Loading...
HomeMy WebLinkAbout03_003 TCSD Resolution RESOLUTION NO. CSD 03-03 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CITY OF TEMECULA COMMUNITY SERVICES DISTRICT APPROVING A CONSTRUCTION AGREEMENT WITH 2H CONSTRUCTION FOR THE STRUCTURAL RENOVATION OF THE CHILDREN'S MUSEUM BUILDING THE CITY OF TEMECULA COMMUNITY SERVICES DISTRICT RESOLVES AS FOLLOWS: Section 1. The Board of Directors of the City of Temecula Community Services District hereby finds, determines and declares that: a. On September 17, 2002, the Board of Directors awarded a bid for the remodeling and renovation of a building located at 42081 Main Street in the City's Old Town Area for the Temecula Children's Museum. In addition to the remodeling and renovation of the building, the Board also awarded a contract for the construction and installation of extensive and complicated creative exhibits for the children. As the construction progressed, the contractor and staff discovered that severe structural problems exist in the exterior bearing wall of the structure, threatening the building's stability. Following an engineering investigation was conducted. It was determined that the wall would need to be reconstructed at the wall's joint with the foundation and the roof and that other structur~.l improvements would be required to insure the structural integrity and stability of the building and the safety of the persons who will be using the building. The work required to reconstruct the wall involves specialized construction techniques. b. 2H Construction has the special expertise and experience required for the construction required to rehabilitate the structural integrity of the building. A proposal was also solicited from the current contractor for the project, which was higher than the proposal of 2H Construction. 2H Construction is also currently working on a historical restoration project for the City of Temecula on a building located near the Children's Museum building. Therefore, the mobilization and administrative costs for 2H Construction on the Children's' Museum Project will be less than other outside contractors. c. It is necessary to interrupt the renovation of the building and the construction of the Children's Museum exhibits in order to address the structural renovation of the walls. Lengthy delays in bidding for the structural renovation work will substantially increase the costs of the building renovation and exhibits. d. Based on the findings set forth above, the Board of Directors hereby finds and determines that the method of selecting the contractor for the structural renovation of the Children's Museum building has enabled the City to obtain excellent bids from qualified contractors in a short period of time so as to allow for the prompt structural renovation of R:/CSD Resos 2003/CSD Resos 03-03 I the Children's Museum and the protection of the public health, safety and general welfare. The Board of Directors further finds and determines that based upon the findings set forth above, full compliance with the otherwise applicable requirements of the Public Contracts Code would be unavailing, would not produce an advantage for the City, and would thus be undesirable, impractical, and impossible. The City's authority to proceed with the structural renovation in this manner was established in Graydon v. Pasadena Redevelopment Agency et aL (1980) 104 Cal. App. 2"d 631 and the cases cited therein. Section 2. The Board of Directors of the City of Temecula Community Services District hereby approves that certain Agreement between the Board and 2H Construction, Inc., in the amount of one hundred fifty one thousand one hundred sixty five dollars ($151,165.00) for the structural renovation of the Children's Museum building and authorizes the President to execute the Agreement in substantially the form submitted to the City. Section 3. The City Clerk shall certify to the adoption of this Resolution. Passed and adopted this 28th day of January~..~.~ ///~.j j Attest: [SEA. L] R:/CSD Resos 2003/CSD Resos 03-03 2 STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss CITY OF TEMECULA ) I, Susan W. Jones, CMC, Secretary for the Temecula Community Services District, do hereby certify that Resolution No. CSD 03-03 was duly and regularly adopted by the Board of Directors of the Temecula Community Services District at a regular meeting thereof held this 28th day of January, 2003, by the following vote: AYES: 5 DIRECTORS: Naggar, Pratt, Roberts, Stone, Comerchero NOES: 0 DIRECTORS: None ABSENT: 0 DIRECTORS: None ABSTAIN: 0 DIRECTORS: None ~ ) rict Secren V~' Jones' CtMa~ R:/CSD Resos 2003/CSD Resos 03-03 3