Loading...
HomeMy WebLinkAboutLot 61-78, 84-87 - Precise Grading TO RIVERSIDE PRECISE GRADING PLANm TO CORONA M r v 39 R PAS 0 DEL SOL GRADING NOTES 4 1. ALL GRADING SHALL CONFORM TO THE 1994 UNIFORM BUILDING CODE, CHAPTER 33, AS AMENDED BY HAS 1 TRACT NO . 1 LOTS 61 78 & 84�87 R PROJECT ORDINANCE 93-04. P AUBA R�. U' SITE 2. MINIMUM BUILDING PAD AND DRAINAGE SWALE SLOPE SHALL BE 17. DRAINAGE SWALES SHALL BE A 0 MINIMUM OF 0.2' DEEP AND BE CONSTRUCTED A MINIMUM OF 2' FROM THE TOP OF CUT OR FILL SLOPES. City of Temecula Ro. 3. MAXIMUM CUT AND FILL SLOPES = 2:1. WAY Ln DPpl� -79 CAMPANULA 4. PROVIDE 5' WIDE BY 1' HIGH BERM OR EQUIVALENT ALONG THE TOP OF ALL FILL SLOPES OVER 5' HIGH. I I I I - HIGHWAY 5. ALL GRADING SHALL BE DONE UNDER THE SUPERVISION OF COMPETENT SOILS ENGINEER WHO SHALL I TO SAN DIEGO CERTIFY THAT ALL FILL HAS BEEN PROPERLY PLACED AND WHO SHALL SUBMIT A FINAL COMPACTION I1 REPORT FOR ALL FILLS OVER 1' DEEP. A 68 69 CIVIL ENGINEER SHALL SUBMIT TO THE CITY ENGINEERING DEPARTMENT WRITTEN k 67 VICINITY MAP CD 6. A REGISTERED C L ad E 1 & 1 CERTIFICATION OF COMPLETION OF ROUGH GRADING IN ACCORDANCE WITH THE APPROVED GRADING I / ' NOT TO SCALE 66 PLAN PRIOR TO ISSUANCE OF THE BUILDING PERMIT. CERTIFICATION SHALL BE TO LINE, GRADE, ELEVATION AND LOCATION OF CUT FILL SLOPES. 1 I5 I 7. PROVIDE BROW DITCH DESIGNED TO HANDLE 100 YR. Q FLOWS, ALONG TOP OF CUT SLOPES. 1 61 62 63 64 ro a 1 8. FINAL COMPACTION REPORT WILL BE REQUIRED FOR ALL FILLS GREATER THAN ONE FOOT. 1co1 9. ALL GRADING SHALL BE DONE IN CONFORMANCE WITH RECOMMENDATIONS OF THE PRELIMINARY SOILS 1 INVESTIGATION BY CONVERSE CONSULTANTS (PROJECT NO 96-81 -420--01) DATED 4-26-96 AND ALL 1 ADDENDA THERETO. TWO SETS OF THE FINAL COMPACTION REPORT SHALL BE SUBMITTED TO THE CITY I I UNLESS OTHERWISE NOTED ON PLAN ENGINEERING DEPARTMENT WHICH SHALL INCLUDE FOUNDATION DESIGN RECOMMENDATIONS AND CERTIFICATIONS THAT GRADING HAS BEEN DONE IN CONFORMANCE WITH THE RECOMMENDATIONS OF e THE PRELIMINARY SOILS REPORT. ao b�? 10. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEERING DEPARTMENT, TEL. (909)694-6411 AT LEAST 24 Io�g �°� Q HOURS IN ADVANCE REQUESTING FINISH LOT GRADE AND DRAINAGE INSPECTION. THIS INSPECTION C 1 MIN. -Z" MUST BE APPROVED PRIOR TO BUILDING PERMIT FINAL INSPECTION FOR EACH LOT. � r w MA A U z 11. CUT SLOPES EQUAL TO OR GREATER THAN 5 IN VERTICAL HEIGHT AND FILL SLOPES EQUAL TO OR - I GREATER THAN 5 IN VERTICAL HEIGHT SHALL BE PLANTED WITH GRASS OR GROUND COVER AS SHOWN ON THE APPROVED LANDSCAPE PLAN TO PROTECT THE SLOPE FROM EROSION AND INSTABILITY IN 39 ACCORDANCE WITH CITY DEVELOPMENT CODE, SECTION 17.06 PRIOR TO THE APPROVAL OF FINAL INSPECTION. o �' � 1 � MIN. I °� � � 5 P= 100.0 me-0.5 12. NO FILL SHALL BE PLACED ON EXISTING GROUND UNTIL THE GROUND HAS BEEN CLEARED OF WEEDS, I I IN.. 2% MIN. DEBRIS, TOPSOIL, AND OTHER DELETERIOUS MATERIAL. Q P.L. MINI � 1 I FF= 100.5 •� 1 I � z 13. IF STEEP SLOPING TERRAIN OCCURS UPON WHICH FILL IS TO BE PLACED, IT MUST BE CLEARED, KEYED, I z AND BENCHED INTO FIRM NATURAL SOIL FOR FULL SUPPORT. PREPARATION SHALL BE APPROVED BY A 1 p 1 I REGISTERED SOILS ENGINEER PRIOR TO PLACEMENT OF FILL MATERIAL. I I o OD 14. DURING ROUGH GRADING OPERATIONS AND PRIOR TO CONSTRUCTION OF PERMANENT DRAINAGE o PREVENT MIN. MIN. N I STRUCTURES, TEMPORARY DRAINAGE CONTROL SHOULD BE PROVIDED TO PR PONDING WATER 1 AND DAMAGE TO ADJACENT PROPERTIES. t-L. �3 I z_ I � z 1 2% MIN. 7 -7415. DUST SHALL BE CONTROLLED BY WATERING OR OTHER APPROVED METHODS. I 8 77 1 PAD 21% MAX. N 7 75 16. ALL EXISTING DRAINAGE COURSES ON THE PROJECT SITE MUST CONTINUE TO FUNCTION, ESPECIALLY DURING STORM CONDITIONS. PROTECTIVE MEASURES AND TEMPORARY DRAINAGE PROVISIONS MUST 1ZI BE USED TO PROTECT ADJOINING PROPERTIES DURING GRADING OPERATIONS. I 119 L4 1 17. STABILITY CALCULATIONS WITH A FACTOR OF AT LEAST ONE AND FIVE TENTH (1.5) SHALL BE I SWALE �O �O SUBMITTED BY A SOILS ENGINEER TO THE CITY ENGINEERING DEPARTMENT FOR CUT AND FILL SLOPES 1 OVER 30' IN VERTICAL HEIGHT. 4 S I D EYAR D LOT DETAIL TYPICAL LOT 18. A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR SHALL SUBMIT CERTIFICATION OF BUILDING I �• 1 PAD ELEVATION. WHERE SPECIFIC ELEVATIONS ARE REQUIRED, THE ELEVATION (WITH RESPECT TO MEAN N.T.s. DRAINAGE D ETAI L I I � I I I I I I I I I I I I I I SEA LEVEL) SHALL BE GIVEN. IF AN ELEVATION WITH RESPECT TO ADJACENT GROUND SURFACE IS 1 o I Ir I I I I I I I N.T.S. REQUIRED, THE ACTUAL DISTANCE ABOVE THE ADJACENT GROUND SHALL BE GIVEN. 19. EROSION CONTROL: ALL GRADED SLOPES SHALL BE PLANTED WITH ROSEA ICE PLANT AT 12" ON CENTERS � 1 OR ANOTHER APPROVED GROUND COVER. SLOPES OVER 15' IN VERTICAL HEIGHT, IN ADDITION TO GROUND OVER SHALL BE PLANTED WITH APPROVED TREES SHRUBS OR COMBINATION THEREOF. SHRUBS SHALL BE PLANTED AT 10' ON CENTERS. SLOPES OVER 4' IN VERTICAL HEIGHT SHALL HAVE PERMANENT IRRIGATION SYSTEMS WITH BACKFLOW PREVENTION DEVICES PER U.P.C., CHAPTER 10.R 0 20. FINISH GRADE SHALL BE SLOPED AWAY FROM ALL EXTERIOR WALLS AT NOT LESS THAN 1/4" PER FOOT FOR 8 II A MINIMUM OF 3 FEET. 21. NO OBSTRUCTION OF FLOOD PLAINS OR NATURAL WATER COURSES SHALL BE PERMITTED. 80 ,�► / w 22. ALL PROPERTY CORNERS SHALL BE CLEARLY DELINEATED IN THE FIELD PRIOR TO COMMENCEMENT OF J ANY CONSTRUCTION/GRADING. 1 �� �9 0 23. APPROVAL OF THESE PLANS BY THE CITY OR ITS AGENTS DOES NOT RELIEVE THE APPLICANT AND HIS 1 ENGINEER FROM THE RESPONSIBILITY FOR THE CORRECTION OF ERRORS OR OMISSIONS DISCOVERED / DURING CONSTRUCTION. UPON REQUEST, THE APPROPRIATE PLAN REVISIONS SHALL BE PROMPTLY I 1 SUBMITTED TO THE CITY ENGINEER FOR REVIEW AND APPROVAL. 1 AY 1 1 1 LEGEND 1 F.L. - FLOW LINE F.S. - FINISHED SURFACE 1 1 F.G. - FINISHED GRADE G.B. GRADE BREAK H.P. - HIGH POINT L.P. - LOW POINT o R. - RATE OF GRADE T.C. - TOP OF CURB T.W. ;, - TOP OF WALL -- BOUNDARY c� INDEX MAP 4 -- LOT NUMBER 0 AS SHOWN50 2S 50 100 P=69.3 - PAD ELEVATION o FF-69.80 - FINISH FLOOR a GRAPHIC SCALE: 1"=50' o 140 STREET LIGHT BENCH MARK COUNTY OF RIVERSIDE B.M. T-29-81 BASIS OF BEARING ,FORE Underground 2 1/2" BRASS DISC IN CONC. CYLINDER LOCATED FROM THE INTERSECTION THE BEARINGS SHOWN HEREON ARE BASED ON A PORTION FIRE HYDRANT z c Service Alert OF FRONT ST. AND RANCHO CALIFORNIA ROAD, 1 .8 MILES N.E. ON RANCHO OF THE CENTERLINE OF BUTTERFIELD STAGE ROAD AS KEITHOWNER/DEVELOPER: Q, of Southern California CALIFORNIA ROAD TO THE INTERSECTION OF RANCHO CALIFORNIA ROAD AND SHOWN ON PARCEL MAP NUMBER 23432 RECORDED IN ` � *�to" o MARGARITA ROAD IN THE N.W. CORNER OF THE INTERSECTION 1 ' E. OF A BOOK 159 PAGES 38 THROUGH 61 OF MAPS RECORDS INTERNATIONAL ZI"'d Call: TOLL FREE 7' CHAIN LINK FENCE 21 'x 16' AROUND SO. CALIF. GAS VALVES, 40' N. OF RIVERSIDE COUNTY CALIFORNIA BEING N 22'56'23"W 0 z+•• ar+� TRIMA Ir PACIFIC HOMES a 1 -80� INC 7700 Irvine Center Dr., Suite 470 OF P.P. (NO.#) 94' N. OF THE CENTERLINE OF RANCHO CALIFORNIA ROAD. = Inland Empire Division t�A'°'"°,,,,,.. 422-4133 FIBERGLASS WITNESS POST SET 1 W. OF MONUMENT. Irvine, California 92805 LD98-- 102GR ao TWO WORKING DAYS BEFORE YOU DIG ADJ. DATE 9/13/82 ELEV. 1128.410 L J MW °W*=Am. Sadle 00• 'a"*' ftfim C' ams W-0"' rn °° CONSTRUCTION RECORD DATE BY REVISIONS DATE ACC'D BENCH MARK SCALE SEAL: QRpFESS/ Designed By Drawn By Checked By Drawing No.RECOMMENDED BY. DATE. � CITY OF TEMECULA DEPARTMENT OF PUBLIC WORKS o � JRW DH Contractor Horizontal �Geo � �e�e - Ions Prepared Under Supervision of � Z PRECISE GRADING PLANS its ' ACCEPTED BY: DATE. - S E E ABOVE - No. 45920 Date RONALD J. PARKS PAS E O DEL S 0 L Inspector � Exp.12-31-98 � DEPUTY DIRECTOR OF PUBLIC WORKS C1..' Date Vertical ��. GEOR A. N EY PHASE 1 TRACT N 0. 24186- 1 Completed '9 - OF CALF R.C.E No. 45920 Expires 12/31/98 R.C.E No. 19744 Expires 9/30/01 LOTS 61 -78 & 84-87 Sheet 1 of 3 PAD_1 r88. 0 �° PA D,, 19 .8 C14 D'_119 PAD=1195.0 06 N 4 8 Ire, ° op PAD=1195.4 P AI&r190 B PAD=1194.2 p PAD=1192.3 PAD-1194 4 .� 90•g9 �o vry .F r0 � o o 19 . 0 7 SET `'�� -r, E�.89, 89 000 � N ano ^� ;.Tc � 11 06 1p WALL < CP N N N ft O� N . � V � � 6 � 7 G °i55 V_ - co 00.5 000 54 •38 5 56 9 T' 99 .2. N p' 6,2 SL6.•F F4959 '.5Q, N -5. , ,� O�� °� 1 47 27, , o N.5 G 4.72 5 �3 �o •� s, O,�0 0 P F 53 s 546.510: 77 47 �' 6 8' � 42.30' 60.00 � o � F ° 1 , 8 20. 68 0�' P. 'S'� �`�6 53.82' 16.4 58.72' 'S ° fi0.00 h0 OS 7 Oh�G 6'� 05 •99 9 ° °' •2' pqD_ ° �. �01•� ti O�' °rte O� ° FG ,c•O o 66 o V __T o -1 F i w 6 G (Al 6 5 y W ,� O Q �/ 1 .8 S, �7 N i0 4 .,o •� CN (a 3,29' o 201.3 PAD"12018 �' -y ' 04, ob`a oo ��' (4 64.60, 9 64 4 9�g5 jV p. S FF"1202. ,5 �. •-o F L F 60' Inv Q� Zv U. 69 130 0 2C 01.4 , A3 5 O �- 5 4 6 373. , ,� 9 5 .F • � 0 5 O'S• �, F 0 5 h 1 °l•j F/L ro PAD=1205.4 9 • ---_ FAL PSD_1 5, 0�9 0�°' Off'��, ,� 5 5' 9 � 2021 �, 5' O =1204.7 FF=1205.9 N O FG 0 1?02.6 F I PAD=1203.3 F PAD PLAN 28 LID 64.0 Q' 00.5 P[,�N PAD=1202.6 5' F2 6 FF=1203.8 FF-1205.2 000 �O r `- o �B FF-1203.1 [ 0,°1. O r. $ - FI L o PLAN 3C 5' PAD=1204.0 PLAN 3A °O� F F I 96 G f O p PLAN 2A o FF=1204.5 03 0 0 O'g 5' w � w 0 0 6'f 10 °o �~-�- '� .° °� oo.s o 60 o °0 0 0.o' PLAN 1 B '� L a °3.6 0 :� a o FjL Off` �. PAD=1205.8 .40 `'� `` "° 0 29.86 o FAL �•S O�• FF=1206.3 ry TC .. -- -. ° a 9$ �[ 02 Z•9 F 02, 04.1 3C D 0. " �- •r ° a, O� F/� PLAN Cn 6 99.9ti ►� av �' Off' Oil• 0�. NaO Ak 04 C6 U 0 07 A< 4 2 98 93 -_..M A 23.19' Q �-� 2.76 60.00 N 9$' N L=2 s .00 � 10, tk �G ,5 O ,� Ory. G 00 Oh. 26 S �G h �►� COURT O�• Ca '� 4 ►a 2+00 15+00 .. 04 3 •o - .� _6 14+00 _ --- 43.58' F L 00.4 00 . 13 � � ` �> P s ° 2' oZ G .sg °� P w Q0 0 40 'moi > 5 7 . � � 02 �C/� 0.5 "-1�201,5 o 1C o �6• 2 ry Oma• 25.55' /L ��,q 0 o• ai o L 514 g ' X 49.55 3� 6 S' O� v ° ;;g ° ON N cp h B7 cly 12, O� co cV N N N °,° •0 o •4 ,n 0 o s .- 5 ., QZ'Z F/ 4 0 'S� L-1 1 .8 01'G �L� X2.3 s• °• ° �� F�� L O• F I�. ° 4 o hJK F ,� e• N �� PAD_ off' �, " � o� A_1 1202.1 s# 02° o• 02 8 0 � ��o 0.�. •s 7 � •O 202.6 5 L 5' F [ < 01.4 [,q rn 2.40' O� o `0 0PAD=1202.5MF • r� PAD=1204.0 ° °� ,� 0 Q• �' 3 FF=1203.0 5 = 04.5 'f - d' F G "' o PLAN 3A w PqD= o o FF 12 7 4 ° 0 1203.0 PAD=1203.5 4. PLAN 3C oo < < o FF=1203.5 FF-1204.0 in 1 °r o °Z'� PLAN 3B ti11 PLAN 2A �' °� PAD120= 4.7 7'f .9 ,- L p 5 65 p� c�,v 07 6 [ F� � �' FF=1205.2 rs c%POZ 1 '�iL °� 03 3 03.3 PLAN 1 C FG L 02.9 L F Q2.5 ; IVY. 4 r c 0 • 6' F 6' N •, � o � o [ PAD 1205.4 69.21' G' OZ•5 �Q �+` 0 'S.',o6 FF=1205.9 7'f -� F c o "- ti,� ° Off`•� PLA N 3A �1 3. Fms' s • o 0�75 03 730 G74 G 69.22 G � •� �F ° 64.49 72 On-U- o cr_ s9. 5 .0 01 o o a_ 4. 10 °°o c7 0 ..� 0 64.5, �` O�0' / Q yA 1 0 G' G Os o _ �X° �'`,. W' F '0 ori 0 v 0 64.14' z "w KEITH 20 10 0 40 INTERNATIONAL o N INC. PUN o ', ► Eaprat..• AWMMM+M GRAPHIC SCALE: 1 =2 0 Inland mPire Divisions„ T J AIM awlim Am. AWP S• Mv » r@NM CA eases (W)w-em. L D 9 8-- 10 2 G R co CONSTRUCTION RECORD DATE BY REVISIONS DATE ACC'D BENCH MARK SCALE SEAL: QRp�FESS/p� Designed By Drawn By Checked By Drawing No. co Contractor . J.R.W. D.H. RECOMMENDED BY: DATE. CITY Q TEMECULA DEPARTMENT OF PUBLIC WORKS HorizontalPl0 ons Prepared Under Supervision Of WV A. `920 ACCEPTED BY: DATE: JA3Lig PRECISE GRADING PLANS Inspector SEE SHEET - 20 No. ��� 1�/l'` RONALD J. PARKS4-1 Date Vertical x'12-31_98 GEORG A. Date ._, DEPUTY DIRECTOR OF PUBLIC WORKS PAS EO DEL S 0 L Completed q�Gr �F \ 1 PHASE 1 TRACT N 0. 24186- 1 CAL 45920 R.C.E No. Expires 12/3 /98 R.C.E No. 19744 Expires �/30/0l LOTS 61 -78 Sheet 2 of 3 Sc 1� 92.79 5 � v TC 9� Q 6 \ � o 00000< • O' -► OSx . g h Xx tn. Lj .10 04 U- 9C N OS o TC o0 q�. NI 9S 9 5. Q ,I AO 6 94.9 GO 0 9-, F NO 98.14 FG DF 9s 7 � ss TC 95.8 95.5 7,c� '6>> , 0) 1g •'`� OA, F rob 0 4 61) 4 b h v � 97.3 ,N A 0. DF 0 0 9 og7.6Is, �w��' ,�`� 0 3 F �G �G x .. 04 o °5• FG ° o 9j 'S oo TC co S5 CLo � .0 'o DF 0 8 0 FIL v� \ 9 .63 0 05.E v. 495oa C 01.1 �A TC 96.5 TW �'' � •5 •g 1 TC 0 5.� ,r,. � 01 .4 0 / 95.8 TF � � ri `ti p 3.67 � Q S� C TC Oj � � �. 0� TC TC /f \ 49 '� �,� o T 8 7 cp 00. O C Tb� r y P a F 120°•0 ��`I-IN 0 ,�ti s/L G 41 Q Qp ,;`� �o� 0.2' 's s 1% o3.78 o• 98.2 TF � v DF 00 TC 0 1C 4 O �- r 6 TC 0 0 ' �?) eTC � 'O F 04 0 l- Q N J O OT L tiP o�a 1v `J 0\ sQ °2.2 °c 00.9 � 2.2 � �O H.P. � o3`FIG �L �� ' , 0 01 .2 TW 52- 00.5 TF 46 PIN CP Yk � �' N 7 p�$ Quo �-S 07 10 co• g o 'S . s• ss "1Z ° FG o, pAD=12��•1 gyp. o �F-120 .6 3 3A '\ Q 9 PLAN o 8 I s6 s4, 96!,>g• �. O3 691 Z 2 p� 3 .o • Q / c� 0 Q O X17 O K7 Z KEITH 00 INTERNATIONAL s • � o , INC. '"' , ►Q"'' 20 10 20 40 Inland Empire Division Water A.,o,Me.. 1 Cwttur W A.. unm MW ONOW AM. sear.sso. BMW �i�aft 0 sssss (80) sea-02" GRAPHIC SCALE: 1 "=20' LD98-- 102GR 00 00 CONSTRUCTION RECORD DATE BY REVISIONS DATE ACC'D BENCH MARK SCALE SEAL: PRpFESS/� Designed By Drawn By Checked By 9OFDrawing No. �� �.R.w. D.H. RECOMMENDED BY: DATE. CITY DEPARTMENT OF PUBLIC WORKS Contractor Horizontal PI ns Prepared Under Supervision Of e d`• rr ' LADe �. Le�niest� ACCEPTED BY: DATE: $ PRECISE G RAD I N G P LAN S Inspector SEE SHEET 1 1 = 20 No. 45920 9 t 10 Date �_„„ RONALD J. PARKS Date Vertical �p.12-31 9e GEORGt 0X`.0' L1WfESTEY DEPUTY DIRECTOR OF PUBLIC WORKS PAS EO DEL S 0 L Completed OFPHASE 1 TRACT N0. 24186- 1 CA��F R.C.E No. 45920 Expires 12/31/98 R.C.E No. 19744 Expires 9/30/01 Sheet 3 of 3 LOTS 84-87