Loading...
HomeMy WebLinkAboutLot 77-94 -Precise Grading IN THE CITY OF TEMECULA GENERAL GRADING NOTES PRIVATE ENGINEER'S NOTE TO CONTRACTOR ALL CONTRACTORS AND SUB--CONTRACTORS PERFORMING WORK SHOWN ON OR 1 . ALL GRADING SHALL CONFORM TO THE UNIFORM BUILDING CODE+ CHAPTER RELATED TO THESE PLANS SHALL CONDUCT THEIR OPERATIONS SO THAT ALL 33+ AS AMENDED BY ORDINANCE 93-04. EMPLOYEES ARE PROVIDED A SAFE PLACE TO WORK AND THE PUBLIC IS PROTECTED. ALL CONTRACTORS AND SUBCONTRACTORS SHALL COMPLY WITH THE 2. MINIMUM BUILDING PAD AND DRAINAGE SWALE SLOPE SHALL BE = 1%. T R A C T N 02 4 18 6 P H A S E 4 "OCCUPATIONAL SAFETY AND HEALTH REGULATIONS" OF THE U.S. DEPARTMENT DRAINAGE SWALES SHALL BE A MINIMUM OF 0. 2' DEEP AND BE CONSTRUCTED a 9 OF LABOR AND THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL A MINIMUM OF 2' FROM THE TOP OF CUT OR FILL SLOPES. RELATIONS "CONSTRUCTION SAFETY ORDERS. " THE CIVIL ENGINEER SHALL LOTS 77 - 94 NOT BE RESPONSIBLE IN ANY WAY FOR THE CONTRACTORS AND SUB-CONTRACTORS 3. MAXIMUM CUT AND FILL SLOPE - 2: 1 . RA tC COMPLIANCE WITH THE SAID REGULATIONS AND ORDERS. Hp ROAOCONTRACTOR FURTHER AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE 4. PROVIDE 5' WIDE BY 1 ' HIGH BERM OR EQUIVALENT ALONG THE TOP OF ALL CALIFORNIA C: FILL SLOPES OVER 5' HIGH. RESPONSIBILITY FOR JOB-SITE CONDITIONS DURING THE COURSE OF m CONSTRUCTION OF THIS PROJECT+ INCLUDING SAFETY OF ALL PERSONS AND 5. ALL GRADING SHALL BE DONE UNDER THE SUPERVISION OF A COMPETENT PROPERTY+ THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE SOILS ENGINEER WHO SHALL CERTIFY THAT ALL FILL HAS BEEN PROPERLY z Tom, ROAD n, LIMITED TO NORMAL WORKING HOURS* AND THAT THE CONTRACTOR SHALL DEFEND. PLACED AND WHO SHALL SUBMIT A FINAL COMPACTION REPORT FOR ALL PAUBAINDEMNIFY AND HOLD THE OWNER AND THE CIVIL ENGINEER HARMLESS FROM ANY FILLS OVER 1 ' DEEP. U, 9 AND ALL LIABILITY+ REAL OR ALLEDGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT+ EXCEPTING FOR LIABILITY ARISING FROM THE SOLE 6. A REGISTERED CIVIL ENGINEER SHALL SUBMIT TO THE CITY OF TEMECULA'S o .• NEGLIGENCE OF THE OWNER OR ENGINEER. ENGINEERING DEPARTMENT A WRITTEN CERTIFICATION OF COMPLETION OF n ROUGH GRADING IN ACCORDANCE WITH THE APPROVED GRADING PLAN PRIOR v ) TFR 24 156-2 THE EXISTENCE AND APPROXIMATE LOCATIONS OF ANY UNDERGROUND UTILITIES OR TO ISSUANCE OF THE BUILDING PERMIT. CERTIFICATION SHALL BE TO STUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE LINE+ GRADE, ELEVATION AND LOCATION OF CUT FILL SLOPES. X11., 8, 267/ 1 - 10 RECORDS. THE CIVIL ENGINEER ASSUMES NO LIABILITY AS TO THE EXACT LOCATION ROq� 2 OF SAID LINES NOR FOR UTILITY OR IRRIGATION LINES WHOSE LOCATIONS ARE NOT 7. PROVIDE A BROW DITCH+ DESIGNED TO HANDLE 100YR Q STORM FLOWS+ �D LOCATION MAP SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY AND ALONG TDP OF CUT SLOPES. a 3 SCALE: I'=100 IRRIGATION COMPANIES PRIOR TO WORK OR EXCAVATION TO DETERMINE THE EXACT N. T.S. LOCATIONS OF ALL LINES AFFECTING THIS WORK, WHETHER OR NOT SHOWN HEREON. 8. FINAL COMPACTION REPORT WILL BE REQUIRED FOR ALL FILLS GREATER HWY. 79 SITE 115 4 AND FOR ANY DAMAGE OR PROTECTION TO THESE LINES. THAN ONE FOOT. TR 24186 1 M, B � 267/ 11 - 19114 ' 1 � 9. ALL GRADING SHALL BE DONE IN CONFORMANCE WITH RECOMMENDATIONS OF THE PRELIMINARY SOILS INVESTIGATION BY CONVERSE CONSULTANTS VICINITY MAP r b DATED APRIL 26+ 1996 & REVISED GEOTECHNICAL DESIGN AND CONSTRUCTION r 113 / RECOMMENDATION REPORT DATED DEC 319 1997, & LETTER DATED DEC 19+ 1998. 1 .. 112 7 / TWO SETS OF THE FINAL COMPACTION REPORT SHALL BE SUBMITTED TO THE j ENGINEERING DEPARTMENT WHICH SHALL INCLUDE FOUNDATION DESIGN , RECOMMENDATIONS AND CERTIFICATION THAT GRADING HAS BEEN DONE IN ....... CONFORMANCE WITH THE RECOMMENDATIONS OF THE PRELIMINARY SOILS REPORT. ) ) p 9 • 10 10. THE CONTRACTOR SHALL NOTIFY THE ENGINEERING DEPARTMENT AT LEAST 24 . ......... ..... ... .. . ... 109 HOURS IN ADVANCE REQUESTING FINISH LOT GRADE AND DRAINAGE ........... :91: 10 ; 12 INSPECTION. THIS INSPECTION MUST BE APPROVED PRIOR TO BUILDING ..... ... 8 PERMIT FINAL INSPECTION FOR EACH LOT. 4 j 1 p7 1 3 PHONE: 694-6411 ............. (909 ) T J 3. ... ................ •r 106 11 . CUT SLOPES EQUAL TO OR GREATER THAN 5' IN VERTICAL HEIGHT 982 •�� L E I G T AND FILL LEGEND 105 14 SLOPES EQUAL TO OR GREATER THAN 5' IN VERTICAL HEIGHT SHALL BE 50 + � PLANTED WITH GRASS OR GROUND COVER TO PROTECT THE SLOPE FROM 95 •�• 10 TOP OF WALL TW EROSION AND INSTABILITY IN ACCORDANCE WITH CITY DEVELOPMENT CODE • 51 9b 103 15 SECTION 14. 06 PRIOR TO THE APPROVAL OF FINAL INSPECTION. " 102 BOTTOM OF WALL .................................................................................. BW 52 12. NO FILL SHALL BE PLACED ON EXISTING GROUND UNTIL THE GROUND HAS 4`� 97 1 b TOP OF CURB ELEVATION ........................... .......................................... TC 47 53 -�• PE BEEN CLEARED OF WEEDS, DEBRIS, TOPSOIL* AND OTHER DELETERIOUS 9a mom PAD ELEVATION MATERIAL. 54 -- - - --- - - - - ------ 46 7 99 FINISHED FLOOR ELEVATION FF 13. IF STEEP SLOPING TERRAIN OCCURS UPON WHICH FILL IS TO BE PLACED+ 45 55 ; ' 7b 1 OD ) p J 17 FINISHED GRADE ELEVATION FG THE TERRAIN MUST BE CLEARED, KEYED, AND BENCHED INTO FIRM NATURAL / r SOIL FOR FULL SUPPORT. PREPARATION SHALL BE APPROVED BY A 44 56 75 1 r HIGH POINT ........................................................................................... HP REGISTERED ENGINEER PRIOR TO PLACEMENT OF FILL MATERIAL. 74 1s TOP SLOPE TS 43 57 FLOW LINE -------------------------------------------------------------"--------------------- ------ FL 14. DURING ROUGH GRADING OPERATIONS AND PRIOR TO CONSTRUCTION OF � Sa � 73 PERMANENT DRAINAGE STRUCTURES, TEMPORARY DRAINAGE CONTROL SHOULD 42 ; 19 TOP OF GRATE ELEVATION ................................................................. TG BE PROVIDED TO PREVENT PONDING WATER AND DAMAGE TO ADJACENT 72 PROPERTIES. 41 �/ 59 71 GARAGE FINISH FLOOR ELEVATION ............................... GFF 7d 20 EXISTING ELEVATION (91,70) 15. DUST SHALL BE CONTROLLED BY WATERING OR OTHER APPROVED METHODS. 40 b0 b9 ba b 1 FIRE HYDRANT LOCATION __4 16. ALL EXISTING DRAINAGE COURSES ON THE PROJECT SITE MUST CONTINUE TO 39 --"---------"-----------~--------------------"-"""------------------�-- FUNCTION, ESPECIALLY DURING STORM CONDITIONS. PROTECTIVE MEASURES • 62 21 STREET LIGHT ........................................................................................ o-� It AND TEMPORARY DRAINAGE PROVISIONS MUST BE USED TO PROTECT 3$ / 63 DIRECTION OF DRAINAGE FLOW ..... .. ...................................................... ------� ADJOINING PROPERTIES DURING GRADING OPERATIONS. n � 37 b4 � -- 17. STABILITY CALCULATIONS WITH A FACTOR OF AT LEAST ONE AND FIVE- o z b PAROL 3� 65 .` 22 DEEPENED FOOTING (6 TYPICAL) ............................................................. TENTHS ( 1 -5 ) SHALL BE SUBMITTED BY SOILS ENGINEER TO THE 4 P a 111 ND 23432 36 bb 67 TR 24 1 86-�} RETAINING WALL (BY SEPARATE PERMIT) ENGINEERING DEPARTMENT FOR CUT AND FILL SLOPES OVER 30' IN Uj o LINE ~ P, M J 8 J 159/38-61 35 - 23 -----------------------------` -- ` ..ate VERTICAL HEIGHT. R50R5AT 1 ON AR5A APPROXIMATE LOCATION OF ELECTRIC METER AND GAS METERS .............. 3 MIN. 18. A REGISTERED CIVIL ENGINEER SHALL SUBMIT CERTIFICATION OF BUILDING W 5 MIN. 34 _ SEWER LATERAL LOCATION _______________________"............_._._...___________............. Q PAD ELEVATIONS. WHERE SPECIFIC ELEVATIONS ARE REQUIRED, THE ; zo 1, o 33 24 WATER LATERAL AND WATER METER LOCATION ...................................... Q ELEVATION WELEVATION I/THHRESPECTTTOOMEAN ADJACENTAGROUND ) SHALL SURFACEBISGREQUIREDF THE AN q p 3 MIN. X �0 32 ELECTRICAL TRANSFORMER .................................................................... 0 ACTUAL DISTANCE ABOVE THE ADJACENT GROUND SHALL BE GIVEN. 2 Z./ LAIN 31 25 POWER LINE AND HANDHOL S 1y 30 19. EROSION CONTROL: ALL GRADED SLOPES SHALL BE PLANTED WITH ROSEA 2i 'MMAX 2 9 TELEPHONE SERVICE ICE PLANT AT 12" ON CENTERS OR ANOTHER APPROVED GROUND COVER. IN 22 GRATE ____ _ ❑ GRADED tie 27 _ _ _ _ _ _ ___ __ ___ ____ _ _ SLOPES OVER 15' IN VERTICAL HEIGHT, IN ADDITION TO GROUND COVER, LOT FG. 26 BLOW OFF VALVE SHALL BE PLANTED WITH APPROVED TREES+ SHRUBS, OR COMBINATION GRADED 6'MIN.� THEREOF. SHRUBS SHALL BE PLANTED AT 10' ON CENTERS; TREES* 20' ON LOT FG. L E .................................................................................. AIR VALVE a CENTER: COMBINATIONS+ 15' ON CENTERS. SLOPES OVER 4' IN VERTICAL ------------------"------~---------�-------------------------------------------------"------ HEIGHT SHALL HAVE PERMANENT IRRIGATION SYSTEMS WITH BACKFLOW SECTION A-A TELEVISION PLATFORM __ __ _ _________ Q PREVENTION DEVICES PER U.P.C. . CHAPTER 10.R. SEWER BACKWATER VALVE. NOTTO SCALE -----------------------------------------------------------------"---- 20. FINISH GRADE SHALL BE SLOPED AWAY FROM ALL EXTERIOR WALLS AT NOT LESS THAN 1/4' PER FOOT FOR A MINIMUM OF 3 FEET. -" 21 . NO OBSTRUCTION OF FLOOD PLAINS OR NATURAL WATER COURSES SHALL BE FG PAR09L 40 EARTHWORK QUANTITES PERMITTED. PER PLAN P, M, N04 23432 NO. LOTS CY/LOT TOTAL 22. ALL PROPERTY CORNERS SHALL BE CLEARLY DELINEATED IN THE FIELD P° M' S, 159/32-6J 18 15 270 PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION/GRADING. FG PER PLAN 23. APPROVAL OF THESE PLANS BY THE CITY OR ITS AGENTS DOES NOT RELIEVE - 1'/�-MIN• ` r z THE APPLICANT AND HIS ENGINEER FROM THE RESPONSIBILITY FOR THE CORRECTION OF ERRORS OR OMISSIONS DISCOVERED DURING CONSTRUCTION. R/W 2 INDICATES LOT NUMBER UPON REQUEST* THE APPROPRIATE PLAN REVISIONS SHALL BE PROMPTLY •. P FF-100.0 FF-100.0 INDICATES FINISHED FLOOR ELEV. SUBMITTED TO THE CITY ENGINEER FOR REVIEW AND APPROVAL. CURB i _ _ • i HP FF=100.0 PE=99.5 PE-99.5 INDICATES PAD ELEV. PER PLAN PE=99.5 2A �A INDICATES BUILDING TYPE • • 1A a - Li DEEPENED i FOOTING f5--dl °----- FS AS REQUIRED • PL PER PLAN 12.0`% ? VARIES 7' g� 5' FS �_MAX FG A FG �- RIGHT OF WAY No No NONEPER PLAN PER PLAN PER PLAN i FG RW ° 5' MIN. 3' MIN. _1% MIN. I PER PLAN - �' - - - - �- - -- - - - - EXIST. CURB AND GUTTER J FG DIG ALEPT • PER PLAN LD TM A BUILDING FOOTPRINTS CALL TYPICAL LOT GRADING DETAIL NOT TO SCALE BEFORE TYPICAL LAYOUT FOR DRIVEWAYS, LD 98- 156 GR You Dior NOT To SCALE SEWER & WATER SERVICES 1-800-227-2600 ► RICK ENGFIIIIIIIEERM COMPAW Our ���• 3050 Cnrcago Avenue NOT TO SCALE suite goo UNDERGROUND SERVrCE ALERT Rrversi�. Callat least 2 working days prior to excavating. Cay IfornIa s25o? c�) 782-0707 DATE BY REVISIONS DATE ACC'D BENCHMARK: SEAL: �ESSI Designed by Drawn by Checked by CONSTRUCTION RECORD SCALE l A Drawing No. COUNTY OF RIVERSIDE B.M.T-29-81 AZ M1CHEt Fye EH EH EMR RECOMMENDED BY. DATE. _ OFTEMECULA DEPARTMENT OF PUBLIC WORKS Contractor 2-1/2'BRASS DISK 1N CONCRETE CYLINDER Horizontal y QQ� �i iN THE N.W.CORNER OF THE INTERSECTION 9 o No.46804 � Pla pared Under Supervision OfR OF RANCHO CALIFORNIA RD.WITH MARGARITA 1'=100' `'� z ACCEPTED BY: DATE: RD. 1.0'EAST OF A 7.0'C.L.FENCE,40'NORTH Exp•6-30-99 PRECISE GRADING PLAN Inspector OF P.P.(NO NUMBER),94'NORTH OF THE CENTER Date Z RONALD J. PARKS LINE OF RANCHO CALIFORNIA RD. SET FIBERGLASS Vertical EDWARD MICHEL ATICAN DEPUTY DIRECTOR OF PUBLIC WORKS TRACT N0. 241$6, PHASE 4 WITNESS POST 1.0'WEST OF MONUMENT. `r1 CI V IV �p - Date Cmplt'd 4jf R.C.E. 46804 6-30-99 PRECISE GRADING PLAN ELEVATION= 1128.410 (ADJ.9-13-82) N/A OF CA��F R.C.E. No. Expires R.C.E. No. �F LOTS 77-94 19744 Expires 9-30-01 1'�'' Sheet 1 of 2 /usr/projdata/r_grp/d_13249/249pgd6.dgn PLOT DATE:21-JAN-1999 JN 13249 1 1 1 I / 115 FUTURE PHASE 6 I 114 99.7 ■'- - ' r FG Q�.00.- 1 13 1 1 2 1 10 109 109 1 .�7 106 -..■ 1J1 99.4 F9-fi �■`■� HP � G 99.5 ■�■ 1 oFG 96 S6� �. 1 99.2 .. HP 99.5 1 CO G 99.1 ■'�•� 1 / 99.1 98.8 �,` FG 96.SS, - SLOPE 2:1 FL 99.0 _F L 1 '� SLOPE 2:1 , � 86 FL 99.1 " '. . . • , ..r.rr rir�r�w rrwr r.r.•rrr rrrrr .i...r1w w rr rrrrrla&r7 ■r�. rwrwrrrr.rr.irwarwawawwrw�r �rrar�.��r�.ua�.r A00 98.8 M 98 7 60�--rPE_1199.7 98.8 `� HP �' FG a FG 43' 98.7 98.1 44.25' 98.1 97.7 45.00' 97.7 97.2 45.00' 97.2 50.00' 96.7/ 96.1 50.00' 96.1 1 q,'1 50.00' ------ - \--03.0_--- 50.00%---�-- �0�FF 1200.2 5, 87 FL - _ o - FG FG FG FG 96.9 ' gA•l •'l 9�•0/ 4 FG , FG FG FFG FG I G F G g2 I , 3A PE=1199.5 �� o 98.4 % % FG F G �P FG 0• FF-1200.0 5.0 I rn HP � N 97.4 O HP _ 95.8 - I F - 1 _ 9 o 1 r 99.4 - �- 97.8 ,�, - M HP o , 96.4 HP O' - I 5.0, 2AR HP _ I - ,,,., �.. _ _ o I NP r FL o /� �_.... 1 � _ _ 0 r� o HP / 3 i 1 98.1 0 N o I 92 N n\_L / 96.5 96.5 1 �. .� 1 _ �� 0 � 1 - - �_98.7 GF=1199.7 .....-.C6 FL 6.1' 7 1 FL FL o / 95.4 1 198.5 � � 97.0 9 .0 / 95.4 1 FL "Moll7 I � � � I 98.4 GF=1199.5 88 FL i 5. 9 .5 1 F4 FL 1 / 96.0 96.0 ` I FL FL 1 ; 9A.2 93•g 1 � � FL 1 1 •5 , PE=1199.1 1 i FL FL i I F�. F� 1 g0 � FL , 98.3 1 6.0 = 89 98.0 97.4 � � � 1 0 1200.7 I FF 1199.fi PE=1198.7 FL 90 91 92 F L 3 B F L 5.0' 1 .0' 9 4 i t o E:1�g3'S 9 0' \ 98. PE=1197.2 0 1 P 3- FIG �/ •�, I 3 r 5•p, FF=1199.2 PE-1198.1 5•p, PE_1197.T 5.0 FF-1197.7 0• PE=1196.1 1 I 5.0, �Gj 1 1 0 1 FF�11g CIOFL FF-1198.2 Z 1 ` a 101 0 '� 98 .�• , 5'0 ZCR 1 FF=1198.6 2AR 1 6.0 3A 1 PE_119fi.T o FF=1196.6 i PE:11g �•2 , I �' 5.0' C"i0 1C 5.0 5 p I FF-1197.2 '� 1 1 :��°� 1 98.3 F , �; d- 1 1 1 1 1 IBR 1 1 2B 0, 11 FF PR 1a.o' a...--- . o FG `� • 99.0 ... . - c7 i 1 1 fj 1 1 1 1 1 CS_,. - 5• I I 1 g2.0 1 0 GF=1199.1 1 a , FL - 97.7 1 6....CO 1 1 96.7 C3------- , 1 1 ;01) F�- :1183.0 0 1 ?I 'A 97.9 GF-1198.7 FL 7 1 GF=1198.1 1 _ FL 96.1 GF=1197.2 d___- 1 95.1 ,i .. rq CF I :• : �' ' X FL 97.6 9 • GF-1197.7 FL GF=1196.7 95.7 FL GF=1196.1 11 GF=11gA� 83,6 91.6 i GF ,. • • �:.. X98, 97.7 0 � r FL FL 97.0 96.5 \ 95.9 FL � 1 •� � � �\ 0• L 0 97.86 FG 00 h , / FL FL 1 95.5 94.9 \ ^ TC o. � -\•W 00 , , �� \ 1 FL / c� i FL / \\ FL �� .�, - rn ,�• \\ 1 , / . U- 98.07\ 1 \` , i c) c, �c cn - 1 cn cn / - 'ago r"' 1 cn � 1 I V, o ,� 1 v7 TC \ o ` °' .!1 .2 N o � 96.7 - � N 1 u_ o � .� o Ln u` N o L` X 1 cn o N• ® �`- u i Ln I �=3 •01' G rn v^i FG � Q N rn COO' rn � N o 95.8 N 'qr � `�•' L; 94.8 rn C5 m � � � 0 0 06 o cv � o ar`,• � r Ir / • Lo % tD ui In Lo LO (V Vi r 1 LC1 N M ' .O - r tT v ' m an °' m Q, Q, Q' m Q m r,� m , � �92 0 0\ m o as �\ a00 1 I 97.47 =51.2 ' L-25.34 FG ♦ FG m 50.00 C, cn rn TC ' • . 50.00 ♦ \ F 50.00 8.31 A •. 50.00' 1 - 1 0 97.03 >- % .• . • ` - ~+ Zo TC a I 96,49 96.00 '` 95.55 95.10 '- 94 93.48 0 a .93 98.02 ,,� 1 `� T 0 0 0 o I .56 o r I g�'1 r„� I o o g -- ..- C TC I I T I I I I 1� C � � o _, .�� r- � CURB & GUTTER C TC - TC TC 0 TC / V ap 11 I I ao ao � ao u0 v� co I ao co I "�C I`� oo io + 3 T 12 BERG► I COURT T` 14 1 V • • : `^° is 97.58~ �, `� 97.08 + v I a' 13 c -- --°�--a, �- m 98.2 �, 97.85 -�. TC - - 96.651 + o - + 0 I 95.78 I + v + o I + a �" + 0 93.94 + o +co 0 15 FG , �i v TC `, TC �, ,` �° I o - 0 96.23 I I N . 95.28 - 95.28 I I - 94.78 rr-, . 14 , - I No g0,$A . • TCI TC I TC I I I TC az o I TC I I I4 -� _.-1 TC _IC L / rn 9 / v v C RB VGUTTER �, c� �� �� c� / �, 7 u � I • B. :L=2:70' • .. �a. _ 7 3, . ., • .. �. ' cn 97.8 L=21. �1' •• :• :• :/. : r--, :•...=' :•• :• . / 48.00 ' �' �` � `` _ �' `` � L-43.96 a; �' '� •: - co o `� - �► 0.00' • 50.0 0.00' I 43.00' ' o t- .� •� . ,,,� Q, . %..) t� 45.00 to V) 45.00 '� cv • v r_ 96.9 cn 1 ...� g m N o .�• � - �,� - 96.00 �,. % cn N - � 94 1 � 1 �O FG �. 0 0 o u- c 95 5 , I a ,0 0 v 10 0 0 0 cn 9 v7 • cn F G r. o ` o rr; FG r" � 1 �° o FG 14 rn u-, o F G •ar, . M 'V` O rn N N N O • / , I / m rn m N r._ m N rn co , m N m / m N �r ao o' N m a-, \ 1 a, Q, 1 rn 99.0 , / 1 r: , , m I I \ , l a0,' / FL 98.4 98.2 98.1 97.5 / , \ / 99.1 FL FL FL FL 97.1 , 96.7 96 1 95.7 / 9A•3 g�,0 91 A FL GF=1200.1 98.6 , ,p GF=1199.2 1 , FL FL 96.9 FL 95.2 FL FL FL 5- �,- GF=1199.7 FL 1 4] 1 GF=1198.7 7 1 6. , GF=1197.9 F 96.3 FL FL 93.0 D GF=1198.3 1 _ 95.9 95.4 11g6,� 11gq•1 5.0 1 I , , ----- GF-1197.4 FL i �.. GF=1196.4 1 G 9 G F t 1 5.0, 1 � 1 1 1 p � 1 L _ FL F= A.6 F= -------- 1 =� I 1 5,p, 1 83 5»0' 97.6 , p-...... , A , , p q , ; 1 ..FL 1 1 1 S,p� 85 1 PE=1199.2 s.0 1 5.0 1 5.0' 1 1 5.0' , , -� PE=1200.1 84 6, , 1 FF=1199.7 82 FL 1 1 8� 1 1 l _11I 1 ` 10 0' 5.0' 1 1 1 j 8.0' FF=1200.6 PE=1199.7 ° I 97.3 81 1 5'0 PE=1197.9 11 p 5.0 1 77 1 �p 6.2- . 182,6 2 B FF=1200.2 1 B R PE_1198.7 F L PE=1198.3 FF=1198.4 78 1 O, PE=1196.4 r 5.0' 85.5 PE.1193'1 R 1 1 FF-1199.2 FF-1198.8 79 PE=1196.9 ;�+ FF=1196.9 pE=11 6,0 5.0, -11gA• FF'1 g1.g 99.4 1 , 3B 98.5 1 3C i 97.6 ZBR 1 114 PE=1197.4 FF=1197.4 0 1CR I FF=118 P F_11gA•6 1 F 99.5 1 FL 98.6 1 (A FF=1197.9 2C ; ZP 9A•g F 3G 83.4 1 FL ► 1 FL i 97.2 1 1 1 1 �. 1 1 FL 1 99.0 1 FL t 98.1 97.6 � 97.2 FL I - B i 1 I F FL I 81,9 FL 99.0 r,. - _ FL 98.0 i --• 1 FL 96.2 96.2 1 , 95.7 95�71 ' 1 A.$ FL = 98.9 1l FL i `.4 FL 1 1 96.7 96.7 1 1 FL FL ` FL FL 1 ; I F�-. 83.5 1 O / N 1 99.8 _ HP - ° _ I ^; op - - - - � FL / 1 �► F�- En - - - - 9FL Zo 9.4HP LA 0 98.4 97.6 1-4 - 7. - - -- � ;�o� -- - -- - �; 3 • �.' �° HP �� .- _ .- _ 1+ 96.6 , rn r►; - - - - g2• HP •- HP �-, 98.0 - 96.1 i �- - 1200.1 1200.1 99.7 a' - � �n �-- 2 r" P °° FG 99.7 99.2 98.7 HP 97.1 � HP � HP I g5' o g3•a rn N d FG FG FG FG 99.2 Q HP ; NP NP Q FG 98.7 98.3 98.3 97.9 N GF FG FG FG 97.9 97.4 97.4 96.9 96.9 96.4 96.4 ' 95•x' S FO gq•1 FO �G 5• 41.59 --- F�1 � FG � FG � �/ 9 G 50-96'45.20 FG F 50.75 a� �'o <b 5.76 50.00' 50.00' _� 45.00' 48.00' 40.59' � otic �p� �� 96, °` 99 h 9 ti o moo g�� \S tea. 49 50 51 52 54 c c 53 PHASE 2 55 5 r 59 �a 60 DIG ALERT r I TM 17D CALL LD 98- 156 GR BEFORE SCALE: V = 20' YOU DIG! RICK]ENGUCERING 1400--227-2600 2 0 0 20 4 0 ����. 3050 Ch t cogo Avenue UNDERGROUND SERVICE ALERT sults 100 R t vera t de, Callat least 2 working days prior to excavating. ��' California 92507 (W9) T6e-0?0T CONSTRUCTION RECORD DATE BY REVISIONS DATE ACC'D BENCHMARK: SEAL: �ESs1 Designed by Drawn by Checked by Drawin No. SCALE / g ACHE � EH EH EMR RECOMMENDED By: DATE: z M c � CITY QF TEMECULA DEPARTMENT OF PUBLIC WORKS V- Horizonta I = �� Contractor `' o No. 46804 P pared Under Supervision Of z w z ACCEPTED BY: DATE: _ PRECISE GRADING PLANS SEE SHEET N0. 1 1'=20' Exp,6-3o-99 Date RONALD J. PARKS Inspector Vertical EDWARD MICHEL RATICAN DEPUTY DIRECTOR OF PUBLIC WORKS - TRACT N0. 24186 PHASE 4 Date Cmp it'd sr4Tf C1 V 1v \� 46804 6-30-99 - �- - N/A O►F' CA1.\F R.C.E. No. Expires R.C.E. No. 19744 Expires 9-30-01 1� LOTS T S 7 7 9 4 Sheet of 2 2 /usr/pro jdato/r_grp/d_13249/249pgd3.dgn PLOT DATES 21-JAN-1999 JN 13249