HomeMy WebLinkAbout2021-28 CC Resolution RESOLUTION NO. 2021-28
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TEMECULA ADOPTING A LIST OF PROJECTS FOR
FISCAL YEAR 2021-22 FUNDED BY SB 1: THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017
THE CITY COUNCIL OF THE CITY OF TEMECULA DOES HEREBY RESOLVE AS
FOLLOWS:
Section 1. Recitals. The City Council hereby finds,determines and declares that:
A. Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statutes of 2017)was passed by the Legislature and Signed into law by the Governor in April 2017
in order to address the significant multi-modal transportation funding shortfalls statewide; and
B. SB 1 includes accountability and transparency provisions that will ensure the
residents of the City of Temecula are aware of the projects proposed for funding in our community
and which projects have been completed each fiscal year; and
C. The City of Temecula must adopt by resolution a list of projects proposed to receive
fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by
SB 1, which must include a description and the location of each proposed project, a proposed
schedule for the project's completion, and the estimated useful life of the improvement; and
D. The City of Temecula will receive an estimated $2,224,694 in RMRA funding in
Fiscal Year 2021-22 from SB 1; and
E. This is the fifth year in which the City of Temecula is receiving SB 1 funding and
will enable the City to continue essential road maintenance and rehabilitation projects,that would
not have otherwise been possible without SB 1; and
F. The City of Temecula used a Pavement Management Program (PMP) to develop
the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective
projects that also meet the communities priorities for transportation investment; and
G. The funding from SB 1 will help the City of Temecula maintain and rehabilitate
three major streets/roads in the City this year and a number of similar projects into the future;and
H. The 2018 California Statewide Local Streets and Roads Needs Assessment found
that the City of Temecula streets and roads are in an"good"condition and this revenue will help
the City increase the overall quality of our road system and bring"at risk"streets/roads into
"good"condition over the next decade; and
I. The SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits statewide.
Section 2. Adoption of the SB 1 Project List for Fiscal Year 2021-22
A. The foregoing recitals are true and correct.
B. The following list of newly proposed projects will be funded in-part or solely with
Fiscal Year 2021-22 Road Maintenance and Rehabilitation Account revenues:
1. Project Title: Citywide Pavement Rehabilitation Program—Butterfield Stage
Road and Pauba Road
Project Description: The roadway rehabilitation shall generally consist of 2
to 3 inches of cold milling and placement of 2 to 3 inches of asphalt concrete.
The project also includes the removal and replacement of existing roadway
striping, pavement markings, and traffic signal loops, the removal and
reconstruction of existing pedestrian ramps in order to comply with current
ADA standards, and adjustment of existing utilities to grade.
Project Location: Roadway rehabilitation of the full width of Pauba Road
approximately from Margarita Road to Butterfield Stage Road, and the full
width of Butterfield Stage Road from 405 feet south of De Portola Road to
230 feet south of Rancho California Road.
Estimated Project Schedule: Start(07/2021)—Completion(02/2022)based
on the component being funded with RMRA funds
Estimated Project Useful Life: 10-20 years
2. Project Title: Pavement Rehabilitation Program—Citywide-Winchester
Road
Project Description: The roadway rehabilitation shall generally consist of 2
to 4 inches of cold milling and placement of 2 to 4 inches of asphalt concrete.
The project also includes the removal and replacement of existing roadway
striping,pavement markings, and traffic signal loops, the removal and
reconstruction of existing pedestrian ramps in order to comply with current
ADA standards, and adjustment of existing utilities to grade.
Project Location: Roadway rehabilitation of the full width of Winchester
Road from Jefferson Avenue to Diaz Road
Estimated Project Schedule: Start(02/2022)—Completion(07/2022)based
on the component being funded with RMRA funds
Estimated Project Useful Life: 10-20 years
Section 3. Certification. The City Clerk shall certify to the adoption of this
Resolution.
2
PASSED, APPROVED, AND ADOPTED by the City Council of the City of Temecula
this 25`h day of May, 2021.
Maryann Edwards, Mayor
ATTEST.
Randi ohl, City Clerk
[SEAL]
3
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss
CITY OF TEMECULA )
I, Randi Johl, City Clerk of the City of Temecula, do hereby certify that the foregoing
Resolution No. 2021-28 was duly and regularly adopted by the City Council of the City of
Temecula at a meeting thereof held on the 25`h day of May, 2021, by the following vote:
AYES: 5 COUNCIL MEMBERS: Alexander, Edwards, Rahn, Schwank,
Stewart
NOES: 0 COUNCIL MEMBERS: None
ABSTAIN: 0 COUNCIL MEMBERS: None
ABSENT: 0 COUNCIL MEMBERS: None
Randi Johl, City Clerk
4