Loading...
HomeMy WebLinkAboutParcel Map 13275 Mass Grading Plans Solana Senior Assisted LivingCONSTRUCTION NOTES : INSTALL SLOPED GEO-GRID RETAINING WALL PER SEPARATE PLAN & PERMIT. INSTALL 18" HDPE STORM DRAIN PIPE (ADS N-12 DUAL WALL OR APPROVED EQUAL). TRENCH DETAIL PER CITY OF TEMECULA STD. NO. 407. 2' MIN. COVER. INSTALL 12" HDPE STORM DRAIN PIPE (ADS N-12 DUAL WALL OR APPROVED EQUAL). TRENCH DETAIL PER CITY OF TEMECULA STD. NO. 407. 2' MIN. COVER. INSTALL HDPE 45° BEND (ADS OR APPROVED EQUAL). INSTALL HDPE TEE (ADS OR APPROVED EQUAL). SIZE AS SHOWN. INSTALL 30" DRAIN BASIN WITH SOLID COVER (NYLOPLAST OR APPROVED EQUAL). INSTALL TEMPORARY SEDIMENT BASIN PER CASQA SE-2. INSTALL RISER PER CASQA SE-2. INSTALL 48" WET WELL & PUMP WITH TRAFFIC RATED COVER. SEE PLUMBING PLANS FOR FURTHER DETAIL. STORM DRAIN MANHOLE PER STORM DRAIN PLAN, SEE SHEET 7. 78" RUBBER GASKET REINFORCED CONCRETE PIPE (RGRCP) STORM DRAIN PER STORM DRAIN PLAN, SEE SHEET 7. STORM DRAIN INLET STRUCTURE PER STORM DRAIN PLAN, SEE SHEET 7. INSTALL 4" HDPE STORM DRAIN PIPE ( ADS N-12 DUAL WALL OR APPROVED EQUAL.) TRENCH DETAIL PER CITY OF TEMECULA STD NO 407. 2' MIN COVER. REMOVE/DEMO HEADWALL AND SAWCUT EXISTING 78 INCH STORM DRAIN PIPE AT NEW CONNECTOIN/STRUCTURE INSTALL SLOPED PROTECTION BARRIER PER SPPWC STD 360-2 OR EQUIVALENT. INSTALL 8" WIDE BY 8" THICK CLASS B CONCRETE APRON AROUND MANHOLE. INSTALL STABILIZED CONSTRUCTION ENTRANCE (TC1). INSTALL PERIMETER PROTECTION WITH FIBER ROLLS (SE5) OR SILT FENCE (SE1). INSTALL TEMPORARY GRAVEL BAG DAM PER DETAIL "C" ON SHEET 8. AMENDED SOIL AND MULCH PER FACT SHEET SD-F. 1/26/2022 1/26/2022 ’ “” “” “ ” ’ ’ ’ ’ ’ “” “” “” “” “ ” CITY OF TEMECULA TWO WORKING DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT 1-800-422-4133CALL TOLL FREE LD20 - 4750 Solana Senior Assisted Living Parcel Map 13275 Mass Grading Plans Notes: General, Grading, & Erosion Control 2 · · · P: \ 1 8 - 1 0 1 3 - T e m e c u l a S e n i o r L i v i n g \ 4 0 1 - R o u g h G r a d i n g P l a n \ C i v i l S u r v e y \ d w g \ 1 8 - 1 0 1 3 - 4 0 1 - 2 - N o t e s . d w g , 1 / 2 6 / 2 0 2 2 3 : 4 9 : 0 9 P M , D W G T o P D F . p c 3 01-17-2022 1/26/2022 1/26/2022 1/26/2022 1/26/2022 1/26/2022 1/26/2022 1/26/2022 1/26/2022 1/26/2022 1/26/2022 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1718192021 UP 22 x 6 13/16" = 12'-6" W/D W/ D W/D W/D W/DW/D W/D W/D W/DW/D W/ D W/ D AL-2a 119 3/A11.2 AL-1a 129 1/A11.2 AL-1a 128 1/A11.2 AL-1a 127 1/A11.2 AL-1a 125 1/A11.2 AL-1a 123 1/A11.2 AL-1a 121 1/A11.2 AL-1a 118 1/A11.2 AL-1a 120 1/A11.2 AL-1a 122 1/A11.2 AL-1a 124 1/A11.2 AL-1a 126 1/A11.2 Activities Director 178Elev Mech 179 AL Med 175 AL HK 174 Elev Mech 172 AL Bistro 152 Corridor C120 Janitor 176 Elev 1 E1 Elev 2 E2 IDF-1 173 RR 177 Corridor C175 Corridor C170 Patio Patio Patio Patio Patio Patio Patio Patio Patio Patio Patio Patio Patio Stair 1 S1 p/ l 3 4 3 4 5 AL - 1 a 12 9 1/ A 1 1 . 2 AL - 1 a 12 8 1/ A 1 1 . 2 El e v M e c h 17 9 BO M 15 4 C Mo v e - i n C o o r d i n a t o r 15 4 D Co m m . R e l . D i r . Pa t i o Pa t i o Pa t i o p/l 1 2 1 2 ELEVATION PLAN Private Storm Drain Plan 7 CONSTRUCTION NOTES: CITY OF TEMECULA TWO WORKING DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT 1-800-422-4133CALL TOLL FREE LD20 - 4750 FROM STA: 10+00 TO 12+68.75 FROM STA: 12+68.75 TO 15+35.76 HEADWALL DETAIL STORM DRAIN CURVE DATA CURVE RADIUS LENGTH TANGENT DELTA 1 22.5 26.03 14.69'66.29° 2 45.00'70.98'45.30'90.38° 3 22.50'35.24'22.40'89.74° 4 22.50'17.02'8.94'43.35° STORM DRAIN LINE DATA LINE LENGTH Centerline Bearing 1 14.66 S82° 16' 43.18"E 2 157.11 S31° 26' 8.0"E 3 170.91 N58° 11' 0.76"E 4 35.91'N31° 33' 28.69"W 5 7.91 N11° 47' 26.03" E scale 1"=5' Solana Senior Assisted Living Parcel Map 13275 Mass Grading Plans P: \ 1 8 - 1 0 1 3 - T e m e c u l a S e n i o r L i v i n g \ 4 1 0 - S t o r m D r a i n \ C i v i l S u r v e y \ d w g \ 1 8 - 1 0 1 3 - 4 1 0 - 2 - P S D P - 0 1 . d w g , 1 / 2 1 / 2 0 2 2 3 : 2 2 : 4 3 P M , D W G T o P D F . p c 3 01-17-2022 1/26/2022 1/26/2022