Loading...
HomeMy WebLinkAboutParcel Map 12078 Parcel 2 Hydrologywirfl Ventura Engineering Inland INC VE I HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135, LD18-0066 40345 WALCOTT LANE, TEMECULA, CALIFORNIA 92591 PARCEL 2 OF PM 12078, MAP PAGE 75122-23 APN: 957-261-011 PREPARED FOR: ANTAYA DEVELOPMENT, INC. 35987 AVENIDA LA CRESTA MURRIETA, CALIFORNIA 92562 (951) 698-0044 PREPARED BY: VENTURA ENGINEERING INLAND 27393 YNEZ ROAD, SUITE 159 TEMECULA, CALIFORNIA 92591 (951) 252-7632 Rev3: October 22, 2018 Rev2: August 31, 2018 Rev1: March 25, 2018 Original Date: November 14, 2017 I hereby declare that I am the engineer of work for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions code, and that the design is consistent with current standards. AI I _ 10/22/18 � WILFREDO S.D. VENTURA 66532 X WILFREDO VENTURA DATE No. R.C.E. NO. 66532 * Exp. 6-30-18 EXPIRES 6130118 CIVIL VENTURA ENGINEERING INLAND, INC. 27393 YNEZ ROAD, SUITE 159, TEMECULA, CALIFORNIA 92591 TOLL FREE OFFICE (877) 723-4224 FAX (951) 552-1686 HYDROLOGY REPORT 011 PARCEL 2 OF PM 12078 LD18-0135, LD18-0066 v,,,,I,mi Imlim•omiq inImid IN( 40345 WALCOTT LANE, TEMECULA, CA 92591 VEI TABLE OF CONTENTS DESCRIPTIONS PAGE COVERSHEET ................................................ i TABLE OF CONTENTS .......................................... 1.0 INTRODUCTION ......................................... 1 2.0 LOCATION ............................................. 1 3.0 METHODOLOGY ........................................ 1 4.0 EXISTING CONDITIONS CALCULATIONS .................... 2 5.0 PROPOSED CONDITIONS CALCULATIONS .................. 2 6.0 COMPARISON .......................................... 3 7.0 FEMA ANALYSIS ........................................ 4 8.0 CONCLUSION .......................................... 4 9.0 REFERENCES .......................................... 4 10.0 DECLARATION OF RESPONSIBLE CHARGE ................. 5 11.0 ATTACHMENTS ......................................... 5 11.1 ATTACHMENT 1. STANDARDS EXCERPTS ............. 5 11.2 ATTACHMENT 2: EXISTING CONDITIONS CALCULATIONS 5 11.3 ATTACHMENT 3: PROPOSED CONDITIONS 5 CALCULATIONS ................................... 11.4 ATTACHMENT 4: HYDROLOGY EXHIBITS .............. 5 11.5 ATTACHMENT 5: FEMA ANALYSIS .................... 5 ATTACHMENT 1: STANDARDS EXCERPTS ATTACHMENT 2. EXISTING CONDITIONS CALCULATIONS ATTACHMENT 3: PROPOSED CONDITIONS CALCULATIONS ATTACHMENT 4: HYDROLOGY EXHIBITS ATTACHMENT 5: FEMA ANALYSIS Rev3: 10122118, Rev2. 8131118, Rev1: 3125118 2017-119 Walcott Lane - i - Original. November 14, 2017 HYDROLOGY REPORT 071 PARCEL 2 OF PM 12078 LD18-0135, LD18-0066 von tma enylnvoinq hilmid we 40345 WALCOTT LANE, TEMECULA, CA 92591 VEI 1.0 INTRODUCTION The purpose of this report is to calculate the pre -development and post development hydrology conditions for the proposed single-family residence proposed Parcel 2 of PM 12078 at 40345 Walcott Lane in Temecula, California 92591. The project site is currently a vacant and undeveloped lot that was previously graded for single-family residential use. The project site partially drains to the northeast onto Walcott Lane and to the southwest corner of the property onto adjacent properties through overland flows. Ultimately, both areas will drain into the Santa Gertrudis Creek downstream of the project site. The proposed grading plan proposes to grade portions of the project site to create enough flat area to build the proposed single-family residence, garage, barn, corral and associated other residential design elements. This report will outline flood control issues only. This report has been created using the Riverside County Flood Control and Water Conservation District Hydrology Manual (April 1978) as discussed further in Section 3.0. 2.0 LOCATION The project site is located at 40345 Walcott Lane in Temecula, California 92591. This parcel is the vacant lot just north of the intersection of Walcott Lane and Wgasa Place. The project site is bordered by residential development on all sides. A vicinity map is provided for reference in Attachment 4. 3.0 METHODOLOGY This report has calculated 100-Year Maximum Peak Runoff based on the Riverside County Flood Control and Water Conservation District Hydrology Manual (April 1978) rational methodology. In addition, this manual will be referred to as the 'Standards' throughout this report. Clean copies of the excerpts from the standards have been included in Attachment 1: Standards Excerpts for reference. The hydrology calculations will be divided into two sections: existing conditions and proposed conditions. The existing conditions calculations are provided in Attachment 2: Existing Conditions Calculations. The proposed calculations are provided for reference in Attachment 3: Proposed Conditions. In addition, hydrology maps have also been created for the project site and are included in Attachment 4: Hydrology Exhibits. And lastly, the impacts on any FEMA related items are discussed in Section 7.0 and mapping is provided for reference in Attachment 5: FEMA Analysis. Rev3: 10122118, Rev2: 8131118, Rev1: 3125118 2017-119 Walcott Lane 1 - Original: November 14, 2017 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135, LD18-0066 ��,�:����•, ,,,���,,,� �,, ���,��„� 40345 WALCOTT LANE, TEMECULA, CA 92591 VEI 4.0 EXISTING CONDITIONS CALCULATIONS The existing conditions have been evaluated using the Rational Method from the Riverside County Flood Control and Water Conservation District Hydrology Manual (April 1978). Certain tables and figures from the Standards are referenced in this report and have been included in Attachment 1: Standards Excerpts. The existing conditions calculations are in Attachment 2 for reference. The existing conditions exhibit is provided for reference in Attachment 4. A summary of the existing conditions calculations is as follows: A summary of the existing conditions data is as follows: EXISTING CONDITIONS COMPLIANCE POINT A SUMMARY DATA 100-YEAR AMC CONDITION 3 STUDY NODE POINT 1.22 INTENSITY IN/HR 4.842 TOTAL DISCHARGE cfs 2.2 TIME OF CONCENTRATION MIN 5.49 AREA ACRES 0.504 EXISTING CONDITIONS COMPLIANCE POINT B SUMMARY DATA 100-YEAR AMC CONDITION 3 STUDY NODE POINT 2.22 INTENSITY IN/HR 4.262 TOTAL DISCHARGE cfs 6.6 TIME OF CONCENTRATION MIN 6.93 AREA ACRES 1.741 5.0 PROPOSED CONDITIONS CALCULATIONS The proposed conditions have been evaluated using the Rational Method from the Riverside County Flood Control and Water Conservation District Hydrology Manual (April 1978). Certain tables and figures from the Standards are referenced in this report and have been included in Attachment 1: Standards Excerpts. The proposed conditions calculations are in Attachment 3 for reference. The proposed conditions exhibit is provided for reference in Attachment 4. A summary of the proposed conditions calculations is as follows: A summary of the proposed conditions data is as follows: PROPOSED CONDITIONS COMPLIANCE POINT A SUMMARY DATA 100-YEAR AMC CONDITION 3 STUDY NODE POINT 1.62 INTENSITY IN/HR 4.821 TOTAL DISCHARGE cfs 2.7 TIME OF CONCENTRATION MIN 8.19 AREA ACRES 0.745 Rev3: 10/22/18, Rev2: 8/31/18, Rev1. 3125118 2017-119 Walcott Lane -2- Original: November 14, 2017 HYDROLOGY REPORT �� PARCEL 2 OF PM 12078 LD18-0135, LD18-0066 v�➢,1LIId Enyli1lot i 11111,11Id we 40345 WALCOTT LANE, TEMECULA, CA 92591 VEI PROPOSED CONDITIONS COMPLIANCE POINT B SUMMARY DATA 100-YEAR AMC CONDITION 3 STUDY NODE POINT 2.82 INTENSITY IN/HR 4.387 TOTAL DISCHARGE cfs 5.9 TIME OF CONCENTRATION MIN 6.39 AREA ACRES 1.499 6.0 COMPARISON The project site proposes low impact development elements like draining impervious areas to landscaped areas. A comparison of pre- and post- conditions at Confluence Points A and B is as follows: COMPLIANCE POINT A SUMMARY COMPARISON DATA EXISTING PROPOSED COMPARISON INTENSITY IN/HR 4.842 4.821 - 0.021 TOTAL DISCHARGE cfs 2.2 2.7 + 0.5 TIME OF CONCENTRATION MIN 5.49 8.19 + 5.70 AREA ACRES 0.504 0.745 1 + 0.241 COMPLIANCE POINT B SUMMARY COMPARISON DATA EXISTING PROPOSED COMPARISON INTENSITY IN/HR 4.262 4.387 + 0.125 TOTAL DISCHARGE cfs 6.6 5.9 - 0.7 TIME OF CONCENTRATION MIN 6.93 6.39 - 0.54 AREA ACRES 1.741 1 1.499 1 - 0.241 With the comparisons in mind, the overall downstream convergence, beyond the scope of the project's proposed development, the summary is as follows: OVERALL DOWNSTREAM SUMMARY DATA BASIN 1 BASIN 2 OVERALL IMPACT INTENSITY IN/HR - 0.021 + 0.125 + 0.538 TOTAL DISCHARGE cfs + 0.5 - 0.7 - 0.2 TIME OF CONCENTRATION MIN + 5.70 - 0.54 + 5.16 AREA ACRES + 0.241 - 0.241 0 Rev3. 10122118, Rev2. 8131118, Rev1: 3125118 2017-119 Walcott Lane - 3 - Original: November 14, 2017 HYDROLOGY REPORT fill 2 OF PM 12078 LD18-0135, LD18-0066 Votit is I i(Imi-ei iq Inland IN( 40345 WALCOTT LANE, TEMECULA, CA 92591 VEI 7.0 FEMA ANALYSIS Based on the FEMA Flood Insurance Study Mapping excerpt provided in Attachment 5 the project site is not designated in any Flooding by FEMA standards. 8.0 CONCLUSION The proposed project will grade portions of a vacant residential lot to construct a new single-family residence, garage, barn, corral and associated other residential design elements on a previously graded site designated for a single-family residence. In addition, the following statements apply to the project site: Drainage Pattern Alteration Statement: The proposed project does not substantially alter the existing drainage pattern of the site or local area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off -site due to no streams or rivers being located within or directly downstream of the project site. This project site will continue to discharge at the same general confluence points in the proposed condition as the existing condition. Flooding Statement: The proposed project does not substantially alter the existing flooding pattern of the site or area in a manner which would result in flooding on- or off -site, nor up- or - down stream. Housing in a 100-Year Flood Hazard Statement: The project does not propose housing in a FEMA mapped flood hazard area per the appropriate FEMA map. This map is provided for reference in Attachment 5. 9.0 REFERENCES The following references were utilized in the creation of this hydrology report: Brater & King, Handbook of Hydraulics, 6th ed. Design Handbook for Low Impact Development Best Management Practices, Riverside County Flood Control & Water Conservation District, September 2011. Hydrology Manual, Riverside County Flood Control & Water Conservation District, April 1978 Rev3: 10122118, Rev2: 8131118, Rev1: 3125118 2017-119 Walcott Lane - 4 - Original: November 14, 2017 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135, LD18-0066 V"(1,11tn'Jin-"inq 1111mid we 40345 WALCOTT LANE, TEMECULA, CA 92591 VEI 10.0 DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I am the engineer of work for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions code, and that the design is consistent with current standards. I understand that the check of project drawings and specifications by the agency is confined to a review only and does not relieve me, as engineer of work, of my responsibilities for project design. Wilfredo Ventura LFREDO S.D. No. 66532 Exp. 6-30-20 CIVIL 11.0 ATTACHMENTS The following attachment sections are provided for reference: 10/22/18 Date 11.1 ATTACHMENT 1: STANDARD EXCERPTS This attachment contains excerpts from the standards. Please refer to the attached references. 11.2 ATTACHMENT 2: EXISTING CONDITIONS CALCULATIONS This attachment contains the existing conditions calculations. The existing conditions calculations are summarized in Section 4 of the report. Calculations are provided here for reference. 11.3 ATTACHMENT 3: PROPOSED CONDITIONS CALCULATIONS This attachment contains the proposed conditions calculations. The proposed conditions calculations are summarized in Section 5 of the report. Calculations are provided here for reference. 11.4 ATTACHMENT 4: HYDROLOGY EXHIBITS The Existing Conditions Hydrology Exhibit, Proposed Conditions Hydrology Exhibit, and a copy of the project site's grading plan are provided here for reference. 11.5 ATTACHMENT 5: FEMA ANALYSIS The site -specific FEMA information is provided here for reference. Rev3: 10122118, Rev2. 8131118, Rev1. 3125118 2017-119 Walcott Lane -5- Original. November 14, 2017 HYDROLOGY REPORT �� PARCEL 2 OF PM 12078 LD18-0135, LD18-0066 VenhIra e,,,j;,,,,otin, Inland IN( 40345 WALCOTT LANE, TEMECULA, CA 92591 VEI ATTACHMENT 1: STANDARD EXCERPTS This attachment contains various excerpts from the Riverside County Flood Control & Water Conservation District Hydrology Manual (April 1978 edition). Please see the attached excerpts from the standards. Riverside County - SWCT Report Page 1 of 1 WQMP Project Report County of Riverside Stormwater Program Santa Ana River Watershed Geodatabase Tuesday, November 14, 2017 Note: The information provided in this report and on the Stormwater Geodatabase for the County of Riverside Stormwater Program is intended to provide basic guidance in the preparation of the applicant's Water Quality Management Plan (WQMP) and should not be relied upon without independent verification. Project Site Parcel Number(s): 957261011, 957170017, 957261010 Latitude/Longitude: 33.5343,-117.1049 Thomas Brothers Page: 959 Project Site Acreage: 2.33 Watershed(s): SANTA MARGARITA This Project Site Resides in the following Hydrologic Unit HUC Name - HUC Number (s) (HUC): Santa Gertudis Creek - 180703020406 The HUCs Contribute stormwater to the following 303d WBID Name - WBID Number listed water bodies and TMDLs which may include Santa Margarita River (Lower) - CAR9021100019980911161346 drainage from your proposed Project Site: Santa Margarita River (Upper) - CAR9022200020011001141050 Murrieta Creek - CAR9023200020010924152136 Santa Gertrudis Creek - CAR9024200020080825001546 These 303d listed Water bodies and TMDLs have the Bacterial Indicators - Enterococcus, Escherichia coli (E. coli), Fecal Coliform following Pollutants of Concern (POC): Metals/Metalloids - Copper, Iron, Manganese Nutrients - Nitrogen, Phosphorus, Total Nitrogen as N Pesticides - Chlorpyrifos Limitations on Infiltration: Project Site Onsite Soils Group(s) - C nown Groundwater Contamination Plumes within 1000' - No Adjacent Water Supply Wells(s) - No information available please contact your local water agency for more information. Your local contact agency is EASTERN MUNICIPAL W.D., RANCHO CALIFORNIA W.D.. Your local wholesaler contact agency is METROPOLITAN WATER DISTRICT. Environmentally Sensitive Areas within 200'(Fish and None Wildlife Habitat/Species): Environmentally Sensitive Areas within 200'(CVMSHCP): None Environmentally Sensitive Areas within 200'(WRMSHCP): Steven's Kangaroo Rat,Burrowing Owl Survey Required Area Groundwater elevation from Mean Sea Level: No Data 85th Percentile Design Storm Depth (in): 0.755 Groundwater Basin: TEMECULA VALLEY MSHCP/CVMSHCP Criteria Cell(s): No Data Retention Ordinance Information: No Data Studies and Reports Related to Project Site: IBI Scores - Southern Cal bulletin118_4-sc water_fact _3_7.11 Murrieta Creek Santa Margarita River Watershed Annual Watermaster Murrieta Creek/Murrieta Valley ADP Map 1 Murrieta Creek/Murrieta Valley ADP Map 2 Murrieta Creek/Murrieta Valley ADP Report SMR Annual Report 2009-10 http://rivco.pei-m itrack.com/report/report.asp?septic=&SECAREA=&PNUM=95726101 1... 1 1 / 14/2017 L 1000 900 800 700 *$ 500 d ck-400 d 350 v 300 c �� 250 J L v� 200 J 150 TC' I00 90 80 70 60 c E 50 o. 0 d a� C 0 35 Q 30 H ;_' 25 3 c E c_ 20 19 1.18 17 16 c 15 14 P 13 c 12 0 II v- 0 E 9 F i= 8 7 6 W LIMITATIONS: I. Maximum length =1000' 2. Maximum area = 10 Acres a H 500 400 300 c c 'a a _ 200 N E 100 0 - .r60 - 80 0 0 50 30 E n o o il) v c 20 A),y U a. 10 8 3 6 K Ai Undeveloped 0 3 Good Cover (D 2 w Undeveloped 0 c 1. Fair Cover .6 _ 5 1-4 RCFC 8& WCD HY�PGLGGY !\/JANUAL Undeveloped 0 .3 `2� / Poor Cover o 2 / o � Single Family LO (1/4 Acre) Commercial 0 (Pav a� p KEY L- H Tc-K-Tc' TC 5 —71 6 v` Q 7 c a� 8 0_ 0 9 a 10 U- II 12 in 14 N 15 w 16 s 17 E 18 s 19 20 ~ c 0 G 4- C 25 U c 0 U 0 30 0 EXAMPLE.' E i= (1) L =550', H =5.0, K = Single Family (1/4 Ac.) 35 Development , TC = 12.6 min. (2) L =550', H =5.0', K = Commercial 40 Development , Tc = 9.7 min. Reference: Bibliography item No. 35. PLATE D-3 w W 0— V/ W•• .� : U Z I W Z `W Z � m �O ^^d Pn.OrP •+amNr NMmPM nNm10 rP Nn N m aor d Y O t r♦ N o m �O ut ♦ M N N .+ O O P P m r �O �O In If1 a♦ a M N N + O o o P P U Z O W .r Y • • • • • M M MMN • • • • • NN N N N • • • • • N NNN^ • • • • • -•^—^... • • • • ^^^ ^^' • • • • • ^'-+— ^.+ • • • .-•.+^ W O Y 7 P W O J J W 2 Q oK 4 7 4 a m .O NOP m0` NInP mrr O +fl ♦Pln .+n Y1 a1 ♦M tmNm M MNN^ o O M Om -.00o P IA OIfl .+m PPmm r U1 NO m0 n nr D D Q W ^ w . . . . . . . . . . . . . . . . . . • . . . . � T N NNN r -. —.-+ .ti -• ^. — —....-. .-..+ — .ti -. — .-. '+ ^ 71 in W z a ¢ o o K •+ w J W fl <? V1 z ti m O` O -+ N M d •++^�.. In .p r m P .. .r .ti .ti^ O N♦ 10m NNNNN O N dm MMM-M .0.0. ♦ 1 mm1fl �O IO m O b rn mODm m C Z =1 H O Z Q �0 m .O If1 -+ N m r m N m a N N N M G N o P P o N If1 P N P m m o M 'p .+ m .-. Y o f n o 111^m Y1N omr If1 d MN^ Omn.Oa MMN^O Omn O .O I!1 ♦ d M M Z > G �O IA In ♦ d d ♦ MM M M MMM MN mN N NfV NN N N.ti—.- — ^--.- — N W O p m G O Z W R Of MO Wmz Nm ♦N Mnd MM m.p I(1 dM m!f w;;m N^oo P PP o m z mnrO 111 P♦P d O ♦ 1 M MM rm ^m O N.ti ^00 mwwom P mmm m 2- -. W Q. (A > a M M MM NNN N N NNN N.ti .+•+-. ^^ ^ ^--^ ----- W S J Z O In Q O Q Q W F H 0 .O r m P N d �Ic o N d�w O O. m O M O TH - m J M f J ^+-+^.+ ..-•.-+.+.ti NNNNN MMMMM d a Ln U1 to On nmm P Z c7 Z Y O< .-. r IA N .-. P m O V1 ♦ ♦ M N --� --� O P P m n n O IR IA I!1 a MMN N .-. o O O 2 Y a M MMM NNNNN NNNNN N^—^^ —^^'+-. ^— ^.. .+ .+... ... r.-• W p � O O N W 2 P o Q r M 1 P n n Ifl M^ o ,p n P N .O Pmr r.o o I(1 O.p N .0 lfl lff a ♦ P N O N r MMNN^ M O �D M^ -.^00o m N m♦ O PP mmm r d N P r r rr.o � • • • • • • • • • • • • • • • • T N NNN N .ti — .y -- ^. r ^ ^ ..• .ti ...r — -• ... -.. -- WnoJ <D mnmP "'=M-d nf^;mP ONd O NNNNNMMMM N♦m 00Cflo ♦ ♦ Ifl m.D l0n Ofl N to r m m OC Z 7 •• O Z a O ^ ♦ aP wQ n PPONo m.oln zw O d mNn NN ♦ Z. d Pln .tin f < > U o < O W .ti .ONP O o^QP aM.-.m n.p D ll1 a MN ^pP P m nn.p O IA d MM N.ti ^O J Z ^ Y U1 d d M M M MMM ni N N N M. N n� N N N .• -. -..ti ...... .... ,ti ........� •......� ._..ti Q r W p U Q a N W O C m Z W W a I(1 ♦ P ♦ P ♦ On M OMnN m O.•mI(1 M W �' 2 of d.•m.Om MN.tioP mmn r.p �p lna MM N NN.-.^ ^OP P m mmrr r • Q Y M MNN N N NNN .+ — .r — .-...+ ----- ^ ....-..r .-. .ti ... 11 1 U W < O N I Z O P O O N d� O m O N d. O m O M.00 I n o I n O U I N Q < C K f J Q Z NNNNN MMMMM W r nmm x 7 2 d in7 2 T U o < O W ♦ on ♦ N ^Pm r.o rva .+ I!1 ♦MNN In a Into ^oP mm Mr ryr M r �p �O II11fl mON�00 a t MNN m--.n M O -.00o Z .ti Y ♦ a MMM M N NNN NN N NN NN .-+— --.-.-- .ti W p � M O N f Z W or C o< Omr^m ml(1MN0 .prm.+d Pmr r.o mmm a O In In t ♦ ♦ -OP t MNN^+^ ^OooP Pmmmr MOmmM rr �D tt J Y N NNN N — ra .-. ^. -+ .-+ ..+ .-...+ .+ — -.— .-..ti ....-...... tl f W •-r In .O nmP O^NM a N.Or mP ON d �m ON d,Om oLn OmO oo m Om U1 cr Z NNNNN MMMMM ♦ ♦Ln Ln IO 0 rmm O Z RCFC a WCD HYDROLOGY ]MANUAL PLATE D-4.1 (4 of 6) RUNOFF INDEX NUMBERS OF HYDROLOGIC SOIL -COVER COMPLEXES FOR PERVIOUS AREAS -AMC II Cover Type (3) Quality of Soil Group A B C D Cover (2) NATURAL COVERS - Barren 78 86 91 93 (Rockland, eroded and graded land) Chaparrel, Broadleaf Poor 53 70 80 85 (Manzonita, ceanothus and scrub oak) Fair 40 63 75 81 Good 31 57 71 78 Chaparrel, Narrowleaf Poor 71 82 88 91 (Chamise and redshank) Fair 55 72 81 86 Grass, Annual or Perennial Poor 67 78 86 89 Fair 50 69 79 84 Good 38 61 74 80 Meadows or Cienegas Poor 63 77 85 88 (Areas with seasonally high water table, Fair 51 70 80 84 principal vegetation is sod forming grass) Good 30 58 72 78 Open Brush Poor 62 76 84 88 (Soft wood shrubs - buckwheat, sage, etc.) Fair 46 66 77 83 Good 41 63 75 81 Woodland Poor 45 66 77 83 (Coniferous or broadleaf trees predominate. Fair 36 60 73 79 Canopy density is at least 50 percent) Good 28 55 70 77 Woodland, Grass Poor 57 73 82 86 (Coniferous or broadleaf trees with canopy Fair 44 65 77 82 density from 20 to 50 percent) Good 33 58 72 79 URBAN COVERS - Residential or Commercial Landscaping Good 32 56 69 75 (Lawn, shrubs, etc.) Turf Poor 58 74 83 87 (Irrigated and mowed grass) Fair 44 65 77 82 Good 33 58 72 79 AGRICULTURAL COVERS - Fallow 76 85 90 92 (Land plowed but not tilled or seeded) R C F C a w C D RUNOFF INDEX NUMBERS FOR r�`tDR�L�JGY 1�/JANUAL PERVIOUS AREA PLATE D-5.5 0 of 2) RUNOFF INDEX NUMBERS OF HYDROLOGIC SOIL -COVER COMPLEXES FOR PERVIOUS AREAS -AMC II Cover Type (3) Quality of Soil Group A B I C D Cover (2) AGRICULTURAL COVERS (cont.) - Legumes, Close Seeded Poor 66 77 85 89 (Alfalfa, sweetclover, timothy, etc.) Good 58 72 81 85 Orchards, Deciduous See Note 4 (Apples, apricots, pears, walnuts, etc.) Orchards, Evergreen Poor 57 73 82 86 (Citrus, avocados, etc.) Fair 44 65 77 82 Good 33 58 72 79 Pasture, Dryland Poor 67 78 86 89 (Annual grasses) Fair 50 69 79 84 Good 38 61 74 80 Pasture, Irrigated Poor 58 74 83 87 (Legumes and perennial grass) Fair 44 65 77 82 Good 33 58 72 79 Row Crops Poor 72 81 88 91 (Field crops - tomatoes, sugar beets, etc.) Good 67 78 85 89 Small Grain Poor 65 76 84 88 (Wheat, oats, barley, etc.) Good 63 75 83 87 Vineyard See Note 4 Notes: 1. All runoff index (RI) numbers are for Antecedent Moisture Condition (AMC) II. 2. Quality of cover definitions: Poor -Heavily grazed or regularly burned areas. Less than 50 per- cent of the ground surface is protected by plant cover or brush and tree canopy. Fair -Moderate cover with 50 percent to 75 percent of the ground sur- face protected. Good -Heavy or dense cover with more than 75 percent of the ground surface protected. 3. See Plate C-2 for a detailed description of cover types. 4. Use runoff index numbers based on ground cover type. See discussion under "Cover Type Descriptions" on Plate C-2. 5. Reference Bibliography item 17. R C F C a W C O RUNOFF INDEX NUMBERS !-JYDROL OGY 1\/IANUAL FOR PERVIOUS AREA PLATE D-5.5(2of 2) ACTUAL IMPERVIOUS COVER Recommended Value Land Use (1) Range -Percent For Average Conditions-Percent(2 Natural or Agriculture 1 0 - 10 I 0 Single Family Residential: (3) 40,000 S. F. (1 Acre) Lots 10 - 25 20 20,000 S. F. (31 Acre) Lots 30 - 45 40 7,200 - 10,000 S. F. Lots 45 - 55 50 Multiple Family Residential: Condominiums 45 - 70 65 Apartments 65 - 90 80 Mobile Home Park 60 - 85 75 Commercial, Downtown 80 -100 90 Business or Industrial Notes: 1. Land use should be based on ultimate development of the watershed. Long range master plans for the County and incorporated cities should be reviewed to insure reasonable land use assumptions. 2. Recommended values are based on average conditions which may not apply to a particular study area. The percentage impervious may vary greatly even on comparable sized lots due to differences in dwelling size, improvements, etc. Landscape practices should also be considered as it is common in some areas to use ornamental grav- els underlain by impervious plastic materials in place of lawns and shrubs. A field investigation of a study area should always be made, and a review of aerial photos, where available may assist in estimat- ing the percentage of impervious cover in developed areas. 3. For typical horse ranch subdivisions increase impervious area 5 per- cent over the values recommended in the table above. RCFC a WCD r�`tDROLUGY 1\/JANUAL IMPERVIOUS COVER FOR DEVELOPED AREAS PLATE E-6.3 HYDROLOGY REPORT �� PARCEL 2 OF PM 12078 LD18-0135, LD18-0066 venter„ lnyo,B@l;Oy 1111,t„d IN( 40345 WALCOTT LANE, TEMECULA, CA 92591 VE ATTACHMENT 2: EXISTING CONDITIONS CALCULATIONS This attachment contains the existing conditions calculations. Please see the attached calculations. HYDROLOGY REPORT PARCEL 2 OF PM 12078 111 LD18-0135 WALCOTT LANE, TEMECULA, CA 92591 VL I EXISTING CONDITIONS, CONFLUENCE POINT A 100 YEAR DESIGN STORM EVENT Riverside County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2014 Version 9.0 Rational Hydrology Study Date: 11/16/17 File: 2017119d1exb1.out ------------------------------------------------------------------------ ********* Hydrology Study Control Information ********** English (in -lb) Units used in input data file ------------------------------------------------------------------------ Rational Method Hydrology Program based on Riverside County Flood Control & Water Conservation District 1978 hydrology manual Storm event (year) = 100.00 Antecedent Moisture Condition = 3 Standard intensity -duration curves data (Plate D-4.1) For the [ Murrieta,Tmc,Rnch Callorco ] area used. 10 year storm 10 minute intensity = 2.360(ln/Hr) 10 year storm 60 minute intensity = 0.880(ln/Hr) 100 year storm 10 minute intensity = 3.480(ln/Hr) 100 year storm 60 minute intensity = 1.300(In/Hr) Storm event year = 100.0 Calculated rainfall intensity data: 1 hour intensity = 1.300(ln/Hr) Slope of intensity duration curve = 0.5500 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.110 to Point/Station 1.210 **** INITIAL AREA EVALUATION **** Initial area flow distance = 100.000(Ft.) Top (of initial area) elevation = 1320.000(Ft.) Bottom (of initial area) elevation = 1299.000(Ft.) Difference in elevation = 21.000(Ft.) Slope = 0.21000 s(percent)= 21.00 TC = k(0.530)*[(lengthA3)/(elevation change)]^0.2 Warning: TC computed to be less than 5 min.; program is assuming the time of concentration is 5 minutes. Initial area time of concentration = 5.000 min. Rainfall intensity = 5.099(ln/Hr) fora 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.889 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 95.60 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 0.798(CFS) Total initial stream area = 0.176(Ac.) Pervious area fraction = 1.000 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 l,t., WALCOTT LANE, TEMECULA, CA 92591 V EI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.210 to Point/Station 1.220 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = 1.542(CFS) Depth of flow = 0.098(Ft.), Average velocity = 4.049(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.25 2 6.00 0.00 3 20.00 0.25 Manning's'N' friction factor = 0.020 Sub -Channel flow = 1.542(CFS) flow top width = 7.806(Ft.) velocity= 4.049(Ft/s) area = 0.381(Sq. Ft) Froude number = 3.230 Upstream point elevation = 1299.000(Ft.) Downstream point elevation = 1279.000(Ft.) Flow length = 120.000(Ft.) Travel time = 0.49 min. Time of concentration = 5.49 min. Depth of flow = 0.098(Ft.) Average velocity = 4.049(Ft/s) Total irregular channel flow = 1.542(CFS) Irregular channel normal depth above invert elev. = 0.098(Ft.) Average velocity of channel(s) = 4.049(Ft/s) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.889 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 95.60 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 4.842(ln/Hr) fora 100.0 year storm Subarea runoff = 1.411(CFS) for 0.328(Ac.) Total runoff = 2.209(CFS) Total area = 0.504(Ac.) Depth of flow = 0.112(Ft.), Average velocity = 4.430(Ft/s) End of computations, total study area = 0.50 (Ac.) The following figures may be used for a unit hydrograph study of the same area. Area averaged pervious area fraction(Ap) = 1.000 Area averaged RI index number = 89.0 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 WALCOTT LANE, TEMECULA, CA 92591 V E EXISTING CONDITIONS, CONFLUENCE POINT B 100 YEAR DESIGN STORM EVENT Riverside County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2014 Version 9.0 Rational Hydrology Study Date: 11/16/17 File: 2017119d1exb2.out ------------------------------------------------------------------------ ********* Hydrology Study Control Information ********** English (in -lb) Units used in input data file ------------------------------------------------------------------------ Rational Method Hydrology Program based on Riverside County Flood Control & Water Conservation District 1978 hydrology manual Storm event (year) = 100.00 Antecedent Moisture Condition = 3 Standard intensity -duration curves data (Plate D-4.1) For the [ Murrieta,Tmc,Rnch Callorco ] area used. 10 year storm 10 minute intensity = 2.360(ln/Hr) 10 year storm 60 minute intensity = 0.880(ln/Hr) 100 year storm 10 minute intensity = 3.480(ln/Hr) 100 year storm 60 minute intensity = 1.300(ln/Hr) Storm event year = 100.0 Calculated rainfall intensity data: 1 hour intensity = 1.300(ln/Hr) Slope of intensity duration curve = 0.5500 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.110 to Point/Station 2.210 **** INITIAL AREA EVALUATION **** Initial area flow distance = 76.000(Ft.) Top (of initial area) elevation = 1320.000(Ft.) Bottom (of initial area) elevation = 1318.000(Ft.) Difference in elevation = 2.000(Ft.) Slope = 0.02632 s(percent)= 2.63 TC = k(0.530)*[(lengthA3)/(elevation change) ]^0.2 Initial area time of concentration = 6.202 min. Rainfall intensity = 4.529(ln/Hr) fora 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.888 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 95.60 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 0.213(CFS) Total initial stream area = 0.053(Ac.) Pervious area fraction = 1.000 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 WALCOTT LANE, TEMECULA, CA 92591 VET ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.210 to Point/Station 2.220 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = 3.431(CFS) Depth of flow = 0.148(Ft.), Average velocity = 5.741(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.50 2 11.70 0.00 3 27.20 0.50 Manning's 'N' friction factor = 0.020 Sub -Channel flow = 3.431(CFS) flow top width = 8.063(Ft.) velocity= 5.741(Ft/s) area = 0.598(Sq.Ft) Froude number = 3.717 Upstream point elevation = 1318.000(Ft.) Downstream point elevation = 1270.000(Ft.) Flow length = 250.000(Ft.) Travel time = 0.73 min. Time of concentration = 6.93 min. Depth of flow = 0.148(Ft.) Average velocity = 5.741(Ft/s) Total irregular channel flow = 3.431(CFS) Irregular channel normal depth above invert elev. = 0.148(Ft.) Average velocity of channel(s) = 5.741(Ft/s) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.887 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 95.60 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 4.262(ln/Hr) fora 100.0 year storm Subarea runoff = 6.383(CFS) for 1.688(Ac.) Total runoff = 6.596(CFS) Total area = 1.741(Ac.) Depth of flow = 0.189(Ft.), Average velocity = 6.761(Ft/s) End of computations, total study area = 1.74 (Ac.) The following figures may be used for a unit hydrograph study of the same area. Area averaged pervious area fraction(Ap) = 1.000 Area averaged RI index number = 89.0 HYDROLOGY REPORT �/�� PARCEL 2 OF PM 12078 LD18-0135 vVillmo flujil,.win') Inkild we WALCOTT LANE, TEMECULA, CA 92591 VEI ATTACHMENT 3: PROPOSED CONDITIONS CALCULATIONS This attachment contains the proposed conditions calculations. Please see the attached calculations. HYDROLOGY REPORT f PARCEL 2 OF PM 12078 q1171 LD18-0135 V,nt oo hulln •emul 1111.110 w( WALCOTT LANE, TEMECULA, CA 92591 VLI PROPOSED CONDITIONS, CONFLUENCE POINT A 100 YEAR DESIGN STORM EVENT Riverside County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2014 Version 9.0 Rational Hydrology Study Date: 08/31/18 File:2017119b1d3.out ------------------------------------------------------------------------ ********* Hydrology Study Control Information ********** English (in -lb) Units used in input data file ------------------------------------------------------------------------ Rational Method Hydrology Program based on Riverside County Flood Control & Water Conservation District 1978 hydrology manual Storm event (year) = 100.00 Antecedent Moisture Condition = 3 Standard intensity -duration curves data (Plate D-4.1) For the [ Murrieta,Tmc,Rnch Callorco ] area used. 10 year storm 10 minute intensity = 2.360(ln/Hr) 10 year storm 60 minute intensity = 0.880(ln/Hr) 100 year storm 10 minute intensity = 3.480(In/Hr) 100 year storm 60 minute intensity = 1.300(In/Hr) Storm event year = 100.0 Calculated rainfall intensity data: 1 hour intensity = 1.300(ln/Hr) Slope of intensity duration curve = 0.5500 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.110 to Point/Station 1.210 **** INITIAL AREA EVALUATION **** Initial area flow distance = 100.000(Ft.) Top (of initial area) elevation = 1313.000(Ft.) Bottom (of initial area) elevation = 1312.000(Ft.) Difference in elevation = 1.000(Ft.) Slope = 0.01000 s(percent)= 1.00 TC = k(0.390)*[(lengthA3)/(elevation change)]^0.2 Initial area time of concentration = 6.181 min. Rainfall intensity = 4.538(ln/Hr) fora 100.0 year storm SINGLE FAMILY (1/4 Acre Lot) Runoff Coefficient = 0.883 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 88.00 Pervious area fraction = 0.500; Impervious fraction = 0.500 Initial subarea runoff = 0.669(CFS) Total initial stream area = 0.167(Ac.) Pervious area fraction = 0.500 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 �I WALCOTT LANE, TEMECULA, CA 92591 VEI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.210 to Point/Station 1.310 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = 0.839(CFS) Depth of flow = 0.082(Ft.), Average velocity = 5.003(Ft/s) ******* Irregular Channel Data *********** ----------------------------------------------------------------- Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.40 2 20.00 0.00 3 20.00 0.40 Manning's W friction factor = 0.013 ----------------------------------------------------------------- Sub-Channel flow = 0.839(CFS) flow top width = 4.095(Ft.) velocity= 5.003(Ft/s) area = 0.168(Sq.Ft) Froude number = 4.357 Upstream point elevation = 1312.000(Ft.) Downstream point elevation = 1295.970(Ft.) Flow length = 115.000(Ft.) Travel time = 0.38 min. Time of concentration = 6.56 min. Depth of flow = 0.082(Ft.) Average velocity = 5.003(Ft/s) Total irregular channel flow = 0.839(CFS) Irregular channel normal depth above invert elev. = 0.082(Ft.) Average velocity of channel(s) = 5.003(Ft/s) Adding area flow to channel SINGLE FAMILY (1/4 Acre Lot) Runoff Coefficient = 0.882 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 88.00 Pervious area fraction = 0.500; Impervious fraction = 0.500 Rainfall intensity = 4.390(ln/Hr) fora 100.0 year storm Subarea runoff = 0.329(CFS) for 0.085(Ac.) Total runoff = 0.998(CFS) Total area = 0.252(Ac.) Depth of flow = 0.087(Ft.), Average velocity = 5.225(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.310 to Point/Station 1.320 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = 1.420(CFS) Depth of flow = 0.144(Ft.), Average velocity = 2.492(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : HYDROLOGY REPORT PARCEL 2 OF PM 12078 , LD18-0135 WALCOTT LANE, TEMECULA, CA 92591 VEI Point number 'X' coordinate 'Y' coordinate 1 0.00 1.00 2 50.00 0.00 3 55.00 1.00 Manning's 'N' friction factor = 0.020 Sub -Channel flow = 1.420(CFS) flow top width = 7.917(Ft.) velocity= 2.492(Ft/s) area = 0.570(Sq.Ft) Froude number = 1.637 Upstream point elevation = 1295.970(Ft.) Downstream point elevation = 1289.000(Ft.) Flow length = 185.000(Ft.) Travel time = 1.24 min. Time of concentration = 7.80 min. Depth of flow = 0.144(Ft.) Average velocity = 2.492(Ft/s) Total irregular channel flow = 1.420(CFS) Irregular channel normal depth above invert elev. = 0.144(Ft.) Average velocity of channel(s) = 2.492(Ft/s) Adding area flow to channel SINGLE FAMILY (1/4 Acre Lot) Runoff Coefficient = 0.880 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 88.00 Pervious area fraction = 0.500; Impervious fraction = 0.500 Rainfall intensity = 3.992(ln/Hr) fora 100.0 year storm Subarea runoff = 0.749(CFS) for 0.213(Ac.) Total runoff = 1.747(CFS) Total area = 0.465(Ac.) Depth of flow = 0.156(Ft.), Average velocity = 2.624(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.320 to Point/Station 1.330 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Depth of flow = 0.074(Ft.), Average velocity = 7.829(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.50 2 0.00 0.00 3 3.00 0.00 4 3.00 0.50 Manning's 'N' friction factor = 0.013 Sub -Channel flow = 1.747(CFS) flow top width = 3.000(Ft.) velocity= 7.829(Ft/s) HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 '.nlrr -r llnrry n°.ri irJnlul I•,1l WALCOTT LANE, TEMECULA, CA 92591 VEI area = 0.223(Sq.Ft) Froude number = 5.059 Upstream point elevation = 1289.000(Ft.) Downstream point elevation = 1288.200(Ft.) Flow length = 5.000(Ft.) Travel time = 0.01 min. Time of concentration = 7.81 min. Depth of flow = 0.074(Ft.) Average velocity = 7.829(Ft/s) Total irregular channel flow = 1.747(CFS) Irregular channel normal depth above invert elev. = 0.074(Ft.) Average velocity of channel(s) = 7.829(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.330 to Point/Station 1.340 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 1288.200(Ft.) Downstream point elevation = 1288.000(Ft.) Channel length thru subarea = 10.000(Ft.) Channel base width = 2.500(Ft.) Slope or'Z' of left channel bank = 3.000 Slope or'Z' of right channel bank = 3.000 Manning's'N' = 0.037 Maximum depth of channel = 0.500(Ft.) Flow(q) thru subarea = 1.747(CFS) Depth of flow = 0.265(Ft.), Average velocity = 2.001(Ft/s) Channel flow top width = 4.090(Ft.) Flow Velocity = 2.00(Ft/s) Travel time = 0.08 min. Time of concentration = 7.90 min. Sub -Channel No. 1 Critical depth = 0.225(Ft.) Critical flow top width = 3.848(Ft.) Critical flow velocity= 2.450(Ft/s) Critical flow area = 0.713(Sq.Ft) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.340 to Point/Station 1.610 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Depth of flow = 0.131(Ft.), Average velocity = 4.661(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.50 2 13.70 0.00 3 22.00 0.50 Manning's 'N' friction factor = 0.020 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135,„, WALCOTT LANE, TEMECULA, CA 92591 V L 1 Sub -Channel flow = 1.747(CFS) flow top width = 5.743(Ft.) velocity= 4.661(Ft/s) area = 0.375(Sq.Ft) Froude number = 3.215 Upstream point elevation = 1288.000(Ft.) Downstream point elevation = 1282.000(Ft.) Flow length = 40.000(Ft.) Travel time = 0.14 min. Time of concentration = 8.04 min. Depth of flow = 0.131(Ft.) Average velocity = 4.661(Ft/s) Total irregular channel flow = 1.747(CFS) Irregular channel normal depth above invert elev. = 0.131(Ft.) Average velocity of channel(s) = 4.661(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.110 to Point/Station 1.610 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.465(Ac.) Runoff from this stream = 1.747(CFS) Time of concentration = 8.04 min. Rainfall intensity = 3.927(ln/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.410 to Point/Station 1.510 **** INITIAL AREA EVALUATION **** Initial area flow distance = 90.000(Ft.) Top (of initial area) elevation = 1313.000(Ft.) Bottom (of initial area) elevation = 1311.000(Ft.) Difference in elevation = 2.000(Ft.) Slope = 0.02222 s(percent)= 2.22 TC = k(0.390)*[(lengthA3)/(elevation change)]10.2 Initial area time of concentration = 5.051 min. Rainfall intensity = 5.071(ln/Hr) fora 100.0 year storm SINGLE FAMILY (1/4 Acre Lot) Runoff Coefficient = 0.884 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 88.00 Pervious area fraction = 0.500; Impervious fraction = 0.500 Initial subarea runoff = 0.278(CFS) Total initial stream area = 0.062(Ac.) Pervious area fraction = 0.500 HYDROLOGY REPORT 011 PARCEL 2 OF PM 12078 LD18-0135 VI-W - 11111if„•, rif i we WALCOTT LANE, TEMECULA, CA 92591 VEI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.510 to Point/Station 1.520 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = 0.390(CFS) Depth of flow = 0.156(Ft.), Average velocity = 12.822(Ft/s) ******* Irregular Channel Data *********** ----------------------------------------------------------------- Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 1.00 2 1.25 0.00 3 2.50 1.00 Manning's 'N' friction factor = 0.013 ----------------------------------------------------------------- Sub-Channel flow = 0.390(CFS) flow top width = 0.390(Ft.) velocity= 12.822(Ft/s) area = 0.030(Sq.Ft) Froude number = 8.090 Upstream point elevation = 1311.000(Ft.) Downstream point elevation = 1290.000(Ft.) Flow length = 40.000(Ft.) Travel time = 0.05 min. Time of concentration = 5.10 min. Depth of flow = 0.156(Ft.) Average velocity = 12.822(Ft/s) Total irregular channel flow = 0.390(CFS) Irregular channel normal depth above invert elev. = 0.156(Ft.) Average velocity of channel(s) = 12.822(Ft/s) Adding area flow to channel UNDEVELOPED (good cover) subarea Runoff Coefficient = 0.877 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 91.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 5.042(ln/Hr) fora 100.0 year storm Subarea runoff = 0.221(CFS) for 0.050(Ac.) Total runoff = 0.499(CFS) Total area = 0.112(Ac.) Depth of flow = 0.171(Ft.), Average velocity = 13.637(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.520 to Point/Station 1.530 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 1290.000(Ft.) Downstream point elevation = 1289.000(Ft.) Channel length thru subarea = 10.000(Ft.) Channel base width = 2.500(Ft.) Slope or'Z' of left channel bank = 3.000 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 Vr111ma fnginrrtinq Inland IN( WALCOTT LANE, TEMECULA, CA 92591 VE I Slope or'Z' of right channel bank = 3.000 Manning's'N' = 0.037 Maximum depth of channel = 0.500(Ft.) Flow(q) thru subarea = 0.499(CFS) Depth of flow = 0.081(Ft.), Average velocity = 2.238(Ft/s) Channel flow top width = 2.988(Ft.) Flow Velocity = 2.24(Ft/s) Travel time = 0.07 min. Time of concentration = 5.18 min. Sub -Channel No. 1 Critical depth = 0.104(Ft.) Critical flow top width = 3.121(Ft.) Critical flow velocity= 1.716(Ft/s) Critical flow area = 0.291(Sq. Ft) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.530 to Point/Station 1.610 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Depth of flow = 0.087(Ft.), Average velocity = 3.010(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.50 2 13.70 0.00 3 22.00 0.50 Manning's 'N' friction factor = 0.020 Sub -Channel flow = 0.499(CFS) flow top width = 3.820(Ft.) velocity= 3.010(Ft/s) area = 0.166(Sq.Ft) Froude number = 2.545 Upstream point elevation = 1289.000(Ft.) Downstream point elevation = 1282.000(Ft.) Flow length = 65.000(Ft.) Travel time = 0.36 min. Time of concentration = 5.54 min. Depth of flow = 0.087(Ft.) Average velocity = 3.010(Ft/s) Total irregular channel flow = 0.499(CFS) Irregular channel normal depth above invert elev. = 0.087(Ft.) Average velocity of channel(s) = 3.010(Ft/s) HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 WALCOTT LANE, TEMECULA, CA 92591 VEI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.410 to Point/Station 1.610 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.112(Ac.) Runoff from this stream = 0.499(CFS) Time of concentration = 5.54 min. Rainfall intensity = 4.821(ln/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 1.747 8.04 3.927 2 0.499 5.54 4.821 Largest stream flow has longer time of concentration Qp = 1.747 + sum of Qb la/lb 0.499 * 0.815 = 0.407 Qp = 2.153 Total of 2 streams to confluence: Flow rates before confluence point: 1.747 0.499 Area of streams before confluence: 0.465 0.112 Results of confluence: Total flow rate = 2.153(CFS) Time of concentration = 8.038 min. Effective stream area after confluence = 0.577(Ac.) HYDROLOGY REPORT PARCEL 2 OF PM 12078' LD 18-0135 WALCOTT LANE, TEMECULA, CA 92591 VE1 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.610 to Point/Station 1.620 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = 2.467(CFS) Depth of flow = 0.178(Ft.), Average velocity = 5.569(Ft/s) ******* Irregular Channel Data *********** ----------------------------------------------------------------- Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.50 2 7.00 0.00 3 14.00 0.50 Manning's 'N' friction factor = 0.013 ----------------------------------------------------------------- Sub-Channel flow = 2.467(CFS) flow top width = 4.980(Ft.) velocity= 5.569(Ft/s) area = 0.443(Sq. Ft) Froude number = 3.291 Upstream point elevation = 1282.000(Ft.) Downstream point elevation = 1279.000(Ft.) Flow length = 50.000(Ft.) Travel time = 0.15 min. Time of concentration = 8.19 min. Depth of flow = 0.178(Ft.) Average velocity = 5.569(Ft/s) Total irregular channel flow = 2.467(CFS) Irregular channel normal depth above invert elev. = 0.178(Ft.) Average velocity of channel(s) = 5.569(Ft/s) Adding area flow to channel UNDEVELOPED (good cover) subarea Runoff Coefficient = 0.870 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 91.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3.888(ln/Hr) fora 100.0 year storm Subarea runoff = 0.569(CFS) for 0.168(Ac.) Total runoff = 2.722(CFS) Total area = 0.745(Ac.) Depth of flow = 0.185(Ft.), Average velocity = 5.708(Ft/s) End of computations, total study area = 0.75 (Ac.) The following figures may be used for a unit hydrograph study of the same area. Area averaged pervious area fraction(Ap) = 0.646 Area averaged RI index number = 76.5 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135-.... lm., h"Jj„ 1�1 WALCOTT LANE, TEMECULA, CA 92591 VEI PROPOSED CONDITIONS, CONFLUENCE POINT B 100 YEAR DESIGN STORM EVENT Riverside County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2014 Version 9.0 Rational Hydrology Study Date: 08/31/18 File: 2017119b2d3.out ------------------------------------------------------------------------ ********* Hydrology Study Control Information ********** English (in -lb) Units used in input data file ------------------------------------------------------------------------ Rational Method Hydrology Program based on Riverside County Flood Control & Water Conservation District 1978 hydrology manual Storm event (year) = 100.00 Antecedent Moisture Condition = 3 Standard intensity -duration curves data (Plate D-4.1) For the [ Murrieta,Tmc,Rnch Callorco ] area used. 10 year storm 10 minute intensity = 2.360(ln/Hr) 10 year storm 60 minute intensity = 0.880(ln/Hr) 100 year storm 10 minute intensity = 3.480(ln/Hr) 100 year storm 60 minute intensity = 1.300(ln/Hr) Storm event year = 100.0 Calculated rainfall intensity data: 1 hour intensity = 1.300(ln/Hr) Slope of intensity duration curve = 0.5500 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.110 to Point/Station 2.120 **** INITIAL AREA EVALUATION **** Initial area flow distance = 25.000(Ft.) Top (of initial area) elevation = 1311.540(Ft.) Bottom (of initial area) elevation = 1300.700(Ft.) Difference in elevation = 10.840(Ft.) Slope = 0.43360 s(percent)= 43.36 TC = k(0.940)*[(lengthA3)/(elevation change)]^0.2 Warning: TC computed to be less than 5 min.; program is assuming the time of concentration is 5 minutes. Initial area time of concentration = 5.000 min. Rainfall intensity = 5.099(In/Hr) fora 100.0 year storm UNDEVELOPED (good cover) subarea Runoff Coefficient = 0.877 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 91.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 0.201(CFS) Total initial stream area = 0.045(Ac.) Pervious area fraction = 1.000 HYDROLOGY REPORT PARCEL 2 OF PM 12078 WALCOTT LANE, TEMECULA, CA 92591 VEI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.120 to Point/Station 2.130 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Depth of flow = 0.140(Ft.), Average velocity = 4.102(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 1.00 2 2.50 0.00 3 5.00 1.00 Manning's'N' friction factor = 0.013 Sub -Channel flow = 0.201(CFS) flow top width = 0.701(Ft.) velocity= 4.102(Ft/s) area = 0.049(Sq.Ft) Froude number = 2.731 Upstream point elevation = 1300.700(Ft.) Downstream point elevation = 1297.500(Ft.) Flow length = 65.000(Ft.) Travel time = 0.26 min. Time of concentration = 5.26 min. Depth of flow = 0.140(Ft.) Average velocity = 4.102(Ft/s) Total irregular channel flow = 0.201(CFS) Irregular channel normal depth above invert elev. = 0.140(Ft.) Average velocity of channel(s) = 4.102(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.130 to Point/Station 2.140 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 1206i500(Ft.) Downstream point/station elevation = 1288.500(Ft.) Pipe length = 65.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 0.201(CFS) Given pipe size = 8.00(ln.) Calculated individual pipe flow = 0.201(CFS) Normal flow depth in pipe = 1.19(ln.) Flow top width inside pipe = 5.69(ln.) Critical Depth = 2.48(In.) Pipe flow velocity = 6.24(Ft/s) Travel time through pipe = 0.17 min. Time of concentration (TC) = 5.44 min. HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 I iW11 Ww, j , WALCOTT LANE, TEMECULA, CA 92591 VLI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.140 to Point/Station 2.210 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 1288.500(Ft.) Downstream point elevation = 1288.000(Ft.) Channel length thru subarea = 10.000(Ft.) Channel base width = 2.500(Ft.) Slope or'Z' of left channel bank = 3.000 Slope or'Z' of right channel bank = 3.000 Manning's'N' = 0.037 Maximum depth of channel = 0.500(Ft.) Flow(q) thru subarea = 0.201(CFS) Depth of flow = 0.058(Ft.), Average velocity = 1.289(Ft/s) Channel flow top width = 2.850(Ft.) Flow Velocity = 1.29(Ft/s) Travel time = 0.13 min. Time of concentration = 5.57 min. Sub -Channel No. 1 Critical depth = 0.058(Ft.) Critical flow top width = 2.846(Ft.) Critical flow velocity= 1.307(Ft/s) Critical flow area = 0.154(Sq.Ft) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.210 to Point/Station 2.820 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = 1.614(CFS) Depth of flow = 0.176(Ft.), Average velocity = 3.841(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 1.00 2 6.00 0.00 3 27.00 1.00 Manning's 'N' friction factor = 0.020 Sub -Channel flow = 1.614(CFS) flow top width = 4.764(Ft.) velocity= 3.841(Ft/s) area = 0.420(Sq.Ft) Froude number = 2.279 Upstream point elevation = 1288.000(Ft.) Downstream point elevation = 1275.000(Ft.) Flow length = 190.000(Ft.) Travel time = 0.82 min. Time of concentration = 6.39 min. Depth of flow = 0.176(Ft.) Average velocity = 3.841(Ft/s) Total irregular channel flow = 1.614(CFS) Irregular channel normal depth above invert elev. = 0.176(Ft.) Average velocity of channel(s) = 3.841(Ft/s) HYDROLOGY REPORT�� PARCEL 2 OF PM 12078 LD18-0135 Venhira higincering Inland IN( WALCOTT LANE, TEMECULA, CA 92591 VET Adding area flow to channel UNDEVELOPED (good cover) subarea Runoff Coefficient = 0.874 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 91.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 4.455(ln/Hr) fora 100.0 year storm Subarea runoff = 2.773(CFS) for 0.712(Ac.) Total runoff = 2.974(CFS) Total area = 0.757(Ac.) Depth of flow = 0.222(Ft.), Average velocity = 4.475(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.110 to Point/Station 2.820 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area = 0.757(Ac.) Runoff from this stream = 2.974(CFS) Time of concentration = 6.39 min. Rainfall intensity = 4.455(ln/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.310 to Point/Station 2.320 **** INITIAL AREA EVALUATION **** Initial area flow distance = 20.000(Ft.) Top (of initial area) elevation = 1313.000(Ft.) Bottom (of initial area) elevation = 1303.000(Ft.) Difference in elevation = 10.000(Ft.) Slope = 0.50000 s(percent)= 50.00 TIC = k(0.940)*[(lengthA3)/(elevation change )]A0.2 Warning: TIC computed to be less than 5 min.; program is assuming the time of concentration is 5 minutes. Initial area time of concentration = 5.000 min. Rainfall intensity = 5.099(ln/Hr) fora 100.0 year storm UNDEVELOPED (good cover) subarea Runoff Coefficient = 0.877 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 91.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 0.179(CFS) Total initial stream area = 0.040(Ac.) Pervious area fraction = 1.000 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 W„lma oi(jine hunt Inland IN( WALCOTT LANE, TEMECULA, CA 92591 VEI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.320 to Point/Station 2.330 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Depth of flow = 0.152(Ft.), Average velocity = 3.089(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 1.00 2 2.50 0.00 3 5.00 1.00 Manning's'N' friction factor= 0.013 Sub -Channel flow = 0.179(CFS) flow top width = 0.761(Ft.) velocity= 3.089(Ft/s) area = 0.058(Sq.Ft) Froude number = 1.973 Upstream point elevation = 1303.000(Ft.) Downstream point elevation = 1302.000(Ft.) Flow length = 40.000(Ft.) Travel time = 0.22 min. Time of concentration = 5.22 min. Depth of flow = 0.152(Ft.) Average velocity = 3.089(Ft/s) Total irregular channel flow = 0.179(CFS) Irregular channel normal depth above invert elev. = 0.152(Ft.) Average velocity of channel(s) = 3.089(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.330 to Point/Station 2.340 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 1300.000(Ft.) Downstream point/station elevation = 1291.500(Ft.) Pipe length = 40.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 0.179(CFS) Given pipe size = 8.00(ln.) Calculated individual pipe flow = 0.179(CFS) Normal flow depth in pipe = 0.98(ln.) Flow top width inside pipe = 5.25(ln.) Critical Depth = 2.33(ln.) Pipe flow velocity = 7.29(Ft/s) Travel time through pipe = 0.09 min. Time of concentration (TC) = 5.31 min. HYDROLOGY REPORT �� PARCEL 2 OF PM 12078 LD18-0135 Venture engincerfnq InIand IN( WALCOTT LANE, TEMECULA, CA 92591 VEI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.340 to Point/Station 2.350 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 1291.500(Ft.) Downstream point elevation = 1291.000(Ft.) Channel length thru subarea = 10.000(Ft.) Channel base width = 2.500(Ft.) Slope or'Z' of left channel bank = 3.000 Slope or'Z' of right channel bank = 3.000 Manning's 'N' = 0.037 Maximum depth of channel = 0.500(Ft.) Flow(q) thru subarea = 0.179(CFS) Depth of flow = 0.054(Ft.), Average velocity = 1.234(Ft/s) Channel flow top width = 2.827(Ft.) Flow Velocity = 1.23(Ft/s) Travel time = 0.14 min. Time of concentration = 5.44 min. Sub -Channel No. 1 Critical depth = 0.053(Ft.) Critical flow top width = 2.816(Ft.) Critical flow velocity= 1.277(Ft/s) Critical flow area = 0.140(Sq.Ft) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.350 to Point/Station 2.820 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Depth of flow = 0.034(Ft.), Average velocity = 2.035(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.25 2 25.00 0.00 3 37.00 0.25 Manning's 'N' friction factor = 0.020 Sub -Channel flow = 0.179(CFS) flow top width = 5.102(Ft.) velocity= 2.035(Ft/s) area = 0.088(Sq.Ft) Froude number = 2.731 Upstream point elevation = 1291.000(Ft.) Downstream point elevation = 1275.000(Ft.) Flow length = 95.000(Ft.) Travel time = 0.78 min. Time of concentration = 6.22 min. Depth of flow = 0.034(Ft.) Average velocity = 2.035(Ft/s) Total irregular channel flow = 0.179(CFS) Irregular channel normal depth above invert elev. = 0.034(Ft.) Average velocity of channel(s) = 2.035(Ft/s) HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 Wntwo enylneerinn hiiand IN( WALCOTT LANE, TEMECULA, CA 92591 VEI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.310 to Point/satation 2.820 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 0.040(Ac.) Runoff from this stream = 0.179(CFS) Time of concentration = 6.22 min. Rainfall intensity = 4.522(ln/Hr) Program is now starting with Main Stream No. 3 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.410 to Point/Station 2.420 **** INITIAL AREA EVALUATION **** Initial area flow distance = 50.000(Ft.) Top (of initial area) elevation = 1312.520(Ft.) Bottom (of initial area) elevation = 1311.500(Ft.) Difference in elevation = 1.020(Ft.) Slope = 0.02040 s(percent)= 2.04 TIC = k(0.390)*[(lengthA3)/(elevation change)]^0.2 Warning: TIC computed to be less than 5 min.; program is assuming the time of concentration is 5 minutes. Initial area time of concentration = 5.000 min. Rainfall intensity = 5.099(ln/Hr) fora 100.0 year storm SINGLE FAMILY (1/4 Acre Lot) Runoff Coefficient = 0.885 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 88.00 Pervious area fraction = 0.500; Impervious fraction = 0.500 Initial subarea runoff = 0.262(CFS) Total initial stream area = 0.058(Ac.) Pervious area fraction = 0.500 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.420 to Point/Station 2.430 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 1310.500(Ft.) Downstream point/station elevation = 1287.000(Ft.) Pipe length = 85.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 0.262(CFS) Given pipe size = 8.00(ln.) Calculated individual pipe flow = 0.262(CFS) Normal flow depth in pipe = 1.11(ln.) Flow top width inside pipe = 5.52(ln.) Critical Depth = 2.83(ln.) Pipe flow velocity = 8.95(Ft/s) Travel time through pipe = 0.16 min. Time of concentration (TC) = 5.16 min. HYDROLOGY REPORT Willi 2 OF PM 12078 LD18-0135 V,.nI f iigiiweiin, Inlaiud we WALCOTT LANE, TEMECULA, CA 92591 VEI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.430 to Point/Station 2.440 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 1287.000(Ft.) Downstream point elevation = 1286.000(Ft.) Channel length thru subarea = 10.000(Ft.) Channel base width = 2.500(Ft.) Slope or'Z' of left channel bank = 3.000 Slope or'Z' of right channel bank = 3.000 Manning's'N' = 0.037 Maximum depth of channel = 0.500(Ft.) Flow(q) thru subarea = 0.262(CFS) Depth of flow = 0.056(Ft.), Average velocity = 1.767(Ft/s) Channel flow top width = 2.833(Ft.) Flow Velocity = 1.77(Ft/s) Travel time = 0.09 min. Time of concentration = 5.25 min. Sub -Channel No. 1 Critical depth = 0.068(Ft.) Critical flow top width = 2.907(Ft.) Critical flow velocity= 1.426(Ft/s) Critical flow area = 0.183(Sq.Ft) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.440 to Point/Station 2.820 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Depth of flow = 0.041(Ft.), Average velocity = 2.289(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.25 2 17.00 0.00 3 34.00 0.25 Manning's 'N' friction factor = 0.020 Sub -Channel flow = 0.262(CFS) flow top width = 5.575(Ft.) velocity= 2.289(Ft/s) area = 0.114(Sq. Ft) Froude number = 2.818 Upstream point elevation = 1286.000(Ft.) Downstream point elevation = 1275.000(Ft.) Flow length = 65.000(Ft.) Travel time = 0.47 min. Time of concentration = 5.73 min. Depth of flow = 0.041(Ft.) Average velocity = 2.289(Ft/s) Total irregular channel flow = 0.262(CFS) HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135, LD18-0066 ,', hi, nd M 40345 WALCOTT LANE, TEMECULA, CA 92591 VEI Irregular channel normal depth above invert elev. = 0.041(Ft.) Average velocity of channel(s) = 2.289(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.410 to Point/Station 2.820 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 3 Stream flow area = 0.058(Ac.) Runoff from this stream = 0.262(CFS) Time of concentration = 5.73 min. Rainfall intensity = 4.733(ln/Hr) Program is now starting with Main Stream No. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.510 to Point/Station 2.520 **** INITIAL AREA EVALUATION **** Initial area flow distance = 85.000(Ft.) Top (of initial area) elevation = 1312.750(Ft.) Bottom (of initial area) elevation = 1310.000(Ft.) Difference in elevation = 2.750(Ft.) Slope = 0.03235 s(percent)= 3.24 TC = k(0.390)*[(lengthA3)/(elevation change)]^0.2 Warning: TC computed to be less than 5 min.; program is assuming the time of concentration is 5 minutes. Initial area time of concentration = 5.000 min. Rainfall intensity = 5.099(ln/Hr) fora 100.0 year storm SINGLE FAMILY (1/4 Acre Lot) Runoff Coefficient = 0.885 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 88.00 Pervious area fraction = 0.500; Impervious fraction = 0.500 Initial subarea runoff = 0.392(CFS) Total initial stream area = 0.087(Ac.) Pervious area fraction = 0.500 HYDROLOGY REPORT �� PARCEL 2 OF PM 12078 LD18-0135, LD18-0066 venrura Engil""'Inq o,i, nd !r.' 40345 WALCOTT LANE, TEMECULA, CA 92591 VE ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.520 to Point/Station 2.610 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 1310.000(Ft.) Downstream point elevation = 1309.500(Ft.) Channel length thru subarea = 10.000(Ft.) Channel base width = 2.500(Ft.) Slope or'Z' of left channel bank = 3.000 Slope or'Z' of right channel bank = 3.000 Manning's 'N' = 0.037 Maximum depth of channel = 0.500(Ft.) HYDROLOGY REPORT �� PARCEL 2 OF PM 12078 LD18-0135 Vonha,, Irujin entiq Inland IN( WALCOTT LANE, TEMECULA, CA 92591 VEI Flow(q) thru subarea = 0.392(CFS) Depth of flow = 0.086(Ft.), Average velocity = 1.644(Ft/s) Channel flow top width = 3.019(Ft.) Flow Velocity = 1.64(Ft/s) Travel time = 0.10 min. Time of concentration = 5.10 min. Sub -Channel No. 1 Critical depth = 0.088(Ft.) Critical flow top width = 3.027(Ft.) Critical flow velocity= 1.615(Ft/s) Critical flow area = 0.243(Sq. Ft) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.610 to Point/Station 2.740 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = 0.955(CFS) Depth of flow = 0.132(Ft.), Average velocity = 3.925(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 0.50 2 3.00 0.00 3 14.00 0.50 Manning's'N' friction factor = 0.020 Sub -Channel flow = 0.955(CFS) flow top width = 3.692(Ft.) velocity= 3.925(Ft/s) area = 0.243(Sq.Ft) Froude number = 2.694 Upstream point elevation = 1309.500(Ft.) Downstream point elevation = 1285.800(Ft.) Flow length = 225.000(Ft.) Travel time = 0.96 min. Time of concentration = 6.06 min. Depth of flow = 0.132(Ft.) Average velocity = 3.925(Ft/s) Total irregular channel flow = 0.955(CFS) Irregular channel normal depth above invert elev. = 0.132(Ft.) Average velocity of channel(s) = 3.925(Ft/s) Adding area flow to channel UNDEVELOPED (good cover) subarea Runoff Coefficient = 0.875 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 91.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 4.589(ln/Hr) fora 100.0 year storm Subarea runoff = 1.060(CFS) for 0.264(Ac.) Total runoff = 1.452(CFS) Total area = 0.351(Ac.) Depth of flow = 0.154(Ft.), Average velocity = 4.359(Ft/s) HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 WALCOTT LANE, TEMECULA, CA 92591 VEI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.510 to Point/Station 2.740 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 4 in normal stream number 1 Stream flow area = 0.351(Ac. ) Runoff from this stream = 1.452(CFS) Time of concentration = 6.06 min. Rainfall intensity = 4.589(ln/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.710 to Point/Station 2.720 **** INITIAL AREA EVALUATION **** Initial area flow distance = 20.000(Ft.) Top (of initial area) elevation = 1313.000(Ft.) Bottom (of initial area) elevation = 1303.000(Ft.) Difference in elevation = 10.000(Ft.) Slope = 0.50000 s(percent)= 50.00 TC = k(0.940)*[(lengthA3)/(elevation change)]"0.2 Warning: TC computed to be less than 5 min.; program is assuming the time of concentration is 5 minutes. Initial area time of concentration = 5.000 min. Rainfall intensity = 5.099(ln/Hr) fora 100.0 year storm UNDEVELOPED (good cover) subarea Runoff Coefficient = 0.877 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 91.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 0.134(CFS) Total initial stream area = 0.030(Ac.) Pervious area fraction = 1.000 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.720 to Point/Station 2.730 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Depth of flow = 0.145(Ft.), Average velocity = 2.551(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 : Point number 'X' coordinate 'Y' coordinate 1 0.00 1.00 2 2.50 0.00 3 5.00 1.00 Manning's 'N' friction factor = 0.013 Sub -Channel flow = 0.134(CFS) flow top width = 0.725(Ft.) velocity= 2.551(Ft/s) area = 0.053(Sq.Ft) Froude number = 1.669 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 �V WALCOTT LANE, TEMECULA, CA 92591 VEI Upstream point elevation = 1303.000(Ft.) Downstream point elevation = 1302.000(Ft.) Flow length = 55.000(Ft.) Travel time = 0.36 min. Time of concentration = 5.36 min. Depth of flow = 0.145(Ft.) Average velocity = 2.551(Ft/s) Total irregular channel flow = 0.134(CFS) Irregular channel normal depth above invert elev. = 0.145(Ft.) Average velocity of channel(s) = 2.551(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.730 to Point/Station 2.740 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 1300.000(Ft.) Downstream point/station elevation = 1285.800(Ft.) Pipe length = 70.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 0.134(CFS) Given pipe size = 8.00(ln.) Calculated individual pipe flow = 0.134(CFS) Normal flow depth in pipe = 0.87(ln.) Flow top width inside pipe = 4.97(In.) Critical Depth = 2.01(In.) Pipe flow velocity = 6.58(Ft/s) Travel time through pipe = 0.18 min. Time of concentration (TC) = 5.54 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.710 to Point/Station 2.740 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 4 in normal stream number 2 Stream flow area = 0.030(Ac.) Runoff from this stream = 0.134(CFS) Time of concentration = 5.54 min. Rainfall intensity = 4.821(ln/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 1.452 6.06 4.589 2 0.134 5.54 4.821 Largest stream flow has longer time of concentration Qp = 1.452 + sum of Qb la/lb 0.134* 0.952 = 0.128 Qp = 1.580 Total of 2 streams to confluence: Flow rates before confluence point: 1.452 0.134 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD 18-0135 WALCOTT LANE, TEMECULA, CA 92591 Area of streams before confluence: 0.351 0.030 Results of confluence: Total flow rate = 1.580(CFS) Time of concentration = 6.057 min. Effective stream area after confluence = 0.381(Ac.) \',main ! mpnrv. 111,1 Inhwd IM VEI ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.740 to Point/Station 2.810 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 1285.800(Ft.) Downstream point elevation = 1285.500(Ft.) Channel length thru subarea = 10.000(Ft.) Channel base width = 2.500(Ft.) Slope or'Z' of left channel bank = 3.000 Slope or'Z' of right channel bank = 3.000 Manning's 'N' = 0.037 Maximum depth of channel = 0.500(Ft.) Flow(q) thru subarea = 1.580(CFS) Depth of flow = 0.224(Ft.), Average velocity = 2.227(Ft/s) Channel flow top width = 3.842(Ft.) Flow Velocity = 2.23(Ft/s) Travel time = 0.07 min. Time of concentration = 6.13 min. Sub -Channel No. 1 Critical depth = 0.211(Ft.) Critical flow top width = 3.766(Ft.) Critical flow velocity= 2.391(Ft/s) Critical flow area = 0.661(Sq. Ft) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.810 to Point/Station 2.820 **** IRREGULAR CHANNEL FLOW TRAVEL TIME **** Estimated mean flow rate at midpoint of channel = 2.125(CFS) Depth of flow = 0.125(Ft.), Average velocity = 3.788(Ft/s) ******* Irregular Channel Data *********** Information entered for subchannel number 1 . Point number 'X' coordinate 'Y' coordinate 1 0.00 0.25 2 8.00 0.00 3 18.00 0.25 Manning's'N' friction factor = 0.020 Sub -Channel flow = 2.125(CFS) flow top width = 8.989(Ft.) velocity= 3.788(Ft/s) area= 0.561(Sq.Ft) Froude number = 2.672 Upstream point elevation = 1285.500(Ft.) Downstream point elevation = 1275.000(Ft.) Flow length = 100.000(Ft.) HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 t WALCOTT LANE, TEMECULA, CA 92591 VEI Travel time = 0.44 min. Time of concentration = 6.57 min. Depth of flow = 0.125(Ft.) Average velocity = 3.788(Ft/s) Total irregular channel flow = 2.125(CFS) Irregular channel normal depth above invert elev. = 0.125(Ft.) Average velocity of channel(s) = 3.788(Ft/s) Adding area flow to channel UNDEVELOPED (good cover) subarea Runoff Coefficient = 0.874 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 3) = 91.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 4.387(In/Hr) fora 100.0 year storm Subarea runoff = 1.008(CFS) for 0.263(Ac.) Total runoff = 2.588(CFS) Total area = 0.644(Ac.) Depth of flow = 0.134(Ft.), Average velocity = 3.979(Ft/s) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.510 to Point/Station 2.820 **** CONFLUENCE OF MAIN STREAMS **** The following data inside Main Stream is listed: In Main Stream number: 4 Stream flow area = 0.644(Ac.) Runoff from this stream = 2.588(CFS) Time of concentration = 6.57 min. Rainfall intensity = 4.387(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 2.974 6.39 4.455 2 0.179 6.22 4.522 3 0.262 5.73 4.733 4 2.588 6.57 4.387 Largest stream flow has longer or shorter time of concentration Qp = 2.974 + sum of Qb la/lb 0.179* 0.985 = 0.176 Qb la/Ib 0.262 * 0.941 = 0.246 Qa Tb/Ta 2.588 * 0.973 = 2.517 Qp = 5.914 Total of 4 main streams to confluence: Flow rates before confluence point: 2.974 0.179 0.262 2.588 Area of streams before confluence: HYDROLOGY REPORT ��� PARCEL 2 OF PM 12078 LD18-0135 vr111m., Impne,-finQ in1.ind we WALCOTT LANE, TEMECULA, CA 92591 VEI 0.757 0.040 0.058 0.644 Results of confluence: Total flow rate = 5.914(CFS) Time of concentration = 6.391 min. Effective stream area after confluence = 1.499(Ac.) End of computations, total study area = 1.50 (Ac.) The following figures may be used for a unit hydrograph study of the same area. Area averaged pervious area fraction(Ap) = 0.952 Area averaged RI index number = 79.5 HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD 18-0135 WALCOTT LANE, TEMECULA, CA 92591 \-ntur,i I ngi,w,-nnq InIand IN( VEI ATTACHMENT 4: EXHIBITS This attachment contains the vicinity map, the existing condition exhibit, and the proposed condition exhibits. Please see the attached exhibits. od ti d ON 30` iS 0131JdRine NI Uoj VA4 v oy v �b b'L ddd� o sg - w QD vZ � Cn °�' N Q n c;) U W W Q (/7 Z a Q a- a — z s�r YNEZ RD -71�iy HYDROLOGY REPORT PARCEL 2 OF PM 12078 LD18-0135 Ventura Engineering Inland IN( WALCOTT LANE, TEMECULA, CA 92591 VET ATTACHMENT 5: FEMA ANALYSIS This attachment contains the project site's FEMA determination exhibit. Please see the attached documents. W r g -- W CL O LL Q a Nm O DI O N C FW- w I v S O a 0 � F � a O d W Q t[fa mCD N Q 0 W C.)zl �$ u w U�Q LL0, o Z W o-. O p o a x Z Q x 0 'o W O ��,v Ja > J (s7Z W2 z dog cn LL xu� ae 0 0 �tw d AM Q O ve t WONa ve 0 mQ Y�E ' mo �,p gV a' () W o UJ 00 H o u dcm5° mm.. N ELaoE L Z .Q m r N Q N OO�YLL aci « m 0 E'a U Z LO ui °° y N Q J ° m vv0,6 -om o w a 0 F - v cCD 3 Z O V O C) W= LL w N N YJ (n .E 0 u ° m O m E ELL �Jv Lu � W _ y a �b u� Gzi c c ° J 3 LL o tag a ,2 i &Oto T m F- 'E'n o E �i= z '"g Qti=gy°y 0 0L N ff m�3r� N 0 v 0 C ° ® v ® v °°ELL-° C 0 ° x m b c ° E N m - N N m m ° `o a 4ow