014 Design Maps Summary Report
• ZJS Design Maps Summary Report
User-Specified Input
Report Title KW INVESTMENTS, LLC PAULITA RD
Tue August 19, 2014 23:27:56 UTC
• Building Code Reference Document ASCE 41-13 Retrofit Standard, BSE-2N
(which utilizes USGS hazard data available in 2008)
Site Coordinates 33.487470N, 117.123890W
Site Soil Classification Site Class D - "Stiff Soil"
0
Om 11
50
• � SOOOm
Te-%�Pula
NORT Fi
•
0De 1ct ....,, ::.y� r'i 0M E R I C A
mapquest o'•'-1,' ^'. 141 0MapRuert
• USGS-Provided Output
Ss,BSE-2N 1.905 g Sxs,e E-2N 1.905 g
51,86E-2N 0.777 g Sx1,BSE-2N 1.166 g
• Horizontal Spectrum Vertical Spectrum
2.20 1.43
2.00 1.30
Leo 1.17
1.60 1.04
1.40 0.91
• pr 1.20 7F 0.79
@ 1.00 N 0.65
0.20 0.52
0.60 0.29
0.40 0.26
• 0.20 0.12
0.00 0.00
0.00 0.20 0.40 0.60 0.20 1.00 1.20 1.40 1.60 1.90 2.00 0.00 0.20 0.40 0.60 0.00 1.00 1.20 1.40 1"60 1.00 2.00
Period, T(sec) Period, T(sec)
Although this information is a product of the U.S. Geological Survey, vie provide no warranty, expressed or implied,
as to the accuracy of the data contained therein. This tool is not a substitute for technical subject-matter
knowledge.
•
http://ehpl-e "uale.er.usgs.gc4designmaps/us/sumnary.php?template=minimal&la0tude=33.487471&lorgitude=-117.123893&siterJass=3&rislcategory=-1... tl1
8/19R014 Design Maps Detailed Report '
LM Design Maps Detailed Report
ASCE 41-13 Retrofit Standard, BSE-2N (33.487470N, 117.12389°W)
Site Class D - "Stiff Soil"
Section 2.4.1 - General Procedure for Hazard Due to Ground Shaking
From Section 2.4.1.1 SS.eSE-2N = 1.905 g
From Section 2.4.1.1 St,OW-,N = 0.777 g
Section 2.4.1.6 - Adjustment for Site Class
�. The authority having jurisdiction (not the USGS), site-specific geotechnical data, and/or
the default has classified the site as Site Class D, based on the site soil properties in
accordance with Section 2.4.1.6.1.
SITE SOIL Soil shear wave Standard penetration Soil undralned shear
CLASS PROFILE velocity, vs, (ft/s) resistance, N strength, s,,, (psf)
NAME
A Hard rock vs > 5,000 N/A N/A
B Rock 2,500 < vs 5 5,000 N/A N/A
C Very dense 1,200 < vs 5 2,500 IV > 50 >2,000 psf
soil and soft
rock
D Stiff'soil 600 5 vs < 1,200 15 <-_N 5 50_ 1,000 to 2,000 psf
- profile
E Stiff soil vs < 600 N < 15 <1,000 psf
profile
E — Any profile with more than 10 ft of soil having the.characteristics:
•1. Plasticity index P1 > 20,
2. Moisture content w >- 40%, and
. 3. Undrained shear strength s < 500 psf
F — Any profile containing soils having one or more of the following characteristics:
1. Soils vulnerable to potential failure or collapse under seismic loading such as
liquefiable soils, quick and highly sensitive clays, collapsible weakly cemented
soils.
2. Peats and/or highly organic clays (H > 10 feet of peat and/or highly organic
clay where H = thickness of soil)
3. Very high plasticity clays (H > 25 feet with plasticity index P1 > 75)
4. Very thick soft/medium stiff clays (H > 120 feet)
For SI: lft/s = 0.3048 m/s llb/ftz = 0.0479 kN/mz
httpllehpl-earlhquale.cr.wg s.ga4dwig rvropsluslrepatphp7tertplate=mnimal8laUtude=37.48747181mgi Wde=-117.1238938sitedass=38risleatagory=-18ed... 114
8/1SQ014 Design Maps Detailed Report
•
Table 2-3. Values of F. as a Function of Site Class and Mapped Short-Period Spectral Response
Acceleration S.
Site Mapped Spectral Acceleration at Short-Period S,
Class
S550.25 Ss = 0.50 Ss = 0.75 SS = 1.00 SS >_ 1.25
A 0.8 0.8 0.8 0.8 0.8
• B 1.0 1.0 1.0 1.0 1.0
C 1.2 1.2 1.1 1.0 1.0
D 1.6 1.4 1.2 1.1 1.0
E 2.5 1.7 1.2 0.9 0.9
F Site-specific geotechnical and dynamic site response analyses shall be
performed
Note: Use straight-line interpolation for intermediate values of SS
For Site Class = D and Ss = 1.905 g, F. = 1.000
• Table 2-4. Values of F� as a Function of Site Class and Mapped Spectral Response Acceleration
at 1 s Period S,
Site Mapped Spectral Acceleration at 1 s Period S,
Class
• S, 50.10 S, = 0.20 S, = 0.30 S, = 0.40 S, 20.50
A 0.8 0.8 0.8 0.8 0.8
B 1.0 1.0 1.0 1.0 1.0
• C 1.7 1.6 1.5 1.4 1.3
D 2.4 2.0 1.8 1.6 1.5
E 3.5 3.2 2.8 2.4 2.4
F Site-specific geotechnical and dynamic site response analyses shall be
performed
Note: Use straight-line interpolation for intermediate values of S,
• For Site Class = D and S, = 0.777 g, F, = 1.500
•
http://ehpl-earthquale.cr.usgs.gmidesigrxraps/us/reputphp?ten, late=riinirrd&latitude=33.4874718orgitude=-117.123893&sited ass=3&risWAegor)--1&ed... 214
811VM14 Design Maps Detailed Report
•
Equation (2-4): S,6BSE-2N = FaSs,BSE-2N = 1.000 X 1.905 g = 1.905 g
Equation (2-5): Sx1,11SE-211 = FvSt,BSE-2N = 1.500 x 0.777 g = 1.166 g
•
Section 2.4.1.7.1 — General Horizontal Response Spectrum
Figure 2-1. General Horizontal Response Spectrum
• 0<T<Ta: Sxs](p� -2) ,L +0.4]
� = Te< T< Ts:
Ts<T:
m
to i
i
o
y �
6 - Sx,/Br=1.166 ------- ------- ---- -----
N
0
•
0.45xr=0.762cc
'
IL ,
Ta=0.122 Ts=0.612 1.000 _
.. Period,-T(set -
•
•
•
•
httpJ/ehpi-earthquale.cr.usgs.gaddesignmaps/usireportphp7terroato=rrinind8laUtLde=33.487471&lo gitude=-117.123a93&siteclass=3&risicatega y=-18ed... 3/4
WlWM14 Design Maps Detailed Report
Section 2.4.1.7.2 — General Vertical Response Spectrum
The General Vertical Response Spectrum is determined by multiplying the General Horizontal
Response Spectrum by %.
2Su/3B,= 1.270 --
a �
m
y �
o
u
u
O
C
. O.BSx,l3-0.508
cc
e
Ta=0.122 T5=0.612 1.000
.Period,T(sec)
htlpllehpl-eartNuale.cr.mgs.goJdesig rvrapshalreporiphp'henplate=nirrimal8latitude=33.48747181ong itude=-117.1238938sitedass=38iisWAegay=-l&ed... 414
••, `��� X � �' =��ii■:71■`■F�■l!■11��■.■!■.!■ice a� a��arr;
v��r�1���.�. � ���f:��.�■���i���l�i��_=�.IA_1=�.��,;. �r � Ili �����
IRON,
t " ,ii, '�. �' f ► I�'�*��'■ 16111111111�.1111111/` _" il��l , ,�
1 J:Ir- if ►� E��III.:•II�M\III►
a �� ��•y / ti�il>! m� �����;� • .�� ! !era �"1
In
I G r IL�:A
' �•_ �jl .ALse•� ii_:•� ._�I1E,11►�. ����w■I.IIu.�=�.wl� �I!/!
•�, �, , ,.` ^, � ��, 11, 1 � �_; ire
'•• ,,,;�.;;:::�bra►♦.� °��;I■ ■II
l ', WYCI�1`
'`•^-t� � `'=:'�• ,.u,-a>/nt! . -.�i _ �__
i 1. �� ♦1� `� `�� '� ) .'COI.
,�i �� �' • � �Div .�w � j ` 171
• �93.0 de5de -Ro
0�
545. 4/ to
PAR AG- Nt•
85 2 . 3 �
J . $ o
• a 0 riAR � 4
na \ a O
AV
��°� � � � 0l•57 o
O �
\.ram H
\o
`n Tc s r r1 i TZ751
J v ,�%5•
•
Alf
� J
I�e2L0 L. PST L0
�7'p1,0�.FlTb2 � G�eLy
• I
•
♦ .d
. •s ; it f � .. '. N•} - - C. .�� .
Ik
Y
*4:
:ti;
�, '`mod'\-..' . - ��1 . .� ••�..`
i� �
MAILINU AUUKtZb
(SEE OWNER)
• 614 MINNESOTA AVE
FALLBROOK CA. 92028
LEGAL DESCRIPTION
RECORDED BOOK/PAGE: PM 113/56
SUBDIVISION NAME: PM 17688
LOT/PARCEL:4, BLOCK: NOT AVAILABLE
, Por.TRACT NUMBER: NOT AVAILABLE
LOT SIZE_
RECORDED LOT SIZE IS 2.53 ACRES
PROPERTY CHARACTERISTICS
• NO PROPERTY DESCRIPTION AVAILABLE
THOMAS BROS.MAPS PAGE/GFU
PAGE:979 GRID: BI
CITY BOUNDARY/SPHERE
CITY OF TEMECULA
• NOT WITHIN A CITY SPHERE
ANNEXATION DATE: NOT.APPLICABLE
LAFCO CASE#:NOT APPLICABLE
PROPOSALS:NOT APPLICABLE
MARCH JOINT POWERS AUTHORITY
NOT IN THE JURISDICTION,OF THE MARCH JOINT POWERS AUTHORITY _
INDIAN TRIBAL LAND
NOT IN A TRIBAL.LAND
SUPERVISORIAL DISTRICT 2011 (ORD.813)
JEFF STONE,DISTRICT 3
.SUPERVISOR14L DISTRICT(2001 BOUNDARIES)
JEFF STONE,DISTRICT 3
TOWNSHIP/RANGE
T8SR2W SEC 7
ELEVATION RANGE
1164/1232 FEET
PREVIOUS APN
NO DATA AVAILABLE
PLANNING
LAND USE DESIGNATIONS
Consult with the city for.land use information.
SANTA ROSA ESCARPMENT BOUNDARY
NOT IN THE SANTA-ROSA ESCARPMENT BOUNDARY
AREA PLAN(RCIP1
SOUTHWEST AREA
COMMUNITY ADVISORY COUNCILS
NOT IN A COMMUNITY ADVISORY COUNCIL AREA
GENERAL-PLAN POLICY OVERLAYS
NOT IN A GENERAL PLAN POLICY OVERLAY AREA
GENERAL PLAN POLICY AREAS
NONE
ZONING CLASSIRCATIONS (ORD.3481
See the city for more information
ZONING DISTRICTS-AND ZONING AREAS
NOT IN A ZONING DISTRICTIAREA
ZONING OV ERLAYS
NOT IN A ZONING OVERLAY
HISTORIC PRESERVATION DISTRICTS
NOT IN AN.HISTORIC PRESERVATION DISTRICT
•
SPECIFIC PLANS
NOT WITHIN A SPECIFIC PLAN
AGRICULTURAL PRESERVE.
NOT IN AN AGRICULTURAL PRESERVE
•' REDEVELOPMENT AREAS
NOT IN A REDEVELOPMENT AREA
AIRPORT INFLUENCE AREAS
NOT IN AN AIRPORT INFLUENCE AREA
• AIRPORT COMPATIBLITYZONES
NOT IN AN AIRPORT COMPATIBILTY ZONE
ENVIRONMENTAL
CVMSHCP(COACHELLA VALLEY MULTISPECIES HABITAT CONSERVATION PLAN)CONSERVATION AREA
• NOT IN A CONSERVATION AREA
CVMSHCP FLUVIAL SAND TRANSPORT SPECIAL PROVISION AREAS
NOT IN A FLUVIAL'SANDTRANSPORT SPECIAL PROVISION AREA
WRMSHCP(W ESTERN RIVERSIDE COUNTY MU TI.SPECIES HABITAT CONSERVATION PLANT CELL GROUP
• NOT IN A CELL GROUP -
W RMSHCP CELL NUMBER
.NOT IN A CELL '
HANS/ERP(HABrTAT ACQUISITION AND NEGOTIATION'STRATE(;YIDCPEDITED REVIEW PROCESS)
NONE
• VEGETATION(2005)
COASTAL SAGE SCRUB
DEVELOPED/DISTURBED LAND
FIRE
HIGH FIRE AREA(ORD.7871
NOT IN A'HIGH FIRE AREA
RRE RESPONSIBLITY AREA
NOT IN AFIRE RESPONSIBILITY AREA
•
DEVELOPMENT FEES
CVMSHCP FEE AREA(ORD.8751
NOT WITHIN THE COACHELLA VALLEY MSHCP FEE AREA
• WRMSHCPFEE AREA(ORD.8101
IN OR PARTIALLY WITHIN THE WESTERN RIVERSIDE MSHCP FEE AREA. SEE MAP FOR MORE INFORMATION.
ROAD& BRIDGE DISTRICT
NOT IN A DISTRICT
• EASTERN TUMF(TRANSPORTATION UNIFORM MRIGATION FEE ORD.673)
NOT.WITHIN THE EASTERN TUMF FEE AREA
W ES 1 ERN'I UINF ITRANSPORTATION UNIFORM MITIGATION FEE ORD.8241
IN OR PARTIALLY WITHIN A TUMF FEE AREA.SEE MAP FOR MORE INFORMATION.SOUTHWEST
DIF(DEVELOPMENT IMPACT FEE AREA ORD.6591
SOUTHWEST AREA
SKR FEE AREA(STEPHEN'S KANGAROO RAT ORD.663,1101
IN OR PARTIALLY WITHIN ANSKR FEE AREA.SEE MAP FOR MORE INFORMATION.
DEVELOPMENT AGREEMENTS
NOT IN A DEVELOPMENT AGREEMENT AREA
TRANSPORTATION
CIRCULATION ELEMENT ULTIMATE RIGHT-OFWAY
NOT IN A CIRCULATION ELEMENT RIGHT-OF-WAY
ROAD BOOK PAGE
132
TRANSPORTATION AGREEMENTS
NOT IN A TRANSPORTATION AGREEMENT
CETAP(COMMUNITY AND ENVIRONMENTAL TRANSPORTATION ACCEPTABILITY PROCESS)CORRIDORS
NOT IN A CETAP CORRIDOR.
HYDROLOGY
FLOOD PLAIN REVIEW_
NOT REQUIRED
WATER DISTRICT
EMWD
FLOOD CONTROL DISTRICT
RIVERSIDE COUNTY FLOOD CONTROL DISTRICT- -
WATERSHED '
SANTA MARGARITA
GEOLOGIC
FAULT ZONE
NOT IN A FAULT ZONE
FAULTS
WITHIN A 1/2 MILE OF
ELSINORE FAULT
ELSINORE FAULTS
WILDOMAR FAULT
LIQUEFACTION POTENTIAL
VERY LOW
SUBSIDENCE
SUSCEPTIBLE
PALEONTOLOGICAL SENSITIVITY
. HIGH SENSITIVITY (HIGH A).
BASED ON GEOLOGIC FORMATIONS OR MAPPABLE ROCK UNITS THAT ARE ROCKS THAT CONTAIN FOSSILIZED BODY ELEMENTS,
AND TRACE FOSSILS SUCH AS TRACKS, NESTS AND EGGS. THESE FOSSILS OCCUR ON OR BELOW THE SURFACE.
MISCELLANEOUS
SCHOOL DISTRICT
TEMECULA VALLEY UNIFIED
COMMUNITIES
• NOT IN A COMMUNITY
COUNTY SERVICE AREA
NOT IN A COUNTY SERVICE AREA.
LIGHTING(ORD.655)
• ZONE B. 17.43 MILES FROM MT. PALOMAR OBSERVATORY
2010 CENSUS TRACT
043222
FARMLAND
OTHER LANDS
TAX RATE AREAS
013004
-CITY OF TEMECULA
-CITY OF TEMECULA INC DISPUTE
-COUNTY FREE LIBRARY
-COUNTY STRUCTURE FIRE PROTECTION
• •EASTERN MUN WATER IMP DIST B
•EASTERN MUN WTR IMP DIST UA
-EASTERN MUNICIPAL WATER
•ELS MURRIETA ANZA RESOURCE CONS -
•ELSINORE AREA ELEM SCHOOL.FUND
-FLOOD CONTROL ADM INIST RATION
-FLOOD CONTROL ZONE 7
• -GENERAL
-GENERAL PURPOSE
-METRO WATER EAST 1301999
-MT SAN JACINTO JUNIOR COLLEGE
-RANCHO CAL WTR R DIV DEBT SV
-RANCHO CALIF JT WATER
•RIV.CO.OFFICE OF EDUCATION
•T EM ECULA COM SVS
-TEMECULA PUBLIC CEMETERY
-TEMECULA UNIFIED
•TEMECULA UNIFIED•B& I
SPECIAL NOTES
NO'SPECIAL NOTES
BUILDING PERMITS
Case p Description Status
NO PLANNING PERMITS INOT APPLICABLE NOT APPLICABLE
ENVIRONMENTAL HEALTH PERMITS
Case# - Description Status
EHS031322 IPLAN REVIEW JAPPLIED
PLANNING PERMITS
Case M Description Status
. NO PLANNING PERMITS INOT APPLICABLE INOT APPLICABLE
REPORT PRINTED 0N...Mon Aug 04 2014 17:02:50 GMT-0700(Pacific Daylight Time)
Verson 131127
y
i.. 4 . 1 •. .K�Jy� , . �'� t r h 1�'����' t ,,. t 'li" n iY Kd��� �1'�t"'�
1
lte
121 C�✓ tiz�" '/ S by , �gy i t:`.
4ti. r��g
r.� ? w -\""..}r '. ''"''' ♦ t�,w„yt,a� ,i1r""r., �•, 1'e� °'� +fib � ���' �° '4*
Z�
1.��t5 �� �� `-'j���i ru 'R'c!'Y'Z�yam✓ It tulsl� \ - "'�a'��_
��r ..K. L�'R� 1F`Y �� 4!r� /r` �'.•}ir ml�a�}.�gYfrtc aY� - �:.
f'_ ,.aJcS�� 1r rr y, �jy` etalye> ��!�,�e•SR�I����f ± Lr±w x �� `�, z�- � ��'' `-.
r J V �4��✓..�� 1 - 1. '.. �}'s`pav! i '�.� �r! �194�i..�!)�l•l{ _ � 4 4 m �� '�'
PI
� I \
4 � �
♦ L� } 4
"gip}" �' ` l �'. �` v±.•}�! �� � .
try
� / i . ���/ ���f� � ��r s �u.X.�.P ` � � 1 �I► `ti J� ` j�a�' '!� fiT�`ak
i i -: ♦ G !Ar ��n `�.L f�. aut" r4 �- �'`' < �- �� � �tii`'2i�u�/
...
AAWR
+�.
/ Ft�n•,, '-[;`., a.+- /R .v55�'.`Rk `vFs l t... y .,
f ✓( � �: Fri W'v ... _ ��' � .. ` C !�\.\t ..
.fry
� 1'�'„. r � �`.+'YI ." � v 1Aygt -r:'' ��i b ..� ��.+ .-iw�'•`+�rV' ♦ � r.. �.
. �d y �f,.7r r _ � S� » 1M y11'� ?'., '• �„�`1`. "� x :�`F'�Cl'�.,
�T Ni ! ✓ ;, ag � 1'r � `.+-.Y'^ .k � �djc � i �,g, i� � i i:.