PC RESOLUTION NO. 2004-054
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TEMECULA APPROVING PLANNING APPLICATION
NO. PA04-0149, A DEVELOPMENT PLAN TO CONSTRUCT A
13,716 SQUARE FOOT INDUSTRIAL AND OFFICE BUILDING
ON 0.90 ACRES LOCATED AT 42103 RIO NEDO, KNOWN AS
ASSESSOR PARCEL NO. 909-252-009.
WHEREAS, Thomas Fanale filed Planning Application No. PA04-0149 (Development
Plan Application), in a manner in accordance with the City of Temecula General Plan and
Development Code;
WHEREAS, the Application was processed including, but not limited to a public notice,
in the time and manner prescribed by State and local law;
WHEREAS, the Planning Commission, at a regular meeting, considered the Application
on October 20, 2004, at a duly noticed public hearing as prescribed by law, at which time the
City staff and interested persons had an opportunity to and did testify either in support or in
opposition to this matter;
WHEREAS, at the conclusion of the Commission hearing and after due consideration of
the testimony, the Commission approved the Application subject to and based upon the findings
set forth hereunder;
WHEREAS, all legal preconditions to the adoption of this Resolution have occurred.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF TEMECULA
DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1. That the above recitations are true and correct and are hereby
incorporated by reference.
Section 2. Findinqs. The Planning Commission, in approving the Application, hereby
makes the following findings as required by Section 17.05.010F of the Temecula Municipal
Code:
A. The proposed use is in conformance with the General Plan for Temecula and with
all applicable requirements of state law and other ordinances of the city.
The proposal is consistent with the land use designation and policies reflected for
Business Park (BP) development in the City of Temecula General Plan. The General
Plan has listed the proposed uses, including the light manufacturing, warehouse, and
office, as typical uses in the Business Park designation. The proposed project is
consistent with the use regulations outlined and conditioned by the Building Department
and Fire Prevention Bureau to comply with all applicable Building and Fire Codes.
B. The overall development of the land is designed for the protection of the public
health, safety, and general welfare.
The architecture proposed for the building meets the architectural requirements as
stated in the Design Guidelines. The proposed building architecture and building
R:ID Pl2004\04.0149 Beacon Industrial BuildinglPC RESOLUTION AND COActo,
I
materials have been found to be compatible with the adjacent buildings. The varying
building shapes and offsets provided serve to break up the massing of the building. The
proposed architecture complements and enhances the visual character along Rio Nedo
and will be a welcome addition to the existing buildings.
The project has been reviewed for, and as conditioned, has been found to be consistent
with, all applicable policies, guidelines, standards and regulations intended to ensure
that the development will be constructed and function in a manner consistent with the
public health, safety and welfare.
Section 3. Environmental Compliance. The project will have no significant
environmental impacts and has been found to be categorically exempt pursuant to Section
15332 (In-Fill Development Project) of the California Environmental Quality Act Guidelines,
Section 4. Conditions. The City of Temecula Planning Commission hereby
conditionally approves the Application, a request to construct, operate and establish a one story,
13,716 square foot square foot one story industrial warehouse and office building with
conditions of approval as set forth on Exhibit A, attached hereto, and incorporated herein by this
reference together with any and all necessary conditions that may be deemed necessary.
Section 5. PASSED, APPROVED AND ADOPTED by the City of Temecula
Planning Commission this 20th day of October 2004.
ATTEST:
~?~.¿ V ~ yk
D ble Ubnoske, Secretary
,~' :)~~~[;EA~],<~cj~ \
,,~' ~ '-'~':~~\-./::¡~\
C'" ,- ' ',,', :~~i
," , : ';/
-';~';:""- <'- - Jfr:;¡
",' /
R:\D 1'\2004\04.0149 Beacon Indusuial BuiJding\PC RESOLUTION AND COAdoc
2
STATE OF CALIFORNIA
COUNTY OF RIVERSIDE
CITY OF TEMECULA
)
) ss
)
I, Debbie Ubnoske, Secretary of the Temecula Planning Commission, do hereby certify
that PC Resolution No. 2004-054 was duly and regularly adopted by the Planning Commission
of the City of Temecula at a regular meeting thereof held on the 20th day of October 2004, by
the following vote of the Commission:
AYES: 5
NOES: 0
ABSENT: 0
ABSTAIN: 0
PLANNING COMMISSIONERS:
Chiniaeff, Guerriero, Mathewson,
Olhasso, Telesio
PLANNING COMMISSIONERS:
PLANNING COMMISSIONERS:
None
None
PLANNING COMMISSIONERS:
None
/'¡2Jþ~' U ~~ SAc-
Debbie Ubnoske, Secretary
R\D Pl2004\04,OI49 Beacon Industrial BuildiuglPC RESOLUTION AND COA,doc
3
EXHIBIT A
FINAL CONDITIONS OF APPROVAL
R:ID Pl2004\04-0149 Beacon Indust<ial BuildinglPC RESOLUTION AND COA,doc
4
EXHIBIT A
CITY OF TEMECULA
CONDITIONS OF APPROVAL
Planning Application No.:
Project Description:
PA04-0149
A Development Plan to construct a 13,716
square foot industrial warehouse and office
building on 0.90 acres located at 42103 Rio
Nedo, generally located on the west side of
Diaz Road.
DIF Category:
MSHCP Category:
Business Park/Industrial
Industrial
Assessor's Parcel No.:
909-252-009
Approval Date:
Expiration Date:
October 20, 2004
October 20, 2006
PLANNING DEPARTMENT
Within Forty-Eight (48) Hours of the Approval of this Project
1.
The applicant shall deliver to the Planning Department a cashier's check or money order
made payable to the County Clerk in the amount of Sixty-Four Dollars ($64,00) for the
County administrative fee, to enable the City to file the Notice of Exemption required
under Public Resources Code Section 21108(b) and California Code of Regulations
Section 15075. II within said forty-eight (48) hour period the applicant has not delivered
to the Planning Department the check as required above, the approval for the project
granted shall be void by reason of failure of condition [Fish and Game Code Section
711.4(c)].
General Requirements
2,
The applicant and owner of the real property subject to this condition shall hereby agree
to indemnify, protect, hold harmless, and defend the City with Legal Counsel of the City's
own selection from any and all claims, actions, awards, judgments, or proceedings
against the City to attack, set aside, annul, or seek monetary damages resulting, directly
or indirectly, from any action in furtherance of and the approval of the City, or any
agency or instrumentality thereof, advisory agency, appeal board or legislative body
including actions approved by the voters of the City, concerning the Planning
Application. The City shall be deemed for purposes of this condition, to include any
agency or instrumentality thereof, or any of its elected or appointed officials, officers,
employees, consultants, contractors, legal counsel, and agents. City shall promptly notify
both the applicant and landowner of any claim, action, or proceeding to which this
condition is applicable and shall further cooperate fully in the defense of the action. The
City reserves the right to take any and all action the City deems to be in the best interest
of the City and its citizens in regards to such defense.
R:ID Pl2004\04-0149 Beacon IndusuiaI Building\PC RESOLUTION AND COA,doc
5
3.
4.
5.
6.
7.
The permittee shall obtain City approval for any modifications or revisions to the
approval of this development plan.
This approval shall be used within two (2) years of the approval date; otherwise, it shall
become null and void. By use is meant the beginning of substantial construction
contemplated by this approval within the two (2) year period, which is thereafter diligently
pursued to completion, or the beginning of substantial utilization contemplated by this
approval.
The Director of Planning may, upon an application being filed within thirty days prior to
expiration, and for good cause, grant a time extension of up to three one-year
extensions of time, one year at a time.
The development of the premises shall substantially conform to the approved site plan
and elevations contained on file with the Planning Department.
Landscaping installed for the project shall be continuously maintained to the reasonable
satisfaction of the Planning Director. If it is determined that the landscaping is not being
maintained, the Planning Director shall have the authority to require the property owner
to bring the landscaping into conformance with the approved landscape plan. The
continued maintenance of all landscaped areas shall be the responsibility' of the
developer or any successors in interest.
8.
All mechanical and roof equipment shall be fully screened from public view by being
placed below the surrounding parapet wall.
9.
Trash enclosures shall be provided to house all trash receptacles utilized on the site.
10.
The construction landscape drawings shall indicate coordination and grouping of all
utilities, which are to be screened from view per applicable City Codes and guidelines.
11.
II at any time during excavationlconstruction of the site, archaeologicallcultural
resources, or any artifacts or other objects which reasonably appears to be evidence of
cultural or archaeological resource are discovered, the property owner shall immediately
advise the City of such and the City shall cause all further excavation or other
disturbance of the affected area to immediately cease. The Director of Planning at
hislher sole discretion may require the property to deposit a sum of money it deems
reasonably necessary to allow the City to consult andlor authorize an independent, fully
qualified specialist to inspect the site at no cost to the City, in order to assess the
significance of the find. Upon determining that the discovery is not an
archaeologicallcultural resource, the Director of Planning shall notify the property owner
of such determination and shall authorize the resumption of work. Upon determining
that the discovery is an archaeologicallcultural resource, the Director of Planning shall
notify the property owner that no further excavation or development may take place until
a mitigation plan or other corrective measures have been approved by the Director of
Planning.
The applicant shall sign both copies of the final conditions of approval that will be
provided by the Planning Department staff, and return one signed set to the Planning
Department for their files.
12.
R:ID Pl2004\04-0I49 Beacon Industrial BuildingIPC RESOLUTION AND COA,doc
6
13.
14.
15.
16.
A separate building permit shall be required for all signage.
Lighting shall be consistent with Ordinance No. 655 for the regulation of light pollution.
The condition of approval specified in this resolution, to the extent specific items,
materials, equipment, techniques, finishes or similar matters are specified, shall be
deemed satisfied by staffs prior approval of the use or utilization of an item, material,
equipment, finish or technique that City staff determines to be the substantial equivalent
of that required by the condition of approval. Staff may elect to reject the request to
substitute, in which case the real party in interest may appeal, after payment of the
regular cost of an appeal, the decision to the Planning Commission for its decision.
Material Finish and Color
Main Body texture and color Vista Paint #774 Storm Grey - Matte
Accent Color Vista Paint #772 Norway Pine - Matte
Accent Color Vista Paint #555 Red Grey - Matte
Glass ]4" green reflective glass
All conditions shall be complied with prior to any occupancy or use allowed by this
Development Plan.
Prior to Issuance of Grading Permits
17.
18.
19.
20.
21.
22.
Provide the Planning Department with a copy of the underground water plans and
electrical plans for verification of proper placement of transformer(s) and double detector
check prior to final agreement with the utility companies.
The applicant shall submit a photometric plan, including the parking lot to the Planning
Department, which meets the requirements of the Development Code and the Palomar
Lighting Ordinance. The parking lot light standards shall be placed in such a way as to
not adversely impact the growth potential of the parking lot trees.
A copy of the Grading Plan shall be submitted and approved by the Planning
Department.
The applicant shall comply with the provisions of Chapter 8.24 of the Temecula
Municipal Code (Habitat Conservation) by paying the appropriate fee set forth in that
Ordinance or by providing documented evidence that the fees have already been paid.
Prior to Issuance of Building Permit
A Consistency Check fee shall be paid per the City of Temecula Fee Schedule.
Three (3) copies of Construction Landscaping and Irrigation Plans shall be reviewed and
approved by the Planning Department. These plans shall conform to the approved
conceptual landscape plan, or as amended by these conditions. The location, number,
genus, species, and container size of the plants shall be shown, The plans shall be
consistent with the Water Efficient Ordinance. The plans shall be accompanied by the
following items:
R:\D 1'\2004\04-0149 Beacon Industrial BuildingIPC RESOLUTION AND COA,doc
7
23.
24.
25.
a,
Appropriate filing fee (per the City of Temecula Fee Schedule at time of
submittal).
Provide a minimum five foot wide planter to be installed at the perimeter of all
parking areas, Curbs, walkways, etc. are not to infringe on this area.
Provide an agronomic soils report with the construction landscape plans.
One (1) copy of the approved grading plan.
Water usage calculations per Chapter 17.32 of the Development Code (Water
Efficient Ordinance).
Total cost estimate of plantings and irrigation (in accordance with approved plan).
A landscape maintenance program shall be submitted for approval, which details
the proper maintenance of all proposed plant materials to assure proper growth
and landscape development for the long-term esthetics of the property. The
approved maintenance program shall be provided to the landscape maintenance
contractor who shall be responsible to carry out the detailed program.
b.
c.
d.
e.
f.
g.
All utilities and light poles shall be shown and labeled on the landscape plans and
appropriate screening shall be provided. A three-foot (3.0') clear zone shall be provided
around fire check detectors as required by the Fire Department before starting the
screen. Group utilities together in order to reduce intrusion.
An appropriate method for screening the gas meters and other externally mounted utility
equipment shall be reviewed and approved by the Planning Department.
The Planning Director shall approve the Construction Landscaping and Irrigation Plans.
The construction plans shall indicate that all roof hatches shall be painted "International
Orange".
Prior to Building Occupancy
26.
27.
28.
29.
The property owner shall fully install all required landscaping and irrigation, and submit a
landscape maintenance bond in a form and amount approved by the Planning
Department for a period of one-year from the date of the first occupancy permit.
Prior to building occupancy, all site improvements including but not limited to parking
areas and striping shall be installed.
All of the foregoing conditions shall be complied with prior to occupancy or any use
allowed by this permit.
FIRE DEPARTMENT
The following are the Fire Department Conditions of Approval for this project. All questions
regarding the meaning of these conditions shall be referred to the Fire Prevention Bureau.
30.
Final fire and life safety conditions will be addressed when building plans are reviewed
by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the
California Building Code (CBC), California Fire Code (CFC), and related codes which
are in force at the time of building plan submittal.
R:\D 1'\2004\04-0149 Beacon Industrial BuildingIPC RESOLUTION AND COA.doc
8
31.
32.
33.
34.
35.
36.
37.
The Fire Prevention Bureau is required to set a minimum fire flow for the remodel or
construction of all commercial buildings per CFC Appendix liLA, Table A-III-A-1.The
developer shall provide for this project, a water system capable of delivering 1625 GPM
at 20 PSI residual operating pressure, plus an assumed sprinkler demand of 1850 GPM
for a total fire flow of 3475 GPM with a three hour duration. The required fire flow may
be adjusted during the approval process to reflect changes in design, construction type,
or automatic fire protection measures as approved by the Fire Prevention Bureau. The
Fire Flow as given above has taken into account all information as provided. (CFC
903.2, Appendix III-A)
The Fire Prevention Bureau is required to set minimum fire hydrant distances per CFC
Appendix III-B, Table A-III-B-1. A minimum of two hydrants, in a combination of on-site
and off-site (6" x 4" x 2-2 1/2" outlets) shall be located on Fire Department access roads
and adjacent public streets. Hydrants shall be spaced at 450 feet apart, at each
intersection and shall be located no more than 225 feet from any point on the street or
Fire Department access road(s) frontage to a hydrant. The required fire flow shall be
available from any adjacent hydrant(s) in the system. The upgrade of existing fire
hydrants may be required. (CFC 903.2, 903.4.2, and Appendix III-B)
As required by the California Fire Code, when any portion of the facility is in excess of
150 feet from a water supply on a public street, as measured by an approved route
around the exterior of the facility, on-site fire hydrants and mains capable of supplying
the required fire flow shall be provided. For this project on site fire hydrants are
required. (CFC 903.2)
If construction is phased, each phase shall provide approved access and fire protection
prior to any building construction. (CFC 8704.2 and 902.2.2)
Prior to building construction, all locations where structures are to be built shall have
approved temporary Fire Department vehicle access roads for use until permanent
roads are installed. Temporary Fire Department access roads shall be an all weather
surface for 80,000 Ibs. GVW. (CFC 8704.2 and 902.2.2.2)
Prior to building final, all locations where structures are to be built shall have approved
Fire Department vehicle access roads to within 150 feet to any portion of the facility or
any portion of an exterior wall of the building(s). Fire Department access roads shall be
an all weather surface designed for 80,000 Ibs. GVW with a minimum AC thickness of
.25 feet. (CFC see 902)
Fire Department vehicle access roads shall have an unobstructed width of not less than
twenty-four (24) feet and an unobstructed vertical clearance of not less than thirteen (13)
feet six (6) inches. (CFC 902.2.2.1)
38.
Prior to building construction, dead end road ways and streets in excess of one hundred
and fifty (150) feet which have not been completed shall have a turnaround capable of
accommodating fire apparatus. (CFC 902.2.2.4)
39.
Prior to building construction, this development shall have two (2) points of access, via
all-weather surface roads, as approved by the Fire Prevention Bureau. (CFC 902.2,1)
R:\D 1'\2004\04-0149 Beacon Industrial Building\PC RESOLUTION AND COA,doc
9
40.
41.
42.
43.
44.
45.
46.
47.
48.
Prior to issuance of building permits, the developer shall furnish one copy of the water
system plans to the Fire Prevention Bureau for approval prior to installation. Plans shall
be signed by a registered civil engineer; contain a Fire Prevention Bureau approval
signature block; and conform to hydrant type, location, spacing and minimum fire flow
standards. After the plans are signed by the local water company, the originals shall be
presented to the Fire Prevention Bureau for signatures. The required water system
including fire hydrants shall be installed and accepted by the appropriate water agency
prior to any combustible building materials being placed on an individual lot. (CFC
8704.3, 901.2.2.2 and National Fire Protection Association 24 1-4.1)
Prior to issuance of a Certificate of Occupancy or building final, "Blue Reflective
Markers" shall be installed to identify fire hydrant locations. (CFC 901.4.3)
Prior to issuance of a Certificate of Occupancy or building final, approved numbers or
addresses shall be provided on all new and existing buildings in such a position as to be
plainly visible and legible from the street or road fronting the property. Numbers shall be
of a contrasting color to their background. Commercial, multi-family residential and
industrial buildings shall have a minimum twelve (12) inches numbers with suite
numbers a minimum of six (6) inches in size. All suites shall gave a minimum of six (6)
inch high ietters andlor numbers on both the front and rear doors. Single family
residences and multi-family residential units shall have four (4) inch letters and lor
numbers, as approved by the Fire Prevention Bureau. (CFC 901.4.4)
Prior to issuance of Certificate of Occupancy or building final, based on square footage
and type of construction, occupancy or use, the developer shall install a fire sprinkler
system. Fire sprinkler plans shall be submitted to the Fire Prevention Bureau for
approval prior to installation. (CFC Article 10, CBC Chapter 9)
Prior to issuance of Certificate of Occupancy or building final, based on a requirement
for monitoring the sprinkler system, occupancy or use, the developer shall install an fire
alarm system monitored by an approved Underwriters Laboratory listed central station.
Plans shall be submitted to the Fire Prevention Bureau for approval prior to installation.
(CFC Article 10)
Prior to the issuance of a Certificate of Occupancy or building final, a "Knox-Box" shall
be provided. The Knox-Box shall be installed a minimum of six (6) feet in height and be
located to the right side of the fire riser door. (CFC 902.4)
All manual and electronic gates on required Fire Department access roads or gates
obstructing Fire Department building access shall be provided with the Knox Rapid entry
system for emergency access by fire fighting personnel.
Prior to final inspection of any building, the applicant shall prepare and submit to the Fire
Department for approval, a site plan designating Fire Lanes with appropriate lane
painting and or signs.
Prior to the building final, speculative buildings capable of housing high-piled
combustible stock, shall be designed with the following fire protection and life safety
features: an automatic fire sprinkler system(s) designed for a specific commodity class
and storage arrangement, hose stations, alarm systems, smoke vents, draft curtains,
Fire Department access doors and Fire department access roads. Buildings housing
R:\D 1'\2004\04,0149 Beacoo Industrial Building\PC RESOLUTION AND COA,doc
10
49.
high-piled combustible stock shall comply with the provisions California Fire Code Article
81 and all applicable National Fire Protection Association standards. (CFC Article 81)
Prior to the issuance of a Certificate of Occupancy or building final, the
developerlapplicant shall be responsible for obtaining underground and/or aboveground
tank permits for the storage of combustible liquids, flammable liquids or any other
hazardous materials from both the County Health department and Fire Prevention
Bureau.(CFC 7901.3 and 8001.3)
Special Conditions
50.
51.
52.
Prior to issuance of a Certificate of Occupancy or building final a simple plot plan and a
simple floor plan, each as an electronic file of the .DWG format must be submitted to the
Fire Prevention Bureau. Alternative file formats may be acceptable, contact fire
prevention for approval.
The applicant shall comply with the requirements of the Fire Code permit process and
update any changes in the items and quantities approved as part of their Fire Code
permit. These changes shall be submitted to the Fire Prevention Bureau for review and
approval per the Fire Code and is subject to inspection. (CFC 105)
The applicant shall submit for review and approval by the Riverside County Department
of Environmental Health and City Fire Department an update to the Hazardous Material
Inventory Statement and Fire Department Technical Report on file at the city; should any
quantities used or stored onsite increase or should changes to operation introduce any
additional hazardous material not listed in existing reports. (CFC Appendix II-E)
DEPARTMENT OF PUBLIC WORKS
Unless otherwise noted, all conditions shall be completed by the Developer at no cost to any
Government Agency. It is understood that the Developer correctly shows on the site plan all
existing and proposed property lines, easements, traveled ways, improvement constraints and
drainage courses, and their omission may require the project to be resubmitted for further
review and revision.
General Requirements
53,
54.
55.
56.
A Grading Permit for precise grading, including all on-site flat work and improvements,
shall be obtained from the Department of Public Works prior to commencement of any
construction outside of the City-maintained street right-of-way.
An Encroachment Permit shall be obtained from the Department of Public Works prior to
commencement of any construction within an existing or proposed City right-of-way.
All grading plans shall be coordinated for consistency with adjacent projects and existing
improvements contiguous to the site and shall be submitted on standard 24" x 36" City of
Temecula mylars.
The Developer shall construct public improvements in conformance with applicable City
Standards and subject to approval by the Director of the Department of Public Works.
R:ID Pl2004\04-0149 Beacon Industrial BuildinglPC RESOLUTION AND COA,doc
II
a.
Street improvements, which may include, but not limited to: sidewalk, drive
approach, storm drain facilities and sewer and domestic water systems
Prior to Issuance of a Grading Permit
57.
58.
59.
60.
61.
62.
63.
64.
A Grading Plan shall be prepared by a registered Civil Engineer and shall be reviewed
and approved by the Department of Public Works. The grading plan shall include all
necessary erosion control measures needed to adequately protect adjacent public and
private property.
The Developer shall post security and enter into an agreement guaranteeing the grading
and erosion control improvements in conformance with applicable City Standards and
subject to approval by the Department of Public Works.
A Soil Report shall be prepared by a registered Soil or Civil Engineer and submitted to
the Director of the Department of Public Works with the initial grading plan check. The
report shall address all soils conditions of the site, and provide recommendations for the
construction of engineered structures and pavement sections.
A Geological Report shall be prepared by a qualified engineer or geologist and
submitted to the Department of Public Works with the initial grading plan check. The
report shall address special study zones and the geological conditions of the site, and
shall provide recommendations to mitigate the impact of ground shaking and
liquefaction.
The Developer must comply with the requirements of the National Pollutant Discharge
Elimination System (NPDES) permit from the State Water Resources Control Board. No
grading shall be permitted until an NPDES Notice of Intent (NOI) has been filed or the
project is shown to be exempt.
As deemed necessary by the Director of the Department of Public Works, the Developer
shall receive written clearance from the following agencies:
a. San Diego Regional Water Quality Control Board
b. Riverside County Flood Control and Water Conservation District
c. Planning Department
d. Department of Public Works
e.
Temecula Fire Prevention Bureau
The Developer shall comply with all constraints which may be shown upon an
Environmental Constraint Sheet (ECS) recorded with any underlying maps related to the
subject property.
The Developer shall obtain any necessary letters of approval or slope easements for off.
site work performed on adjacent properties as directed by the Department of Public
Works.
65.
A flood mitigation charge shall be paid. The Area Drainage Plan fee is payable to the
Riverside County Flood Control and Water Conservation District by either cashier's
check or money order, prior to issuance of permits, based on the prevailing area
R\D Pl2004\04-0149 Beacon Indusuial BuildioglPC RESOLUTION AND COAdoc
12
66.
drainage plan fee. If the full Area Drainage Plan fee or mitigation charge has already
been credited to this property, no new charge needs to be paid.
The site is in an area identified on the Flood Insurance Rate Map as Flood Zone A. This
project shall comply with Chapter 15, Section 15.12 of the City Municipal Code which
may include obtaining a Letter of Map Revision from FEMA. A Flood Plain Development
Permit shall be submitted to the Department of Public Works for review and approval.
67.
Prior to Issuance of a Building Permit
68.
69.
70.
71.
72.
Precise grading plans shall conform to applicable City of Temecula Standards subject to
approval by the Director of the Department of Public Works. The following design criteria
shall be observed:
Flow line grades shall be 0.5% minimum over P.C.C. and 1.00% minimum over
A.C. paving.
Driveways shall conform to the applicable City of Temecula Standard No. 207A.
Street lights shall be installed aiong the public streets adjoining the site in
accordance with City Standard Nos. 800, 801, 802 and 803.
Concrete sidewalks and ramps shall be constructed along public street frontages
in accordance with City of Temecula Standard Nos. 400, 401 and 402.
All street and driveway centerline intersections shall be at 90 degrees.
Landscaping shall be limited in the corner cut-off area of all intersections and
adjacent to driveways to provide for minimum sight distance and visibility.
The Developer shall construct the following public improvements to City of Temecula
General Plan standards unless otherwise noted. Plans shall be reviewed and approved
by the Director of the Department of Public Works:
a. Improve Rio Nedo (Secondary Highway Standards - 88' R/W) to include
installation of sidewalk, street lights, drainage facilities, signing and striping,
utilities (including but not limited to water and sewer).
a.
b.
c.
d.
e.
f.
A construction area Traffic Control Plan shall be designed by a registered Civil or Traffic
Engineer and reviewed by the Director of the Department of Public Works for any street
closure and detour or other disruption to traffic circulation as required by the Department
of Public Works. '
The building pad shall be certified to have been substantially constructed in accordance
with the approved Precise Grading Plan by a registered Civil Engineer, and the Soil
Engineer shall issue a Final Soil Report addressing compaction and site conditions.
The Developer shall pay to the City the Public Facilities Development Impact Fee as
required by, and in accordance with, Chapter 15,06 of the Temecula Municipal Code and
all Resolutions implementing Chapter 15.06.
The Developer shall record a written offer to participate in, and waive all rights to object
to the formation of an Assessment District, a Community Facilities District, or a Bridge
and Major Thoroughfare Fee District for the construction of the proposed Western
Bypass Corridor in accordance with the General Plan. The form of the offer shall be
subject to the approval of the City Engineer and City Attorney.
R:ID 1'\2004\04-0149 Beacon Industrial BuildinglPC RESOLUTION AND COA,doc
13
73.
The Developer shall pay to the City the Western Riverside County Transportation
Uniform Mitigation Fee (TUMF) Program as required by, and in accordance with,
Chapter 15.08 of the Temecula Municipal Code and all Resolutions implementing
Chapter 15.08.
Prior to Issuance of a Certificate of Occupancy
74.
75.
76.
As deemed necessary by the Department of Public Works, the Developer shall receive
written clearance from the following agencies:
a. Rancho California Water District
b.
Eastern Municipal Water District
Department of Public Works
c.
All public improvements shall be constructed and completed per the approved plans and
City standards to the satisfaction of the Director of the Department of Public Works.
The existing improvements shall be reviewed. Any appurtenance damaged or broken
shall be repaired or removed and replaced to the satisfaction of the Director of the
Department of Public Works.
BUILDING AND SAFETY DEPARTMENT
77.
78.
79.
80.
All design components shall comply with applicable provisions of the 2001 edition of the
California Building, Plumbing and Mechanical Codes; 2001 California Electrical Code;
California Administrative Code, Title 24 Energy Code, California Title 24 Disabled
Access Regulations, and the Temecula Municipal Code.
The City of Temecula has adopted an ordinance to collect fees for a Riverside County
area wide Transportation Uniform Mitigation Fee (TUMF). Upon the adoption of this
ordinance on March 31, 2003, this project will be subject to payment of these fees at the
time of building permit issuance. The fees shall be subject to the provisions of Ordinance
03-01 and the fee schedule in effect at the time of building permit issuance.
Submit at time of plan review, a complete exterior site lighting plans showing compliance
with Ordinance No. 655 for the regulation of light pollution. All street-lights and other
outdoor lighting shall be shown on electrical plans submitted to the Department of
Building and Safety. Any outside lighting shall be hooded and directed so as not to shine
directly upon adjoining property or public rights'of-way.
A receipt or clearance letter from the Temecula Valley School District shall be submitted
to the Building & Safety Department to ensure the payment or exemption from School
Mitigation Fees.
81.
Obtain all building plans and permit approvals prior to commencement of any
construction work.
82.
Obtain street addressing for all proposed buildings prior to submittal for plan review.
All building and facilities must compiy with applicable disabled access regulations.
Provide all details on plans. (California Disabled Access Regulations effective April 1,
1998)
83.
R:\D Pl2004\04-0I49 Beacon Iudusuial BuildinglPC RESOLUTION AND COA,doc
14
84.
85.
86.
87.
88.
89,
90.
91.
92.
93.
94.
95.
Provide disabled access from the public way to the main entrance of the building.
Provide van accessible parking located as close as possible to the main entry.
Provide house electrical meter provisions for power for the operation of exterior lighting,
fire alarm systems.
Restroom fixtures, number and type, to be in accordance with the provisions of the 2001
edition of the California Building Code Appendix 29.
Provide appropriate stamp of a registered professional with original signature on plans
prior to permit issuance.
Provide electrical plan including load calculations and panel scheduie, plumbing
schematic and mechanical plan for plan review.
Truss calculations that are stamped by the engineer of record and the truss
manufacturer engineer are required for plan review submittal.
Provide precise grading plan at plan check submittal to check accessibility for persons
with disabilities.
A pre-construction meeting is required with the building inspector prior to the start of the
building construction.
Trash enclosures, patio covers, light standards, and any block walls if not on the
approved building plans, will require separate approvals and permits.
Show all building setbacks.
Signage shall be posted conspicuously at the entrance to the project that indicates the
hours of construction, shown below, as allowed by the City of Temecula Ordinance No.
94-21, specifically Section G (1) of Riverside County Ordinance No. 457.73, for any site
within one-quarter mile of an occupied residence.
Monday-Friday 6:30 a.m. - 6:30 p.m.
Saturday 7:00 a.m. - 6:30 p.m.
No work is permitted on Sunday or Government Holidays
COMMUNITY SERVICES DEPARTMENT
The TCSD has reviewed the Development Plan for the aforementioned project and has the
following Conditions of Approval:
General Conditions
96.
The trash enclosures shall be large enough to accommodate a recycling bin, as well as,
regular solid waste containers.
97,
The developer shall contact the City's franchised solid waste hauler for disposal of
construction debris. Only the City's franchisee may haul construction debris.
R:\D 1'\2004\04-0149 Beacon Industrial BuildinglPC RESOLUTION AND COA,doc
15
98.
The Applicant shall comply with the Public Art Ordinance.
99.
All parkways, landscaping, fencing, and on site lighting shall be maintained by the
property owner or maintenance association.
Prior to issuance of Building Permit
100.
The developer shall provide TCSD verification of arrangements made with the City's
franchise solid waste hauler for disposal of construction debris.
By placing my signature below, I confirm that I have read, understand and accept ail the above
Conditions of Approval. I further understand that the property shall be maintained in
conformance with these conditions of approval and that any changes I may wish to make to the
project shall be subject to Community Development Department approval.
Applicant's Signature
Date
Applicant's Printed Name
R:\D 1'\2004\04-0149 Beacon IndusuiaI BuildinglPC RESOLUTION AND COA.doc