Loading...
HomeMy WebLinkAboutParcel Map 21382 Parcel 1 MS Moutain View Building 1 WQMPCity of Temecula WATER QUALITY MANAGEMENT PLAN (WQMP) PROJECT NAME & PERMIT NOS: PM 21382 (MS MOUNTAIN VIEW) PARCEL 1 (BUILDING 1) LD21-1665, B20-4793, PA20-0533 PROJECT ADDRESS: AVENIDA ALVARADO PROJECT APNs: 909-290-001 PREPARED BY: Name Tory R. Walker Engineering, Inc._______ Address 122 Civic Center Drive, Suite 206_______ Vista, CA 92084____________________ Phone (760)414-9212_____________________ Email info@trwengineering.com ___________ PREPARED FOR: Name Silagi Development & Management, Inc._ Address 101 Hodencamp Road, Suite 200_______ Thousand Oaks, CA 91360____________ Phone (805)424-7704_____________________ Email info@SilagiDevelopment.com _________ DATE OF WQMP: June 4, 2021 APPROVED BY: APPROVAL DATE: WQMP 3 Template Date: October 31st, 2018 Preparation Date: June 4, 2021 Step 1: Source Control BMP Checklist Source Control BMPs All development projects must implement source control BMPs 4.2.1 through 4.2.6 where applicable and feasible. See Chapter 4.2 and Appendix E of the City BMP Design Manual for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following: • "Yes" means the project will implement the source control BMP as described in Chapter 4.2 and/or Appendix E of the City BMP Design Manual. Discussion / justification must be provided and show locations on the project plans. Select applicable Source Controls in the Source Control BMP summary on the following page. • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion / justification must be provided. • "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion / justification must be provided. Source Control Requirement Applied? 4.2.1 Prevention of Illicit Discharges into the MS4 ☒Yes ☐No ☐N/A Discussion / justification: The following applicable source control BMPs will be implemented to effectively eliminate discharges of non-stormwater into the MS4: SC-G – Refuse areas exposure reduction • Refuse will be handled by the City’s contracted waste hauler* • Refuse stored for pickup within roofed, walled trash enclosure designed in accordance with City of Temecula City-Wide Design Guidelines (see architectural plan sheets A-1 and A3-1/structural plan sheet S.4) • Signs will be posted on or near dumpsters with the words “Do not dump hazardous materials here” or similar (see architectural plans sheet A1-0, Keynote 16) SC-H – Industrial processes performed indoors* • All process activities to be performed indoors • No processes to drain to exterior or to storm drain system SC-M – Loading dock drainage and coverage requirements • Move loaded and unloaded items indoors as soon as possible • All loading docks doors are equipped with weather stripping to effectively prevent mobilization of loading dock waste outdoors (see architectural plan sheets AD-5, detail 11) SC-O – Miscellaneous drain or wash water not to storm drain system • Condensate drain lines are routed internally from the rooftop condenser units down to mop sinks with an indirect “air gap” connection to the sewer (see plumbing plans sheet P3.1) • Roof drain material consists of ABS/PVC DWV plastic (see piping schedule on plumbing plan sheet P0.1) SC-P – Plazas, sidewalks, and parking lot sweeping and washing requirements* • Plazas, sidewalks, and parking lots shall be swept regularly to prevent the accumulation of litter and debris • Debris from pressure washing shall be collected to prevent entry into the storm drain system • Washwater containing any cleaning agent or degreaser shall be collected and discharged to the sanitary sewer and not discharged to a storm drain *prohibitions via CC&Rs; will be drafted and executed prior to granting of certificates of occupancy 4 WQMP Preparation Date: June 4, 2021 Template Date: October 31st, 2018 4.2.2 Storm Drain Stenciling or Signage ☒Yes ☐No ☐N/A Discussion / justification: Stenciling shall be placed adjacent to storm drain inlets (see grading plan Construction Note 9). 4.2.3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal ☐Yes ☐No ☒N/A Discussion / justification: Materials with the potential to pollute stormwater runoff will be stored indoors. 4.2.4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and Wind Dispersal ☐Yes ☐No ☒N/A Discussion / justification: Work areas with potential for pollutant generation will occur indoors. 4.2.5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal ☒Yes ☐No ☐N/A Discussion / justification: See description provided for SC-G under Source Control BMP 4.2.1. 4.2.6 Additional BMPs Based on Potential Sources of Runoff Pollutants ☐Yes ☐No ☒N/A Discussion / justification. Clearly identify which sources of runoff pollutants are discussed: The project site is not expected to generate potential pollutant sources requiring source control BMPs in addition to the applicable source control requirements identified above. WQMP 5 Template Date: October 31st, 2018 Preparation Date: June 4, 2021 Source Control BMP Summary Select all source control BMPs identified for your project in sections 4.2.1 through 4.2.6 above in the column on the left below. Then select “yes” if the BMP has been implemented and shown on the project plans, “No” if the BMP has not been implemented, or “N/A” if the BMP is not applicable to your project. ☒ SC-A. On-site storm drain inlets ☒Yes ☐No ☐N/A ☐ SC-B. Interior floor drains and elevator shaft sump pumps ☐Yes ☐No ☒N/A ☐ SC-C. Interior parking garages ☐Yes ☐No ☒N/A ☒ SC-D1. Need for future indoor & structural pest control ☒ Yes ☐No ☐N/A ☒ SC-D2. Landscape/outdoor pesticide use ☒ Yes ☐No ☐N/A ☐ SC-E. Pools, spas, ponds, fountains, and other water features ☐Yes ☐No ☒N/A ☐ SC-F. Food service ☐Yes ☐No ☒N/A ☒ SC-G. Refuse areas ☒Yes ☐No ☐N/A ☒ SC-H. Industrial processes ☒Yes ☐No ☐N/A ☐ SC-I. Outdoor storage of equipment or materials ☐Yes ☐No ☒N/A ☐ SC-J. Vehicle and equipment cleaning ☐Yes ☐No ☒N/A ☐ SC-K. Vehicle/equipment repair and maintenance ☐Yes ☐No ☒N/A ☐ SC-L. Fuel dispensing areas ☐Yes ☐No ☒N/A ☒ SC-M. Loading docks ☒Yes ☐No ☐N/A ☒ SC-N. Fire sprinkler test water ☐Yes ☐No ☒N/A ☒ SC-O. Miscellaneous drain or wash water ☒Yes ☐No ☐N/A ☒ SC-P. Plazas, sidewalks, and parking lots ☒Yes ☐No ☐N/A ☐ SC-Q. Large trash generating facilities ☐Yes ☐No ☒N/A ☐ SC-R. Animal facilities ☐Yes ☐No ☒N/A ☐ SC-S. Plant nurseries and garden centers ☐Yes ☐No ☒N/A ☐ SC-T. Automotive facilities ☐Yes ☐No ☒N/A Note: Show all source control measures applied above on the plan sheets. 6 WQMP Preparation Date: June 4, 2021 Template Date: October 31st, 2018 Step 2: Site Design BMP Checklist Site Design BMPs All development projects must implement site design BMPs SD-A through SD-H where applicable and feasible. See Chapter 4.3 and Appendix E of the City BMP Design Manual for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following: • "Yes" means the project will implement the site design BMP as described in Chapter 4.3 and/or Appendix E of the City BMP Design Manual. Discussion / justification must be provided and show locations on the project plans. • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion / justification must be provided. • "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project site has no existing natural areas to conserve). Discussion / justification must be provided. Site Design Requirement Applied? 4.3.1 Maintain Natural Drainage Pathways and Hydrologic Features ☐Yes ☐No ☒N/A Discussion / justification: The existing site features have been previously graded and possesses no natural drainage pathways or hydrologic features. 4.3.2 Conserve Natural Areas, Soils, and Vegetation ☐Yes ☐No ☒N/A Discussion / justification: The existing site features have been previously graded and possesses no natural areas, soils, or vegetation. 4.3.3 Minimize Impervious Area ☒Yes ☐No ☐N/A Discussion / justification: The site layout and building: (1) is sized to the maximum allowable zoning height, (2) will not exceed maximum 40% lot coverage, and (3) provides more than the minimum required 20% landscape area. The frontage improvements (1) hold the proposed sidewalk width to the minimum width possible per the applicable industrial zoning requirements and (2) proposes aesthetic street trees within the right-of-way to intercept direct rainfall 4.3.4 Minimize Soil Compaction ☒Yes ☐No ☐N/A Discussion / justification: Disturbance in planned green space and proposed landscape areas will be avoided. Areas planned for green space will be amended and re-tilled.as applicable and feasible, per the City of Temecula BMP Design Manual Fact Sheet SD-F. 4.3.5 Impervious Area Dispersion ☒Yes ☐No ☐N/A Discussion / justification: Private sidewalk, hardscape, and parking areas drain onto adjacent pervious where feasible and as shown on the plans. The presence of large cut slopes on the pad significantly reduces the developable footprint available to provide the minimum necessary building footprint and minimum required parking spaces, drive aisles, and vehicle turnaround areas. Furthermore, the landscaped area along the eastern side of the building is within a water pipeline and storm easement. Therefore, the design team does not find it prudent nor feasible to drain large rooftop areas to relatively small swales located within close proximity to the proposed structures or to infiltrate over existing public utilities along the drainage easement. Public improvements are to be constructed per City Standard Nos. 102 and 103 in accordance with the PM 21382 plan change process for the street improvement, which includes a curb adjacent sidewalk. WQMP 7 Template Date: October 31st, 2018 Preparation Date: June 4, 2021 4.3.6 Runoff Collection ☐Yes ☒No ☐N/A Discussion / justification: Based on the proposed traffic loading and soils, the geotechnical investigation supports a “no infiltration” condition on the lots and recommends an asphaltic-concrete pavement section. 4.3.7 Landscaping with Native or Drought Tolerant Species ☒Yes ☐No ☐N/A Discussion / justification: Native and/or drought tolerant plant species comprise 85% of the total landscape area on each lot. Water use for said landscaping complies with the City of Temecula Irrigation Guidelines and California Ordinance AB 1881. 4.3.8 Harvesting and Using Precipitation ☐Yes ☒No ☐N/A Discussion / justification: Per BMPDM Appendix B.2.2.2, onsite demand for harvested stormwater is not appreciable because onsite landscaped areas are less than 30% of the parcel footprint for each building. Therefore, harvest and use features within the are not technically feasible due to insufficient harvested water demand. 8 WQMP Preparation Date: June 4, 2021 Template Date: October 31st, 2018 Step 3: Construction Stormwater BMP Checklist Minimum Required Standard Construction Stormwater BMPs If you answer “Yes” to any of the questions below, your project is subject to Table 1 on the following page (Minimum Required Standard Construction Stormwater BMPs). As noted in Table 1, please select at least the minimum number of required BMPs 1, or as many as are feasible for your project. If no BMP is selected, an explanation must be given in the box provided. The following questions are intended to aid in determining construction BMP requirements for your project. Note: All selected BMPs below must be included on the BMP plan incorporated into the construction plan sets. 1. Will there be soil disturbing activities that will result in exposed soil areas? (This includes minor grading and trenching.) Reference Table 1 Items A, B, D, and E Note: Soil disturbances NOT considered significant include, but are not limited to, change in use, mechanical/electrical/plumbing activities, signs, temporary trailers, interior remodeling, and minor tenant improvement. ☒ Yes ☐No 2. Will there be asphalt paving, including patching? Reference Table 1 Items D and F ☒ Yes ☐No 3. Will there be slurries from mortar mixing, coring, or concrete saw cutting? Reference Table 1 Items D and F ☒ Yes ☐No 4. Will there be solid wastes from concrete demolition and removal, wall construction, or form work? Reference Table 1 Items D and F ☒ Yes ☐No 5. Will there be stockpiling (soil, compost, asphalt, concrete, solid waste) for over 24 hours? Reference Table 1 Items D and F ☒ Yes ☐No 6. Will there be dewatering operations? Reference Table 1 Items C and D ☒ Yes ☐No 7. Will there be temporary on-site storage of construction materials, including mortar mix, raw landscaping and soil stabilization materials, treated lumber, rebar, and plated metal fencing materials? Reference Table 1 Items E and F ☒ Yes ☐No 8. Will trash or solid waste product be generated from this project? Reference Table 1 Item F ☒ Yes ☐No 9. Will construction equipment be stored on site (e.g.: fuels, oils, trucks, etc.?) Reference Table 1 Item F ☒ Yes ☐No 10. Will Portable Sanitary Services (“Porta-potty”) be used on the site? Reference Table 1 Item F ☒ Yes ☐No 1 Minimum required BMPs are those necessary to comply with the City of Temecula Erosion and Sediment Control Ordinance (Chapter 18.18 et seq.) and the City of Temecula Engineering and Construction Manual (Chapter 18). WQMP 9 Template Date: October 31st, 2018 Preparation Date: June 4, 2021 Table 1. Construction Stormwater BMP Checklist Minimum Required Best Management Practices (BMPs) CALTRANS SW Handbook 2 Detail  BMP Selected Reference sheet No.’s where each selected BMP is shown on the plans. If no BMP is selected, an explanation must be provided. A. Select Erosion Control Method for Disturbed Slopes (choose at least one for the appropriate season) Vegetation Stabilization Planting 3 (Summer) SS-2, SS-4 ☐ Precise Grading Plan Sheet 6 Hydraulic Stabilization Hydroseeding2 (Summer) SS-4 ☒ Bonded Fiber Matrix or Stabilized Fiber Matrix 4 (Winter) SS-3 ☐ Physical Stabilization Erosion Control Blanket3 (Winter) SS-7 ☐ B. Select erosion control method for disturbed flat areas (slope < 5%) (choose at least one) Will use erosion control measures from Item A on flat areas also SS-3, 4, 7 ☒ Precise Grading Plan Sheet 6 Sediment Desilting Basin (must treat all site runoff) SC-2 ☐ Mulch, straw, wood chips, soil application SS-6, SS-8 ☐ 2 State of California Department of Transportation (Caltrans). 2003. Storm Water Quality Handbooks, Construction Site Best Management Practices (BMPs) Manual. March. Available online at: http://www.dot.ca.gov/hq/construc/stormwater/manuals.htm. 3 If Vegetation Stabilization (Planting or Hydroseeding) is proposed for erosion control it may be installed between May 1st and August 15th. Slope irrigation is in place and needs to be operable for slopes >3 feet. Vegetation must be watered and established prior to October 1st. The owner must implement a contingency physical BMP by August 15th if vegetation establishment does not occur by that date. If landscaping is proposed, erosion control measures must also be used while landscaping is being established. Established vegetation must have a subsurface mat of intertwined mature roots with a uniform vegetative coverage of 70 percent of the natural vegetative coverage or more on all disturbed areas. 4 All slopes over three feet must have established vegetative cover prior to final permit approval. 10 WQMP Preparation Date: June 4, 2021 Template Date: October 31st, 2018 Table 1. Construction Stormwater BMP Checklist (continued) Minimum Required Best Management Practices (BMPs) CALTRANS SW Handbook Detail  BMP Selected Reference sheet No.’s where each selected BMP is shown on the plans. If no BMP is selected, an explanation must be provided. C. If runoff or dewatering operation is concentrated, velocity must be controlled using an energy dissipater Energy Dissipater Outlet Protection 5 SS-10 ☒ Precise Grading Plan Sheet 6 D. Select sediment control method for all disturbed areas (choose at least one) Silt Fence SC-1 ☒ Precise Grading Plan Sheet 6 Fiber Rolls (Straw Wattles) SC-5 ☒ Gravel & Sand Bags SC-6 & 8 ☒ Dewatering Filtration NS-2 ☐ Storm Drain Inlet Protection SC-10 ☒ Engineered Desilting Basin (sized for 10-year flow) SC-2 ☐ E. Select method for preventing offsite tracking of sediment (choose at least one) Stabilized Construction Entrance TC-1 ☒ Precise Grading Plan Sheet 6 Construction Road Stabilization TC-2 ☐ Entrance/Exit Tire Wash TC-3 ☐ Entrance/Exit Inspection & Cleaning Facility TC-1 ☐ Street Sweeping and Vacuuming SC-7 ☒ F. Select the general site management BMPs F.1 Materials Management Material Delivery & Storage WM-1 ☒ Precise Grading Plan Sheet 6 Spill Prevention and Control WM-4 ☒ F.2 Waste Management 6 Waste Management Concrete Waste Management WM-8 ☒ Precise Grading Plan Sheet 6 Solid Waste Management WM-5 ☒ Sanitary Waste Management WM-9 ☒ Hazardous Waste Management WM-6 ☒ Note: The Construction General Permit (Order No. 2009-0009-DWQ) also requires all projects not subject to the BMP Design Manual to comply with runoff reduction requirements through the implementation of post-construction BMPs as described in Section XIII of the order. 5 Regional Standard Drawing D-40 – Rip Rap Energy Dissipater is also acceptable for velocity reduction. 6 Not all projects will have every waste identified. The applicant is responsible for identifying wastes that will be onsite and applying the appropriate BMP. For example, if concrete will be used, BMP WM-8 must be selected. WQMP 11 Template Date: October 31st, 2018 Preparation Date: June 4, 2021 Step 4: Project type determination (Standard or Priority Development Project) Is the project part of another Priority Development Project (PDP)? ☐ Yes ☒ No If so, Standard and PDP requirements apply. Go to Step 4.1 and select “PDP” The project is (select one): ☒ New Development ☐ Redevelopment 7 The total proposed newly created or replaced impervious area is: 30,164 ft2 The total existing (pre-project) impervious area is: 0 ft2 The total area disturbed by the project is: 49,586 ft2 If the total area disturbed by the project is 1 acre (43,560 sq. ft.) or more OR the project is part of a larger common plan of development disturbing 1 acre or more, a Waste Discharger Identification (WDID) number must be obtained from the State Water Resources Control Board. WDID: 9 33C390921 Is the project in any of the following categories, (a) through (f)?8 Yes ☒ No ☐ (a) New development projects that create 10,000 square feet or more of impervious surfaces 9(collectively over the entire project site). This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. Yes ☐ No ☒ (b) Redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface (collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surfaces). This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. Yes ☒ No ☐ (c) New and redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface (collectively over the entire project site), and support one or more of the following uses: (i) Restaurants. This category is defined as a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). (ii) Hillside development projects. This category includes development on any natural slope that is twenty-five percent or greater. (iii) Parking lots. This category is defined as a land area or facility for the temporary parking or storage of motor vehicles used personally, for business, or for commerce. (iv) Streets, roads, highways, freeways, and driveways. This category is defined as any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7 Redevelopment is defined as: The creation and/or replacement of impervious surface on an already developed site. Examples include the expansion of a building footprint, road widening, the addition to or replacement of a structure, and creation or addition of impervious surfaces. Replacement of impervious surfaces includes any activity that is not part of a routine maintenance activity where impervious material(s) are removed, exposing underlying soil during construction. Redevelopment does not include routine maintenance activities, such as trenching and resurfacing associated with utility work; pavement grinding; resurfacing existing roadways; new sidewalks construction; pedestrian ramps; or bike lanes on existing roads; and routine replacement of damaged pavement, such as pothole repair. 8 Applicants should note that any development project that will create and/or replace 10,000 square feet or more of impervious surface (collectively over the entire project site) is considered a new development. 12 WQMP Preparation Date: June 4, 2021 Template Date: October 31st, 2018 Project type determination (continued) Yes ☐ No ☒ (d) New or redevelopment projects that create and/or replace 2,500 square feet or more of impervious surface (collectively over the entire project site), and discharging directly to an Environmentally Sensitive Area (ESA). “Discharging directly to” includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands). Note: ESAs are areas that include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Board and San Diego Water Board; State Water Quality Protected Areas; water bodies designated with the RARE beneficial use by the State Water Board and San Diego Water Board; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. See BMP Design Manual Chapter 1.4.2 for additional guidance. Yes ☐ No ☒ (e) New development projects, or redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface, that support one or more of the following uses: (i) Automotive repair shops. This category is defined as a facility that is categorized in any one of the following SIC codes: 5013, 5014, 5541, 7532-7534, or 7536- 7539. (ii) Retail gasoline outlets (RGOs). This category includes RGOs that meet the following criteria: (a) 5,000 square feet or more or (b) a projected Average Daily Traffic (ADT) of 100 or more vehicles per day. Yes ☒ No ☐ (f) New or redevelopment projects that result in the disturbance of one or more acres of land and are expected to generate pollutants post construction. Note: See BMP Design Manual Chapter 1.4.2 for additional guidance. Does the project meet the definition of one or more of the Priority Development Project categories (a) through (f) listed above? ☐ No – the project is not a Priority Development Project (Standard Project). ☒ Yes – the project is a Priority Development Project (PDP). Further guidance may be found in Chapter 1 and Table 1-2 of the BMP Design Manual. The following is for redevelopment PDPs only: The area of existing (pre-project) impervious area at the project site is: _______________ ft2 (A) The total proposed newly created or replaced impervious area is _______________ ft2 (B) Percent impervious surface created or replaced (B/A)*100: _______________ % The percent impervious surface created or replaced is (select one based on the above calculation): ☐ less than or equal to fifty percent (50%) – only newly created or replaced impervious areas are considered a PDP and subject to stormwater requirements OR ☐ greater than fifty percent (50%) – the entire project site is considered a PDP and subject to stormwater requirements WQMP 13 Template Date: October 31st, 2018 Preparation Date: June 4, 2021 Step 4.1: Water Quality Management Plan requirements Step Answer Progression Is the project a Standard Project, Priority Development Project (PDP), or exception to PDP definitions? To answer this item, complete Step 4 Project Type Determination Checklist, and see PDP exemption information below. For further guidance, see Chapter 1.4 of the BMP Design Manual in its entirety. ☐ Standard Project Standard Project requirements apply, STOP, you have satisfied stormwater requirements. ☒ PDP Standard and PDP requirements apply. Complete Exhibit A “PDP Requirements.” http://temeculaca.gov/wqmpa2 ☐ PDP Exemption Go to Step 4.2 below. Step 4.2: Exemption to PDP definitions Is the project exempt from PDP definitions based on either of the following: ☐ Projects that are only new or retrofit paved sidewalks, bicycle lanes, or trails that meet the following criteria: (i) Designed and constructed to direct stormwater runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (ii) Designed and constructed to be hydraulically disconnected from paved streets or roads [i.e., runoff from the new improvement does not drain directly onto paved streets or roads]; OR (iii) Designed and constructed with permeable pavements or surfaces in accordance with City of Temecula Guidance on Green Infrastructure; If so: Standard Project requirements apply, AND any additional requirements specific to the type of project. City concurrence with the exemption is required. Provide discussion and list any additional requirements below in this form. STOP, you have satisfied stormwater requirements. ☐ Projects that are only retrofitting or redeveloping existing paved alleys, streets or roads that are designed and constructed in accordance with the City of Temecula Guidance on Green Infrastructure. Complete Exhibit A “PDP Requirements.” Select Green Streets Exemptions where applicable. Discussion / justification, and additional requirements for exceptions to PDP definitions, if applicable: Exhibit A City of Temecula PRIORITY DEVELOPMENT PROJECT REQUIREMENTS ii PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 This page was left intentionally blank. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS iii Template Date: September 26, 2019 Preparation Date: June 4, 2021 Table of Contents Preparer's Certification Page ...................................................................................................... v Step 1: Site Information Checklist ......................................................................................... 7 Step 1.1: Description of Existing Site Condition and Drainage Patterns ............................ 7 Step 1.2: Description of Proposed Site Development and Drainage Patterns ................... 9 Step 1.3: Other Site Requirements and Constraints ........................................................11 Step 2: Strategy for Meeting PDP Performance Requirements ............................................14 ATTACHMENT 1: Stormwater Pollutant Control BMP Selection ...............................................16 Attachment 1a: DMA Exhibit Checklist...................................................................................18 Attachment 1b: 85th Percentile 24-Hour Isohyetal Map ..........................................................20 Attachment 1c: Worksheet B.1-1 DCV ...................................................................................22 Attachment 1d: Applicable Site Design BMP Fact Sheet(s) from Appendix E ........................24 Attachment 1e: Structural Pollutant Control BMP Checklist ...................................................26 Identification and Narrative of Receiving Water and Pollutants of Concern ........................28 Attachment 1f: Onsite Alternative Compliance WQE Calculations .........................................30 Attachment 1g: Offsite Alternative Compliance Participation Form - Pollutant Control ...........32 ATTACHMENT 2: Hydromodification Control Measures ...........................................................34 Attachment 2c: Management of Critical Coarse Sediment Yield Areas ..................................38 Attachment 2d: Structural BMP Design Calculations, Drawdown Calculations, & Overflow Design ...................................................................................................................................40 Attachment 2g: Hydromodification Offsite Alternative Compliance Participation Form ...........42 ATTACHMENT 3 ......................................................................................................................44 Structural BMP Maintenance Information ..............................................................................44 ATTACHMENT 4 ......................................................................................................................48 City of Temecula PDP Structural BMP Verification for Permitted Land Development Projects ..............................................................................................................................................48 ATTACHMENT 5 ......................................................................................................................54 Copy of Plan Sheets Showing Permanent Stormwater BMPs, Source Control, and Site Design ...................................................................................................................................54 ATTACHMENT 6 ......................................................................................................................56 Copy of Project's Drainage Report ........................................................................................56 ATTACHMENT 7 ......................................................................................................................58 Copy of Project's Geotechnical and Groundwater Investigation Report .................................58 iv PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 This page was left intentionally blank. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS v Template Date: September 26, 2019 Preparation Date: June 4, 2021 Preparer's Certification Page Project Name: MS Mountain View Park - Building 1 Permit Number: LD21-1665, B20-4793, PA20-0533 PREPARER'S CERTIFICATION I hereby declare that I am the Engineer in Responsible Charge of design of Stormwater best management practices (BMPs) for this project, and that I have exercised responsible charge over the design of the BMPs as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the PDP requirements of the City of Temecula BMP Design Manual, which is a design manual for compliance with local City of Temecula Stormwater and Urban Runoff Management and Discharge Controls Ordinance (Chapter 8.28 et seq.) and regional MS4 Permit (California Regional Water Quality Control Board San Diego Region Order No. R9-2013-0001 as amended by R9-2015-0001 and R9-2015-0100) requirements for stormwater management. I have read and understand that the City of Temecula has adopted minimum requirements for managing urban runoff, including stormwater, from land development activities, as described in the BMP Design Manual. I certify that this PDP WQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this PDP WQMP by City staff is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of stormwater BMPs for this project, of my responsibilities for project design. Engineer of Work's Signature, PE Number & Expiration Date Tory R. Walker Print Name Tory R. Walker Engineering, Inc. (760) 414-9212 Company & Phone No. _____________________________ Date Engineer's Seal: June 17, 2021 RCE No. 45005 Exp. 3-31-2022 vi PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 This page was left intentionally blank. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 7 Template Date: September 26, 2019 Preparation Date: June 4, 2021 Step 1: Site Information Checklist Step 1.1: Description of Existing Site Condition and Drainage Patterns Project Watershed (Complete Hydrologic Unit, Area, and Subarea Name with Numeric Identifier; e.g., 902.52 Santa Margarita HU, Pechanga HA, Wolf HSA) 902.32 Santa Margarita HU, Murrieta HA, Murrieta HSA Current Status of the Site (select all that apply): ☐ Existing development ☒ Previously graded but not built out ☐ Demolition completed without new construction ☐ Agricultural or other non-impervious use ☐ Vacant, undeveloped/natural Description / Additional Information: The existing site was mass graded in 1990 under the PM 21382 rough grading plan and remains part of the only unbuilt portion of the larger adjoining industrial park (PM 21383) along the unfinished crossroads between Avenida Alvarado and Via Industria. Existing Land Cover Includes (select all that apply and provide each area on site): ☒ Pervious Area 1.14 Acres (49,586 Square Feet) ☐ Impervious Areas _______ Acres (_______ Square Feet) Description / Additional Information: Existing land cover consists entirely of graded land with no impervious features. Per the site- specific geotechnical investigation, the site-wide soils are characterized as artificial fill comprised of dense, silty sand with low to very slow percolation rates. Therefore, the geotechnical engineer has characterized the existing hydrologic soil groups as 60 percent Type C and 40 percent Type D. How is stormwater runoff conveyed from the site? At a minimum, this description should answer: (1) Whether existing drainage conveyance is natural or urban; (2) Is runoff from offsite conveyed through the site? If yes, describe the offsite drainage areas, design flows, and locations where offsite flows enter the project site, and summarize how such flows are conveyed through the site; (3) Provide details regarding existing project site drainage conveyance network, including any existing storm drains, concrete channels, swales, detention facilities, stormwater treatment facilities, natural or constructed channels; and (4) Identify all discharge locations from the existing project site along with a summary of conveyance system size and capacity for each of the discharge locations. Provide summary of the pre-project drainage areas and design flows to each of the existing runoff discharge locations. Reference the Drainage report Attachment for detailed calculations. Describe existing site drainage patterns: The existing project site has been previously graded with frontage curb and gutter and conveys flow via overland flow. The existing site discharges directly into the storm drain line along the Avenida Alvarado frontage (Network 8, per PM 21382 storm drain improvement plans) via curb inlet. Network 8 was designed for the originally planned build-out condition and is comprised of a series of reinforced concrete pipes (RCPs) ranging between 24 and 54 inches in diameter. 8 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 (Existing site drainage patterns, continued): No offsite area contributes runoff through the site. Network 8 outlets at a concrete headwall adjacent to the southern property line of Tract Map 14936 Parcel 6 via 48-inch diameter RCP and continues draining northeasterly in a vegetated open channel until becoming intercepted by a 72-inch diameter RCP aligned northeasterly and continues underground through PM 12890 along the northern property line. The existing 72-inch diameter RCP discharges directly to Murrieta Creek just east of Diaz Road. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 9 Template Date: September 26, 2019 Preparation Date: June 4, 2021 Step 1.2: Description of Proposed Site Development and Drainage Patterns Project Description / Proposed Land Use and/or Activities: The project proposes one private light industrial building used exclusively for warehouse storage and frontage sidewalk. Proposed Land Cover Includes (select all that apply and provide each area on site): Existing to Remain ☐ Pervious Area _______ Acres (_______ Square Feet) ☐ Impervious Areas _______ Acres (_______ Square Feet) Existing to Be Replaced ☒ Pervious Area 0.45 Acres (19,423 Square Feet) ☐ Impervious Areas _______ Acres (_______ Square Feet) Newly Created ☐ Pervious Area _______ Acres (_______ Square Feet) ☒ Impervious Areas 0.69 Acres (30,164 Square Feet) Total ☒ Pervious Area 0.44 Acres (19,423 Square Feet) ☒ Impervious Areas 0.69 Acres (30,164 Square Feet) Description / Additional Information: Proposed land cover will consist of typical surfaces necessary for light industrial land use, including warehouse roofing, paved parking and drive aisle, hardscape, and landscaping. Proposed public improvements include driveway approach, sidewalk and vegetated parkway. List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): The impervious features within the parcel boundaries will include paved parking, hardscape and rooftop. The impervious features within the public right-of-way will include a commercial driveway approach and six-foot-wide sidewalk. List/describe proposed pervious features of the project (e.g., landscape areas): The pervious features within the parcel boundaries will include stabilized, drought-tolerant landscaping and mulched surfaces, including one lined biofiltration basin. The pervious features within the public right-of-way will include vegetated parkway. Describe any grading or changes to site topography: The site will maintain the same mass graded topography, with the lot sloping towards the frontage. 10 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Provide details regarding the proposed project site drainage conveyance network, including storm drains, concrete channels, swales, detention facilities, stormwater treatment facilities, natural or constructed channels, and the method for conveying offsite flows through or around the proposed project site. Identify all discharge locations from the proposed project site along with a summary of the conveyance system size and capacity for each of the discharge locations. Provide a summary of pre- and post-project drainage areas and design flows to each of the runoff discharge locations. Reference the drainage study for detailed calculations. Describe proposed site drainage patterns: The proposed project includes construction of one privately owned and maintained light industrial building used exclusively for warehouse storage and construction of a biofiltration BMP (Basin 1) sized at 3% of the effective impervious tributary area. The basin will provide the required pollutant removal and hydromodification management flow control for the onsite portion of the project. Building 1 and its associated onsite improvements will discharge into the existing PM 21382 storm drain (Network 8) at Station ~12+00 via direct lateral connection from the proposed basin. The basin will feature an overflow riser and outflow storm drain directly connected to said existing offsite storm drain to safely convey treated low-flows and overflows. The precise grading plan provides an overland escape path with adequate freeboard to safely discharge emergency flows offsite in the event the proposed drainage infrastructure becomes inoperable. Please refer to the PM 21382 storm drain improvement plans for precise sizing and location of proposed offsite infrastructure. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 11 Template Date: September 26, 2019 Preparation Date: June 4, 2021 Step 1.3: Other Site Requirements and Constraints When applicable, list other site requirements or constraints that will influence stormwater management design, such as zoning requirements including setbacks and open space, or local codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements. This WQMP has been prepared in conjunction with the precise grading plans for MS Mountain View Building 1 (PM 21382, Lot 1). Therefore, this WQMP provides detail necessary for precise grading approval for this individual development plan. As Building 1 is included within PM 21382, and this plan is being prepared concurrently with the Master WQMP for Buildings 2 through 11 and their associated offsite improvements, there is expected to be some informational overlapping between this WQMP and the Master WQMP where warranted; please refer to the separate, Master WQMP for the adjacent project site for more information when references are made thereto. The individual development plans included within the Master WQMP are referenced below: • PM 21382, Parcels 1, 4-14, 23 and 48-57 (LD20-1528) • PM 21382, Parcels 16-22 (LD21-0249) • PM 21382, Parcel 3 (Basin 1) LD21-0239 • PM 21382, Parcel 4 (Building 2) LD21-0241, B20-4794, PA20-0534 • PM 21382, Parcel 5 (Building 3) LD21-0242, B20-4795, PA20-0535 • PM 21382, Parcels 6 & 7 (Building 4) LD21-1385, B21-2367, PA21-0105 • PM 21382, Parcel 8 (Building 5) – PA No. TBD • PM 21382, Parcel 9 (Building 6) – PA No. TBD • PM 21382, Parcel 57 (Building 7) LD21-0245, B20-4796, PA20-0536 • PM 21382, Parcel 56 (Building 8) LD21-1386, B21-2368, PA21-0132 • PM 21382, Parcel 55 (Building 9) LD21-1387, B21-2730, PA21-0125 • PM 21382, Parcel 54 (Building 10) – PA No. TBD • PM 21382, Parcel 53 (Building 11) – PA No. TBD Offsite Storm Drain Assessment This development plan is being completed concurrently with a construction plan change for the existing PM 21382 storm drain network. A drainage study was prepared for the PM 21382 street and storm drain improvement plan changes that determined the existing offsite storm drain network (Network 8) was sized to accommodate build-out from the Building 1 project site. Furthermore, Network 8 was sized to accommodate the build-out hydrology not only for Building 1, but also for PM 21382 Lots 1 through 11, 48 through 61, Avenida Alvarado, Via Industria, half of Tierra Alta Way, and upstream inlet bypass from the Lots 12 through 20. This previous Network 8 ultimate condition 100-year flowrate was approximately 40.5 cfs (for the portion of Network 8 adjacent to the project frontage). As reflected in the Master WQMP and associated drainage report, portions of the offsite storm drain system (specifically, Networks 7 and 8) are to be revised to accommodate contemporary stormwater management and drainage design requirements for the proposed 21382 build-out condition. (see next page for continued drainage discussion) 12 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed. As part of this change, the originally proposed upstream Network 7 curb inlet has been removed from the plans and the existing Network 8 inlets adjacent to the Lot 4 and 58 frontages will be relocated to the Lot 3 and 59 frontages, respectively. Additionally, these relocated curb inlets will be upsized to fully intercept all flow within the right-of-way into a centralized biofiltration basin on Lot 3 via one proposed 18-inch-high by 48-inch wide RCB. The revised ultimate condition 100-year flow intercepted by these relocated and upsized inlets is approximately 52 cfs. Detained outflows from the centralized basin will be routed into Network 8 at a rate of approximately 17 cfs. This proposed change to the existing offsite storm drain system results in: (1) no bypass from the Network 8 inlets (for up to a 100-year storm) and (2) an ultimate condition decrease in peak flow to the Network 8 main line. The net result of the upstream PM 21382 storm drain improvements on Network 8 is that both the tributary area and flowrate contributing flow into Network 8 become notably reduced. Since the PM 21382 storm drain plans demonstrate that the Network 8 system can adequately convey the larger, originally planned peak flow (40.5 cfs), the smaller, revised peak flow (17 cfs) can also be adequately conveyed. Therefore, with this Network 8 peak flow reduction considered, onsite detention for Building 1 is not warranted based upon the adequacy of the existing offsite and downstream storm drain system to convey up to 40.5 cfs. Onsite Storm Drain Assessment Due to the adequacy of the offsite storm drain system to accommodate the build-out flow from the project site, the onsite storm drain system need only to convey flows into the proposed basin and make provision for overland conveyance with adequate freeboard in the event the event the onsite storm drain system becomes inoperable. The proposed condition 100-year rational method peak flow has been conservatively estimated assuming a 100-year rainfall intensity corresponding to a 5-minute time of concentration per NOAA Atlas 14. The peak flow has been estimated as follows: 𝑄𝑄=𝐶𝐶𝐶𝐶𝐶𝐶 Where: 𝐶𝐶=0.90 𝐶𝐶=5.22 𝐶𝐶𝑖𝑖/ℎ𝑟𝑟 𝐶𝐶=0.88 𝑎𝑎𝑎𝑎 𝑸𝑸=𝟒𝟒.𝟏𝟏𝟏𝟏 𝒄𝒄𝒄𝒄𝒄𝒄≅𝟓𝟓 𝒄𝒄𝒄𝒄𝒄𝒄 (see next page for continued drainage discussion) PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 13 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This space provided for additional information or continuation of information from previous sections as needed. The proposed basin overflow riser structure is a three-foot-wide by three-foot-wide Brooks Box (or equivalent) with rim elevated two and one-half feet above basin finished grade (FG). The riser will feature one (1) one-half-inch diameter orifice at 12 inches above basin FG to bypass stored volume in excess of the pollutant control design storm, as well as one (1) 12-inch-wide by two-inch-high slot at 24 inches above basin FG. The riser rim is the primary overflow structure and is conservatively assumed to operate as a broad-crested weir once surface ponding depths exceed three feet. The available hydraulic head between the riser rim elevation (1023.50) and the lowest adjacent basin wall elevation (1024.00) is six inches. Therefore, the static hydraulic head required to discharge the unattenuated 100-year peak flow through the riser rim has been conservatively estimated as follows: 𝑄𝑄=𝐶𝐶𝐶𝐶𝐻𝐻3 2⁄ 𝐻𝐻=�𝑄𝑄𝐶𝐶𝐶𝐶�2 3⁄ Where: 𝑄𝑄=5.22 𝑎𝑎𝑐𝑐𝑐𝑐 𝐶𝐶=3.087 𝐶𝐶=12 𝑐𝑐𝑓𝑓 𝑯𝑯=𝟑𝟑.𝟐𝟐𝟓𝟓 𝒊𝒊𝒊𝒊≅𝟒𝟒 𝒊𝒊𝒊𝒊𝒄𝒄𝒊𝒊𝒊𝒊𝒄𝒄 𝑭𝑭𝑭𝑭𝒊𝒊𝒊𝒊𝑭𝑭𝑭𝑭𝑭𝑭𝑭𝑭𝑭𝑭 (𝒕𝒕𝑭𝑭 𝑭𝑭𝒗𝒗𝒊𝒊𝑭𝑭𝒕𝒕𝑭𝑭𝒗𝒗𝒗𝒗𝒊𝒊𝒊𝒊𝒗𝒗)≅𝟐𝟐 𝒊𝒊𝒊𝒊𝒄𝒄𝒊𝒊𝒊𝒊𝒄𝒄 Therefore, in the unlikely event the 100-year storm peak flow arrives concurrently with two and one-half feet of surface ponding, the proposed basin and overflow riser provide the surface storage and hydraulic capacity necessary to fully convey the unattenuated 100-year peak flow without basin overtopping. In the more unlikely event the riser rim is completely inoperable and the basin surface storage were to be completely full (i.e. at surface water ponded three feet), then the lowest adjacent length of wall along the basin frontage would serve as the emergency overland escape path. As the wall can also be conservatively assumed to operate as a broad-crested weir in this scenario, the corresponding weir length would need to be equal to or greater than the riser rim circumference (9.42 feet) in order to discharge the same unattenuated 100-year peak flow at the equivalent depth of 4 inches (or less). Since the basin wall length at the spill elevation (1024.00 feet) is at least as long as the riser circumference, this criterion is satisfied and the emergency water surface elevation is assumed to be no greater than 1024.33 feet. Compared with the proposed finished floor elevation of 1027.00 feet, there is more than 2.5 feet of freeboard to the onsite habitable structure in this ultimate failure scenario. In this event, emergency flows within the improved half-street are safely conveyed to Murrieta Creek within the Avenida Alvarado right-of-way. These are highly conservative estimates based on conservative assumptions, as the basin underdrain and riser structure orifices will likely be operable under normal circumstances. This conservative sizing assessment demonstrates that, during either failure scenario, the proposed basin incorporates the necessary flow controls to safely convey the 100-year peak flow offsite without exceeding the basin surface storage capacity or inundating the proposed finished floor elevation. Therefore, the adequately sized onsite storm drain and overflow system deem the onsite storm drain system satisfactory for construction purposes, as presented on the precise grading plan. 14 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Step 2: Strategy for Meeting PDP Performance Requirements PDPs must implement BMPs to control pollutants in stormwater that may be discharged from a project (see Chapter 5). PDPs subject to hydromodification management requirements must implement flow control BMPs to manage hydromodification (see Chapter 6). Both stormwater pollutant control and flow control can be achieved within the same BMP(s). Projects triggering the 50% rule must address stormwater requirements for the entire site. Structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owner's representative and engineer of record to certify construction of the structural BMPs (see Chapter 1.12). Structural BMPs must be maintained into perpetuity, and the City must confirm the maintenance (see Chapter 7). Provide a narrative description of the general strategy for pollutant control and flow control at the project site in the box below. This information must describe how the steps for selecting and designing stormwater pollutant control BMPs presented in Chapter 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated or separate. At the end of this discussion, provide a summary of all the BMPs within the project including the type and number. Describe the general strategy for BMP implementation at the site. The proposed developments are characterized by three DMAs, summarized in the table below: DMA ID 1 SM 1 SM 2 SM 3 UNT 1 BMP ID 1 Self-Mitigating Onsite Alternative Compliance (PM 21382) BMP Type BF-1 Per Automated Worksheet B.3-1, Harvest and Use will not be feasible due to insufficient wet season harvested water demand. Per the site-wide geotechnical report and percolation testing results, it was determined that the project site is within Feasibility Category 5 via Automated Worksheet B.3-1 and will therefore implement one standard lined biofiltration BMP sized at three percent of the effective impervious tributary area. The structural BMP will be integrated for pollutant removal and hydromodification flow control for DMA 1, which consists of all proposed onsite improvements. Therefore, the basin includes various flow controls, including an underdrain flow control orifice. DMA UNT 1 is fully comprised of the proposed driveway approach, frontage sidewalk and associated vegetated parkway. As it is not feasible (nor prudent) to hydraulically connect the offsite drainage system to the onsite basin, this portion of the project will claim earned pollutant control credits made available by the PM 21382 Master WQMP (under the same project ownership). The DMA UNT 1 deficit of effectively treated stormwater is 100 cubic feet. When adjusting for water quality equivalency, the deficit becomes 125 cubic feet. The pollutant control credits earned by the Master WQMP is 859 cubic feet. Therefore, the available credits (859 cubic feet) exceed the equivalent deficit (125 cubic feet) and the PDP Performance Requirements for DMA UNT 1 are satisfied by way of said PM 21382 water quality credits. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 15 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. Category #Description i ii iii iv v vi vii viii ix x Units 0 Drainage Basin ID or Name 1 UNT 1 --------unitless 1 85th Percentile Storm Depth 0.95 0.95 --------inches 2 Design Infiltration Rate Recommended by Geotechnical Engineer 0.010 0.000 --------in/hr 3 Total Tributary Area 38,476 1,574 --------sq-ft 4 85th Percentile Storm Volume (Rainfall Volume)3,046 125 --------cubic-feet 5 Initial Weighted Runoff Factor 0.75 0.80 --------unitless 6 Initial Design Capture Volume 2,285 100 --------cubic-feet 7 Dispersion Area Reductions 0 0 --------cubic-feet 8 Tree Well and Rain Barrel Reductions 0 0 --------cubic-feet 9 Effective Area Tributary to BMP 28,857 1,259 --------square feet 10 Final Design Capture Volume Tributary to BMP 2,285 100 --------cubic-feet 11 Basin Drains to the Following BMP Type Biofiltration Other --------unitless 12 Volume Retained by BMP (normalized to 36 hour drawdown)46 0 --------cubic-feet 13 Total Fraction of Initial DCV Retained within DMA 0.02 0.00 --------fraction 14 Percent of Average Annual Runoff Retention Provided 3.0%0.0%--------% 15 Percent of Average Annual Runoff Retention Required 1.5%1.5%--------% Performance Standard 16 Percent of Pollution Control Standard Satisfied 100.0%0.0%--------% 17 Discharges to Secondary Treatment in Drainage Basin ----------unitless 18 Impervious Surface Area Still Requiring Treatment 0 1,399 --------square feet 19 Impervious Surfaces Directed to Downstream Dispersion Area ----------square feet 20 Impervious Surfaces Not Directed to Downstream Dispersion Area ----------square feet Result 21 Deficit of Effectively Treated Stormwater 0 -100 --------cubic-feet -Performance standards for onsite pollutant control are not satisfied. The applicant must implement onsite flow-thru BMPs per Worksheet B.6-1 and an offsite alternative compliance project to mitigate for the deficit of effectively treated stormwater. All fields in this summary worksheet are populated based on previous user inputs. If applicable, drainage basin elements that require revisions and/or supplemental information outside the scope of these worksheets are highlighted in orange and summairzed in the red text below. If all drainage basins achieve full compliance without a need for supplemental information, a green message will appear below. Summary Notes: -Applicant is proposing a structural BMP 'other' that is not currently supported by this automated worksheet and must provide appropriate supporting calculations to the satisfaction of the County. False False -Requirements for minimum annual retention are not satisfied at the drainage area level. Incorporate additional retention features or demonstrate minimum retention criteria is satisfied as the project-level-scale. False Total Volume Reductions Attention! Summary of Stormwater Pollutant Control Calculations (V1.3) Initial DCV Site Design Volume Reductions General Info BMP Volume Reductions Treatment Train 16 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 ATTACHMENT 1: Stormwater Pollutant Control BMP Selection Indicate which Items are Included behind this cover sheet: Attachment Sequence Contents Checklist Special Considerations for Redevelopment Projects (50% Rule) see chapter 1.7 and Step 4 of Appendix A.1. ☐ Less than or equal to fifty percent (50%) ☐ Greater than fifty percent (50%) Refer to Figure 5-1: Stormwater Pollutant Control BMP Selection Flow Chart Attachment 1a DMA Exhibit (Required) See DMA Exhibit Checklist on the back of this form. See Chapter 3.3.3 for guidance ☒ Included ☐ Entire project is designed with Self-Mitigating and De-Minimis DMAs. The project is compliant with Pollution Control BMP sizing requirements. STOP * Attachment 1b Figure B.1-1: 85th Percentile 24-hour Isohyetal Map with project location ☒ Included Attachment 1c Worksheet B.1-1 DCV 1 ☒ Included Attachment 1d Applicable Site Design BMP Fact Sheet(s) from Appendix E ☒ Included ☐ Entire project is designed with Self-Retaining DMAs. The project is compliant with Pollution Control BMP sizing requirements. STOP * Attachment 1e Structural Pollutant Control BMP Checklist ☒ Included Attachment 1f Onsite Alternative Compliance Calculations ☐ No ☒ Yes - Include WQE worksheets Attachment 1g Offsite Alternative Compliance Participation Form - Pollutant Control Refer to Figure 1-3:Pathways to Participating in Offsite Alternative Compliance Program ☐ Full Compliance Onsite ☒ Partial Compliance Onsite with Offsite Alternative Compliance or Full Offsite Alternative Compliance. Document onsite structural BMPs and complete - Pollutant Control Offsite Alternative Compliance Participation Form, and - WQE worksheets * If this box is checked, the remainder of Attachment 1 does not need to be filled out. 1 All stormwater pollutant control worksheets have been automated and are available for download at: https://www.sandiegocounty.gov/content/sdc/dpw/watersheds/DevelopmentandConstruction/BMP_Design_Manual. html PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 17 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. 18 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Attachment 1a: DMA Exhibit Checklist See Chapter 3.3.3 for guidance ☒ Point(s) of Compliance ☒ Project Site Boundary (equivalent to the Project Disturbed Area for this project) ☒ Project Disturbed Area Footprint (referred to in this WQMP as the “PDP Limits”) ☒ Drainage management area (DMA) boundaries, DMA ID numbers, DMA areas (square footage or acreage), DMA land use and pollutants of concern, and DMA type (i.e., drains to structural BMP, self-retaining, self-mitigating, or de-minimis) Note on exhibit de-minimis areas and discuss reason they could not be included in Step 1.3 per section 5.2.2 of the manual. Include offsite areas receiving treatment to mitigate Onsite Water Quality Equivalency. ☒ Include summary table of worksheet inputs for each DMA. ☒ Include description of self-mitigating areas. ☒ Potential pollutant source areas and corresponding required source control BMPs (see Chapter 4, Appendix E.1, and Step 3.5) ☒ Proposed Site Design BMPs and surface treatments used to minimize imperviousness. Show sections, details, and dimensions of site design BMP’s per chapter 5.2.3 (tree wells, dispersion areas, rain gardens, permeable pavement, rain barrels, green roofs, etc.) ☐ Proposed Harvest and Use BMPs ☒ Underlying hydrologic soil group (Web Soil Survey) ☐ Existing natural hydrologic features (watercourses, seeps, springs, wetlands, pond, lake) ☒ Existing topography and impervious areas ☒ Proposed grading and impervious areas. If the project is a subdivision or spans multiple lots show pervious and impervious totals for each lot. ☒ Existing and proposed site drainage network and connections to drainage offsite ☐ Potable water wells, onsite wastewater treatment systems (septic), underground utilities ☒ Structural BMPs (identify location, structural BMP ID No., type of BMP, and size/detail) ☒ Approximate depth to groundwater at each structural BMP ☒ Approximate infiltration rate and feasibility (full retention, partial retention, biofiltration) at each structural BMP ☐ Critical coarse sediment yield areas to be protected and or conveyed through the project site, if applicable. ☒ Temporary Construction BMPs. Include protection of source control, site design and structural BMPs during construction. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 19 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. 10 2 5 1025 1025 1030 10 3 0 CITY OF TEMECULA, CA POC 1 VICINITY MAP SITE CITY OF TEMECULA 2 1 BMP 1 DMA 1 DMA SM 1 SITE DESIGN BMPs · · · · · · PERMANENT AND OPERATIONAL SOURCE CONTROL BMPs · · · · · · · · · · · · · · · GENERAL NOTES SOURCE CONTROL BMP NOTES EXHIBIT LEGEND AND SYMBOLOGY SELF-MITIGATING DMA NOTES: APPLICANT CIVIL ENGINEER WQMP PREPARER B-16 B-15 LB-16 DMA SM 3 BIO-CURB-KMF-23 PER ACP20-001 DMA SM 2 WQMP EXHIBIT PM 21382 (MS MOUNTAIN VIEW) WQMP EXHIBIT PM 21382 (MS MOUNTAIN VIEW) PARCEL 1 (BUILDING 1) LD21-1665, B20-4793, PA20-0533 PARCEL 1 (BUILDING 1) CITY OF TEMECULA 2 2 LINED BIOFILTRATION BASIN CROSS SECTION BASIN DETAIL BMP 1 BMP DETAIL CITY OF TEMECULA, CA PM 21382 (MS MOUNTAIN VIEW) PM 21382 (MS MOUNTAIN VIEW) PARCEL 1 (BUILDING 1) LD21-1665, B20-4793, PA20-0533 PARCEL 1 (BUILDING 1) 20 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Attachment 1b: 85th Percentile 24-Hour Isohyetal Map PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 21 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. PROJECT SITE 22 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Attachment 1c: Worksheet B.1-1 DCV PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 23 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. Category #Description i ii iii iv v vi vii viii ix x Units 0 Drainage Basin ID or Name 1 UNT 1 unitless 1 Basin Drains to the Following BMP Type Biofiltration Other unitless 2 85th Percentile 24-hr Storm Depth 0.95 0.95 inches 3 Design Infiltration Rate Recommended by Geotechnical Engineer 0.010 in/hr 4 Impervious Surfaces Not Directed to Dispersion Area (C=0.90) 28,843 1,321 sq-ft 5 Semi-Pervious Surfaces Not Serving as Dispersion Area (C=0.30)sq-ft 6 Engineered Pervious Surfaces Not Serving as Dispersion Area (C=0.10)sq-ft 7 Natural Type A Soil Not Serving as Dispersion Area (C=0.10)sq-ft 8 Natural Type B Soil Not Serving as Dispersion Area (C=0.14)sq-ft 9 Natural Type C Soil Not Serving as Dispersion Area (C=0.23)sq-ft 10 Natural Type D Soil Not Serving as Dispersion Area (C=0.30)9,633 253 sq-ft 11 Does Tributary Incorporate Dispersion, Tree Wells, and/or Rain Barrels?No No yes/no 12 Impervious Surfaces Directed to Dispersion Area per SD-B (Ci=0.90) sq-ft 13 Semi-Pervious Surfaces Serving as Dispersion Area per SD-B (Ci=0.30)sq-ft 14 Engineered Pervious Surfaces Serving as Dispersion Area per SD-B (Ci=0.10)sq-ft 15 Natural Type A Soil Serving as Dispersion Area per SD-B (Ci=0.10)sq-ft 16 Natural Type B Soil Serving as Dispersion Area per SD-B (Ci=0.14)sq-ft 17 Natural Type C Soil Serving as Dispersion Area per SD-B (Ci=0.23)sq-ft 18 Natural Type D Soil Serving as Dispersion Area per SD-B (Ci=0.30)sq-ft 19 Number of Tree Wells Proposed per SD-A # 20 Average Mature Tree Canopy Diameter ft 21 Number of Rain Barrels Proposed per SD-E # 22 Average Rain Barrel Size gal 23 Does BMP Overflow to Stormwater Features in Downstream Drainage?unitless 24 Identify Downstream Drainage Basin Providing Treatment in Series unitless 25 Percent of Upstream Flows Directed to Downstream Dispersion Areas percent 26 Upstream Impervious Surfaces Directed to Dispersion Area (Ci=0.90)0 0 0 0 0 0 0 0 0 0 cubic-feet 27 Upstream Impervious Surfaces Not Directed to Dispersion Area (C=0.90)0 0 0 0 0 0 0 0 0 0 cubic-feet 28 Total Tributary Area 38,476 1,574 0 0 0 0 0 0 0 0 sq-ft 29 Initial Runoff Factor for Standard Drainage Areas 0.75 0.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 unitless 30 Initial Runoff Factor for Dispersed & Dispersion Areas 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 unitless 31 Initial Weighted Runoff Factor 0.75 0.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 unitless 32 Initial Design Capture Volume 2,285 100 0 0 0 0 0 0 0 0 cubic-feet 33 Total Impervious Area Dispersed to Pervious Surface 0 0 0 0 0 0 0 0 0 0 sq-ft 34 Total Pervious Dispersion Area 0 0 0 0 0 0 0 0 0 0 sq-ft 35 Ratio of Dispersed Impervious Area to Pervious Dispersion Area n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a ratio 36 Adjustment Factor for Dispersed & Dispersion Areas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ratio 37 Runoff Factor After Dispersion Techniques 0.75 0.80 n/a n/a n/a n/a n/a n/a n/a n/a unitless 38 Design Capture Volume After Dispersion Techniques 2,285 100 0 0 0 0 0 0 0 0 cubic-feet 39 Total Tree Well Volume Reduction 0 0 0 0 0 0 0 0 0 0 cubic-feet 40 Total Rain Barrel Volume Reduction 0 0 0 0 0 0 0 0 0 0 cubic-feet 41 Final Adjusted Runoff Factor 0.75 0.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 unitless 42 Final Effective Tributary Area 28,857 1,259 0 0 0 0 0 0 0 0 sq-ft 43 Initial Design Capture Volume Retained by Site Design Elements 0 0 0 0 0 0 0 0 0 0 cubic-feet 44 Final Design Capture Volume Tributary to BMP 2,285 100 0 0 0 0 0 0 0 0 cubic-feet Worksheet B.1-1 General Notes: False False False Automated Worksheet B.1-1: Calculation of Design Capture Volume (V1.3) A. Applicants may use this worksheet to calculate design capture volumes for up to 10 drainage areas User input must be provided for yellow shaded cells, values for all other cells will be automatically generated, errors/notifications will be highlighted in red and summarized below. Upon completion of this worksheet, proceed to the appropriate BMP Sizing worksheet(s). Dispersion Area, Tree Well & Rain Barrel Inputs (Optional) Standard Drainage Basin Inputs Results Tree & Barrel Adjustments Initial Runoff Factor Calculation Dispersion Area Adjustments Treatment Train Inputs & Calculations False 24 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Attachment 1d: Applicable Site Design BMP Fact Sheet(s) from Appendix E PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 25 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. SD-F Amended Soils E-56 July 2018 E.11 SD-F Amended Soils2 Naturally occurring (undisturbed) topsoil and vegetation provide important storm water functions including: water infiltration; nutrient, sediment, and pollutant adsorption; sediment and pollutant biofiltration; water interflow storage and transmission; and pollutant decomposition. Natural functions are largely lost when development strips away native topsoil and vegetation and replaces it with minimal topsoil and sod. Not only are these important storm water functions lost, but such landscapes themselves become pollution generating pervious surfaces due to increased use of pesticides, fertilizers and other landscaping and household/industrial chemicals, the concentration of pet wastes, and pollutants that accompany roadside litter. Amended soil attains greater storm water functions in the post development landscape, provides increased treatment of pollutants and sediments that result from development and habitation, and minimizes the need for some landscaping chemicals, thus reducing pollution through prevention. Amended soil primarily functions as a site design BMP for reducing the effective imperviousness of a site by providing partial or full infiltration of the flows that are routed to amended soil areas and otherwise slowing down excess flows that eventually reach the storm drain system. 2Reprinted from Guidelines and Resources for Implementing Amended Soil BMP T5.13 in WDOE Storm Water Management Manual for Western Washington, 2010, Washington Organic Recycling Council. MS4 Permit Category Site Design Manual Category Site Design Applicable Performance Standard Site Design Primary Benefits Volume Reduction Peak Flow Attenuation Description Design Adaptations for Project Goals SD-F Amended Soils E-57 July 2018 Amending soil per these guidelines is not the same as preservation of naturally occurring topsoil and vegetation. However, amending soil will improve on-site management of storm water flow and water quality. Soil organic matter can be attained through numerous materials such as compost, composted woody material, and biosolids. It is important that the materials used to meet this Amended Soil Fact Sheet be appropriate and beneficial to the plant cover to be established. Likewise, it is important that imported topsoils improve soil conditions and do not have an excessive percent of clay fines. The amended soil layer shall have a minimum depth of eight inches except where tree roots limit the depth of incorporation of amendments needed to meet the criteria. Subsoils below the topsoil layer should be scarified at least 4 inches with some incorporation of the upper material to avoid stratified layers, where feasible. The amended soil layer for trees shall be a minimum of three feet deep and extend at least twelve inches in all directions of the root ball when planted; the amended soil layer for shrubs shall be a minimum of two feet deep and extend at least twelve inches in all directions of the root ball when planted; the length and width must ensure the appropriate volume for the species and site. Amended Soils can be considered infeasible on slopes greater than 25 percent. Only amended planting holes for trees and shrubs need meet these requirements. Mulching requirements still apply to slopes over 25 percent. Soil Retention □ □ □ Retain, in an undisturbed state, the mulch and native topsoil to the maximum extent practicable. In any areas requiring grading remove and stockpile the mulch and topsoil on site in a designated, controlled area, not adjacent to public resources and critical areas, to be reapplied to other portions of the site where feasible. Relocated soil can be utilized to create berms or high points within the landscaping. They help contain and move water increasing the holding capacity of swales. Berms also become homes for plants that like fast drainage. Soil Quality All areas subject to clearing and grading that have not been covered by impervious surface, incorporated into a drainage facility or engineered as structural fill or slope shall, at project completion, demonstrate the following: Design Criteria and Con siderations Applications and Limitati ons SD-F Amended Soils E-58 July 2018 Soil Quality □ Amended soil Shall have a minimum organic matter content of 10% dry weight in planting beds, and 5% organic matter content in turf areas, and a pH from 6.0 to 8.0 or matching the pH of the undisturbed topsoil. Organic matter, such as leaves and twigs, feed the microbes in the soil. Microbes form part of the soil structure and act like sponges, helping the soil absorb water. □ Amended soil Shall have a minimum organic matter content of 10% dry weight in planting beds, and 5% organic matter content in turf areas, and a pH from 6.0 to 8.0 or matching the pH of the undisturbed topsoil. Organic matter, such as leaves and twigs, feed the microbes in the soil. Microbes form part of the soil structure and act like sponges, helping the soil absorb water. □ A minimum three inch layer of mulch shall be applied on all exposed soil surfaces in each landscaped area except in turf areas, creeping or rooting ground covers or direct seeding applications where mulch is contraindicated. Organic mulch materials made from recycled or post- consumer products/materials shall take precedence over inorganic materials or virgin forest products unless the recycled post-consumer organic products are not locally available. Organic mulches are not required where prohibited by County Fire Code. Highly flammable mulch material, such as straw or small, mini size wood chips, shall not be used in a "Hazardous Fire Area," as that term is defined in the County Fire Code. Mulch creates a blanket protecting the soil and plant roots from temperature change, keeps moisture in by slowing down evaporation and keeps weeds from sprouting by reducing sunlight penetration. Siting and Design Intent/Rationale □ When mulch is used as an amendment, it is applied at grade over all planting areas to a depth of 3”. Mulch should be applied on top and not mixed into underlying soils □ When shavings or compost is used as an amendment, it is rototilled into the native soil to a minimum depth of 6” (12 inches preferred). If soil is not completely mixed the overall benefit will be reduced. □ Compost meets the criteria in Appendix F.3.1.2 If poor quality compost is used, it will have negative impact to water quality. SD-F Amended Soils E-59 July 2018 Siting and Design Intent/Rationale □ Soil amendments are free of stones, stumps, roots, glass, plastic, metal, and other deleterious materials. Large debris in amended soils can cause localized erosion. Trash/harmful materials can result in personal injury or contamination. □ Mixing of soils are done prior to planting Soil mixing before planting results in a more homogeneous mixing and will reduce the stress on plants. □ Care is taken around existing trees and shrubs to prevent root damage during construction and soil amendment application. Preservation of existing established vegetation is an important part of site design and erosion control. □ Soil amendments are applied at the end of construction Soil amendments applied too soon in the construction process may become over compacted reducing effectiveness. □ Soil amendments are compatible with planned vegetation The soil amendments impact the pH and salinity of the soil. Some plants have sensitive pH and/or salinity tolerance ranges.  When soil amendments are used a runoff factor of 0.1 can be used for DCV calculation for the amended area.  Amended soils should be used as part of SD-B Impervious Area Dispersion, and to increase the retention volume in other BMPs. Annual maintenance may be required to determine reapplication requirements of amended soils. Amended soils should be regularly inspected for signs of compaction, waterlogging, and unhealthy vegetation. Maintenance Conceptual Design and Sizing Approach for Site Design 26 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Attachment 1e: Structural Pollutant Control BMP Checklist Provide the following items for each Structural BMP selected Refer to Figure 5-2: Stormwater Pollutant Control Structural BMP Selection Flow Chart DMA ID No. 1 Structural BMP ID No. 1 Precise Grading Plan Sheets 3 and 5 ☒ Worksheet B.3-1 Structural BMP Feasibility: Project-Scale BMP Feasibility Analysis ☒ Worksheet C.4-1: Categorization of Infiltration Feasibility Condition Refer to Appendices C and D to complete. ☐ Not included because the entire project will use harvest and use BMPs ☒ Worksheet D.5-1 Infiltration & partial retention Safety Factor Structural BMP Selection and Design (Chapter 5.5) complete an include the applicable worksheet(s) found in appendix B and design criteria checklists from the associated fact sheets found in appendix E for selected Structural BMP(s): ☐ Worksheet B.6-1 - Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) ☐ Retention by harvest and use (HU-1) ☐ Continuous simulation Model ☐ Worksheet B.4-1 ☐ Infiltration basin (INF-1) ☐ Bioretention (INF-2) ☐ Permeable pavement (INF-3) ☒ Worksheet B.5-1 ☐ Biofiltration with partial retention (PR-1) ☒ Biofiltration (BF-1) ☒ Biofiltration with Nutrient Sensitive Media Design (BF-2) ☒ Identification and Narrative of Receiving Water Pollutants of Concern ☐ Proprietary Biofiltration (BF-3) ☐ Appendix F checklist ☐ Identification and Narrative of Receiving Water Pollutants of Concern ☐ Worksheet B.5-3 Minimum Footprint ☐ Worksheet B.5-4 Biofiltration + Storage ☒ Selected BMPs have been designed to address the entire DCV. The DMA is compliant with Pollution Control BMP sizing requirements. STOP * ☐ Other (describe in discussion section below) ☐ Worksheet B.6-1 - Flow-thru treatment control with alternative compliance (provide BMP type/description in discussion section below) ☐ Describe in discussion section below why the remaining BMP size could not fit on site. ☐ Identification and Narrative of Receiving Water Pollutants of Concern ☐ Selection of Flow-Thru Treatment Control BMPs with high or medium effectiveness ☐ FT-1 Vegetated swales ☐ FT-2 Media Filters ☐ FT-3 Sand Filters ☐ FT-4 Dry Extended Detention Basin ☐ FT-5 Proprietary flow-thru treatment control ☐ Pollutant Control Offsite Alternative Compliance Participation form ☐ Water Quality Equivalency Worksheets20 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 27 Template Date: September 26, 2019 Preparation Date: June 4, 2021 Purpose: ☐ Pre-treatment/forebay for another structural BMP ☐ Pollutant control only ☒ Combined pollutant control and hydromodification control (see Attachment 2) ☐ Other (describe in discussion section below) Who will certify construction of this BMP? Provide name and contact information for the party responsible to sign BMP verification forms (See Chapter 1.12 of the BMP Design Manual) SDH & Associates 27363 Via Industria Temecula, California 92590 (951) 683-3691 Who will be the final owner of this BMP? ☐ HOA ☒ Property Owner ☐ City ☐ Other (describe) Who will maintain this BMP into perpetuity? ☐ HOA ☒ Property Owner ☐ City ☐ Other (describe) Discussion (as needed): The structural BMP specifications are summarized in the following table: DMA ID 1 Area (acres) 0.88 Impervious Percentage 75% DCV (cf) 2,285 DMA Type Drains to BMP BMP ID 1 In-Situ Infiltration Rate (in/hr) 0.03 Infiltration Safety Factor 3.1 Design Infiltration Rate (in/hr) 0.010 BMP Feasibility Category 5 BMP Type BF-1 3% EIA Basin Footprint (sf) 866 Proposed Footprint (sf) 930 Pollutant Control Surface Ponding Depth (in) 12 Soil Media Thickness (in) 18 Mulch Layer Depth (in) 3 Total Media Thickness (in) 21 Gravel Depth above UD (in) 11 Gravel Depth below UD (in) 3 Low-Flow Orifice Diameter (in) 0.625 * If this box is checked, Worksheet B.6-1 does not need to be filled out. Category #Description Value Units 0 Design Capture Volume for Entire Project Site 2,285 cubic-feet 1 Proposed Development Type Industrial unitless 2 Number of Residents or Employees at Proposed Development 25 # 3 Total Planted Area within Development 19,189 sq-ft 4 Water Use Category for Proposed Planted Areas Low unitless 5 Is Average Site Design Infiltration Rate ≤0.500 Inches per Hour?Yes yes/no 6 Is Average Site Design Infiltration Rate ≤0.010 Inches per Hour?Yes yes/no 7 Is Infiltration of the Full DCV Anticipated to Produce Negative Impacts?No yes/no 8 Is Infiltration of Any Volume Anticipated to Produce Negative Impacts?No yes/no 9 36-Hour Toilet Use Per Resident or Employee 1.10 cubic-feet 10 Subtotal: Anticipated 36 Hour Toilet Use 28 cubic-feet 11 Anticipated 1 Acre Landscape Use Over 36 Hours 52.14 cubic-feet 12 Subtotal: Anticipated Landscape Use Over 36 Hours 23 cubic-feet 13 Total Anticipated Use Over 36 Hours 51 cubic-feet 14 Total Anticipated Use / Design Capture Volume 0.02 cubic-feet 15 Are Full Capture and Use Techniques Feasible for this Project?No unitless 16 Is Full Retention Feasible for this Project?No yes/no 17 Is Partial Retention Feasible for this Project?No yes/no Result 18 Feasibility Category 5 1, 2, 3, 4, 5 Worksheet B.3-1 General Notes: H. PDPs participating in an offsite alternative compliance program are not held to the feasibility categories presented herein. Capture & Use Inputs Automated Worksheet B.3-1: Project-Scale BMP Feasibility Analysis (V1.3) C. Feasibility Category 1: Applicant must implement capture & use, retention, and/or infiltration elements for the entire DCV. D. Feasibility Category 2: Applicant must implement capture & use elements for the entire DCV. E. Feasibility Category 3: Applicant must implement retention and/or infiltration elements for all DMAs with Design Infiltration Rates greater than 0.50 in/hr. B. Negative impacts associated with retention may include geotechnical, groundwater, water balance, or other issues identified by a geotechnical engineer and substantiated through completion of Form I-8. Infiltration Inputs G. Feasibility Category 5: Applicant must implement standard lined biofiltration BMPs sized at ≥3% of the effective impervious tributary area for all DMAs with Design Infiltration Rates of 0.010 in/hr or less. Applicants may also be permitted to implement reduced size and/or specialized biofiltration BMPs provided additional criteria identified in "Supplemental Retention Criteria for Non-Standard Biofiltration BMPs" are satisfied. A. Applicants may use this worksheet to determine the types of structural BMPs that are acceptable for implementation at their project site (as required in Section 5 of the BMPDM). User input should be provided for yellow shaded cells, values for all other cells will be automatically generated. Projects demonstrating feasibility or potential feasibility via this worksheet are encouraged to incorporate capture and use features in their project. F. Feasibility Category 4: Applicant must implement standard unlined biofiltration BMPs sized at ≥3% of the effective impervious tributary area for all DMAs with Design Infiltration Rates of 0.011 to 0.50 in/hr. Applicants may be permitted to implement lined BMPs, reduced size BMPs, and/or specialized biofiltration BMPs provided additional criteria identified in "Supplemental Retention Criteria for Non-Standard Biofiltration BMPs" are satisfied. Calculations Worksheet C.4-1: Categorization of Infiltration Feasibility Condition Categorization of Infiltration Feasibility Condition Worksheet C.4-1 Part 1 - Full Infiltration Feasibility Screening Criteria Would infiltration of the full design volume be feasible from a physical perspective without any undesirable consequences that cannot be reasonably mitigated? Note that it is not necessary to investigate each and every criterion in the worksheet if infiltration is precluded. Instead a letter of justification from a geotechnical professional familiar with the local conditions substantiating any geotechnical issues will be required. Criteria Screening Question Yes No 1 Is the estimated reliable infiltration rate below proposed facility locations greater than 0.5 inches per hour? The response to this Screening Question must be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D. X Provide basis: Due to unavailability of a percolation test at the proposed basin location, measured infiltration rates from nearby test holes P-6, P-12 and P-13 were selected due to substantial similarity in soil type to those below the proposed facility. The proposed facility bottom is approximately 10 feet below existing ground surface, within the Pauba formation (Qbs) with soils characterized as dense, moist, fine-grained silty sand. The infiltration rates at test holes P-6, P-12, and P-13 were measured within Qbs dense, moist, fine grained silty sand and were observed to infiltrate at <0.01, 0.03 and 0.04 inches per hour, respectively. The estimated in-situ infiltration rate was therefore assumed to be the average of these three rates, yielding 0.03 inches per hour. Therefore, before consideration of a design safety factor, the estimated in-situ infiltration rate is less than 0.5 inches per hour. 2 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question must be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. Worksheet C.4-1 Page 2 of 4 Criteria Screening Question Yes No 3 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of groundwater contamination (shallow water table, storm water pollutants or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question must be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 4 Can infiltration greater than 0.5 inches per hour be allowed without causing potential water balance issues such as change of seasonality of ephemeral streams or increased discharge of contaminated groundwater to surface waters? The response to this Screening Question must be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. Part 1 Result* If all answers to rows 1 - 4 are “Yes” a full infiltration design is potentially feasible. The feasibility screening category is Full Infiltration If any answer from row 1-4 is “No”, infiltration may be possible to some extent but would not generally be feasible or desirable to achieve a “full infiltration” design. Proceed to Part 2 NO *To be completed using gathered site information and best professional judgment considering the definition of MEP in the Regional MS4 Permit. Additional testing and/or studies may be required by City staff to substantiate findings. Worksheet C.4-1 Page 3 of 4 Part 2 – Partial Infiltration vs. No Infiltration Feasibility Screening Criteria Would infiltration of water in any appreciable amount be physically feasible without any negative consequences that cannot be reasonably mitigated? Criteria Screening Question Yes No 5 Do soil and geologic conditions allow for infiltration in any appreciable rate or volume? The response to this Screening Question must be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D. X Provide basis: Per Automated Worksheet B-3.1 BMP feasibility analysis, design infiltration rates equal to or less than 0.010 per hour are not considered appreciable. When the estimated in-situ infiltration rate of 0.03 inches per hour is considered along with the estimated design safety factor of 3.1, the estimated design infiltration rate is reduced to 0.01 inches per hour. Therefore, the soil and geologic conditions are not expected to allow for infiltration in any appreciable rate or volume, and partial retention is not feasible. 6 Can Infiltration in any appreciable quantity be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question must be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. Worksheet C.4-1 Page 4 of 4 Criteria Screening Question Yes No 7 Can Infiltration in any appreciable quantity be allowed without posing significant risk for groundwater related concerns (shallow water table, storm water pollutants or other factors)? The response to this Screening Question must be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. 8 Can infiltration be allowed without violating downstream water rights? The response to this Screening Question must be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. Part 2 Result* If all answers from row 5-8 are yes then partial infiltration design is potentially feasible. The feasibility screening category is Partial Infiltration. If any answer from row 5-8 is no, then infiltration of any volume is considered to be infeasible within the drainage area. The feasibility screening category is No Infiltration. No Infiltration *To be completed using gathered site information and best professional judgment considering the definition of MEP in the Regional MS4 Permit. Additional testing and/or studies may be required by Agency/Jurisdictions to substantiate findings. Worksheet D.5-1: Factor of Safety and Design Infiltration Rate Worksheet Factor of Safety and Design Infiltration Rate Worksheet Worksheet D.5-1 Factor Category Factor Description Assigned Weight (w) Factor Value (v) Product (p) p = w x v A Suitability Assessment Soil assessment methods 0.25 2 0.50 Predominant soil texture 0.25 3 0.75 Site soil variability 0.25 1 0.25 Depth to groundwater / impervious layer 0.25 1 0.25 Suitability Assessment Safety Factor, SA = Λp 1.75 B Design Level of pretreatment/ expected sediment loads 0.5 1 0.50 Redundancy/resiliency 0.25 2 0.50 Compaction during construction 0.25 3 0.75 Design Safety Factor, SB = Λp 1.75 Combined Safety Factor, Stotal= SA x SB 3.1 Observed Infiltration Rate, inch/hr, Kobserved (corrected for test-specific bias) 0.03 Design Infiltration Rate, in/hr, Kdesign = Kobserved / Stotal 0.01 Supporting Data Factor A: The infiltration rate for the proposed facility was estimated as the average in-situ infiltration rate measured at boring locations P-6, P -12 and P -13. The infiltration rates at these borings were measured in accordance with the Riverside County Percolation Test (2011) (v=2). The corresponding boring logs at these offsite boring locations, as well as the onsite boring logs LB-16, B-15 and B -16, indicate that the soils at the facility bottom are reliably characterized as relatively homogeneous (v=1), predominantly silty and clayey (v=3), and separated at least 15 feet from the groundwater table (v=1). Factor B: The project land use is characterized as light industrial. The percentage of proposed impervious area is approximately one-half rooftop and one-half non-sanded parking, drive aisle, and hardscape. The proposed pervious areas are characterized as mostly flat, stabilized landscaped areas (v=1). The facility has an overflow riser and an overland emergency escape path in the event clogging occurs (v=2). The project site has been previously graded and compacted and the geotechnical report recommends remedial grading be provided across the lot two feet below the ground surface due to potential foundation settlement (v=3). Therefore, the site is expected to treat runoff from relatively clean surfaces, the proposed facility has a backup pathway for stormwater to discharge if clogging occurs and facility construction will occur on a compacted site. Category #Description i ii iii iv v vi vii viii ix x Units 0 Drainage Basin ID or Name 1 ---------sq-ft 1 Design Infiltration Rate Recommended by Geotechnical Engineer 0.010 ---------in/hr 2 Effective Tributary Area 28,857 ---------sq-ft 3 Minimum Biofiltration Footprint Sizing Factor 0.030 ---------ratio 4 Design Capture Volume Tributary to BMP 2,285 ---------cubic-feet 5 Is Biofiltration Basin Impermeably Lined or Unlined?Lined unitless 6 Provided Biofiltration BMP Surface Area 930 sq-ft 7 Provided Surface Ponding Depth 12 inches 8 Provided Soil Media Thickness 21 inches 9 Provided Depth of Gravel Above Underdrain Invert 11 inches 10 Diameter of Underdrain or Hydromod Orifice (Select Smallest)0.63 inches 11 Provided Depth of Gravel Below the Underdrain 3 inches 12 Volume Infiltrated Over 6 Hour Storm 0 0 0 0 0 0 0 0 0 0 cubic-feet 13 Soil Media Pore Space Available for Retention 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 unitless 14 Gravel Pore Space Available for Retention 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 unitless 15 Effective Retention Depth 1.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 inches 16 Calculated Retention Storage Drawdown (Including 6 Hr Storm)120 0 0 0 0 0 0 0 0 0 hours 17 Volume Retained by BMP 81 0 0 0 0 0 0 0 0 0 cubic-feet 18 Fraction of DCV Retained 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ratio 19 Portion of Retention Performance Standard Satisfied 0.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ratio 20 Fraction of DCV Retained (normalized to 36-hr drawdown)0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ratio 21 Design Capture Volume Remaining for Biofiltration 2,239 0 0 0 0 0 0 0 0 0 cubic-feet 22 Max Hydromod Flow Rate through Underdrain 0.0196 n/a n/a n/a n/a n/a n/a n/a n/a n/a CFS 23 Max Soil Filtration Rate Allowed by Underdrain Orifice 0.91 n/a n/a n/a n/a n/a n/a n/a n/a n/a in/hr 24 Soil Media Filtration Rate per Specifications 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 in/hr 25 Soil Media Filtration Rate to be used for Sizing 0.91 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 in/hr 26 Depth Biofiltered Over 6 Hour Storm 5.46 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 inches 27 Soil Media Pore Space Available for Biofiltration 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 unitless 28 Effective Depth of Biofiltration Storage 20.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 inches 29 Drawdown Time for Surface Ponding 13 0 0 0 0 0 0 0 0 0 hours 30 Drawdown Time for Effective Biofiltration Depth 23 0 0 0 0 0 0 0 0 0 hours 31 Total Depth Biofiltered 26.06 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 inches 32 Option 1 - Biofilter 1.50 DCV: Target Volume 3,359 0 0 0 0 0 0 0 0 0 cubic-feet 33 Option 1 - Provided Biofiltration Volume 2,019 0 0 0 0 0 0 0 0 0 cubic-feet 34 Option 2 - Store 0.75 DCV: Target Volume 1,679 0 0 0 0 0 0 0 0 0 cubic-feet 35 Option 2 - Provided Storage Volume 1,597 0 0 0 0 0 0 0 0 0 cubic-feet 36 Portion of Biofiltration Performance Standard Satisfied 0.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ratio 37 Do Site Design Elements and BMPs Satisfy Annual Retention Requirements?Yes ---------yes/no 38 Overall Portion of Performance Standard Satisfied 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ratio 39 This BMP Overflows to the Following Drainage Basin ----------unitless 40 Deficit of Effectively Treated Stormwater 0 n/a n/a n/a n/a n/a n/a n/a n/a n/a cubic-feet Worksheet B.5-1 General Notes: False Biofiltration Calculations A. Applicants may use this worksheet to size Lined or Unlined Biofiltration BMPs (BF-1, PR-1) for up to 10 basins. User input must be provided for yellow shaded cells, values for blue cells are automatically populated based on user inputs from previous worksheets, values for all other cells will be automatically generated, errors/notifications will be highlighted in red/orange and summarized below. BMPs fully satisfying the pollutant control performance standards will have a deficit treated volume of zero and be highlighted in green. False False False False Result False False Retention Calculations Automated Worksheet B.5-1: Sizing Lined or Unlined Biofiltration BMPs (V1.3) False BMP Inputs False BF-1 Biofiltration E-120 July 2018 E.18 BF-1 Biofiltration Location: 43rd Street and Logan Avenue, San Diego, California Biofiltration (Biofiltration with underdrain) facilities are vegetated surface water systems that filter water through vegetation, and soil or engineered media prior to discharge via underdrain or overflow to the downstream conveyance system. Biofiltration with underdrain facilities are commonly incorporated into the site within parking lot landscaping, along roadsides, and in open spaces. Because these types of facilities have limited or no infiltration, they are typically designed to provide enough hydraulic head to move flows through the underdrain connection to the storm drain system. Treatment is achieved through filtration, sedimentation, sorption, biochemical processes and plant uptake. Typical biofiltration with underdrain components include:  Inflow distribution mechanisms (e.g, perimeter flow spreader or filter strips)  Energy dissipation mechanism for concentrated inflows (e.g., splash blocks or riprap)  Shallow surface ponding for captured flows  Side slope and basin bottom vegetation selected based on expected climate and ponding depth  Non-floating mulch layer (Optional)  Media layer (planting mix or engineered media) capable of supporting vegetation growth  Filter course layer consisting of aggregate to prevent the migration of fines into uncompacted native soils or the aggregate storage layer  Aggregate storage layer with underdrain(s) Description MS4 Permit Category Biofiltration Manual Category Biofiltration Applicable Performance Standard Pollutant Control Flow Control Primary Benefits Treatment Volume Reduction (Incidental) Peak Flow Attenuation (Optional) BF-1 Biofiltration E-121 July 2018  Impermeable liner or uncompacted native soils at the bottom of the facility  Overflow structure Typical plan and Section view of a Biofiltration BMP BF-1 Biofiltration E-122 July 2018 Biofiltration Treatment BMP for storm water pollutant control. The system is lined or un-lined to provide incidental infiltration, and an underdrain is provided at the bottom to carry away filtered runoff. This configuration is considered to provide biofiltration treatment via flow through the media layer. Storage provided above the underdrain within surface ponding, media, and aggregate storage is considered included in the biofiltration treatment volume. Saturated storage within the aggregate storage layer can be added to this design by raising the underdrain above the bottom of the aggregate storage layer or via an internal weir structure designed to maintain a specific water level elevation. Integrated storm water flow control and pollutant control configuration. The system can be designed to provide flow rate and duration control by primarily providing increased surface ponding and/or having a deeper aggregate storage layer above the underdrain. This will allow for significant detention storage, which can be controlled via inclusion of an outlet structure at the downstream end of the underdrain. Siting Criteria Intent/Rationale □ Placement observes geotechnical recommendations regarding potential hazards (e.g., slope stability, landslides, liquefaction zones) and setbacks (e.g., slopes, foundations, utilities). Must not negatively impact existing site geotechnical concerns. □ An impermeable liner or other hydraulic restriction layer is included if site constraints indicate that infiltration or lateral flows should not be allowed. Lining prevents storm water from impacting groundwater and/or sensitive environmental or geotechnical features. Incidental infiltration, when allowable, can aid in pollutant removal and groundwater recharge. □ Contributing tributary area shall be ≤ 5 acres (≤ 1 acre preferred). Bigger BMPs require additional design features for proper performance. Contributing tributary area greater than 5 acres may be allowed at the discretion of the City Engineer if the following conditions are met: 1) incorporate design features (e.g. flow spreaders) to minimizing short circuiting of flows in the BMP and 2) incorporate additional design features requested by the City Engineer Design Adaptations for Project Goals Recommended Siting Criteria BF-1 Biofiltration E-123 July 2018 Siting Criteria Intent/Rationale for proper performance of the regional BMP. □ Finish grade of the facility is ≤ 2%. Flatter surfaces reduce erosion and channelization within the facility. BMP Component Dimension Intent/Rationale Freeboard ≥ 2 inches Freeboard provides room for head over overflow structures and minimizes risk of uncontrolled surface discharge. Surface Ponding ≥ 6 and ≤ 12 inches Surface ponding capacity lowers subsurface storage requirements. Deep surface ponding raises safety concerns. Surface ponding depth greater than 12 inches (for additional pollutant control or surface outlet structures or flow-control orifices) may be allowed at the discretion of the City Engineer if the following conditions are met: 1) surface ponding depth drawdown time is less than 24 hours; and 2) safety issues and fencing requirements are considered (typically ponding greater than 18” will require a fence and/or flatter side slopes) and 3) potential for elevated clogging risk is considered. Recommended BMP Component Dimensions BF-1 Biofiltration E-124 July 2018 BMP Component Dimension Intent/Rationale Ponding Area Side Slopes 3H:1V or shallower Gentler side slopes are safer, less prone to erosion, able to establish vegetation more quickly and easier to maintain. Mulch ≥ 3 inches Mulch will suppress weeds and maintain moisture for plant growth. Aging mulch kills pathogens and weed seeds and allows the beneficial microbes to multiply. Media Layer ≥ 18 inches A deep media layer provides additional filtration and supports plants with deeper roots. Standard specifications shall be followed. For non-standard or proprietary designs, compliance with F.1 ensures that adequate treatment performance will be provided. Underdrain Diameter ≥ 6 inches Smaller diameter underdrains are prone to clogging. Cleanout Diameter ≥ 6 inches Properly spaced cleanouts will facilitate underdrain maintenance. BF-1 Biofiltration E-125 July 2018 Biofiltration with underdrain must meet the following design criteria. Deviations from the below criteria may be approved at the discretion of the City Engineer if it is determined to be appropriate: Design Criteria Intent/Rationale Surface Ponding □ Surface ponding is limited to a 24-hour drawdown time. Surface ponding limited to 24 hours for plant health. Surface ponding drawdown time greater than 24-hours but less than 96 hours may be allowed at the discretion of the City Engineer if certified by a landscape architect or agronomist. Vegetation □ Plantings are suitable for the climate and expected ponding depth. A plant list to aid in selection can be found in Appendix E.26. Plants suited to the climate and ponding depth are more likely to survive. □ An irrigation system with a connection to water supply should be provided as needed. Seasonal irrigation might be needed to keep plants healthy. Mulch (Optional or Mandatory – Dependent on jurisdiction) □ A minimum of 3 inches of well-aged, shredded hardwood mulch that has been stockpiled or stored for at least 12 months is provided. Mulch will suppress weeds and maintain moisture for plant growth. Aging mulch kills pathogens and weed seeds and allows the beneficial microbes to multiply. Media Layer □ Media maintains a minimum filtration rate of 5 in/hr over lifetime of facility. An initial filtration rate of 8 to 12 in/hr is recommended to allow for clogging over time; the initial filtration rate should not exceed 12 inches per hour. A filtration rate of at least 5 inches per hour allows soil to drain between events. The initial rate should be higher than long term target rate to account for clogging over time. However an excessively high initial rate can have a negative impact on treatment performance, therefore an upper limit is needed. □ Media is a minimum 18 inches deep, meeting either of these two media specifications: Section F.3 Biofiltration Soil Media (BSM) or specific jurisdictional guidance. A deep media layer provides additional filtration and supports plants with deeper roots. Design Criteria and Considerations BF-1 Biofiltration E-126 July 2018 Design Criteria Intent/Rationale Alternatively, for proprietary designs and custom media mixes not meeting the media specifications, the media meets the pollutant treatment performance criteria in Section F.1. Standard specifications shall be followed. For non-standard or proprietary designs, compliance with F.1 ensures that adequate treatment performance will be provided. □ Media surface area is 3% of contributing area times adjusted runoff factor or greater. Unless demonstrated that the BMP surface area can be smaller than 3%. Greater surface area to tributary area ratios: a) maximizes volume retention as required by the MS4 Permit and b) decrease loading rates per square foot and therefore increase longevity. Adjusted runoff factor is to account for site design BMPs implemented upstream of the BMP (such as rain barrels, impervious area dispersion, etc.). Refer to Appendix B.2 guidance. □ Where receiving waters are impaired or have a TMDL for nutrients, the system is designed with nutrient sensitive media design (see fact sheet BF-2). Potential for pollutant export is partly a function of media composition; media design must minimize potential for export of nutrients, particularly where receiving waters are impaired for nutrients. Filter Course Layer □ A filter course is used to prevent migration of fines through layers of the facility. Filter fabric is not used. Migration of media can cause clogging of the aggregate storage layer void spaces or subgrade. Filter fabric is more likely to clog. □ Filter course is washed and free of fines. Washing aggregate will help eliminate fines that could clog the facility and impede infiltration. □ Filter course calculations assessing suitability for particle migration prevention have been completed. Gradation relationship between layers can evaluate factors (e.g., bridging, permeability, and uniformity) to determine if particle sizing is appropriate or if an intermediate layer is needed. Aggregate Storage Layer □ Class 2 Permeable per Caltrans specification 68- 1.025 is recommended for the storage layer. Washing aggregate will help eliminate fines that could clog the aggregate storage BF-1 Biofiltration E-127 July 2018 Design Criteria Intent/Rationale Washed, open-graded crushed rock may be used, however a 4-6 inch washed pea gravel filter course layer at the top of the crushed rock is required. layer void spaces or subgrade. □ The depth of aggregate provided (12-inch typical) and storage layer configuration is adequate for providing conveyance for underdrain flows to the outlet structure. Proper storage layer configuration and underdrain placement will minimize facility drawdown time. Inflow, Underdrain, and Outflow Structures □ Inflow, underdrains and outflow structures are accessible for inspection and maintenance. Maintenance will prevent clogging and ensure proper operation of the flow control structures. □ Inflow velocities are limited to 3 ft/s or less or use energy dissipation methods. (e.g., riprap, level spreader) for concentrated inflows. High inflow velocities can cause erosion, scour and/or channeling. □ Curb cut inlets are at least 12 inches wide, have a 4-6 inch reveal (drop) and an apron and energy dissipation as needed. Inlets must not restrict flow and apron prevents blockage from vegetation as it grows in. Energy dissipation prevents erosion. □ Underdrain outlet elevation should be a minimum of 3 inches above the bottom elevation of the aggregate storage layer. A minimal separation from subgrade or the liner lessens the risk of fines entering the underdrain and can improve hydraulic performance by allowing perforations to remain unblocked. □ Minimum underdrain diameter is 6 inches. Smaller diameter underdrains are prone to clogging. □ Underdrains are made of slotted, PVC pipe conforming to ASTM D 3034 or equivalent or corrugated, HDPE pipe conforming to AASHTO 252M or equivalent. Slotted underdrains provide greater intake capacity, clog resistant drainage, and reduced entrance velocity into the pipe, thereby reducing the chances of solids migration. □ An underdrain cleanout with a minimum 6-inch diameter and lockable cap is placed every 250 to 300 feet as required based on underdrain length. Properly spaced cleanouts will facilitate underdrain maintenance. □ Overflow is safely conveyed to a downstream storm drain system or discharge point Size overflow structure to pass 100-year peak flow for on-line infiltration basins and water quality Peak flow for off-line basins. Planning for overflow lessens the risk of property damage due to flooding. BF-1 Biofiltration E-128 July 2018 To design biofiltration with underdrain for storm water pollutant control only (no flow control required), the following steps should be taken: 1. Verify that siting and design criteria have been met, including placement requirements, contributing tributary area, maximum side and finish grade slopes, and the recommended media surface area tributary ratio. 2. Calculate the DCV per Appendix B based on expected site design runoff for tributary areas. 3. Use the sizing worksheet presented in Appendix B.5 to size biofiltration BMPs. Control of flow rates and/or durations will typically require significant surface ponding and/or aggregate storage volumes, and therefore the following steps should be taken prior to determination of storm water pollutant control design. Pre-development and allowable post-project flow rates and durations should be determined as discussed in Chapter 6 of the manual. 1. Verify that siting and design criteria have been met, including placement requirements, contributing tributary area, maximum side and finish grade slopes, and the recommended media surface area tributary ratio. 2. Iteratively determine the facility footprint area, surface ponding and/or aggregate storage layer depth required to provide detention storage to reduce flow rates and durations to allowable limits. Flow rates and durations can be controlled from detention storage by altering outlet structure orifice size(s) and/or water control levels. Multi-level orifices can be used within an outlet structure to control the full range of flows. 3. If biofiltration with underdrain cannot fully provide the flow rate and duration control required by this manual, an upstream or downstream structure with significant storage volume such as an underground vault can be used to provide remaining controls. 4. After biofiltration with underdrain has been designed to meet flow control requirements, calculations must be completed to verify if storm water pollutant control requirements to treat the DCV have been met. Normal Expected Maintenance. Biofiltration requires routine maintenance to: remove accumulated materials such as sediment, trash or debris; maintain vegetation health; maintain Conceptual Design and Sizing Approach for Storm Water Pollutant Control Only Conceptual Design and Sizing Approach when Storm Water Flow Control is Applicable Maintenance Overview BF-1 Biofiltration E-129 July 2018 infiltration capacity of the media layer; replenish mulch; and maintain integrity of side slopes, inlets, energy dissipators, and outlets. A summary table of standard inspection and maintenance indicators is provided within this Fact Sheet. Non-Standard Maintenance or BMP Failure. If any of the following scenarios are observed, the BMP is not performing as intended to protect downstream waterways from pollution and/or erosion. Corrective maintenance, increased inspection and maintenance, BMP replacement, or a different BMP type will be required.  The BMP is not drained between storm events. Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health, and surface ponding longer than approximately 96 hours following a storm event poses a risk of vector (mosquito) breeding. Poor drainage can result from clogging of the media layer, filter course, aggregate storage layer, underdrain, or outlet structure. The specific cause of the drainage issue must be determined and corrected.  Sediment, trash, or debris accumulation greater than 25% of the surface ponding volume within one month. This means the load from the tributary drainage area is too high, reducing BMP function or clogging the BMP. This would require pretreatment measures within the tributary area draining to the BMP to intercept the materials. Pretreatment components, especially for sediment, will extend the life of components that are more expensive to replace such as media, filter course, and aggregate layers.  Erosion due to concentrated storm water runoff flow that is not readily corrected by adding erosion control blankets, adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade, the City Engineer shall be contacted prior to any additional repairs or reconstruction. Other Special Considerations. Biofiltration is a vegetated structural BMP. Vegetated structural BMPs that are constructed in the vicinity of, or connected to, an existing jurisdic tional water or wetland could inadvertently result in creation of expanded waters or wetlands. As such, vegetated structural BMPs have the potential to come under the jurisdiction of the United States Army Corps of Engineers, San Diego Water Board, California Department of Fish and Wildlife, or the United States Fish and Wildlife Service. This could result in the need for specific resource agency permits and costly mitigation to perform maintenance of the structural BMP. Along with proper placement of a structural BMP, routine maintenance is key to preventing this scenario. BF-1 Biofiltration E-130 July 2018 The property owner is responsible to ensure inspection, operation and maintenance of permanent BMPs on their property unless responsibility has been formally transferred to an agency, community facilities district, homeowners association, property owners association, or other special district. Maintenance frequencies listed in this table are average/typical frequencies. Actual maintenance needs are site -specific, and maintenance may be required more frequently. Maintenance must be performed whenever needed, based on maintenance indicators presented in this table. The BMP owner is responsible for conducting regular inspections to see when maintenance is needed based on the mainten ance indicators. During the first year of operation of a structural BMP, inspection is recommended at least once prior to August 31 and then monthly from September through May. Inspection during a storm event is also recommended. After the initial period of frequent inspections, the minimum inspection and maintenance frequency can be determined based on the results of the first year inspections. Threshold/Indicator Maintenance Action Typical Maintenance Frequency Accumulation of sediment, litter, or debris Remove and properly dispose of accumulated materials, without damage to the vegetation or compaction of the media layer.  Inspect monthly. If the BMP is 25% full* or more in one month, increase inspection frequency to monthly plus after every 0.1- inch or larger storm event.  Remove any accumulated materials found at each inspection. Obstructed inlet or outlet structure Clear blockage.  Inspect monthly and after every 0.5-inch or larger storm event.  Remove any accumulated materials found at each inspection. Damage to structural components such as weirs, inlet or outlet structures Repair or replace as applicable  Inspect annually.  Maintain when needed. Summary of Standard Inspection and Maintenance BF-1 Biofiltration E-131 July 2018 Threshold/Indicator Maintenance Action Typical Maintenance Frequency Poor vegetation establishment Re-seed, re-plant, or re-establish vegetation per original plans.  Inspect monthly.  Maintain when needed. Dead or diseased vegetation Remove dead or diseased vegetation, re- seed, re-plant, or re-establish vegetation per original plans.  Inspect monthly.  Maintain when needed. Overgrown vegetation Mow or trim as appropriate.  Inspect monthly.  Maintain when needed. 2/3 of mulch has decomposed, or mulch has been removed Remove decomposed fraction and top off with fresh mulch to a total depth of 3 inches.  Inspect monthly.  Replenish mulch annually, or more frequently when needed based on inspection. Erosion due to concentrated irrigation flow Repair/re-seed/re-plant eroded areas and adjust the irrigation system.  Inspect monthly.  Maintain when needed. BF-1 Biofiltration E-132 July 2018 Threshold/Indicator Maintenance Action Typical Maintenance Frequency Erosion due to concentrated storm water runoff flow Repair/re-seed/re-plant eroded areas, and make appropriate corrective measures such as adding erosion control blankets, adding stone at flow entry points, or minor re- grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade, the City Engineer shall be contacted prior to any additional repairs or reconstruction.  Inspect after every 0.5-inch or larger storm event. If erosion due to storm water flow has been observed, increase inspection frequency to after every 0.1-inch or larger storm event.  Maintain when needed. If the issue is not corrected by restoring the BMP to the original plan and grade, the City Engineer shall be contacted prior to any additional repairs or reconstruction. Standing water in BMP for longer than 24 hours following a storm event Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health Make appropriate corrective measures such as adjusting irrigation system, removing obstructions of debris or invasive vegetation, clearing underdrains, or repairing/replacing clogged or compacted soils.  Inspect monthly and after every 0.5-inch or larger storm event. If standing water is observed, increase inspection frequency to after every 0.1-inch or larger storm event.  Maintain when needed. BF-1 Biofiltration E-133 July 2018 Threshold/Indicator Maintenance Action Typical Maintenance Frequency Presence of mosquitos/larvae For images of egg rafts, larva, pupa, and adult mosquitos, see http://www.mosquito.org/biology If mosquitos/larvae are observed: first, immediately remove any standing water by dispersing to nearby landscaping; second, make corrective measures as applicable to restore BMP drainage to prevent standing water. If mosquitos persist following corrective measures to remove standing water, or if the BMP design does not meet the 96-hour drawdown criteria due to release rates controlled by an orifice installed on the underdrain, the City Engineer shall be contacted to determine a solution. A different BMP type, or a Vector Management Plan prepared with concurrence from the County of Riverside Department of Environmental Health, may be required.  Inspect monthly and after every 0.5-inch or larger storm event. If mosquitos are observed, increase inspection frequency to after every 0.1-inch or larger storm event.  Maintain when needed. Underdrain clogged Clear blockage. Inspect if standing water is observed for longer than 24-96 hours following a storm event. Maintain when needed. “25% full” is defined as ¼ of the depth from the design bottom elevation to the crest of the outflow structure (e.g., if the height to the outflow opening is 12 inches from the bottom elevation, then the materials must be removed when there is 3 inches of accumulation – this should be marked on the outflow structure). BF-2 Nutrient Sensitive Media Design E-134 July 2018 E.19 BF-2 Nutrient Sensitive Media Design Some studies of biofiltration with underdrains have observed export of nutrients, particularly inorganic nitrogen (nitrate and nitrite) and dissolved phosphorus. This has been observed to be a short-lived phenomenon in some studies or a long term issue in some studies. The composition of the soil media, including the chemistry of individual elements is believed to be an important factor in the potential for nutrient export. Organic amendments, often compost, have been identified as the most likely source of nutrient export. The quality and stability of organic amendments can vary widely. The biofiltration media specifications contained in the County of San Diego Low Impact Development Handbook: Appendix G - Biofiltration Soil Specification (June 2014, unless superseded by more recent edition) and the City of San Diego Low Impact Development Design Manual (page B-18) (July 2011, unless superseded by more recent edition) were developed with consideration of the potential for nutrient export. These specifications include criteria for individual component characteristics and quality in order to control the overall quality of the blended mixes. As of the publication of this manual, the June 2014 County of San Diego specifications provide more detail regarding mix design and quality control. The City and County specifications noted above were developed for general purposes to meet permeability and treatment goals. In cases where the BMP discharges to receiving waters with nutrient impairments or nutrient TMDLs, the biofiltration media should be designed with the specific goal of minimizing the potential for export of nutrients from the media. Therefore, in addition to adhering to the City or County media specifications, the following guidelines should be followed: 1. Select plant palette to minimize plant nutrient needs A landscape architect or agronomist should be consulted to select a plant palette that minimizes nutrient needs. Utilizing plants with low nutrient needs results in less need to enrich the biofiltration soil mix. If nutrient quantity is then tailored to plants with lower nutrient needs, these plants will generally have less competition from weeds, which typically need higher nutrient content. The following practices are recommended to minimize nutrient needs of the plant palette:  Utilize native, drought-tolerant plants and grasses where possible. Native plants generally have a broader tolerance for nutrient content, and can be longer lived in leaner/lower nutrient soils.  Start plants from smaller starts or seed. Younger plants are generally more tolerant of lower nutrient levels and tend to help develop soil structure as they grow. Given the lower cost of smaller plants, the project should be able to accept a plant mortality rate that is somewhat higher than starting from larger plants and providing high organic content. 2. Minimize excess nutrients in media mix BF-2 Nutrient Sensitive Media Design E-135 July 2018 Once the low-nutrient plant palette is established (item 1), the landscape architect and/or agronomist should be consulted to assist in the design of a biofiltration media to balance the interests of plant establishment, water retention capacity (irrigation demand), and the potential for nutrient export. The following guidelines should be followed:  The mix should not exceed the nutrient needs of plants. In conventional landscape design, the nutrient needs of plants are often exceeded intentionally in order to provide a factor of safety for plant survival. This practice must be avoided in biofiltration media as excess nutrients will increase the chance of export. The mix designer should keep in mind that nutrients can be added later (through mulching, tilling of amendments into the surface), but it is not possible to remove nutrients, once added.  The actual nutrient content and organic content of the selected organic amendment source should be determined when specifying mix proportions. Nutrient content (i.e., C:N ratio; plant extractable nutrients) and organic content (i.e, % organic material) are relatively inexpensive to measure via standard agronomic methods and can provide important information about mix design. If mix design relies on approximate assumption about nutrient/organic content and this is not confirmed with testing (or the results of prior representative testing), it is possible that the mix could contain much more nutrient than intended.  Nutrients are better retained in soils with higher cation exchange capacity. Cation exchange capacity can be increased through selection of organic material with naturally high cation exchange capacity, such as peat or coconut coir pith, and/or selection of inorganic material with high cation exchange capacity such as some sands or engineer ed minerals (e.g., low P-index sands, zeolites, rhyolites, etc). Including higher cation exchange capacity materials would tend to reduce the net export of nutrients. Natural silty materials also provide cation exchange capacity; however potential impacts to permeability need to be considered.  Focus on soil structure as well as nutrient content. Soil structure is loosely defined as the ability of the soil to conduct and store water and nutrients as well as the degree of aeration of the soil. Soil structure can be more important than nutrient content in plant survival and biologic health of the system. If a good soil structure can be created with very low amounts of organic amendment, plants survivability should still be provided. While soil structure generally develops with time, biofiltration media can be designed to promote earlier development of soil structure. Soil structure is enhanced by the use of amendments with high humus content (as found in well-aged organic material). In addition, soil structure can be enhanced through the use of organic material with a distribution of particle sizes (i.e., a more heterogeneous mix).  Consider alternatives to compost. Compost, by nature, is a material that is continually evolving and decaying. It can be challenging to determine whether tests previously done on a given compost stock are still representative. It can also be challenging to determine how the properties of the compost will change once placed in the media bed. More stable materials BF-2 Nutrient Sensitive Media Design E-136 July 2018 such as aged coco coir pith, peat, biochar, shredded bark, and/or other amendments should be considered. With these considerations, it is anticipated that less than 10 percent organic amendment by volume could be used, while still balancing plant survivability and water retention. If compost is used, designers should strongly consider utilizing less than 10 percent by volume. 3. Design with partial retention and/or internal water storage An internal water storage zone, as described in Fact Sheet PR-1 is believed to improve retention of nutrients. For lined systems, an internal water storage zone worked by providing a zone that fluctuates between aerobic and anaerobic conditions, resulting in nitrification/denitrification. In soils that will allow infiltration, a partial retention design (PR-1) allows significant volume reduction and can also promote nitrification/denitrification. Acknowledgment: This fact sheet has been adapted from the Orange County Technical Guidance Document (May 2011). It was originally developed based on input from: Deborah Deets, City of Los Angeles Bureau of Sanitation, Drew Ready, Center for Watershed Health, Rick Fisher, ASLA, City of Los Angeles Bureau of Engineering, Dr. Garn Wallace, Wallace Laboratories, Glen Dake, GDML, and Jason Schmidt, Tree People. The guidance provided herein does not reflect the individual opinions of any individual listed above and should not be cited or otherwise attributed to those listed. Refer to maintenance information provided in the Biofiltration (BF-1) Fact Sheet. Adjust maintenance actions and reporting if required based on the specific media design. Maintenance Overview 28 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Identification and Narrative of Receiving Water and Pollutants of Concern Describe flow path of stormwater from the project site discharge location(s), through urban storm conveyance systems as applicable, to receiving creeks, rivers, and lagoons as applicable, and ultimate discharge to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable): PM 21382 Network 8  Unnamed vegetated open channel adjacent to TM 14936  existing 72-inch diameter RCP through PM 12890  Murrieta Creek  see table below: List any 303(d) impaired water bodies2 within the path of stormwater from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)/stressor(s) causing impairment, and identify any TMDLs and/or Highest Priority Pollutants from the WQIP for the impaired water bodies (see BMP Design Manual Appendix B.6.1): 303(d) Impaired Water Body Pollutant(s)/Stressor(s) TMDLs / WQIP Highest Priority Pollutant Murrieta Creek Chlorpyrifos, Copper, Indicator Bacteria, Iron, Manganese, Nitrogen, Phosphorus, Toxicity Nutrient Loading Santa Margarita River (Upper) Indicator Bacteria, Iron, Manganese, Nitrogen, Phosphorus, Toxicity Nutrient Loading Santa Margarita River (Lower) Benthic Community Effects, Chlorpyrifos, Indicator Bacteria, Nitrogen, Phosphorus, Toxicity Nutrient Loading Santa Margarita Lagoon Eutrophic Nutrient Loading and Eutrophication 2 The current list of Section 303(d) impaired water bodies can be found at http://www.waterboards.ca.gov/water_issues/programs/water_quality_assessment/#impaired PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 29 Template Date: September 26, 2019 Preparation Date: June 4, 2021 Identification of Project Site Pollutants* *Identification of project site pollutants below is only required if flow-thru treatment BMPs are implemented onsite in lieu of retention or biofiltration BMPs. Note the project must also participate in an alternative compliance program (unless prior lawful approval to meet earlier PDP requirements is demonstrated). Identify pollutants expected from the project site based on all proposed use(s) of the site (see BMP Design Manual Appendix B.6.): Pollutant Not Applicable to the Project Site Anticipated from the Project Site Also a Receiving Water Pollutant of Concern Sediment ☐ ☒ ☐ Nutrients ☐ ☒ ☒ Heavy Metals ☐ ☒ ☒ Organic Compounds ☐ ☒ ☐ Trash & Debris ☐ ☒ ☐ Oxygen Demanding Substances ☒ ☐ ☐ Oil & Grease ☐ ☒ ☐ Bacteria & Viruses ☒ ☐ ☐ Pesticides ☐ ☒ ☒ 30 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Attachment 1f: Onsite Alternative Compliance WQE Calculations PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 31 Template Date: September 26, 2019 Preparation Date: June 4, 2021 Per DCV Worksheet B.1-1, Item 44, the required DCV for the bypass DMA UNT 1 is 100 cf. Per the PM 21392 Master WQMP, the Earned Stormwater Pollutant Control Volume (46,123 cf) for the project exceeds the DCV required by the PDP (45,264 cf), making the difference (859 cf) available as credits for use elsewhere within the PM 21382 project limits without any in-lieu fee (due to both projects being under the same ownership). To establish equivalency between the untreated volume from DMA UNT 1 (VE) and the available credits earned by the MS Mountain View Master WQMP, the required ACP volume (VACP) is calculated as follows: 𝑉𝑉𝐸𝐸𝐶𝐶=𝑉𝑉𝐴𝐴𝐴𝐴𝐴𝐴 Where: 𝑉𝑉𝐸𝐸=100 (per DCV Worksheet B.1-1, #44) 𝐶𝐶=0.80 (per WQE Worksheet A.5) ∴𝑽𝑽𝑬𝑬=𝟏𝟏𝟐𝟐𝟓𝟓 𝒄𝒄𝒄𝒄 The available credits earned by the MS Mountain View Master WQMP (859 cf) exceed the equivalent DCV required by DMA UNT 1 (125 cf). Therefore, MS Mountain View Building 1 will claim 125 cubic feet from the Master WQMP and effectively offset the treatment not provided for bypass DMA UNT 1, leaving 734 cf remaining credits available for the PM 21382 Master WQMP. Agriculture 0.10 0.10 0.45 1.00 1.00 1.00 1.00 0.59 1.00 0% Agriculture 0 0 % 0% Agriculture 0 0 Commercial 0.80 0.80 0.13 0.16 0.16 0.56 0.48 1.00 0.87 0% Commercial 0 0 % 0% Commercial 0 0 Education 0.50 0.50 0.13 0.20 0.11 0.14 0.25 0.39 0.13 0% Education 0 0 % 0% Education 0 0 Industrial 11.92 0.90 0.90 0.13 0.19 0.15 0.54 0.68 0.89 0.49 71% Industrial 10.725 71 % 0% Industrial 0 0 Multi Family Residential 0.60 0.60 0.10 0.13 0.13 0.14 0.15 0.29 0.27 0% Multi Family Residential 0 0 % 0% Multi Family Reside 0 0 Orchard 0.10 0.10 0.18 0.17 0.67 1.00 1.00 0.59 0.11 0% Orchard 0 0 % 0% Orchard 0 0 Rural Residential 0.30 0.30 1.00 0.51 0.14 0.10 0.71 0.13 0.19 0% Rural Residential 0 0 % 0% Rural Residential 0 0 Single Family Residential 0.40 0.40 0.13 0.20 0.15 0.27 0.43 0.35 0.63 0% Single Family Residentia 0 0 % 0% Single Family Reside 0 0 Transportation 4.76 0.90 0.04 0.90 0.11 0.26 0.12 0.53 0.31 0.62 0.12 28% Transportation 4.2857 28 % 100% Transportation 0.0335 100 Vacant / Open Space 1.90 0.10 0.10 0.16 0.10 0.10 0.12 0.10 0.10 0.10 1% Vacant / Open Space 0.1897 1 % 0% Vacant / Open Spac 0 0 Water 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0% Water 0 0 % 0% Water 0 0 Total 18.58 -0.04 --------15.2 0.0335 0.12 0.21 0.14 0.53 0.57 0.80 0.38 0.11 0.26 0.12 0.53 0.31 0.62 0.12 -0.80 1.17 ---3.17 Notes: ACP Ref Effective area composition graphics are for illustrative purposes only. TSS TP Relative Pollutant Concentrations by Land Use 3 TN TCu TPb Automated Spreadsheet Calculation for Worksheet A.5: Land Use Factor Determination (Version 1.0) Land Use Designation ACP Tributary Characteristics Reference Tributary Characteristics 2 Area (Acres) Runoff Factor 1 Area (Acres) Runoff Factor 1 TZn FC Relative Pollutant Concentration for ACP Tributary 4 Equation 2-2 Applied to Example: Relative Pollutant Concentration for Reference Tributary 4 Land Use Factor 5 Santa Margarita River Santa Margarita (902.00) * Applicants must provide user input for yellow shaded cells. Values for all other cells will be automatically generated. 1. Revisions to default runoff factors must be supported to the satisfaction of the applicable Copermittee. 2.Applicant-Implemented ACPs must identify reference tributary characteristics that are representative of their specific PDP. Independent ACPs must reference Table 2-3 for appropriate area and runoff factor information applicable to their watershed management area. 3.Relative Pollutant Concentrations by Land Use have been identified through examination of available EMC data.Additional information on how these relative concentrations were developed is provided in Appendix B.Example: An ACP Tributary with 5.25 acres of Commercial, 1.63 Acres of Education, and 2.65 acres of Transportation land uses produces a relative pollutant concentration 0.12 for Total Suspended Solids (assumes default runoff factors are applied). Watershed Management Area Hydrologic Unit Equation 2-2: Effective Area Composition -ACP Tributary 0% Agriculture 0% Commercial 0% Education 71% Industrial 0% Multi Family Residential 0% Orchard 0% Rural Residential 0% Single Family Residential 28% Transportation 1% Vacant / Open Space 0% Water Effective Area Composition -Reference Tributary 0% Agriculture 0% Commercial 0% Education 0% Industrial 0% Multi Family Residential 0% Orchard 0% Rural Residential 0% Single Family Residential 100% Transportation 0% Vacant / Open Space 0% Water 32 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Attachment 1g: Offsite Alternative Compliance Participation Form - Pollutant Control Refer to Chapter 1.8 Onsite Project Information Record ID: Assessor's Parcel Number(s) [APN(s)] Quantity of Pollutant Control Debits or Credits (cubic feet) ☐ Debits ☐ Credits *See Attachment 1 of the PDP WQMP Offsite Project Information – Projects providing or receiving credits (add rows as needed) Record ID: APN(s) Project Owner/Address Credit/Debit Quantity (cubic feet) 1. ☐ Credit ☐ Debit 2. ☐ Credit ☐ Debit 3. ☐ Credit ☐ Debit 4. ☐ Credit ☐ Debit 5. ☐ Credit ☐ Debit 6. ☐ Credit ☐ Debit Total sum of Credits and Debits (∑Credits -∑Debits) (cubic feet) Additional Information Are offsite project(s) in the same credit trading area as the onsite project? ☐ Yes ☐ No Will projects providing credits be completed prior to completion of projects receiving credits? ☐ Yes ☐ No Are all deficits accounted for? If No, onsite and offsite projects must be redesigned to account for all deficits. ☐ Yes ☐ No Provide Alternative Compliance In-Lieu Fee Agreement and supporting WQE calculations as part of this attachment. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 33 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. 34 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 ATTACHMENT 2: Hydromodification Control Measures Indicate which Items are Included behind this cover sheet: Attachment Sequence Contents Checklist Attachment 2a Do Hydromodification Management Requirements apply? See Chapter 1.6 and Figure 1-2. ☒ Hydromodification management controls required. ☐ Green Streets Project (Exempt from hydromodification management requirements) STOP * ☐ Exempt from hydromodification management requirements ☐ Include Figure 1-2 and document any “NO” answer STOP * Attachment 2b HMP Exhibits (Required) See Checklist on the back of this Attachment cover sheet. see Chapter 6.3.1 ☒ Combined with DMA Exhibit ☐ Included Attachment 2c Management of Critical Coarse Sediment Yield Areas See Chapter 6.2 and Appendix H of the BMP Design Manual. ☒ Exhibit depicting onsite/ upstream CCSYAs (Figure H.1-1) AND, documentation that project avoids CCSYA per Appendix H.1. OR ☐ Sediment Supply BMPs implemented. Attachment 2d Structural BMP Design Calculations, Drawdown Calculations, & Overflow Design. See Chapter 6 & Appendix G of the BMP Design Manual ☒ Included ☐ Project is designed entirely with De-Minimus, Self–Mitigating, and/or qualifying Self-Retaining Areas. STOP * Attachment 2e Geomorphic Assessment of Receiving Channels. See Chapter 6.3.4 of the BMP Design Manual. ☒ low flow threshold is 0.1Q2 ☐ low flow threshold is 0.3Q2 ☐ low flow threshold is 0.5Q2 Attachment 2f Vector Control Plan (Required when structural BMPs will not drain in 96 hours) ☐ Included ☒ Not required because BMPs will drain in less than 96 hours Attachment 2g Hydromodification Offsite Alternative Compliance Form. Refer to Figure 1- 3: Pathways to Participating in Offsite Alternative Compliance Program ☒ Full Compliance Onsite ☐ Offsite ACP. Document onsite structural BMPs and complete Hydromodification Offsite Alternative Compliance Participation Form, and WQE worksheets * If this box is checked, the remainder of Attachment 2 does not need to be filled out. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 35 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. 36 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Use this checklist to ensure the required information has been included on the Hydromodification Management Exhibit: ☒ Point(s) of Compliance with name or number ☒ Project Site Boundary ☒ Project Disturbed Area Footprint ☒ Drainage management area (DMA) boundaries, DMA ID numbers, DMA areas (square footage or acreage), and DMA type (i.e., drains to structural BMP, self-retaining, self- mitigating, or de-minimis) Note on exhibit De-minimis areas and reason they could not be included. Include offsite areas receiving treatment to mitigate Onsite Water Quality Equivalency. ☒ Potential pollutant source areas and corresponding required source control BMPs (see Chapter 4, Appendix E.1, and Step 3.5) ☒ Proposed Site Design BMPs and surface treatments used to minimize imperviousness. Show sections, details, and dimensions of site design BMP’s (tree wells, dispersion areas, rain gardens, permeable pavement, rain barrels, green roofs, etc.) ☐ Proposed Harvest and Use BMPs ☒ Underlying hydrologic soil group (Web Soil Survey) ☐ Existing natural hydrologic features (watercourses, seeps, springs, wetlands, pond, lake) ☒ Existing topography and impervious areas ☒ Proposed grading and impervious areas. If the project is a subdivision or spans multiple lots show pervious and impervious totals for each lot. ☒ Existing and proposed site drainage network and connections to drainage offsite ☐ Potable water wells, onsite wastewater treatment systems (septic), underground utilities ☒ Structural BMPs (identify location, structural BMP ID No., type of BMP, and size/detail) ☒ Approximate depth to groundwater at each structural BMP ☒ Approximate infiltration rate and feasibility (full retention, partial retention, biofiltration) at each structural BMP ☐ Critical coarse sediment yield areas to be protected and or conveyed through the project site. ☐ Temporary Construction BMPs. Include protection of source control, site design and structural BMPs during construction. ☐ Onsite and Offsite Critical coarse sediment yield areas to be protected ☒ Proposed design features and surface treatments used to minimize imperviousness ☐ Existing and proposed drainage boundary and drainage area to each POC (when necessary, create separate exhibits for pre-development and post-project conditions) ☒ Structural BMPs for hydromodification management (identify location, type of BMP, and size/detail) PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 37 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. 38 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Attachment 2c: Management of Critical Coarse Sediment Yield Areas Document the findings of Site-specific Critical Coarse Sediment Analysis below. Include any calculations, and additional documentation completed as part of the analysis. Refer to Chapter 6.2 and Appendix H of the City of Temecula BMP Design Manual for additional guidance. The project effectively manages Critical Coarse Sediment Yield Areas (CCSYAs) using the following methodology: ☒ Step A. A Site-Specific Critical Coarse Sediment Yield Analysis was performed: ☒ Step A.1. Determine whether the project site is a significant source of critical coarse sediment to the channel receiving runoff (refer to CCSYA mapping in Appendix H): ☐ The project site is a significant source of Bed Sediment Supply. All channels on the project site are preserved or bypassed within the site plan. (Complete Step A.2, below) ☐ The project site is a source of Bed Sediment Supply. Channels identified as verified critical coarse sediment yield areas are preserved. (Complete Step A.2, below) ☒ The Project site is not a significant source of Bed Sediment Supply. (STOP, supporting information provided with this checklist) ☐ Impacts to verified CCSYAs cannot be avoided. (Complete Step B, below) ☐ Step A.2. Project site design avoids CCSYAs and maintains sediment supply pathways, documentation is provided following this checklist. (STOP, include supporting documentation with this checklist) ☐ Step B. Sediment Supply BMPs are implemented onsite to mitigate impacts of development in CCSYAs, documentation is provided following this checklist. (STOP, include supporting documentation with this checklist) PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 39 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. S a n t a M arg arita River 0 1 2 Miles $ June 20, 2018 Pa t h : D : \ P r o j e c t \ S o C a l \ D e l i v e r a b l e \ M A P S \ S a n t a M a r g a r i t a W a t e r S h e d _ C r i t i c a l C o a r s e _ 1 1 x 1 7 _ S u b S h e d s _ S a n d G r a v e l D e p o s i t s _ p k g _ v 2 . m x d Santa Margarita River Watershed Boundary Protected Lands Potential Critical Coarse Sediment Yield Area Potential Sediment Source Area !!?Sand and Gravel Deposits Riverside Co. San Diego Co. Santa Margarita Eco Reserve SANTA MARGARITA RIVER WATERSHED POTENTIAL CRITICAL COARSE SEDIMENT YIELD AREAS AND POTENTIAL SEDIMENT SOURCE AREASExhibit G-1 PROJECT SITE 40 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Attachment 2d: Structural BMP Design Calculations, Drawdown Calculations, & Overflow Design PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 41 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. List of Peak events and Determination of Q2 and Q10 (Pre-Development) MS Mountain View, Building 1 (POC-1) T (Year) Cunnane (cfs) Weibull (cfs) 10 0.60 0.62 Date Posit Weibull Cunnane 9 0.57 0.59 0.29 12/4/1974 39 1.03 1.02 8 0.55 0.56 0.3 2/12/1992 38 1.05 1.04 7 0.54 0.55 0.3 2/7/1994 37 1.08 1.07 6 0.53 0.53 0.3 2/14/1995 36 1.11 1.10 5 0.50 0.50 0.3 1/18/2010 35 1.14 1.13 4 0.47 0.47 0.31 9/11/1976 34 1.18 1.17 3 0.40 0.40 0.31 2/17/1980 33 1.21 1.20 2 0.35 0.35 0.31 1/20/1982 32 1.25 1.24 0.31 4/1/1982 31 1.29 1.28 0.31 1/14/1993 30 1.33 1.32 Note:0.31 1/10/1995 29 1.38 1.37 Cunnane is the preferred 0.32 1/7/1974 28 1.43 1.42 method by the HMP permit.0.32 2/8/1998 27 1.48 1.47 0.32 2/21/2000 26 1.54 1.53 0.32 10/20/2004 25 1.60 1.59 0.33 12/30/1976 24 1.67 1.66 0.34 2/19/1980 23 1.74 1.73 0.34 3/17/1982 22 1.82 1.81 0.34 3/1/1983 21 1.90 1.90 0.35 1/16/1978 20 2.00 2.00 0.35 12/16/2002 19 2.11 2.11 0.35 1/9/2005 18 2.22 2.23 0.38 1/11/2005 17 2.35 2.36 0.38 11/30/2007 16 2.50 2.51 0.39 1/18/1993 15 2.67 2.68 0.39 1/9/1998 14 2.86 2.88 0.4 3/2/1983 13 3.08 3.11 0.44 12/22/2010 12 3.33 3.38 0.45 11/30/1982 11 3.64 3.70 0.47 1/10/1978 10 4.00 4.08 0.5 12/4/1980 9 4.44 4.56 0.5 12/6/1997 8 5.00 5.16 0.53 2/23/1998 7 5.71 5.94 0.54 1/16/1993 6 6.67 7.00 0.56 1/4/1995 5 8.00 8.52 0.62 2/8/1993 4 10.00 10.89 0.66 1/29/1980 3 13.33 15.08 0.71 1/6/1993 2 20.00 24.50 0.92 1/4/1978 1 40.00 65.33 Peaks (cfs) Period of Return (Years) List of Peak events and Determination of Q2 and Q10 (Post-Development) MS Mountain View, Building 1 (POC-1) T (Year) Cunnane (cfs) Weibull (cfs) 10 0.60 0.61 Date Posit Weibull Cunnane 9 0.59 0.60 0.26 3/9/1906 39 1.03 1.02 8 0.56 0.58 0.26 2/23/1917 38 1.05 1.04 7 0.52 0.54 0.27 3/21/1917 37 1.08 1.07 6 0.44 0.46 0.27 3/9/1929 36 1.11 1.10 5 0.44 0.44 0.28 1/11/1904 35 1.14 1.13 4 0.39 0.39 0.28 12/31/1904 34 1.18 1.17 3 0.35 0.35 0.28 2/10/1912 33 1.21 1.20 2 0.32 0.32 0.28 2/8/1921 32 1.25 1.24 0.28 2/9/1924 31 1.29 1.28 0.29 11/24/1911 30 1.33 1.32 Note:0.29 1/4/1921 29 1.38 1.37 Cunnane is the preferred 0.29 3/5/1921 28 1.43 1.42 method by the HMP permit.0.29 12/1/1923 27 1.48 1.47 0.3 12/19/1909 26 1.54 1.53 0.31 2/13/1906 25 1.60 1.59 0.31 1/15/1908 24 1.67 1.66 0.31 2/15/1926 23 1.74 1.73 0.31 10/15/1930 22 1.82 1.81 0.31 1/4/1931 21 1.90 1.90 0.32 2/2/1920 20 2.00 2.00 0.33 1/2/1900 19 2.11 2.11 0.33 1/5/1904 18 2.22 2.23 0.33 12/10/1928 17 2.35 2.36 0.34 2/11/1906 16 2.50 2.51 0.35 11/28/1900 15 2.67 2.68 0.35 9/6/1902 14 2.86 2.88 0.35 1/5/1924 13 3.08 3.11 0.38 1/6/1931 12 3.33 3.38 0.38 11/24/1933 11 3.64 3.70 0.39 2/24/1909 10 4.00 4.08 0.44 11/24/1908 9 4.44 4.56 0.44 2/18/1924 8 5.00 5.16 0.44 12/16/1936 7 5.71 5.94 0.52 1/11/1919 6 6.67 7.00 0.58 12/29/1920 5 8.00 8.52 0.61 1/23/1906 4 10.00 10.89 0.65 2/3/1919 3 13.33 15.08 0.72 1/1/1919 2 20.00 24.50 0.92 12/31/1903 1 40.00 65.33 Peaks (cfs) Period of Return (Years) Flow Duration Curve Data for MS Mountain View, Building 1 (POC-1), Temecula, CA Q2 =0.35 cfs Fraction 10 % Q10 =0.60 cfs Step =0.0057 cfs Count =338063 hours 38.57 years Pass or Q (cfs)Hours > Q % time Hours>Q % time Post/Pre Fail? 1 0.035 828 2.45E-01 821 2.43E-01 99%Pass 2 0.041 733 2.17E-01 718 2.12E-01 98%Pass 3 0.046 733 2.17E-01 718 2.12E-01 98%Pass 4 0.052 652 1.93E-01 635 1.88E-01 97%Pass 5 0.058 652 1.93E-01 635 1.88E-01 97%Pass 6 0.063 595 1.76E-01 572 1.69E-01 96%Pass 7 0.069 595 1.76E-01 572 1.69E-01 96%Pass 8 0.075 551 1.63E-01 502 1.48E-01 91%Pass 9 0.080 504 1.49E-01 448 1.33E-01 89%Pass 10 0.086 504 1.49E-01 448 1.33E-01 89%Pass 11 0.092 449 1.33E-01 394 1.17E-01 88%Pass 12 0.097 449 1.33E-01 394 1.17E-01 88%Pass 13 0.103 406 1.20E-01 345 1.02E-01 85%Pass 14 0.109 406 1.20E-01 345 1.02E-01 85%Pass 15 0.115 372 1.10E-01 304 8.99E-02 82%Pass 16 0.120 327 9.67E-02 279 8.25E-02 85%Pass 17 0.126 327 9.67E-02 279 8.25E-02 85%Pass 18 0.132 280 8.28E-02 241 7.13E-02 86%Pass 19 0.137 280 8.28E-02 241 7.13E-02 86%Pass 20 0.143 253 7.48E-02 221 6.54E-02 87%Pass 21 0.149 253 7.48E-02 221 6.54E-02 87%Pass 22 0.154 238 7.04E-02 206 6.09E-02 87%Pass 23 0.160 238 7.04E-02 206 6.09E-02 87%Pass 24 0.166 211 6.24E-02 182 5.38E-02 86%Pass 25 0.171 187 5.53E-02 165 4.88E-02 88%Pass 26 0.177 187 5.53E-02 165 4.88E-02 88%Pass 27 0.183 175 5.18E-02 145 4.29E-02 83%Pass 28 0.188 175 5.18E-02 145 4.29E-02 83%Pass 29 0.194 159 4.70E-02 139 4.11E-02 87%Pass 30 0.200 159 4.70E-02 139 4.11E-02 87%Pass 31 0.205 146 4.32E-02 130 3.85E-02 89%Pass 32 0.211 128 3.79E-02 118 3.49E-02 92%Pass 33 0.217 128 3.79E-02 118 3.49E-02 92%Pass 34 0.222 119 3.52E-02 107 3.17E-02 90%Pass 35 0.228 119 3.52E-02 107 3.17E-02 90%Pass 36 0.234 107 3.17E-02 98 2.90E-02 92%Pass 37 0.240 107 3.17E-02 98 2.90E-02 92%Pass 38 0.245 93 2.75E-02 87 2.57E-02 94%Pass Detention Optimized Interval Existing Condition Pass or Q (cfs)Hours > Q % time Hours>Q % time Post/Pre Fail? Detention Optimized Interval Existing Condition 39 0.251 79 2.34E-02 77 2.28E-02 97%Pass 40 0.257 79 2.34E-02 77 2.28E-02 97%Pass 41 0.262 71 2.10E-02 70 2.07E-02 99%Pass 42 0.268 71 2.10E-02 70 2.07E-02 99%Pass 43 0.274 63 1.86E-02 63 1.86E-02 100%Pass 44 0.279 63 1.86E-02 63 1.86E-02 100%Pass 45 0.285 60 1.77E-02 56 1.66E-02 93%Pass 46 0.291 53 1.57E-02 46 1.36E-02 87%Pass 47 0.296 53 1.57E-02 46 1.36E-02 87%Pass 48 0.302 48 1.42E-02 42 1.24E-02 88%Pass 49 0.308 48 1.42E-02 42 1.24E-02 88%Pass 50 0.313 41 1.21E-02 33 9.76E-03 80%Pass 51 0.319 41 1.21E-02 33 9.76E-03 80%Pass 52 0.325 35 1.04E-02 32 9.47E-03 91%Pass 53 0.330 33 9.76E-03 29 8.58E-03 88%Pass 54 0.336 33 9.76E-03 29 8.58E-03 88%Pass 55 0.342 29 8.58E-03 26 7.69E-03 90%Pass 56 0.347 29 8.58E-03 26 7.69E-03 90%Pass 57 0.353 26 7.69E-03 23 6.80E-03 88%Pass 58 0.359 26 7.69E-03 23 6.80E-03 88%Pass 59 0.365 26 7.69E-03 23 6.80E-03 88%Pass 60 0.370 26 7.69E-03 23 6.80E-03 88%Pass 61 0.376 26 7.69E-03 23 6.80E-03 88%Pass 62 0.382 24 7.10E-03 18 5.32E-03 75%Pass 63 0.387 24 7.10E-03 18 5.32E-03 75%Pass 64 0.393 20 5.92E-03 16 4.73E-03 80%Pass 65 0.399 20 5.92E-03 16 4.73E-03 80%Pass 66 0.404 19 5.62E-03 16 4.73E-03 84%Pass 67 0.410 19 5.62E-03 16 4.73E-03 84%Pass 68 0.416 19 5.62E-03 16 4.73E-03 84%Pass 69 0.421 19 5.62E-03 15 4.44E-03 79%Pass 70 0.427 19 5.62E-03 15 4.44E-03 79%Pass 71 0.433 18 5.32E-03 14 4.14E-03 78%Pass 72 0.438 18 5.32E-03 14 4.14E-03 78%Pass 73 0.444 15 4.44E-03 11 3.25E-03 73%Pass 74 0.450 15 4.44E-03 11 3.25E-03 73%Pass 75 0.455 14 4.14E-03 11 3.25E-03 79%Pass 76 0.461 14 4.14E-03 11 3.25E-03 79%Pass 77 0.467 14 4.14E-03 11 3.25E-03 79%Pass 78 0.472 13 3.85E-03 10 2.96E-03 77%Pass 79 0.478 13 3.85E-03 10 2.96E-03 77%Pass 80 0.484 13 3.85E-03 9 2.66E-03 69%Pass 81 0.490 13 3.85E-03 9 2.66E-03 69%Pass 82 0.495 13 3.85E-03 8 2.37E-03 62%Pass 83 0.501 11 3.25E-03 8 2.37E-03 73%Pass Pass or Q (cfs)Hours > Q % time Hours>Q % time Post/Pre Fail? Detention Optimized Interval Existing Condition 84 0.507 11 3.25E-03 8 2.37E-03 73%Pass 85 0.512 11 3.25E-03 8 2.37E-03 73%Pass 86 0.518 11 3.25E-03 8 2.37E-03 73%Pass 87 0.524 11 3.25E-03 7 2.07E-03 64%Pass 88 0.529 11 3.25E-03 7 2.07E-03 64%Pass 89 0.535 9 2.66E-03 7 2.07E-03 78%Pass 90 0.541 8 2.37E-03 6 1.77E-03 75%Pass 91 0.546 8 2.37E-03 6 1.77E-03 75%Pass 92 0.552 6 1.77E-03 6 1.77E-03 100%Pass 93 0.558 6 1.77E-03 6 1.77E-03 100%Pass 94 0.563 5 1.48E-03 5 1.48E-03 100%Pass 95 0.569 5 1.48E-03 5 1.48E-03 100%Pass 96 0.575 5 1.48E-03 5 1.48E-03 100%Pass 97 0.580 5 1.48E-03 4 1.18E-03 80%Pass 98 0.586 5 1.48E-03 4 1.18E-03 80%Pass 99 0.592 4 1.18E-03 4 1.18E-03 100%Pass 100 0.597 4 1.18E-03 4 1.18E-03 100%Pass Peak Flows calculated with Cunnane Plotting Position Return Period (years)Pre-dev. Q (cfs)Post-Dev. Q (cfs) Reduction (cfs) 10 0.597 0.599 -0.001 9 0.572 0.586 -0.014 8 0.553 0.559 -0.006 7 0.540 0.520 0.020 6 0.531 0.445 0.086 5 0.500 0.440 0.060 4 0.466 0.388 0.078 3 0.395 0.350 0.045 2 0.350 0.320 0.030 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.0001 0.001 0.01 0.1 1 Q ( c f s ) Percentage of time exceeded (%) Flow Duration Curve -MS Mountain View Building 1 (POC-1) Existing Proposed Qx 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Q ( c f s ) Percentage of time exceeded (%) Flow Duration Curve -MS Mountain View Building 1 (POC-1) Existing Proposed Qx BMP 1 Storage Curve Depth (ft)Area (ft2)Volume (ft3)Elevation (ft) 0.000 930 0 18.00 0.083 930 31 18.08 0.167 930 62 18.17 0.250 930 93 18.25 0.333 930 124 18.33 0.417 930 155 18.42 0.500 930 186 18.50 0.583 930 217 18.58 0.667 930 248 18.67 0.750 930 279 18.75 0.833 930 310 18.83 0.917 930 341 18.92 1.000 930 372 19.00 1.083 930 403 19.08 1.167 930 434 19.17 1.250 930 465 19.25 1.333 930 488 19.33 1.417 930 512 19.42 1.500 930 535 19.50 1.583 930 558 19.58 1.667 930 581 19.67 1.750 930 605 19.75 1.833 930 628 19.83 1.917 930 651 19.92 2.000 930 674 20.00 2.083 930 698 20.08 2.167 930 721 20.17 2.250 930 744 20.25 2.333 930 767 20.33 2.417 930 791 20.42 2.500 930 814 20.50 2.583 930 837 20.58 2.667 930 860 20.67 2.750 930 884 20.75 2.833 930 907 20.83 2.917 930 930 20.92 3.000 930 953 21.00 3.083 930 1,031 21.08 3.167 930 1,108 21.17 3.250 930 1,186 21.25 3.333 930 1,263 21.33 3.417 930 1,341 21.42 3.500 930 1,418 21.50 BMP 1 Storage Curve Depth (ft)Area (ft2)Volume (ft3)Elevation (ft) 3.583 930 1,496 21.58 3.667 930 1,573 21.67 3.750 930 1,651 21.75 3.833 930 1,728 21.83 3.917 930 1,806 21.92 4.000 930 1,883 22.00 4.083 930 1,961 22.08 4.167 930 2,038 22.17 4.250 930 2,116 22.25 4.333 930 2,193 22.33 4.417 930 2,271 22.42 4.500 930 2,348 22.50 4.583 930 2,426 22.58 4.667 930 2,503 22.67 4.750 930 2,581 22.75 4.833 930 2,658 22.83 4.917 930 2,736 22.92 5.000 930 2,813 23.00 5.083 930 2,891 23.08 5.167 930 2,968 23.17 5.250 930 3,046 23.25 5.333 930 3,123 23.33 5.417 930 3,201 23.42 5.500 930 3,278 23.50 5.583 930 3,356 23.58 5.667 930 3,433 23.67 5.750 930 3,511 23.75 5.833 930 3,588 23.83 5.917 930 3,666 23.92 6.000 930 3,743 24.00 6.083 930 3,821 24.08 6.167 930 3,898 24.17 6.250 930 3,976 24.25 6.333 930 4,053 24.33 6.417 930 4,131 24.42 6.500 930 4,208 24.50 Effective Depth:12.00 in BMP 1 DISCHARGE RATING CURVE Notes: Diameter:0.500 inches Quantity:1 Quantity:1 h taken as total depth above the invert of the lowest discharge opening. Quantity:1 Invert Elevation:1.00 ft Invert Elevation:1.50 ft Hw = height of slot/weir invert above basin bottom Invert Elevation:0.000 ft Width:1.00 ft Length:12.00 ft Type Vertical Height:2.00 in Hw:1023.50 ft 0.167 ft Type Sharp Hw:1023.00 ft Diameter:inches Quantity:Invert Elevation:2.00 ft Basin Footprint:sf Quantity:Invert Elevation:ft Length:24.00 ft Infiltration Rate in/hr Invert Elevation:ft Width:ft Breadth:5.00 ft Factor of Safety Height:in Hw:1024.00 ft Design Infiltration Rate in/hr 0.000 ft Type Broad Hw:1022.00 ft Invert Elevation:1022.00 ft Orifice Discharge Coefficient Orifice Flow Weir Flow Q control (cfs)h/D Orifice Discharge Coefficient Orifice Flow Weir Flow Q control (cfs) Orifice Discharge Coefficient Orifice Flow Weir Discharge Coefficient Weir Flow Q control (cfs) Orifice Discharge Coefficient Orifice Flow Weir Discharge Coefficient Weir Flow Q control (cfs) Weir Discharge Coefficient Q (cfs) Weir Discharge Coefficient Q (cfs) 1022.00 0.000 N/A N/A 0.000 0.000 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.000 1022.08 0.083 0.655 0.002 N/A 0.002 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.002 1022.17 0.167 0.655 0.003 N/A 0.003 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.003 1022.25 0.250 0.655 0.003 N/A 0.003 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.003 1022.33 0.333 0.655 0.004 N/A 0.004 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.004 1022.42 0.417 0.655 0.005 N/A 0.005 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.005 1022.50 0.500 0.655 0.005 N/A 0.005 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.005 1022.58 0.583 0.655 0.005 N/A 0.005 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.005 1022.67 0.667 0.655 0.006 N/A 0.006 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.006 1022.75 0.750 0.651 0.006 N/A 0.006 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.006 1022.83 0.833 0.648 0.006 N/A 0.006 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.006 1022.92 0.917 0.648 0.007 N/A 0.007 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.007 1023.00 1.000 0.646 0.007 N/A 0.007 N/A N/A N/A N/A N/A N/A N/A 3.270 0.000 0.000 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.007 1023.08 1.083 0.644 0.007 N/A 0.007 N/A N/A N/A N/A N/A N/A N/A 3.270 0.079 0.079 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.086 1023.17 1.167 0.643 0.008 N/A 0.008 N/A N/A N/A N/A N/A N/A N/A 3.270 0.222 0.222 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.230 1023.25 1.250 0.641 0.008 N/A 0.008 N/A N/A N/A N/A N/A 0.626 0.342 N/A N/A 0.342 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.350 1023.33 1.333 0.640 0.008 N/A 0.008 N/A N/A N/A N/A N/A 0.626 0.419 N/A N/A 0.419 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.427 1023.42 1.417 0.640 0.008 N/A 0.008 N/A N/A N/A N/A N/A 0.626 0.483 N/A N/A 0.483 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0.492 1023.50 1.500 0.638 0.008 N/A 0.008 N/A N/A N/A N/A N/A 0.625 0.540 N/A N/A 0.540 N/A N/A N/A N/A N/A 3.270 0.000 N/A N/A N/A 0.548 1023.58 1.583 0.637 0.009 N/A 0.009 N/A N/A N/A N/A N/A 0.624 0.590 N/A N/A 0.590 N/A N/A N/A N/A N/A 3.270 0.944 N/A N/A N/A 1.543 1023.67 1.667 0.636 0.009 N/A 0.009 N/A N/A N/A N/A N/A 0.624 0.637 N/A N/A 0.637 N/A N/A N/A N/A N/A 3.270 2.670 N/A N/A N/A 3.316 1023.75 1.750 0.635 0.009 N/A 0.009 N/A N/A N/A N/A N/A 0.623 0.680 N/A N/A 0.680 N/A N/A N/A N/A N/A 3.270 4.905 N/A N/A N/A 5.595 1023.83 1.833 0.634 0.009 N/A 0.009 N/A N/A N/A N/A N/A 0.623 0.722 N/A N/A 0.722 N/A N/A N/A N/A N/A 3.270 7.552 N/A N/A N/A 8.283 1023.92 1.917 0.634 0.010 N/A 0.010 N/A N/A N/A N/A N/A 0.622 0.759 N/A N/A 0.759 N/A N/A N/A N/A N/A 3.270 10.554 N/A N/A N/A 11.323 1024.00 2.000 0.633 0.010 N/A 0.010 N/A N/A N/A N/A N/A 0.622 0.797 N/A N/A 0.797 N/A N/A N/A N/A N/A 3.270 13.874 2.800 0.000 N/A 14.681 1024.08 2.083 0.632 0.010 N/A 0.010 N/A N/A N/A N/A N/A 0.622 0.832 N/A N/A 0.832 N/A N/A N/A N/A N/A 3.270 17.484 2.800 1.617 N/A 19.942 1024.17 2.167 0.631 0.010 N/A 0.010 N/A N/A N/A N/A N/A 0.622 0.866 N/A N/A 0.866 N/A N/A N/A N/A N/A 3.270 21.361 2.800 4.572 N/A 26.810 1024.25 2.250 0.631 0.010 N/A 0.010 N/A N/A N/A N/A N/A 0.622 0.898 N/A N/A 0.898 N/A N/A N/A N/A N/A 3.270 25.489 2.800 8.400 N/A 34.798 1024.33 2.333 0.630 0.010 N/A 0.010 N/A N/A N/A N/A N/A 0.621 0.929 N/A N/A 0.929 N/A N/A N/A N/A N/A 3.270 29.854 2.860 13.210 N/A 44.003 1024.42 2.417 0.630 0.011 N/A 0.011 N/A N/A N/A N/A N/A 0.621 0.959 N/A N/A 0.959 N/A N/A N/A N/A N/A 3.270 34.442 2.920 18.849 N/A 54.260 1024.50 2.500 0.630 0.011 N/A 0.011 N/A N/A N/A N/A N/A 0.620 0.988 N/A N/A 0.988 N/A N/A N/A N/A N/A 3.270 39.245 3.000 25.456 N/A 65.699 LOWER WEIR EMERGENCY WEIR Q inf (cfs) Q TOTAL (cfs) Infiltration UPPER SLOT Elevation (ft) Lowest Orifice Lower Slot Lower Weir Upper Orifice Upper Slot Emergency Weir Absolute Invert Elevation of Lowest Discharge Opening h (ft) LOWEST ORIFICE UPPER ORIFICE LOWER SLOT 0.000 0.500 1.000 1.500 2.000 2.500 3.000 0.000 10.000 20.000 30.000 40.000 50.000 60.000 70.000 St a g e ( f t ) Discharge (cfs) Rating Curve BMP_1 ABMP 930.0 sq-ft Cg 0.61 Dorif 0.625 in Aorif 0.00213 sq-ft CSWMM 0.1399 s-(in)^0.5/h 0.011265 cfs Hgravel 1.166667 ft Hgravel 14 in Hsoil 1.75 ft Hsoil 21 in Hsurface 1 ft Hsurface 12 in Hdesign-SWMM 3.917 ft 47 in Hdesign 3.891 ft 46.6875 in Qorif-classic 0.02064 cfs Qorif-SWMM 0.02064 cfs Qdiversion 0.02064 cfs Qorif-classic 0.02057 cfs Qorif-SWMM 0.02057 cfs Using Hdesign-SWMM Using Hdesign [TITLE] ;;Project Title/Notes MS Mountain View, Building 1 Hydromodification Management Plan Existing Condition [OPTIONS] ;;Option             Value FLOW_UNITS           CFS INFILTRATION         GREEN_AMPT FLOW_ROUTING         KINWAVE LINK_OFFSETS         DEPTH MIN_SLOPE            0 ALLOW_PONDING        NO SKIP_STEADY_STATE    NO START_DATE           01/05/1974 START_TIME           00:00:00 REPORT_START_DATE    01/05/1974 REPORT_START_TIME    00:00:00 END_DATE             07/29/2012 END_TIME             23:00:00 SWEEP_START          01/01 SWEEP_END            12/31 DRY_DAYS             0 REPORT_STEP          01:00:00 WET_STEP             01:00:00 DRY_STEP             01:00:00 ROUTING_STEP         0:01:00  RULE_STEP            00:00:00 INERTIAL_DAMPING     PARTIAL NORMAL_FLOW_LIMITED  BOTH FORCE_MAIN_EQUATION  H‐W VARIABLE_STEP        0.75 LENGTHENING_STEP     0 MIN_SURFAREA         12.557 MAX_TRIALS           8 HEAD_TOLERANCE       0.005 SYS_FLOW_TOL         5 LAT_FLOW_TOL         5 MINIMUM_STEP         0.5 THREADS              1 [EVAPORATION] ;;Data Source    Parameters ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ MONTHLY          0.047  0.076  0.091  0.130  0.155  0.192  0.171  0.127  0.086  0.051  0.040  0.041  DRY_ONLY         NO [RAINGAGES] ;;Name           Format    Interval SCF      Source     ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐ ‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ TEMECULA_VALLEY  INTENSITY 1:00     1.0      TIMESERIES TEMECULA_VALLEY  [SUBCATCHMENTS] ;;Name           Rain Gage        Outlet           Area     %Imperv  Width    %Slope   CurbLen  SnowPack         ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DMA_1_Pads       TEMECULA_VALLEY  POC‐1            0.725    0        316      2        0                         DMA_1_Slopes     TEMECULA_VALLEY  DMA_1_Pads       0.158    0        343      40       0                         [SUBAREAS] ;;Subcatchment   N‐Imperv   N‐Perv     S‐Imperv   S‐Perv     PctZero    RouteTo    PctRouted  ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ DMA_1_Pads       0.012      0.05       0.05       0.1        25         OUTLET     DMA_1_Slopes     0.012      0.05       0.05       0.1        25         OUTLET     [INFILTRATION] ;;Subcatchment   Param1     Param2     Param3     Param4     Param5     ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ DMA_1_Pads       7.2        0.0525     0.31                             DMA_1_Slopes     7.2        0.0525     0.31                             [OUTFALLS] ;;Name           Elevation  Type       Stage Data       Gated    Route To         ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ POC‐1            0          FREE                        NO                        [TIMESERIES] ;;Name           Date       Time       Value      ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ TEMECULA_VALLEY  FILE "X:\ENGR\HMP\SWMM\Rain Gages\Temecula Valley\SWMM_TemeculaValley_Hourly.txt" [REPORT] ;;Reporting Options SUBCATCHMENTS ALL NODES ALL LINKS ALL [TAGS] [MAP] DIMENSIONS 2182.681359 6021.851375 2183.279716 6040.229030 Units      Degrees [COORDINATES] ;;Node           X‐Coord            Y‐Coord            ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ POC‐1            2182.346120        6029.689506        [VERTICES] ;;Link           X‐Coord            Y‐Coord            ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ [Polygons] ;;Subcatchment   X‐Coord            Y‐Coord            ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DMA_1_Pads       2182.349244        6034.276834        DMA_1_Slopes     2181.246986        6035.519380        [SYMBOLS] ;;Gage           X‐Coord            Y‐Coord            ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ TEMECULA_VALLEY  2182.754161        6037.224397          EPA STORM WATER MANAGEMENT MODEL ‐ VERSION 5.1 (Build 5.1.015)   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   MS Mountain View, Building 1    Hydromodification Management Plan    Existing Condition          *********************************************************   NOTE: The summary statistics displayed in this report are   based on results found at every computational time step,     not just on results from each reporting time step.   *********************************************************      ****************   Analysis Options   ****************   Flow Units ............... CFS   Process Models:     Rainfall/Runoff ........ YES     RDII ................... NO     Snowmelt ............... NO     Groundwater ............ NO     Flow Routing ........... NO     Water Quality .......... NO   Infiltration Method ...... GREEN_AMPT   Starting Date ............ 01/05/1974 00:00:00   Ending Date .............. 07/29/2012 23:00:00   Antecedent Dry Days ...... 0.0   Report Time Step ......... 01:00:00   Wet Time Step ............ 01:00:00   Dry Time Step ............ 01:00:00         **************************        Volume         Depth   Runoff Quantity Continuity     acre‐feet        inches   **************************     ‐‐‐‐‐‐‐‐‐       ‐‐‐‐‐‐‐   Total Precipitation ......        44.601       606.130   Evaporation Loss .........         0.479         6.507   Infiltration Loss ........        35.991       489.125   Surface Runoff ...........         9.477       128.799   Final Storage ............         0.000         0.000   Continuity Error (%) .....        ‐3.019         **************************        Volume        Volume   Flow Routing Continuity        acre‐feet      10^6 gal   **************************     ‐‐‐‐‐‐‐‐‐     ‐‐‐‐‐‐‐‐‐   Dry Weather Inflow .......         0.000         0.000   Wet Weather Inflow .......         9.477         3.088   Groundwater Inflow .......         0.000         0.000   RDII Inflow ..............         0.000         0.000   External Inflow ..........         0.000         0.000   External Outflow .........         9.477         3.088   Flooding Loss ............         0.000         0.000   Evaporation Loss .........         0.000         0.000   Exfiltration Loss ........         0.000         0.000   Initial Stored Volume ....         0.000         0.000   Final Stored Volume ......         0.000         0.000   Continuity Error (%) .....         0.000         ***************************   Subcatchment Runoff Summary   ***************************      ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐                             Total      Total      Total      Total     Imperv       Perv      Total       Total     Peak  Runoff                            Precip      Runon       Evap      Infil     Runoff     Runoff     Runoff      Runoff   Runoff   Coeff   Subcatchment                 in         in         in         in         in         in         in    10^6 gal      CFS   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   DMA_1_Pads               606.13      30.04       6.58     490.30       0.00     156.87     156.87        3.09     0.94   0.247   DMA_1_Slopes             606.13       0.00       6.19     483.72       0.00     137.83     137.83        0.59     0.19   0.227      Analysis begun on:  Mon Mar 29 13:35:44 2021   Analysis ended on:  Mon Mar 29 13:36:05 2021   Total elapsed time: 00:00:21 [TITLE] ;;Project Title/Notes MS Mountain View, Building 1 Hydromodification Management Plan Proposed Condition [OPTIONS] ;;Option             Value FLOW_UNITS           CFS INFILTRATION         GREEN_AMPT FLOW_ROUTING         KINWAVE LINK_OFFSETS         DEPTH MIN_SLOPE            0 ALLOW_PONDING        NO SKIP_STEADY_STATE    NO START_DATE           01/05/1974 START_TIME           00:00:00 REPORT_START_DATE    01/05/1974 REPORT_START_TIME    00:00:00 END_DATE             07/29/2012 END_TIME             23:00:00 SWEEP_START          01/01 SWEEP_END            12/31 DRY_DAYS             0 REPORT_STEP          01:00:00 WET_STEP             01:00:00 DRY_STEP             01:00:00 ROUTING_STEP         0:01:00  RULE_STEP            00:00:00 INERTIAL_DAMPING     PARTIAL NORMAL_FLOW_LIMITED  BOTH FORCE_MAIN_EQUATION  H‐W VARIABLE_STEP        0.75 LENGTHENING_STEP     0 MIN_SURFAREA         12.557 MAX_TRIALS           8 HEAD_TOLERANCE       0.005 SYS_FLOW_TOL         5 LAT_FLOW_TOL         5 MINIMUM_STEP         0.5 THREADS              1 [EVAPORATION] ;;Data Source    Parameters ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ MONTHLY          0.047  0.076  0.091  0.130  0.155  0.192  0.171  0.127  0.086  0.051  0.040  0.041  DRY_ONLY         NO [RAINGAGES] ;;Name           Format    Interval SCF      Source     ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐ ‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ TEMECULA_VALLEY  INTENSITY 1:00     1.0      TIMESERIES TEMECULA_VALLEY  [SUBCATCHMENTS] ;;Name           Rain Gage        Outlet           Area     %Imperv  Width    %Slope   CurbLen  SnowPack         ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DMA_1_Pads       TEMECULA_VALLEY  BMP_1            0.700    91       632      2        0                         BMP_1            TEMECULA_VALLEY  SURF_1           0.021350 0        10       0        0                         DMA_1_Slopes     TEMECULA_VALLEY  DMA_1_Pads       0.158    0        343      40       0                         [SUBAREAS] ;;Subcatchment   N‐Imperv   N‐Perv     S‐Imperv   S‐Perv     PctZero    RouteTo    PctRouted  ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ DMA_1_Pads       0.012      0.05       0.05       0.1        25         OUTLET     BMP_1            0.012      0.05       0.05       0.1        25         OUTLET     DMA_1_Slopes     0.012      0.05       0.05       0.1        25         OUTLET     [INFILTRATION] ;;Subcatchment   Param1     Param2     Param3     Param4     Param5     ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ DMA_1_Pads       1.5        0.3        0.33       7          0          BMP_1            1.5        0.3        0.33       7          0          DMA_1_Slopes     7.2        0.0525     0.31       7          0          [LID_CONTROLS] ;;Name           Type/Layer Parameters ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ BMP_1            BC BMP_1            SURFACE    12         0          0          0          5          BMP_1            SOIL       21         0.4        0.2        0.1        5          5          1.5        BMP_1            STORAGE    14         0.67       0          0          BMP_1            DRAIN      0.1610     0.5        3          6          0          0                     [LID_USAGE] ;;Subcatchment   LID Process      Number  Area       Width      InitSat    FromImp    ToPerv     RptFile                  DrainTo          FromPerv   ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ BMP_1            BMP_1            1       930.01     10         0          100        0          *                        POC‐1            100              [OUTFALLS] ;;Name           Elevation  Type       Stage Data       Gated    Route To         ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ POC‐1            0          FREE                        NO                        [STORAGE] ;;Name           Elev.    MaxDepth   InitDepth  Shape      Curve Name/Params            N/A      Fevap    Psi      Ksat     IMD      ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐          ‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ SURF_1           0        2.5        0          TABULAR    SURF_1                       0        1        [OUTLETS] ;;Name           From Node        To Node          Offset     Type            QTable/Qcoeff    Qexpon     Gated    ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐ OUT_1            SURF_1           POC‐1            0          TABULAR/DEPTH   OUT_1                       NO       [CURVES] ;;Name           Type       X‐Value    Y‐Value    ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ OUT_1            Rating     0.000      0.000      OUT_1                       0.083      0.002      OUT_1                       0.167      0.003      OUT_1                       0.250      0.003      OUT_1                       0.333      0.004      OUT_1                       0.417      0.005      OUT_1                       0.500      0.005      OUT_1                       0.583      0.005      OUT_1                       0.667      0.006      OUT_1                       0.750      0.006      OUT_1                       0.833      0.006      OUT_1                       0.917      0.007      OUT_1                       1.000      0.007      OUT_1                       1.083      0.086      OUT_1                       1.167      0.230      OUT_1                       1.250      0.350      OUT_1                       1.333      0.427      OUT_1                       1.417      0.492      OUT_1                       1.500      0.548      OUT_1                       1.583      1.543      OUT_1                       1.667      3.316      OUT_1                       1.750      5.595      OUT_1                       1.833      8.283      OUT_1                       1.917      11.323     OUT_1                       2.000      14.681     OUT_1                       2.083      19.942     OUT_1                       2.167      26.810     OUT_1                       2.250      34.798     OUT_1                       2.333      44.003     OUT_1                       2.417      54.260     OUT_1                       2.500      65.699     ; SURF_1           Storage    0          930        SURF_1                      2.5        930        [TIMESERIES] ;;Name           Date       Time       Value      ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐ TEMECULA_VALLEY  FILE "X:\ENGR\HMP\SWMM\Rain Gages\Temecula Valley\SWMM_TemeculaValley_Hourly.txt" [REPORT] ;;Reporting Options SUBCATCHMENTS ALL NODES ALL LINKS ALL [TAGS] [MAP] DIMENSIONS 191.920 4920.830 1021.827 5718.627 Units      None [COORDINATES] ;;Node           X‐Coord            Y‐Coord            ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ POC‐1            760.149            4957.093           SURF_1           759.940            5158.889           [VERTICES] ;;Link           X‐Coord            Y‐Coord            ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ [Polygons] ;;Subcatchment   X‐Coord            Y‐Coord            ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DMA_1_Pads       758.437            5568.928           DMA_1_Pads       758.437            5568.928           BMP_1            759.940            5369.356           DMA_1_Slopes     656.259            5626.828           [SYMBOLS] ;;Gage           X‐Coord            Y‐Coord            ;;‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ TEMECULA_VALLEY  751.625            5690.405             EPA STORM WATER MANAGEMENT MODEL ‐ VERSION 5.1 (Build 5.1.015)   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   MS Mountain View, Building 1    Hydromodification Management Plan    Proposed Condition          *********************************************************   NOTE: The summary statistics displayed in this report are   based on results found at every computational time step,     not just on results from each reporting time step.   *********************************************************      ****************   Analysis Options   ****************   Flow Units ............... CFS   Process Models:     Rainfall/Runoff ........ YES     RDII ................... NO     Snowmelt ............... NO     Groundwater ............ NO     Flow Routing ........... YES     Ponding Allowed ........ NO     Water Quality .......... NO   Infiltration Method ...... GREEN_AMPT   Flow Routing Method ...... KINWAVE   Starting Date ............ 01/05/1974 00:00:00   Ending Date .............. 07/29/2012 23:00:00   Antecedent Dry Days ...... 0.0   Report Time Step ......... 01:00:00   Wet Time Step ............ 01:00:00   Dry Time Step ............ 01:00:00   Routing Time Step ........ 60.00 sec         **************************        Volume         Depth   Runoff Quantity Continuity     acre‐feet        inches   **************************     ‐‐‐‐‐‐‐‐‐       ‐‐‐‐‐‐‐   Initial LID Storage ......         0.004         0.051   Total Precipitation ......        44.417       606.130   Evaporation Loss .........         4.076        55.620   Infiltration Loss ........         9.607       131.100   Surface Runoff ...........        10.152       138.535   LID Drainage .............        22.243       303.540   Final Storage ............         0.004         0.051   Continuity Error (%) .....        ‐3.739         **************************        Volume        Volume   Flow Routing Continuity        acre‐feet      10^6 gal   **************************     ‐‐‐‐‐‐‐‐‐     ‐‐‐‐‐‐‐‐‐   Dry Weather Inflow .......         0.000         0.000   Wet Weather Inflow .......        32.395        10.556   Groundwater Inflow .......         0.000         0.000   RDII Inflow ..............         0.000         0.000   External Inflow ..........         0.000         0.000   External Outflow .........        32.316        10.531   Flooding Loss ............         0.000         0.000   Evaporation Loss .........         0.074         0.024   Exfiltration Loss ........         0.000         0.000   Initial Stored Volume ....         0.000         0.000   Final Stored Volume ......         0.000         0.000   Continuity Error (%) .....         0.015         ********************************   Highest Flow Instability Indexes   ********************************   All links are stable.         *************************   Routing Time Step Summary   *************************   Minimum Time Step           :    60.00 sec   Average Time Step           :    60.00 sec   Maximum Time Step           :    60.00 sec   Percent in Steady State     :     0.00   Average Iterations per Step :     1.00   Percent Not Converging      :     0.00         ***************************   Subcatchment Runoff Summary   ***************************      ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐                             Total      Total      Total      Total     Imperv       Perv      Total       Total     Peak  Runoff                            Precip      Runon       Evap      Infil     Runoff     Runoff     Runoff      Runoff   Runoff   Coeff   Subcatchment                 in         in         in         in         in         in         in    10^6 gal      CFS   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   DMA_1_Pads               606.13      31.11      49.04      55.51     553.97       2.30     556.26       10.57     0.94   0.873   BMP_1                    606.13   18238.15     637.17       0.00       0.00       0.00   18207.90       10.56     0.94   0.966   DMA_1_Slopes             606.13       0.00       6.19     483.72       0.00     137.83     137.83        0.59     0.19   0.227      ***********************   LID Performance Summary   ***********************   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐                                          Total      Evap     Infil   Surface    Drain    Initial     Final  Continuity                                         Inflow      Loss      Loss   Outflow   Outflow   Storage   Storage       Error   Subcatchment      LID Control             in        in        in        in        in        in        in           %   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   BMP_1             BMP_1             18844.28    637.19      0.00   5706.06  12502.43      2.10      2.10       ‐0.01      ******************   Node Depth Summary   ******************      ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐                                  Average  Maximum  Maximum  Time of Max    Reported                                    Depth    Depth      HGL   Occurrence   Max Depth   Node                 Type         Feet     Feet     Feet  days hr:min        Feet   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   POC‐1                OUTFALL      0.00     0.00     0.00     0  00:00        0.00   SURF_1               STORAGE      0.01     1.53    23.53  1461  00:02        1.53         *******************   Node Inflow Summary   *******************      ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐                                   Maximum  Maximum                  Lateral       Total        Flow                                   Lateral    Total  Time of Max      Inflow      Inflow     Balance                                    Inflow   Inflow   Occurrence      Volume      Volume       Error   Node                 Type           CFS      CFS  days hr:min    10^6 gal    10^6 gal     Percent   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   POC‐1                OUTFALL       0.02     0.94  1461  00:02        7.25        10.5       0.000   SURF_1               STORAGE       0.92     0.92  1461  00:01        3.31        3.31       0.047         *********************   Node Flooding Summary   *********************      No nodes were flooded.         **********************   Storage Volume Summary   **********************      ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐                          Average     Avg  Evap Exfil       Maximum     Max    Time of Max    Maximum                           Volume    Pcnt  Pcnt  Pcnt        Volume    Pcnt     Occurrence    Outflow   Storage Unit          1000 ft3    Full  Loss  Loss      1000 ft3    Full    days hr:min        CFS   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   SURF_1                   0.013       1     1     0         1.424      61    1461  00:02       0.92         ***********************   Outfall Loading Summary   ***********************      ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐                          Flow       Avg       Max       Total                          Freq      Flow      Flow      Volume   Outfall Node           Pcnt       CFS       CFS    10^6 gal   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   POC‐1                  6.84      0.02      0.94      10.530   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   System                 6.84      0.02      0.94      10.530         ********************   Link Flow Summary   ********************      ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐                                  Maximum  Time of Max   Maximum    Max/    Max/                                   |Flow|   Occurrence   |Veloc|    Full    Full   Link                 Type          CFS  days hr:min    ft/sec    Flow   Depth   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   OUT_1                DUMMY        0.92  1461  00:02         *************************   Conduit Surcharge Summary   *************************      No conduits were surcharged.      Analysis begun on:  Fri Jun  4 16:00:38 2021   Analysis ended on:  Fri Jun  4 16:01:10 2021   Total elapsed time: 00:00:32 42 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Attachment 2g: Hydromodification Offsite Alternative Compliance Participation Form Refer to Chapter 1.8 Onsite Project Information Record ID: Assessor's Parcel Number(s) [APN(s)] Quantity of Hydromodification Debits or Credits (DCIA) ☐ Debits ☐ Credits *See Attachment 1 of the PDP WQMP Offsite Project Information – Projects providing or receiving credits (add rows as needed) Record ID: APN(s) Project Owner/Address Credit/Debit Quantity (DCIA) 1. ☐ Credit ☐ Debit 2. ☐ Credit ☐ Debit 3. ☐ Credit ☐ Debit 4. ☐ Credit ☐ Debit 5. ☐ Credit ☐ Debit 6. ☐ Credit ☐ Debit Total sum of Credits and Debits (∑Credits -∑Debits) (DCIA) Additional Information Are offsite projects in the same credit trading area as the onsite project? ☐ Yes ☐ No Do offsite projects discharge directly to the same susceptible stream reach as the onsite project? (required for certain hydromodification scenarios) ☐ Yes ☐ No Will projects providing credits be completed prior to completion of projects receiving credits? ☐ Yes ☐ No Are all deficits accounted for? If No, onsite and offsite projects must be redesigned to account for all deficits. ☐ Yes ☐ No Provide supporting WQE calculations as part of this attachment. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 43 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. 44 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 ATTACHMENT 3 Structural BMP Maintenance Information Indicate which Items are Included behind this cover sheet: Maintenance Responsibility has been assigned to: ☒ Property Owner ☐ Special District ☐ City of Temecula ☐ Attachment 3 is not required because the project does not propose structural BMPs ☐ Not applicable at this time – Discretionary Project Attachment Sequence Contents Checklist Attachment 3 Standard Structural BMP Water Quality Management Plan Operation and Maintenance Agreement (BMP Design Manual Appendix A.3) ☒ Included ☐ Signed, Notarized, and Recorded* ☐ City Maintained – Do Not Record, must be reviewed & accepted by City Maintenance Dept. Exhibit A Legal Description ☒ Included Exhibit B Individual Structural BMP DMA Mapbook (WQMP Exhibits) ☒ Included ☒ Place each map on 8.5”x11” paper ☒ BMP Site layout – Clearly depict location of each BMP ☒ Legible construction details of each BMP. Exhibit C Structural BMP Maintenance Plan (Required) ☒ Included See Structural BMP Maintenance Information Checklist on the back of this Attachment cover sheet. Exhibit D Structural BMP Design Fact Sheets (Appendix E) ☒ Included Note* Do not notarize & record until City staff has reviewed and approved the final Water Quality Management Plan Operation and Maintenance Agreement. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 45 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. 46 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 Use this checklist to ensure the required information has been included in the Structural BMP Maintenance Plan Exhibit: Attachment 3 Exhibit C must identify: ☒ Purpose of the Operation and Maintenance Manual ☒ General description and function of all Structural BMPs implemented ☒ Inspection & Maintenance Documentation. Refer to Chapter 7.4 ☒ Inspection, Maintenance, & Reporting Frequency: Refer to Chapter 7.5 ☒ Measures to Control Maintenance Costs. Refer to Chapter 7.6 ☒ Maintenance indicators and actions for structural BMP(s). Refer to Chapter 7.7 ☐ Structural BMP Life Cycle Cost Analysis including Inspection, Maintenance, documentation, reporting, and replacement. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 47 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. Page 2 Water Quality Management Plan Operation and Maintenance Agreement Property Owner Name: MS-MOUNTAIN VIEW, LLC Property Owner Mailing Address: 16130 Ventura Blvd. #510, Encino CA 91436 Project Address or Location: Parcel Map No. 21382 in the City of Temecula, County of Riverside, State of California Project's Assessor Parcel Number: 909-290-001 This Operation and Maintenance Agreement (Agreement) is made in The City of Temecula (City), a municipal agency, located in the County of Riverside, State of California, by (insert property owner) MS-Mountain View, LLC (Owner), this (insert day) 21 of (insert month and year) May 2021 WHEREAS, the Owner owns real property (Property) as described in Exhibit "A" and depicted in Exhibit "B", each of which exhibit is attached hereto and incorporated by reference, and has proposed that the Property be developed in accordance with governmental approvals issued by the City and other agencies having jurisdiction over the Property; WHEREAS, at the time of initial approval of the development project (Project) known as (insert name of project) MS-Mountain View (Parcel Map No. 21382) – Parcel 1 within the Property, the City required the Project to generate a Water Quality Management Plan (WQMP). The WQMP describes how the Project proposes to remove pollutants and minimize any adverse impacts from the discharge of storm water and non- storm water runoff generated as a result of the Project, and includes structural and non- structural treatment devices, also known as "Best Management Practices" (BMPs), that will be constructed, or installed, or implemented for this purpose. The precise location(s) of these BMPs are depicted in the WQMP, on file with the City; WHEREAS, the Owner signed and certified the WQMP and accepted the requirement to routinely inspect, clean, maintain, repair, reconstruct, and replace the BMPs associated with the Project in order to retain their original intent and effectiveness; WHEREAS, this Agreement is transferable onto subsequent owners, heirs, executors, administrators, representatives, and assigns (collectively "Successors") of this Property, Project, and all associated BMPs; WHEREAS, the Owner and Successors are aware that such operation and maintenance requirements are in accordance with, and enforceable under, the City's Municipal Code and State and Federal environmental laws regulating the discharge of pollutants in storm water and non-stormwater runoff, and may also require compliance with Local, State, and Federal laws and regulations pertaining to confined space entry and waste disposal methods in effect at the time such maintenance occurs; Page 3 NOW THEREFORE, the Owner and Successors shall be subject to the following conditions: 1. This Agreement shall be recorded in the Office of the Recorder of Riverside County, California, at the expense of the Owner and shall constitute notice to the Owner and all Successors of the title to said Property of the obligations required by this Agreement. This Agreement shall also be accompanied by a copy of an 'Operation and Maintenance Manual', included in Exhibit "C", providing detailed instructions on how and when each treatment BMP proposed for construction, or installation, or implementation must be inspected, cleaned, maintained, repaired, reconstructed, and replaced, if necessary, (collectively "Maintained") in order to retain their original intent and effectiveness. 2. Owner shall, at their sole cost, expense, and liability, routinely maintain all BMPs in a manner assuring peak performance at all times without request or demand from the City or other agency. All reasonable precautions shall be exercised in the removal of any material(s) from the BMPs and the ultimate disposal of the material(s) in a manner consistent with all relevant laws and regulations in effect at the time of the recording of this Agreement. As may be requested from time to time by the City, the Owner shall provide the City with documentation identifying the inspections, maintenance activities, material(s) and quantity(ies) removed, and disposal destinations. 3. Owner hereby provides the City complete access at any time and of any duration during business hours to the BMPs, their immediate vicinity, and all legally accessible areas draining to them upon reasonable notice, or in case of emergency as determined by the City without advance notice, for the purpose of inspecting the BMPs and/or sampling runoff into and/or from the BMPs. The City shall make every effort to minimize interference with the Owner's use of the Property during these inspections and sampling activities. 4. In the event the Owner fails to accomplish the necessary operation and maintenance obligations required by this Agreement, the Owner hereby authorizes the City to perform any maintenance necessary to restore the BMPs to their original intent and effectiveness. Owner shall reimburse all expenses associated with the City's maintenance activities to the City, including administrative costs, attorney fees, and interest thereon at the maximum rate authorized by the Civil Code. The City may also opt to use the proceeds from any securities posted for the project, or place a lien on the Property in such amount as will fully reimburse the City, to pay for such maintenance in order to guarantee the continued performance of the BMPs. 5. Owner shall notify any successor to title of all or part of the Property about the existence of this Agreement and provide such notice and a copy of this Agreement prior to such Successor obtaining an interest in all or part of the Property. EXHIBIT A Legal Description of Property PARCEL 1 OF PARCEL MAP NO. 21382 AS SHOWN IN PMB 161 ON PAGE 47-50 ON FILE IN THE COUNTY OF RIVERSIDE EXHIBIT B WQMP Exhibits Exhibits shall include: a) a BMP site layout that clearly depicts the location of each BMP, and b) legible construction details of each BMP. Ensure all exhibits are 8.5"X11". Do not include color exhibits. AVENIDA ALVARADO PERMANENT BMPs MS MOUNTAIN VIEW EXHIBIT "B" OPERATION AND MAINTENANCE PLAN BMP-1-1 BIOFILTRATION BMP (BASIN) LEGEND SHEET 1 0F 4 AVENIDA ALVARADO PERMANENT BMPs MS MOUNTAIN VIEW EXHIBIT "B" OPERATION AND MAINTENANCE PLAN BMP-1-1 BIOFILTRATION BMP (BASIN) LEGEND SHEET 2 0F 4 PERMANENT BMPs MS MOUNTAIN VIEW EXHIBIT "B" OPERATION AND MAINTENANCE PLAN SHEET 3 OF 4 LINED BIOFILTRATION BASIN CROSS SECTION BMP-1-1 PERMANENT BMPs MS MOUNTAIN VIEW EXHIBIT "B" OPERATION AND MAINTENANCE PLAN SHEET 4 0F 4 BIOFILTRATION SOIL MEDIA COMPOSITION EXHIBIT C Operation and Maintenance Manual Operation and Maintenance Manual Below are specific details about the proposed biofiltration BMP (structural BMP) for the project. Other relevant project-specific site design and source control BMPs are summarized in the Operation and Maintenance (O&M) Plan summary table following the narrative. 1. Purpose of the Biofiltration BMP Maintenance Manual The purpose of this manual is to provide maintenance instructions for the biofiltration BMP (Basin) located along the northerly edge of the site. The biofiltration BMP is a pollution control device designed to treat urban runoff from the project before it enters in to the downstream storm drain systems located downstream. Regular maintenance will help to ensure that the biofiltration BMP functions as it has been designed. This manual will serve as a reference guide and filed manual to assist the property owner with: · An overview of the biofiltration BMPs (basins) and how It functions · A description of the location of biofiltration BMPs · An understanding of the procedures required to effectively maintain the biofiltration BMPs on a regular basis · Reproducible copies of the forms, logs and guidance sheets necessary for recording maintenance activities associated with the structural BMPs. 2. General Description and function of the biofiltration BMPs (basins) The biofiltration BMPs are in the form of basins comprised of layers of porous materials, including the bioretention soil mix (BSM), choker layer, and gravel layer, that allow collective urban runoff to be treated through the BSM while allowing some incidental infiltration into the ground (where applicable and as recommended by the geotechnical engineer). From the top to the bottom of the biofiltration BMP section, the porous materials consist of · Ponding depth, per the site plan · Varying depth layer of mulch (minimum depth of 3") · Bioretention Soil Mix (BSM), per the site plan and consistent with the specification in the City of Temecula BMP Design Manual · Choker Layer – Clean Washed ASTM No. 33 Gravel (Typically 3”) · Choker Layer – ASTM No. 8 (Typically 3”) · Gravel Reservoir Layer – ASTM No. 57 Open Graded Stone – This typically includes 3” of “dead storage” layer at the bottom. · Impermeable liner on the sides of the Basin (where applicable and as recommended by the geotechnical engineer) A perforated PVC will be installed (where applicable) within the Gravel Reservoir Layer. This pipe connects to a storm drain outlet junction box and serves to provide a positive outlet for collected. This prevents standing water from occurring in the biofiltration BMPs, which in turn could create vector concerns. Pollution is mitigated through filtration/infiltration of runoff into the porous materials (specifically bioretention soil mix) within the biofiltration BMP and ultimately through incidental infiltration in to the ground below (where applicable and as recommended by the geotechnical engineer). 3. Maintenance Responsibility As described in the agreement narrative section, MS-Mountain View, LLC is expected to be responsible for long-term maintenance of the proposed biofiltration BMP and other relevant site design and source control BMPs on-site. The goal in maintaining the biofiltration BMPs is to ensure that effective pollutant control (treatment) is occurring prior to discharging to the downstream storm drain system. Regular inspection and replacement of materials within the biofiltration BMPs once they become ineffective in performing as designed are the major components in the maintenance program. In order to achieve this, the following general procedures shall be followed: · Qualified maintenance personnel should periodically inspect the biofiltration BMPs at least twice a year. The first Inspection should happen prior to August 1 and the subsequent inspection should happen during the period between February 1 and March 31. · If a problem is identified, it should be rectified as soon as possible to ensure that the biofiltration BMP functions as designed. · Regular removal of trash and debris should occur as needed. Trash and debris, visible along the surface of the biofiltration BMPs shall be promptly removed. Detailed maintenance procedures are outlined in section 5. 4. Maintenance Indicators and Activities Functional Maintenance: Regular functional maintenance is required to ensure that the biofiltration BMPs perform in an effective manner. Functional maintenance consists of both preventative and corrective activities. Logs and guidance sheets are contained herein to use in recording vital information while performing operation Inspection and other biofiltration BMP maintenance activities. Maintenance records shall be maintained by the property owner for a minimum of five years. The proper use and subsequent storage of these records will assure the City of Temecula that the biofiltration BMPs are functioning as designed. Preventative Maintenance: Preventative maintenance shall be performed on a regular basis. Checklists are included herein to track and record preventative maintenance activities. These activities include trash and debris removal' and sediment management. Trash and debris removal shall be performed to ensure that runoff has adequate surface area to filtrate through the various layers that comprise the cross section of the biofiltration BMP. Sediment management will occur when testing indicates that the filtration/infiltration rate has diminished below the stated acceptable rate. · Corrective Maintenance: Corrective maintenance will be required on an emergency or non-routine basis to correct problems and restore the intended operation and safe function of the biofiltration BMP. Biofiltration BMP Maintenance · Inspect a minimum of twice a year, before and after the rainy season, after large storms or more frequently as needed. · Clean the biofiltration BMPs when the loss of filtration/infiltrative capacity (within the bioretention soil mix) is observed. When the standing water is present for a period of time in excess of 72 hours, removal of sediment may be necessary and/or after a certain period pending routine maintenance (after ~8 to 10 years), the bioretention soil mix may require partial/full replacement. This is an expensive activity and the need for it may be minimized through the prevention of upstream erosion. · Control mosquitoes as necessary. · Remove litter and debris from surface as required. Operation and Maintenance (O&M) Plan has been summarized in a tabular format and provided in the next page. This O&M Plan table also includes columns to keep track of ongoing inspection and maintenance as well as the comment/note sections. PERMANENT BMP OPERATION AND MAINTENANCE (O&M) PLAN - SUMMARY PROJECT NAME: SITE ADDRESS: APN: INSPECTION FREQUENCY INDICATIONS FOR MAINTENANCE MAINTENANCE FREQUENCY OPERATION AND MAINTENANCE ACTIVITIES PARTIES RESPONSIBLE FOR MAINTENANCE AND FUNDING SITE DESIGN LANDSCAPED AREAS THE ON-SITE LANDSCAPED AREAS SHALL BE MONITORED MONTHLY. THE LANDSCAPING AREAS SHOULD BE MAINTAINED IF EROSION IN THE FORM OF RILLS OR GULLIES, PONDING WATER, BARE AREAS, ANIMAL BURROWS, HOLES, MOUNDS AND TRASH ARE OBSERVED. 1. AS DETERMINED BY INSPECTION AND MAINTENANCE INDICATORS; AND 2. ON OR BEFORE SEPTEMBER 30TH. 1. FILL AND COMPACT AREAS OF RUTS, RILLS, OR GULLIES; 2. RE-SEED AND/OR PLANT SLOPES AND AREAS EXPOSED SOILS; AND 3. ROUTINE MOWING AND TRIMMING; MANICURE LANDSCAPING ROUTINELY; AND 4. REMOVE CLIPPING, TRASH/DEBRIS. SOURCE CONTROL EFFECTIVE IRRIGATION SYSTEM THE EFFECTIVE IRRIGATION SYSTEM SHALL BE MONITORED MONTHLY. WHEN BROKEN SPRINKLER HEADS, RAIN SHUTOFF DEVICES AND FLOW REDUCERS ARE OBSERVED; OR RUNNING SPRINKLERS IN RAIN AREA OBSERVED. IRRIGATION SYSTEMS SHOULD BE CHECKED FOR IRREGULAR FLOWS TO THE LANDSCAPED AREAS WHEN PONDING OR DRY SOIL OCCURS. AS DETERMINED BY INSPECTION AND MAINTENANCE INDICATORS. REPAIR AND/OR REPLACE THE BROKEN AND/OR MALFUNCTIONING PARTS OF IRRIGATION SYSTEM (IRRIGATION APPURTENANCES). SOURCE CONTROL INTEGRATED PEST MANAGEMENT THE INSPECTOR SHALL CHECK FOR INDICATIONS OF THE PRESENTS OF PESTS ON-SITE MONTHLY. WHEN THE PEST OR PESTS, OBSERVED IN GREATEST ABUNDANCE OR CAUSE THE MOST OBSERVED SYMPTOMS, ARE IDENTIFIED. AS DETERMINED BY INSPECTION AND MAINTENANCE INDICATORS. CHECK FREQUENTLY FOR PESTS, AND TREAT WITH A PESTICIDE ONLY WHEN A PEST IS PRESENT, ETC. SOURCE CONTROL PREVENTATIVE STENCILING AND SIGNAGE (SC-A) CURB INLETS SHALL BE INSPECTED ANNUALLY. WHEN FULLY OR PARTIALLY ERASED SIGNS ARE OBSERVED; WHEN DUMPING OF TRASH ARE OBSERVED AT PUBLIC ACCESS POINTS, BUILDING ENTRANCES, PUBLIC PARKS, ETC. AS DETERMINED BY INSPECTION AND MAINTENANCE INDICATORS. 1. REPLACE OR REPAINT THE STENCILS AND SIGNAGE SO THAT THEY ARE LEGIBLE; AND 2. MAKE SURE THAT THEY ARE PLACED AT ALL REQUIRED LOCATIONS (I.E. - ALL INLETS). SOURCE CONTROL REFUSE AREAS (SC-G) REFUSE AREAS SHALL BE INSPECTED WEEKLY. 1. AS DETERMINED BY INSPECTION; 2. STANDING WATER IN REFUSE AREA; 3. LOOSE TRASH OR DEBRIS; 4. LEAKED OR SPILLED MATERIALS; 5. COMPROMISED FENCE, SCREEN, GATE, WALL, BIN, LID OR ROOF AWNING (WHERE APPLICABLE); 6. CRACKED OR COMPROMISED PAVING OR OTHER FLAWED SURFACE (AS APPLICABLE). AS DETERMINED BY INSPECTION AND MAINTENANCE INDICATORS. 1. IF STANDING WATER IS OBSERVED IN THE AREA, DETERMINE THE WATER SOURCE AND REMOVE THE SOURCE. ALLOW STANDING WATER TO EVAPORATE. IF WATER DOES NOT EVAPORATE IN 48 HOURS, REDISTRIBUTE THE WATER TO LANDSCAPE AREA(S). DO NOT DRAIN WATER TO STORM DRAIN SYSTEM. 2. REMOVE AND PROPERLY DISPOSE LOOSE TRASH, DEBRIS AND LEAKED OR SPILLED MATERIALS. USE APPROPRIATE SPILL CLEANUP MATERIAL AS NECESSARY TO REMOVE ALL LEAKED AND SPILLED MATERIALS INCLUDING MATERIALS ADHERED TO PAVEMENT. IDENTIFY AND REMOVE OR REPAIR THE SOURCE OF ANY LEAKED OR SPILLED MATERIALS. 3. REPAIR THE FOLLOWING AS APPLICABLE: COMPROMISED FENCE, SCREEN, GATE, WALL, BIN, LID OR ROOF AWNING (WHERE APPLICABLE), CRACKED OR COMPROMISED PAVING OR OTHER FLOOR SURFACE (AS APPLICABLE). SOURCE CONTROL INDUSTRIAL PROCESSES (SC-H) VISUALLY INSPECTED ROUTINELY TO MAKE SURE INDUSTRIAL PROCESSES (IF APPLICABLE) SHALL BE PERFORMED INDOORS. WHEN INDUSTRIAL PROCESS ARE OBSERVED OUTDOORS. AS DETERMINED BY INSPECTION AND MAINTENANCE INDICATORS. 1. REVIEW EDUCATIONAL MATERIALS W/ OPERATORS, TENANTS, CONTRACTORS, EMPLOYEES ON AS-NEEDED BASIS TO ENSURE INDUSTRIAL PROCESSES ARE PERFORMED INDOORS; 2. REFER TO CASQA FACT SHEET SC-10 "NON-STORMWATER DISCHARGES" AND/OR "INDUSTRIAL & COMMERCIAL FACILITIES BEST MANAGEMENT PRACTICES FOR: INDUSTRIAL, COMMERCIAL FACILITIES" BROCHURE FOR MORE INFORMATION. BEST MANAGEMENT PRACTICE (BMP) DESCRIPTION MS-MOUNTAIN VIEW LLC Page 1 of 2 INSPECTION FREQUENCY INDICATIONS FOR MAINTENANCE MAINTENANCE FREQUENCY OPERATION AND MAINTENANCE ACTIVITIES PARTIES RESPONSIBLE FOR MAINTENANCE AND FUNDING BEST MANAGEMENT PRACTICE (BMP) DESCRIPTION SOURCE CONTROL LOADING DOCKS (SC-M) LOADING DOCKS AREA SHALL BE INSPECTED MONTHLY. IF THERE SEEMS TO BE BLOCKAGE, ACCUMULATION OF DEBRIS/TRASH, STANDING WATER, OR A FOUL SMELL, MAINTENANCE MEASURES SHOULD BE TAKEN. ALSO WHEN A ROOF OVERHANG OVER THE LOADING AREA (COVER MATERIALS) AND/OR DOOR SKIRT IS DAMAGED, MAINTENANCE MEASURES SHOULD BE TAKEN. AS DETERMINED BY INSPECTION AND MAINTENANCE INDICATORS. 1. REGULARLY REMOVE MATERIALS ACCUMULATED IN SUMP; 2. REPAIR/REPLACE THE LOADING DOCK COVER MATERIALS AND/OR DOOR SKIRT BETWEEN DELIVERY VEHICLES AND BUILDING AS-NEEDED (IF APPLICABLE); AND 3. REFER TO CASQA FACT SHEET SC-30, "OUTDOOR LOADING AND UNLOADING" FOR OTHER RELEVANT/APPLICABLE MAINTENANCE ACTIVITIES. SOURCE CONTROL MISCELLANEOUS DRAIN OR WASH WATER (SC-O) MISCELLANEOUS DRAIN SUCH AS BOILER DRAIN LINES, CONDENSATE DRAIN LINES, ROOFTOP EQUIPMENT, DRAINAGE SUMPS, ROOFING, GUTTERS, AND TRIM SHALL BE INSPECTED TWICE A YEAR. MAINTENANCE MEASURES ARE NEEDED WHEN FOLLOWING ITEMS ARE OBSERVED: - BOILER DRAIN LINES AND/OR CONDENSATE DRAIN LINES ARE DISCHARGED TO THE STORM DRAIN SYSTEM; - ROOFTOP EQUIPMENT WITH POTENTIAL TO PRODUCE POLLUTANTS IS NOT CONTAINED OR ROOFED/COVERED; - DRAINAGE SUMPS WITH SEDIMENT BUILDUPS; OR - ROOFING, GUTTERS, AND TRIM MATERIALS MADE OF COPPER OR OTHER UNPROTECTED METALS. AS DETERMINED BY INSPECTION AND MAINTENANCE INDICATORS. MAINTAIN (REPAIR/REPLACE) AS-NEEDED TO ENSURE THAT POTENTIAL ISSUES LISTED IN THE MAINTENANCE INDICATORS ARE ADDRESSED. SOURCE CONTROL PLAZA, SIDEWALKS, AND PARKING LOTS (SC-P) PLAZA, SIDEWALKS, AND PARKING AREAS (WHERE APPLICABLE) SHALL BE INSPECTED TWICE A MONTH. WHEN ACCUMULATION OF LITTER AND DEBRIS, OR GREASE/OIL ARE OBSERVED. AS DETERMINED BY INSPECTION AND MAINTENANCE INDICATORS. SWEEP PLAZAS, SIDEWALKS, AND PARKING LOTS (WHERE APPLICABLE) REGULARLY TO PREVENT ACCUMULATION OF LITTER AND DEBRIS. COLLECT DEBRIS FROM PRESSURE WASHING TO PREVENT ENTRY INTO THE STORM DRAIN SYSTEM. COLLECT WASH WATER CONTAINING ANY CLEANING AGENT OR DEGREASER AND DISCHARGE TO THE SANITARY SEWER NOT TO A STORM DRAIN. STRUCTURAL BMP BIOFILTRATION BMP (BASIN) "BMP-1-1" TWICE A YEAR AND AFTER SIGNIFICANT STORM EVENT MAINTENANCE SHOULD OCCUR ROUTINELY. IF THERE SEEMS TO BE BLOCKAGE, ACCUMULATION OF DEBRIS/TRASH, STANDING WATER, A FOUL SMELL, PLANTS THAT LOOK UNHEALTHY, EROSION IN THE FORM OF RILLS OR GULLIES, BARE AREAS, ANIMAL BURROWS, HOLES, OR MOUNDS ARE SIGNS THAT MAINTENANCE MEASURES SHOULD BE TAKEN. 1. AS DETERMINED BY INSPECTION AND MAINTENANCE INDICATORS; AND 2. ON OR BEFORE SEPTEMBER 30TH AND FOLLOWING THE RAINY SEASON AFTER MAY 1ST. 1. REPLACE MULCH IN AREAS OF RUTS, RILLS, OR GULLIES; 2. RE-SEED AND/OR PLANT SLOPES AND AREAS OF EXPOSED SOILS; 3. ROUTINE MAINTENANCE TO REMOVE ACCUMULATED MATERIALS SUCH AS TRASH AND DEBRIS; 4. NON-ROUTINE MAINTENANCE WILL BE REQUIRED TO BACKWASH AND CLEAR UNDERDRAINS IF INSPECTION INDICATES UNDERDRAINS ARE CLOGGED; 5. DEPENDING ON POLLUTANT LOADS, SOILS MAY NEED TO BE REPLACED EVERY 5 TO 10 YEARS. 6. THE RISER STRUCTURE SHOULD BE MAINTAINED TO AVOID CLOGGING AND ANY LEAKAGE THROUGH THE BOLT HOLES; 7. TRIM VEGETATION AT THE BEGINNING AND END OF WET SEASON AND INSPECT MONTHLY TO PREVENT ESTABLISHMENT OF WOODY VEGETATION FOR AESTHETIC AND VECTOR REASONS; AND 8. REFER TO THE CITY OF TEMECULA BMP DESIGN MANUAL FACT SHEETS PR-1, BF-1, AND BF-2 SPECIFIC TO THE MAINTENANCE OVERVIEW SECTION FOR MORE DETAILS. NOTE: 1. SIGNIFICANT RAIN EVENT (STORM EVENT) CONSIDERED WHENEVER THE NATIONAL WEATHER SERVICE REPORTS 0.50" OF RAIN IN 48 HOURS FOR THE LOCAL COMMUNITY 2. COMPLETED COPIES MUST BE KEPT ONSITE TO PROVIDE PROOF THAT THE WQMP IS BEING MAINTAINED AND OPERATED, AND MUST BE AVAILABLE TO THE LOCAL AGENCY AND REGIONAL BOARD UPON REQUEST. MS-MOUNTAIN VIEW LLC Page 2 of 2 PERMANENT BMP OPERATION AND MAINTENANCE (O&M) CHECKLIST PROJECT NAME: SITE ADDRESS: APN: BEST MANAGEMENT PRACTICE (BMP) DESCRIPTION INSPECTION BY INSPECTION DATE MAINTENANCE NEEDED (Y/N) OBSERVATIONS / COMMENTS (Example - Describe inspection outcome and if maintenance was conducted or not. If the maintenance was not needed, note when it will be done.) MAINTENANCE BY (IF APPLICABLE) MAINTENANCE DATE (IF APPLICABLE) LANDSCAPED AREAS EFFECTIVE IRRIGATION SYSTEM INTEGRATED PEST MANAGEMENT PREVENTATIVE STENCILING AND SIGNAGE (SC-A) REFUSE AREAS INDUSTRIAL PROCESSES Page 1 of 2 BEST MANAGEMENT PRACTICE (BMP) DESCRIPTION INSPECTION BY INSPECTION DATE MAINTENANCE NEEDED (Y/N) OBSERVATIONS / COMMENTS (Example - Describe inspection outcome and if maintenance was conducted or not. If the maintenance was not needed, note when it will be done.) MAINTENANCE BY (IF APPLICABLE) MAINTENANCE DATE (IF APPLICABLE) LOADING DOCKS MISCELLANEOUS DRAIN OR WASH WATER PLAZA, SIDEWALKS, AND PARKING LOTS BIOFILTRATION BMP (BASIN) "BMP-1-1" GENERAL COMMENTS/NOTES: Page 2 of 2 EXHIBIT D Structural BMP Design Fact Sheets & Relevant Source Control Fact Sheets (For Reference Purpose related to Maintenance) BF-1 Biofiltration E-120 July 2018 E.18 BF-1 Biofiltration Location: 43rd Street and Logan Avenue, San Diego, California Biofiltration (Biofiltration with underdrain) facilities are vegetated surface water systems that filter water through vegetation, and soil or engineered media prior to discharge via underdrain or overflow to the downstream conveyance system. Biofiltration with underdrain facilities are commonly incorporated into the site within parking lot landscaping, along roadsides, and in open spaces. Because these types of facilities have limited or no infiltration, they are typically designed to provide enough hydraulic head to move flows through the underdrain connection to the storm drain system. Treatment is achieved through filtration, sedimentation, sorption, biochemical processes and plant uptake. Typical biofiltration with underdrain components include:  Inflow distribution mechanisms (e.g, perimeter flow spreader or filter strips)  Energy dissipation mechanism for concentrated inflows (e.g., splash blocks or riprap)  Shallow surface ponding for captured flows  Side slope and basin bottom vegetation selected based on expected climate and ponding depth  Non-floating mulch layer (Optional)  Media layer (planting mix or engineered media) capable of supporting vegetation growth  Filter course layer consisting of aggregate to prevent the migration of fines into uncompacted native soils or the aggregate storage layer  Aggregate storage layer with underdrain(s) Description MS4 Permit Category Biofiltration Manual Category Biofiltration Applicable Performance Standard Pollutant Control Flow Control Primary Benefits Treatment Volume Reduction (Incidental) Peak Flow Attenuation (Optional) EXCERPT - CITY OF TEMECULA BMPDM FACT SHEET BF-1 BF-1 Biofiltration E-121 July 2018  Impermeable liner or uncompacted native soils at the bottom of the facility  Overflow structure Typical plan and Section view of a Biofiltration BMP BF-1 Biofiltration E-122 July 2018 Biofiltration Treatment BMP for storm water pollutant control. The system is lined or un-lined to provide incidental infiltration, and an underdrain is provided at the bottom to carry away filtered runoff. This configuration is considered to provide biofiltration treatment via flow through the media layer. Storage provided above the underdrain within surface ponding, media, and aggregate storage is considered included in the biofiltration treatment volume. Saturated storage within the aggregate storage layer can be added to this design by raising the underdrain above the bottom of the aggregate storage layer or via an internal weir structure designed to maintain a specific water level elevation. Integrated storm water flow control and pollutant control configuration. The system can be designed to provide flow rate and duration control by primarily providing increased surface ponding and/or having a deeper aggregate storage layer above the underdrain. This will allow for significant detention storage, which can be controlled via inclusion of an outlet structure at the downstream end of the underdrain. Siting Criteria Intent/Rationale □ Placement observes geotechnical recommendations regarding potential hazards (e.g., slope stability, landslides, liquefaction zones) and setbacks (e.g., slopes, foundations, utilities). Must not negatively impact existing site geotechnical concerns. □ An impermeable liner or other hydraulic restriction layer is included if site constraints indicate that infiltration or lateral flows should not be allowed. Lining prevents storm water from impacting groundwater and/or sensitive environmental or geotechnical features. Incidental infiltration, when allowable, can aid in pollutant removal and groundwater recharge. □ Contributing tributary area shall be ≤ 5 acres (≤ 1 acre preferred). Bigger BMPs require additional design features for proper performance. Contributing tributary area greater than 5 acres may be allowed at the discretion of the City Engineer if the following conditions are met: 1) incorporate design features (e.g. flow spreaders) to minimizing short circuiting of flows in the BMP and 2) incorporate additional design features requested by the City Engineer Design Adaptations for Project Goals Recommended Siting Criteria BF-1 Biofiltration E-123 July 2018 Siting Criteria Intent/Rationale for proper performance of the regional BMP. □ Finish grade of the facility is ≤ 2%. Flatter surfaces reduce erosion and channelization within the facility. BMP Component Dimension Intent/Rationale Freeboard ≥ 2 inches Freeboard provides room for head over overflow structures and minimizes risk of uncontrolled surface discharge. Surface Ponding ≥ 6 and ≤ 12 inches Surface ponding capacity lowers subsurface storage requirements. Deep surface ponding raises safety concerns. Surface ponding depth greater than 12 inches (for additional pollutant control or surface outlet structures or flow-control orifices) may be allowed at the discretion of the City Engineer if the following conditions are met: 1) surface ponding depth drawdown time is less than 24 hours; and 2) safety issues and fencing requirements are considered (typically ponding greater than 18” will require a fence and/or flatter side slopes) and 3) potential for elevated clogging risk is considered. Recommended BMP Component Dimensions BF-1 Biofiltration E-124 July 2018 BMP Component Dimension Intent/Rationale Ponding Area Side Slopes 3H:1V or shallower Gentler side slopes are safer, less prone to erosion, able to establish vegetation more quickly and easier to maintain. Mulch ≥ 3 inches Mulch will suppress weeds and maintain moisture for plant growth. Aging mulch kills pathogens and weed seeds and allows the beneficial microbes to multiply. Media Layer ≥ 18 inches A deep media layer provides additional filtration and supports plants with deeper roots. Standard specifications shall be followed. For non-standard or proprietary designs, compliance with F.1 ensures that adequate treatment performance will be provided. Underdrain Diameter ≥ 6 inches Smaller diameter underdrains are prone to clogging. Cleanout Diameter ≥ 6 inches Properly spaced cleanouts will facilitate underdrain maintenance. BF-1 Biofiltration E-125 July 2018 Biofiltration with underdrain must meet the following design criteria. Deviations from the below criteria may be approved at the discretion of the City Engineer if it is determined to be appropriate: Design Criteria Intent/Rationale Surface Ponding □ Surface ponding is limited to a 24-hour drawdown time. Surface ponding limited to 24 hours for plant health. Surface ponding drawdown time greater than 24-hours but less than 96 hours may be allowed at the discretion of the City Engineer if certified by a landscape architect or agronomist. Vegetation □ Plantings are suitable for the climate and expected ponding depth. A plant list to aid in selection can be found in Appendix E.26. Plants suited to the climate and ponding depth are more likely to survive. □ An irrigation system with a connection to water supply should be provided as needed. Seasonal irrigation might be needed to keep plants healthy. Mulch (Optional or Mandatory – Dependent on jurisdiction) □ A minimum of 3 inches of well-aged, shredded hardwood mulch that has been stockpiled or stored for at least 12 months is provided. Mulch will suppress weeds and maintain moisture for plant growth. Aging mulch kills pathogens and weed seeds and allows the beneficial microbes to multiply. Media Layer □ Media maintains a minimum filtration rate of 5 in/hr over lifetime of facility. An initial filtration rate of 8 to 12 in/hr is recommended to allow for clogging over time; the initial filtration rate should not exceed 12 inches per hour. A filtration rate of at least 5 inches per hour allows soil to drain between events. The initial rate should be higher than long term target rate to account for clogging over time. However an excessively high initial rate can have a negative impact on treatment performance, therefore an upper limit is needed. □ Media is a minimum 18 inches deep, meeting either of these two media specifications: Section F.3 Biofiltration Soil Media (BSM) or specific jurisdictional guidance. A deep media layer provides additional filtration and supports plants with deeper roots. Design Criteria and Considerations BF-1 Biofiltration E-126 July 2018 Design Criteria Intent/Rationale Alternatively, for proprietary designs and custom media mixes not meeting the media specifications, the media meets the pollutant treatment performance criteria in Section F.1. Standard specifications shall be followed. For non-standard or proprietary designs, compliance with F.1 ensures that adequate treatment performance will be provided. □ Media surface area is 3% of contributing area times adjusted runoff factor or greater. Unless demonstrated that the BMP surface area can be smaller than 3%. Greater surface area to tributary area ratios: a) maximizes volume retention as required by the MS4 Permit and b) decrease loading rates per square foot and therefore increase longevity. Adjusted runoff factor is to account for site design BMPs implemented upstream of the BMP (such as rain barrels, impervious area dispersion, etc.). Refer to Appendix B.2 guidance. □ Where receiving waters are impaired or have a TMDL for nutrients, the system is designed with nutrient sensitive media design (see fact sheet BF-2). Potential for pollutant export is partly a function of media composition; media design must minimize potential for export of nutrients, particularly where receiving waters are impaired for nutrients. Filter Course Layer □ A filter course is used to prevent migration of fines through layers of the facility. Filter fabric is not used. Migration of media can cause clogging of the aggregate storage layer void spaces or subgrade. Filter fabric is more likely to clog. □ Filter course is washed and free of fines. Washing aggregate will help eliminate fines that could clog the facility and impede infiltration. □ Filter course calculations assessing suitability for particle migration prevention have been completed. Gradation relationship between layers can evaluate factors (e.g., bridging, permeability, and uniformity) to determine if particle sizing is appropriate or if an intermediate layer is needed. Aggregate Storage Layer □ Class 2 Permeable per Caltrans specification 68- 1.025 is recommended for the storage layer. Washing aggregate will help eliminate fines that could clog the aggregate storage BF-1 Biofiltration E-127 July 2018 Design Criteria Intent/Rationale Washed, open-graded crushed rock may be used, however a 4-6 inch washed pea gravel filter course layer at the top of the crushed rock is required. layer void spaces or subgrade. □ The depth of aggregate provided (12-inch typical) and storage layer configuration is adequate for providing conveyance for underdrain flows to the outlet structure. Proper storage layer configuration and underdrain placement will minimize facility drawdown time. Inflow, Underdrain, and Outflow Structures □ Inflow, underdrains and outflow structures are accessible for inspection and maintenance. Maintenance will prevent clogging and ensure proper operation of the flow control structures. □ Inflow velocities are limited to 3 ft/s or less or use energy dissipation methods. (e.g., riprap, level spreader) for concentrated inflows. High inflow velocities can cause erosion, scour and/or channeling. □ Curb cut inlets are at least 12 inches wide, have a 4-6 inch reveal (drop) and an apron and energy dissipation as needed. Inlets must not restrict flow and apron prevents blockage from vegetation as it grows in. Energy dissipation prevents erosion. □ Underdrain outlet elevation should be a minimum of 3 inches above the bottom elevation of the aggregate storage layer. A minimal separation from subgrade or the liner lessens the risk of fines entering the underdrain and can improve hydraulic performance by allowing perforations to remain unblocked. □ Minimum underdrain diameter is 6 inches. Smaller diameter underdrains are prone to clogging. □ Underdrains are made of slotted, PVC pipe conforming to ASTM D 3034 or equivalent or corrugated, HDPE pipe conforming to AASHTO 252M or equivalent. Slotted underdrains provide greater intake capacity, clog resistant drainage, and reduced entrance velocity into the pipe, thereby reducing the chances of solids migration. □ An underdrain cleanout with a minimum 6-inch diameter and lockable cap is placed every 250 to 300 feet as required based on underdrain length. Properly spaced cleanouts will facilitate underdrain maintenance. □ Overflow is safely conveyed to a downstream storm drain system or discharge point Size overflow structure to pass 100-year peak flow for on-line infiltration basins and water quality Peak flow for off-line basins. Planning for overflow lessens the risk of property damage due to flooding. BF-1 Biofiltration E-128 July 2018 To design biofiltration with underdrain for storm water pollutant control only (no flow control required), the following steps should be taken: 1. Verify that siting and design criteria have been met, including placement requirements, contributing tributary area, maximum side and finish grade slopes, and the recommended media surface area tributary ratio. 2. Calculate the DCV per Appendix B based on expected site design runoff for tributary areas. 3. Use the sizing worksheet presented in Appendix B.5 to size biofiltration BMPs. Control of flow rates and/or durations will typically require significant surface ponding and/or aggregate storage volumes, and therefore the following steps should be taken prior to determination of storm water pollutant control design. Pre-development and allowable post-project flow rates and durations should be determined as discussed in Chapter 6 of the manual. 1. Verify that siting and design criteria have been met, including placement requirements, contributing tributary area, maximum side and finish grade slopes, and the recommended media surface area tributary ratio. 2. Iteratively determine the facility footprint area, surface ponding and/or aggregate storage layer depth required to provide detention storage to reduce flow rates and durations to allowable limits. Flow rates and durations can be controlled from detention storage by altering outlet structure orifice size(s) and/or water control levels. Multi-level orifices can be used within an outlet structure to control the full range of flows. 3. If biofiltration with underdrain cannot fully provide the flow rate and duration control required by this manual, an upstream or downstream structure with significant storage volume such as an underground vault can be used to provide remaining controls. 4. After biofiltration with underdrain has been designed to meet flow control requirements, calculations must be completed to verify if storm water pollutant control requirements to treat the DCV have been met. Normal Expected Maintenance. Biofiltration requires routine maintenance to: remove accumulated materials such as sediment, trash or debris; maintain vegetation health; maintain Conceptual Design and Sizing Approach for Storm Water Pollutant Control Only Conceptual Design and Sizing Approach when Storm Water Flow Control is Applicable Maintenance Overview BF-1 Biofiltration E-129 July 2018 infiltration capacity of the media layer; replenish mulch; and maintain integrity of side slopes, inlets, energy dissipators, and outlets. A summary table of standard inspection and maintenance indicators is provided within this Fact Sheet. Non-Standard Maintenance or BMP Failure. If any of the following scenarios are observed, the BMP is not performing as intended to protect downstream waterways from pollution and/or erosion. Corrective maintenance, increased inspection and maintenance, BMP replacement, or a different BMP type will be required.  The BMP is not drained between storm events. Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health, and surface ponding longer than approximately 96 hours following a storm event poses a risk of vector (mosquito) breeding. Poor drainage can result from clogging of the media layer, filter course, aggregate storage layer, underdrain, or outlet structure. The specific cause of the drainage issue must be determined and corrected.  Sediment, trash, or debris accumulation greater than 25% of the surface ponding volume within one month. This means the load from the tributary drainage area is too high, reducing BMP function or clogging the BMP. This would require pretreatment measures within the tributary area draining to the BMP to intercept the materials. Pretreatment components, especially for sediment, will extend the life of components that are more expensive to replace such as media, filter course, and aggregate layers.  Erosion due to concentrated storm water runoff flow that is not readily corrected by adding erosion control blankets, adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade, the City Engineer shall be contacted prior to any additional repairs or reconstruction. Other Special Considerations. Biofiltration is a vegetated structural BMP. Vegetated structural BMPs that are constructed in the vicinity of, or connected to, an existing jurisdic tional water or wetland could inadvertently result in creation of expanded waters or wetlands. As such, vegetated structural BMPs have the potential to come under the jurisdiction of the United States Army Corps of Engineers, San Diego Water Board, California Department of Fish and Wildlife, or the United States Fish and Wildlife Service. This could result in the need for specific resource agency permits and costly mitigation to perform maintenance of the structural BMP. Along with proper placement of a structural BMP, routine maintenance is key to preventing this scenario. BF-1 Biofiltration E-130 July 2018 The property owner is responsible to ensure inspection, operation and maintenance of permanent BMPs on their property unless responsibility has been formally transferred to an agency, community facilities district, homeowners association, property owners association, or other special district. Maintenance frequencies listed in this table are average/typical frequencies. Actual maintenance needs are site -specific, and maintenance may be required more frequently. Maintenance must be performed whenever needed, based on maintenance indicators presented in this table. The BMP owner is responsible for conducting regular inspections to see when maintenance is needed based on the mainten ance indicators. During the first year of operation of a structural BMP, inspection is recommended at least once prior to August 31 and then monthly from September through May. Inspection during a storm event is also recommended. After the initial period of frequent inspections, the minimum inspection and maintenance frequency can be determined based on the results of the first year inspections. Threshold/Indicator Maintenance Action Typical Maintenance Frequency Accumulation of sediment, litter, or debris Remove and properly dispose of accumulated materials, without damage to the vegetation or compaction of the media layer.  Inspect monthly. If the BMP is 25% full* or more in one month, increase inspection frequency to monthly plus after every 0.1- inch or larger storm event.  Remove any accumulated materials found at each inspection. Obstructed inlet or outlet structure Clear blockage.  Inspect monthly and after every 0.5-inch or larger storm event.  Remove any accumulated materials found at each inspection. Damage to structural components such as weirs, inlet or outlet structures Repair or replace as applicable  Inspect annually.  Maintain when needed. Summary of Standard Inspection and Maintenance BF-1 Biofiltration E-131 July 2018 Threshold/Indicator Maintenance Action Typical Maintenance Frequency Poor vegetation establishment Re-seed, re-plant, or re-establish vegetation per original plans.  Inspect monthly.  Maintain when needed. Dead or diseased vegetation Remove dead or diseased vegetation, re- seed, re-plant, or re-establish vegetation per original plans.  Inspect monthly.  Maintain when needed. Overgrown vegetation Mow or trim as appropriate.  Inspect monthly.  Maintain when needed. 2/3 of mulch has decomposed, or mulch has been removed Remove decomposed fraction and top off with fresh mulch to a total depth of 3 inches.  Inspect monthly.  Replenish mulch annually, or more frequently when needed based on inspection. Erosion due to concentrated irrigation flow Repair/re-seed/re-plant eroded areas and adjust the irrigation system.  Inspect monthly.  Maintain when needed. BF-1 Biofiltration E-132 July 2018 Threshold/Indicator Maintenance Action Typical Maintenance Frequency Erosion due to concentrated storm water runoff flow Repair/re-seed/re-plant eroded areas, and make appropriate corrective measures such as adding erosion control blankets, adding stone at flow entry points, or minor re- grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade, the City Engineer shall be contacted prior to any additional repairs or reconstruction.  Inspect after every 0.5-inch or larger storm event. If erosion due to storm water flow has been observed, increase inspection frequency to after every 0.1-inch or larger storm event.  Maintain when needed. If the issue is not corrected by restoring the BMP to the original plan and grade, the City Engineer shall be contacted prior to any additional repairs or reconstruction. Standing water in BMP for longer than 24 hours following a storm event Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health Make appropriate corrective measures such as adjusting irrigation system, removing obstructions of debris or invasive vegetation, clearing underdrains, or repairing/replacing clogged or compacted soils.  Inspect monthly and after every 0.5-inch or larger storm event. If standing water is observed, increase inspection frequency to after every 0.1-inch or larger storm event.  Maintain when needed. BF-1 Biofiltration E-133 July 2018 Threshold/Indicator Maintenance Action Typical Maintenance Frequency Presence of mosquitos/larvae For images of egg rafts, larva, pupa, and adult mosquitos, see http://www.mosquito.org/biology If mosquitos/larvae are observed: first, immediately remove any standing water by dispersing to nearby landscaping; second, make corrective measures as applicable to restore BMP drainage to prevent standing water. If mosquitos persist following corrective measures to remove standing water, or if the BMP design does not meet the 96-hour drawdown criteria due to release rates controlled by an orifice installed on the underdrain, the City Engineer shall be contacted to determine a solution. A different BMP type, or a Vector Management Plan prepared with concurrence from the County of Riverside Department of Environmental Health, may be required.  Inspect monthly and after every 0.5-inch or larger storm event. If mosquitos are observed, increase inspection frequency to after every 0.1-inch or larger storm event.  Maintain when needed. Underdrain clogged Clear blockage. Inspect if standing water is observed for longer than 24-96 hours following a storm event. Maintain when needed. “25% full” is defined as ¼ of the depth from the design bottom elevation to the crest of the outflow structure (e.g., if the height to the outflow opening is 12 inches from the bottom elevation, then the materials must be removed when there is 3 inches of accumulation – this should be marked on the outflow structure). BF-2 Nutrient Sensitive Media Design E-134 July 2018 E.19 BF-2 Nutrient Sensitive Media Design Some studies of biofiltration with underdrains have observed export of nutrients, particularly inorganic nitrogen (nitrate and nitrite) and dissolved phosphorus. This has been observed to be a short-lived phenomenon in some studies or a long term issue in some studies. The composition of the soil media, including the chemistry of individual elements is believed to be an important factor in the potential for nutrient export. Organic amendments, often compost, have been identified as the most likely source of nutrient export. The quality and stability of organic amendments can vary widely. The biofiltration media specifications contained in the County of San Diego Low Impact Development Handbook: Appendix G - Biofiltration Soil Specification (June 2014, unless superseded by more recent edition) and the City of San Diego Low Impact Development Design Manual (page B-18) (July 2011, unless superseded by more recent edition) were developed with consideration of the potential for nutrient export. These specifications include criteria for individual component characteristics and quality in order to control the overall quality of the blended mixes. As of the publication of this manual, the June 2014 County of San Diego specifications provide more detail regarding mix design and quality control. The City and County specifications noted above were developed for general purposes to meet permeability and treatment goals. In cases where the BMP discharges to receiving waters with nutrient impairments or nutrient TMDLs, the biofiltration media should be designed with the specific goal of minimizing the potential for export of nutrients from the media. Therefore, in addition to adhering to the City or County media specifications, the following guidelines should be followed: 1. Select plant palette to minimize plant nutrient needs A landscape architect or agronomist should be consulted to select a plant palette that minimizes nutrient needs. Utilizing plants with low nutrient needs results in less need to enrich the biofiltration soil mix. If nutrient quantity is then tailored to plants with lower nutrient needs, these plants will generally have less competition from weeds, which typically need higher nutrient content. The following practices are recommended to minimize nutrient needs of the plant palette:  Utilize native, drought-tolerant plants and grasses where possible. Native plants generally have a broader tolerance for nutrient content, and can be longer lived in leaner/lower nutrient soils.  Start plants from smaller starts or seed. Younger plants are generally more tolerant of lower nutrient levels and tend to help develop soil structure as they grow. Given the lower cost of smaller plants, the project should be able to accept a plant mortality rate that is somewhat higher than starting from larger plants and providing high organic content. 2. Minimize excess nutrients in media mix EXCERPT - CITY OF TEMECULA BMPDM FACT SHEET BF-2 BF-2 Nutrient Sensitive Media Design E-135 July 2018 Once the low-nutrient plant palette is established (item 1), the landscape architect and/or agronomist should be consulted to assist in the design of a biofiltration media to balance the interests of plant establishment, water retention capacity (irrigation demand), and the potential for nutrient export. The following guidelines should be followed:  The mix should not exceed the nutrient needs of plants. In conventional landscape design, the nutrient needs of plants are often exceeded intentionally in order to provide a factor of safety for plant survival. This practice must be avoided in biofiltration media as excess nutrients will increase the chance of export. The mix designer should keep in mind that nutrients can be added later (through mulching, tilling of amendments into the surface), but it is not possible to remove nutrients, once added.  The actual nutrient content and organic content of the selected organic amendment source should be determined when specifying mix proportions. Nutrient content (i.e., C:N ratio; plant extractable nutrients) and organic content (i.e, % organic material) are relatively inexpensive to measure via standard agronomic methods and can provide important information about mix design. If mix design relies on approximate assumption about nutrient/organic content and this is not confirmed with testing (or the results of prior representative testing), it is possible that the mix could contain much more nutrient than intended.  Nutrients are better retained in soils with higher cation exchange capacity. Cation exchange capacity can be increased through selection of organic material with naturally high cation exchange capacity, such as peat or coconut coir pith, and/or selection of inorganic material with high cation exchange capacity such as some sands or engineer ed minerals (e.g., low P-index sands, zeolites, rhyolites, etc). Including higher cation exchange capacity materials would tend to reduce the net export of nutrients. Natural silty materials also provide cation exchange capacity; however potential impacts to permeability need to be considered.  Focus on soil structure as well as nutrient content. Soil structure is loosely defined as the ability of the soil to conduct and store water and nutrients as well as the degree of aeration of the soil. Soil structure can be more important than nutrient content in plant survival and biologic health of the system. If a good soil structure can be created with very low amounts of organic amendment, plants survivability should still be provided. While soil structure generally develops with time, biofiltration media can be designed to promote earlier development of soil structure. Soil structure is enhanced by the use of amendments with high humus content (as found in well-aged organic material). In addition, soil structure can be enhanced through the use of organic material with a distribution of particle sizes (i.e., a more heterogeneous mix).  Consider alternatives to compost. Compost, by nature, is a material that is continually evolving and decaying. It can be challenging to determine whether tests previously done on a given compost stock are still representative. It can also be challenging to determine how the properties of the compost will change once placed in the media bed. More stable materials BF-2 Nutrient Sensitive Media Design E-136 July 2018 such as aged coco coir pith, peat, biochar, shredded bark, and/or other amendments should be considered. With these considerations, it is anticipated that less than 10 percent organic amendment by volume could be used, while still balancing plant survivability and water retention. If compost is used, designers should strongly consider utilizing less than 10 percent by volume. 3. Design with partial retention and/or internal water storage An internal water storage zone, as described in Fact Sheet PR-1 is believed to improve retention of nutrients. For lined systems, an internal water storage zone worked by providing a zone that fluctuates between aerobic and anaerobic conditions, resulting in nitrification/denitrification. In soils that will allow infiltration, a partial retention design (PR-1) allows significant volume reduction and can also promote nitrification/denitrification. Acknowledgment: This fact sheet has been adapted from the Orange County Technical Guidance Document (May 2011). It was originally developed based on input from: Deborah Deets, City of Los Angeles Bureau of Sanitation, Drew Ready, Center for Watershed Health, Rick Fisher, ASLA, City of Los Angeles Bureau of Engineering, Dr. Garn Wallace, Wallace Laboratories, Glen Dake, GDML, and Jason Schmidt, Tree People. The guidance provided herein does not reflect the individual opinions of any individual listed above and should not be cited or otherwise attributed to those listed. Refer to maintenance information provided in the Biofiltration (BF-1) Fact Sheet. Adjust maintenance actions and reporting if required based on the specific media design. Maintenance Overview BROCHURE - INDUSTRIAL/COMMERCIAL FACILITIES EXCERPT - CASQA FACT SHEET SC-10 EXCERPT - CASQA FACT SHEET SC-30 48 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 ATTACHMENT 4 City of Temecula PDP Structural BMP Verification for Permitted Land Development Projects ☐ Not applicable at this time – Discretionary Project ☐ Attachment 4 is not required because the project does not propose structural BMPs PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 49 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. 50 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 City of Temecula Structural BMP Verification Form Project Summary Information Project Name MS Mountain View Record ID (e.g., grading/improvement plan number) Project Address See attached Assessor's Parcel Number(s) (APN(s)) See attached Project Watershed (Complete Hydrologic Unit, Area, and Subarea Name with Numeric Identifier) Responsible Party for Construction Phase Developer's Name MS Mountain View, LLC Address 16130 Ventura Boulevard, Suite 510 Encino, CA 91436 Email Address mcalvillo@leeriverside.com Phone Number (951) 276-3657 Engineer of Work SDH & Associates, Inc. Engineer's Phone Number (951) 683-3691 Responsible Party for Ongoing Maintenance Owner's Name(s)* MS Mountain View, LLC Address 16130 Ventura Boulevard, Suite 510 Encino, CA 91436 Email Address mcalvillo@leeriverside.com Phone Number (951) 276-3657 *Note: If a corporation or LLC, provide information for principal partner or Agent for Service of Process. If an HOA, provide information for the Board or property manager at time of project closeout. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 51 Template Date: September 26, 2019 Preparation Date: June 4, 2021 City of Temecula Structural BMP Verification Form Page 2 of 4 Stormwater Structural Pollutant Control & Hydromodification Control BMPs* (List all from WQMP) Description/Type of Structural BMP Plan Sheet # STRUCT- URAL BMP ID# Maintenance Agreement Recorded Doc # Revisions Note: If this is a partial verification of Structural BMPs, provide a list and map denoting Structural BMPs that have already been submitted, those for this submission, and those anticipated in future submissions. 52 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 City of Temecula Structural BMP Verification Form Page 3 of 4 Checklist for Applicant to submit to City inspector: ☐ Photograph of each completed Structural BMP. ☐ Photograph(s) of each Structural BMP during the construction process to illustrate proper construction as described in the Structural BMP Fact sheets. ☐ Certificates of compliance for materials as required in the Structural BMP Fact sheets. ☐ Infiltration Tests as required in the Structural BMP Fact sheets. By signing below, I certify that the Structural BMP(s) for this project have been constructed and all BMPs are in substantial conformance with the approved plans and applicable regulations. I understand the City reserves the right to inspect the above BMPs to verify compliance with the approved plans and City Ordinances. Should it be determined that the BMPs were not constructed to plan or code, corrective actions may be necessary before permits can be closed. Please sign your name and seal. Professional Engineer's Printed Name: Professional Engineer's Signed Name: Date: PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 53 Template Date: September 26, 2019 Preparation Date: June 4, 2021 City of Temecula Structural BMP Verification Form Page 4 of 4 City - OFFICIAL USE ONLY: For City Inspector: Verification Package #: __________ City Inspector: Date Project has/expects to close: Date verification received from EOW: By signing below, City Inspector concurs that every noted Structural BMP has been installed per plan. City Inspector’s Signature: _______________________________ Date: For Land Development Staff: Date Received from City Inspector: Land Development Submittal Reviewer: Land Development Reviewer concurs that the information provided for the following Structural BMPs is acceptable to enter into the Structural BMP Maintenance verification inventory: List acceptable Structural BMPs: Land Development Reviewer’s Signature: Date: 54 PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS Preparation Date: June 4, 2021 Template Date: September 26, 2019 ATTACHMENT 5 Copy of Plan Sheets Showing Permanent Stormwater BMPs, Source Control, and Site Design Use this checklist to ensure the required information has been included on the plans: The plans must identify: ☒ Structural BMP(s) with ID numbers ☒ The grading and drainage design shown on the plans must be consistent with the delineation of DMAs shown on the DMA exhibit ☐ Improvements within City Public Right-of-Way have been designed in accordance with Appendix K: Guidance on Green Infrastructure. ☒ Details and specifications for construction of structural BMP(s). ☐ Manufacturer and part number for proprietary parts of structural BMP(s) when applicable. ☐ Signage indicating the location and boundary of source control, site design, and structural BMP(s) as required by City staff. ☒ How to access the structural BMP(s) to inspect and perform maintenance. ☒ Features that are provided to facilitate inspection (e.g., observation ports, cleanouts, silt posts, benchmarks or other features that allow the inspector to view necessary components of the structural BMP and compare to maintenance thresholds) ☒ Include landscaping plan sheets showing vegetation and amended soil requirements for vegetated structural BMP(s), amended soil areas, dispersion areas, tree-wells, and self- mitigating areas ☒ All BMPs must be fully dimensioned on the plans ☒ Include all Construction stormwater, source control, and site design measures described in the WQMP. Can be included as separate plan sheets as necessary. ☐ When proprietary BMPs are used, site-specific cross section with outflow, inflow, and model number must be provided. Photocopies of general brochures are not acceptable. PRIORITY DEVELOPMENT PROJECT (PDP) REQUIREMENTS 55 Template Date: September 26, 2019 Preparation Date: June 4, 2021 This page was left intentionally blank. 10 2 5 1025 1030 10 3 0 C AVENIDA ALVARADOL VICINITY MAP SITE LEGEND SOILS ENGINEER: ARCHITECT ASSESSORS PARCEL NO. LEGAL DESCRIPTION TOPOGRAPHY SOURCE SHEET INDEX CONSTRUCTION NOTES AND QUANTITIES EARTHWORK NOTE: INDEX MAP APPLICANT ENGINEER SHEET 3 SHEET 4 EROSION CONTROL NOTES AND QUANTITIES MS MOUNTAIN VIEW - BLDG 1 PARCEL MAP No. 21382 LOT 01 PRECISE GRADING PLANS IN THE CITY OF TEMECULA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA MS MOUNTAIN VIEW - BLDG 1 PARCEL MAP No. 21382 LOT 01 PRECISE GRADING PLANS TITLE SHEET CITY OF TEMECULA UNDERGROUND SERVICE ALERT DIAL TOLL FREE 1-800-422-4133 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA · · · LD21-1665 TEMECULA, CA 92590 27363 VIA INDUSTRIA TEL: (951) 683-3691 FAX (951) 788-2314 SDH AND ASSOCIATES INC. BASIS OF BEARINGS: PRIVATE ENGINEERS NOTICE TO CONTRACTORS ARCHAEOLOGICAL/CULTURAL RESOURCES GRADING NOTE DISCOVERY OF CULTURAL RESOURCES ARCHAEOLOGICAL MONITORING NOTES TRIBAL MONITOR NOTES RELINQUISHMENT OF CULTURAL RESOURCES PRESERVATION OF SACRED SITES PROJECT SIZE BLDG 1 WDID: 9 33C390921 BUILDING AND SAFETY UTILITIES PARCEL 01 MS MOUNTAIN VIEW - BLDG 1 PARCEL MAP No. 21382 LOT 01 PRECISE GRADING PLANS NOTES CITY OF TEMECULA UNDERGROUND SERVICE ALERT DIAL TOLL FREE 1-800-422-4133 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA · · · TEMECULA, CA 92590 27363 VIA INDUSTRIA TEL: (951) 683-3691 FAX (951) 788-2314 SDH AND ASSOCIATES INC. GRADING NOTES ¾ EROSION AND SEDIMENT CONTROL GENERAL NOTES WDID: 9 33C390921 BUILDING AND SAFETY LD21-1665 1026.6 1026.1 1026.3 1026.6 1023.6 1023.4 1023.51023.9 1023.7 1024.5 1025.4 1025.9 1022.9 1034.3 1023.3 1026.3 1025 1025 10 3 0 SEE SHEET 4 MS MOUNTAIN VIEW - BLDG 1 PARCEL MAP No. 21382 LOT 01 PRECISE GRADING PLANS CITY OF TEMECULA UNDERGROUND SERVICE ALERT DIAL TOLL FREE 1-800-422-4133 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA · · · TEMECULA, CA 92590 27363 VIA INDUSTRIA TEL: (951) 683-3691 FAX (951) 788-2314 SDH AND ASSOCIATES INC. WDID: 9 33C390921 BUILDING AND SAFETY CONSTRUCTION NOTES AND QUANTITIES LD21-1665 1028.7 1027.2 1027.3 1027.1 1026.7 1026.6 1026.6 1027.2 1022.0 1022.4 1034.4 1023.3 1021.8 1022.4 1023.5 1034.4 1022.6 1025 1025 10 2 5 1030 10 3 0 APN 921-020-001 SEE SHEET 3 MS MOUNTAIN VIEW - BLDG 1 PARCEL MAP No. 21382 LOT 01 PRECISE GRADING PLANS CITY OF TEMECULA UNDERGROUND SERVICE ALERT DIAL TOLL FREE 1-800-422-4133 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA · · · TEMECULA, CA 92590 27363 VIA INDUSTRIA TEL: (951) 683-3691 FAX (951) 788-2314 SDH AND ASSOCIATES INC. WDID: 9 33C390921 BUILDING AND SAFETY CONSTRUCTION NOTES N.A.P. APN 909-290-002 N.A.P. LD21-1665 PARCEL 2 BLOCK 1 OF PAUBA LAND AND WATER COMPANY SUBDIVISION SECTION A-A SECTION B-B MS MOUNTAIN VIEW - BLDG 1 PARCEL MAP No. 21382 LOT 01 PRECISE GRADING PLANS SECTIONS CITY OF TEMECULA UNDERGROUND SERVICE ALERT DIAL TOLL FREE 1-800-422-4133 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA · · · TEMECULA, CA 92590 27363 VIA INDUSTRIA TEL: (951) 683-3691 FAX (951) 788-2314 SDH AND ASSOCIATES INC. WDID: 9 33C390921 BUILDING AND SAFETY RIBBON GUTTER DETAIL LINED BIOFILTRATION BASIN CROSS SECTION BMP 1 LD21-1665 1028.7 1027.2 1027.3 1027.1 1026.7 1026.6 1026.1 1026.3 1026.6 1027.2 1022.0 1023.3 1022.4 1023.6 1023.4 1023.51023.9 1023.7 1024.5 1025.9 1034.4 1023.3 1022.9 1021.8 1022.4 1034.4 1034.3 1022.6 1023.1 1026.3 1025 1025 10 2 5 1025 1030 10 3 0 GRAVEL BAG DETAIL CONSTRUCTION ENTRANCE DETAIL SECTION Y-Y SILT FENCE DETAIL Y Y EROSION CONTROL NOTES MS MOUNTAIN VIEW - BLDG 1 PARCEL MAP No. 21382 LOT 01 PRECISE GRADING PLANS EROSION CONTROL PLAN CITY OF TEMECULA UNDERGROUND SERVICE ALERT DIAL TOLL FREE 1-800-422-4133 AT LEAST TWO DAYS BEFORE YOU DIG UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA · · · TEMECULA, CA 92590 27363 VIA INDUSTRIA TEL: (951) 683-3691 FAX (951) 788-2314 SDH AND ASSOCIATES INC. WDID: 9 33C390921 BUILDING AND SAFETY LD21-1665 LANDSCAPE TITLE SHEET 1 AJ/AP EXP. 11-30-22 P O F SIGNATURE NO. 2076 S A S T F TEO AC IL DATE DEERT ISG RE O ETRT SC DNAL CAS TEP A RO N I C H T I E N C T E AR 2883 VIA RANCHEROS WAY FALLBROOK, CA 92028 PH:760-842-8993 DRAWN: SHEET TITLE JOB # CHK'D: SP CITY SUBMITTAL 01-05-2021 OF 8 SHEETS CAUTION: IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT CLIENT: CONSULTANTS: SPLA C I V I L STRUCTURAL MECHANICAL PLUMBING ELECTRICAL LANDSCAPE SOILS ENGINEER FIRE PROTECTION - - - - - - - MATERIAL HANDLING - MS M O U N T A I N V I E W P A R K B L D G 1 42 4 3 3 A V E N I D A A L V A R D O TE M E C U L A , C A MS-MOUNTAIN VIEW, LLC C/O SILAGE DEVELOPMENT & MANAGEMENT, INC. 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 5-25-21 APN # 909-290-001 PA20-0533 PR I N T D A T E : 5 / 2 5 / 2 1 CITY RE-SUBMITTAL 03-17-2021 SITE UPDATE 03-31-2021 CITY RE-SUBMITTAL 05-03-2021 CITY RE-SUBMITTAL 05-17-2021 N.T.S. VICINITY MAP NORTH LANDSCAPE ARCHITECTURAL DRAWINGS FOR: MS MOUNTAIN VIEW PARK BLDG 1 (PHASE 1) 42433 AVENIDA ALVARADO TEMECULA, CA SHEET INDEX LANDSCAPE TITLE SHEET LANDSCAPE IRRIGATION PLAN WATER MANAGEMENT INFORMATION IRRIGATION & PLANTING DETAILS IRRIGATION SPECIFICATIONS PLANTING PLAN PLANTING SPECIFICATIONS SD-F AMENDED SOILS LT-1.0 LI-1.0 LI-2.0 LI-3.0 LI-4.0 LP-1.0 LP-2.0 LP-3.0 GENERAL NOTES 1.ALL WORK SPECIFIED HEREIN SHALL BE PERFORMED PER APPLICABLE LAWS, ORDINANCE, AND REGULATIONS. 2.CONTRACTOR SHALL CONTACT LANDSCAPE ARCHITECT IN ORDER TO SCHEDULE A PRE-CONSTRUCTION MEETING PRIOR TO STARTING ANY WORK. THE CONTRACTOR SHALL CONFIRM THAT HE IS WORKING FROM THE CURRENT CITY APPROVED LANDSCAPE & IRRIGATION DWGS. 3.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PERMITS ASSOCIATED WITH THIS PROJECT RELATING TO HARDSCAPE, IRRIGATION & PLANTING INSTALLATIONS. 4.ALL LANDSCAPE & HARDSCAPE IMPROVEMENTS SHALL BE APPROVED BY THE CITY OF TEMECULA'S LANDSCAPE PLANNING DIVISION PRIOR TO ANY CONSTRUCTION. 5.THE PLANT MATERIAL SUPPLIER/ OR LANDSCAPE CONTRACTOR SHALL PROVIDE GUARANTEED EVIDENCE TO LAND. ARCH. THAT ALL PLANT MATERIAL IS CONSISTENT WITH THE APPROVED PLANT LEGEND CONSIDERING GENUS, SPECIES, CULTIVARS, AND SIZE SPECIFIED. ALL PLANT MATERIAL NOT CONSISTENT WITH THE PLANT LEGEND MAY BE REJECTED. 6.ALL REVISIONS AND CHANGE ORDERS TO THE APPROVED LAND. ARCH. PLANS AND SPECIFICATIONS ARE SUBJECT TO THE REVIEW AND APPROVAL BY THE LAND. ARCH. & PROPERTY OWNER BEFORE WORK MAY CONTINUE. 7.CONTRACTOR TO VERIFY WITH OWNER AND UTILITY COMPANIES THE LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION, TO DETERMINE IN THE FIELD THE ACTUAL LOCATIONS AND ELEVATIONS OF ALL EXISTING UTILITIES, WHETHER SHOWN ON THE PLANS OR NOT. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (USA) BEFORE THE START OF CONSTRUCTION AT 811 DIG-ALERT 72 HOURS PRIOR TO CONSTRUCTION. 8.REFER TO SITE CONSTRUCTION PLANS, IRRIGATION & PLANTING PLANS FOR SPECIFIC NOTES PERTAINING TO THESE TASKS. 9.ALL CONSTRUCTION SHALL COMPLY WITH THE CITY OF TEMECULA'S STANDARDS RELATING TO EROSION CONTROL, PORTABLE TOILETS, ETC. 10.ALL IRRIGATION IMPROVEMENTS SHALL COMPLY WITH THE CALIFORNIA STATE WATER ORDINANCE 1881 & THE CITY'S IRRIGATION STANDARDS AND GUIDELINES FOR WATER EFFICIENT LANDSCAPES. 11.SOIL TEST SHALL BE SUBMITTED TO LANDSCAPE ARCHITECT WITH PROOF OF AMENDMENTS USED AND QUANTITIES AS DIRECTED BY THE SOIL REPORT. 12.CONTRACTOR SHALL EXAMINE FINISH SURFACE, GRADES, TOPSOIL QUALITY AND DEPTH. DO NOT START ANY WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. VERIFY LIMITS OF WORK BEFORE STARTING. 13.CONTRACTOR TO REPORT ALL DAMAGES TO EXISTING CONDITIONS AND INCONSISTENCIES WITH PLANS TO LANDSCAPE ARCHITECT. 14.CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AWAY FROM ANY BUILDINGS IN ALL LANDSCAPE PLANTING AREAS. 15.CONTRACTOR TO FINE GRADE AND ROCK-HOUND ALL TURF AREAS PRIOR TO SEEDING, TO PROVIDE A SMOOTH AND CONTINUAL SURFACE, FREE OF REGULARITIES, MATERIALS OR DEBRIS. (IF APPLICABLE) 16.COORDINATE LANDSCAPE INSTALLATION WITH INSTALLATION OF UNDERGROUND IRRIGATION AND DRAINAGE SYSTEMS. 17.CONTRACTOR SHALL NOT REMOVE ANY TREES DURING CONSTRUCTION WITHOUT THE EXPRESS WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. EXISTING VEGETATION TO REMAIN SHALL BE PROTECTED AS DIRECTED BY THE LANDSCAPE ARCHITECT. 18.WHERE PROPOSED TREE LOCATIONS OCCUR UNDER EXISTING OVERHEAD UTILITES OR CROWD EXISTING TREES, NOTIFY LANDSCAPE ARCHITECT TO ADJUST TREE LOCATIONS. 1.ALL PLANTER CURBS ADJACENT TO PARKING STALLS SHALL HAVE AN 18" WIDE STEP-OUT (6" CURB PLUS 12" STEP-OUT.) 2.CITY OF TEMECULA PLANNING DEPT. SHALL BE CALLED PRIOR TO COMMENCING ANY LANDSCAPE INSTALLATION IN ORDER TO SCHEDULE REQUIRED LANDSCAPE INSPECTION. 3.A SHREDDED MULCH SHALL BE APPLIED TO ALL PLANTING AREAS. 3" DEPTH UNDER ALL TREES & 112" UNDER GROUND COVER FROM FLATS. 4.TREES & SHRUBS SHALL BE PLACED A MIN. OF 5' AWAY FROM WATER METER. GAS METER OR SEWER LATERALS; A MIN. 10' AWAY FROM UTILITY POLES AND A MIN. OF 8' AWAY FROM FIRE HYDRANTS AND FIRE SPRINKLERS & STAND PIPE CONNECTIONS. CITY NOTES: PARKING LOT TREE REQUIREMENTS *TOTAL NUMBER OF PARKING STALLS =21 *PARKING LOT TREES REQUIRED AT =5 1 TREE PER 4 SPACES *NUMBER OF PARKING LOT TREES PROVIDED =6 KEY MAP NORTH SCALE: 1" = 20'-0" 0 20'40'60' SCOPE OF WORK BUILDING #1 AVENIDA ALVARADO LT-1.0 SCOPE OF WORK PREPARED FOR: MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. 16130 VENTURA BLVD., SUITE 510 ENCINO, CA 91436 CONTACT: MARIO CALVILLO PHONE: (951) 276-3657 CONTROLLER ('A') IRRIGATION CONTROLLER PER LEGEND. 120 V. ELEC. REQ. 3 5 4 MV 12 MANIFOLD ASSEMBLY AS REQUIRED 6 IRRIGATION POINT OF CONNECTION DIAGRAM N.T.S. FS W.1 A KEY NOTES: 1.NEW 1" WATER METER PER LEGEND (POTABLE WATER) 2.1" BACKFLOW UNIT PER LEGEND 3.1-1/2" MASTER VALVE PER LEGEND 4.RAINBIRD FLOW SENSOR PER LEGEND 5.GATE VALVE PER LEGEND 6.IRRIGATION MAIN LINE DRIP BIO-RETENTION 892 SF. 579 SF. BUILDING #1 AVENIDA ALVARADO P.L. R.O.W. P.L. P.L. 1" A-15 * DRIP 2" 1" A-13 * DRIP 11 2" 1" A-10 * DRIP NOTE: ADJUST DRIP TUBING TO REFLECT SLOPE WITHIN THIS AREA. INSTALL DRAIN VALVES AS REQUIRED. 11 2" 1" A-8 * DRIP 1" A-9 8 BUBBLER B WALL MOUNTED AUTO CONTROLLER 120 V. ELEC. REQUIRED. LOCATE ON EXTERIOR WALL OF ELEC. ROOM. 1" A-7 * DRIP 11 2" 1" A-6 * DRIP NOTE: ADJUST DRIP TUBING TO REFLECT SLOPE WITHIN THIS AREA. INSTALL DRAIN VALVES AS REQUIRED. 1" A-5 8 BUBBLER 11 2"1" A-4 * DRIP 1" A-3 6 BUBBLER 1" A-2 * DRIP 11 2" 1" 1" A-1 * FS MV W.1 11 2" NOTE: POINT OF CONNECTION ASSEMBLY PER POC DIAGRAM THIS SHEET.REFER TO SEPARATE IRRIGATION DWGS. FOR ASSOCIATION FRONTAGE 1" A-14 * DRIP 1" A-12 6 BUBBLER 3 4" 3 4" 1,178 SF. 1,320 SF. 2,048 SF. 1,951 SF. 1" A-11 * DRIP 1,916 SF. 1,935 SF. 1,420 SF. 1,395 SF. 2,141 SF.471 SF. 628 SF. 628 SF. 471 SF. SCALE: 1" = 20'-0" 0 20'40'60' SYSTEM FLOW STA.# VALVE SIZE AT CONTROLLER SYSTEM FLOW FOR SUB-SURFACE DRIP SYSTEM BASED UPON ZONE SIZE. MAX. SHALL NOT EXCEED 23 GPM. A-1 1"12 A-2 PSI REMARKSGPMRAD. IRRIGATION HEADS MODELSYMBOLTYPEMANUF. RAINBIRD .5(2) 1806-PRS-SAM-5BQ TREE BUBBLER 30 6" POP-UP 1"* NOTE: INSTALL (2) BUBBLERS ALONG EACH SIDE OF TREE ROOT BALL. INSTALL BUBBLERS ON RAINBIRD 1806-PRS-SAM POP-UP BODY. IRRIGATION LEGEND (POTABLE WATER) LATERAL LINE SCH 40 PVC PIPE LASCO SCH 40 PVC SLEEVE PRIOR TO PAVING SLEEVE TO BE TWICE THE SIZE OF LATERAL LINE LATERAL LINE INSTALLED IN SCH 40 PVC SLEEVE PRIOR TO PAVING PRESSURE SUPPLY LINE 2" AND LARGER USE CLASS 315 PVC 1 12" AND SMALLER USE SCHEDULE 40. NOTE: DRAWINGS ARE DIAGRAMMATIC, INSTALL MAINLINE IN PLANTING AREA. PRESSURE SUPPLY LINE INSTALLED IN SCH 40 PVC SLEEVE PRIOR TO PAVING. SLEEVE TO BE TWICE THE SIZE OF THE MAINLINE PIPE, PER PLAN. REMOTE CONTROL VALVE BY RAINBIRD # PES-B. LOCATE IN VALVE BOX. DRIP IRRIGATION VALVE IN VALVE BOX. RAINBIRD XCZ-PRB-150-COM 1 12" X 2 @ 1" WITH 150-PESB FILTER AND 1" PR QUICK-CHECK BASKET FILTER (2). QUICK COUPLER VALVE BY RAINBIRD # 33-DRC. LOCATE IN LOCKING VALVE BOX GATE VALVE BY NIBCO (LINE SIZE) T-113 POINT OF CONNECTION AT NEW 1" METER REFER TO "IRRIGATION P.O.C. DIAGRAM" ON SHT LI-1.0. VERIFY EXACT LOCATION IN FIELD. FEBCO #825YA (1" SIZE) REDUCED PRESSURE BACK FLOW UNIT INSTALLED IN PROTECTIVE STEEL CAGE BY STRONG BOX SBBC-30-SS. 1-1/2" SIZE NORMALLY OPEN MASTER VALVE BY GRISWOLD #2260 F-4076. REFER TO POINT OF CONNECTION DIAGRAM ON SHT. L-3. NOTE: CONTRACTOR SHALL INSTALL REQUIRED RELAY FROM CONTROLLER. RAINBIRD FLOW SENSORS PRIMARY P.O.C.: FS150P 12" PVC INSTALL PER MANUFACTURER'S SPECIFICATIONS. CONTROLLER 'A' 16 STATION WALL MOUNTED RAINBIRD ESP-LXME SMART CONTROLLER. LOCATED ON EXTERIOR WALL OF ELECTRICAL ROOM. 120 V. ELEC. REQ. INSTALL WITH IQ-COMMUNICATION CARTRIDGE ALONG WITH FLOW SENSOR & MASTER VALVE. NOTE: IQ COMMUNICATION CARTRIDGE WILL NOT BE ACTIVATED UNTIL ETHERNET OR WIFI HAS BEEN ACTIVATED AT BLDG. TO BE CONFIRMED AT TIME OF COMPLETION. REPRESENTS SUB-SURFACE DRIP IRRIGATION ZONE BY RAINBIRD XFS-09-18-500 DRIPLINE. REFER TO GENERAL INSTALLATION DIAGRAM SHEET L-11. MV FS A W.1 INSTALL DRIP TUBING WITHIN 'BIO-RETENTION' AREA. INSTALL SUB-SURFACE TUBING TO REFLECT EXACT PLAN LAYOUT. REFER TO PLANTING PLAN REFER TO SEPARATE MASTER ASSOCIATION DRAWINGS FOR IRRIGATION WITHIN PUBLIC R.O.W. AREAS. LANDSCAPE IRRIGATION PLAN 2 AJ EXP. 11-30-22 P O F SIGNATURE NO. 2076 S A S T F TEO AC IL DATE DEERT ISG RE O ETRT SC DNAL CAS TEP A RO N I C H T I E N C T E AR 2883 VIA RANCHEROS WAY FALLBROOK, CA 92028 PH:760-842-8993 DRAWN: SHEET TITLE JOB # CHK'D: SP CITY SUBMITTAL 01-05-2021 OF 8 SHEETS CAUTION: IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT CLIENT: CONSULTANTS: SPLA C I V I L STRUCTURAL MECHANICAL PLUMBING ELECTRICAL LANDSCAPE SOILS ENGINEER FIRE PROTECTION - - - - - - - MATERIAL HANDLING - MS M O U N T A I N V I E W P A R K B L D G 1 42 4 3 3 A V E N I D A A L V A R D O TE M E C U L A , C A MS-MOUNTAIN VIEW, LLC C/O SILAGE DEVELOPMENT & MANAGEMENT, INC. 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 5-25-21 APN # 909-290-001 PA20-0533 PR I N T D A T E : 5 / 2 5 / 2 1 CITY RE-SUBMITTAL 03-17-2021 SITE UPDATE 03-31-2021 CITY RE-SUBMITTAL 05-03-2021 CITY RE-SUBMITTAL 05-17-2021 LI-1.0 NORTH NOTE: DRIP IRRIGATION COVERAGE AREA IS NOT TO EXCEED 2,500 SQ. FT. PER VALVE. CONTROLLER A STATION NUMBERS DEC - FEB MAR. - MAY JUN. - AUG.SEP. - NOV IRRIGATION MAINTENANCE SCHEDULE TIME(MIN.)DAYS/WK DAYS/WKTIME(MIN.)TIME(MIN.)DAYS/WK DAYS/WK DRIP BUBBLER 1 2 SYSTEM TYPE SYSTEM TYPE NOTE: WATER USE CALCULATIONS SHALL COMPLY WITH THE CITY OF TEMECULA IRRIGATION GUIDELINES AND CALIFORNIA ORDINANCE AB 1881. (X) = 'GERMINATION PERIOD' 1.CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT PRIOR TO STARTING ANY CONSTRUCTION. 2.THE DESIGN IS DIAGRAMMATIC ONLY. ALL PIPING, VALVES, BACK FLOW PREVENTOR, WIRING, ETC. SHOWN WITHIN PAVED AREAS ARE FOR DESIGN CLARIFICATION ONLY, AND SHALL BE INSTALLED IN PLANTER AREAS WHEREVER POSSIBLE. 3.DO NOT WILLFULLY INSTALL THE IRRIGATION SYSTEM AS SHOWN ON THESE DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS, GRADE DIFFERENCES OR DIFFERENCES IN AREA DIMENSIONS EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING. 4.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FAMILIARIZE HIMSELF WITH ALL GRADE DIFFERENCES, LOCATION OF FIXTURES, UTILITIES, SIGNS, POSTS, POLES, WALLS AND PAVING. THE CONTRACTOR SHALL REPAIR OR REPLACE ALL ITEMS DAMAGED BY HIS WORK. HE SHALL COORDINATE HIS WORK WITH OTHER CONTRACTORS (IF ANY) FOR THE LOCATION AND INSTALLATION OF PIPE SLEEVES AND LATERALS THROUGH WALLS, UNDER ROADWAYS AND UNDER PAVING, ETC. 5.ALL IRRIGATION EQUIPMENT SHALL BE INSTALLED AS PER MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. 6.ALL LATERAL, MAINLINE PIPING AND CONTROL WIRES UNDER PAVING SHALL BE INSTALLED IN SEPARATE SLEEVES. MAINLINE SLEEVE SIZE SHALL BE A MINIMUM OF TWICE (2X) THE OUTSIDE DIAMETER OF THE PIPE TO BE SLEEVED. CONTROL WIRE SLEEVES SHALL BE SUFFICIENT SIZE FOR THE REQUIRED NUMBER OF WIRES UNDER PAVING REFER TO PLAN. 7.ALL SLEEVES UNDER ROADWAYS SHALL BE SCHEDULE 40 (NEW). EXISTING SLEEVES SHALL REMAIN IN PLACE, IF EXTENSIONS ARE REQUIRED THE PIPE SHALL BE SCH. 40. LATERAL LINE SLEEVE UNDER PAVING SHALL BE SCHEDULE 40. ALL SLEEVES SHALL BE P.V.C. OR AS NOTED ON PLANS. 8.PIPE SIZES SHALL CONFORM TO THOSE SHOWN ON THE PLANS AND DETAILS. NO SUBSTITUTIONS OF SMALLER PIPE SIZES SHALL BE PERMITTED, BUT SUBSTITUTIONS OF LARGER SIZE MAY BE APPROVED. ALL DAMAGED AND REJECTED PIPE SHALL BE REMOVED FROM THE SITE AT THE TIME OF SAID REJECTION. 9.THE CONTRACTOR SHALL MAKE THE FINAL CONNECTION FROM THE ELECTRICAL SOURCE TO THE CONTROLLER. 10.ADV (ANTI-DRAIN VALVE) UNITS MAY NOT BE REQUIRED ON ALL HEADS. PRIOR TO INSTALLATION. THE CONTRACTOR SHALL VERIFY WITH THE ON SITE GRADES. IF THERE IS AN ELEVATION DIFFERENCE OF 24" OR MORE BETWEEN THE HIGHEST HEAD AND THE LOWEST HEAD ON A SYSTEM, THE ADV'S SHALL BE INSTALLED. 11.ALL SPRINKLER HEADS SHALL BE SET PERPENDICULAR TO FINISH GRADE UNLESS OTHERWISE SPECIFIED. 12.THE CONTRACTOR SHALL FLUSH AND ADJUST ALL SPRINKLER HEADS AND VALVES FOR OPTIMUM COVERAGE, ELIMINATING OVER-SPRAY ONTO WALKS, STREETS, WALLS, ETC. 13.THE IRRIGATION SYSTEM SHALL BE FULLY AUTOMATIC. CONTROL VALVES SHALL BE INSTALLED PER DETAILS. 14.ALL SLEEVES SHALL EXTEND BEYOND THE EDGE OF PAVING OR BACK OF CURB TO 3'. 15.THE CONTRACTOR SHALL NOTIFY THE VA'S REPRESENTATIVE IF STATIC WATER PRESSURE IS LESS THAN 65 PSI. 16.THE CONTRACTOR SHALL GUARANTEE ALL WORK & WORKMANSHIP FOR (1) FULL YEAR FROM ACCEPTANCE. 17.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE 100% COVERAGE. 18.ALL SUB-TERRAINEAN DRIP TUBING SHALL BE BURIED WITH MULCH (NOT VISIBLE). INSTALL ALL DRIP TUBING PER MANUFACTURER'S SPECIFICATIONS. 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) STA.A-1 STA.A-2 STA.A-3 STA.A-4 STA.A-5 STA.A-6 STA.A-7 STA.A-8 STA.A-9 STA.A-10 STA.A-11 STA. A-12 STA. A-13 STA. A-14 STA. A-15 IRRIGATION NOTES (X) = 'GERMINATION PERIOD' NOTE: THE IRRIGATION SCHEDULE SHALL BE SET FOR 'GERMINATION PERIOD' FOR THE FIRST 3 MONTHS AFTER THE LANDSCAPE HAS BEEN PLANTED. AFTER 3 MONTHS THE IRRIGATION SCHEDULE SHALL BE SET FOR TYP. 'MAINTENANCE SCHEDULE', PER STATION. THE IRRIGATION SCHEDULE SHOWN IS FOR USE AS A GUIDE ONLY. THE CONTRACTOR SHALL FINE TUNE THE WATERING SCHEDULE FOR EACH VALVE STATION SO AS NOT TO ALLOW EXCESS SURFACE RUNOFF AND PROVIDE ADEQUATE SOIL SATURATION. TIME(MIN.) 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) WATER CONSERVATION STATEMENT 1.THE IRRIGATION SYSTEM WAS DESIGNED UTILIZING 'STATE OF THE ART' IRRIGATION EQUIPMENT SUCH AS MULTIPLE START TIMES FOR CONTROLLERS, ET BASED MASTER CONTROLLERS, 'RAIN SHUT OFF' DEVICE @ CONTROLLERS, PRESSURE AND REGULATING VALVE & LOW FLOW IRRIGATION BUBBLER & ROTOR HEADS UTILIZING DRIP SYSTEMS WHERE APPROPRIATE. 2.THIS LANDSCAPE DESIGN GROUPS PLANTS WITH SIMILAR WATER NEEDS TOGETHER INTO DISTINCT HYDROZONES OF VERY LOW, LOW & MEDIUM WATER USE AREAS. MINIMUM HIGH WATER USE PLANT MATERIALS SUCH AS LAWN OR SEASONAL COLOR BEDS WILL BE USED IN THIS PROJECT. THE LOWER HYDROZONES WHICH ARE MADE UP OF DROUGHT TOLERANT PLANT SPECIES COMPRISES 85% OF THE TOTAL LANDSCAPE AREA. THE IRRIGATION SYSTEM HAS BEEN DESIGNED TO GROUP SIMILAR HYDROZONES WITHIN THE SAME IRRIGATION VALVE. IN ADDITION A MINIMUM OF 3" LAYER WOOD FIBER MULCH IS USED OVER THE ENTIRE SHRUB AREAS TO RETAIN SOIL MOISTURE. WATER USE CALCULATIONS PROJECT: MS MOUNTAIN VIEW PARK BUILDING 1 PROJECT LOCATION: TEMECULA, CA LANDSCAPE ARCHITECT: SCOTT PETERSON, A.S.L.A. IRRIGATION MAINTENANCE SCHEDULE A REGULAR SCHEDULE SATISFYING THE FOLLOWING CONDITIONS SHALL INCLUDE THE FOLLOWING: 1.LANDSCAPES SHALL BE MAINTAINED TO ENSURE WATER EFFICIENCY. A REGULAR SCHEDULE SHALL INCLUDE BUT NOT BE LIMITED TO CHECKING, ADJUSTING AND REPAIRING IRRIGATION EQUIPMENT, RESETTING THE AUTOMATIC CONTROLLER, REPLENISHING MULCH, FERTILIZING, PRUNING AND WEEDING IN ALL LANDSCAPED AREAS. 2.WHENEVER POSSIBLE, REPAIR OF IRRIGATION EQUIPMENT SHALL BE DONE WITH THE ORIGINALLY SPECIFIED MATERIALS OR THEIR EQUIVALENTS. WATER MANAGEMENT INFORMATION 3 AJ EXP. 11-30-22 P O F SIGNATURE NO. 2076 S A S T F TEO AC IL DATE DEERT ISG RE O ETRT SC DNAL CAS TEP A RO N I C H T I E N C T E AR 2883 VIA RANCHEROS WAY FALLBROOK, CA 92028 PH:760-842-8993 DRAWN: SHEET TITLE JOB # CHK'D: SP CITY SUBMITTAL 01-05-2021 OF 8 SHEETS CAUTION: IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT CLIENT: CONSULTANTS: SPLA C I V I L STRUCTURAL MECHANICAL PLUMBING ELECTRICAL LANDSCAPE SOILS ENGINEER FIRE PROTECTION - - - - - - - MATERIAL HANDLING - MS M O U N T A I N V I E W P A R K B L D G 1 42 4 3 3 A V E N I D A A L V A R D O TE M E C U L A , C A MS-MOUNTAIN VIEW, LLC C/O SILAGE DEVELOPMENT & MANAGEMENT, INC. 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 5-25-21 APN # 909-290-001 PA20-0533 PR I N T D A T E : 5 / 2 5 / 2 1 CITY RE-SUBMITTAL 03-17-2021 SITE UPDATE 03-31-2021 CITY RE-SUBMITTAL 05-03-2021 CITY RE-SUBMITTAL 05-17-2021 PRESSURE LOSS CHART CONTROLLER 'A' VALVE A-1 APPROX. FLOW =21 GPM LATERAL LINE 2.00 PSI MAINLINE 1470 FT.@ 2"6.17 PSI FITTINGS 2.50 PSI VALVE 3.10 PSI MATSTER VALVE/FLOW SENSOR/BFU 14.00 PSI WATER METER 1.5"1.00 PSI ELEVATION CHANGE 2.00 PSI HEAD PRESSURE REQ.20.00 PSI MIN. REQ. PRESSURE 50.77 PSI STATIC PRESSURE =65.00 PSI RESIDUAL PRESSURE =14.23 PSI NOTE: CONTRACTOR SHALL VERIFY EXACT STATIC PRESSURE. NOTIFY LAND. ARCH. IF STATIC PRESSURE IS LESS THAN 65 PSI. Reference Evapotranspiration (ETo)55.6 Hdrozone Plant type Plant Factor Irrigation Method Irrigation Efficiency ETAF (PF/IE) Landscape Area sq.ft. ETAF x Area Estimated Total Water Use (ETWU) Regular Landscape Areas Low 0.2 Drip 0.81 0.25 16,775 4,141.98 142,782 Moderate 0.35 Bubbler 0.85 0.41 2,198 905.06 31,199 Totals 18,973 5,047.03 173,981 Special Landscape Areas Totals 0 ETWU Total 173,981 MAWA (Annual Gallons Allowed) = ETo x 0.62 x ETAF x Area MAWA 294,317 ETWU must be less than MAWA Difference 120,335 Reqular Landscape Areas Total ETAF x Area 5,047.03 Total Area 18,973 Average ETAF 0.27 All Landscape Areas Total ETAF x Area 5,047.03 Total Area 18,973 Site Average ETAF 0.27 LI-2.0 8 3 9 11 6 10 552(11)(4)(13)(5)(17)(6)(15)(5) 8 3 9 11 6 10 552(11)(4)(13)(5)(17)(6)(15)(5) 8 3 9 11 6 10 552(11)(4)(13)(5)(17)(6)(15)(5) 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) 8 3 9 11 6 10 552(11)(4)(13)(5)(17)(6)(15)(5) 1 14 3 16 18 6 16 54(22)(4)(26)(5)(29)(6)(27)(5) 1.THE PLANTING PLAN IS DIAGRAMMATIC. PLANT LOCATIONS ARE APPROXIMATE PLANT SYMBOLS TAKE PRECEDENCE OVER PLANT QUANTITIES SPECIFIED. NOTIFY THE OWNER'S REPRESENTATIVE OF DISCREPANCIES PRIOR TO STARTING WORK. 2.PLANT QUANTITIES GIVEN IN THE LEGEND ARE APPROXIMATE AND FOR THE CONVENIENCE OF THE OWNER ONLY. 3.PRIOR TO PLANTING, CONSTRUCTION ADJACENT TO PLANTING AREAS SHALL BE COMPLETE AND IRRIGATION SYSTEMS INSTALLED AND OPERATIONAL. 4.PLANT MATERIAL IN OR NEAR PAVING AND WALLS MAY REQUIRE INSTALLATION PRIOR TO CONSTRUCTION. COORDINATE THIS WORK THROUGH THE GENERAL CONTRACTOR. 5.SOIL SHALL COMPLY WITH SD-F AMENDED SOIL REQUIREMENTS. 6.THREE WEEKS PRIOR TO DELIVERY TO SITE, SUBMIT PHOTOS OF NURSERY STOCK TREES TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL. 7.INSTALL TREES AT STALL LINES IN PLANTING AREAS WHERE TREES MAY INTERFERE WITH PARKED CARS. 8.KEEP SHRUBS AND TREES A MINIMUM OF 3'-0" (OR AS INDICATED ON PLAN) FROM BACK OF PARKING CURBS TO ALLOW FOR CAR OVERHANG. 9.LANDSCAPE CONTRACTOR SHALL PERFORM A PERCOLATION CHECK FOR ALL TREE PLANTING PITS WHICH APPEAR TO HAVE A POTENTIAL DRAINAGE PROBLEM. THE TREE PLANTING PITS SHALL BE FILLED WITH WATER AND RE-CHECKED AFTER A 24-HOUR PERIOD. IF THERE IS NO SIGNIFICANT CHANGE IN THE WATER LEVEL, IT IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO PROVIDE FOR ADEQUATE DRAINAGE PRIOR TO PLANTING. THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY UPON COMPLETION OF THE PERCOLATION TESTS IN ORDER TO DISCUSS APPROPRIATE DRAINAGE DETAILS. 10.REFER TO SPECIFICATIONS AND DETAILS FOR ADDITIONAL INFORMATION. 11.LANDSCAPE CONTRACTOR SHALL REPAIR EXISTING LANDSCAPE AREAS (IF ANY) WHICH ARE DAMAGED DURING CONSTRUCTION PHASE. ALL DAMAGED MATERIAL SHALL BE REPLACED WITH MATCHING MATERIAL OF SIMILAR SIZE AND CALIBER. 12.CONTRACTOR SHALL APPLY A 3" LAYER OF MULCH WITHIN PLANTING AREAS. SAMPLES OF MULCH WILL BE REQUIRED PRIOR TO APPLICATION. SHALL MEET SD-F REQUIREMENTS. MULCH SHOULD BE APPLIED ON TOP AND NOT MIXED INTO UNDERLYING SOILS. NOTE: MULCH SHALL BE APPROVED BY LANDSCAPE ARCHITECT. 13.ANY TREE THAT HAS A ROOT SYSTEM WITH SURFACE RUNNERS OR A TREE LOCATED WITHIN 5 FEET OF A PUBLIC SIDEWALK SHALL BE INSTALLED WITH ROOT GUARDS. PLANTING NOTES SD-F AMENDED SOIL NOTES: SOIL QUALITY: A.AMENDED SOIL SHALL HAVE A MINIMUM ORGANIC MATTER CONTENT OF 10% DRY WEIGHT IN PLANTING BEDS, AND 5% ORGANIC MATTER CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8.0 OR MATCHING THE PH OF THE UNDISTURBED TOPSOIL. B.A MINIMUM THREE INCH LAYER OF MULCH SHALL BE APPLIED ON ALL EXPOSED SOIL SURFACES IN EACH LANDSCAPED AREA EXCEPT IN TURF AREAS, CREEPING OR ROOTING GROUND COVERS OR DIRECT SEEDING APPLICATION WHERE MULCH IS CONTRAINDICATED. ORGANIC MULCH MATERIALS MADE FROM RECYCLED OR POST CONSUMER PRODUCTS/MATERIALS SHALL TAKE PRECEDENCE OVER INORGANIC MATERIALS OR VIRGIN FOREST PRODUCTS UNLESS THE RECYCLED POST-CONSUMER ORGANIC PRODUCTS ARE NOT LOCALLY AVAILABLE. ORGANIC MULCHES ARE NOT REQUIRED WHERE PROHIBITED BY COUNTY FIRE CODE. HIGHLY FLAMMABLE MULCH MATERIAL, SUCH AS STRAW OR SMALL, MINI SIZE WOOD CHIPS, SHALL NOT BE USED IN A 'HAZARDOUS FIRE AREA,' AS THAT TERM IS DEFINED IN THE COUNTY FIRE CODE. FLUSH VALVE DETAIL FLUSH-VALVE KEY NOTES: 1.FINISH GRADE 2.FLUSH CAP FOR EASY FIT COMPRESSION FITTINGS: POTABLE:RAIN BIRD MDCFCAP NON-POTABLE: RAIN BIRD MDCFPCAP 3.EASY FIT COUPLING: RAIN BIRD MDCFCOUP 4.SUBTERRANEAN EMITTER BOX: RAIN BIRD SEB 7X8 LID 5.SUB-SURFACE DRIPLINE: RAIN BIRD XF DRIPLINE PORABLE: XFS DRIPLINE NON-POTABLE: XFSP DRIPLINE. ALLOW FOR 12-24" OF BLANK TUBING IN FLUSH VALVE BOX FOR FLUSHING INTO ADJACENT LANDSCAPE AREA. 6.3-INCH MINIMUM DEPTH OF 3/4-INCH WASHED GRAVEL 7.BRICK (1 OF 2) NOTE: 1.ALLOW A MINIMUM OF 6-INCHES OF DRIPLINE TUBING IN VALVE BOX IN ORDER TO DIRECT FLUSHED WATER OUTSIDE VALVE BOX. A N.T.S 141 2 3 5 7 6 AIR RELIEF VALVE DETAIL AIR RELIEF VALVE KEY NOTES: 1.EMITTER BOX LID. 2.EMITTER BOX. RAINBIRD SEB.7X8 3.12" AIR RELIEF VALVE ARV050 4.TYP. DRIP TUBING 5.CRUSHED GRAVEL N.T.S 1 F.G. 3 2 4 5 B G SUB-SURFACE DRIP IRRIGATION DIAGRAM NTS 1.IRRIGATION MAIN LINE 2.DRIP VALVE ASSEMBLY (IN VALVE BOX) 3.PVC, POLYETHYLENE TUBING, OR DRIPLINE HEADER 4.COMPRESSION FITTINGS 5.XF SERIES DRIPLINE LATERALS (INLINE EMITTERS) 6.FLUSH VALVE 7.AIR RELIEF VALVE KIT IN VALVE BOX 18" O.C. (PREFERRED) DRIP KEY NOTES DRIPLINE LATERAL RUN LENGTH 1 2 4 3 6 3 4 7 5 18" O.C.18" O.C. 3-4" 15" (TO FIRST DRIPLINE)EDGE OF PAVING PLAN VIEW LOAM SOIL 24" O.C.24" O.C. 3-4" CLAY SOIL 12" O.C.12" O.C. 3-4" SANDY SOIL NOTES: A.VALVE BOX SHALL BE STENCILED 'ECV' W/ 6" HIGH BY 1" LETTERS. THE PAINT SHALL BE GREEN, OIL BASED ENAMEL AND HAND PAINTED. B.PLACE AGGREGATE PRIOR TO INSTALLATION OF BOX. COVER VALVE BOX PIPE OPENINGS TO PREVENT SOIL ENTRY. C.INSTALL VALVE A MIN. OF 18" FROM STRUCTURES OR HARDSCAPING. D.INSTALL VALVE IN PLANT BEDS WHERE EVER POSSIBLE, NEXT TO SIDEWALKS. E.PLACE BOX AT RIGHT ANGLES TO STRUCTURES OR HARDSCAPING. F.ADJACENT VALVES SHALL BE NO CLOSER THAN 48" APART. 5 6 3 7 4 3 12 1 8 9 10 11 4 3 5 7 8 217 6 15 1 12" FL O W 18 " M I N 11 10 12 FLOW 13 18 " M I N 14 9 16 NOTE: A.ALL PIPE FITTINGS SHALL BE BRASS UNLESS OTHERWISE NOTED. B.THE BACKFLOW PREVENTOR DEVICES AND INSTALLATIONS OF HEALTH SERVICES & WATER AGENCY. C.COAT ALL EXPOSED THREADS W/ AN APPROVED RUST INHIBITING SEALANT. D.PLASTIC PIPE SHALL NOT BE USED ABOVE FINISH GRADE. E.EQUIPMENT TO BE INSTALLED A MINIMUM OF 24" FROM ANY STRUCTURES OR HARDSCAPE. F.RADIUS ALL EXPOSED CONCRETE EDGES. G.WHEN UNIT IS NEXT TO A STRUCTURE (I.E. WALL, BUILDING, ETC.) MOUNT TEST COCKS ON OPEN OR NON-STRUCTURE SIDE. 1.PLASTIC VALVE BOX & LOCKING COVER. REFER TO SPECIFICATIONS FOR TYPE. 2.TO SPRINKLER- ANGLE PIPE TO SPECIFIED DEPTH W/ 45 ELLS. 3.SCHEDULE 40 PVC MALE ADAPTOR. 4.WIRE SPLICES SHALL BE SCOTCH LOC PEN TITES OR APPROVED EQUAL W/ EXPANSION LOOPS INSTALLED. 5.FINISH GRADE. 6.PIG TAIL EXPANSION LOOP (MIN. 24-INCHES LONG.) 7.ELECTRIC VALVE. 8.2" X 4" X 8" CONC. BLOCKS 9.6-INCH THICK OF 3 4" WASHED CRUSHED AGGREGATE. 10.CONTROL & COMMON WIRES. 11.PRESSURE SUPPLY LINE. 12.12" IN LAWN AREAS, 1-INCH IN PLANTING BEDS. DRIP VALVE ASSEMBLY NTSB A REMOTE CONTROL VALVE NTS BACKFLOW DEVICE NTSJ 1.PRESSURE REGULATOR. 2.BACKFLOW PREVENTOR ASSEMBLY 3.BRASS NIPPLE-TYPICAL (4) PLACES. 4.BRASS 90 DEGREE ELL-TYPICAL (2) PLACES. 5.BRASS NIPPLE. 6.BRASS WYE STRAINER W/ 30 MESH MONEL SCREEN. 7.4-INCHES THICK, 36-INCHES LONG, 32 INCHES WIDE CONCRETE PAD SLOPE PAD TO DRAIN 2% MIN. 2,000PSI MIN. 8.FINISH GRADE. 9.90% COMPACTION REQUIRED. 10.BRASS NIPPLE-TYPICAL (2) PLACES. 11.SCH 80 PVC COUPLING (TYP.) 12.SCH 40 PVC MALE ADAPTORS TYPICAL(2) PLACES. 13.PRESSURE SUPPLY LINE. 14.SCH 40 PVC 90 DEGREE ELL (2) PLACES. 15.BRASS UNION. 16.LINE FROM WATER SOURCE. 17.INSTALL PROTECTIVE STEEL CAGE PER PLAN. 2 654321 7 8 9 8 10 11 1312 14 15 16 17 18 1.FINISH GRADE/TOP OF MULCH 2.VALVE BOX WITH COVER: RAIN BIRD VB-STD 3.DRIP REMOTE CONTROL VALVE: RAIN BIRD 150 PESB (INCLUDED IN XCZ-PRB-150-COM KIT) 4.ID TAG 5.WATERPROOF CONNECTION: RAINBIRD DB SERIES 6.30-INCH LINEAR LENGTH OF WIRE, COILED. 7.PRESSURE REGULATING QUICK CHECK BASKET FILTER: RAINBIRD PRB-QKCHK-100 (INCLUDED IN XCZ-PRB-150 COM KIT) 8.PVC SCH 80 NIPPLE (LENGTH AS REQUIRED) 9.PVC SCH 40 ELL 10.PVC SCH 80 NIPPLE (2-INCH LENGTH, HIDDEN) AND PVC SCH 40 ELL 11.PVC SCH 40 TEE OR ELL 12.MAINLINE PIPE 13.3-INCH MINIMUM DEPTH OF 3/4-INCH WASHED GRAVEL 14.PVC SCH 80 NIPPLE, CLOSE (INCLUDED IN XCZ-PRB-150-COM KIT) 15.PVC SCH 40 TEE (INCLUDED IN XCZ-PRB-150-COM KIT) 16.PVC SCH 40 ELL (INCLUDED IN XCZ-PRB-150-COM KIT) 17.PVC SCH 40 FEMALE ADAPTOR 18.LATERAL PIPE. WALL MOUNT IRRIGATION CONTROLLER, INSTALL PER MANUFACTURER'S INSTRUCTIONS. 1 120 V. AC POWER SUPPLY CONDUIT (NON-SWITCHED POWER) 2 JUNCTION BOX.3 212" PVC CONDUIT FOR CONTROL WIRES.4 SWEEP ELL.5 DIRECT BURIAL WIRES TO VALVES.6 FINISH GRADE.7 110 9 67 4 5 2 3 812" MIN. 60" EXTERIOR BUILDING SLAB.8 BUILDING WALL.9 LOCATE IN PROTECTIVE STAINLESS STEEL WALL MOUNTED ENCLOSURE BY 'STRONG BOX' OR APPROVED EQUAL. 10 H NTS WALL MOUNTED IRR. CONTROLLER D QUICK COUPLER VALVE NTS 3 21 8 4 5 7 6 1' - 0 " ELEVATION8 10 BELOW GRADE PIPING INSTALLATION RAINBIRD OR APPROVED EQUAL QUICKCOUPLING VALVE SHALL BE 2" BELOW VALVE BOX COVER. 1 APPROVED VALVE BOX 10" LOCKING CARSON OR EQUAL. STENCILED WITH 6" HIGH X 1" WIDE "Q" ON LID AND ADJACENT CURB TOP AND FACE WITH FEDERAL SAFETY GREEN ENAMEL. 2 FINISHED GRADE.3 STAINLESS STEEL CLAMPS OR STEEL CLAMPS (COMMERCIAL QUALITY GALVANIZED OR CADMIUM PLATED)- TWO REQUIRED. 4 PRESSURE LINE FITTING LENGTH AS REQUIRED SCH. 80 PVC RISER. 5 3 4" DIA. SCHEDULE 40 GALVANIZED STEEL PIPE STAKE. 6 PVC NIPPLE (12" LONG).7 P.V.C STREET ELL.8 PEA GRAVEL. 2 CUBIC FEET.9 PRESSURE SUPPLY LINE. 18" BELOW FINISHED GRADE. 10 9 FLOW SENSOR KEY NOTES: 1.LOCKABLE VALVE BOX, HEAT BRANDED WITH COMPONENT NAME. PROVIDE WATER ID TAG ON ALL VALVES 2.FLOW SENSOR PER LEGEND. CONNECT WIRES PER MANUF. SPECS. 3.DISTANCE PER MANUFACTURER'S SPECS. 4.GRAVEL. 5.MASTER VALVE PER IRRIG. LEGEND. 6.MAIN LINE TO SYSTEMS. 7.MAIN LINE TO P.O.C. 8.WATER ID TAG 1 2 3 44 5 76 8 1 8 M FLOW SENSOR/ MASTER VALVE INSTALLATION NTSNOTES: 1.ALL PIPE AND FITTINGS SHALL BE SCHEDULE 80 PVC UNLESS OTHERWISE SPECIFIED. 2.QUICK COUPLER VALVE BOX IN LAWN AREAS SHALL BE SET AT GRADE. 3.QUICK COUPLER VALVE BOX IN SHRUB AREAS SHALL BE SET AT 4" ABOVE GRADE. 4.PIPE SIZE FROM MAIN LINE SHALL MATCH QUICK COUPLER INLET DIAMETER. 5.SIMILAR METALS SHALL BE SEPARATED BY AN APPROVED DIELECTRIC COUPLING. 6.SCHEDULE 80 PLASTIC PIPE SHALL BE USED ABOVE FINISHED GRADE. 3 5 4 LEGEND: 6 7 1 2 9 12 " M I N 8 TYP 3" GATE VALVEC 1.1/2" IN LAWN AREAS, 1" IN PLANT BEDS. 2.ROUND PLASTIC VALVE BOX W/ LOCKING PLASTIC COVER MARKED "GATE VALVE" (REFER TO SPECIFICATIONS FOR TYPE). 3.FINISH GRADE. 4.KING BROS. IND. GATE VALVE OR APPROVED EQUAL SLIP FIX 5.TXT- NIPPLE 6.SCH 40 PVC MALE ADAPTORS. SLIP-FIX CONNECTION 7.2"X4"X8" CONCRETE BLOCKS. 8.1" WASHED CRUSHED AGGREGATE OVER WIRE MESH. 9.SUPPLY LINE. PLASTIC LOCKING VALVE BOX & LID HEAT BRANDED W/'GATE VALVE W/SS. BOLT 1 2 3 4 5 6 36 " M I N . D E P T H 2" CL R 6" NOTES: A.ALL SLEEVES TO BE PVC. SCH. 40 AND TWICE THE DIAMETER OF THE WORKING PIPE. B.ALL SLEEVES TO RUN A MIN. OF 12" BEYOND HARDSCAPE EDGES. C.SLEEVE SHALL BE IDENTIFIED WITH MARKING TAPE INSTALLED 12" FROM THE SURFACE INDENTIFYING TYPE OF LINE WITH APWA STANDARD "CAUTION WATERLINE BURIED BELOW" IN BLUE OR "CAUTION RECYCLED WATERLINE BURIED BELOW' IN PURPLE. D.CLEAN BACKFILL MAY BE SUBSTITUTED FOR SAND UNDER WALKS AND DRIVES. 1.HARDSCAPE SURFACE. 2.CLEAN BACKFILL AS REQUIRED. TO BE SET IN 6-INCHES LIFTS. 3.LATERAL LINE WITH SLEEVE. 4.PRESSURE MAIN LINE WITH SLEEVE. 5.CLEAN SAND. 6.CONTROL WIRES & COMPUTER HARDWARE WIRE SLEEVE. F IRRIGATION SLEEVING NTS FINISH GRADE.1 CLEAN COMPACTED BACKFILL. 2 NON-PRESSURE LATERAL LINE.3 PRESSURE SUPPLY LINE. SNAKE PIPE IN TRENCH. 4 PROVIDE 2" OF CLEAN BACKFILL.5 CONTROL WIRES. BUNDLE AND TAPE AT 15' O.C. AND INSTALL BELOW PRESSURE SUPPLY LINE. 6 12 " M I N . 18 " M I N . 1 2 4 3 6" TYP 6 5 E PIPE TRENCHING NOTES: A. PIGTAIL AND LOOP CONTROL WIRE AT ALL 90 DEGREE CHANGES IN DIRECTION. NTS PURPLE IF RECYCLED WATER ONLY NTS 24" 6" 5 4 31 6 1.WALKWAY, CURB, OR HEADER. 2.SHRUB BUBBLER NOZZLE PER LEGEND. 3.6-INCHES POP-UP BODY (INSTALL 1 4" ABOVE F.G.) 4.FINISHED GRADE. 5.TRIPLE SWING JOINT REQUIRED. 6.LATERAL LINE (TEE OR ELL) 2 POP-UP BUBBLER AT TREE NTSI 2 4 3 1 8 6 X 2X 7 5 1.ROOT BALL - DO NOT COMPACT ROOT BALL SOIL. ALLOW ROOT BALL TO SETTLE TO FINISHED GRADE. 2.FINISHED GRADE. 3.ROCK/MULCH. 4.3-INCH BERM TIGHTLY COMPACTED IN PLACE TO FORM WATERING BASIN. 5.NATIVE SOIL. 6.GROW POWER PLANT TABS PER MANUFACTURERS RECOMMENDATIONS. 7.PREPARED SOIL MIX. PLANT PIT TO BE 1 12" TIMES THE WIDTH OF THE ROOT BALL. 8.SHRUB TRUNK. SHRUB PLANTING NTSL 2 1/2X ROOTBALL DIAMETER TREE PLANTING (DOUBLE STAKE) SOILNATIVE FIRM ROOTBALL DEPTH TOP OF ROOTBALL IS TO BE PLACED AT 2" ABOVE FINISH GRADE. THE FINISH GRADE IS TO BE LEVEL WITH TOP OF CONC. CURB OR SIDEWALK. 2 CREATE 3" HIGH WATERING BASIN BERM. ALLOW FOR 48" DIA. OF 1" THICK SHREDDED BARK MULCH WITHIN WATERING BASIN BERM. 1 2 RUBBER OR VINYL CINCH TIE OR APPROVED EQUAL. SCREWED W/GALV. SCREWS STAKE WITH ROOF NAIL. NO HOSE AND WIRE. PLACE TIE 6" ABOVE TOP FLEX POINT ON TREE TRUNK. (2 LOCATIONS) 3 2" LODGEPOLE PINE TREE STAKE TREATED W/ COPPER NAPTHANATE. 2" DIA. BY 8' LENGTH FOR 15 GAL. TREE. AND BY 10' LENGTH FOR 24" BOX TREE. STAKES ARE TO BE INSTALLED IN A "v" CONFIGURATION. SEE DIAGRAM TO RIGHT 4 NATIVE SOIL BACKFILL5 5 6 BACKFILL MIX6 NOTE: FLOOD THE ROOT ZONE AFTER PLANTING TO REMOVE AIR AND SETTLE SOIL. 3 APPLY A 1-2" LAYER OF SHREDDED BARK MULCH WITHIN WATERING BASIN. 7 17 3 K 4 NOTE: STAKE PLACEMENT SHALL NOT DAMAGE TRUNK OR BRANCHES OR PIERCE ROOTBALL. TIE STAKES INTO TREE AT CANOPY NOTE: STAKE PLACEMENT SHALL NOT PIERCE ROOTBALL N.T.S. WYE STRAINER SHALL BE ON BACKFLOW RISER TO SHORTEN LENGTH OF ASSEMBLY. IRRIGATION & PLANTING DETAILS 5 AJ/AP EXP. 11-30-22 P O F SIGNATURE NO. 2076 S A S T F TEO AC IL DATE DEERT ISG RE O ETRT SC DNAL CAS TEP A RO N I C H T I E N C T E AR 2883 VIA RANCHEROS WAY FALLBROOK, CA 92028 PH:760-842-8993 DRAWN: SHEET TITLE JOB # CHK'D: SP CITY SUBMITTAL 01-05-2021 OF 8 SHEETS CAUTION: IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT CLIENT: CONSULTANTS: SPLA C I V I L STRUCTURAL MECHANICAL PLUMBING ELECTRICAL LANDSCAPE SOILS ENGINEER FIRE PROTECTION - - - - - - - MATERIAL HANDLING - MS M O U N T A I N V I E W P A R K B L D G 1 42 4 3 3 A V E N I D A A L V A R D O TE M E C U L A , C A MS-MOUNTAIN VIEW, LLC C/O SILAGE DEVELOPMENT & MANAGEMENT, INC. 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 5-25-21 APN # 909-290-001 PA20-0533 PR I N T D A T E : 5 / 2 5 / 2 1 CITY RE-SUBMITTAL 03-17-2021 SITE UPDATE 03-31-2021 CITY RE-SUBMITTAL 05-03-2021 CITY RE-SUBMITTAL 05-17-2021 LI-3.0 I.SCOPE OF WORK A.the Contractor shall provide all labor, tools, machinery, and processes necessary to install a complete irrigation system as shown on the plans and/or specified herein. When completed the irrigation system shall be a 100 % coverage system in a total functioning manner. II.GENERAL REQUIREMENTS A.VERIFICATION OF DIMENSION 1.All scaled dimensions are approximate. Before proceeding with any work, the Contractor shall carefully check and verify all dimensions. Spacing of irrigation heads, location of valves and vacuum breakers, and proposed P.O.C. Shall be as indicated on the drawings. Any deviation from the plans must have the approval of the Owner's Representative or the Landscape Architect. B.VERIFICATION OF FINISH GRADE 1.The Contractor shall inspect the site and check all finish grades within the work area in order to insure the proper soil coverage (as specified) of irrigation system pipes. C.WATER SUPPLY 1.The Contractor shall verify and be familiar with the source of water supply to the irrigation system as indicated on the drawings and verify available water pressure. If pressure is less than what has been designed with, the Contractor is to notify the Owner's Representative or the Landscape Architect. D.PERMITS AND FEES 1.The Contractor shall apply and pay for all necessary permits and fees required in the pursuit of his work as required by the governing codes. E.CARE OF EXISTING BUILDINGS AND SITE 1.The Contractor shall be held responsible for the care and preservation of all existing buildings and structures on the property and adjacent premises and contiguous property. Any part of them injured, damaged or disturbed because of his work shall be repaired, replaced or cleaned by him at his expense. F.REVIEW OF DRAWINGS 1.It is the Contractor's responsibility to review irrigation drawings and note any areas he believes additional heads or valves are required prior to submitting a bid. If no changes are submitted, the Contractor is responsible for full coverage of the irrigation system and providing additional equipment as necessary at the Contractor's expense. G.GOVERNING REGULATION 1.All local, municipal and state laws, rules and regulations governing or relating to any portion of this work are hereby incorporated into and made a part of these specifications, and their provisions shall be carried out by the irrigation contractor. H.DIAGRAMMATIC DESIGN 1.This design is diagrammatic. All pipe, valves, etc. shown within paved areas are for design clarification only and shall be installed in planting areas where possible. Never install backflow preventers in lawn areas, always in shrub areas. I.INSTALLATION 1.All irrigation materials shall be installed in accordance with the techniques and specifications set forth by each respective manufacturer. All pertinent descriptive literature issued by these manufacturers becomes part of these specifications after having been approved by the Owner's authorized representative. Such installation practices shall be followed only if the directions of the irrigation drawings and specifications do not thoroughly and completely order the methods or techniques to be followed. Install all equipment and materials as shown in details. J.SITE PROBLEMS 1.The irrigation contractor shall not willfully install the sprinkler system as indicated on drawings when it is obvious in the field that there are unknown obstructions, grade differences, and/or discrepancies in the area dimensions until such conditions are brought to the attention of the Landscape Architect. I II.MATERIALS Irrigation materials and equipment shall be of type, size and location as noted and indicated on the drawings. Unless permission to change is granted from the Landscape Architect or Owner's Representative, materials are to be new and in perfect condition. No deviations from the specifications shall be allowed. The decision of the Landscape Architect shall be final in the determination of the quality of materials. A.PIPE TRENCHING 1.The Contractor shall verify exact locations of all existing subsurface utilities (mechanical and electrical) prior to excavation. Any A.C. paving concrete work, etc. Destroyed or damaged by any work under the contract shall be repaired or replaced at the Contractor's expense. 2.Trenches for pipe shall be cut to required grade line at a true gradient to provide uniform support for the full length of pipe. 3.Depth of trenches shall be sufficient to provide a minimum cover above the top of the pipe as noted on the drawings. B.JOINING PIPE 1.The Contractor is responsible to be familiar with the methods of assembling, joining, and installing the various type of pipe to be used. He will adhere in strict accordance with the manufacturer's recommended procedures. 2.No PVC pipe shall be threaded and all transition from PVC to metal piping shall be by PVC male thread adaptor fitting. C.BACKFLOW PREVENTER 1.The backflow prevention device specified herein shall be verified with Local Plumbing and Health Codes. In the event of any conflict on the device or installation methods the Landscape Architect shall be notified PRIOR TO BID OPENING. D.TESTS 1.All main lines and lateral lines which have glued joists under paving in the system shall be capped and pressure tested at 150 psi. 2.Pressure shall be sustained in the lines for not less than two (3) hours. If leaks develop the joints shall be replaced and the test repeated until the entire system is watertight. 3.Tests shall be observed and approved by Owner's representative prior to backfill. 4.When the irrigation system is completed (and before planting is begun) the Contractor in the presence of the Owner's representative shall test the coverage of water afforded the lawn and planting areas as complete and adequate. The Contractor shall furnish all materials and perform all work required to correct any inadequacies of coverage disclosed. 5.The Contractor shall inform the Owner's representative of any deviation from the plan required by wind, planting, soil or site condition that bear on present coverage. E.IRRIGATION HEAD INSTALLATION 1.Shrubbery or groundcover spray heads adjacent to curbs or walks shall be installed 6" away from the curb or walk and the nozzle shall be 6" above finished grade. Pop-up shrub heads are to be set flush with grade. 2.Shrubbery spray heads adjacent to buildings, fences, or similar structures shall be installed 6" away from the structure and the nozzle shall be 6" above finished grade. Shrubbery spray heads not near paving or structures shall be set 6" above finish grade, or as stated on drawings. 3.All irrigation heads are to have swing joints as detailed. 4.Install all irrigation heads per details. F.IRRIGATION HEAD ADJUSTMENTS 1.The irrigation contractor shall flush and adjust all irrigation heads for optimum performance and to prevent overspray onto walks and buildings as much as possible. This shall include selecting the best degree of arc to fit existing site situations. G.CLOSING IN UNINSPECTED WORK 1.The Contractor shall not allow or cause any of his work to be covered or enclosed until it has been inspected, tested and approved by an authorized representative of the Owner. Should any of his work be enclosed or covered before such inspection and test he shall uncover the work at his own expense and after it has been inspected, tested, and approved shall make all repairs with like materials necessary to restore all his work and that of other Contractors to its original condition. H.BACKFILLING 1.Backfill shall not be placed until the installed sprinkler system has been inspected and approved by the Owner's representative. 2.Trenches shall be backfilled with a minimum of 4" of fine, granular materials to protect the pipe from the clods or rocks, the remaining excavated dirt can be used as backfill. The Contractor shall not place detrimental subsoil in the top 6" of backfill. 3.If settlement occurs and adjustments in pipes, valves, sprinkler heads or sod are necessary to bring the system to proper working order, the Contractor shall as a part of the work under this contract make all the necessary adjustments without extra cost to the Owner. I.AUTOMATIC CONTROLLER AND VALVES 1.A 120 volt electrical power outlet to the controller shall be provided by others. The irrigation Contractor shall be responsible for making the hook-up from the outlet to the controller. 2.All wire from the controller to electric control valves shall be solid copper U.F. +14=600 volt direct burial. Use white wire for common, blue for lawn systems, black for shrub systems and red for moisture sensor control wire install in common trench with main line pipe where possible. Provide minimum 18" cover. 3.Wire connections shall be made with "Scotch-Look" wire connector sealing packs #3576 or equal. 4.There shall be a control wire from each control valve running to the controller and each control valve shall be connected to the common ground. 5.All electrical work shall comply with applicable codes. 6.Install all valves per details. J.MOISTURE SENSOR INSTALLATION (IF APPLICABLE) 1.All installations and wiring is to be done by the Contractor in compliance with installation and Operating Instruction enclosed with the moisture sensors. V.RECORD DRAWINGS (AS BUILTS) 1.The landscape contractor shall request in writing from the landscape architect the documents necessary to proceed with the preparation of the as-built. 2.The Contractor shall dimension from two (2) permanent points of reference, building corners, sidewalk, or road intersections, etc., the locations of the following items: (1)Connection to existing water lines. (2)Connection to existing electrical power. (3)Gate valves. (4)Routing of sprinkler pressure lines (dimension max. 100' along routing). (5)Sprinkler control valves. (6)Routing of control wiring. (7)Quick coupling valves. (8)Other related equipment as directed by the Architect. 3.On or before the date of the final inspection, the Contractor shall deliver the corrected and completed sepias to the Architect. Delivery of the sepias will not relieve the Contractor of the responsibility of furnishing required information that may be omitted from the prints. A.CONTROLLER CHARTS 1.Do not prepare charts until record drawings have been approved by the Landscape Architect and/or Owner. 2. Provide one controller chart for each controller supplied. 3.The chart shall show the area controlled by the automatic controller and shall be the maximum size which the controller door will allow. 4.The chart is to be a reduced drawing of the actual as-built system. However in the event the controller sequence is not legible when the drawing is reduced, it shall be enlarged to a size that will be readable when reduced. 5.The chart shall be a reduced copy of irrigation as-built and the area of coverage for each station shall be clearly identified on each sheet. 6.When completed and approved, the chart shall be hermetically sealed between two pieces of plastic, each piece being a minimum 10 mils thick. 7.These charts shall be completed and approved prior to final inspection of the irrigation system. B.OPERATION AND MAINTENANCE MANUALS 1.Provide one individually bound manual detailing operation and maintenance requirements for irrigation systems. Assemble material in vinyl covered 3-ring binders. Provide the following in each manual: a.Catalog and parts sheets on every material and equipment installed under this Contract. b.The Contractor shall submit a statement or guarantee and its duration. c.Complete operating and maintenance instructions on all major equipment. Equipment list (provide the following for each item): ·Manufacturer's name. ·Make and model number. ·Name and address of local manufacturer's representative. ·Spare parts list in detail. d.Detailed operating and maintenance instructions for major equipment. e.In addition the above-mentioned maintenance manuals, provide the Owner's maintenance personnel with instructions for major equipment and show evidence in writing to the Architect as rendered. f.Index sheet, stating irrigation contractor's name, address, telephone number and name of person to contact. C.EQUIPMENT TO BE FURNISHED Supply as a part of this Contract the following tools: 1.two sets of special tools required for removing, disassembling and adjusting each type of sprinkler and valve supplied on this project. 2.Two five-foot valve keys for operation of gate valves. 3.Two keys for each automatic controller. 4.Six Quick coupler keys and matching hose swivels for each type of quick coupling valve installed. The above-mentioned equipment shall be turned over to the Owner at the conclusion of the project. Before final inspection can occur, evidence that the Owner has received material must be shown to the Architect. VI.CLEAN-UP A. SCOPE AND FREQUENCY A.After all installation operations have been completed remove all trash, excess soil and rubbish from the property. All scars, ruts or other marks in the area caused by this work shall be repaired and the ground left in a neat and orderly condition, throughout the site. The Contractor shall pick up all trash resulting from this work no less than each Friday before leaving the site, once a week and/or the last working day each week. All trash shall be removed completely from the site. VII.GUARANTEE A.The guarantee for the sprinkler irrigation shall be made in accordance with the form shown below. A copy of the guarantee form shall be included in the operations and maintenance manual. The guarantee form shall be re-typed onto the Contractor's letterhead and contain the following information: GUARANTEE FOR SPRINKLER IRRIGATION SYSTEM We hereby guarantee that the sprinkler irrigation system we have furnished and installed is free from defects in materials and workmanship and the work has been completed in accordance with the drawings and specifications, ordinary wear and tear and unusual abuse or neglect expected. We agree to repair or replace any defects in material or workmanship which may develop during the period of one year from date of acceptance and also to repair or replace any damage resulting from the repairing or replacing of such defects at no additional cost to the Owner. We shall make such repairs or replacements within a reasonable time, as determined by the Owner, after receipt of written notice. In the event of our failure to make such repairs or replacements within a reasonable time after receipt of written notice from the Owner, we authorize the Owner to proceed to have said repairs made at our expense and we will pay the costs and charges therefore upon demand. PROJECT: LOCATION: SIGNED: Contractor ADDRESS: PHONE: DATE OF ACCEPTANCE: B.INSTRUCTION After the system has been completed and the connections made the Contractor shall instruct the Owner or his representative in the operations and maintenance of the system. C.TEMPORARY REPAIRS The Owner reserves the right to make temporary repairs as necessary to keep the irrigation system equipment in operating condition. The exercise of this right by the Owner shall not relieve the Contractor of his responsibility under the terms of the guarantee as herein specified. IRRIGATION SPECIFICATIONS IRRIGATION SPECIFICATIONS 6 AJ EXP. 11-30-22 P O F SIGNATURE NO. 2076 S A S T F TEO AC IL DATE DEERT ISG RE O ETRT SC DNAL CAS TEP A RO N I C H T I E N C T E AR 2883 VIA RANCHEROS WAY FALLBROOK, CA 92028 PH:760-842-8993 DRAWN: SHEET TITLE JOB # CHK'D: SP CITY SUBMITTAL 01-05-2021 OF 8 SHEETS CAUTION: IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT CLIENT: CONSULTANTS: SPLA C I V I L STRUCTURAL MECHANICAL PLUMBING ELECTRICAL LANDSCAPE SOILS ENGINEER FIRE PROTECTION - - - - - - - MATERIAL HANDLING - MS M O U N T A I N V I E W P A R K B L D G 1 42 4 3 3 A V E N I D A A L V A R D O TE M E C U L A , C A MS-MOUNTAIN VIEW, LLC C/O SILAGE DEVELOPMENT & MANAGEMENT, INC. 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 5-25-21 APN # 909-290-001 PA20-0533 PR I N T D A T E : 5 / 2 5 / 2 1 CITY RE-SUBMITTAL 03-17-2021 SITE UPDATE 03-31-2021 CITY RE-SUBMITTAL 05-03-2021 CITY RE-SUBMITTAL 05-17-2021 LI-4.0 GROUND COVER AND SHRUB MASSES - GROUND COVER AND SHRUB MASSES SHALL BE CHOSEN FROM THE FOLLOWING: SYMBOL GROUND COVER/SHRUB MASS NAME WUCOLS LANTANA 'GOLD RUSH', LANTAN GOLD RUSH 1 GAL. SIZE @ 24" O.C.L SALVIA GREGGII, AUTUMN SAGE 1 GAL. SIZE @ 36" O.C.L ROSMARINUS OFFICINALIS 'PROSTRATUS', PROSTRATE ROSEMARY 1 GAL. SIZE @ 30" O.C.L LONICERA J. 'HALLIANA', HALL'S HONEYSUCKLE 1 GAL. SIZE @ 24" O.C.L SALVIA LEUCANTHA, MEXICAN BUSH SAGE 5 GAL. SIZE @ 42" O.C.L MUHLENBERGIA RIGENS, DEER GRASS 5 GAL. SIZE @ 42" O.C.M VINE SYMBOL VINE NAME QTY.WUCOLS FICUS REPENS, CREEPING FIG 5 GAL. SIZE. TRAIN TO FENCE.8 M BASIN PLANTING SYMBOL GRASS NAME WUCOLS LEYMUS C. 'CANYON PRINCE', CANYON PRINCE WILD RYE 1 GAL. SIZE @ 24" O.C. NOTES: * PLANT MATERIAL AT BOTTOM OF BASIN IS TOLERANT OF BEING UNDERWATER FOR PROLONGED PERIOD OF TIME AND IN SATURATED SOILS. * HEAVY EQUIPMENT IS PROHIBITED IN THIS AREA. NO COMPACTION IN ALLOWED. L TREES SYMBOL TREE NAME QTY.WUCOLS PINUS ELDARICA, MONDELL PINE 24" BOX SIZE. STANDARD TRUNK. DOUBLE STAKE 8 L CUPRESSUS SEMPERVIRENS, MEDITERRANEAN CYPRESS 15 GAL. SIZE. DOUBLE STAKE 3 L RHUS LANCEA, AFRICAN SUMAC 24" BOX SIZE. STANDARD TRUNK. DOUBLE STAKE PLANT WITH DEEP ROOT BARRIER PANELS AS REQUIRED. 8 L QUERCUS ILEX, HOLY OAK 24" BOX SIZE. STANDARD TRUNK. DOUBLE STAKE PLANT WITH DEEP ROOT BARRIER PANELS AS REQUIRED. 6 L CERCIDIUM 'DESERT MUSEUM', PALO VERDE 36" BOX SIZE. MULTI-TRUNK. DOUBLE STAKE 3 L PLANTING LEGEND *APPLY A 3" LAYER OF SHREDDED WOOD MULCH THROUGHOUT ALL PLANTING AREAS EXCEPT ROCK MULCH AREAS. MULCH SHALL BE FOREST FINES MULCH BY AGRISERVICE OR APPROVED EQUAL. SHRUBS - PROPOSED SHRUBS WILL BE SELECTED FROM THE FOLLOWING: SYMBOL SHRUB NAME QTY.WUCOLS LEUCOPHYLLUM FRUTESCENS, TEXAS RANGER 5 GAL. SIZE 9 L WESTRINGIA FRUTICOSA, COAST ROSEMARY 5 GAL. SIZE 2 L JUSTICIA SPICIGERA, MEXICAN HONEYSUCKLE 5 GAL. SIZE 12 L TAGETES LEMMONII, MOUNTAIN MARIGOLD 5 GAL. SIZE 69 L DODONAEA VISCOSA, HOPSEED BUSH 5 GAL. SIZE 79 M RHAPHIOLEPIS I. 'CLARA', INDIAN HAWTHORN 5 GAL. SIZE 15 L REFER TO SEPARATE PLANTING PLANS FOR STREET FRONTAGE (MASTER ASSOCIATION) NOTES: A 1 BUILDING #1 AVENIDA ALVARADO B 2 C 20'-0" DRAINAGE EASEMENT. NO TREES F P.L. D 3 E REFER TO EMPLOYEE BREAK AREA ENLARGEMENT 'A', SHEET LP-1.0. R.O.W. 4 G REFER TO TYP. ENTRY DRIVEWAY ENLARGEMENT 'B', SHEET LP-1.0. (TYP.) P.L. P.L. INSTALL MULCH, THIS AREA. APPLY CRUSHED GRAVEL IN FRONT OF ELECTRICAL BOX ACCESS DOORS. REFER TO SEPARATE DRAWINGS FOR STREET FRONTAGE AREA. 1.HALF DIAMOND TREE WELLS. 2.ENHANCED VEHICULAR ENTRY PAVING. COLORED GRID PATTERN CONC. REFER TO ENLARGEMENT 'B', SHEET LP-1.0 FOR VEHICULAR PAVING DESIGN AT PROJECT ENTRY DRIVE. 3.TYP. VINES AT TRASH ENCLOSURE. 4.ALL TREES LOCATED 4' OR LESS TO CURB, WALKWAY OR WALL SHALL BE INSTALLED WITH DEEP ROOT BARRIER PANELS. 18" MIN. DEPTH X 10' WIDE PANEL. REFER TO DETAIL 'A', SHEET LP-1.0. CONSTRUCTION KEY NOTES: A.PUBLIC SIDEWALK PER CIVIL PLANS. B.CONCRETE ENTRY PAVING AT BUILDING ENTRY. C.DETENTION BASIN PER CIVIL DWGS. D.TRASH ENCLOSURE PER ARCHITECTURE PLANS. E.TYP. LIGHT STANDARD PER CIVIL PLANS. F.ELECTRICAL TRANSFORMER PER CIVIL PLANS. G.FIFDDC UNIT PER CIVIL PLANS. REFERENCE KEY NOTES: NOTES: ·APPLY A 3" MIN. LAYER OF MULCH TOP DRESSING WITHIN ALL PLANTING AREAS. A SAMPLE IS REQUIRED PRIOR TO APPLICATION. ·NO MULCH APPLICATION AT BOTTOM OF BASIN. ·PLANT MATERIALS WILL NOT BEAR FRUIT TO DETER PESTS ON SITE. ·BASIN PLANTING ARE SUITABLE FOR THE CLIMATE AND EXPECTED PONDING DEPTH. SCALE: 1" = 20'-0" 0 20'40'60' PLANTING PLAN 4 AP EXP. 11-30-22 P O F SIGNATURE NO. 2076 S A S T F TEO AC IL DATE DEERT ISG RE O ETRT SC DNAL CAS TEP A RO N I C H T I E N C T E AR 2883 VIA RANCHEROS WAY FALLBROOK, CA 92028 PH:760-842-8993 DRAWN: SHEET TITLE JOB # CHK'D: SP CITY SUBMITTAL 01-05-2021 OF 8 SHEETS CAUTION: IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT CLIENT: CONSULTANTS: SPLA C I V I L STRUCTURAL MECHANICAL PLUMBING ELECTRICAL LANDSCAPE SOILS ENGINEER FIRE PROTECTION - - - - - - - MATERIAL HANDLING - MS M O U N T A I N V I E W P A R K B L D G 1 42 4 3 3 A V E N I D A A L V A R D O TE M E C U L A , C A MS-MOUNTAIN VIEW, LLC C/O SILAGE DEVELOPMENT & MANAGEMENT, INC. 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 5-25-21 APN # 909-290-001 PA20-0533 PR I N T D A T E : 5 / 2 5 / 2 1 CITY RE-SUBMITTAL 03-17-2021 SITE UPDATE 03-31-2021 CITY RE-SUBMITTAL 05-03-2021 CITY RE-SUBMITTAL 05-17-2021 ENLARGEMENT 'A' - EMPLOYEE BREAK AREA SCALE: 1/4" = 1'-0" LP-1.0ENLARGEMENT 'B' - ENHANCED PAVING AT VEHICULAR ENTRY DRIVE SCALE: 1/8" = 1'-0" 12" WIDE BAND AVENIDA A L V A R A D O PA EQ. VARIABLE CL R.O.W. LINE 37 ' - 6 " PA 60" MAX. 60" MAX. EQ. PA PA ENLARGEMENT 'A' KEY NOTES: 1.CONCRETE PAVING AT BUILDING ENTRY, PER ARCHITECTURAL PLANS. 2.BIKE RACK PER ARCHITECTURAL PLANS. 3.(1) TRASH RECEPTACLE BY 'QUICK CRETE PRODUCTS' MODEL #QS-SQ2432W (20" SQUARE). LIGHT SAND BLASTED FINISH. (NATURAL COLOR) 4.12" WIDE CONCRETE STEP OFF ADJACENT TO PARKING STALLS. REFER TO CIVIL DWGS. 5.SAW-CUT SCORE LINE 45° ANGLE 3'X3' GRID PATTERN. COLOR TO BE INTEGRAL COLOR COCOA #6130 BY DAVIS COLORS, TOPCAST 05 FINISH INFIELD. NOTE: CONTRACTOR SHALL PROVIDE A 3'X3' SAMPLE FOR REVIEW & APPROVAL BY LANDSCAPE ARCHITECT & OWNER PRIOR TO FINAL POUR. 6.(2) TABLES BY 'QUICK CRETE PRODUCTS CORP', MODEL #QR42FC, LIGHT SAND BLASTED FINISH. (NATURAL COLOR) ALLOW FOR HOLES AT CENTER OF TABLES FOR FUTURE UMBRELLA. 7.12" MAX. COLORED CONCRETE PERIMETER BAND. ENLARGEMENT 'B' KEY NOTES: 1.INTEGRAL COLORED CONCRETE. DAVIS COLORS 'DARK GRAY'. TOPCAST #05 FINISH. PROVIDE MOCK UP FOR REVIEW. 3'X3' SCORELINE GRID PATTERN AS INDICATED. THICKNESS AND REINFORCING PER GEOTHECHNICAL REPORT FOR VEHICULAR PAVING. 2.CONCRETE PERIMETER ACCENT BAND. NATURAL GRAY, MEDIUM BROOM FINISH. PROVIDE EVENLY SPACED CONTROL JOINTS AND AT ALL CORNERS. 18" WIDE MAX. 3.PUBLIC SIDEWALK PER CIVIL PLANS. 1 2 3 3 4 2 5 PA PA BLDG 1 BLDG 1 PA 6 7 1 1.THICKENED CONC. EDGE OR NEW STREET CURB. 2.INSTALL DEEP ROOT BARRIER PANELS AT BACK OF WALKWAY AND CURB FOR ALL NEW TREES. 3.LINEAR DEEP ROOT BARRIER PANEL. INSTALL 12" ABOVE FINISH GRADE. 4.TREE ROOT BALL. ROOT-BARRIER KEY NOTES: 1 24" MAX. 3 4 2 F.G. DEEP-ROOT BARRIER PANEL DETAIL NTSA NORTH PLANTING SPECIFICATIONS 7 AP EXP. 11-30-22 P O F SIGNATURE NO. 2076 S A S T F TEO AC IL DATE DEERT ISG RE O ETRT SC DNAL CAS TEP A RO N I C H T I E N C T E AR 2883 VIA RANCHEROS WAY FALLBROOK, CA 92028 PH:760-842-8993 DRAWN: SHEET TITLE JOB # CHK'D: SP CITY SUBMITTAL 01-05-2021 OF 8 SHEETS CAUTION: IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT CLIENT: CONSULTANTS: SPLA C I V I L STRUCTURAL MECHANICAL PLUMBING ELECTRICAL LANDSCAPE SOILS ENGINEER FIRE PROTECTION - - - - - - - MATERIAL HANDLING - MS M O U N T A I N V I E W P A R K B L D G 1 42 4 3 3 A V E N I D A A L V A R D O TE M E C U L A , C A MS-MOUNTAIN VIEW, LLC C/O SILAGE DEVELOPMENT & MANAGEMENT, INC. 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 5-25-21 APN # 909-290-001 PA20-0533 PR I N T D A T E : 5 / 2 5 / 2 1 CITY RE-SUBMITTAL 03-17-2021 SITE UPDATE 03-31-2021 CITY RE-SUBMITTAL 05-03-2021 CITY RE-SUBMITTAL 05-17-2021 LP-2.0 I.SCOPE OF WORK A.Furnish all labor, materials, and equipment necessary to provide and install plant material as shown on the drawings or as specified herein. B.WORK INCLUDED IN THIS SECTION -- (ITEMS INCLUDED BUT NOT LIMITED TO): 1.Grade, including mounding, molding and shaping surface of all planting areas as indicated including the removal of existing vegetation unless otherwise specified. 2.Prepare and till soil in planting areas including furnishing all soil amendments as specified. 3.Furnish and plant all plant materials as indicated by the drawings and specifications. 4.Furnish and plant all plant materials as indicated by the drawings and specifications. 5.Perform all pruning as required. 6.Stake and tie all plant material as specified. 7.Provide for the maintenance of the planting until acceptance of the job by the landscape architect. 8.Dispose of all debris and surplus materials. 9.Clean up 10.Guarantees 11.Maintenance II.VERIFICATIONS OF SITE CONDITIONS: A.EXCAVATION 1.The contractor shall verify exact location of all existing sub-surface utilities (mechanical and electrical) prior to excavation. Any utilities, a.c. paving, concrete work, etc., destroyed or damaged by any work under this contract shall be repaired or replaced at the contractor's expense. B.SUB-SURFACE DRAINAGE OR SOIL CONDITIONS 1.Should sub-surface drainage or soil conditions be encountered which would be detrimental to growth or survival of plant material, the contractor shall notify the landscape architect in writing, stating the condition and submitting a proposal covering cost of correction. if the contractor fails to notify the landscape architect of such conditions, he shall be responsible for plant material under the guarantee clause of the specifications. C.DIMENSIONS 1.All scaled dimensions are approximate. before proceeding with any work, the contractor shall carefully check and verify all dimensions and quantities, and shall immediately inform the landscape architect of any discrepancy between the information on the drawings and actual conditions, refraining from doing any work in said areas until given approval to do so by the landscape architect. III. MATERIALS A.SOIL AMENDMENTS (SD-F) 1.Amended soil shall have a minimum organic matter content of 10% dry weight in planting beds, and 5% organic matter content in turf areas, and a ph from 6.0 to 8.0 or matching the ph of the undisturbed topsoil. 2.A minimum three inch layer of mulch shall be applied on all exposed soil surfaces in each landscaped area except in turf areas, creeping or rooting ground covers or direct seeding application where mulch is contraindicated. 3.Organic mulch materials made from recycled or post consumer products/materials shall take precedence over inorganic materials or virgin forest products unless the recycled post-consumer organic products are not locally available. Organic mulches are not required where prohibited by county fire code. 4.Highly flammable mulch material, such as straw or small, mini size wood chips, shall not be used in a 'hazardous fire area,' as that term is defined in the county fire code. B.SOIL AMENDMENTS SITING AND DESIGN (SD-F) 1.When mulch is used as an amendment, it is applied at grade over all planting areas to a depth of 3". 2.Soil amendments are free of stones, stumps, roots, glass, plastic, metal, and other deleterious materials. 3.Mixing of soils are done prior to planting. 4.Care is taken around existing trees and shrubs to prevent root damage during construction and soil amendment application. 5.Soil amendments are applied at the end of construction. 6.Soil amendments are compatible with planned vegetation. C.PLANT MATERIALS 1.Plant names used in the plant list conform to “standardized plant names” by american joint committee of horticultural nomenclature except in the cases not covered therein. in these instances the established custom of the nursery trade is followed. 2.Plants shall be sound, healthy, vigorous, free from disease, insect pests or their eggs and shall have healthy, normal root systems, well filling their containers, but not to the point of being root bound. 3.Plants shall not be pruned prior to delivery except as authorized by the landscape architect. in no case shall trees be topped before delivery. 4.All plant material shall be subject to approval of size, health, quality, character, etc., by the landscape architect. 5.The height and spread of all plant material shall be measured with branches in their normal position. 6.The calpier of the trees shall be measure 4' above the surface of the ground. 7.Where caliper or other dimensions of any plant materials are omitted from the plant list, it shall be understood that these plant materials shall be normal stock for type listed. 8.Plant material shall be symmetrical, typical for variety and species, and shall conform to measurement specified in the plant list. 9.Plant material larger than those specified may be supplied if complying in all other respects and at no additional cost to the owner, upon approval of the landscape architect. 10.All plant materials must have been previously inspected at the nursery by the county horticultural department and shall be subject to acceptance as to quality by the landscape architect. 11.Substitutions will be permitted as indicated, or if proof is submitted that any plant specified is not available, a proposal will be considered for the use of the nearest equivalent size or variety with an equitable adjustment of the contract price. 12.Quantities shown on the call outs on the planting plan are for convenience of the contractor only. quantities drawn on the plan (whether by circles or dots), are the final authority and shall be furnished and installed as drawn. IV. OBSTRUCTIONS BELOW GROUND A.CONTRACTOR'S RESPONSIBILITY 1.The contractor is responsible for verifying the locations of all utility lines and other underground obstructions so that proper precautions may be taken not to disturb or damage such improvements. in the event of a conflict between such lines and plant locations, the contractor shall properly notify the landscape architect who shall arrange for the relocation of one or the other. Failing to follow this practice, the contractor shall at his own expense make any and all repairs for damages resulting from his work. V.FINISH GRADING A.TILLING 1.Till all planting areas as herein specified. B.UNIFORM GRADE 1.After tilling, all areas shall be brought to uniform grade by floating or hand raking. C.GRADE RELATIONSHIPS 1.Finish grade of planting areas after application of soil amendment shall be 1” below top of concrete walks and curb grades and 6” below finish floor of building or as noted by spot elevations. D.SLOPE FROM BUILDING 1.Soil areas adjacent to building shall slope from the building at 2% minimum for 10 ft, and shall continue to slope at a minimum of 1% until water drains to street or storm system. E.ROCKS OR CLODS 1.No rock or clod over ¾” in diameter shall be on top of prepared planting bed. VI.WEED CONTROL A.KILLING WEEDS 1.The contractor shall germinate and destroy existing weed seeds before preparing areas for planting. sufficient water shall be applied to cause weed seed to sprout. young weeds shall then be destroyed and removed before they have an opportunity to set. VII.SOIL PREPARATION A.SOILS REPORT 1.Shall comply with SD-F. Refer to sheet LP-3.0. B.COMPACTED AREAS Shall comply with SD-F. Refer to sheet LP-3.0. C.METHOD OF MIXING 1.If the slope is under 2 ½ to 1 the soil preparation materials should be broadcast uniformly over all landscape areas and worked a depth of 6” by a rototiller or other acceptable mechanical means to obtain a uniform blend to the soil. If the slope is greater than 2 ½ to 1 the amendments shall be hydraulically applied for areas over 1000 sq. ft. and raked in for small areas. D.EXTRANEOUS MATERIAL 1.In addition to the work specified above the contractor shall remove all extraneous material that is exposed on the surface, and grade to facilitate run-off of surface water. E.DELIVERY SLIPS 1.Supply delivery slips from the supplier for the soil amendments to the site, bulk loads from the contractors' yard will not be accepted. Supply empty bags for fertilizer to the superintendent of the job. VIII.SHRUB AND TREE PLANTING A.CORRELATION 1.Trees and shrubs shall not be planted until all operations in conjunction with the installation of all the irrigation systems have been completed, final grades have been established, and the planting beds properly prepared by cultivation and fertilization as covered in these specifications. B.PLANTING TIME 1.No planting shall take place during extremely hot, dry, windy or freezing weather. C.LOCATIONS 1.Relative position of all plants and trees is subject to approval by the landscape architect, and they shall, if necessary, be relocated at his direction, as part of this contract. D.DISTRIBUTION 1.No more plants shall be distributed about the landscape area than can be planted and watered on the same day. E.CONTAINER REMOVAL 1.Plant containers shall be removed once plants have been installed. cans shall be split on both sides. An axe or spade shall not be used. All containers shall be removed from the site. F.PLANTING PITS 1.All trees and shrub pits shall have a diameter of at least twice diameter of the root ball. pit depths shall be minimum 12” deeper than the root ball for trees and 8” deeper than the root ball for shrubs or as per planting details. G.PLACING 1.Plans shall be placed and be held during backfill in an upright position in the center of the pit. plants shall be held at, or slightly above nursery level. the earth ball shall be kept intact. any exposed roots shall be spread. injured roots shall be pruned. H.BACKFILL 1.Plant pit backfilling soil shall consist of 1 part nitrogen stabilized sawdust w/ 2 parts topsoil. Materials shall be thoroughly mixed before placement. in addition to backfill commercial fertilizer 20-15-5 agriform 21 gram tablets shall be added to the plant pits at the following rates: 1 tablet per 1 gal. plant 3 tablets per 5 gal. plant 4 tablets per 15 gal. plant 1 tablet per ½” caliper tree trunk for specimen plants larger than 15 gallon I.WATERING 1.When the pit has been backfilled to three quarters of its depth, water shall be poured about the roots. Air pockets shall be eliminated and backfill continued until the backfill is brought to the grade level. J.COMPACTING 1.Backfill shall not be compacted around the roots or ball of the plant during or after planting. The backfill on which the root ball shall be compacted. K.SETTLEMENT 1.Plants which settle shall be raised to the required level or relocated at the option of the contractor. Raised plants which fail to grow shall be replaced. L.STAKING 1.Stakes shall be driven to sufficient depth to hold tree rigid. tree shall be supported by at least two ties. (see details) M.PRUNING 1.Limbs, branches, canes and runners which require trimming shall be removed to leave a clean cut flush with trunk. (pruning only as directed by the landscape architect) N.PLANTING BEDS 1.Planting beds shall be edged and cultivated to line shown. Beds shall be brought to a smooth even surface conforming to established grades after full settlement has occurred. IX.GROUND COVER AREAS A.REFERENCE 1.Refer to paragraph v, vi, vii, for finish grading, weed control and soil preparation. B.SOIL PREPARATION 1.Prepare the soil as per SD-F requirements on sheet LP-3.0 and the “planting notes” on sheet LI-2.0. C.GRADING 1.Areas shall be raked and floated smooth to provide a true surface. D.PLANT PITS AND FERTILIZER 1.Planting pits for ground cover shall be 4”x4” or adequate to accept material from flats without crushing or deforming the rootball. Place a 20-10-5 agriform 5 gram fertilizer tablet in each groundcover hole. E.SPACING 1.Plant at spacings and in areas indicated on the drawings. Soil shall be firmly pressed around each plant, and the excess soil removed from the crown. F.WATERING 1.Each section of ground cover shall be immediately watered upon completion of planting and thereafter as required. G.SPACING FROM EDGE 1.The first row of ground cover shall always be within 6” from the edge of the planting area. X.SEASONAL COLOR A.REFERENCE 1.Refer to paragraph v, vi, vii, for finish grading, weed control, and soil preparation. B.SOIL PREPARATION Prepare the soil as per SD-F requirements on sheet LP-3.0.and the “planting notes” on sheet LI-2.0. C.GRADING 1.Areas shall be raked and floated smooth to provide a true and uniform surface. D.QUALITY OF PLANTS 1.Plants shall be healthy annual plant material in 4” pots in bloom. E.PLANT PITS AND FERTILIZER 1.Each plant pit for seasonal color shall be 6” x 6” x 6” with one teaspoon of bone meal mix into the backfill mix. (use shrub backfill mix.) Do not use agriform plant tablets. F.SPACING 1.Plant at spacing and in areas indicated on the drawings. soil shall be firmly pressed around each plant, and the excess soil removed from the crown. G.WATERING 1.Each section of seasonal color shall be immediately watered upon completion of planting and watering thereafter as required. H.SPACING FROM EDGE 1.The first row of seasonal color should always be within 6” of the edge of the planting area. XI.SOD LAWN MATERIALS AND PLANTING (IF APPLICABLE) A.QUALITY 1.Sod shall be at 1 grade machine cut at a uniform thickness of 5/8” excluding top growth and thatch, weed free and shall be no less than eight months nor more than sixteen months old. B.TIMING 1.Installation shall take place within 24 hours after harvesting. C.REFERENCE 1.Refer to paragraph v, vi,vii, for finish grading, weed control, and soil preparation. D.PREPARATION 1.Soil preparation shall comply with SD-F requirements. E.INSTALLATION 1.Sod shall be laid in a staggered pattern, with tight joints and in the same direction each time. On all slopes sod shall be installed from the bottom up and the newly laid sod should be protected by walking on boards as installer moves upward. On slopes, pin the sod down with wooden pegs. No metal staples will be allowed. No sod of less than 18” in length will be allowed. F.JOINTS 1.Adjoin the section of sod firmly together. If air spaces occur between sections of sod they must be filled with sand or have the sod relaid. G.ROLLING 1.Roll sod with an adequately weighted roller to smooth out the sod bed. H.PROTECTION OF EDGES 1.Regrade to protect the edges from drying if mowing edge is not used. I.WATERING 1.After installation sod must be kept thoroughly watered to a depth of 6”. No foot traffic should be allowed for 2 to 3 weeks from the date of installation. J.INSPECTION BY SUPPLIER 1.If there are any questions regarding the quality of sod installation a representative of the supplier shall be required to inspect the installation and the contractor called out by the supplier's representative. XII.SEED LAWN PLANTING (IF APPLICABLE) A.REFERENCE 1.Refer to paragraphs v, vi, vii, for finish grading, weed control, and soil preparation. B.PREPARATION 1.Cultivate to a depth of 2” below finish grade, remove stones, foreign growth of any kind and extraneous matter and grade to remove ridges and depressions so that areas after settlement will conform to the finish grade. Roll and take lightly until the surface is smooth, friable and of uniform fine texture. C.SOWING 1.Sow lawn seed in the area designated on the drawings at the rate as designated on the drawings. Sow the lawn in two directions. D.TOP DRESSING 1.Rake lightly, spread ¼” of top dressing with a mechanical spreader, roll with 200 lb. Roller and water with a fine spray. XIII.HYDROSEEDING SPECIFICATIONS (IF APPLICABLE) A.GENERAL B.EQUIPMENT 1.Hydraulic equipment used for the application of the fertilizer, seed and slurry of prepared wood pulp shall be the “super hydro-seeder” type as approved by the landscape architect. C.APPLICATION 1.The operator shall spray the area with a uniform, visible coat by using the green color of the wood pulp as a guide. The slurry shall be applied in a sweeping motion, in an arched stream so as to fall like rain allowing the wood fibers to build on each other until a good coat is achieved and the material is spread at the required rate per acre. D.TIME LIMIT 1.All slurry mixture which has not been applied to the slopes within four hours after mixing will be rejected and removed from the project at the contractor's expense. E.PROTECTION 1.Special care should be exercised by the contractor in preventing any of the slurry being sprayed inside any reservoir basin or onto drainage ditches and channels which may impede the free flow of rain or irrigation water. Any slurry spilled into restricted areas shall be cleaned up at the contractor's expense to the satisfaction of the landscape architect or owner. F.MAINTENANCE AND IRRIGATION 1.Once the slurry mulch has been applied and allowed to set for one day, the slopes shall then be irrigated. There is no set irrigation requirements in gallons per minute. Duration of time and number of gallons to be applied to the slopes will vary from day to day and system to system depending on the rate of growth and climatic conditions encountered. As a rule of thumb the soil surface must be kept moist at all times, particularly during the seeding germination period (30 days). G.RESEEDING 1.All bare spots shall be reseeded (sodded, if hydroseed is turf mix), by the contractor within 45 days providing the lack of cover growth or mulch is not due to inadequate sprinkling or erosion caused by excessive watering by owner. XIV.REPLACEMENTS A.GENERAL 1.Contractor shall immediately replace any and all plant materials which for any reason die or are damaged while under his care. replacements shall be made with plants of like kind and size in the same manner as specified for the original planting. (see guarantee “c” for definition of replacements.) XV.CLEAN-UP A.GENERAL 1.After the installation operations have been completed remove all trash, excess soil, empty plant containers and rubbish from the property. All scars, ruts or other marks in the areas caused by this work shall be repaired and the ground left in a neat and orderly condition throughout the site. Contractor shall pick up all trash resulting from this work no less than each friday before leaving the site, once a week, and/or the last working day each week. All trash shall be removed completely from the site. B.TOP SOIL 1.Excess topsoil shall be removed from the site. C.REMOVAL OF TAGS 1.Remove all tags, labels, nursery stakes and ties from all plants unless otherwise directed, only at the end of all installation. XVI.PROTECTION A.GENERAL 1.At all times during construction, adequate protection shall be provided for all planted areas against damage of any kind until final acceptance by the landscape architect. B.RESPONSIBILITY 1.The contractor shall be held responsible for the care and preservation of all existing buildings and structures on the property and adjacent premises. any part of them injured, damaged or disturbed because of his work shall be repaired, replaced or cleaned by him at his expense. XVII.GUARANTEE A.SHRUBS 1.All shrubs shall be guaranteed as to growth and health for a period of 180 days after completion of the specified maintenance period and/or final acceptance by the owner. B.TREES 1.Trees shall be guaranteed to live and grow in acceptable upright position for 12 months after the specified maintenance period and/or final acceptance by the owner. The owner must provide adequate maintenance to insure the extended guarantee on trees. C.DEFINITION OF DEATH 1.Plants which die or lose more than 30% of their original leaves shall be replaced. D.REPLACEMENT 1.The contractor, within seven (7) days of written notifications by the owner, shall remove and replace all guaranteed plant materials which, for any reason, fail to meet the requirement of this guarantee. Replacement shall be made with plant materials as indicated or specified for the first planting, and all such replacement materials shall be guaranteed as specified for the original guarantee material. XVIII.MAINTENANCE A.SCOPE 1.After all work indicated on the drawings or herein specified has been completed, inspected, and approved by the owner or his representative, the contractor shall maintain all planted areas by means of continuous watering, weeding, rolling, mowing, reseeding, edging and/or any other operations necessary for their care and upkeep for a period of not less than ninety (30) days. At the end of the maintenance period, all plant materials shall be in healthy, growing condition. B.WEED CONTROL 1.All planted areas shall be kept free of debris and shall be weeded at not more than ten (10) day intervals. Areas that do not have a pre-emergent weed killer shall also be cultivated at not more than ten (10) day intervals. C.FERTILIZING Shall comply with SD-F requirements. Refer to sheet LP-3.0. D.CONDITION OF SITE 1.During the maintenance period, keep the project neat and free from debris at all times. Obtain the owner's approval for on-site storage of equipment or maintenance material. XIX.FINAL CONSTRUCTION INSPECTION AND FINAL MAINTENANCE INSPECTION A.FINAL CONSTRUCTION INSPECTION 1.When all landscape improvements have been installed in accordance with the plans and specifications, the contractor shall notify the landscape architect and request a “final construction” inspection. if the landscape architect determines the work to be substantially complete and in conformance with plans and specifications, the contractor will be advised that the basic maintenance period is started. B.FINAL MAINTENANCE INSPECTION 1.At the end of the maintenance period and when ground covers and turf have established and all pick-up items have been completed the contractor shall request a final maintenance inspection. The contractor will be advised by the landscape architect at the final inspection that work is or is not satisfactory. ·If the work is satisfactory, the basic maintenance period will end on the date of the final inspection. ·If the work is unsatisfactory, the basic maintenance period will continue at no additional expense to the owner until the work has been completed, inspected and approved by the landscape architect. C.FAILURE TO PASS INSPECTION 1.If work fails to pass final inspection, any subsequent inspections must be rescheduled as per above and will be charged to the contractor at the prevailing hourly rate of the landscape architect. PLANTING SPECIFICATIONS SD-F AMENDED SOILS 8 AP EXP. 11-30-22 P O F SIGNATURE NO. 2076 S A S T F TEO AC IL DATE DEERT ISG RE O ETRT SC DNAL CAS TEP A RO N I C H T I E N C T E AR 2883 VIA RANCHEROS WAY FALLBROOK, CA 92028 PH:760-842-8993 DRAWN: SHEET TITLE JOB # CHK'D: SP CITY SUBMITTAL 01-05-2021 OF 8 SHEETS CAUTION: IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT CLIENT: CONSULTANTS: SPLA C I V I L STRUCTURAL MECHANICAL PLUMBING ELECTRICAL LANDSCAPE SOILS ENGINEER FIRE PROTECTION - - - - - - - MATERIAL HANDLING - MS M O U N T A I N V I E W P A R K B L D G 1 42 4 3 3 A V E N I D A A L V A R D O TE M E C U L A , C A MS-MOUNTAIN VIEW, LLC C/O SILAGE DEVELOPMENT & MANAGEMENT, INC. 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 5-25-21 APN # 909-290-001 PA20-0533 PR I N T D A T E : 5 / 2 5 / 2 1 CITY RE-SUBMITTAL 03-17-2021 SITE UPDATE 03-31-2021 CITY RE-SUBMITTAL 05-03-2021 CITY RE-SUBMITTAL 05-17-2021 LP-3.0 PARCEL 1 -PM 21382 THE PROJECT SCOPE OF WORK SHALL INCLUDES ONE CONCRETE TILT-UP TYPE III-B SPECULATIVE INDUSTRIAL SHELL BUILDING AND SITE WALLS, FENCES, SIE LIGHT, TRASH ENCLOSURES, AND AN IMPROVED OFFICE SPACE ARE INCLUDED IN THIS PERMIT PACKAGE. 1. YARDS USED FOR AREA INCREASE SHALL BE PERMANENTLY MAINTAINED. 2. THIS PROJECT SHALL COMPLY WITH THE FOLLOWING CODES: 2019 CALIFORNIA BUILDING CODE (CBC) 2019 CALIFORNIA MECHANICAL CODE (CMC) 2019 CALIFORNIA PLUMBING CODE (CPC) 2019 CALIFORNIA ENERGY CODE (CEC) 2019 CALIFRONIA GREEN BUILDING STANDARDS (CGBS) 2019 CALIFORNIA FIRE CODE 3. SEPARATE PERMITS SHALL BE REQUIRED FOR ALL OF THE FOLLOWING: GATES, SITE & PERIMETER WALLS, FENCES & LIGHT POLE STANDARDS PRIOR TO COMMENCEMENT OF ANY WORK. 4. SEPARATE PERMITS AND SEPARATE PLAN SUBMITTALS WILL BE REQUIRED FOR THE FOLLOWING: GRADING, MONUMENT SIGNS, WATER FLOW MONITORING AND UNDERGROUND FIRE LINES, FIRE SPRINKLER SYSTEMS AND FIRE ALARM SYSTEMS. 5. FUTURE TENANT IMPROVEMENTS SHALL COMPLY WITH BUILDING AND FIRE CODES AS REQUIRED. THE BUILDING MAY NOT BE OCCUPIED UNTIL IMPROVED WITH PLUMBING FIXTURES AS REQUIRED. 6. THE FINAL COMPACTION REPORT AND SOIL ENGINEER EXCAVATION INSPECTION REPORT MUST BE SUBMITTED TO THE BUILDING INSPECTOR PRIOR TO FOUNDATION INSPECTION AND THAT CITY INSPECTOR MUST INSPECT EXCAVATIONS BEFORE POURING ANY CONCRETE. 7. A LANDSCAPING PLAN SHALL BE SUBMITTED TO THE CITY FOR APPROVAL PRIOR TO ISSUANCE OF BUILDING PERMITS AND SHALL BE IMPLEMENTED PRIOR TO OCCUPANCY. 8. FOR INDOOR AIR QUALITY, MEET THE REQUIREMENTS OF THE CEC FOR OUTSIDE AIR DELIVERY AND CARBON DIOXIDE MONITORING. 9. NO HAZARDOUS MATERIALS WILL BE STORED AND / OR USED WITHIN THE BUILDING WHICH EXCEED THE QUANTITIES LISTED IN CBC TABLES 307.1(1) AND 307.2(2). 10. STATE OF CALIFORNIA "GENERAL CONSTRUCTION NPDES PERMITS AND WDID NUMBERS MUST BE OBTAINED PRIOR TO PERMIT. 11. THIS BUILDING IS DESIGNED FOR HIGH PILE STORAGE. A SEPARATE PERMIT FROM THE BUILDING AND FIRE DEPARTMENTS IS REQUIRED FOR HIGH PILE STORAGE WITHIN THE FACILITY. 12. SPECIAL INSPECTION NOTES SPECIFIC TO THIS PROJECT MAY BE FOUND ON SHEET SD-0 OF THE STRUCTURAL PORTION OF THIS PACKAGE. JURISDICTION ASSESSOR'S PARCEL NUMBER: ZONNING DESIGNATION: GENERAL PLAN DESIGNATION: LAND USE: PLANNING APPLICATION NUMBER: CITY OF TEMECULA 909-290-001 LI (LIGHT INDUSTRIAL) IP (INDUSTRIAL PARK) LI (LIGHT INDUSTRIAL) PA20-0533 STRUCTURAL 1S0.0 STRUCTURAL ISOMETRIC (BUILDING-1) 1S1.1 FOUNDATION PLAN (BUILDING-1) 1S2.1 ROOF FRAMING PLAN (BUILDING-1) 1S3.1 ROOF NAILING DIAGRAM GIRDER AND BAR JOIST SCHEDULE (BUILDING-1) 1S4.1 PANEL ELEVATIONS (BUILDING-1) 1S4.2 PANEL ELEVATIONS (BUILDING-1) 1SD0.0 GENERAL NOTES (BUILDING-1 1SD0.1 GENERAL NOTES (BUILDING-1) 1SD1 FOUNDATION DETAILS (BUILDING-1) 1SD2 PANEL TO FOOTING DETAILS (BUILDING-1) 1SD2.1 PANEL TO FOOTING DETAILS (BUILDING-1) 1SD3 TYPICAL PANEL DETAILS (BUILDING-1) 1SD4 TYPICAL ROOF FRAMING DETAILS (BUILDING-1) 1SD5 TYPICAL ROOF FRAMING DETAILS (BUILDING-1) 1SD6 TYPICAL ROOF FRAMING DETAILS (BUILDING-1) 1SD7 MISCELLANEOUS DETAILS (BUILDING-1) 1SD8 METAL STUD DETAILS (BUILDING-1) 1-M1.0 BLDG-1 MECHANICAL NOTING PLAN 1-M1.1 BLDG-1 MECHANICAL T-24 NOTING PLAN 1-M2.0 BLDG-1 FLOOR PLAN PLUMBING P0.1 NOTES & DETAILS P1.1 PLUMBING SITE PLAN P2.1 PLUMBING PLAN P3.1 WASTE & VENTS P4.1 DOMESTIC WATER ELECTRICAL 1E1 ELECTRICAL SYMBOLS & DETAILS 1E2 ELECTRICAL SITE PLAN 1E3 WAREHOUSE LIGHTING PLAN 1E4 OFFICE LIGHTING & POWER PLANS 1ESL1 SITE LIGHTING PLAN MECHANICAL 1ESL2 LIGHTING EXTERIOR ELEVATIONS RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER PROJECT DIRECTORY PROJECT DATAVICINITY MAP OWNER MS-MOUNTAIN VIEW LLC -C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 CONTACT: MOSHE SILAGI PHONE: 805-494-7704 EMAIL:moshe@silagidevelopment.com GENERAL CONTRACTOR RM DALTON CORPORATION 1400 BRISTOL STREET NORTH, SUITE 120 NEWPORT BEACH, CA 92660 CONTACT:LARRY WARES PHONE: 949.300.0039 EMAIL: larry@rmdalton.com ARCHITECT RGA, OFFICE OF ARCHITECTURAL DESIGN 15231 ALTON PARKWAY, SUITE 100 IRVINE, CA 92618 CONTACT:MIKE GILL PHONE:949-341-0922 EMAIL: mike@rga-architects.com STRUCTURAL ENGINEER DFA AND ASSOCIATES, INC. 3230 E. IMPERIAL HIGHWAY, SUITE 302 BREA, CA 92821-6747 CONTACT: DARIN FONG PHONE : (714) 494-4888 ext 403 EMAIL: darin@dfaengineering.com CIVIL ENGINEER SDH & ASSOCIATES, INC. 27363 VIA INDUSTRIA TEMECULA, CA 92590 CONTACT: STEVE SOMMERS PHONE: 951.683.3691 EMAIL: steve@sdhinc.net MECHANICAL ENGINEER BLAKE AIR CONDITIONING & SERVICE CO. INC. 1175 N. OSPREY CR. ANAHEIM, CA 92807 CONTACT:RANDY BLAKE PHONE : 714.630.6412 EMAIL: engineering@blakeac.com PLUMBING ENGINEER CRAIG MECHANICAL, INC. 6770-A CENTRAL AVE. RIVERSIDE, CA 92504 CONTACT:FRANK CRAIG PHONE : 951-352-7940 EMAIL:frankc@craigmech.com ELECTRICAL ENGINEER GREGG ELECTRIC, INC. 1608 WEST EMPORIA STREET ONTARIO, CA 91762 CONTACT:GLENN TASSON PHONE :909.321.3607 EMAIL: glennt@greggelectric.com FIRE PROTECTION ENGINEER GENERAL UNDERGROUND FIRE PROTECTION, INC. 701 W. GROVE AVE. ORANGE, CA 92865 CONTACT:VICTOR MACHADO PHONE 714-632-8646 EMAIL:victor@gufpinc.com GEOTECHNICAL ENGINEER CONTACT: PHONE : EMAIL: LANDSCAPE ARCHITECT SCOTT PETERSON LANDSCAPE ARCHITECT, INC. 2883 VIA RANCHEROS WAY FALLBROOK, CA 92028 CONTACT:SCOTT PETERSON PHONE : 760 842 8993 EMAIL:scott@splainc.com 1-A0-1 TITLE SHEET MS MOUNTAIN VIEW PARK M.G. C.P. 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. MS MOUNTAIN VIEW PARK SITE AREA - GROSS 54,885 SF / 1.26 AC SITE AREA - NET 47,480 SF / 1.10 AC BUILDING AREA: OFFICE 1,446 SF WAREHOUSE 11,848 SF GROSS FLOOR AREA 13,294 SF LOT COVERAGE 24% TOTAL ON-SITE LANDSCAPE AREA (33%)18,054 SF BUILDING HEIGHT / CLR HEIGHT 29'-0" / 20'-0" DOCK HEIGH POSSITIONS 1 GRADE DOORS 1 CONSTRUCTION TYPE IIIB OCCUPANCY S-1/B FIRE SPRINKLERS FULLY SPRINKLERED PER NFPA 13 ALLOWABLE BUILDING HEIGHT - TABLE 504.3 75' ALLOWABLE NUMBER OF STORIES - TABLE 504.4 3 STORIES ALLOWABLE BUILDING AREA - TABLE 506.2 70,000 SF MIXED USE OCCUPANCY IS JUSTIFIED BASED ON 2019 CBC CHAPTER 5. BOTH OCCUPANCIES (B & S-1) HAVE UNLIMITED AREA ALLOWANCES. NO OCCUPANCY SEPARATION IS REQUIRED PER TABLE 508.4 FIRE RESISTANCE RATING PER TABLE 601 / 602: PRIMARY STRUCTURAL FRAME 0 HRS BEARING WALLS - EXTERIOR (X<5)2 HRS BEARING WALLS - INTERIOR 0 HRS NON BEARING WALLS AND PARTITIONS - INTERIOR 0 HRS (SEE NOTE ABOVE) FLOOR CONSTRUCTION 0 HRS ROOF CONSTRUCTION 0 HRS EXTERIOR WALL OPENINGS - TABLE 705.8 COMPLIANCE SEE ELEVATIONS OCCUPANT LOAD CALCULATIONS SEE FLOOR PLAN PLUMBING FIXTURE CALCULATIONS SEE FLOOR PLAN SHEET INDEX 1-A0-1 Sheet index SHEET NO.SHEET NAME 1ST. PLAN CHECK SUBMITTAL 2ND. PLAN CHECK SUBMITTAL ARCHITECTURAL 1-A0-1 TITLE SHEET x 1-A0-2 GENERAL NOTES x 1-A0-3 CAL GREEN NOTES x 1-A0-4 CAL GREEN NOTES x 1-A0-5 CAL GREEN NOTES x 1-A0-6 CONDITIONS OF APPROVAL 1-A0-7 CONDITIONS OF APPROVAL 1-A1-0 SITE PLAN x 1-A2-1 FLOOR PLAN x 1-A2-2 PLAN ENLARGEMENTS x 1-A2-3 PLAN ENLARGEMENTS x 1-A2-4 ROOF PLAN x 1-A3-1 ELEVATIONS x 1-A4-1 WALL SECTIONS x 1-A4-2 WALL SECTIONS x 1-A4-3 WALL SECTIONS x 1-A5-1 SCHEDULES x 1-A5-2 FINISH SCHEDULES x AD-1 DETAILS x AD-2 DETAILS x AD-3 DETAILS x AD-4 DETAILS x AD-5 DETAILS x AD-6 DETAILS x AUTO PARKING BUILDING CODE ANALYSIS SITE / BUILDING INFORMATION GENERAL NOTES PROJECT SCOPE LEGAL DESCRIPTION ZONING INFORMATION 1 STORY 15,629 SF 29' USE OFFICE WAREHOUSE TOTAL REQUIRED ACCESSIBLE PARKING REQUIRED 11B-208 DESIGNATED PARKING FOR CLEAN AIR CalGreen TABLE 5.106.5.2 TOTAL NUMBER OF EVCS REQUIRED 11B-228.3.2.1 MOTORCYCLE PARKING BICYCLE RACKS RATIO 1:300 1:1000 10 -25 VAN ACCESSIBLE AMBULATORY STANDARD ACCESSIBLE 1/25 AUTO PARKING 5% OF AUTO PARKING PARKING REQUIRED 5 STALLS 12 STALLS 17 STALLS 1 (VAN) 1 1 - - NONE (1) TWO-BIKE RACK PARKING PROVIDED 17 STALLS 1 (VAN) 1 1 MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL PC1 04/16/21 PLAN CHECK COMMENTS 42433 SHELL + T.I. SITE N 42433 APN # 909-290-001 PA20-0533 BP20-4793 ARCHITECTURAL CIVIL STRUCTURAL MECHANICAL PLUMING ELECTRICAL ANGLE AT ANCHOR BOLT ABOVE ACRYLIC ASPHALT CONCRETE ACOUSTICAL AIR CONDITIONING UNIT AREA DRAIN AMERICANS WITH DISABILITIES ACT ADJUSTABLE OR ADJACENT ALUMINUM ANODIZED ACCESS PANEL APPROVED APPROXIMATE ARCHITECT ASPHALT AMERICAN SOCIETY OF TESTING & MATERIALS BOARD BUILDING BLOCK OR BLACK BLOCKING BEAM BOTTOM BRONZE BRITISH THERMAL UNIT BUILT-UP ROOFING CABINET CATCH BASIN CALIFORNIA BUILDING CODE CEMENT CERAMIC CERTIFICATE CUBIC FEET PER MINUTE CAST IRON CENTER-LINE CEILING CLOSET CLEAR CONCRETE MASONRY UNIT CONCRETE OPENING COLUMN CONCRETE CONTINUOUS CORRIDOR CARPET CLERESTORY COMBINATION STANDPIPE CUBIC CUBIC FOOT DOUBLE DEGREE DEMOLISH DEPARTMENT DETAIL DRINKING FOUNTAIN DIAMETER DIAGONAL DIMENSION DISPENSER DISTANCE DIVISION DOWN DOOR DETAIL DOWNSPOUT DRY STANDPIPE DISHWASHER DRAWING EACH EGGSHELL ENAMEL ELEVATION ELECTRICAL ELEVATOR OR ELEVATION EMERGENCY ENCLOSURE ENGINEER ELECTRICAL PANEL EQUAL EQUIPMENT EXECUTIVE EXISTING EXPANSION JOINT EXPOSED EXTERIOR FIRE ALARM FLOOR DRAIN FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FINISH FLOOR FIXTURES, FURNISHINGS & EQUIPMENT FIRE HOSE CABINET FIRE HYDRANT FINISH FIXTURE FLOOR FLASHING FLUORESCENT FACTORY MUTUAL (FM GLOBAL) FACE OF FACE OF CONCRETE FACE OF FINISH FACE OF MASONRY OR MULLION FACE OF PANEL FACE OF STUD FACE OF WALL FIRE RISER FIRBERGLASS REINFORCED PANEL FLOOR SINK FOOT FOOTING FURRING FUTURE FIELD VERIFY FLAT WALL (PAINT) GAUGE GALVANIZED GALVANIZED IRON GLASS GRADE GYPSUM WALL BOARD HEIGHT HOSE BIBB HOLLOW CORE HARDBOARD HEADER HARDWOOD HOLLOW METAL HORIZONTAL HIGH POINT HOUR HEIGHT INTERNATIONAL BUILDING CODE INTERNATIONAL CODE COUNCIL INSIDE DIAMETER INCH INSULATION INTERIOR INTERMEDIATE INVERT JANITOR JOINT JOIST KNOCK-OUT PANEL LAMINATE LAVATORY LEVEL LINEAR LOW POINT LOUVER LIGHT WEIGHT A OR ARCH. C OR CIV. S OR STRUCT. M OR MECH. P OR PLUMB. E OR ELEC. L @ A.B. ABV. AC. A.C. ACOUS. A.C.U. A.D. ADA ADJ. AL. OR ALUM. ANOD. A.P. APP'D APPROX. ARCH. ASPH ASTM BD. BLDG. BLK. BLKG. BM. BOT. BRZ. BTU. B.U.R. CAB. C.B. CBC CEM. CER. CERT. CFM. C.I. C.L. CLG. CLO. CLR. C.M.U. C.O. COL. CONC. CONT. CORR. CPT. C.S. C.S.P. CU. CU. FT. DBL. DEG. DEMO. DEPT. DET. D.F. DIA. DIAG. DIM. DISP. DIST. DIV. DN. DR. DTL. DS. D.S.P. DW. DWG. EA. E.E. EL. ELEC. ELEV. EMER. ENCL. ENG. E.P. EQ. EQUIP. EXEC. EXIST. OR (E) EXP. JT. EXP. EXT. F.A. F.D. F.E. F.E.C. F.F. FF&E F.H.C. F.H. FIN. FIXT. FLR. FLASH. FLUOR. FM. F.O. F.O.C. F.O.F. F.O.M. F.O.P. F.O.S. F.O.W. F.R. FRP. F.S. FT. FTG. FURR. FUT. F.V. F.W. GA. GALV. G.I. GL. GR. GYP. BD. H. H.B. H.C. HDBD. HDR. HDWD. H.M. HORIZ. H.P. HR. HT. IBC ICC I.D. IN. INSUL. INT. INTERM. INV. JAN. JT. JST. K.O. OR K.O.P. LAM. LAV. LEV. LIN. L.P. LVR. LT. WT. MATL. MAX. M.C. MECH. MET. MEZZ. MFR. M.H. MIN. MISC. M.O. MTD. MTG. MTL. MULL. NAT. NEC. NEMA. N.F. N.I.C. NO. OR # NOM. N.T.S. O.C. O.D. OPNG. OPP. O.S. PERF. PERIM. PERP. PH. P.J. P.L. PL. P. LAM. PLAS. PLYWD. POL. PR. PROP. PREFAB. P.T. R. RAD. RCP. R.D. RDWD. REC. RECT. REFL. REINF. REM. RET. REQ. OR REQD. RESIL. REV. RM. RTU. R.O. R.O.W. S&P S.C. SCHED. S.D. SECT. S.G.E. SHWR. SHT. SIM. SIL.POL. SPEC. SQ. S.S. STAGG. STD. STIF. STL. STOR. STRUCT. SUPP. SURF. SUSP. SYMM. T&G TEL. TEMP. THK. T.I. T.O.C. T.O.P. T.O.S. T.O.W. T-STAT TV. TYP. UC. U.L. U.N.O. UTIL. VENT. VERT. VEST. V.C.T. V.I.F. V.W.C. W/ W. W.C. WD. WF. W.H. WHSE. W/O W.R. W.S.P. W.W. WWF. WWM. MATERIAL MAXIMUM MINERAL CORE MECHANICAL METAL MEZZANINE MANUFACTURER MANHOLE MINIMUM MISCELLANEOUS MASONRY OPENING MOUNTED MOUNTING METAL MULLION NATURAL NATIONAL ELECTRIC CODE NATIONAL ELECTRICAL MANUF. ASSOC. NO FINISH NOT IN CONTRACT NUMBER NOMINAL NOT TO SCALE ON CENTER OVERFLOW DRAIN OPENING OPPOSITE OVERFLOW SCUPPER PERFORATED PERIMETER PERPENDICULAR PENTHOUSE PANEL JOINT PROPERTY LINE PLATE PLASTIC LAMINATE PLASTIC PLYWOOD POLISHED PAIR PROPERTY PREFABRICATED PAY TELEPHONE RISE RADIUS REFLECTED CEILING PLAN ROOF DRAIN REDWOOD RECESSED RECTANGLE REFLECTED REINFORCED (OR REINFORCING) REMOVE RETAINING REQUIRED RESILIENT REVERSED ROOM ROOF-TOP UNIT ROUGH OPENING RIGHT-OF-WAY SHELF & POLE SOLID CORE SCHEDULE STORM DRAIN SECTION SEMI-GLOSS ENAMEL SHOWER SHEET SIMILAR SILICONE POLYESTER SPECIFICATION SQUARE STAINLESS STEEL STAGGERED STANDARD STEEL STIFFENER STORAGE STRUCTURAL SUPPLEMENTAL SURFACE SUSPENDED SYMMETRICAL TONGUE & GROOVE TELEPHONE TEMPORARY THICK TENANT IMPROVEMENT TOP OF CONCRETE OR CURB TOP OF PARAPET TOP OF SHEATHING TOP OF WALL THERMOSTAT TELEVISION TYPICAL UNDERCUT UNDERWRITERS LABORATORY UNLESS NOTED OTHERWISE UTILITY VENTILATION VERTICAL VESTIBULE VINYL COMPOSITION TILE VERIFY IN FIELD VINYL WALL COVERING WITH WIDTH WATER CLOSET WOOD WIDEFLANGE WATER HEATER WAREHOUSE WITHOUT WATER RESISTANT WET STANDPIPE WINDOW WALL WELDED WIRE FABRIC WELDED WIRE MESH 1. THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS TO INCLUDE ALL LABOR, MATERIALS AND SERVICES NECESSARY FOR COMPLETION OF ALL WORK SHOWN, PRESCRIBED, OR REASONABLY IMPLIED BUT NOT LIMITED TO THAT EXPLICITLY INDICATED IN THE CONTRACT DOCUMENTS. 2. ALL WORK SHALL CONFORM TO ALL APPLICABLE BUILDING CODES, ORDINANCES AND REGULATIONS AS ADOPTED BY LOCAL AUTHORITIES HAVING JURISDICTION. 3. DIMENSIONS ON DRAWINGS ARE SHOWN TO CENTERLINE OF COLUMNS AND WALLS AND FACE OF MASONRY/CONCRETE UNLESS INDICATED OTHERWISE. 4. DO NOT SCALE DRAWINGS. 5. STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, CIVIL, AND LANDSCAPE DRAWINGS ARE SUPPLEMENTAL TO THE ARCHITECTURAL DRAWINGS. THE CONTRACTOR SHALL REVIEW ALL PLANS AND DRAWINGS. IN THE EVENT OF CONFLICTING STATEMENTS, INSUFFICIENT INFORMATION OR ERRORS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND OBTAIN CLARIFICATION BEFORE ANY WORK IS BEGUN. WORK INSTALLED WHERE CONFLICTING CONDITIONS EXIST SHALL BE CORRECTED AT CONTRACTORS EXPENSE. 6. DIMENSIONS, DETAILS, NOTES AND/OR SYMBOLS THAT APPLY TO ONE UNIT, APPLY TO ALL UNITS IN LIKE SITUATIONS UNLESS NOTED OTHERWISE. 7. DETAILS NOTED AS 'TYPICAL' SHALL APPLY IN ALL LIKE CONDITIONS UNLESS SPECIFICALLY SHOWN OR NOTED OTHERWISE. WHERE NO SPECIFIC DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR SIMILAR TO THAT INDICATED FOR LIKE CASES OF CONSTRUCTION OF THIS PROJECT. 8. WHENEVER AN ARTICLE, DEVICE, OR PIECE OF EQUIPMENT IS SHOWN, INDICATED, OR REFERRED TO ON THE DRAWINGS OR THESE NOTES IN THE SINGULAR NUMBER, SUCH REFERENCES APPLY TO AS MANY SUCH ARTICLES AS ARE REQUIRED TO COMPLETE THE INSTALLATION. 9. THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND CONDITIONS ON THE JOB SITE PRIOR TO BEGINNING CONSTRUCTION AND SHALL REPORT ANY DISCREPANCIES OR UNIDENTIFIED CONDITIONS TO THE ARCHITECT FOR RESOLUTION BEFORE ANY WORK IS BEGUN. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES AND PROCEDURES EMPLOYED IN THE PERFORMANCE OF WORK IN, ON OR ABOUT THE JOB SITE; THE CONTRACTOR SHALL COORDINATE AND VERIFY ALL WORK PERFORMED BY SUB-CONTRACTORS. 11. ALL CONTRACTORS AND SUB-CONTRACTORS PERFORMING WORK ON, OR RELATED TO THIS PROJECT SHALL CONDUCT THEIR OPERATIONS SO THAT ALL EMPLOYEES ARE PROVIDED A SAFE PLACE TO WORK AND THE PUBLIC IS PROTECTED, AND SHALL COMPLY WITH THE 'OCCUPATIONAL SAFETY AND HEALTH REGULATION' OF THE U.S. DEPARTMENT OF LABOR AND WITH ANY AND ALL OTHER APPLICABLE STATE AND/OR LOCAL SAFETY REGULATIONS. THE CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE SAFETY CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT; THAT THIS REQUIREMENT SHALL APPLY CONTINUALLY AND NOT BE LIMITED TO NORMAL WORKING HOURS AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE OWNER AND ARCHITECT FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH PERFORMANCE OF WORK ON THIS PROJECT. 12. THE STRUCTURE IS DESIGNED AS A STABLE UNIT AFTER ALL COMPONENTS ARE IN PLACE. THE CONTRACTOR SHALL DESIGN AND PROVIDE ALL SHORING AND BRACING NECESSARY TO ENSURE THE STABILITY OF ANY AND ALL PARTS OF THE BUILDING DURING CONSTRUCTION. 13. UNLESS SPECIFICALLY SHOWN OR NOTED ON THE DRAWINGS, NO STRUCTURAL MEMBER SHALL BE CUT, NOTCHED, BORED, WELDED, OR OTHERWISE MODIFIED WITHOUT THE PERMISSION OF THE ARCHITECT. 14. WHETHER OR NOT DETAILED ON THE DRAWINGS, THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BACK-UP PLATES AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK AND OF ALL WALL MOUNTED OR SUSPENDED MECHANICAL, ELECTRICAL, OR MISCELLANEOUS EQUIPMENT INCLUDING PLYWOOD BACKBOARDS FOR TELEPHONE AND ELECTRICAL EQUIPMENT ROOMS. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING APPROVAL AND PERMITS FOR ALL DESIGN/BUILD SYSTEMS. HE SHALL ALSO BE RESPONSIBLE FOR INSURING THAT THE SYSTEMS MEET ALL APPLICABLE CODE REQUIREMENTS. 16. ANY MODIFICATIONS TO THE BUILDING SHELL RESULTING FROM DESIGN/BUILD REQUIREMENTS SHALL BE REPORTED TO THE OWNER AND ARCHITECT ALONG WITH ANY REQUIRED COSTS OR SAVINGS PRIOR TO CONSTRUCTION. ANY MODIFICATIONS NOT REPORTED WILL BE THE CONTRACTORS RESPONSIBILITY FOR COORDINATION, CODE CONFORMANCE, AND COST. 17. NEITHER THE ARCHITECT'S REVIEW OR APPROVAL OF SHOP DRAWINGS SHALL RELIEVE THE GENERAL CONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS UNLESS HE HAS CALLED THE ARCHITECT'S ATTENTION IN WRITING TO SUCH DEVIATIONS AT THE TIME OF SUBMISSION NOR SHALL IT RELIEVE HIM OF RESPONSIBILITY FOR ERRORS OF ANY SORT IN THE SHOP DRAWINGS. 18. INSTALLATION OF GLASS SHALL CONFORM TO FEDERAL SPECIFICATION 16-CFR-1202 AND ALL LOCAL CODES AND ORDINANCES. GLASS SUBJECT TO HUMAN IMPACT SHALL COMPLY WITH U.S. CONSUMER PRODUCT SAFETY STANDARDS. A CERTIFICATE SHALL ACCOMPANY PRODUCT STATING DATE AND PLACE OF MANUFACTURE. ALL GLAZING SHALL BE TEMPERED WHEN REQUIRED BY CBC 2019 CHAPTER 24. 19. REFER TO THE CIVIL ENGINEER'S DRAWINGS FOR LOCATIONS OF EXISTING UTILITY LINES. LOCATIONS OF ALL UTILITIES SHOWN ARE APPROXIMATE AND THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN EXCAVATION AND TRENCHING TO AVOID INTERCEPTING EXISTING PIPING OR CONDUITS. 20. THE CONTRACTOR SHALL SUBMIT A SOILS REPORT AND A COMPACTION REPORT TO THE BUILDING DEPARTMENT FOR APPROVAL PRIOR TO FOUNDATION INSPECTIONS. 21. LOCATIONS OF ALL UTILITIES SHOWN ON THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN EXCAVATION AND TRENCHING TO AVOID INTERCEPTING EXISTING PIPING OR CONDUITS. THE CONTRACTOR IS RESPONSIBLE TO VERIFY LOCATION OF ALL SITE UTILITIES AND TO COORDINATE AND AVOID CONFLICT IN THE LOCATIONS OF NEW UNDERGROUND AND SITE UTILITIES. 22. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND ARCHITECT SHOULD UNIDENTIFIED FIELD CONDITIONS BE DISCOVERED. 23. THE CONTRACTOR SHALL KEEP AN UP-TO-DATE RECORD OF 'AS BUILT' CONDITIONS OF THE WORK ON A SET OF DRAWINGS, INCLUDING ALL ADDENDA AND BULLETIN DRAWINGS. UPON COMPLETION OF THE WORK, THE MARKED UP SET SHALL BE RETURNED TO THE ARCHITECT COMPLETELY AND NEATLY POSTED SHOWING ALL ADDITIONS, DELETIONS, CORRECTIONS, AND REVISIONS IN THE ACTUAL CONSTRUCTION OF THE PROJECT. RECORD DRAWINGS SHALL BE SIGNED BY THE SUB-CONTRACTORS REPRESENTING ALL MAJOR TRADES FOR THE PROJECT AS WELL AS THE GENERAL CONTRACTOR. 24. WHEN REQUESTED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, MOUNTING, AND DISPLAYING ARCHITECT'S JOB SIGN. CONTRACTOR SHALL ALSO RETURN THE JOB SIGN TO ARCHITECT AT COMPLETION OF PROJECT IN GOOD CONDITION. 25. SEE WALL LEGENDS OR CALLOUTS ON PLANS FOR WALL FRAMING MEMBERS, FIRE RATINGS, GYPSUM BOARD THICKNESSES AND OTHER WALL CONSTRUCTION MATERIALS. PROVIDE AND INSTALL HEAVIER GAUGE STUDS, STIFFENERS, BRACING, BACK-UP PLATES, ETC. AS REQUIRED IN STUD WALLS FOR THE SUPPORT OF TOILET ROOM FIXTURES AND OTHER WALL MOUNTED EQUIPMENT. 26. ALL GYPSUM BOARD USED IN JANITOR'S ROOMS AND ALL TOILET ROOMS SHALL BE WATER RESISTANT EXCEPT AT CEILINGS PER THE 2019 CBC CHAPTER 25. 27. ALL ROOFING MATERIALS SHALL COMPLY WITH ALL APPLICABLE STANDARDS LISTED IN 2019 CBC CHAPTER 15. 28. PRIOR TO ERECTION, THE CONTRACTOR SHALL SUPPLY THE BUILDING INSPECTOR WITH AN A.I.T.C. CERTIFICATE OF COMPLIANCE FOR THE STRUCTURAL GLU-LAMINATED MEMBERS WHEN USED. 29. IN ACCORDANCE WITH 2019 CBC SECTION 1010, EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. IN GROUP B OCCUPANCIES AT THE MAIN ENTRANCE ONLY, PROVIDE SIGNAGE STATING IN 1" HIGH LETTER "THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED" THE LOCKING DEVICE SHALL BE OF A TYPE READILY DISTINGUISHABLE AS LOCKED. 30. EXIT DOORS MUST OPEN OVER A LANDING NOT MORE THAN 1/2" BELOW THE THRESHOLD AND THE DOOR SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING AN OCCUPANT LOAD OF 50 OR MORE. 31. EXIT DOORS SHALL BE NOT LESS THAN 3'-0" IN WIDTH AND 6'-8" IN HEIGHT AND NO SINGLE LEAF SHALL EXCEED 4'-0" IN WIDTH. 32. THE FLOOR ADJACENT TO ANY DOORWAY SHALL BE LEVEL (1/4" PER FOOT MAX. FOR EXTERIOR CONDITIONS) FOR A DISTANCE OF FIVE FEET FROM THE DOOR IN THE DIRECTION OF THE DOOR SWING AND SHALL NOT BE LESS THAN FIVE FEET WIDE. 33. EXIT SIGNS SHALL BE PROVIDED AT ALL REQUIRED EXIT DOORS AND IN OTHER LOCATIONS WHERE REQUIRED BY, AND IN ACCORDANCE WITH, APPLICABLE LAWS. THE PRINCIPAL STROKE OF SUCH SIGNS SHALL BE NOT LESS THAN 3/4" WIDE AND 6" TALL. 34. EXIT SIGNS SHALL BE INTERNALLY ILLUMINATED PER 2019 CBC SECTION 1013 AND SHALL BE LISTED FOR THEIR USE. 35. EXIT SIGNS SHALL BE PROVIDED WITH AN EMERGENCY SOURCE OF SELF CONTAINED POWER PER 2019 CBC SECTION 1013 AND THEY SHALL BE INSTALLED PER THE ELECTRICAL CODE. 36. THE POWER FOR MEANS OF EGRESS ILLUMINATION SHALL BE IN ACCORDANCE WITH 2019 CBC CHAPTER 10. 37. ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER OR OTHERS, AND THOSE SHOWN ON THE RECORDS EXAMINED, ARE INDICATED BY APPROXIMATE LOCATION AND EXTENT. THE OWNER AND CONTRACTOR, BY ACCEPTING THESE PLANS OR PROCEEDING WITH IMPROVEMENTS HERETO, AGREES TO ASSUME LIABILITY AND HOLD THE ARCHITECT HARMLESS FOR ANY DAMAGES RESULTING FROM THE EXISTENCE OF UNDERGROUND UTILITIES OR STRUCTURES NOT REPORTED BY THE ARCHITECT, NOT INDICATED ON THE RECORDS EXAMINED, LOCATED AT VARIANCE WITH THOSE REPORTED, OR SHOWN ON RECORDS EXAMINED. THE CONTRACTOR IS REQUIRED TO NOTIFY THE OWNER OF THE UTILITIES OR STRUCTURES CONCERNED PRIOR TO COMMENCING WORK. 1. THE CONTRACTOR SHALL PROVIDE FIRE PROTECTION FOR THE PROJECT UNDER CONSTRUCTION PER REQUIREMENTS OF THE LOCAL GOVERNING AGENCIES. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN AUTOMATIC FIRE SPRINKLER SYSTEM AND ALARM SYSTEM INCLUDING ALL ON SITE FIRE HYDRANTS AND UNDERGROUND MAINS PER REQUIREMENTS OF THE LOCAL GOVERNING AGENCIES AND ANY IDENTIFIED OWNER/TENANT INSURING AGENCIES. SPRINKLER SYSTEM PLANS SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. CONTRACTOR SHALL BE RESPONSIBLE FOR APPLICABLE PLAN CHECKS AND PERMITS. ANY CHANGES MADE TO ACCOMMODATE FIELD CONDITIONS SHALL BE RESUBMITTED TO THE CITY AND ARCHITECT AT THE CONTRACTORS EXPENSE. WHERE ENUNCIATOR PANELS, ALARMS, ETC. ARE REQUIRED IN AN EXPOSED LOCATION, CONTRACTOR SHALL SUBMIT PROPOSED LOCATIONS AND CUT SHEETS INDICATING FINISHES AND SIZES TO THE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. 2. THE CONTRACTOR SHALL PROVIDE AND INSTALL FIRE DAMPERS WHERE DUCTS PENETRATE FIRE RATED ASSEMBLIES. 3. PENETRATIONS OF FIRE RESISTIVE WALLS, FLOOR/CEILINGS AND ROOF/CEILINGS SHALL BE PROTECTED AS REQUIRED IN THE CBC CHAPTER 7. A FIRE PENETRATION PROTECTION PLAN FOR EACH APPLICABLE TRADE SHALL BE SUBMITTED BY THE CONTRACTOR TO THE ARCHITECT AND CITY FOR APPROVAL PRIOR TO INSTALLATION IN THE FIELD. PENETRATION PROTECTION SYSTEMS SHALL BE UL LISTED. 4. RETURN AIR PLENUMS SHALL HAVE NO EXPOSED MATERIALS WITHIN THEM WITH A FLAME SPREAD RATING OF 26 OR GREATER OR A SMOKE DEVELOPED RATING OF 50 OR GREATER. ALL WIRING IN RETURN AIR PLENUMS SHALL BE IN NONCOMBUSTIBLE CONDUIT OR SHALL HAVE AN APPROVED PLENUM RATING. TEMPERATURES IN RETURN AIR PLENUMS SHALL BE RESTRICTED TO A RANGE OF 50 TO 125 DEGREES FAHRENHEIT AND MOISTURE CONTENT SHALL BE CONTROLLED SO AS NOT TO ADVERSELY AFFECT GYPSUM PRODUCTS WITHIN THE PLENUM. 5. ALL EXPOSED COMBUSTIBLE FRAMING MEMBERS WITHIN A RETURN AIR PLENUM SHALL BE SHEATHED WITH MIN. ONE LAYER OF 1/2" GYPSUM BOARD SECURELY FASTENED AND TAPED (PROVIDE BLOCKING/FURRING AS REQUIRED) UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS. FIRE RETARDANT WOOD AND HEAVY TIMBER MEMBERS MAY BE EXPOSED IN RETURN AIR PLENUMS WHEN SPECIFICALLY APPROVED BY THE BUILDING OFFICIAL. 6. INTERIOR FINISHES SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM E84 OR UL 723 AND GROUP IN THE FOLLOWING CLASSES IN ACCORDANCE WITH THEIR FLAME SPREAD AND SMOKE-DEVELOPED INDEXES: CLASS A: 0-25 FLAME SPREAD: SMOKE DEVELOPED 0-450 CLASS B: 26-75 FLAME SPREAD: SMOKE DEVELOPED 0-450 CLASS C: 76-200 FLAME SPREAD: SMOKE DEVELOPED 0-450 7. INTERIOR WALL AND CEILING FINISHES SHALL COMPLY WITH THE CLASSIFICATIONS NOTED PER THE SPRINKLERED OCCUPANCIES LISTED IN 2019 CBC CHAPTER 8, TABLE 803.11 & 803.13 8. CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS OF TYPE, QUANTITY AND LOCATION DETERMINED BY THE FIRE DEPARTMENT INSPECTOR. CONTRACTOR SHALL SUBMIT PROPOSED LOCATIONS AND CUT SHEETS INDICATING FINISHES AND SIZES TO THE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. 9. PROVIDE AND INSTALL OUTSIDE GAS SHUT-OFF VALVE AND SIGNAGE IDENTIFYING LOCATIONS OF GAS AND ELECTRICAL SHUT-OFFS PER THE FIRE DEPARTMENT INSPECTOR. 10. PROVIDE AND INSTALL SMOKE DETECTORS, DUCT DETECTORS, AND OTHER SUCH DETECTION DEVICES AS REQUIRED BY CODE AND THE FIRE DEPARTMENT INSPECTOR. 11. PROVIDE ALL PAINTING OF CURBS AND SIGNAGE INDICATING FIRE LANES, ROOF ADDRESS, BUILDING ADDRESS, ETC. AS REQUIRED BY THE FIRE DEPARTMENT INSPECTOR. 12. PROVIDE MASTER KEY KNOX-BOX AT ENTRY OF EACH BUILDING AND SITE GATES AS REQUIRED BY THE FIRE DEPARTMENT INSPECTOR. LOCATIONS SHALL BE APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION. 13. IDENTIFICATION OF FIRE AND SMOKE SEPARATION WALLS SHALL BE IDENTIFIED PER CHAPTER 7 OF 2019 CBC. IDENTIFICATION SHALL BE REPEATED AT INTERVALS NOT EXCEEDING 30 FEET MEASURED HORIZONTALLY ALONG THE WALL OR PARTITION; AND INCLUDE LETTERING NOT LESS THAN .5 INCHES IN HEIGHT INCORPORATING THE SUGGESTED WORDING : " FIRE AND OR SMOKE BARRIER -PROTECT ALL OPENINGS," 1. PROVIDE ACCESS DOORS AND PANELS IN WALLS, CEILINGS, AND FLOORS AS REQUIRED BY INSTALLATION OF MECHANICAL, FIRE PROTECTION, ELECTRICAL, AND PLUMBING SYSTEMS IN ADDITION TO THOSE SHOWN ON THE DRAWINGS. CONTRACTOR SHALL SUBMIT PROPOSED LOCATIONS AND CUT SHEETS INDICATING FINISHES AND SIZES TO THE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. 2. CONTRACTOR SHALL VERIFY AND COORDINATE SIZE, LOCATION AND TYPE OF ALL MECHANICAL EQUIPMENT PLATFORMS AND BASES AS WELL AS POWER AND GAS/WATER/DRAIN INSTALLATIONS WITH MANUFACTURERS REQUIREMENTS PRIOR TO INSTALLATION OF EQUIPMENT AND PLATFORMS. CHANGES MADE TO ACCOMMODATE FIELD CONDITIONS OR CONTRACTORS SUBSTITUTIONS SHALL BE MADE AT THE CONTRACTOR'S EXPENSE. 3. WHERE RESTROOMS ARE PROVIDED, CONTRACTOR SHALL SUPPLY MECHANICAL VENTILATION TO ENSURE AIR CHANGES EVERY FIVE MINUTES PER CBC CHAPTER 12 AND TABLE 403.7 OF THE CMC. CHAPTER 5. 4. IN WAREHOUSE AREAS, A MINIMUM OF ONE AIR CHANGE EVERY HOUR SHALL BE PROVIDED VIA MECHANICAL SYSTEMS, OR ALTERNATELY VIA NATURAL VENTILATION AS PER 2019 CBC SECTION 1203.5. SEE ROOF PLAN AND MECHANICAL DRAWINGS. 1. THE BOTTOM 10" OF ALL DOORS (EXCEPT SLIDING DOORS OR DOORS THAT DO NOT EXTEND TO WITHIN 10" OF THE FLOOR / GROUND) SHALL HAVE A SMOOTH AND UNINTERRUPTED PANEL ON THE PUSH SIDE FOR OPENING, PER SECTION 11B-404.2.10. 2. CENTER OF ALL DOOR HARDWARE TO BE 34" MINIMUM TO 44" MAXIMUM ABOVE FLOOR. LATCHING AND LOCKING DOORS TO BE OPERABLE WITH A SINGLE EFFORT BY LEVER OR PUSH-PULL TYPE HARDWARE. 3. THE MAXIMUM EFFORT REQUIRED TO OPERATE A DOOR SHALL NOT EXCEED 5 POUNDS FOR EXTERIOR DOORS AND 5 POUNDS FOR INTERIOR DOORS WITH A PULL OR PUSH EFFORT BEING APPLIED AT RIGHT ANGLE TO HINGED DOORS AND AT THE CENTER PLANE OF SLIDING OR FOLDING DOORS. AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE ABOVE STANDARDS. WHEN FIRE RATED DOORS ARE UTILIZED, THE MAXIMUM EFFORT TO OPERATE THE DOOR MAY BE INCREASED TO 15 POUNDS WITH A CLOSURE DEVICE. 4. PROVIDE A 2" WIDE STRIP OF SLIP RESISTANT (EQUAL TO ADJACENT TREADS) MATERIAL IN CONTRASTING COLOR AT 1" FROM THE EDGE OF THE LOWEST TREAD AND AT THE UPPER APPROACH TO EACH RUN OF STAIRS. AT EXTERIOR STAIRS, USE PAINT FOR MARKING TREADS UNLESS NOTED OTHERWISE ON DRAWINGS. 5. FAUCET CONTROLS AND OPERATING MECHANISMS FOR DRINKING FOUNTAINS, KITCHEN SINKS, LAVATORIES, AND TOILET FIXTURES SHALL BE OPERABLE WITH ONE HAND NOT REQUIRING GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO OPERATE CONTROLS SHALL NOT EXCEED FIVE POUNDS. THE FLUSH VALVE ON ALL WATER CLOSETS SHALL BE LOCATED ON THE WIDE SIDE OF THE STALL. MAXIMUM HEIGHT OF FLUSH VALVES FOR ACCESSIBLE FIXTURE SHALL NOT EXCEED 44" A.F.F. THE ACCESSIBLE LAVATORIES, FAUCET CONTROLS AND OPERATING MECHANISMS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE FAUCET CONTROLS AND OPERATING MECHANISMS SHALL BE NO GREATER THAN 5 LBS. LEVER-OPERATED, PUSH-TYPE, AND ELECTRONICALLY CONTROLLED MECHANISMS ARE EXAMPLES OF ACCEPTABLE DESIGNS. SELF-CLOSING VALVES ARE ALLOWED IF THE FAUCET REMAINS OPEN FOR AT LEAST 10 SECONDS. 6. THE MAXIMUM SLOPE OF ANY DISABLED VEHICULAR PARKING STALL SHALL NOT EXCEED 1/4" (1:50) PER FOOT IN ANY DIRECTION. 7. LATCHING & LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL, SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, PANIC BARS, PUSH-PULL ACTIVATING BARS, OR OTHER HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. 8. ALL FLOOR SURFACES IN THE PATH OF TRAVEL SHALL BE SLIP RESISTANT. 9. DRINKING FOUNTAIN BUBBLERS SHALL BE ACTIVATED BY A MANUALLY OPERATED SYSTEM COMPLYING WITH SECTION 11B-602 THAT IS FRONT MOUNTED OR SIDE MOUNTED AND LOCATED WITHIN 6" OF THE FRONT EDGE OF THE FOUNTAIN OR AN ELECTRONICALLY CONTROLLED DEVICE. SPOUT OUTLETS SHALL BE 36" MAX. A.F.F. THE SPOUT SHALL BE LOCATED 15" MIN. FROM THE VERTICAL SUPPORT AND 5" MAX. FROM THE FRONT EDGE OF THE UNIT, INCLUDING BUMPERS. THE SPOUT SHALL PROVIDE A FLOW OF WATER AT LEAST 4" HIGH MIN. AND SHALL BE LOCATED 5" MAX. FROM THE FRONT OF THE UNIT. THE ANGLE OF THE WATER STREAM SHALL BE MEASURED HORIZONTALLY RELATIVE TO THE FRONT FACE OF THE UNIT. WHERE SPOUTS ARE LOCATED LESS THAN 3" FROM THE FRONT OF THE UNIT, THE ANGLE OF THE WATER STREAM SHALL BE 15 DEG. MAX. ON AN ACCESSIBLE DRINKING FOUNTAIN WITH A ROUND OR OVAL BOWL, THE SPOUT MUST BE POSITIONED SO THE FLOW OF WATER IS WITHIN 3" OF THE FRONT EDGE OF THE FOUNTAIN. 10. OBJECTS PROJECTING FROM WALLS (FOR EXAMPLE TELEPHONES) WITH THEIR LEADING EDGES BETWEEN 27" AND 80" ABOVE FINISH FLOOR SHALL PROTRUDE NO FURTHER THAN 4" INTO WALKS, HALLS, CORRIDORS, PASSAGEWAYS OR AISLES. OBJECTS MOUNTED WITH THEIR LEADING EDGES AT OR BELOW 27"ABOVE THE FINISH FLOOR MAY PROTRUDE ANY AMOUNT INTO WALKS, HALLS, CORRIDORS, PASSAGEWAYS, OR AISLES. FREE STANDING OBJECTS MOUNTED ON POSTS OR PYLONS MAY OVERHANG 12" MAXIMUM FROM 27" TO 80" ABOVE FINISHED FLOOR. PROTRUDING OBJECTS SHALL NOT REDUCE THE CLEAR WIDTH OF AN ACCESSIBLE ROUTE OR MANEUVERING SPACE. WALKS , HALLS, CORRIDORS, PASSAGEWAYS AISLES, OR OHER CIRCULATION SPACES SHALL HAVE 80 INCHES ABOVE THE WALKING SURFACE AS MEASURED FROM THE BOTTOM OF THE OBSTRUCTION. ANY OBSTRUCTION OVERHANGING A PEDESTRIAN WAY SHALL BE A MINIMUM OF 80" ABOVE THE WALKING SURFACE AS MEASURE TO THE BOTTOM OF THE OBSTRUCTION. 11. WHERE A GUY SUPPORT IS USED PARALLEL TO A PATH OF TRAVEL, INCLUDING, BUT NOT LIMITED TO SIDEWALKS, A GUY BRACE, SIDEWALK GUY OR SIMILAR DEVICE SHALL BE USED TO PREVENT AN OVERHANGING OBSTRUCTION AS DEFINED. 12. DETECTABLE WARNING SURFACES, MEASURING 36" IN THE DIRECTION OF TRAVEL, COMPLYING WITH SECTION 11B-705, MUST BE PROVIDED ANYWHERE AN ACCESSIBLE PATH OF TRAVEL CROSSES OR ADJOINS A VEHICULAR WAY AND THE WALKING SURFACES ARE NOT SEPARATED BY CURBS, RAILING OR OTHER ELEMENTS BETWEEN THE PEDESTRIAN AREAS AND THE VEHICULAR AREAS. 13. THE HIGHEST OPERABLE PART OF ALL CONTROLS , DISPENSERS, RECEPTACLES AND OTHER OPERABLE EQUIPMENT SHALL BE INSTALLED AT AN ACCESSIBLE LOCATION MEETING THE CLEARANCES AND REACH RANGE REQUIREMENTS OF SECTION 11B-308 & 309 AND NOT LESS THAN 15" ABOVE THE FLOOR OR WORKING PLATFORM. THE CENTER OF 15, 20 & 30 AMP RECEPTACLE OUTLETS SHALL BE NOT LESS THAN 15" ABOVE THE FINISHED FLOOR OR WORKING PLATFORM. 14. THE CENTER OF THE GRIP OF THE OPERATING HANDLE OF CONTROLS OR SWITCHES INTENDED TO BE USED BY THE OCCUPANT OF THE ROOM OR AREA TO CONTROL LIGHTING AND RECEPTACLE OUTLETS, APPLIANCES, OR COOLING , HEATING AND VENTILATING EQUIPMENT SHALL BE 48" ABOVE THE FLOOR OR WORKING PLATFORM. IN CONFORMANCE WITH CBC 11B-308 & 309. 15. THE CENTER OF THE ELECTRICAL RECEPTACLE OUTLETS OR BRANCH CIRCUITS OF 30 AMPERES OR LESS SHALL BE INSTALLED NOT MORE THAN 48 INCHES NOR LESS THAN 14 INCHES ABOVE THE FLOOR OR WORKING PLATFORM. 16. SIGNS: VISUAL CHARACTERS ON SIGNS SHALL BE SELECTED FROM FONTS WHERE THE WIDTH OF THE UPPERCASE LETTER "O" IS 60% MIN. AND 110% MAX. OF THE HEIGHT OF THE UPPERCASE LETTER "I". STROKE THICKNESS OF THE UPPERCASE LETTER "I" SHALL BE 10% MIN. AND 20% MAX. OF THE HEIGHT OF THE CHARACTER. 17. SIGNS: RAISED CHARACTERS AND PICTORIAL SYMBOLS ON SIGNS SHALL BE SELECTED FROM FONTS WHERE THE WIDTH OF THE UPPERCASE LETTER "O" IS 60% MIN. AND 110% MAX. OF THE HEIGHT OF THE UPPERCASE LETTER "I". STROKE THICKNESS OF THE UPPERCASE LETTER "I" SHALL BE 15% MAX. OF THE HEIGHT OF THE CHARACTER. 18. SIGNS: CONTRACTED GRADE II BRAILLE: DOTS SHALL BE 1/10" ON CENTERS IN EACH CELL WITH 2/10" SPACE BETWEEN CELLS, MEASURED FROM THE SECOND COLUMN OF DOTS IN THE FIRST CELL TO THE FIRST COLUMN OF DOTS IN THE SECOND CELL. DOTS SHALL BE RAISED A MINIMUM OF 1/40" ABOVE THE BACKGROUND, AND ARE TO BE ROUNDED, NOT SQUARE DOTS. 1. ALL EXTERIOR DOORS AND DOORS LOCATED IN A THERMAL ENVELOPE SHALL BE FITTED WITH AN ASTRAGAL, SEAL OR BAFFLE AT THE HEAD, JAMB AND SILL. 2. MEETING RAILS OF SECTIONAL DOORS AND MEETING STILES OR RAILS OF BI-PARTING DOORS SHALL BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE. 3. DOOR JAMBS MOUNTED ON AN EXTERIOR WALL SHALL LAP THE ADJACENT WALL A MINIMUM OF ONE INCH ON BOTH THE INTERIOR AND EXTERIOR SIDE. 4. DOORS REQUIRING A VERTICAL TRACK GUIDE SHALL USE A CONTINUOUS MOUNTING ANGLE SEALED. 5. EXTERIOR BUILDING PANEL JOINTS, AROUND WINDOW AND DOOR FRAMES, BETWEEN WALLS AND FOUNDATIONS, AT PENETRATIONS OF UTILITY SERVICES THROUGH WALLS AND FLOORS, AND ALL OTHER OPENINGS BETWEEN CONDITIONED AND UNCONDITIONED SPACES SHALL BE SEALED, CAULKED, GASKETED OR WEATHER STRIPPED TO LIMIT AIR PENETRATION. BUILDING PANEL JOINTS, WINDOWS, AND UTILITY PENETRATIONS SHALL BE CAULKED AT BOTH THE EXTERIOR AND INTERIOR SIDE OF THE JOINT. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING TO THE BUILDING OFFICIAL, FOR REVIEW AND APPROVAL, DRAWINGS AND CALCULATIONS PREPARED BY A STATE LICENSED PROFESSIONAL ENGINEER, OF THE FOLLOWING ITEMS: 1. AUTOMATIC FIRE SPRINKLER SYSTEM PER NFPA 13 2. FIRE ALARM SYSTEM. 3. ROOF TRUSS SYSTEM. 4. STOREFRONT WIND LOAD CALCULATIONS (ONLY WHEN REVIEW IS REQUIRED BY LOCAL JURISDICTION). 5. ROOF TOP SOLAR PV SYSTEMS (IF INCLUDED WITH DESIGN). 6. HIGH PILE STORAGE AND RACKING (IF INCLUDED WITH DESIGN). 7. GUARD BOOTH (IF INCLUDED WITH DESIGN). 8. GATE AND FENCES. 9. OTHER DOCUMENTS WHEN REQUESTED BY THE BUILDING OFFICIAL OR FIRE MARSHALL. THE DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT OR ENGINEER OF RECORD WHO SHALL REVIEW THEM AND MARK THEM WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND THAT THEY HAVE BEEN FOUND TO BE IN GENERAL CONFORMANCE WITH THE DESIGN OF THE BUILDING. THE GENERAL CONTRACTOR SHALL SUBMIT THEM TO THE BUILDING OFFICIAL. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. 1. THE ARCHITECT SHALL NOT HAVE CONTROL OVER OR CHARGE OF AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, SINCE THESE ARE SOLELY THE CONTRACTOR'S RESPONSIBILITY UNDER THE CONTRACT FOR CONSTRUCTION. THE FOLLOWING IS A LIST OF SAFETY ISSUES TO BE REVIEWED BY THE CONTRACTOR PRIOR TO THE START OF THE WORK. THIS LIST IS NOT INTENDED TO BE A COMPLETE LIST OF RELEVANT SAFETY ISSUES. OBSERVATION VISITS PERFORMED BY THE ARCHITECT SHALL NOT INCLUDE REVIEW OF THE FOLLOWING ITEMS: A. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE AND DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE DESIGN ADEQUACY AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND HAS NOT BEEN CONSIDERED BY THE ARCHITECT OR HIS CONSULTANTS. THE CONTRACTOR IS RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE DURING ALL PHASES OF CONSTRUCTION. B. CONTRACTOR SHALL DETERMINE ALL PHASES OF WORK WHICH REQUIRE AN ERECTION PLAN ACCORDING TO ALL APPLICABLE SAFETY REGULATIONS. A CERTIFIED COPY OF SUCH ERECTION PLANS SHALL REMAIN ON THE CONSTRUCTION SITE AT ALL TIMES. 3. TEMPORARY LOADING DURING CONSTRUCTION SHALL NOT OVERLOAD DESIGN VALUES. CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL TRADES OF SUCH VALUES PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR SHALL PROVIDE MOUNTED VISIBLE SIGNAGE INDICATING THE DESIGN LOADS IN ALL SPACES AS REQUIRED BY APPLICABLE SAFETY REGULATIONS. THE FINAL OCCUPANT OF THE BUILDING SHALL BE RESPONSIBLE FOR NOT EXCEEDING THESE LIMITS FOLLOWING COMPLETION OF THE PROJECT. 4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE IF A CAL-OSHA PERMIT IS REQUIRED FOR ANY PART OF THE WORK, AND TO OBTAIN SUCH PERMIT SHOULD IT BE REQUIRED. 5. LACK OF A GUARDRAIL AT BUILDING PARAPETS, FLOOR OPENINGS, AND ROOF OPENINGS MAY NOT MEET CURRENT LABOR CODES FOR A SPACE WHICH MAY BE OCCUPIED. THE ARCHITECT RECOMMENDS THE USE OF GUARDRAILS AT ALL SUCH CONDITIONS. SHOULD GUARDRAILS NOT BE INSTALLED, THE OWNER SHALL ACCEPT FULL RESPONSIBILITY. IN ADDITION, THE CONTRACTOR SHALL PROVIDE CLEARLY LEGIBLE SIGNAGE AT THESE LOCATIONS STATING "CAUTION -NO GUARDRAIL." 6. ALL TEMPORARY FLOOR AND ROOF OPENINGS LACKING GUARDRAILS SHOULD BE ADEQUATELY PROTECTED DURING CONSTRUCTION. 7. CONTRACTOR SHALL VERIFY THAT ALL INSTALLED SKYLIGHTS HAVE BEEN DESIGNED TO WITHSTAND THE MINIMUM LOADS AS SPECIFIED IN THE CBC. 8. MATERIALS USED IN THIS DESIGN MAY BE HAZARDOUS TO ONE HEALTH. THE CONTRACTOR AND OWNER SHALL ACCEPT ALL RESPONSIBILITY FOR SUCH MATERIALS AND SHALL POST SIGNAGE WARNING OF SUCH MATERIALS WHERE REQUIRED BY LAW PRIOR TO PROJECT OCCUPANCY. 9. THE CONTRACTOR, DURING CONSTRUCTION, AND THE OWNER, DURING OCCUPANCY, SHALL ASSUME FULL RESPONSIBILITY FOR PROPER ROOF MAINTENANCE TO INSURE PROPER ROOF DRAINAGE AT ALL TIMES. RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A0-2 GENERAL NOTES MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver GENERAL NOTES:FIRE PROTECTION NOTES: ENERGY NOTES: SAFETY NOTES: DISABLED ACCESS NOTES: DEFERRED APPROVALS: MECHANICAL AND ELECTRICAL NOTES: ABBREVIATIONS MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL 42433 APN # 909-290-001 PA20-0533 BP20-4793 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A0-3 CAL GREEN NOTES MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL 42433 APN # 909-290-001 PA20-0533 BP20-4793 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A0-4 CAL GREEN NOTES MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL 42433 APN # 909-290-001 PA20-0533 BP20-4793 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A0-5 CAL GREEN NOTES MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL 42433 APN # 909-290-001 PA20-0533 BP20-4793 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A0-6 CONDITIONS OF APPROVAL MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL PC1 04/16/21 PLAN CHECK COMMENTS 42433 APN # 909-290-001 PA20-0533 BP20-4793 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A0-7 CONDITIONS OF APPROVAL MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver MARK DATE DESCRIPTION PC1 04/16/21 PLAN CHECK COMMENTS FIRE DEPARTMENT NOTES -NCOME FIRE DEPARTMENT NOTES -TENANT IMPROVEMENT APN # 909-290-001 PA20-0533 BP20-4793 1. SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION REGARDING SITE DRAINAGE, TOPOGRAPHY AND UTILITIES. 2. UNLESS NOTED OTHERWISE, SHADED AREAS REPRESENT PROPOSED LANDSCAPE WITHIN PROJECT BOUNDARIES AND ALONG STREET FRONTAGE - SEE LANDSCAPE DRAWINGS FOR ADDITIONAL DATA. PROVIDE PROTECTIVE 6" X 6" (MIN) CONCRETE CURBING FOR ALL PLANTERS ADJACENT TO AREAS INTENDED FOR VEHICLE PARKING OR TRAVELING AND ALL PAVED AREAS. 3. NO EXTERIOR TENANT SIGNAGE IS PROPOSED FOR THE PROJECT AS PART OF THIS PERMIT APPLICATION. 4. FOR PAVING SECTIONS, CONCRETE CURBS, SWALES, AND GUTTERS SEE CIVIL DRAWINGS. 5. ALL DIMENSIONS ARE TO FACE OF CONCRETE CURB, FACE OF CONCRETE PANEL, OR TO GRIDLINE U.N.O. 6. PAINT CURBS AND PROVIDE POSTED SIGNAGE TO INDICATE FIRE LANES PER FIRE DEPARTMENT (FIELD INSPECTOR) REQUIREMENTS - SEE ADJACENT FIRE NOTES. CONTRACTOR TO COORDINATE FINAL LOCATIONS IN FIELD WITH FIRE INSPECTOR. WHERE CURBS ARE PAINTED, PROVIDE ROLLED PRIMER COAT PRIOR TO FINISH COAT. 7. ALL AUTO PARKING STALLS SHALL BE STRIPED PER CITY STANDARDS. CONTRACTOR SHALL CONFIRM FINAL STRIPING CONFIGURATION WITH CURRENT CITY STANDARDS PRIOR TO PAINTING. SEE SPECIFIC DETAILS FOR ACCESSIBLE STALL DIMENSIONS. 8. WHEN DIRECTLY IN FRONT OF AUTO STALLS IN OVERHANG AREA, PLANT TREES AND LOCATE LIGHT STANDARDS CENTERED BETWEEN STALLS. 9. PROVIDE ROOT BARRIERS IN LANDSCAPE AREAS WHERE LESS THAN FIVE FEET IN WIDTH U.N.O. ON LANDSCAPE DRAWINGS OR PER CITY STDS. GENERAL NOTES 10. PROVIDE GUARD POSTS AT ALL FIRE HYDRANTS AND P.I.V.'S PER LOCAL ORDINANCES, FIRE PROTECTION DRAWINGS AND PER ARCHITECTURAL DETAILS. 11. PROVIDE A KNOX BOX KEY ACCESS AT THE PRIMARY BUILDING ENTRANCES AND AT ALL SITE GATES TO BE INSTALLED PER FIRE DEPARTMENT RECOMMENDATIONS. (THE NUMBER OF KNOX BOXES REQUIRED FOR EACH BUILDING SHALL BE DETERMINED BY THE FIRE DEPARTMENT PENDING FIELD INSPECTION). ARCHITECT SHALL BE CONSULTED REGARDING LOCATION PRIOR TO INSTALLATION. 12. WALK SURFACES WITH A SLOPE OF LESS THAN 5% GRADIENT SHALL HAVE A MEDIUM BROOM OR EXPOSED AGGREGATE FINISH WITH A SLIP RESISTANCE EQUAL TO A MED. SALT FINISH U.N.O. WALK SURFACES WITH A SLOPE OF GREATER THAN 6% GRADIENT SHALL BE SLIP RESISTANT PER DISABLED ACCESS STANDARDS. ACCESSIBLE WALK CROSS SURFACE SLOPES SHALL NOT EXCEED 1/4" PER FOOT OR 2%. 13. ANY ABRUPT LEVEL CHANGES SHALL BE LESS THAN OR EQUAL TO 1/2" ALONG ANY ACCESSIBLE ROUTE OF TRAVEL. WHEN CHANGES DO OCCUR, THEY SHALL BE BEVELED WITH A SLOPE OF LESS THAN OR EQUAL TO 1:2. LEVEL CHANGES OF 1/4" MAX MAY BE VERTICAL. IF LEVEL CHANGES ARE GREATER THAN 1/2", THEY MUST COMPLY WITH THE REQUIREMENTS OF CURB RAMPS. 14. CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING THE SOILS REPORT AND FOLLOWING IT'S RECOMMENDATIONS FOR EXCAVATIONS. 15. ALL UNDERGROUND PIPING SUBJECT TO CORROSIVITY SHALL BE WRAPPED WITH PROTECTIVE COATINGS PER SOILS & CORROSIVITY REPORT RECOMMENDATIONS. 16. PROPERTY LINE MEETS & BOUNDS WHICH MAY BE SHOWN ON THIS DRAWING ARE FOR REFERENCE ONLY. REFER TO CIVIL DRAWINGS. 17. FRONTAGE USED FOR ALLOWABLE AREA INCREASES PER CBC SECTION 506.2 SHALL BE PERMANENTLY MAINTAINED. 1 2 11 3 8 17 16 9 33 37 12 30 24 23 36 6'-0" 6'-0"10'-3" 6 36 4 5 RAMP SLOPE 1:12 MAX 10 13 15 15 17 17 18 17 20 21 26 25 27 28 29 37 14 ' - 0 " 3' - 0 " 1' - 6 " 84 ' - 2 " 41 ' - 0 " 1 ' - 6 " 26'-0" 14'-0" 35 38 35 19 3'-0" 9'-0" 12'-0" 4'-0" 3' - 0 " 39 18'-0"6'-0" 2'-0" 4'-6" 76'-0" NEW INDUSTRIAL BUILDING 13,294 SF CONSTR. TYPE: IIIB - FULLY SPRINKLERED OCCUPANCY: S1/B CLEAR HEIGHT: 20'-0" CLR 5'-0" MIN. SETBACK 89'-0 (VARIABLE) ZONING: PUBLIC INSTITUTIONAL ZO N I N G : I P - I L ZONING: IP-IL AVENIDA ALVARADO 24'-0" 24'-0" 19 5 ' - 0 " 7' - 6 " 5'-8" 22'-2" SE T B A C K 2 0 ' - 0 " M I N . 21 ' - 7 " 5'-0" MIN. SETBACK 40'-8" (VARIABLE) 5'-0" MIN SETBACK 10 ' - 6 " 33 ' - 4 " 79'-0" 6'-11" 18'-0" 23 23 5' - 6 " 9' - 0 " 42 50'-0"15'-0" 60'-0" 60'-0" 20'-0" R 28 ' - 0" R 2 8' - 0" ON SITE FIRE DEPARTMENT ACCESS LANE 22 5 ' - 0 " 28 28 20'-0" 20 ' - 0 " 1. NEW TYPE III B CONCRETE TILT UP BUILDING. 2. PROPOSED CURB CUT AND DRIVEWAY APPROACH PER CITY / COUNTY STANDARDS. PROVIDE 40'-0" MIN. ENHACED PAVING AT SITE ENTRANCE SEE CIVIL AND LANDSCAPE FOR IMPROVEMENTS. 3. CONSTRUCT NEW MEDIUM BROOM FINISH CONCRETE SIDEWALK: MIN. 4" THK. 2500 PSI W/ #3 BARS @ 18" O.C. EA. WAY, OR GRADE 80, 18X18 - D8.3 X D8.3 WELDED WIRE FABRIC EQUIVALENT, OVER 95% COMPACTED 12" SUBGRADE. PROVIDE CONTROL / CONSTRUCTION JOINTS @ MAX. 5'-0" O.C. EA. WAY. SEE LANDSCAPE DRAWINGS FOR ADDITIONAL INFORMATION REGARDING CONTROL JOINT PLACEMENT AND ACCENT FINISHES. 4. ACCESSIBLE PARKING STALL COMPLIANCE SIGNAGE AT DRIVEWAY ENTRANCES INTO SITE. SEE DETAIL 5-D/AD-1. 5. SHADED AREA: FULLY IRRIGATED LANDSCAPING BOUNDED BY 6" CONCRETE CURB. SEE LANDSCAPE DRAWINGS. 6. NEW ACCESSIBLE PATH OF TRAVEL FROM STALLS & PUBLIC WAY TO PRIMARY ENTRANCE. SEE CIVIL DRAWINGS. SURFACE SLOPE NOT TO EXCEED 1:20 EXCEPT AT CURB RAMPS AND OTHER DEFINED RAMPS. SEE DETAIL 7/AD-1 FOR TYPICAL CURB RAMP REQUIREMENTS. SEE GENERAL NOTES ON THIS SHEET FOR ADDITIONAL DATA. SEE LANDSCAPE DRAWINGS FOR ADDITIONAL INFORMATION REGARDING ACCENT FINISHES AT ALL DRIVE AISLE CROSSINGS. 7. ACCESSIBLE PATH OF TRAVEL DIRECTIONAL SIGNAGE MOUNTED AT 24" ABOVE GRADE. SEE DETAIL 5-A/AD-1 WHERE INDICATED. 8. PRIMARY BUILDING ENTRANCE - ACCESSIBLE PER ADA & T-24 GUIDELINES. PROVIDE SIGNAGE PER DETAIL 2/AD-1. 9. NEW ON-SITE FIRE HYDRANT. PROVIDE GUARDPOSTS PER FIRE DEPARTMENT STANDARDS. SEE DETAIL 2/AD-4. 10. . PROPOSED ONSITE LIGHT POLE ON CONCRETE BASE PER DETAIL 14/AD-4. OUTDOOR LIGHTING SYSTEMS SHALL BE DESIGNED AND INSTALLED TO COMPLY WITH ALL THE FOLLOWING: - THE MIN. REQUIREMENTS IN THE CALIF. ENERGY CODE FOR LIGHTING ZONES 1-4 - BACKLIGHT, UPLIGHT AND GLARE (BUG) RATINGS AS DEFINED IN IESNA TM-15-11 - ALLOWABLE BUG RATINGS NOT EXCEEDING THOSE SHOWN ON TABLE 5.106.8 11. CONCRETE TRUCKING APRON: MIN. 6" THK., 3,000 PSI UNREINFORCED 0/ 95% COMPACTED SUBGRADE PER SOILS REPORT. PROVIDE CONTROL/CONSTRUCTION JOINTS @ MAX. 15'-0" O.C. MAX EA. WAY. ALIGN JOINTS W/ BUILDING WALL JOINTS WHERE POSSIBLE. PROVIDE LIGHT BROOM FINISH. SEE CIVIL DRAWINGS & STRUCTURAL. 12. . AC PAVING O/ CRUSHED BASE MATERIAL. SEE CIVIL DRAWINGS & SOILS REPORT. AC FINISH TO HAVE A FINE SMOOTH FINISH WITH NO COLD JOINTS. - ADD ALTERANET FOR 100% CONCRETE PAVING IN ALL CAR AND TRUCK PARKING AREAS. 13. . TRANSFORMER AND VAULT. SEE APPROVED EDISON DRAWINGS FOR FINAL LAYOUT. COORDINATE VAULT & CABLE TRENCH / CONDUIT SWEEPS WITH FOOTING DETAILS. PROVIDE BOLLARDS AS REQUIRED. 14. UNLESS SHOWN OTHERWISE, PROVIDE MIN. 5' SQ CONCRETE LANDING W/ 2% MAX SLOPE IN ANY DIRECTION AT ALL BUILDING EXIT DOORS. AT LANDINGS WITH MORE THAN ONE RISER, PROVIDE HANDRAILS PER DETAIL SHEET AD-1. 15. INTERIOR ROOF DRAIN TO EXIT BUILDING BELOW FLOOR SLAB AND EXTEND TO FACE OF CURB. OVERFLOW DRAIN TO DAYLIGHT THROUGH CONCRETE PANEL @ 15" A.F.G. SEE DETAILS 7/AD-4 AND 8/AD-4. SEE CIVIL DRAWINGS. 16. PAINTED 6' HIGH CONCRETE TILT-UP TRASH & RECYCLABLES STORAGE ENCLOSURE. PROVIDE SOLID ROOF COVERING. REFER TO AD-4 FOR GATE DETAILS. PROVIDE SIGNAGE ON TRASH ENCLOSURE "DO NOT DUMP HAZARDOUS MATERIALS HERE". 17. TYPICAL STANDARD PARKING STALL 9' X 18' U.N.O. - DOUBLE STRIPE PER CITY STANDARDS. SEE DETAIL 11/AD-1. WHERE NOTED AT E.V. STALLS, PROVIDE CONDUIT STUBBED AND CAPPED IN LANDSCAPE FOR FUTURE ELECTRIC VEHICLE CHARGER. SEE ELECTRICAL DRAWINGS. 18. EXTERIOR GALVANIZED BICYCLE RACKS, ONE RACK TO ACCOMODATE 2 BICYCLES. SEE DETAIL 15/AD-4. 19. PUBLIC SIDEWALK AND STREET FRONTAGE LANDSCAPING . SEE CIVIL / LANDSCAPE DRAWINGS FOR ADDITONAL INFO. 20. SANITARY SEWER LINE POC - SEE CIVIL AND PLUMBING DRAWINGS. 21. DOMESTIC WATER LINE POC - SEE CIVIL AND PLUMBING DRAWINGS. 22. LANDSCAPE CONTROLLER. SEE LANDSCAPE DRAWINGS. CONTRACTOR TO COORDINATE OUTLET REQUIREMENTS FOR CONDITIONS AS REQUIRED. SEE ELECTRICAL DRAWING. 23. 8'-0 HIGH BLACK TUBULAR STEEL FENCE PER DETAIL 6/AD-4. 24. MONUMENT SIGN. G.C. TO COORDINATE LANDSCAPE AND ELECTRICAL CONDUITS. LOCATION T.B.D. 25. ACCESSIBLE PARKING STALL PER DETAIL 10/AD-1. REFER DETAIL 5/AD-1 FOR CORRESPONDING SIGNAGE. 26. PRE-CAST CONCRETE WHEEL STOP PER DETAIL 12/AD-1. 27. EMPLOYEE BREAK AREA / ENTRANCE ACCENT PAVING. REFER TO LANDSCAPE DWGS. 28. 24'-0 FIRE ACCESS LANE AND FIRE DEPARTMENT HAMMERHEAD. PROVIDE FIRE LANE IDENTIFICATION "NO PARKING - FIRE LANE" AND RED CURB PAINT AS REQUIRED. 29. PROPERTY LINE. 30. EXISTING EASEMENT - REFER TO CIVIL DWGS. 31. EXISTING PL TO BE REMOVED 32. BI PARTING SLIDING GATE / TELESCOPIC GATE - PER PLAN. PROVIDE KNOX BOX FOR FIRE DEPARTMENT ACCESS G.C. 33. PROVIDE 8' HIGH ROLLING/SWING GATES AS SHOWN ON SITE PLAN. ALL SITE GATES WILL HAVE KNOX BOXES TO ALLOW FOR FIRE DEPARTMENT ACCESS. GATES SHALL PROVIDE 80% OPACITY. SUBMIT DETAILED SHOP DRAWINGS AND STRUCTURAL CALCULATIONS FOR APPROVAL. PROVIDE CONDUIT FOR FUTURE GATE MOTORS AND COMMUNICATIONS. 34. DOUBLE CHECK DETECTOR VALVE. 35. SITE RETAINING WALL. REFER TO CIVIL AND STRUCTURAL DWGS. 36. KNOX BOX FOR FIRE RISER ROOM ACCESS @ 6'-0 AFF PLACED ON THE RIGHT SIDE OF THE DOOR. 37. 18" CONCRETE STEP OUT ADJACENT TO PARKING STALL. 38. WATER QUALITY BASIN PER CIVIL DWGS. 39. EXTERIOR FURNITURE PER LANDSCAPE DWGS. 40. 42" FALL PROTECTION REAILING ADJACENT TO WATER QUALITY BASIN. 41. DRAINAGE EASMENT - SEE CIVIL DWGS. 42. ROLLED CURB. RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A1-0 SITE PLAN MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver KEYNOTES 0'40'80'160'20'10' 3/32" = 1'-0"1 SITE PLAN 000 MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL PC1 04/16/21 PLAN CHECK COMMENTS 42433 APN # 909-290-001 PA20-0533 BP20-4793 1. PAINTED CONCRETE TILT-UP WALL PANEL. PAINT INTERIOR WAREHOUSE WALLS, INTERIOR AND EXTERIOR ELECTRICAL ROOM WALLS, WITH ONE COAT (TO COVER) DUNN-EDWARDS WHISPER WHITE WITH MOLD INHIBITING ADDITIVE. SUBMIT COLOR SAMPLE FOR APPROVAL. 1A. PROVIDE 2HR FIRE RATED CAULKING AT CONCRETE TILT-UP WALLS WHERE PROPERTY LINE IS LESS THAN 15' TO FACE OF WALL. 2. ACCESSIBLE PRIMARY ENTRANCE. PROVIDE 5' MIN. DEEP LEVEL CONCRETE LANDING W/ MAX. CROSS SLOPES NOT EXCEEDING 1/4" PER FOOT. PROVIDE INTERNATIONAL SYMBOL OF ACCESSIBILITY PER CBC CHAPTER 11B DIVISION 7, SECTIONS 11B-703.2 THRU 703.7.2 AND CBC SECTION 1011. THE SIGNAGE SHALL BE LOCATED ADJACENT TO THE LATCH SIDE OF THE SINGLE DOOR AND RIGHT SIDE OF THE DOUBLE DOORS. SEE DETAIL 2/AD-1 REQUIRED ADA SIGNAGE, AND PROVIDE "NO SMOKING" SIGNS PER DETAIL 4/AD-1. 3. GLAZING SET IN OFFSET ALUMINUM STOREFRONT SYSTEM -SEE ELEVATIONS. 4. BURNISHED HARD STEEL TROWEL FINISHED FLOOR SLAB: 7" THK. 4,000 PSI, REINFORCING PER STRUCT. PROVIDE SLAB O/ 95% COMPACTED SUBGRADE SOILS (AS APPROVED BY GEOTECHNICAL ENGINEER). SLAB CURING TO BE A MINIMUM SEVEN DAYS OF WET CURE WITH BURLEEN BLANKETS. SEAL SLAB W/ LAPIDOLITH SEALER PER MANUF. REPAIR ALL NAIL HOLES AND CHIPS IN SLAB WITH EPOXY SYSTEM. CLEAN OUT ALL JOINTS AT END OF JOB -SEE GENERAL NOTES. FLOOR FLATNESS / LEVELNESS: OVERALL VALUES: OAFF-50 / OAFL-35 MIN. LOCAL VALUES: MLFF-30 / MLFL-21 BID ALTERNATE: MM80 FOR ENTIRE BUILDING. CHEMICAL SLAB CURING COMPOUND. 5. PROVIDE MIN. 15 MIL VAPOR BARRIER AT HATCH AREA AS INDICATED. 6. STRUCTURAL STEEL ROOF COLUMN. BOTTOM 12'-0" OF THE COLUMN TO BE PAINTED TWO (2) COATS LATEX “HAZARD” YELLOW PAINT. BOTTOM 12'-0" OF COLUMNS THAT HAVE FIRE EXTINGUISHER WILL BE PAINTED RED. 7. 12' W X 15' H GRADE LEVEL ROLL-UP DOOR ASSEMBLY. ENSURE TRACKS PROVIDE 1’CLEARANCE BETWEEN BOTTOM OF DOOR AND TOP OF OPENING PER DETAIL 9/AD-5. PROVIDE (1) 24" X 6" VISION PANELS OR EQUAL. DOOR TO BE 20 GAUGE MIN. STANDARD GRADE, PRE-FINISH WHITE WITH WEATHER STRIPPING ALL FOUR SIDES. PROVIDE 6”CONCRETE FILL BOLLARD ON EACH SIDE OF THE DOOR JAMB. PROVIDE MIN. 5’-0”H GALVANIZED 3/16”BENT METAL PLATE AT EACH SIDE OF ALL GRADE LEVEL DOORS, PAINTED TO MATCH BUILDING PER DETAIL 10/AD-5. PROVIDE 4'-0" HIGH STEEL "Z" CHANNEL PROTECTION AT EACH DOOR TRACK. CONFORM TO LOCAL WIND LOAD REQUIREMENTS. 8. 9' W X 10' H DOCK HIGH MANUAL VERTICAL LIFT DOOR ASSEMBLY. PROVIDE (1) 24" X 6" VISION PANELS OR EQUAL. DOOR TO BE 24 GAUGE MIN. STANDARD GRADE, PRE-FINISH WHITE WITH WEATHER STRIPPING ALL FOUR SIDES. PROVIDE MIN. 5’-0”H GALVANIZED 3/16”BENT METAL PLATE AT EACH SIDE OF ALL GRADE LEVEL DOORS, PAINTED TO MATCH BUILDING PER DETAIL 10/AD-5. PROVIDE 4'-0" HIGH STEEL "Z" CHANNEL PROTECTION AT EACH DOOR TRACK. CONFORM TO LOCAL WIND LOAD REQUIREMENTS. 9. 3'W X 7'H (U.N.O.) PAINTED SELF-CLOSING HOLLOW METAL MAN DOOR. ALL EXIT DOORS SHALL HAVE A MINIMUM 5'-0" SQ. CLEAR AND LEVEL CONCRETE LANDING W/ MAX. CROSS SLOPES NOT EXCEEDING 1/4" PER FOOT. SEE DETAIL 14/AD-1 FOR CLEAR LANDING DIMENSIONS. SEE DETAIL 3/AD-1 FOR TACTILE EGRESS SIGN REQUIREMENTS. 10. FUTURE 7' X 8' DOCK LEVELER PIT -SEE STRUCTURAL DRAWINGS FOR POUR STRIP DIMENSIONS. TYPICAL AT ALL DOCK DOORS. 11. INTERIOR ROOF DRAIN / OVERFLOW DRAIN TO EXIT THE BUILDING THROUGH THE TILT-UP WALL AND EXTEND TO THE FACE OF CURB OR STORM DRAIN. NO ROOF DRAINS OR OVERFLOW DRAINS SHALL OUTLET INTO LANDSCAPE. SEE SITE PLAN AND DETAILS 15/AD-2, 7/AD-4 AND 8/AD-4. 12. NOT USED. KEYNOTES 26. GYP. BOARD FURRING O/ EXISTING CONCRETE WALL. SEE WALL LEGEND AND DETAIL 2/AD-2. INSULATION EXTENDES FROM F.F TO UNDERSIDE OF ROOF DECK. 27. NEW SUSPENDED T-BAR CEILING SYSTEM @ 10'-0" A.F.F. U.N.0. -SEE CEILING LEGEND ON SHEET A2-2 AND DETAIL 14/AD-2. 28. 5/8" GYPSUM BOARD HARDLID CEILING AT 9'-0" A.F.F. U.N.O. -SEE CEILING LEGEND. WHERE RATED ENCLOSURE IS NOTED, PROVIDE 5/8" THK. GYP. BOARD BOTH SIDES OF CEILNG JOISTS. SPRINKLERS LOCATED IN GYP. BOARD CEILINGS TO BE A RECESSED TYPE HEAD. 29. WALL BRACING AT WALLS WITHOUT CEILING JOISTS AS SPECIFIED IN STRUCTURAL DWGS. SEE DETAILS 18/AD-2 AND 19/AD-2. 30. NEW HVAC PACKAGE UNITS ON ROOF W/ FACTORY CURBS PER MECHANICAL DRAWINGS. LEVELING PLATFORM AND STRUCTURAL FRAMING PER SHELL DRAWINGS. SEE DETAIL 15 & 18,SHEET AD-1. 31. PROVIDE R-19 BATT INSULATION UNDERSIDE OF ROOF/MEZZANINE DECK. INSULATION ON TOP OF THE T-BAR IS NOT AN ACCEPTABLE SUBSTITUTE. 32. PATCH AND REPAIR EXISTING PRECAST PANELS TO REMAIN EXPOSED IF REQUIRED WITHIN THE T.I. SCOPE. APPLY SCRATCH COAT AND PAINT PER FINISH SCHEDULE. TYP. 33. PROVIDE 6" WALL BASE B-2 AT WALL ON WAREHOUSE SIDE. SEE FINISH SCHEDULE FOR SPECIFICATION. 34. PARTITION OR BEARING WALL PER WALL LEGEND. 35. PROVIDE SINGLE FULL HEIGHT SIDELITE BY TIMELY W/ 1/4" VISION GLASS. SEE GENERAL NOTE C FOR TEMEPERED GLASS REQUIRMENTS. 36. INTERIOR STOREFRONT GLAZING SYSTEM -2" X 4-1/2" CLEAR ANNODIZE FINISH, CENTER -SET CLEARED TEMPERED 1/4" THK GLASS. PROVIDE PAINTED / CASED GYP. BOARD OPENINGS AT JAMB ABD HEAD. PROVIDE CONT. HEADER FOR POSITIVE CONNECTION AT TOP OF STOREFRONT. GC TO FIELD VERIFY ALL DIMENSIONS AND PROVIDE SHOP DWG SUBMITTALS FOR EACH OPENING PRIOR TO CONSTRUCTION. USE CRL 487 SERIES OR SIMILAR. 37. MECHANICAL DUCT DOWN FROM ROOF. 38. NON ASBORBENT INTERIOR FLOOR FINISH PER CGBC 2019 REQUIREMENTS. 39. FLOOR FINISH TRANSITIONS BY SCHLUTER. SIZE TO MATCH FLOORING THICKNESSES. 40. PROJECTION OF GYP. BD. SOFFIT ABOVE. SEE DETAIL 2/AD-6. 41. SCHEDULED DOOR. REFER TO SHEET A5-1. 42. CONTRACTOR TO REVIEW CONDITIONS FOR PLACEMENT OF FIRE EXTINGUISHERS. PROVIDE AND INSTALL NEW FIRE EXTINGUISHERS TO COMPLY W/ LOCAL FIRE CODE STANDARDS AT OFFICE AREAS. PROVIDE EXTINGUISHERS IN SEMI RECESSED CABINETS WITH STAINLESS STEEL FINISH. AT WAREHOUSE AND PRODUCTION AREAS EXTINGUISHERS TO BE IN SEMI RECESSED OR SURFACE MOUNTED CABINETS WITH FACTORY PAINTED FINISH. WHERE INSTALLED ON ROOF COLUMNS EXTINGUISHER TO BE EXPOSED. FINAL LOCATION TO BE VERIFIED IN FIELD WITH FIRE INSPECTOR. a. A MINIMUM OF ONE 2A 10-B:C SHALL BE PROVIDE ON EACH FLOOR LEVEL, CONSPICUOUSLY LOCATED, ALONG NORMAL PATHS OF TRAVEL AND WITHIN 75 FEET OF TRAVEL DISTANCE , (CRR, TITLE 19, DIVISION 1 CBC 567 (a) THROUGH (k) b. SIZE AND DISTRIBUTION OF PORTABLE FIRE EXTINGUISHERS SHALL BE IN ACCORDANCE WITH (CFC 906.3.1)2 13. UNDER-SLAB SANITARY SEWER LOCATION. SEE PLUMBING DRAWINGS. PROVIDE TRAFFIC RATED CAST IRON CLEANOUT ASSEMBLIES IN THE FLOOR SLAB. 14. DOMESTIC WATER STUB INTO BUILDING. SEE CIVIL AND PLUMBING DRAWINGS. 15. ELECTRICAL SWITCHGEAR AND TELEPHONE BACKBOARD LOCATION W/ ELECTRICAL SERVICE. PAINT INTERIOR AND EXTERIOR WALL SURFACES. CONTRACTOR TO COORDINATE CONDUIT SWEEPS OR CABLE TRENCHES AND FOOTING LOCATIONS WITH STRUCTURAL ENGINEER PRIOR TO FOUNDATION POUR. ELECTRICAL ROOM SHALL BE 1 HOUR RATED CONSTRUCTION. SEE DETAIL 1/AD-5. 16. EXIT SIGN W/ INTERNAL SELF ILLUMINATION AND SECONDARY POWER SOURCE -PER GENERAL NOTES AND 2019 CBC REQUIREMENTS. EXIT SIGNS SHALL BE U.L. 924 LISTED. ANYWHERE AN ILLUMINATED EXIT SIGN IS PROVIDED, ALSO PROVIDE A WALL-MTD. TACTILE EXIT SIGN PER DETAIL 3/AD-1. 17. PROVIDE 6" 2500 PSI CONCRETE FILLED GUARDPOST PAINTED SAFETY YELLOW -TYPICAL AT ALL INTERIOR FIRE RISER LOCATIONS (TWO EA. RISER), EXPOSED PIV'S, SECTIONAL VALVES, FIRE HYDRANTS, AND ELECTRICAL TRANSFORMERS ON SITE OR EXPOSED IN THE WAREHOUSE. SEE DETAIL 1/AD-4. 18. FIRE RISER LOCATION. CONFIRM FINAL LOCATION WITH FIRE PROTECTION DRAWINGS. USE LIGHT WEIGHT CONCRETE TO PATCH AROUND BASE OF RISER PENETRATION IN FLOOR SLAB. PROVIDE TWO 6" DIA. CONCRETE FILLED GUARDPOSTS PAINTED SAFETY YELLOW PER DETAIL 1/AD-4. CONTRACTOR SHALL THOROUGHLY CLEAN & PAINT THE RISER ASSEMBLY. 19. PAINTED CONCRETE TILT-UP RAMP WALL. TOP OF WALL TO BE MIN. 42" ABOVE ADJACENT GRADES ON EACH SIDE. 20. PAINTED 4' X 8' G.I. LOUVER ASSEMBLY WITH FIXED 4" RAIN-RESISTANT BLADES AND 50% FREE OPEN AREA. PROVIDE 1" DISPOSABLE FILTERS PER MECH. DRAWINGS IN A TIGHT-FITTING GALV. FILTER RACK THAT CLOSES OFF ANY PERIMETER GAPS TO PREVENT UNFILTERED AIRFLOW. PROVIDE STANDARD PREFABRICATED BURGLAR BARS IN LOUVERS OUTSIDE SECURED TRUCKCOURT AREA. 21. STEEL ROOF LADDER W/ INTERMEDIATE LANDING. PRIMER PAINT AND FINISH COAT OSHA YELLOW. SUBMIT COMPLETE SHOP DRAWINGS OF ASSEMBLY FOR ARCHITECT'S REVIEW & APPROVAL ASSEMBLY TO CONFORM TO ALL APPLICABLE OSHA REGULATIONS. CONTRACTOR TO COORDINATE FINAL LOCATION W/ ROOF STRUCTURE & HATCH. MOUNT LADDER TO CONCRETE WALL. SEE DETAIL 20/AD-5 22. PAINTED STRUCTURAL STEEL OPEN TRELLIS WHERE INDICATED OVER ENTRANCES. SEE ELEVATIONS FOR LOCATION. PROVIDE RECESSED SOFFIT LIGHT FIXTURES WHERE INDICATED PER ELECTRICAL DRAWINGS. 23. PROVIDE KEY ACCESS BOX (KNOX BOX) RECESSED ON PANEL AND MOUNTED 5'-0" ABOVE ADJACENT FLOOR WITHIN 10'-0" OF MAIN ENTRY DOOR OR PER L.A. CITY FIRE DEPARTMENT STANDARDS. 24. ONE HOUR RATED ELECTRIC ROOM WALL PARTITION TO 12'-0" A.F.F.: 5/8" TYPE X EA. SD. OF 362S125-33 STEEL CHANNEL STUDS @ 16" O.C. TO THE UNDERSIDE OF CEILING JOISTS. CONSTRUCT WALL PER CBC TABLE 720.1 ITEM 13-1.1: CHANNEL SHAPED STUDS 16" ON CENTER WITH ONE FULL-LENGTH LAYER OF 5/8" TYPE X GYPSUM WALLBOARD APPLIED VERTICALLY ATTACHED WITH 1" LONG NO. 6 DRYWALL SCREWS TO EACH STUD. SCREWS ARE 8" ON CENTER AROUND THE PERIMETER AND 12" ON CENTER ON THE INTERMEDIATE STUD. PROVIDE "NO STORAGE ABOVE" SIGNAGE AT 12' O.C. MAX. ON EACH WALL FACING WAREHOUSE. MOUNT SIGN AT 8'-0:" A.F.F.. SIGNAGE LETTERS SHALL BE 2" HIGH MIN.. PROVIDE 4" BLACK VINYL WALL BASE ON ALL GYP. BD. WALLS. 25. PROVIDE AND INSTALL 1 HR. CEILING ASSEMBLY AT HEIGHT OF 10'-0" AFF PER 21 ST. EDITION GYPSUM ASSOCIATION GA-600 -2015 FIRE RESISTANCE DESIGN MANUAL AS FOLLOWS: GA FILE NO. FC 4502. BASE LAYER 1/2" PROPRIETARY TYPE X GYPSUM WALLBOARD APPLIED AT RIGHT ANGELS TO CHANNEL SHAPED, MINIMUM 7" DEEP, 43 MIL (18 GA.) GALVANIZED STEEL JOISTS 24" O.C. WITH 1" TYPE S-12 DRYWALL SCREWS 8" O.C. AT BUTT JOINTS AND 12" O.C. AT INTERMEDIATE JOISTS. FACE LAYER 1/2" PROPRIETARY TYPE X GYPSUM WALLBOARD APPLIED AT RIGHT ANGELS TO JOISTS WITH 1-1/2" TYPE G DRYWALL SCREWS AT BUTT JOINTS BETWEEN JOISTS AND 1 5/8" TYPE S-12 DRYWALL SCREWS 12" O.C. AT INTERMEDIATE JOISTS. JOINTS OFFSET FROM BASE LAYER JOINTS. STEEL JOISTS SUPPORTING 5/8" T & G EDGED PLYWOOD FLOOR APPLIED AT RIGHT ANGELS TO JOISTS AND 1 15/16" NO. 6-20 S-12 POINT SCREWS 6" O.C. AT FLOOR PERIMETER AND END JOINTS AND 10" O.C. AT ITERMEDIATE JOISTS. CAP SHEET PLYWOOD FLOOR WITH 1/4" TYPE "X" GYP BD. TO FINISH. WALL LEGEND 1. INTERIOR FIRE HOSE AND EXTINGUISHER LOCATIONS SHALL BE PER FIRE PROTECTION DRAWINGS AND AS APPROVED BY FIRE DEPARTMENT. 2. CONTRACTOR SHALL CHEMICAL SEAL THE FLOOR AND CONTRACTOR SHALL CONFIRM THAT ALL PRODUCTS USED ARE AQMD APPROVED WHERE APPLICABLE. SEE KEYNOTES THIS SHEET. ALL CONSTRUCTION MARKINGS ON THE FLOOR SLAB MUST BE REMOVED PRIOR TO SEALING. PROVIDE SUBMITTAL SHOWING COMPATIBILITY WITH PROPOSED BOND BREAKER. NO GREASE PENCIL SHALL BE ALLOWED ON THE SLAB. 3 CONTRACTOR TO PROTECT FLOOR SLAB DURING CONSTRUCTION AND KEEP CLEAN AT ALL TIMES. ALL VEHICLES ON SLAB DURING CONSTRUCTION SHALL BE DIAPERED TO PREVENT OIL SPILLS. 4. ALL DIMENSIONS ARE TO FACE OF CONCRETE WALL, STRUCTURAL GRID LINE, OR CENTERLINE OF STUD/COLUMN U.N.O. 5. ALL DOOR OPENING DIMENSIONS GIVEN ARE FINISH OPENING SIZES. CONTRACTOR SHALL ADJUST OPENING FOR JAMB AND SILL ASSEMBLIES ACCORDINGLY. 6. CONTRACTOR SHALL NOT PLACE CRANES ON THE FLOOR SLAB. CONTRACTOR SHALL SUBMIT THE PANEL LIFTING PLAN TO THE ARCHITECT FOR REVIEW. 7. NO "READY MIX" TRUCKS WILL BE PERMITTED TO DRIVE OR OPERATE ON ANY PORTION OF THE BUILDING FLOOR SLAB. A MAXIMUM 8 CUBIC YARD READY MIX TRUCK MAY BE ALLOWED ON THE FLOOR SLAB FOR PERIMETER CLOSURE STRIP. 8. THE SHELL BUILDING IS DESIGNED FOR HIGH PILE STORAGE COMMODITY CLASSES ONE THROUGH FIVE. TENANT'S SHALL SECURE ALL SEPARATE PERMITS WHICH ARE REQUIRED FOR ALL STORAGE PLANS, RACK INSTALLATIONS, AND CONVEYOR INSTALLATIONS. 9. FLOOR SLAB MAY SLOPE -SEE CIVIL DRAWINGS. CONTRACTOR SHALL COORDINATE ALL DIMENSIONS TO COMPENSATE FOR SLOPING FLOOR. 10. ALL EXPOSED STEEL INSIDE BUILDING SHALL BE PRIMER GREY. MATCH COLOR OF TRUSS MANUFACTURER'S STANDARD GREY. PROVIDE TOUCH-UP PAINT AT ALL FIELD WELDED CONNECTIONS. 11. G-2000 SOFT CUT CONTROL JOINTS MUST BE 1-1/2" MINIMUM DEPTH IMMEDIATELY AFTER FINISH TROWELING. (A SOFT CUT MODEL 280 IS NOT ALLOWED.) ALL SAWCUT JOINTS ARE TO BE CLEANED OUT AT THE END OF THE PROJECT. GENERAL NOTES 12. ALL FLOOR SLAB PANEL FORM NAIL HOLES TO BE PREDRILLED AND WOOD DOWELED PRIOR TO NAILING. BRACE HOLES TO BE PREDRILLED. METHOD OF CHAMFER LAYOUT IS WITH HIGH STRENGTH SPRAY ADHESIVE, TAPE OR APPROVED EQUAL. ALL FLOOR SLAB NAIL OR BRACE FRAME HOLES FILLED WITH APPROVED 2 PART EPOXY COMPOUND TO MATCH CONCRETE COLOR. PEGA BOND LV 2000, BURKE EPOXY INJECTION RESIN OR EQUAL. 13. SEE STRUCTURAL DRAWINGS FOR LOCATIONS OF ANY KNOCK-OUT WALL PANELS. 14. SACK AND PATCH ALL WALL LIFT POINT POCKETS ON WALL PANELS. 15. ALL PENETRATIONS THROUGH BUILDING ARE TO BE CAULKED ON BOTH THE INTERIOR AND EXTERIOR OF THE WALL. 16. ANY TIME A BUILDING OR A PORTION OF A BUILDING IS OCCUPIED, THE MEANS OF EGRESS SERVING THE OCCUPIED PORTION SHALL BE ILLUMINATED AT AN INTENSITY NOT LESS THAN 1-FOOT-CANDLE AT THE WALKING SURFACE LEVEL. 17. PENETRATIONS OF FIRE RESISTIVE WALLS, FLOOR/CEILING AND ROOF/CEILINGS SHALL BE PROTECTED AS REQUIRED IN CBC CHAPTER 7. 18. PROVIDE FIRE/SMOKE DAMPERS FOR ALL DUCTS THAT PASS THROUGH A FIRE RATED WALL OR CORRIDOR. SEE MECHANICAL DRAWINGS. 19. ANY GLAZING WITHIN 24" OF A DOOR SWING SHALL BE TEMPERED. 20. ALL DRYWALL SURFACES TO RECEIVE A LEVEL 4 FINISH -SMOOTH WITH NO TEXTURE. 21. FIELD VERIFY ALL DIMENSIONS FOR MILLWORK. SUBMIT SHOP DRAWINGS FOR ALL MILLWORK FOR REVIEW AND APPROVAL PRIOR TO FABRICATION. 22. FIELD VERIFY ALL DIMENSIONS FOR INTERIOR STOREFRONT WALL SYSTEMS. SUBMIT SHOP DRAWINGS FOR ALL INTERIOR STROFRONT WALL SYSTEMS FOR REVIEW AND APPROVAL PRIOR TO FABRICATION. EXTERIOR PERIMETER WALL. CONCRETE TILT-UP PANEL -THICKNESS PER STRUCTURAL DRAWINGS. 2 HRS RATED PER TABLE 721.2.1.1 -5" THICK MIN. EXTERIOR PERIMETER WALL -1" INSULATED LOW E GLASS & GLAZING SYSTEM EXTERIOR PERIMETER WALL -1/4" MONOLITIC GLASS & GLAZING SYSTEM. 9" FULL HEIGHT PARTITION TO UNDERSIDE OF MEZZANINE / ROOF DECK: USE 5/8" TYPE "X" GYP. BD. EA. SIDE OF MIN. 800S200-43 STEEL CHANEL STUD @ 24" O.C. TO UNDERSIDE OF FLOOR / ROOF DECK ABOVE (SEE STRUCUTAL DRAWINGS FOR FINAL STUD SIZING). TOP OF GYP. BOARD ON OFFICE SIDE OF STUD ABOVE MAY TERMINATE AT 6" MIN. ABOVE T-BAR CEILING IF STRAPPING IS PROVIDED PER STRUCT. DETAILS. WAREHOUSE SIDE OF STUDS ONLY TO UNDERSIDE OF ROOF DECK. PROVIDE R-22 BATT INSULATION FULL HEIGHT TO UNDERSIDE OF ROOF DECK, SECURE BETWEEN STUDS PER MANUFACTURER'S RECOMMENDATIONS. FURRING AT CONCRETE TILT-UP PANEL: USE 5/8" TYPE "X" GYP. BOARD O/ 20 GA 3-5/8" STEEL CHANNEL STUDS @ MAX. 24" O.C. TO MIN. 6" ABOVE THE CEILING ASSEMBLY. PROVIDE R-13 FOIL FACED BATT INSULATION BETWEEN FURRING STUDS. INSULATION TO EXTEND TO UNDERSIDE OF THERMAL ENVELOPE -EITHER UNDERSIDE OF CEILING OR UNDERSIDE OF ROOF DECK AS APPLIES. 5" INTERIOR PARTITION: USE 5/8" TYPE "X" GYP. BD. EA. SIDE OF MIN. 20 GA 3-5/8" STEEL CHANNEL STUDS @ 16" O.C. TO MIN. 6" ABOVE CEILING ASSEMBLY, OR TO UNDERSIDE OF CEILING JOISTS. PROVIDE R-11 SOUND BATT. 7" WIDE PLUMBING WALL: PROVIDE 5/8" TYPE "X" GYP. BD. EA. SIDE OF MIN. 20 GA 6" STEEL CHANNEL STUDS @ 16" O.C. TO UNDERSIDE OF CEILING JOISTS. PROVIDE R-11 SOUND BATT. 12" WIDE PLUMBING WALL: PROVIDE 5/8" TYPE "X" GYP. BD. EA. SIDE OF MIN. 20 GA 6" STEEL CHANNEL STUDS @ 16" O.C. TO UNDERSIDE OF CEILING JOISTS. PROVIDE R-11 SOUND BATT. 1-A 1-A 1-B 1-B 1-B.1 1-B.1 1-C 1-C 1-D 1-D 1-E 1-E 1-11-1 1-31-3 1-2.11-2.1 49'-0"56'-0"56'-0" 34'-0" 15'-0" 161'-0" 5'-0"5'-0"16'-0"5'-0" 2'-0" 5'-0" 16'-0" 5'-0" 5'-0" 33'-0" 28'-0"5'-0"50'-0"6'-0"50'-0"6'-0"50'-0" WAREHOUSE 1-100 ELECTRICAL ROOM 1-102 FIRE RISER ROOM 1-101 1-A2-2 2 1-01 76'-0" 63'-0"5'-0"50'-0"10'-0"31'-0"2'-0" 5'-0"12'-0"6'-0"9'-0"2'-0" 34'-0"49'-0"56'-0"56'-0" 195'-0" EXIT EXIT EXIT EXIT 38'-0" 30'-9"55'-0" 3-A AD-1 1-051-06 1-08 1-09 1-10 3-A AD-1 3-A AD-1 3-A AD-1 5'-0" 76'-0" 10'-0" 66'-0" 4'-0" 55'-0" 1 23 3 45 6 78 9 11 11 13 14 24 16 16 16 18 19 20 21 22 23 15 25 1-A2-1 2 2 AD-1 17'-0" 39'-2" 36'-10" 5'-0" 3'-0" 4'-0" 4'-0" 21'-0" 37'-0" 5'-0" 31'-0" 43'-0" 39'-2" 36'-10" 1-2 1-2 44'-0" 42 1-C 1-1 1-1 30'-9" 9'-0" 20'-0" 2'-4" 1-08 1-09 1-10 13'-8" 10'-0" 8" 5'-4" 8" 2'-2" 5'-0" 18'-2" FIRE RISER ROOM 1-101 ELECTRICAL ROOM 1-102 EXIT EXIT 15 24 25 18 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A2-1 FLOOR PLAN MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver 1/8" = 1'-0"1 FLOOR PLAN 0'4'8'16'32' 1/4" = 1'-0"2 ENLARGED FLOOR PLAN -ELEC. RM MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL PC1 04/16/21 PLAN CHECK COMMENTS 42433 APN # 909-290-001 PA20-0533 BP20-4793 1-D 1-D 1-E 1-E 1-11-1 1-31-3 1-2.1 1-2.1 56'-0" 545 SF OPEN OFFICE 1-110 172 SF OFFICE 1 1-111 169 SF OFFICE 2 1-112 162 SF OFFICE 3 1-113 114 SF BREAK ROOM 1-114 RESTROOM OFFICE 1-115 RESTROOM WAREHOUSE 1-116 JANITOR AREA 1-117 3'-0"4'-0"12'-0"7'-0"2'-0"5'-0"5'-0"16'-0"5'-0"2'-0" 4'-6"3'-0"4'-6"5'-0"6'-0"5'-0" 3'-5" 1'-5" 5'-0" 16'-0" 5'-0" 5'-0" 2'-10" 3'-0" 4'-8" 12'-0" 4'-8" 3'-0" 2'-10" 5'-0" 76'-0" 36'-10" 5'-0"5'-0"18'-0"5'-0" 56'-0" 4'-6" 3'-0" 4'-6" 5'-0" 6'-0" 5'-0" 1 2 4 AD-1 2 AD-1 EXIT 3-A AD-1 1-01 3 31 5 6 1-20 1-21 1-25 1-23 1-24 1-20 1-22 11 13 14 16 EXIT 3-B AD-1 22 23 26 26 26 33 32 363 41 13'-0"13'-0" 10'-5"27'-7" 13'-0" 2'-0"5"5"2'-0" 26'-10" 18'-0"12'-8" 11'-8" 10'-0" 3'-11" 2'-0" 5" 5'-0" 7'-6" 7'-6" 3'-11" 5'-1" 22'-8" 3'-0" 13'-5" 3'-0" 10'-0"20'-8"2'-8" 22 1 5" 34 39'-2" 1-2 1-2 3'-0"4'-0" 42 1-E 1-1 1-2.1 27 28 2940 27 29 27 29 2'-0"6'-0"2'-0" 2'-0" 3'-6" 2'-0" 28 2'-0" 3'-6" 2'-0" 40 EQEQEQ 22 22 40 16 16 9' - 0" 9' - 0" 10' - 0"10' - 0" 10' - 0" 10' - 0" 10' - 0" 19' - 0" 1-2 1-C 1-11-1 2828 16 10' - 0" 16 CEILING LEGEND NOTE: SEE ELECTRICAL AND MECHANICAL DRAWINGS FOR ADDITIONAL NOTES AND FIXTURE LOCATIONS TYPICAL SUSPENDED T-BAR CEILING SYSTEM: ARMSTRONG "DUNE" SECOND LOOK 2X4 TILES. SEE FINISH SCHEDULE. ARMSTRONG 15/16 T-BAR GRID SYSTEM BY ARMSTRONG. 2' X 4' SUSPENDED LIGHT FIXTURE -PER ELECTRICAL 2' X 4' SUSPENDED LIGHT FIXTURE -PRISMATIC LENS -PER ELECTRICAL 1' X 4' SURFACE MOUNTED STRIP LIGHT -PRISMATIC LENS -PER ELECTRICAL RECESSED CAN LIGHT -PER ELECTRICAL DRAWINGS SUPPLY AIR REGISTER -SEE MECHANICAL DRAWINGS RETURN AIR REGISTER -SEE MECHANICAL DRAWINGS EXHAUST AIR REGISTER -PROVIDE MIN. ONE AIR CHANGE EVERY 15 MIN. IN TOILET ROOMS. ILLUMINATED EXIT SIGN PER 2016 CBC -SEE KEYNOTESEXIT GYPSUM BOARD HARDLID CEILING -CONTRACTOR MAY PROVIDE 20 GA. METAL STUD CEILING JOISTS PER CEILING JOIST SCHEDULE OR ARMSTRONG SUSPENDED DRYWALL GRID SYSTEM INSTALLED FOR L/240 DEFLECTION CRITERIA. SEE DETAILS. RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A2-2 PLAN ENLARGEMENTS MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver 1/4" = 1'-0"2 ENLARGED FLOOR PLAN 1/4" = 1'-0"1 CEILING PLAN -OFFICE KEYNOTES GENERAL NOTES SEE A2-1 FOR GENERAL NOTES. SEE A2-1 FOR KEYNOTES. 00 0'2'4'8'16'1'0'2'4'8'16'1' 0'2'4'8'16'1' 1/4" = 1'-0"3 CEILING PLAN -ELECT & FIRE RISER ROOM RM NUMBER NAME AREA (NET)OCC LOAD FACTOR OCC LOAD 1-100 WAREHOUSE 10871 SF S-1 500 SF 22 1-110 OPEN OFFICE 545 SF B-1 150 SF 4 1-111 OFFICE 1 172 SF B-1 150 SF 1 1-112 OFFICE 2 169 SF B-1 150 SF 1 1-113 OFFICE 3 162 SF B-1 150 SF 1 1-114 BREAK ROOM 114 SF B-1 150 SF 1 TOTAL 29 OCCUPANT LOAD FACTOR MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL PC1 04/16/21 PLAN CHECK COMMENTS 42433 APN # 909-290-001 PA20-0533 BP20-4793 1-2.1 114 SF BREAK ROOM 1-114 RESTROOM OFFICE 1-115 RESTROOM WAREHOUSE 1-116 JANITOR AREA 1-117 1-25 1-23 1-24 EXIT 3-B AD-1 10'-5" 12'-8" 10'-0" 5'-0" 7'-6" 7'-6" 3'-11" 5'-1" 10'-0" 1'-6" 1'-0" 1'-6" 3'-6" 4'-6" 60" MIN. 5'-3" 4'-8" 9'-0" 2'-0" 1'-0" 5" MIN. 12" 18" MIN. 1'-6" 7" 60" MIN. 5'-3" 4'-6" 18" MIN. 1'-6" 3'-6" 6"3'-0"6'-6" 7 10 10 9" 1'-0" 1'-0"3 9 4 5 6 812 13 13 10 14 86513124 3 9 7 10 9" 17161513 18 13 1-2 SHADED AREA -PROVIDE SMOOTH WHITE FRP FINISH TO 48" HEIGHT UNLESS NOTED OTHERWISE IN FINISH SCHEDULE DRINKING FOUNTAINS SHALL BE PLACED IN AN ALCOVE OR POSITIONED BETWEEN WING WALL / RAILS THAT PROJECT OUT AT LEAST AS FAR AS THE DRINKING FOUNTAIN. MIN. 32" CLEARANCE BETWEEN WING WALLS ADJACENT DRINKING FOUNTAIN SHALL BE MOUNTED HIGHER TO ALLOW THOSE WITH DIFFICULTY STOOPING OR BENDING TO ACCESS THE FOUNTAIN NOTES: 1. THE BUBBLER SHALL BE ACTIVATED BY EITHER A LEVER OR PUSH BAR MECHANISM. THE WATER STREAM FROM THE BUBBLER SHALL BE SUBSTANTIALLY PARALLEL TO THE FRONT EDGE OF THE FOUNTAIN. 2. SEE ARCHITECTURAL GENERAL NOTE SHEET FOR ADDITIONAL REQUIREMENTS FOR DISABLED ACCESS. 4 8" M IN . C L R .27" CLR. 36" MAX. 15" MIN.5" MAX. 18" MIN. 5" MAX. 36" MIN. 24" MIN.12" MIN. 44" MIN.33" MIN.- 36" MIN. 19" MIN. 54" MIN. 12" MAX.42" MIN. 24" MIN. TO OUTLET 19" MIN. 1'-0" 4'-8" 44" MAX. 17" MAX.3'-4" 3'-4" 2'-5" 5"4" 3'-2" 3'-4" 40" MAX. BASE 6" MIN. 8" MIN.6" MAX. 17" MIN. 9" MIN. 9'-0" 48" MIN. 19" MAX. 18" MIN. 30" MIN. 8" 2'-3" 1'-5" 17" MIN. 8" MAX. TOE CLEARANCE 6" 9"27" MAX. 29" MAX. REFERTO FINISH SCHEDULE FOR HEIGHT. 48" MIN. 17" - 18" 1'-0" 54" MIN. WALL SCONCES-SEE ELECTRICAL FOR SPEC-CENTER LIGHT FIXTURE ON MIRROR. TYP. OF (2) AT EACH LOCATION PROVIDE PLAM SKIRT TO HIDE PIPING-SEE DETAIL THIS SHEET FOR DIM. COMPLIANCE NOTE: ALL OPERABLE PORTIONS OF TOILET ROOM ACCESSORIES SHALL BE MOUNTED NOT EXCEED 40" A.F.F. 11"6" NOTE: IT IS ALLOWED TO HAVE TOE CLEARANCE THAT EXTENDS FURTHER THAN 6" UNDER THE LAVATORY. HOWEVER THE MEASUREMENT OF THE REQUIRED 30" X 48" WHEELCHAIR CLEAR FLOOR SPACE MAY ONLY OVERLAP THIS TOE CLEARANCE BY A MINIMUM OF 6" REQUIRED CLR. SPACE. FOAM OR FIBER INSULATION WITH PROTECTIVE OVERWARP ON DRAIN, HOT WATER SUPPLY AND SHARP OBJECTS TYP. LAV. KNEE AND TOE CLEARANCE 2' - 10" 3' - 4" 18" MIN. WCWC GB TP-1 UR TP LVMISD 9" MAX 7" MIN. MI LVGB EACH BUILDING SHALL BE PROVIDED WITH SANITARY FACILITIES , INCLUDING PROVISIONS FOR THE PHYSICALLY HANDICAPPED, AS PRESCRIBED BY THE CALIFORNIA PLUMBING CODE TABLE 422.1 AND ASSOCIATED TABLE A. OFFICE AREA: OFFICE IMPROVEMENTS AREA TOTAL OCCUPANCY LOAD OF OFFICE @ 1/200 = FIXTURE COUNT REQUIRED USING (BASED ON 50% MALE AND 50% FEMALE) WATER CLOSETS REQUIRED 4 -MEN 4 -WOMEN URINALS REQUIRED 4 -MEN LAVATORIES REQUIRED 4 -MEN 4 -WOMEN DRINKING FOUNTAINS WAREHOUSE: WAREHOUSE AREA TOTAL OCCUPANT LOAD FOR WAREHOUSE AREA @ 1/5000: FIXTURE COUNT REQUIRED USING (BASED ON 50% MALE AND 50% FEMALE) WATER CLOSETS REQUIRED 2 -MEN 2 -WOMEN URINALS REQUIRED 2 -MEN LAVATORIES REQUIRED 2 -MEN 2 -WOMEN DRINKING FOUNTAINS 1,446 SF 8 OCCUPANTS 1-WC 2-WC 0-URINAL 1-LAV 1-LAV 1-DF 14,182 SF 4 OCCUPANTS 1-WC 1-WC 0-URINAL 1-LAV 1-LAV 1-DF PLUMBING CALCULATIONS TOTAL COMBINED FIXTURE COUNT REQUIRED & PROVIDED -(2) ALL GENDER RESTROOMS WATER CLOSET URINALS LAVATORIES DRINKING FOUNTAINS PROVIDED (ALL GENDER) 2 2 2 2 REQUIRED 2 0 2 2 (PER CPC 415.2) 1. ALUMINUM THRESHOLD AT RESTROOM DOORS WHERE INDICATED. 2. NOT USED. 3. 1-1/2" DIA. GRAB BAR 42" X 54" MIN. MNT. C.L. AT 33" A.F.F. CONTRACTOR SHALL PROVIDE RIGID BACKING IN WALL FRAMING. 250 LB/LIN. FT. MAX. LOAD ON GRAB BAR. PROVIDE 1-1/2" CLEARANCE BETWEEN WALL AND BAR. THE GRAB BAR AND ADJACENT SURFACES/WALL SHALL BE FREE OF ANY SHARP OR ABRASIVE ELEMENTS. GRAB BARS SHALL NOT ROTATE WITHIN THEIR FITTINGS. BAR EDGES SHALL HAVE A MIN. RADIUS OF 1/8". 4. COMBINATION DISPENSER UNITS FOR TOILET SEAT COVERS AND TISSUE PAPER. PROVIDE SANITARY NAPKIN DISPOSAL IN WOMENS. MOUNT W/ FRONT OF TISSUE ROLL AT 7"-9" IN FRONT OF TOILET SEAT. UNIT IS RECESS WALL MTD. OR PARTITION MTD. -SEE DWG. USE BOBRICK B-347/357 SERIES. PROVIDE RECESS WALL UNITS AT ADA STALLS, AND BACK-TO-BACK PARTITION MOUNTED DISPENSOR UNITS WHERE POSSIBLE. 5. RESTROOM MIRRORS - 24"W X 36"H W/ BOT. EDGE @ 39" A.F.F. MAX. BY BOBRICK OR EQUIVALENT. OMIT TILE / FRP BEHIND THE MIRROR. PROVIDE 4-SIDED S.S. FRAME. 6. WALL MOUNTED LAVATORY PER PLUMBING DWGS. MOUNT TOP OF SINK AT MAX 34" A.F.F. W/ 27" CLR. BELOW AND PROVIDE INSULATION JACKET ON ALL EXPOSED PIPING. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER THE LAVS. PROVIDE SINK MOUNTED SOAP DISPENSER COMPATIBLE WITH SINK. 7. DURABLE FLOOR SURFACE WITH COVED BASE PER FINISH SCHEDULE. OFFICE RESTROOM: TILE FINISH. WAREHOUSE RESTROOMS: SEALED CONCRETE. 8. COMBINATION UNIT RECESSED FOLDED PAPER TOWEL DISPENSER W/ RECESSED WASTE RECEPTACLE B-3944 OR EQUIVALENT. 9. FLUSH VALVE TOILET -SEE PLUMBING DRAWINGS. TOP OF SEAT TO BE AT 18" A.F.F. IN ALL HANDICAP ACCESSIBLE STALLS. 10. RESTROOM ACCESSIBILITY SIGNAGE -SEE DETAIL 1/AD-2. 11. FLOOR DRAIN. IF SLAB IS EXISTING, SAWCUT, REMOVE AND REPLACE CONCRETE FLOOR SLAB IN BATHROOM AS INDICATED, AND SLOPE FLOOR TO DRAIN: 0.5% MIN AND 1% MAX. SEE SHEET A2-1 AND STRUCTURAL DRAWINGS FOR FLOOR SLAB REPAIR NOTES. 12. WALL MTD. URINAL W/ 14" PROJECTING ELONGATED RIM -SEE PLUMBING DRAWINGS. MNT. FIRST URINAL IN EACH RESTROOM TOP OF RIM AT 17" A.F.F. 13. NON-ABSORBENT WALL SURFACE AT ALL RESTROOM WALLS / JANITOR'S AREA TO A HEIGHT OF 7' A.F.F. PER THE FINISH SCHEDULE. TILE / FRP MAY BE OMITTED BEHIND THE MIRROR ABOVE THE LAVATORY ALCOVE. 14. NEW WALL MOUNTED SPLIT-LEVEL ELECTRIC DRINKING FOUNTAIN PER PLUMBING DRAWINGS -COMPLIANT W/ CPC & CBC CHAPTER 11B ACCESSIBLE REQUIREMENTS. SEE DETAIL. PROVIDE FRP WALL FINISH BEHIND WATER FOUNTAIN EXTEND A 1'-0" ON EACH SIDE. SEE DETAIL 20/AD-1. 15. JANITOR'S MOP SINK. SEE PLUMBING DRAWINGS. 16. NEW ELECTRIC WATER HEATER PER PLUMBING DRAWINGS. ELECTRICAL CONTRACTOR TO COORDINATE ELEC. REQUIREMENTS. ALL WATER HEATERS ARE TO BE STRAPPED TO A WALL IN TWO PLACES. ONE SHALL BE AROUND THE UPPER 1/3 OF THE TANK, AND ONE SHALL BE IN THE LOWER 1/3 OF THE TANK. THE LOWER POINT SHALL BE A MIN. OF 4" ABOVE THE CONTROLS. 17. STAINLESS STEEL SHELF W/ MOP HOOKS. BOBRICK OR EQUIVALENT. 18. TOP MOUNTED KITCHEN SINK IN LAMINATE COUNTER TOP AND FAUCETS PER PLUMBING DWGS. MOUNT TOP OF SINK AT MAX 34" A.F.F. W/ 27" CLR. BELOW AND PROVIDE INSULATION JACKET ON ALL EXPOSED PIPING. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDERNEATH. KEYNOTES 9 6 5 COVED WALL BASE PER FINISH SCHEDULE PAINT PER FINISH SCHEDULE SCHEDULED DOOR WHERE OCCURS 2'-10" 3'-4" 17" 40" 34" 2'-10" 9 5 6 12 3 9 4 7'-0" 6" 17" 19" MIN. 2'-0" 7"-9" 9'-0" 33" MIN. - 36" MAX. 2'-10" 349 COVED WALL BASE PER FINISH SCHEDULE FRP / TILE FINISH PER FINISH SCHEDULE PAINT PER FINISH SCHEDULE 6" MIN. 39" 20" 4" 34" 10'-0" 8'-1" 7 1-A2-3 8 1-A2-3 PLASTIC LAMINATE PER FINISH SCHEDULE COUNTER TOP PER FINISH SINK 2x WOOD BLOCKING CONT SEALANT 3'-0" MAXIMUM HEIGHT AFF 4'-10" FIXTURE AND CABINET DIMENSIONS ARE CRITICAL TO ADAAG AND LOCAL ACCESSIBILITY CODE REQUIREMENTS. ENSURE INSTALLATION COMPLIES. PER SCHEDULE CONT SEALANT CONT SEALANT DRILL FOR ADJUSTABLE SHELVES 3" FROM SHELF EDGE 1'-0" 2 ADJ 10" TYP 3" TYP 3" 2' - 10" 29" CLR. 27" CLR. 9" CLR. 0' - 8" 0' - 4"6" MIN. 1'-5" MIN. DRAWER, OMITTED UNDER SINK WOOD BLOCKING CONT SEALANT COUNTER TOP PER SCHEDULE DRILL FOR ADJUSTABLE SHELF 4" FROM SHELF EDGE PER SCHEDULE CONT SEALANT CONT SEALANT DRILL FOR ADJUSTABLE SHELVES 3" FROM SHELF EDGE 2x WOOD BLOCKING 1'-0" 6"1" 2" 2 ADJ 10" TYP 3" TYP 3" 2'-0" MAXIMUM HEIGHT AFF 2'-10" 2'-0" 3'-0" 1'-11" TYP 4" TYP 4" 0" 3" RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A2-3 PLAN ENLARGEMENTS MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver 3/8" = 1'-0"1 ENLARGED FLOOR PLAN REFER TO A2-1/A2-2 FOR ADDITIONAL NOTES AND WALL LEGEND. SEE SHEET A2-1 FOR ADDITIONAL GENERAL NOTES. 1. ALL WASHROOM EQUIPMENT SHALL BE BY BOBRICK OR APPROVED EQUAL. 2. CONTRACTOR SHALL PROVIDE SOLID PLYWOOD BACKING FOR ALL WALL MOUNTED ACCESSORIES. ALL WALL MOUNTED EQUIPMENT IS TO BE INSTALLED PRIOR TO TILE INSTALLATION. 3. PROVIDE EXPANSION JOINTS IN TILE AT ALL LOCATIONS WHERE BACKING MATERIAL CHANGES PER A.N.S.I. STANDARDA.108.1. TILE INSTALLATION SHALL BE PER THE CURRENT TILE COUNCIL OF AMERICA HANDBOOK FOR INSTALLATION GUIDELINES. 4. USE DENS-SHIELD GYP. BD. W/ WATER RESISTANT CORE BY GEORGIA PACIFIC CORP. FOR ALL VERTICAL TILE BACKING. 5. NOTE THAT ALL MOUNTING HEIGHTS GIVEN ARE PER MANUF. RECOMMENDATIONS TO INSURE THAT ALL OPERATIONAL PORTIONS OF ACCESSORIES ARE WITHIN 40" A.F.F. FOR DISABLED ACCESS. CONTRACTOR SHALL CONFIRM ACCESSPRIOR TO INSTALLATION. 6. DOOR HARDWARE @ HANDICAP STALL: INSIDE AND OUTSIDE OF THE COMPARTMENT DOOR SHALL BE EQUIPPED HANDLE NEAR THE LATCH WITH A SHAPE THAT IS OPERABLE WITH ONE HAND AND DOES NOT REQUIRE TIGHT GRASPING, PINCHING OR TWISTING OF THE WRIST. 11B-604-8.1.2, 11B-309.4 . THE FORCE REQUIRED TO ACTIVATE THE OPERABLE PARTS ON THE DOOR IS 5 POUNDS MAX. 11B-604.8.2.2. 7. WATER CLOSET AND URINAL FLUSH VALVE CONTROLS, AND FAUCET AND OPERATING MECHANISM CONTROLS, SHALL BE OPERABLE WITH ONE HAND, SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST, AND SHALL BE MOUNTED NO MORE THAN 44" ABOVE THE FLOOR. SECTION 1502 1503.2.2. & 1504.2.1 8. THE FORCE REQUIRED TO ACTIVATE WATER CLOSET AND URINAL FLUSH VALVE CONTROLS, AND FAUCET AND OPERATING MECHANISM CONTROLS, SHALL BE NO GREATER THAN 5 LBF. ELECTRONIC OR AUTOMATIC FLUSHING CONTROLS ARE ACCEPTABLE AND PREFERABLE. SECTION 1502, 1503.2.2, & 1504.2.1 9. ALL WALL MOUNTED EQUIPMENT IS TO BE INSTALLED PRIOR TO TILE INSTALLATION. 10. CONSTRUCT 1 HR RATED ENCLOSURE UNDER THE STAIRS. WALLS ARE TO BE 5/8" GYP. BD. WITH STUDS AS INDICATED IN FLOOR PLANS. PROVIDE 2-LAYERS OF 5/8" TYPE-X GYP BD. TO THE UNDERSIDE OF THE STAIR STRINGER. NOTE: 1 HR CONSTRUCTION SHALL BE MANTAINED PER SECTION 1011.7.3 & 4 OF THE 2017 LABC. 11. PROVIDE 4'X8'X3/4" PLYWOOD BACKBOARD FOR TELEPHONE COMPANY. CONTRACTOR TO COORDINATE SWEEPS OR CABLE TRENCHES AND FOOTING LOCATIONS WITH STRUCTURAL ENGINEER & DRY UTILITY CONSULTANT PRIOR TO FOUNDATION POUR GENERAL NOTES 1/4" = 1'-0" TYPICAL WATER FOUNTAIN INSTALLATION 1/4" = 1'-0" TYPICAL TOILET ELEVATION 3/8" = 1'-0"3 TYPICAL ELEVATION 3/8" = 1'-0"2 TYPICAL ELEVATION 3/8" = 1'-0"5 TYPICAL ELEVATION 3/8" = 1'-0"6 BREAKROOM CABINET ELEVATION 4 9 3/4" = 1'-0"7 CABINET SECTION @ SINK 3/4" = 1'-0"8 CABINET SECTION MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL PC1 04/16/21 PLAN CHECK COMMENTS 42433 APN # 909-290-001 PA20-0533 BP20-4793 1-A 1-A 1-B 1-B 1-B.1 1-B.1 1-C 1-C 1-D 1-D 1-E 1-E 1-11-1 1-31-3 1-2.11-2.1 2 3 4 5 6 7 6 11 3 2 SLOPE TO DRAIN 1/4" PER FOOT MIN. 34'-0"49'-0"56'-0"56'-0" 195'-0" 76'-0" 34'-0"49'-0"56'-0"56'-0" 161'-0" 76'-0" 16'-7" 46'-7" 29'-5" XXXXX 12 5'-0" 10'-0" 10'-3" 1-2 1-2 9'-9" 19'-5" 10'-0" 16'-7" 12'-0"24'-0"24'-0"24'-0"24'-0"24'-0"16'-0"26'-0"21'-0" RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A2-4 ROOF PLAN MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver 1/8" = 1'-0"1 PARTIAL ROOF PLAN GENERAL NOTES 1. VERIFY THAT ALL AREAS HAVE POSITIVE 1/4" PER FOOT MIN. ROOF DRAINAGE PRIOR TO INSTALLATION. 2. COORDINATE W/ STRUCTURAL DRAWINGS FOR ROOF ELEVATIONS. 3. CONTRACTOR SHALL VERIFY ALL MECHANICAL UNIT LOCATIONS, CURBS AND HOOKUPS WITH SUBCONTRACTORS, MECHANICAL & STRUCTURAL ENGINEERS, AND ARCHITECT PRIOR TO INSTALLATION. 4. FOR TYPICAL ROOF PENETRATIONS AND FACTORY CURBS, SEE SHEET AD-2. CONTRACTOR TO CONFIRM ALL LOCATIONS WITH MECHANICAL AND STRUCTURAL DRAWINGS. 5. DOWNSPOUTS ARE SIZED FOR CODE MIN. / HOUR 15 MIN DURATION RAINFALL PER 2019 CPC. 6. PROVIDE SPECIFIED CRICKETS ALONG UPPER SLOPE OF ALL SKYLIGHTS, MECHANICAL EQUIPMENT UNITS AND OTHER CURBED OPENINGS TO FACILITATE POSITIVE DRAINAGE. 7. WHEN REQUIRED BY LOCAL JURISDICTION AND PRIOR TO TRUSS INSTALLATION , TRUSS MANUFACTURER TO SUBMIT PLANS TO BUILDING DEPARTMENT FOR APPROVAL. 8. CONTRACTOR SHALL INSURE PROPER JOB-SITE STORAGE OF MATERIALS TO MINIMIZE EXPOSURE TO MOISTURE DURING THE CONSTRUCTION CYCLE. 9. INSTALL ROOFING MATERIALS AS SOON AS POSSIBLE AFTER INSTALLATION OF WOOD ROOF DECKS TO MINIMIZE EXPOSURE OF THE WOOD DECK TO MOISTURE SOURCES. USE TEMPORARY COVERINGS IF ROOFING MATERIALS CANNOT BE INSTALLED IN SUCH A TIMELY MANNER. PROVIDE FOR "OSB" MOISTURE INSPECTION INTERIOR/EXTERIOR AND GAP DISTANCE BY AN INSPECTOR APPROVED BY THE "OSB" MANUFACTURER, PRIOR TO ANY ROOFING MEMBRANE INSTALLATION. 10. USE DRY WOOD (GRADE STAMPED 'S-DRY'), WITH A MOISTURE CONTENT LESS THAN OR EQUAL TO 16%. DO NOT INSTALL BELOW ROOF INSULATION MATERIALS OR VAPOR RETARDERS UNTIL ALL WOOD FRAMING ELEMENTS HAVE DRIED TO A MOISTURE CONTENT OF 12% OR LESS AT THE TIME OF INSTALLATION OF THESE MATERIALS. 11. MINIMIZE IRREGULARITIES AND LOCAL DISCONTINUITIES IN STRUCTURAL WOOD ROOF PANELS WHICH MAY BE CAUSED BY HANGER FLANGES OR DISPROPORTIONATE SHRINKAGE OF CONNECTING WOOD ELEMENTS. AVOID NAILS, SCREWS OR OTHER MECHANICAL FASTENERS PROTRUDING ABOVE THE SURFACE OF THE ROOF DECK. 12. ROOF TRUSSES SHALL BE MANUFACTURER'S LIGHT GREY PRIMER PAINTED. 13. ALL FIRE MAINS AND BRANCH LINES ARE TO BE PLACED UP IN THE BAR JOISTS. 14. HIGH PILE STORAGE IS NOT A PART OF THIS PERMIT. SHOULD HIGH PILE STORAGE BE UTILIZED WITHIN THE BUILDINGS, ADDITIONAL IMPROVEMENTS WILL BE INSTALLED WHEN REQUIRED BY THE CFC. 15. THE BUILDING IS PROTECTED WITH AN ESFR SPRINKLER SYSTEM. 16. PROVIDE TAPERED ROOF INSULATION CRICKETS / CANT STRIPS WITH ROOF SYSTEM OR PLYWOOD CRICKETS OVER SUBSTRATE TO PROVIDE POSITIVIE DRAINAGE IN ALL WATERWAYS AND DRAINAGE AREAS AT THE BASE OF PARAPET WALLS. KEYNOTES 00 1. NOT USED. 2. INTERIOR ROOF DRAIN & OVERFLOW. ALONG INTERIOR WALL HORIZONTAL RUNS, UPSIZE ACCORDING TO CPC AND SLOPE @ MIN. 1/4" PER FOOT. SEE GENERAL NOTES BELOW. 3. CONCRETE PARAPET WALL -SEE STRUCTURAL DRAWINGS. 4. PROVIDE JOHNS MANVILLE UL ER10167-03 4-PLY BUILT-UP BITUMINOUS ROOFING PER SPECIFICATIONS O/ 1/2" MIN. THK PLYWOOD O/ ROOF FRAMING (SEE STRUCTURAL DRAWINGS). BASE SHEET: PERMAPLY 28 ASPHALT COATED FIBERGLASS (OR APPROVED EQUAL) GLASS FIBER FELT & REINFORCING PLIES: GLASPLY IV (OR APPROVED EQUAL) CAP SHEET: GLASKAP (OR APPROVED EQUAL). ROOFING SYSTEM TO BE UL CLASS ‘A’FIRE RATING, FM CLASS 1 FIRE RESISTANCE, AND MEET FM I-90 MPH MINIMUM WIND UPLIFT RESISTANCE REQUIREMENTS. INSTALL PER MANUFACTURER'S SPECIFICATIONS AND PROJECT SPECIFICATIONS. PROVIDE 15-YEAR NDL WARRANTY WITH 5-YEAR LABOR GUARANTEE –PROVIDE ALTERNATE 10- YEAR NDL WARRANTY. WARRANTIES SHALL INCLUDE ALL ROOFING COMPONENTS (FLASHINGS, SEALANTS, ETC.). SEE ROOFING SPECIFICATIONS AND DETAILS ON AD-2 AND AD-3. 5. GALVANIZED & PAINTED BILCO TYPE S ROOF HATCH 36" X 30" WITH INSULATED LID. PROVIDE CRICKET AS REQUIRED TO MAINTAIN POSITIVE DRAINAGE AROUND HATCH. PROVIDE LADDER-UP SAFETY POST AT TOP OF LADDER OR APPROVED EQUAL. SEE DETAIL 19/AD-2. PARAPET HEIGHT AT ROOF HATCH LOCATION IS GREATER THAN 42" ABOVE ADJACENT ROOF SURFACE -NO GUARDRAIL IS REQUIRED. 6. ICC APPROVED 48" X 96" CURB MOUNTED NON-VENTING SKYLIGHT -BRISTOLITE MODEL NO. 4896-SS-CM-HS1-MF, ICC-ESR 3177 OR APPROVED EQUAL PER DETAIL 17/AD-2. PROVIDE SECURITY BARS. CONTRACTOR SHALL COORDINATE FINAL LOCATION WITH FIRE SPRINKLER CONTRACTOR, ARCHITECT, AND STRUCTURAL ENGINEER. PROVIDE CRICKETS PER ARCHITECTURAL SKYLIGHT DETAIL. PROVIDE CONT. BEAD OF SEALANT AT PERIMETER AT MOUNTING TO WOOD ROOF CURB. SEE DETAIL 17/AD-2 7. ROOF MOUNTED EXHAUST FAN PER MECHANICAL DRAWINGS. SEE DETAIL 17/AD-2 AND STRUCTURAL DRAWINGS FOR FRAMING / ROOFING REQUIREMENTS. 8. WHITE, FOIL BACKED SCRIM ACROSS WAREHOUSE AREA. TRIM BACK SCRIM TO EXPOSE THE METAL SUB-PURLIN HANGERS WITHIN EACH JOIST BAY AND STAPLE ENDS TO THE SUB-PURLINS. AT SKYLIGHTS OPENINGS -TURN UP FOIL VERTICALLY AND STAPLE TO THE INSIDE OF THE 2X10 SKYLIGHT CURBS. SEE DETAIL 7/AD-5. 9. DESIGNATED ROOF AREA FOR FUTURE SOLAR. THIS AREA SHALL BE IN COMPLIANCE WITH 2019 CALIFORNIA GREEN CODE SECTIONS 110.10 (b) THROUGH 110.10 (d). SEE ELECTRICAL DRAWINGS FOR ADDITIONAL COMPLIANCE INFORMATION. FUTURE SOLAR PANELS SHALL REQUIRE A SEPARATE PERMIT. 10. PROVIDE PLYWOOD CRICKET AS REQUIRED AT INSIDE CORNERS OF ROOF AND PARAPET LOCATIONS, TYPICAL. 11. ROOF ADDRESS LETTERS PAINTED BLACK, 8'-0" HIGH WITH MIN. 24" WIDE STROKE PER LETTER -CONTRACTOR SHALL CONFIRM ACTUAL ADDRESS NUMBER PRIOR TO INSTALLATION. 12. RTU PER MECHANICAL DWGS. ROOF DRAIN SIZING MIN. SIZE SHOWN -SEE PLAN FOR ACTUAL SIZE TO BE PROVIDED WAREHOUSE SKYLIGHT CALC'S OWNER REQUESTED SKYLIGHTS % FOR DAYLIGHTING GROUND FLOOR BUILDING AREA: 3 % x 470 SF 32 SF PER SKYLIGHT SKYLIGHTS PROVIDED 3 % OF WAREHOUSE AREA 15,629 SF 15 REQUIRED 15 PROVIDED WAREHOUSE VENTILATION CALC'S: SEE MECHANICAL DWGS FOR WAHREHOUSE VENTILATION CALCULATIONS -MECHANICAL SYSTME PROVIDES 1 FULL AIR EXCHANGE PER HOUR. SOLAR ZONE CALC'S CALIFORNIA GREEN CODE -SOLAR ZONE REQUIREMENTS APPROX. ROOF AREA: 15.00 % x SF PROVIDED MINIMUM 15.00 % OF TOTAL ROOF AREA 15,629 SF 2,344 SF 2,760 SF 0'4'8'16'32' MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL PC1 04/16/21 PLAN CHECK COMMENTS 42433 APN # 909-290-001 PA20-0533 BP20-4793 1-A 1-B 1-C 1-D 1-E 14610 14 29'-0" 28'-0" B 1-A4-1 A 1-A4-2 1-1 1-31-2.1 145 6109 28'-0" APROX. 4'-0" - --- 1-2D 1-A4-2 C 1-A4-2 1-11-3 28'-0" 3 20 21 3 36 10 - --- 42433 16 1-2 B 1-A4-2 B 1-A4-1 C 1-A4-1 - --- 1-A1-B1-B.11-C1-D 1-E - --- - --- - --- 133 4 5 61011 14 15 21 82720 29'-0" 28'-0" 7'-0" 3'-0" 8'-2" 1'-4" 9'-6" 7'-10" 28'-0" 3 - --- - --- - --- - --- A 1-A4-1 C 1-A4-1 B 1-A4-1 B 1-A4-2 A 1-A4-2 C 1-A4-2 A 1-A4-3 B 1-A4-3 1. FIELD COLOR SHERWIN WILLIAMS - SW 7663 NEBULUS WHITE 2. ACCENT COLOR SHERWIN WILLIAMS - SW 7066 GRAY MATTERS 3. ACCENT COLOR SHERWIN-WILLIAMS - SW 7674 PEPPERCORN 4. ACCENT COLOR SHERWIN WILLIAMS -SW 6027 CORDOVAN 5. GLASS TYPE #1: 1" I.G.: OUTSIDE LITE: 1/4" PPG VISTACOOL PACIFICA, REFLECTIVE #2 INSIDE LITE: 1/4" CLEAR SHADING COEFFICIENT: 0.29 / SOLAR HEAT GAIN COEFFICIENT: 0.25 U-FACTOR WINTER NIGHTTIME: 0.47 / U-FACTOR SUMMER DAYTIME: 0.50 6. GLASS TYPE #2: 1/4" PPG VISTACOOL PACIFICA, REFLECTIVE #2 7. GLASS TYPE #3: 1/4" PPG VISTACOOL PACIFICA, REFLECTIVE #2 -W/ SPANDREL COATING USE: ICD COATINGS OPACI-COAT COLOR 3-820 HARMONY GRAY. G.C. TO SUBMIT GLASS SAMPLES FOR ARCH. APP'L. 8. STEEL TRELLIS PAINT: ACRYLIC POLYURETHANE PAINT -PRECISION COATINGS COLOR: TBD; FINISH: TBD. PREP SUBSTRATE, GRIND ALL WELDS AND FILL ALL PITS PER MANUFACTURER'S RECOMMENDATIONS. SUBMIT PAINT SAMPLE CHIPS TO ARCHITECT FOR APPROVAL PRIOR TO CONSTRUCTION. 6'-0" 2'-6" SOLID ROOF COVER ROOF STRUCTURAL SUPPORT PAINTED MASONRY WALLS MATCHING MAIN BUILDING COLOR SCHEME GATE PER DETAIL THIS SHEET 2'-6" NOTE: SEE SHEET A3-1P FOR FINISHES LEGEND. SOLID ROOF COVER ROOF STRUCTURAL SUPPORT PAINTED MASONRY WALLS MATCHING MAIN BUILDING COLOR SCHEME 14'-0" 2'-6" 6'-0" 2'-6" 19'-4" RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A3-1 ELEVATIONS MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver 1/8" = 1'-0"4 EAST ELEVATION 1/8" = 1'-0"3 SOUTH ELEVATION 1/8" = 1'-0"2 NORTH ELEVATION 1/8" = 1'-0"1 WEST ELEVATION 1. NO SIGNAGE OTHER THAN BUILDING ADDRESS IS PROPOSED FOR THE PROJECT AS PART OF THIS APPLICATION. 2. ALL PAINT COLOR CHANGES TO OCCUR AT INSIDE CORNERS U.N.O. 3. ALL PAINT FINISHES TO BE FLAT U.N.O. PAINTING IS 3-COATS: 1-COAT PRIMER, 2 COATS ACRYLIC FINISH, W/ FINAL COAT TO BE ROLLED (SPRAYED AND BACKROLLED IS NOT PERMITTED). PRIME ALL CURBS TO RECEIVE PAINT. PRE WASH BUILDING WITHIN 24 HOURS OF PAINTING. 4. STOREFRONT AND CURTAINWALL CONSTRUCTION: GLASS, ATTACHMENTS, MULLIONS, AND LINTELS SHALL BE DESIGNED TO RESIST 110 MPH EXPOSURE 'C' WINDS. CONTRACTOR SHALL DESIGN ALL CONNECTIONS AND SUBMIT TO CITY & ARCHITECT FOR APPROVAL. PROVIDE BUSHINGS BETWEEN ALL DISSIMILAR METALS TO PREVENT ELECTROLYSIS. 5. AT SPANDREL GLAZING CONDITIONS AGAINST CONCRETE WALL PANELS, PROVIDE ONE 3/4" DIA HOLE THROUGH CONC. WALL PANEL BEHIND EACH 20 SF OF SPANDRAL GLAZING -MIN. ONE HOLE PER PANE. ALLOW FOR AIR MOVEMENT BEHIND GLAZING AND MULLIONS. 6. ALL EXTERIOR DOORS AND LOUVERS SHALL BE FABRICATED AND WEATHERSTRIPPED TO WITHSTAND 110 MPH EXPOSURE C WINDS. 7. CONTRACTOR SHALL FULLY PAINT UP TO FOUR CONCRETE PANELS WITH SELECTED COLORS AND ALLOW BOTH THE OWNER AND ARCHITECT TO APPROVE PRIOR TO PAINTING THE REMAINDER OF THE BUILDING. 8. FLOOR SLAB SLOPES -SEE CIVIL DRAWINGS. CONTRACTOR SHALL COORDINATE ALL DIMENSIONS TO COMPENSATE FOR SLOPING FLOOR. 9. THE PERIMITER SEALS OF STOREFRONT UNITS SHALL BE IN PLACE PRIOR TO PAINTING OF THE CONCRETE. 10. ALL PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE CAULKED ON BOTH THE INTERIOR AND EXTERIOR SIDES. 11. ALL HORIZONTAL REVEALS IN CONCRETE WALL PANELS, AND PAINT COLORS, SHALL CONTINUE AROUND PANEL CORNERS AT RECESSED WALL CONDITIONS AND AT SCREENWALL END CONDITIONS. 12. PRIME ALL CURBS TO RECEIVE PAINT. 13. ALL ON-SITE AND OFF-SITE FIRE HYDRANTS, PIVS, DDCS SHALL BE FULLY RE-PAINTED JUST PRIOR TO PROJECT HANDOVER TO OWNER. 14. TRUCK COURT GATES, MAIN GATES, ETC. SHALL RECEIVE PRIMER AND ENAMEL PAINT. FINAL COLOR TO BE FIELD SELECTED BY OWNER AND ARCHITECT. 15. SACK & PATCH ALL WALL LIFT POINTS ON INSIDE SURFACE ON CONCRETE WALL PANELS. FINISH SCHEDULE KEYNOTESGENERAL NOTES 1. PAINTED CONCRETE TILT-UP PANELS -SEE GENERAL NOTES FOR TYP. PAINTING REQUIREMENTS. 2. PAINTED CONCRETE RAMP WALL. TOP OF WALL TO BE MIN. 42" ABOVE FINISH SURFACE ON BOTH SIDES. 3. ALUMINUM STOREFRONT SYSTEM W/ MIN. 30 STC RATING. PROVIDE CLEAR ANODIZED MIN. 2" X 4.5" OFF-SET GLAZING SYSTEM BY UNITED STATES ALUMINUM CORPORATION, KAWNEER, OR APPROVED EQUAL. SYSTEM SHALL BE WATER TESTED PER ASTM E 331 PER PROJECT SPECIFICATIONS. USE GLAZING AS INDICATED BY THE FINISH SCHEDULE, THIS SHEET. ALL GLAZING TO BE HEAT TREATED. CONTRACTOR TO SUBMIT SHOP DRAWINGS AND GLASS SAMPLES TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING MATERIAL. CONTRACTOR TO COORDINATE LONG LEAD GLASS ORDERS WITH CONSTRUCTION SCHEDULE TO MINIMIZE IMPACT ON OVERALL COMPLETION DATE. "T" INDICATES TEMPERED GLASS. 4. 2" WIDE X 3/4" DEEP VERTICAL / HORIZONTAL REVEAL IN CONCRETE WALL PANEL. 5. PAINTED 3' X 7' HOLLOW METAL MAN DOORS. SEE DOOR SCHEDULE. 6. PANEL JOINTS PER STRUCTURAL DRAWINGS. SEE 1/AD-3 FOR TYPICAL PANEL JOINT CAULKING. 7. PAINTED 9'-0" X 10' DOCK HIGH VERTICAL LIFT METAL TRUCK DOOR ASSEMBLY. SEE DOOR SCHEDULE. 8. PAINTED 12' X 15' GRADE LEVEL ROLL-UP METAL TRUCK DOOR ASSEMBLY. SEE DOOR SCHEDULE. 9. AIR INTEK LOUVER -4' X 8' GALVANIZED LOUVER ASSEMBLY W/ FIXED RAIN-RESISTANT BLADES, BIRD SCREEN, 50% FREE OPEN AREA AND SECURITY GRILLE. PROVIDE GALVANIZED FILTER RACK & DISPOSABLE FILTERS PER MECH. DRAWINGS. PAINT TO MATCH BUILDING. SEE DETAILS 6/AD-5. 10. APPROXIMATE FINISH GRADE. 11. INTERIOR ROOF DRAIN / OVERFLOW DRAIN PER DETAILS 9/AD-2 & 15/AD-2. UPSIZE DRAIN ALONG HORIZONTAL RUNS PER CPC. SEE ROOF PLAN FOR SIZING & SITE PLAN FOR CONTINUATION TO CURB FACE OR SIMILAR CONDITION. NO ROOF DRAIN OR OVERFLOW DRAINS SHALL OUTLET INTO LANDSCAPED AREAS. 12. NOT USED. 13. NOT USED. 14. DASHED LINE INDICATES ROOF DECK BEYOND. 15. PRIMARY BUILDING ENTRANCE -ACCESSIBLE PER ADA & T-24 GUIDELINES. STOREFRONT DOORS W/ TEMPERED GLAZING. PROVIDE ACRYLIC SIGNAGE PER DETAIL 2/AD-1. 16. PROVIDE 20" HIGH X 2" WIDE X 2" METAL CHANNEL BRUSHED ALUMINUM NUMBERING FIXED TO FACE OF CONCRETE WALL PANEL. SEE ELECTRCIAL DRAWINGS FOR EXTERIOR ILLUMINATION. SUBMIT SHOP DRAWING TO ARCHITECT FOR APPROVAL. CONTRACTOR TO CONFIRM BUILDING ADDRESS PRIOR TO INSTALLATION. COORDINATE FINAL LOCATION WITH ARCHITECT, FIRE & POLICE DEPT. 17. PROVIDE KEY ACCESS BOX (KNOX BOX) PER FIRE DEPARTMENT RECESSED ON PANEL AND MOUNTED 5'-0" ABOVE ADJACENT FLOOR WITHIN 10'-0" OF MAIN ENTRY DOOR. 18. CONCRETE TRASH ENCLOSURE. 19. WALL MOUNTED LIGHT FIXTURES. CENTER FIXTURE IN PANEL WHERE POSSIBLE. SEE ELECTRICAL DRAWINGS FOR FINAL LOCATIONS AND MOUNTING HEIGHTS. FIXTURE HOUSINGS COLOR: TBD. 20. STEEL FRAMED CANOPY ASSEMBLY AS INDICATED. SEE SECTIONS AND DETAILS. SUBMIT SAMPLES AND SHOP DRAWINGS FOR ARCHITECT APP'L. PROVIDE RECESSED SOFFIT LIGHT FIXTURES WHERE INDICATED PER ELECTRICAL DRAWINGS. 21. PROPOSED LOCATION OF TENAT SIGNAGE UNDER SEPARATE PERMIT. 22. 8’H MANUALLY OPERATED BI-PARTING BLACK TUBULAR STEEL ROLLING GATES. SEE ELECTRICAL DWGS FOR CONDUIT PROVIDED FOR FUTURE ELECTRCIAL GATE OPERATION. SITE GATES SHALL HAVE KNOX BOXES TO ALLOW FOR FIRE DEPARTMENT ACCESS. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL INCLUDING STRUCT. DETAILS & WIND LOAD CALCS PRIOR TO CONSTRUCTION. 00 MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL PC1 04/16/21 PLAN CHECK COMMENTS 42433 16. GLAZING IN THE FOLLOWING LOCATIONS SHOULD BE OF SAFETY GLAZING MATERIAL IN ACCORDANCE WITH SECTION 2406.4 (SEE EXCEPTIONS): A) FIXED AND OPENABLE PANELS OF DOOR ASSEMBLIES. B) FIXED OR OPERABLE PANELS ADJACENT TO A DOOR WHERE THE NEAREST VERTICAL EDGE OF THE GLAZING IS WITHIN A 24-INCH ARC OF EITHER VERTICAL EDGE OF THE DOOR IN A CLOSED POSITION AND WHERE THE BOTTOM EXPOSED EDGE OF THE GLAZING IS LESS THAN 60 INCHES ABOVE THE WALKING SURFACE. C) INDIVIDUAL FIXED OR OPERABLE PANELS THAT MEET ALL OF THE FOLLOWING CONDITIONS: I) EXPOSED AREA OF AN INDIVIDUAL PANE IS GREATER THAN 9 SQUARE FEET, AND: II) EXPOSED BOTTOM EDGE IS LESS THAN 18 INCHES ABOVE THE FLOOR, AND: III) EXPOSED TOP EDGE IS GREATER THAN 36 INCHES ABOVE THE FLOOR, AND: IV) ONE OR MORE WALKING SURFACES ARE WITHIN 36 INCHES HORIZONTALLY OF THE PLANE OF THE GLAZING. 17. THE WIDTH OF THE OPENINGS FOR THE TRANSOM WINDOWS WILL MATCH THOSE FOR THE OPENINGS LOCATED BELOW, UNO. 1/4" = 1'-0"5 TRASH ENCLOSURE ELEVATION APN # 909-290-001 PA20-0533 BP20-4793 SEE ELEVATIONS FOR FINAL LOCATION OF REVEALS GENERAL NOTES 1. CONCRETE TILT-UP WALL PANEL. SEE STRUCTURAL DRAWINGS. 2. CONCRETE FLOOR SLAB -SEE FLOOR PLANS. 3. CONCRETE POUR STRIP -SLOPE 1/2" ( 2% MAX ) TOWARDS EXTERIOR AT ALL MAN DOORS, DOCK DOORS AND GRADE DOORS -SEE STRUCTURAL DRAWINGS FOR CONNECTION WITH FOOTING. 4. BUILT-UP ROOFING OVER PANELIZED ROOF STRUCTURE -SEE STRUCTURAL DRAWINGS & ROOF PLAN. 5. CONCRETE TRUCKING APRON -SEE SITE PLAN. 6. 3/4" DEEP REVEAL IN CONCRETE WALL PANEL. SEE ELEVATIONS FOR FINAL LOCATIONS. 7. CONCRETE FOOTING -SEE STRUCTURAL DRAWINGS FOR SIZE AND LOCATION. 8. INTERIOR MOUNTED VERTICAL LIFT OR ROLL-UP METAL DOOR -SEE DOOR SCHEDULE -INSTALL PER MANUFACTURER'S RECOMMENDATIONS. DOOR JAMBS TO BE BOLTED OR WELDED TO WALLS (SHOT PINS NOT ALLOWED). DOOR MOUNTING TO PROVIDE FOR SPECIFIED DOOR LIFECYCLE. 9. HOLLOW METAL PAINTED MAN DOOR -SEE DOOR SCHEDULE. 10. MIN. 60" SQ. CONCRETE LANDING AT DOORS U.N.O. WITH 1/4" PER FOOT MAX. SLOPE IN ANY DIRECTION. SLOPE AWAY FROM BUILDING. SEE FLOOR AND SITE PLANS. PROVIDE LIGHT BROOM FINISH U.N.O. 11. BENT PLATE JAMB TYPICAL AT ALL OVERHEAD DOORS -SEE STRUCTURAL DRAWINGS. 12. PROVIDE MIN. 24" SMOOTH STEEL DOWELS @ 18" O.C. AT ALL DOOR THRESHOLDS. U.N.O. ON STRUCTURAL. 13. FUTURE CONCRETE DOCK LEVELER PIT -SEE STRUCTURAL DRAWINGS. 14. LANDSCAPING -SEE SITE PLAN AND LANDSCAPE DRAWINGS. SLOPE AWAY FROM BUILDING @ 2% MINIMUM. 15. 3/4" DEEP V DRIP. 16. STOREFRONT GLAZING. SEE ELEVATIONS FOR ADDITIONAL INFORMATION. 17. GALVANIZED FORMED STEEL LOUVER ASSEMBLY. SEE DETAIL 6/AD-5. 18. DUST FILTER: PROVIDE 2" DUST STOP DISPOSABLE FILTERS SET IN 16 GA. GALVANIZED FRAME ASSEMBLY ATTACHED TO BACKSIDE OF LOUVER ASSEMBLY. PROVIDE .060 GALVANIZED PANELS AROUND PERIMETER OF FILTER FRAME TO BLANK OFF ANY UNFILTERED AREAS OF THE LOUVERS. 19. CORED 3/4" DIA. HOLE THROUGH CONC. WALL AT SPANDREL GLAZING LOCATIONS FOR AIR MOVEMENT -MIN. 1 PER EACH PANE OF GLASS, SEE ELEVATION SHEETS FOR ADD'L INFO. 20. STEEL FRAMED CANOPY ASSEMBLY W/ COMPOSITE ALUMINUM METAL FINISH. REFER TO ELEVATIONS FOR LOCATION. 21. RECESSED DOWLIGHT PER ELECTRICAL DRAWINGS. REFER TO ELECTRICAL DWGS FOR LOCATION AND COUNT. KEYNOTES 00 7'-0" 3'-0" 7'-10" 1'-0" 1'-0" 1'-0" TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF SPANDREL 4'-1" 4'-1" 8'-2" 1'-4" 9'-6" C.L. OF MULLION TOP OF CANOPY BOT. OF CANOPY TOP OF SPANDREL FINISH FLOOR 29'-0" SEE STRUCTURAL DWGS. 4 1 21 15 19 20 6 16 2 TOP OF PARAPET AD-3 56 AD-3 2 3 AD-3 4 AD-3 AD-3 8 AD-3 1816 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" TOP OF PARAPET TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL FLOOR FINISH 4 1 6 TYP. 2 27'-0" AD-3 56 AD-3 2 3 AD-3 4 AD-3 7'-0" 1'-6" 1'-6" 8'-0" 1'-6" 1'-6" 8'-0" TOP OF PARAPET TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL FINISH FLOOR 4 1 6 2 29'-0" AD-3 5 6 AD-3 2 3 AD-3 4 AD-3 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A4-1 WALL SECTIONS MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL 42433 APN # 909-290-001 PA20-0533 BP20-4793 1/2" = 1'-0"A WALL SECTION @ OFFICE ENTRY 1/2" = 1'-0"B WALL SECTION @ ACCENT PANEL 1/2" = 1'-0"C WALL SECTION @ CONCRETE PANEL 4 1 6 2 7 2'-6" 5'-6" 1'-6" 1'-6" 7'-10" 1'-8" 1'-6" 6'-0" 28'-0" TOP OF REVEAL TOP OF PARAPET TOP OF REVEAL BOTTOM OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL BOTTOM OF REVEAL FINISH FLOOR TYP. AD-3 56 AD-3 2 3 AD-3 4 AD-3 2'-6" 5'-5" 1'-7" 1'-6" 7'-10" 1'-8" 1'-6" 6'-0" 28'-0" 4 16 1 6 16 2 7 TOP OF REVEAL TOP OF PARAPET TOP OF MULLION BOTTOM OF MULLION TOP OF REVEAL TOP OF MULLION BOTTOM OF MULLION CL OF MULLION TYP. FINISH FLOOR AD-3 2 3 AD-3 4 AD-3 AD-3 5 6 AD-3 9 AD-3 9 6'-0" 1'-6" 1'-6" 8'-0" 1'-6" 1'-6" 1'-0" 7'-0" 1 6 16 2 TOP OF PARAPET TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF OPENING FINISH FLOOR 7 28'-0" AD-3 2 3 AD-3 4 AD-3 AD-3 6 AD-3 7 AD-3 56 6'-0" 1'-6" 1'-6" 8'-0" 1'-6" 8'-0" 1'-6" 4'-0" TYP. SEE CIVIL DWGS 4 1 6 1817 2 7 TOP OF REVEAL TOP OF PARAPET TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF OPENING BOTTOM OF OPENING FLOOR FINISH 28'-0" AD-3 2 3 AD-3 4 AD-3 AD-3 56 AD-5 6 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A4-2 WALL SECTIONS MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver KEYNOTES SEE SHEET A4-1 GENERAL NOTES SEE SHEET A4-1 00 MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL 42433 APN # 909-290-001 PA20-0533 BP20-4793 1/2" = 1'-0"A WALL SECTION @ CONCRETE PANEL 1/2" = 1'-0"B WALL SECTION @ CONCRETE PANEL 1/2" = 1'-0"C WALL SECTION @ MAN DOOR 1/2" = 1'-0"D WALL SECTION @ LOUVER 4 1 2 7 4'-0" 10'-0" 10" 8'-0" 1'-8" 1'-6" 6'-0" TOP OF PARAPET TOP OF OPENING TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL 28'-0" AD-3 11 12 AD-3 2 3 AD-3 4 AD-3 AD-3 5 6 4 1 2 7 8'-6" 1'-2" 6" 3'-10" 15'-0" 4'-0" TOP OF PARAPET TOP OF OPENING TOP OF REVEAL TOP OF REVEAL TOP OF REVEAL 29'-0" AD-3 11 AD-3 2 3 AD-3 4 AD-3 AD-3 5 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A4-3 WALL SECTIONS MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver KEYNOTES SEE SHEET A4-1 GENERAL NOTES SEE SHEET A4-1 00 MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL 42433 APN # 909-290-001 PA20-0533 BP20-4793 1/2" = 1'-0"A WALL SECTION @ DOCK DOOR 1/2" = 1'-0"B WALL SECTION @ GRADE DOOR HW-1 SINGLE EXTERIOR GLASS ENTRY DOOR 1 FLOOR CLOSER SC-PH-G28-AHO 90 626 RIX 1 DEADLOCK MS1861-02 628 ADA 1 I/C MORTISE CYLINDER 20-061 x A/R CAM 626 SCH 1 THUMBTURN CYLINDER 4066 626 ADA 1 ARMOR COLLAR K-24 626 KEE 1 SET PUSH/PULL TRIM 1747-1 630 TRM 1 THRESHOLD 171 x MSA 628 PEM SEALS BY FRAME MANUFACTURER HW-2 PAIR EXTERIOR GLASS ENTRY DOOR 2 FLOOR CLOSER SC-PH-G28-AHO 90 626 RIXD 1 DEADLOCK MS1861-01 628 ADA 1 DEADLOCK MS1861-02 628 ADA 2 I/C MORTISE CYLINDER 20-061 x A/R CAM 626 SCH 2 THUMBTURN CYLINDER 4066 626 ADA 2 ARMOR COLLAR K-24 626 KEE 2 SET PUSH/PULL TRIM 1747-1 630 TRM 1 THRESHOLD 171 x MSA 628 PEM SEALS BY FRAME MANUFACTURER HW-3 SINGLE EXTERIOR STOREFRONT ENTRY DOOR 1 OFFSET PIVOT 195 LESS TOP PIVOT 626 RIX 2 INTERMEDIATE PIVOT M19 626 RIX 1 DEADLOCK MS1850S 628 ADA 1 MORTISE CYLINDER 20-001 x A/R CAM 626 SCH 1 THUMBTURN CYLINDER 4066 626 ADA 1 ARMOR COLLAR K-24 626 KEE 1 EXIT INDICATOR 4089-02 628 ADA 1 PR DOOR PULL 1191-3 x BACK TO BACK 630 TRM 1 O.H. CONCEALED CLOSER 300 SERIES -MODEL 310 AL IDC 1 DOOR BOTTOM 222PK 628 PEM 1 THRESHOLD 171 x MSA 628 PEM SEALS BY STOREFRONT MANUFACTURER HW-4 PAIR EXTERIOR STOREFRONT ENTRY DOOR 2 OFFSET PIVOT 195 LESS TOP PIVOT 626 RIX 4 INTERMEDIATE PIVOT M19 626 RIX 1 HEADER BOLT 4085 ---- ADA 1 THRESHOLD BOLT 4015-18 ---- ADA 1 DEADLOCK MS1850S 628 ADA 1 MORTISE CYLINDER 20-001 x A/R CAM 626 SCH 1 THUMBTURN CYLINDER 4066 626 ADA 1 ARMOR COLLAR K-24 626 KEE 1 EXIT INDICATOR 4089-02 628 ADA 2 PR DOOR PULL 1191-3 x BACK TO BACK 630 TRM 2 O.H. CONCEALED CLOSER 300 SERIES -MODEL 310 AL IDC 2 DOOR BOTTOM 222PK 628 PEM 1 THRESHOLD 171 x MSA 628 PEM SEALS BY STOREFRONT MANUFACTURER HW-5 SINGLE EXTERIOR STOREFRONT EXIT DOOR WITH PANIC HARDWARE 1 OFFSET PIVOT 195 LESS TOP PIVOT 626 RIX 2 INTERMEDIATE PIVOT M19 626 RIX 1 PANIC EXIT DEVICE CD35A-NL-OP x 388 626 VON 1 MORTISE CYLINDER 20-001 626 SCH 1 RIM CYLINDER 20-022 626 SCH 1 ARMOR COLLAR K-24 626 KEE 1 O.H. CONCEALED CLOSER 300 SERIES -MODEL 310 AL IDC 1 DOOR PULL 1191-3 630 TRM 1 DOOR BOTTOM 222PK 628 PEM 1 THRESHOLD 171 x MSA 628 PEM SEALS BY STOREFRONT MANUFACTURER HW-6 PAIR EXTERIOR STOREFRONT EXIT DOOR WITH PANIC HARDWARE 2 OFFSET PIVOT 195 LESS TOP PIVOT 626 RIX 4 INTERMEDIATE PIVOT M19 626 RIX 1 PANIC EXIT DEVICE CD3548A-NL-OP x 388 626 VON 1 PANIC EXIT DEVICE CD3548A-EO 626 VON 2 MORTISE CYLINDER 20-001 626 SCH 1 RIM CYLINDER 20-022 626 SCH 1 ARMOR COLLAR K-24 626 KEE 2 O.H. CONCEALED CLOSER 300 SERIES -MODEL 310 AL IDC 2 DOOR PULL 1191-3 630 TRM 2 DOOR BOTTOM 222PK 628 PEM 1 THRESHOLD 171 x MSA 628 PEM SEALS BY STOREFRONT MANUFACTURER HW-7 SINGLE EXTERIOR HOLLOW METAL ENTRY DOOR 3 HINGE FBB191 -4-1/2 x 4-1/2NRP 600 STA 1 LOCKSET LV9453P x 17A 626 SCH 1 ARMOR COLLAR K-24 626 KEE 1 SURFACE CLOSER P4041-H-EDA 689 LCN 1 FLOOR STOP 1209 626 TRM 1 SET SEALS 2891S HEAD & JAMBS 628 PEM 1 DOOR BOTTOM 217PK 628 PEM 1 LOCK ASTRAGAL 5000 626 TRM INSTALL DOOR SEALS BEFORE CLOSER HW-7-P SINGLE EXTERIOR HOLLOW METAL ENTRY/EXIT DOOR W/ PANIC HARDWARE 3 HINGE FBB191 -4-1/2 x 4-1/2NRP 600 STA 1 PANIC EXIT DEVICE 22-SERIES NL-OP x 17 SP28 VON 1 ARMOR COLLAR K-24 626 KEE 1 SURFACE CLOSER P4041-H-EDA 689 LCN 1 FLOOR STOP 1209 626 TRM 1 SET SEALS 2891S HEAD & JAMBS 628 PEM 1 DOOR BOTTOM 217PK 628 PEM 1 LOCK ASTRAGAL 5000 626 TRM INSTALL DOOR SEALS BEFORE CLOSER HW-8 PAIR EXTERIOR HOLLOW METAL ENTRY DOOR 6 HINGE FBB191 -4-1/2 x 4-1/2NRP 600 STA 2 FLUSH BOLT 3917 626 TRM 1 DUST PROOF STRIKE 3910 626 TRM 1 LOCKSET LV9453P x 17A x 7/8 STK 626 SCH 1 ARMOR COLLAR K-24 626 KEE 1 SURFACE CLOSER P4041-H-EDA 689 LCN 1 DOOR HOLDER PAH-60 (@ INACTIVE LEAF) 689 LCN 2 FLOOR STOP 1209 626 TRM 1 ASTRAGAL 357 600 PEM 1 SET SEALS 2891S HEAD & JAMBS 628 PEM 2 DOOR BOTTOM 217PK 628 PEM INSTALL DOOR SEALS BEFORE CLOSER AND HOLDER HW-9 SINGLE EXTERIOR HOLLOW METAL EXIT ONLY DOOR 3 HINGE FBB191 -4-1/2 x 4-1/2NRP 600 STA 1 LOCKSET L9453P x 17A x L/OST 626 SCH 1 MOUNTING PLATE L283-150 ---- SCH 1 ARMOR COLLAR K-24 626 KEE 1 SURFACE CLOSER P4041-EDA 689 LCN 1 FLOOR STOP 1209 626 TRM 1 SET SEALS 2891S HEAD & JAMBS 628 PEM 1 DOOR BOTTOM 217PK 628 PEM 1 LOCK ASTRAGAL 5000 626 TRM INSTALL DOOR SEALS BEFORE CLOSER EXTERIOR HARDWARE SETS HW-10 SINGLE INTERIOR WOOD LATCHSET/LOCKSET DOOR 3 HINGE FBB179 -4-1/2 x 4 652 STA 1 LATCHSET ND10S x SPA 626 SCH OR 1 LOCKSET ND50PD x SPA 626 SCH 1 FLOOR STOP 1211 626 TRM 3 SILENCERS 1229A GRY TRM HW-10-PR PAIR INTERIOR WOOD LATCHSET DOOR (NO DUMMY TRIM) 6 HINGE FBB179 -4-1/2 x 4 652 STA 1 LATCHSET ND10S x SPA 626 SCH 2 FLOOR STOP 1211 626 TRM 6 SILENCERS 1229A GRY TRM 2 FLUSH BOLTS FB358 626 IVES 1 DUST PROOF STRIKE DP2 626 IVES HW-10-T SINGLE INTERIOR WOOD LATCHSET/LOCKSET DOOR AT THERMAL ENEVLOPE 3 HINGE FBB179 -4-1/2 x 4 652 STA 1 LATCHSET ND10S x SPA 626 SCH OR 1 LOCKSET ND50PD x SPA 626 SCH 1 SURFACE CLOSER 4041/P4041 689 LCN 1 FLOOR STOP 1211 626 TRM DOOR SEALS S88 JAMBS & HEAD BL PEMKO HW-11 SINGLE INTERIOR WOOD SECURITY DOOR (MORTISE LOCKSET) 3 HINGE FBB179 -4-1/2 x 4 652 STA 1 LOCKSET L9453P x 17A 626 SCH 1 ARMOR COLLAR K-24 626 KEE 1 FLOOR STOP 1211 626 TRM 3 SILENCERS 1229A GRY TRM HW-11-T SINGLE INTERIOR WOOD SECURITY DOOR (MORTISE) AT THERMAL ENVELOPE 3 HINGE FBB179 -4-1/2 x 4 652 STA 1 LOCKSET L9453P x 17A 626 SCH 1 ARMOR COLLAR K-24 626 KEE 1 FLOOR STOP 1211 626 TRM 1 SURFACE CLOSER 4041/P4041 689 LCN DOOR SEALS S88 JAMBS & HEAD BL PEMKO HW-12 SINGLE INTERIOR MULTIPLE-USER RESTROOM DOOR 3 HINGE FBB179 -4-1/2 x 4 652 STA 1 PUSH PLATE 1001-9 -6 x 16 630 TRM 1 PULL PLATE 1014-3 -4 x 16 630 TRM 1 SURFACE CLOSER 4041/P4041 689 LCN 1 KICK PLATE KO050 -10 x 2 LDW 630 TRM 1 WALL BUMPER 1270WV 630 TRM 3 SILENCERS 1229A GRY TRM USE PARALLEL ARM CLOSER ON OUT-SWINGING DOORS HW-13 SINGLE INTERIOR PRIVACY RESTROOM DOOR 3 HINGE FBB179 -4-1/2 x 4 652 STA 1 PRIVACY ND40S x SPA 626 SCH 1 SURFACE CLOSER 4041/P4041 689 LCN 1 KICK PLATE KO050 -10 x 2 LDW 630 TRM 1 WALL BUMPER 1270WV 630 TRM 3 SILENCERS 1229A GRY TRM USE PARALLEL ARM CLOSER ON OUT-SWINGING DOORS HW-14 SINGLE INTERIOR HOLLOW METAL LOCKSET MAN DOOR 3 HINGE FBB191 -4-1/2 x 4-1/2NRP 600 STA 1 LOCKSET LV9453P x 17A 626 SCH 1 ARMOR COLLAR K-24 626 KEE 1 SURFACE CLOSER 4041/P4041 689 LCN 1 FLOOR STOP 1209 626 TRM 1 SET SEALS 2891S HEAD & JAMBS 628 PEM 1 DOOR BOTTOM 217PK 628 PEM HW-15 PAIR INTERIOR HOLLOW METAL LOCKSET MAN DOOR 6 HINGE FBB191 -4-1/2 x 4-1/2NRP 600 STA 2 FLUSH BOLT 3917 626 TRM 1 DUST PROOF STRIKE 3910 626 TRM 1 LOCKSET LV9453P x 17A x 7/8 STK 626 SCH 1 ARMOR COLLAR K-24 626 KEE 1 SURFACE CLOSER 4041/P4041 689 LCN 1 DOOR HOLDER PAH-60 (@ INACTIVE LEAF) 689 LCN 2 FLOOR STOP 1209 626 TRM 1 SET SEALS 2891S HEAD & JAMBS 628 PEM 2 DOOR BOTTOM 217PK 628 PEM HW-16 SINGLE INTERIOR HERCULITE GLASS PASSAGE DOOR 1 TOP PATCH PL-424 #4 SS PRL 1 BOTTOM PATCH PL-414 #4 SS PRL 1 PIVOT PATCH PL-440 #4 SS PRL 1 FLOOR CLOSER BTS80 689 DOR 1 SET 10" PUSH/PULL TRIM 1191-3-BACK TO BACK 630 TRM 1" BOTTOM U-CHANNEL WU3SASL ANOD. CRL 1.5" TOP U-CHANNEL WU1SASL ANOD. CRL HW-17 PAIR INTERIOR HERCULITE GLASS PASSAGE DOORS 2 TOP PATCH PL-424 #4 SS PRL 2 BOTTOM PATCH PL-414 #4 SS PRL 2 PIVOT PATCH PL-440 S/L TR #4 SS PRL 2 FLOOR CLOSER BTS80 689 DOR 2 SETS 10" PUSH/PULL TRIM 1191-3-BACK TO BACK 630 TRM 1" BOTTOM U-CHANNEL WU3SASL ANOD. CRL 1.5" TOP U-CHANNEL WU1SASL ANOD. CRL HW-18 SINGLE INTERIOR STOREFRONT PASSAGE DOOR 1 OFFSET PIVOT 195 LESS TOP PIVOT 626 RIX 2 INTERMEDIATE PIVOT M19 626 RIX 1 PR DOOR PULL 1191-3 x BACK TO BACK 630 TRM 1 O.H. CONCEALED CLOSER RTS88BFE x 105 HO 689 DOR 1 DOOR BOTTOM 209-V A PEM SEALS BY STOREFRONT MANUFACTURER HW-19 PAIR INTERIOR STOREFRONT PASSAGE DOOR 2 OFFSET PIVOT 195 LESS TOP PIVOT 626 RIX 4 INTERMEDIATE PIVOT M19 626 RIX 2 PR DOOR PULL 1191-3 x BACK TO BACK 630 TRM 2 O.H. CONCEALED CLOSER RTS88BFE x 105 HO 689 DOR 2 DOOR BOTTOM 209-V A PEM SEALS BY STOREFRONT MANUFACTURER INTERIOR HARDWARE SETS 1. LOCKS SHALL BE KEY OPERATED FROM THE OUTSIDE AND OPERATED FROM THE INSIDE USING A DEVICE NOT PROHIBITED BY CHAPTER 10 OF THE CBC. 2. ALL EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT PER CBC SECTION 1010.1.9. 3. ALL EXTERIOR SWING DOORS SHALL BE EQUIPPED WITH A DEADBOLT AND DEAD LOCKING LATCH . THESE LATCHES SHALL COMPLY WITH CBC SECTION 1010. 4. AT THE MAIN ENTRANCE ONLY, PROVIDE SIGNAGE STATING IN 1" HIGH LETTER " THIS DOOR TO REMAIN UNLOCKED WHEN SPACE IS OCCUPIED" THE LOCKING DEVICE SHALL BE OF A TYPE READILY DISTINGUISHABLE AS LOCKED. ASSEMBLY SHALL COMPLY WITH CBC SECTION 1010.1.9.3 5. DEADBOLTS SHALL CONTAIN HARDENED INSERTS OR MANUFACTURER'S EQUIVALENT. STRAIGHT DEADBOLTS SHALL HAVE A MIN. 1" THROW WITH A MIN. 5/8" EMBEDMENT. HOOK OR EXPANDING DEADBOLTS SHALL HAVE A MIN. 3/4" THROW. 6. ALL LOCKS WHICH AUTOMATICALLY ACTIVATE TWO OR MORE DEADBOLTS SHALL EMBED A MIN. 1/2" BUT NEED NOT EXCEED 1/4" INTO A HOLDING DEVICE. 7. PIN-TYPE HINGES ACCESSIBLE TO THE EXTERIOR SHALL HAVE NON-REMOVABLE PINS. 8. ACCESSIBLE MORTISE OR RIM TYPE CYLINDER LOCKS INSTALLED IN HOLLOW METAL DOORS SHALL BE PROTECTED BY CYLINDER GUARDS WHERE THE CYLINDER PROJECTS BEYOND THE EXTERIOR OF THE DOOR. 9. EXITS SHALL BE ILLUMINATED AT ALL TIMES DURING BUILDING OCCUPANCY WITH LIGHT HAVING AN INTENSITY OF NOT LESS THAN 1 FOOT CANDLE AT THE FLOOR PER CBC SECTION 1008. 10. ALL FIRE RATED DOORS AND FRAMES SHALL HAVE COMPLETE EQUALLY RATED ASSEMBLIES INCLUDING SMOKE SEALS, CLOSURES, ETC. FIRE DOOR ASSEMBLIES SHALL BE LABELED BY AN APPROVED AGENCY. DOOR NOTES 11. "T' = TEMPERED SAFETY GLAZING PER CBC SECTION 2406. 12. PROVIDE CLOSURE DEVICES ON ALL EXTERIOR DOORS AND AT PERIMTER OF CONDITIONED SPACES, U.N.O. 13. WIDTH AND HEIGHT OF REQUIRED EXIT DOORS SHALL COMPLY WITH CBC ACCESSIBILITY GUIDELINES. SEE DOOR SCHEDULE FOR ACTUAL SIZES. 14. CENTER OF ALL DOOR HARDWARE TO BE 34" TO 44" ABOVE FLOOR. LATCHING AND LOCKING DOORS TO BE OPERABLE WITH A SINGLE EFFORT BY LEVER OR PUSH-PULL TYPE HARDWARE. 15. THE MAXIMUM EFFORT REQUIRED TO OPERATE A DOOR SHALL NOT EXCEED 5 POUNDS FOR EXTERIOR OR INTERIOR DOORS WITH A PULL OR PUSH EFFORT BEING APPLIED AT RIGHT ANGLE TO HINGED DOORS AND AT THE CENTER PLANE OF SLIDING OR FOLDING DOORS. AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE ABOVE STANDARDS. WHEN FIRE RATED DOORS ARE UTILIZED, THE MAXIMUM EFFORT TO OPERATE THE DOOR MAY BE INCREASED TO 15 POUNDS WITH A CLOSURE DEVICE. 16. LATCHING & LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL, SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, PANIC BARS, PUSH-PULL ACTIVATING BARS, OR OTHER HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. 17. ALL INTERIOR DOORS SHALL HAVE SILENCERS, UNLESS FULL SEALS ARE REQUIRED. 18. ALL SOLID CORE WOOD DOORS SHALL BE STAIN GRADE ROTARY SELECT WHITE BIRCH STAINED TO MATCH HALEY WINDSOR AS NOTED IN SCHEDULE. PROVIDE SAMPLE OF DOOR WITH STAINED FINISH FOR APPROVAL. 19. ON ALL VERTICAL LIFT DOORS, BOTTOM OF DOORS SHALL OPEN TO BE MINIMUM 12" HIGHER THAN TOP OF DOOR OPENING IN WALL. 20. ON ALL DOCK AND GRADE LEVEL DOORS, USE 13 GAUGE, 3" TRACKS. DOORS SHALL BE 24 GAUGE WITH BOLTED SPRING BUMPERS -NOT WELDED. DOOR SLIDE BOLTS SHALL BE MINIMUM 50" A.F.F. TO AVOID THE STEEL PROTECTION BAR. NOTES: 1. THE ITEMS LISTED IN THE FOLLOWING "SCHEDULE OF FINISH HARDWARE" SHALL CONFORM THROUGHOUT TO THE REQUIREMENTS OF THE FOREGOING SPECIFICATION. THE LAST COLUMN IN THE HARDWARE SCHEDULE REFERS TO THE MANUFACTURER ABBREVIATION LISTED ABOVE. 2. HARDWARE AT ALL EXIT DOORS SHALL COMPLY WITH CBC SECTION 1008. 3. ON STOREFRONT DOORS, PROVIDE ALTERNATE FOR CONT. GEARED HINGE IN LIEU OF PIVOTS. USE MARKAR FM100 OR PEMKO CFM PEMKOHINGE. 4. ON ALL EXTERIOR DOORS SERVING ELECTRIC ROOMS, COORDINATE WITH LOCAL UTILITY IN ORDER TO PROVIDE A LOCK KEYED TO PUBLIC UTILITIES MASTER KEY. 5. AT 8' HIGH DOORS, INCREASE NUMBER OF HINGES PER DOOR LEAF FROM 3 TO 4, TYP. 6. USE SCHLAGE INTERCHANGEABLE CORES (IC) AT ALL LOCKSET CYLINDERS HARDWARE SCHEDULE LEGEND OF LISTED MANUFACTURERS: ADA ADAMS RITE CRL C.R. LAURENCE DOR DORMA IDC INTERNATIONAL DOOR IVES IVES KEE KEEDEX LCN LCN CLOSERS PEM PEMKO RIX RIXSON SCH SCHLAGE STA STANLEY TRM TRIMCO VON VON DUPRIN MEDIUM STYLE STOREFRONT DOORAEXTERIOR GLASS ENTRANCE DOOR B DOCK HIGH DOOR -VERTICAL LIFT U.N.O. EDGRADE LEVEL DOOR - VERTICAL LIFT U.N.O. VISION LITE WHERE INDICATED IN DOOR SCHEDULE # AD-# # AD-# # AD-# # AD-# # AD-# # AD-# 38" HOLLOW METAL DOUBLE DOOR F VISION LITE WHERE INDICATED IN DOOR SCHEDULE # AD-# # AD-# # AD-# HOLLOW METAL DOOR C HOLLOW METAL DOOR -FULL DOOR LOUVER HOLLOW METAL DOOR -VENTED G SOLID CORE INT. DOOR W/NARROW LITE J KHOLLOW METAL DOOR W/HALF LITE MSOLID CORE INTERIOR WOOOD DOOR H # AD-# # AD-# # AD-# N O T U S E D 38" MIN. 24"H x 30"W, GALVANIZED, WITH INSECT SCREENS. 10" # AD-# # AD-# # AD-# # AD-# # AD-# # AD-# # AD-# # AD-# # AD-# MIN. 24"W x 66"W, FULL DOOR LOUVER GALV, WITH INSECT SCREENS. 10" # AD-# # AD-# # AD-# 10"37 45/64" # AD-# # AD-# # AD-# 38" 10" 42"N O T U S E D T 10" 42" # AD-# # AD-# # AD-# 5'-0" 5'-0" 38" T 8"X34"VISION LITE- FRAME TO MATCH DOOR JAMB 43" MAX. 42" T TTT T BRUSHED ALUM. CLR SHALLOW BOT. CHANNEL BRUSHED ALUM. CLR TOP CHANNEL RECESS INTO 5/8"GYP.BD. N O T U S E D LINTERIOR GLASS ENTRANCE DOOR RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A5-1 SCHEDULES MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver 1-DOOR SCHEDULE DOOR NUMBER DOOR FRAME HARDWARE COMMENTSFIRE RATING DOOR TYPE WIDTH HEIGHT THICKNESS DOOR MATERIAL DOOR FINISH VISION LITE TRANSOM SIGNAGE FRAME MATERIAL FRAME FINISH HARDWARE GROUP NO. LOCKING HARDWARE CLOSER THESHOLD ELEC. HW / KEYCARD 1-01 ---B 6' - 0"7' - 10"1/4"ALUM ANOD.--YES ALUM ANOD.HW-6 YES YES YES -ADA SIGNAGE / NO SMOKING SIGNAGE 1-05 ---D 12' - 0"15' - 0"20 GA STEEL PAINT 1 --MANUF.PAINT MANUF.---- 1-06 ---E 9' - 0"10' - 0"20 GA STEEL PAINT 1 --MANUF.PAINT MANUF.---- 1-08 ---C 4' - 0"7' - 0"1-3/4"H.M.PAINT --STEEL PAINT HW-7P YES YES --UTILITY PROVIDER KEY 1-09 ---C 3' - 0"7' - 0"1-3/4"H.M.PAINT --YES STEEL PAINT HW-7 YES YES --FIRE DEPARTMENT ACCESS KEY 1-10 ---C 3' - 0"7' - 0"1-3/4"H.M.PAINT ---STEEL PAINT HW-7 YES YES --ADA SIGNAGE. 1-20 ---H 3' - 0"7' - 0"1-3/4"WOOD STAIN ---TIMELY ALUMATONE HW-10 ---- 1-21 ---H 3' - 0"7' - 0"1-3/4"WOOD STAIN ---TIMELY ALUMATONE HW-10 ---- 1-22 ---H 3' - 0"7' - 0"1-3/4"WOOD STAIN ---TIMELY ALUMATONE HW-10 ---- 1-23 ---J 3' - 0"7' - 0"1-3/4"WOOD STAIN 1 --TIMELY ALUMATONE HW-10T YES YES -- 1-24 ---H 3' - 0"7' - 0"1-3/4"WOOD STAIN --YES TIMELY ALUMATONE HW-13 -YES --RESTROOM COMPLIANT SIGNAGE 1-25 ---H 3' - 0"7' - 0"1-3/4"H.M.PAINT --YES STEEL PAINT HW-13 YES YES --RESTROOM COMPLIANT SIGNAGE 1-26 ---C 3' - 0"7' - 0"1-3/4"H.M.PAINT --YES STEEL PAINT YES MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL 42433 APN # 909-290-001 PA20-0533 BP20-4793 1. REVISIONS ARE SHOWN IN BOLD AND ITALIC TYPE . 2. WALL, FLOORS, AND CEILINGS SHALL NOT EXCEED THE FLAME SPREAD CLASSIFICATIONS IN CBC T-803.9 3. ALL FLOORINGS SHALL HAVE TRANSITIONS STRIPS BY SCHLUTER OR APPROVED EQUAL. 4. PLASTIC LAMINATE COUNTER TOPS TO HAVE RADIUS EDGES AND COVE AT BACKSPLASH 5. SEE MATERIAL LEGEND FOR SPRINKLER ESCUTCHEON REQUIREMENTS. 6. PROVIDE EXPANSION JOINTS IN TILE AT ALL LOCATIONS (SEE FINISH SCHEDULE) WHERE BACKING MATERIAL CHANGES PER A.N.S.I. STANDARD A.108.1. TILE INSTALLATION SHALL BE PER THE CURRENT TILE COUNCIL OF AMERICA HANDBOOK FOR INSTALLATION GUIDELINES. 7. USE DENSSHIELD® TILE BACKER GYP. BD. WITH WATER RESISTANT CORE BY GEORGIA PACIFIC CORP. FOR ALL VERTICAL TILE BACKING. 8. NOTE THAT ALL MOUNTING HEIGHTS GIVEN ARE PER MANUF. RECOMMENDATIONS TO ENSURE THAT ALL OPERATIONAL PORTIONS OF ACCESSORIES ARE WITHIN 40" A.F.F. FOR DISABLED ACCESS. CONTRACTOR SHALL CONFIRM ACCESS PRIOR TO INSTALLATION. 9. PLUMBING FIXTURE SHALL BE PROVIDED IN ACCORDANCE WITH CHAPTER 4 OF THE CPC. 10. ALL FLOOR SHALL BE THIN SET TILE -CONTRACTOR SHALL NOTE TOILET ROOM LOCATIONS. PREP AS REQUIRED PER TILE COUNCIL OF AMERICA HANDBOOK. 11. ALL WASHROOM EQUIPMENT SHALL BE BOBRICK OR APPROVED EQUAL. 12. CONTRACTOR SHALL PROVIDE SOLID BACKING FOR WALL MTD EQUIPMENT AS REQUIRED BY MFG. 13. WHEN TILE IS DISRUPTED BY WASHROOM EQUIPMENT & MIRRORS; CONTRACTOR IS TO TAKE TILE UP AND AROUND EQUIPMENT AS APPLIES. CONTRACTOR SHALL VERIFY W/ ARCHITECT PRIOR TO INSTALLING TILE. 14. TOILET COMPARTMENT DOORS SHALL BE AS FOLLOWS: a. DOOR HARDWARE SHALL COMPLY WIT SECTION 11B-404. b. THE DOOR SHALL BE SELF-CLOSING. c. THE DOOR PULLS COMPLYING WITH SEC. 11B-404.2.7 SHALL BE PLACED ON BOTH SIDES OF THE DOOR NEAR THE LATCH. 15. FINISH SAMPLES SHALL BE SUBMITTED TO ARCHITECT FOR REVIEW PRIOR TO INSTALLATION. 16. DOOR AND FRAMES RECEIVING PAINT SHALL MATCH ADJACENT WALL COLOR. NOTES: RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER 1-A5-2 FINISH SCHEDULES MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA 16130 VENTURA BLVD SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS-MOUNTAIN VIEW LLC C/0 SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver ROOM WALL FINISH CEILING COMMENTSRM #NAME FLOOR FINISH BASE FINISH NORTH EAST SOUTH WEST SYSTEM FINISH HEIGHT 1-100 WAREHOUSE SC-1 -P-1 P-1 P-1 P-1 EXPOSED --PROVIDE B-2 ON DIMISING WALL BETWEEN OFFICE AND WAREHOUSE (WAREHOUSE SIDE) 1-101 FIRE RISER ROOM SC-1 B-2 P-1 P-1 P-1 P-1 GYP BD P-1 10'-0"PROVIDE B-2 ON DIMISING WALL BETWEEN FIRE RISER ROOM AND WAREHOUSE (WAREHOUSE SIDE) 1-102 ELECTRICAL ROOM SC-1 B-2 P-1 P-1 P-1 P-1 GYP BD P-1 10'-0"PROVIDE B-2 ON DIMISING WALL BETWEEN ELECTRICAL ROOM AND WAREHOUSE (WAREHOUSE SIDE) 1-110 OPEN OFFICE CP-1/LVT-1 B-1 P-1 P-1 P-1 P-1 ACT -10'-0" 1-111 OFFICE 1 CP-1 B-1 P-1 P-1 P-1 P-1 ACT -10'-0" 1-112 OFFICE 2 CP-1 B-1 P-1 P-1 P-1 P-1 ACT -10'-0" 1-113 OFFICE 3 CP-1 B-1 P-1 P-1 P-1 P-1 ACT -10'-0" 1-114 BREAK ROOM LVT-1 B-1 P-2 P-2 P-2 P-2 ACT -10'-0" 1-115 RESTROOM OFFICE TL-1 B-3 TL-2/P-2 TL-2/P-2 P-2 P-2 GYP BD P-1 9'-0" 1-116 RESTROOM WAREHOUSE SC-1 B-2 FRP/P-2 P-2 P-2 FRP/P-2 GYP BD P-1 9'-0" 1-117 JANITOR AREA SC-1 B-2 FRP/P-2 --FRP/P-2 EXPOSED -- ROOM FINISHES SCHEDULE MARK DATE DESCRIPTION PC 11/24/2020 PLAN CHECK SUBMITTAL 42433 APN # 909-290-001 PA20-0533 BP20-4793 18 7111519 81216 17 10 15 2 3 4 14 20 TYPICAL DOME SECTIONTYPICAL DOME PLAN 0. 2 0 " TAPERED EDGES WHERE EXPOSED 2.3" MIN. 2. 3 " M I N . 0.9" MIN.0.45" MIN. 2. 4 " M A X . 2.4" MAX.0.92" MAX.0.47" MAX. 0. 6 5 " M I N . TY P . B A S E TO B A S E NOTES: 1. THE DETECTABLE WARNING SURFACE SHALL BE YELLOW AND APPROXIMATE FS 33538 OF FEDERAL STANDARD 595C, PER CBC SECTION 11B-705.1.1.3.1. 2. THE DETECTABLE WARNING SURFACE SHALL COMPLY WITH CBC SECTION 11B.705.1.2.2 FOR CURB RAMPS. 3. THE DETECTABLE WARNING SURFACE SHALL COMPLY WITH CBC SECTION 11B.705.1.2.5 FOR WALKS. 4. IN CALIFORNIA: ONLY DSA-AC DETECTABLE WARNING PRODUCTS SHALL BE INSTALLED DETECTABLE TRUNCATED DOMES SURFACING SCALE: N.T.S.01010 NOTES: 1. CURB RAMPS SHALL COMPLY WITH 2016 CBC SECTION 11B-406. 2. LANDINGS AT TOP AND BOTTOM SHALL NOT EXCEED 1/4" PER FOOT SLOPE IN ANY DIRECTION U.N.O. 8. 3 3 % MA X CONCRETE SIDEWALK W/ MED. BROOM FINISH U.N.O. 12" WIDE BORDER OF 1/4" X 1/4" GROOVES @ 3/4" O.C. LANDSCAPING DETECTABLE WARNING SURFACE ON RAMP SURFACE CONCRETE CURB 2% MA X 12 " 48 " M I N . 48" MIN AS R E Q U I R E D A TYPICAL CURB RAMPS SCALE: 1/4" = 1'-0"01132 8 - 2" MAX. 6" M I N . / 8" M A X . 36 " B 8.33% MAX 2% MAX 48 " M I N 48" MIN.AS REQUIRED LANDSCAPING CONCRETE CURB DETECTABLE WARNING SURFACE ON TRANSITION SURFACE 12" 48" MIN. - 0" CURB CONDITION PROVIDE DETECTABLE WARNINGS FULL WIDTH 36 " 2" MAX. 8 - C 8. 3 3 % MA X 2% M A X LA N D I N G 48" MIN 2" MAX. 6" M I N . / 8" M A X . 36 " 1:10 MAX. 1:10 MAX. DETECTABLE WARNING SURFACE ON TRANSITION SURFACE CONCRETE CURB 8 - 0" CURB 0" CURB PERPENDICULAR CURB RAMP W/ FLARED SIDES PARALLEL CURB RAMP W/ FLARED SIDES PERPENDICULAR CURB RAMP W/ STRAIGHT SIDES 48 " M I N . AS R E Q U I R E D SCALE: 1" = 1'-0"01102 PRE-CAST CONCRETE WHEEL STOP CONC. CURB & LANDSCAPE WHERE OCCURS PRE-CAST CONC. WHEEL STOP W/ REINF. - USE 2 - #4 REBAR EMBEDED 18" MIN. INTO NAT. GRADE & SET FLUSH W/ TOP OF STOP. STOP LENGHT SHALL BE 6'-0" WHEN SHARED BY TWO STALLS OR 4'-0" FOR SINGLE STALL A.C. PAVING O/ A.B. NOTES: 1.USE EPOXY ADHESIVE IN LIEU OR REBAR FOR INSTAL. ON CONC. SLAB 2.SEE SITE PLAN FOR LOCATION OF STOPS. 18 " A. B . A. C . 5 1 / 2 " 7 1/2" 2'-0" TYP. UP CONCRETE TILT-UP PANEL PER STRUCT. DWNGS POURED IN PLACE CONC. STAIRS & LANDING W/ LIGHT BROOM FIN. W/ TILT-UP EDGE PANELS - FINISH & PAINT SIDES TO MATCH BLDG. 1-1/2" DIA. PAINTED STEEL HANDRAIL/GUARDRAIL CONC. CURB WHERE OCCURS PER PLAN CONC. WALK W/ MED. BROOM FIN LANDSCAPING WHERE OCCURS PER PLAN NOTES: 1. G.C. SHALL ADJUST THE NUMBER OF TREADS AND RISERS PER FIN. GRADE AT EA. LOCATION PER CIVIL DWGS. 2. EVERY RISER HEIGHT SHALL BE BE NOT LESS THAT 4" NOR GREATER THAN 7" AND EA. TREAD SHALL BE NOT LESS THAN 11" MEASURED FROM NOSE TO NOSE. 3. SEE STRUCT. DRAWINGS FOR FURTHER NOTES. 6' - 2 " 11 " T R E A D S 5' - 6 " 12 " 11 " 12 " 12 " 3' - 0 " 6" EXTERIOR CONCRETE STAIRS SCALE: 3/16" = 1'-0"01300 20 - UP 5' - 1 1 " 1 1 " TR E A D S 5' - 8 " 4' - 0 " 12 " 11 " 12 " 12 " 3' - 0 " 8" 5'-3" SEE SITE PLAN 5'-0" CLR. SEE SITE PLAN 18 AD-1 20 - 16 AD-1 4' - 0 " A STAIRS W/ CONC. TILT-UP GUARDRAILS (GREATER THAN 30" GRADE DIFFERENCE)B STAIRS W/ STEEL PIPE HANDRAILS (LESS THAN 30" GRADE DIFFERENCE) 3" 23 " NOTES: 1. NO SMOKING SIGNAGE SHALL BE APPROX. 6" X 10" & PROVIDED AT THE PRIMARY OFFICE ENTRY(S) AND AT ANY OTHER LOCATION AS IDENTIFIED ON THE ARCHITECTURAL SITE PLAN. 2. LOCATIONS ARE SCHEMATIC AND CONTRACTOR IS TO COORDINATE THE FINAL LOCATIONS WITH THE ARCHITECT. NO SMOKING SIGN - APPROX. 6" X 10" NO SMOKING SIGNAGE SCALE: 1/2" = 1'-0" WITHIN 25 FEET OF BUILDING 01129 01000 INTERNATIONAL SYMBOL FOR ACCESSIBILITY - WHEN PAINTED IN PARKING STALL, SYMBOL SHALL BE 36" SQUARE. SIGN FIELD: BLUE #15090 IN FEDERAL STANDARD 595C. SYMBOL: WHITE, 3" WIDE STRIPING NOTES: 1. SEE SITE PLAN FOR LOCATIONS OF DISABLED ACCESS STALLS. 2. WHEN PAINTED IN STALL; EMBLEM MUST BE LOCATED SO THAT IT IS VISIBLE BY A TRAFFIC ENFORCEMENT OFFICER WHEN A VEHICLE IS PROPERLY PARKED IN THE SPACE (CENTERED AT ENTRANCE TO STALL RECOMMENDED). INTERNATIONAL ACCESSIBILITY SYMBOL SCALE: 1" = 1'-0" 3'-0" 3' - 0 " 3" @ C O N C . C U R B 18 " @ C O N C . C U R B & G U T T E R BACK TO BACK STALLS STALLS @ LANDSCAPING CONC. WHEEL STOP CONC. CURB 3" WIDE WHITE TRAFFIC PAINT STRIPING ADD 10" WHITE PAINTED TEXT WHEN STALL IS INDICATED AS SUCH ON THE SITE PLAN NOTES: 1. SEE SITE PLAN ACTUAL STALL DIMENSIONS & OVERHANG LOCATIONS. 2. PROVIDE 2 COATS OF TRAFFIC PAINT O/ NON-SEALED A.C. & 1 COAT O/ SEALED A.C. U.N.O.. 3. CONFIRM STRIPING CONFIGURATION WITH GOVERNING CITY STANDARDS PRIOR TO PAINTING. 3'3' 24 " T Y P . U N O STALL WIDTH SEE PLAN ST A L L D E P T H SE E P L A N 7 1/2" 12 - CLEAN AIR/ VANPOOL/EV STALL STRIPING SCALE: 1/8" = 1'-0"01100 CONCRETE WALL PANEL HANDRAIL TO RETURN TO WALL SEE NOTE #7 BELOW 1-1/2" PIPE STEEL PRIMED AND PAINTED U.N.O. SPECIFICATIONS - GRIND ALL WELDS SMOOTH AND FILL ALL PITS 3/4" DIA. STEEL SUPPORT PAINT TO MATCH U.N.O. 1/4" X 3" DIA PL WELDED TO HANDRAIL AND SECURED TO PANEL W/ 3 - 3/8" X 3" EXP. BOLTS @ 6'-0" MAX. O.C. AND AT 6" FROM EA. END 34 " A . F . F . O R A B O V E T R E A D N O S E NOTES: (REFER TO CBC SECTIONS 1014 & 11B-505). 1. HANDRAILS ARE TO BE PROVIDED EACH SIDE OF ALL STAIRS AND RAMPS. 2. HANDRAILS ARE TO BE CONTINUOUS WITHIN THE FULL LENGTH OF EACH STAIR FLIGHT OR RAMP RUN, WITHOUT INTERRUPTION BY NEWEL POSTS OR OTHER OBSTRUCTIONS. 3. INSIDE HANDRAILS ON SWITCHBACK OR DOGLEG STAIRS AND RAMPS ARE CONTINUOUS BETWEEN FLIGHTS OR RUNS. 4. HANDRAIL GRIPPING SURFACES ARE NOT TO BE OBSTRUCTED ALONG THEIR TOPS OR SIDES. THE BOTTOM OF THE HANDRAIL GRIPPING SURFACE SHALL NOT BE OBSTRUCTED FOR MORE THAN 20% OF ITS LENGTH. 5. HANDRAIL GRIPPING SURFACES AND ANY SURFACES ADJACENT TO THEM ARE FREE OF SHARP OR ABRASIVE ELEMENTS AND HAVE ROUNDED EDGES. 6. HANDRAILS DO NOT ROTATE IN THEIR FITTINGS. 7. HANDRAILS SHALL RETURN TO A WALL, GUARD, OR THE WALKING / LANDING SURFACE OR SHALL BE CONTINUOUS TO THE HANDRAIL OF AN ADJACENT STAIR FLIGHT OR RAMP RUN. 8. HANDRAIL EXTENTIONS SHALL BE PROVIDED PER PLAN AT TOP AND BOTTOM OF ALL RAMPS AND STAIRS. 9. HANDRAILS SHALL BE RESIST A LINEAR LOAD OF 50 LBS. PER LINEAL FOOT, & A CONCENTRATED LOAD OF 200 LBS. 4" 1-1/2" HANDRAIL @ CONCRETE WALL SCALE: 3" = 1'-0"01360 4-1/2" MAX. MIN. 2" CONCRETE STAIR SECTION SCALE: 1/4" = 1'-0"01320.30 NOTES: 1. SEE STRUCTURAL DRAWINGS FOR FURTHER NOTES AND REINF. REQUIREMENTS. 20 AD-1 19 AD-1 1-1/2" DIA. PIPE HANDRAIL - GRIND ALL WELDS SMOOTH CONC. LANDING CONC. TILT-UP PANEL POURED IN PLACE CONC. STAIRS AND LANDING 34 " 34 " 11" 12" FLAT RUN 6'-0" MAX. 4" - 7 " R I S E R S 42 "8" 3" 12" FLAT RUN 34 " LEVEL LANDING WITH MAX 1/4" PER FOOT SLOPE TO DRAIN 1-1/2" DIA. PAINTED STEEL HANDRAIL CONCRETE STAIR TREAD W/ MEDIUM BROOM FINISH PAINTED CONC. TILT-UP WALL PANEL SCALE: 3/16" = 1'-0"01305.5 EXTERIOR CONCRETE STAIR UP NOTES: 1. CONTRACTOR SHALL ADJUST THE NUMBER OF TREADS AND RISERS PER FINISH GRADE AT EA. LOCATION PER CIVIL DWGS. 2. EVERY RISER HEIGHT SHALL BE BE NOT LESS THAT 4" NOR GREATER THAN 7" AND EA. TREAD SHALL BE NOT LESS THAN 11" MEASURED FROM NOSE TO NOSE. ALL RISERS & TREADS SHALL BE OF UNIFORM HEIGHT & WIDTH. 3. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL NOTES. 4. WHERE STAIRWAYS OCCUR OUTSIDE A BUILDING, THE UPPER APPROACH AND ALL TREADS SHALL BE MARKED BY A STRIP OF CLEARLY CONTRASTING COLOR AT LEAST 2" WIDE AND NOT MORE THAN 4" WIDE PLACED PARALLEL TO AND NOT MORE THAN 1" FROM THE NOSE OF THE STEP OR LANDING TO ALERT THE VISUALLY IMPAIRED.THE STRIP SHALL BE OF A MATERIAL IS AT LEAST AS SLIP-RESISTANT AS THE OTHER TREADS OF THE STAIR. A PAINT STRIP IS ACCEPTABLE. 5'-0"11"4'-0" 6'-11"5'-0" 24 " C L R 3' - 0 " 6" 5' - 6 " 18 - 3" 11" TREADS DS WHERE AN EXIT SIGN IS PROVIDED 3-C - 20 - -12" FLAT RUN PRIMARY ENTRANCE SIGNAGE SCALE: N.T.S.01124 FIN. GRADE INTERNATIONAL SYMBOL FOR ACCESSIBILITY - BACKGROUND COLOR SHALL BE BLUE 15090 IN FEDERAL STANDARD 595C. SYMBOL, LETTERS AND BRAILLE SHALL BE WHITE. CHARACTERS AND SYMBOLS SHALL HAVE A NON GLARE FINISH AND SHALL BE RAISED 1/32". 5/8" HIGH MIN. SANS SERIF CHARACTERS WITH A WIDTH TO HEIGHT RATIO OF BETWEEN 3:5 AND 1:1 AND A STROKE WIDTH TO HEIGHT RATIO OF BETWEEN 1:5 AND 1:10. GRADE II BRAILLE - 3/8" HIGH CHARACTERS SEE NOTES BELOW 6" ACCESSIBLE ENTRANCE 48 " M I N . 60 " M A X . 6" NOTES: 1. PROVIDE 6" SQ. ACRYLIC ACCESSIBILITY SYMBOL SIGNAGE AT ALL PRIMARY BUILDING ENTRANCES PER CBC CHAPTER 11B DIVISION 2 SECTIONS 11B-201.1 &11B-202.4 2. THE SIGN SHALL COMPLY WITH CBC CHAPTER 11B DIVISION 7 SECTIONS 11B-703.2 THRU 703.7.2 AND CBC SECTION 1013. 3. THE SIGN SHALL BE LOCATED ADJACENT TO THE LATCH SIDE OF A SINGLE DOOR AND RIGHT SIDE OF DOUBLE DOORS 48" MIN. A.F.F. TO THE BOTTOM OF LOWEST BRAILLE CHARACTER AND 60" MAX. TO THE BASELINE OF THE HIGHEST LINE OF RAISED CHARACTER. SIGN SHALL BE CENTERED IN AN 18" X 18" CLEAR AREA ADJACENT AND CLEAR OF THE DOOR SWING PER SECTION 11B-703.4.2. 4. VISUAL CHARACTERS ON SIGNS SHALL BE SELECTED FROM FONTS WHERE THE WIDTH OF THE UPPERCASE LETTER "O" IS 60% MIN. AND 110% MAX. OF THE HEIGHT OF THE UPPERCASE LETTER "I". STROKE THICKNES OF THE UPPERCASE LETTER "I" SHALL BE 10% MIN. AND 20% MAX. OF THE HEIGHT OF THE CHARACTER. 5. CONTRACTED GRADE II BRAILLE: DOTS SHALL BE 1/10" ON CENTERS IN EACH CELL WITH 2/10" SPACE BETWEEN CELLS, MEASURED FROM THE SECOND COLUMN OF DOTS IN THE FIRST CELL TO THE FIRST COLUMN OF DOTS IN THE SECOND CELL. DOTS SHALL BE RAISED A MINIMUM OF 1/40" ABOVE THE BACKGROUND, AND ARE TO BE ROUNDED, NOT SQUARE DOTS. SINGLE DOOR DOUBLE DOOR 9"9" FIN. FLR. WALL MOUNTED SIGN - BACKGROUND COLOR SHALL BE BLUE 15090 IN FEDERAL STANDARD 595C. LETTERS AND BRAILLE SHALL BE WHITE. CHARACTERS SHALL HAVE A NON GLARE FINISH AND SHALL BE RAISED 1/32". 1" HIGH MIN. SANS SERIF CHARACTERS - SEE NOTE #3 BELOW FOR ADD'L REQUIREMENTS. GRADE LEVEL EXITS SHALL HAVE THE WORD "EXIT". EXIT DOORS THAT LEAD DIRECTLY TO A STAIR OR RAMP SHALL HAVE THE FOLLOWING WORDS AS APPROPRIATE: "EXIT STAIR DOWN""EXIT STAIR UP" "EXIT RAMP DOWN""EXIT RAMP UP" GRADE II BRAILLE - SEE NOTE #5 BELOW FOR ADD'L REQUIREMENTS SINGLE DOOR SIGN LOCATION DOUBLE DOOR SIGN LOCATION 3" M I N . AS REQUIRED TACTILE EXIT SIGNS SCALE: N.T.S.01125 48 " M I N . 60 " M A X . EXIT STAIR DOWN EXIT STAIR DOWN EXIT STAIR DOWN EXIT ROUTE EXIT STAIR DOWN EXIT RAMP DOWN EXIT SIGN TYPE SIGN TYPE SIGN TYPE SIGN TYPE NOTES: 1. PROVIDE WALL MOUNTED EXIT SIGNAGE AT EACH DOOR REQUIRED TO HAVE AN EXIT SIGN PER 2019 CBC SECTION 1013. 2. THE SIGN SHALL COMPLY WITH CBC CHAPTER 11B SECTIONS 11B-703.1 THROUGH 11B-703.5 AND CHAPTER 10 SECTION 1013. 3. THE SIGN SHALL BE LOCATED ADJACENT TO THE LATCH SIDE OF A SINGLE DOOR AND RIGHT SIDE OF DOUBLE DOORS 48" MIN. A.F.F. TO BOTTOM OF LOWEST BRAILLE CHARACTER AND 60" MAX. TO TOP OF HIGHEST BRAILLE CHARACTER. A PERSON SHALL BE ABLE TO APPROACH WITHIN 3" OF THE SIGN WITHOUT ENCOUNTERING A PROTRUDING OBJECT OR BE WITHIN THE SWING OF THE DOOR PER CBC SECTION 11B-703.4.2. 4. VISUAL CHARACTERS ON SIGNS SHALL BE SELECTED FROM FONTS WHERE THE WIDTH OF THE UPPERCASE LETTER "O" IS 60% MIN. AND 110% MAX. OF THE HEIGHT OF THE UPPERCASE LETTER "I". STROKE THICKNESS OF THE UPPERCASE LETTER "I" SHALL BE 10% MIN. AND 20% MAX. OF THE HEIGHT OF THE CHARACTER. 5. CONTRACTED GRADE II BRAILLE: DOTS SHALL BE 1/10" ON CENTERS IN EACH CELL WITH 2/10" SPACE BETWEEN CELLS, MEASURED FROM THE SECOND COLUMN OF DOTS IN THE FIRST CELL TO THE FIRST COLUMN OF DOTS IN THE SECOND CELL. DOTS SHALL BE RAISED A MINIMUM OF 1/40" ABOVE THE BACKGROUND, AND ARE TO BE ROUNDED, NOT SQUARE DOTS. A B C D DISABLED ACCESS SITE SIGNAGE ON STEEL POSTS SCALE: 1" = 1'-0"01127 24 " H E I G H T N . T . S . 60 " M I N . H T . W H E R E W A L L M T D . O R I N L A N D S C A P E PARKING ONLY MINIMUM FINE $250 VAN ACCESSIBLE MINIMUM FINE $250 80 " M I N . H T . I N P A R K I N G / P E D E S T R I A N W A L K W A Y S SIGN TYPE DSIGN TYPE CSIGN TYPE BSIGN TYPE A FIN. GRADE SIGNAGE REQUIREMENTS: 1. ALL SIGNS TO BE 1/8" THK., REFLECTORIZED, WHITE LETTERING ON BLUE BACKGROUND. PROVIDE 1/2" MIN. RADIUS CORNERS. BLUE SHALL BE COLOR 15090 IN FEDERAL STANDARD 595C. 2. NO SIGN SHALL BE SMALLER THAN 70 SQ. INCHES. 3. ALL LETTERING TO BE MIN. 1" HIGH. 4. SEE SITE PLAN FOR LOCATIONS. 5. G.C. SHALL BE RESPONSIBLE FOR OBTAINING CONTACT INFO & GOVERNING AGENCY REQ. NECESSARY TO COMPLETE THE SIGN TEXT PRIOR TO BUILDING FINAL. 60 " M I N . H T . W H E R E W A L L M T D . O R I N L A N D S C A P E 80 " M I N . H T . I N P A R K I N G / P E D E S T R I A N W A L K W A Y S 60 " N . T . S . ( P L A C E I N L A N D S C A P E ) SIGN TYPE D: MIN. 17" X 22" - UNAUTHORIZED VEHICLE WARNING SIGN, LOCATED AT EACH AUTO ENTRANCE TO THE FACILITY FROM RIGHT OF WAY SIGN TYPE C: 9" MIN. WIDTH - PARKING SPACE SIGNAGE AT VAN ACCESSIBLE DISABLED ACCESS STALLS AS IDENTIFIED ON THE SITE PLAN SIGN TYPE B: 9" MIN. WIDTH - PARKING SPACE SIGNAGE AT TYPICAL DISABLED ACCESS STALLS AS IDENTIFIED ON THE SITE PLAN SIGN TYPE A: 9" MIN. WIDTH - ADA PATH OF TRAVEL DIRECTIONAL SIGNAGE. LOCATE AT ENTRANCE OF ACCESSIBLE PATH FROM RIGHT-OF-WAY, AND AT EACH MAJOR JUNCTION. SEE SITE PLAN. G.C. SHALL BE RESPONSIBLE FOR FIELD COORDINATING THE ARROW DIRECTION 3" DIA. GALVANIZED POLE SET IN CONC. FOOTING- TYP. UNAUTHORIZED VEHICLES PARKED IN DESIGNATED ACCESSIBLE SPACES NOT DISPLAYING DISTINGUISHING PLACARDS OR SPECIAL LICENSE PLATES ISSUED FOR PERSONS WITH DISABILITIES WIL BE TOWED AWAY AT THE OWNERS EXPENSE TOWED VEHICLES MAY BE RECLAIMED AT OR BY TELEPHONING (___) ________ (INSERT TEXT) X XX X XX SCALE: 1/4" = 1'-0"01299 TYP. MANEUVERING CLEARANCES AT DOORS 24" 44 " * 4 8 " R E Q . WH E R E D O O R PR O V I D E D W / CL O S E R 22" 44 " * 4 8 " R E Q . WH E R E D O O R PR O V I D E D W / BO T H C L O S E R & LA T C H 24"18" 12" 24"36" 60 " 60 " WIDTH OF DOOR 48 " 48 " FRONT APPROACH PULL SIDE - EXTERIOR HINGE APPROACH PULL SIDE FRONT APPROACH PUSH SIDE FRONT APPROACH PUSH SIDE - DOOR PROVIDED W/ BOTH CLOSER AND LATCH (F) HINGE APPROACH PUSH SIDE LATCH APPROACH PUSH SIDE LATCH APPROACH PULL SIDE FRONT APPROACH PULL SIDE - INTERIOR NOTES: 1. MAX. SLOPE AT EXTERIOR LANDINGS IS 2% IN ANY DIRECTION. 2. INTERIOR LANDINGS ARE LEVEL (UP TO 0.5% SLOPE MAX.). 3. FOR TYPICAL THRESHOLD REQUIREMENTS AT EACH LOCATION - SEE SEPARATE DETAILS 4. ALL DOORS SHALL PROVIDE MIN. 32" CLR. FROM FACE TO DOOR TO STOP WITH DOOR AT 90 DEG. OPEN. 7 AD-3 8 AD-3 36" OC MAX. ACCESSIBLE PARKING STALL SCALE: 1/8" = 1'-0"01112 NOTES: 1. SURFACE SLOPES SHALL NOT EXCEED 1/4" PER FOOT IN ANY DIRECTION. 2.SEE SITE PLAN FOR LAYOUT VARIATIONS 3. ALL STRIPING FOR BORDERS OF DISABLED ACCESS LOADING STALLS SHALL BE BLUE. ACCESSIBLE PARKING STALL SIGN @ CENTER OF STALL U.N.O. 6" CURB, TYP. VAN ACCESSIBLE PARKING SIGN @ CENTER OF STALL U.N.O. CONCRETE WHEEL STOP WHERE OCCURS ON SITE PLAN 6" WIDE BLUE TRAFFIC PAINT STRIPING ADD TEXT WHEN STALL IS INDICATED AS "VAN ACCESSIBLE" ON SITE PLAN 3" WIDE BLUE STRIPING ACCESSIBLE PARKING STALL SYMBOL @ REAR/CENTER OF STALL - SEE DETAIL 5'-0" OR 8'-0" SEE SITE PLAN VAN ACCESSIB LE 9'-0"9'-0" SINGLE STALL CONFIGURATION DOUBLE STALL CONFIGURATION 9'-0"5'-0" MULTIPLE STALL CONFIGURATION 24 " 48 " M I N . 18 ' - 0 " M I N . 12 " 36" 36 " 1 - 12 - 5-C - 5-B - 8 - 36 " NO PARKIN G #3 BARS @ 12" O.C. EA. WAY POURED IN PLACE CONC. STEPS W/ LIGHT BROOM FINISH #4 BAR AT TOP & BOTTOM BLACK CONTRAST STRIPE IN COMPLIANCE W/ CBC 11B-504.4.1 1/2" MAX. RADIUS AT LEADING EDGE OF STAIR NOSING 1/4" X 1/4" TOOLED GROOVES PAINTED WITH CONTRASTING PAINT - PROVIDE AT EACH TREAD AND UPPER APPROACH TOOLED EDGE W/ #3 BAR AT NOSING - SEE BLOWUP ABOVE FINISH - SEE SITE PLANS 1/2" EXP. JOINT NOTES: 1. SEE STRUCTURAL FOR FURTHER NOTES. 2. EXTERIOR STAIR TREADS / LANDINGS SHALL BE DESIGNED TO PREVENT WATER ACCUMULATION. 2 3/4"1" CONCRETE STEPS AND NOSINGS SCALE: 3/4" = 1'-0"01321 11"1-1/4" MAX. 10" MIN. 18 " M I N . 3" 3" 4" M I N . 7" M A X . MAX. NOTES: 1. SEE CIVIL DRAWINGS FOR NUMBER AND HEIGHT OF RISERS. 2. IN ACCORDANCE WITH ACCESSIBILITY GUIDELINES, THE VERTICAL SUPPORT JUST BELOW THE HANDRAIL SHALL BE OF A SMALLER DIA. THAN THE HANDRAIL. 3. SEE NOTES ON DETAIL 20, THIS SHEET, FOR COMPLETE HANDRAIL REQUIREMENTS. 4. GUARDRAIL CONDITION IS REQUIRED WHERE GRADE DIFFERENCE TO ADJACENT GRADE EXCEEDS 30" PER CBC SECTION 1015. SCALE: 1/2" = 1'-0" SITE STEPS 01322 17 " 17 " 34 " 17 " 17 " 6" 6'-0" O.C. MAX 1-1/2" DIA. PIPE HANDRAILS CONT. WHERE SHOWN ON PLAN & STRUCT. DRAWINGS 3" 12" FLAT 12" FLAT RUN RUN 11" 1-1/2" DIA. PIPE HANDRAIL - GRIND ALL WELDS SMOOTH & PAINT PER SPECS. 19 AD-1 FINISH - SEE PLANS 1/2" EXP. JOINT VERTICAL SUPPORTS SHALL BE SMALLER THAN HANDRAIL FOR CONTINUOUS GRIPPING SURFACE SHEET: SHEET TITLE RGA Office of Architectural Design 15231 Alton Parkway, Suite 100 Irvine, CA 92618 T 949-341-0920 FX 949-341-0922 RGA, OFFICE OF ARCHITECTURAL DESIGN COPYRIGHT CHK'D BY: DRAWN BY: CAD FILE NAME: OWNER PROJECT NO: RGA PROJECT NO: MARK DESCRIPTIONDATE CONSULTANT PROFESSIONAL SEALS PROJECT NAME DETAILS AD-1 MS-MOUNTAIN VIEW LLC C/O SILAGI DEVELOPMENT & MANAGMENT, INC. 16130 VENTURA BLVD. SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS MOUNTAIN VIEW PARK AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA MG CP 00000.00 19073.00.AD-1 19073.00 11/24/2020 PLAN CHECK SUBMITTALPC 18 71519 81216 17 1 2 3 4 14 59 6 20 CLAMPED LEAD PIPE FLASHING SCALE: 1-1/2" = 1'-0"03201 NOTES: 1. USE A CONT. LEAD SOLDER IF SPLIT LEAD SLEEVE IS REQD. 2. PROVIDE PROTECTIVE WHITE ACRYLIC COATING TO ALL EXPOSED ROOF CEMENT APPLICATIONS. PIPE PENETRATION OR SUPPORT STAINLESS STEEL CLAMP W/ ELASTOMERIC SEALANT 2-1/2# LEAD FLASHING SLEEVE - SET BASE FLANGE INTO ROOF CEMENT O/ INSTALLED INTERPLY FELT - USE 4# LEAD IF FIELD SOLDER IS REQD. ROOFING CEMENT W/ PROTECTIVE WHITE-ACRYLIC COATING 2-PLYS AND CAP EMBEDED IN ASPHALT B.U.R. O/ PLYWOOD DECK 8" M I N 03705 ROOF PENETRATION CLEARANCES N.T.S. 18" MIN . 18" MIN. CURB WALL NOTE: ALL PENETRATIONS SHALL BE LOCATED A MIN. 18" OUT OF VALLEY WATERWAYS, AS WELL AS A MIN. 18" FROM OTHER PENETRATIONS OR PROJECTIONS, SUCH AS PIPES, WALLS, CURBS, ETC. 4" 18" MIN . 4" OSB DECK 03701 TYPICAL ROOFING SECTION N.T.S. PERIMETER BASE SHEET FASTENING PATTERN GRANULE SURFACED FIBERGLASS CAP SHEET - SET INTO A CONTINUOUS MOPPING OF HOT ASPHALT 2-PLIES FIBERGLASS FELT - SET EACH PLY INTO A CONTINUOUS MOPPING OF HOT ASPHALT SUBSTRATE SUBSTRATE FIBERGLASS BASE SHEET TAPE AND STAPLES - MINIMUM REQUIREMENTS IS 4 ROWS EACH SHEET FIELD BASE SHEET FASTENING PATTERN 9" 9" 9" TYP. 12" 2" 9" 9" TYP. 2" 6" 9" INTERIOR ROOF DRAIN & OVERFLOW DRAIN SCALE: 1-1/2" = 1'-0"03020 OVERFLOW DRAIN ASSEMBLY W/ SLEEVE ROOF DRAIN ASSEMBLY 4# LEAD FLASHING SHT. SET INTO ROOF CEMENT O/ INSTALLED PLY SHEETS. INSTALL FLASHING PLIES AND SURFACING OVER LEAD BUILT-UP ROOFING O/ STRUCTURE 2 X FRAMING - SEE STRUCTURAL DWGS. NO-HUB CAST IRON ASSEMBLIES U.N.O. 5"8" MIN 5" 4" 2" NOTES: 1. RESEAL THE CORNERS OF THE DRAIN SUMP WITH A THREE-COURSE APPLICATION WITH A PROTECTIVE WHITE ACRYLIC COATING SURFACING. 2. ROOF DRAIN AND OVERFLOW DRAIN LINES SHALL REMAIN INDEPENDENT THROUGH POINT OF DISCHARGE. B.U.R. O/ DECK O/ STRUCTURE CONC. TILT-UP PANEL 24 GA. G.I. OVERFLOW SCUPPER FLASHING SET IN ROOF CEMENT O/ FIELD PLIES - INSTALL FLASHING PLIES O/ NAILED FLANGES - PRIME & PAINT EXT. TO MATCH BLDG. 4# LEAD FLASHING SHT. SET INTO ROOF CEMENT O/ INSTALLED PLY SHEETS. INSTALL FLASHING PLIES AND SURFACING OVER LEAD. 2 X FRAMING PER STRUCTURAL ROOF DRAIN ASSEMBLY 4" 5" MIN. 2" A B O V E AD J . R O O F SU R F A C E 4 " MI N . SE E R O O F PL A N ROOF DRAIN AND OVERFLOW SCUPPER SCALE: 1-1/2" = 1'-0"03000 NOTES: 1. RESEAL THE CORNERS OF THE DRAIN SUMP WITH A THREE-COURSE APPLICATION WITH A PROTECTIVE WHITE ACRYLIC COATING SURFACING. 2. SEE THE ROOF PLAN FOR DRAIN & OVERFLOW SCUPPER SIZES. 8" MIN. SEE ROOF PLAN 03706 NOTE: NO FASTENERS SHALL PENETRATE THE ROOFING MEMBRANE. NEW UNI-STRUT SPECIFIED WALKPAD (LIGHTWEIGHT PIPES.) DAB OF ROOF CEMENT PLACED BETWEEN BLOCK AND PAD NEW 4X4 MIN. PRESSURE TREATED BLOCKING SPACED AT 5' O.C. - FIELD VERIFY METAL STRAP WITH LAG SCREWS ATTACHED TO ALLOW FOR MOVEMENT OF PIPING MIN. 1/2" ROOF PROTECTION MATERIAL SET OVER COMPLETE ROOF SYSTEM 2X4X6" PRESSURE TREATED BLOCKING SPACED AT 5' O.C. - SET INTO ROOF CEMENT OVER ROOF PROTECTION MATERIAL CONDUIT OR CONDENSATE LINE ROOF CEMENT SMALL CONDUIT OR CONDENSATE LINE 2" MIN . 2"MIN. 2" MIN . 2"MIN. 2" MIN . 2"MIN. WOOD PIPE SUPPORTS N.T.S. METAL STRAP WITH LAG SCREWS NOTES: 1. SEE STRUCTURAL AND MECHANICAL DRAWINGS FOR ADDITIONAL NOTES AND DETAILS. 2. CONTRACTOR TO COORDINATE REQUIRED OPENINGS AND SUPPORTS/CURBS FOR EACH UNIT AND SUBMIT COMPLETE SHOP DRAWINGS FOR APPROVAL. 3. SHAPE CANT STRIP TO AVOID GAPS. 4. SEE DETAIL 17 THIS SHEET FOR TYPICAL ROOF CURB FLASHING / COUNTERFLASHING REQUIREMENTS. 5. G.C. TO COORDINATE FINAL MOUNTING CONFIG. W/ ARCHITECTURAL / MECHANICAL DRAWINGS PRIOR TO INSTALLATION. B.U.R. O/ PLY WOOD DECK. PROVIDE TAPERED PERLITE CRICKETS ON HIGH SIDE OF UNIT TO MAINTAIN POSITIVE DRAINAGE MECHANICAL UNIT INDEPENDENT FIBERGLASS CAP SHEET OVER TWO PLIES - ATTACH BEHIND COUNTER FLASHING W/ CAP-HEADED ROOFING NAILS AT 8" O.C. CONT. 1/2" PLYWOOD SKIRT INSULATED PREFABRICATED FACTORY EQUIPMENT CURB W/ CANT STRIP. ATTACH CURB THROUGH BLOCKING PER MECHANICAL DWGS. LEVELING CURB MIN 1.5 X 3.5. ATTACH TO DECK WITH MIN 2 EXT. SIDE CLIPS EA. SIDE AND 2 INT. SIDE CLIPS EA. SIDE PERIMITER SUPPORT STRUCTURE. SEE STRUCTURAL DWGS. 6" MIN8" M I N . HVAC UNIT @ ROOF WITH FACTORY CURB SCALE: 1-1/2" = 1'-0"03310 2-PIECE SURFACE MOUNTED COUNTERFLASHING ASSEMBLY 24 GA. SCUPPER FLASHING STRIPPED-IN SCALE: 3/4" = 1'-0" SCALE: VARIES 03002 24 GA. G.I. OVERFLOW AND SCUPPER ASSEMBLY PAINTED TO MATCH BUILDING OVERFLOW AND DRAIN OUTLET OPENINGS IN WALL PANEL INTERNAL G.I. SUPPORTS TOP OF ROOF DECK 24 GA. G.I. DOWNSPOUT PAINTED TO MATCH BUILDING 8" MIN SEE ROOF PLAN 8"SEE ROOF PLAN OVERFLOW DRAIN 1"2" SE E R O O F PL A N 2" 2"2"4"2"2" SEE ELEVATIONS SEE ROOF PLAN SEE ELEVATIONS C. L . P A N E L J O I N T CLOSED TOP OPEN TOP OPEN BOT.CLOSED BOT. EXT. DOWNSPOUT AND OVERFLOW SCUPPER SCALE: 1-1/2" = 1'-0" PRIMED 24 GA. G.I. SCUPPER FLASHING SET IN ROOF CEMENT O/ FIELD OF PLIES - INSTALL FLASHING AND STRIPPING PLIES O/ NAILED FLANGES MINERAL SURFACE CAP SHEET TO RETURN INTO OPENING ON ALL SIDES CONC. TILT-UP PANEL SEALANT 24 GA. G.I. SCUPPER PAINTED TO MATCH BUILDING 4" 8" DO W N S P O U T D I M . SEE ROOF PLAN 8"SEE ROOF PLAN NOTES: 1. SEE ROOF PLAN FOR DOWNSPOUT AND SCUPPER SIZES, SIZED PER CPC. 2. SEAL ALL ROOFING MEMBRANES WITH THREE COURSE APPLICATION AND PROTECTIVE WHITE ACRYLIC COATING. 3. CAULK ALL WALL SCUPPERS PRIOR TO INSTALLING EXTERIOR DOWNSPOUTS. 4. SIMILAR REQUIREMENTS APPLY FOR OVERFLOW SCUPPERS WHERE COMBINED WITH INTERIOR ROOF DRAIN. ROOF DRAIN OVERFLOW SCUPPER 8" MIN. SE E R O O F P L A N 4" M I N . 8" MIN. SE E R O O F PL A N 4" M I N . 2" A B O V E SH E A T H I N G PRIMED 24 GA. G.I. OVERFLOW SCUPPER FLASHING SET IN ROOF CEMENT O/ FIELD PLIES - INSTALL FLASHING PLIES O/ NAILED FLANGES - PAINT EXT. TO MATCH BLDG. 24 GA. G.I. DOWNSPOUT B.U.R. O/ DECK O/ STRUCTURE CONCRETE WALL 2" SEE ROOF PLAN SEE ROOF PLAN EXTERIOR ELEVATION INTERIOR ELEVATION AT COUNTERFLASHING CONDITION SECTION PLAN 2" SCALE: 1-1/2" = 1'-0" CANT STRIP D.S. OPG. O.S. OPG. 2" O.S. OPG. D.S. OPG. 4" 4" 03704 WALL FLASHING ASSEMBLY 4" FIBER CANT STRIP 2-PIECE SURFACE MOUNTED COUNTERFLASHING ASSEMBLY NEW 13 GA. 1" WIDE TERMINATION BAR CONTINUOUS CAULKING APPLICATION ALONG ENTIRE VERTICAL SIDE TAP-CON FASTENERS THROUGH STEEL/NEOPRENE WASHERS AT 12" O.C. BUILT-UP ROOF SYSTEM PLYWOOD/OSB DECK GRANULAR SURFACED TORCH APPLIED MODIFIED BITUMEN MEMBRANE STRIP PARAPET FLASHING TRANSITION N.T.S. 03703 ROOFING AT PARAPET PANEL JOINT SCALE: N.T.S. 18" MIN. MODIFIED BITUMEN FLASHING - SET INTO HOT ASPHALT TO PRIMED SURFACE CONCRETE TILT-UP WALL 03702 6" 6" 6" 6" IRC - 3/99 INVERTED CAP SHEET - LOOSE LAID OVER STRAP & NAILED IN PLACE SEISMIC STRAP OSB DECK ROOF PROTECTION @ SEISMIC STRAPS SCALE: N.T.S. MECHANICAL EQUIPMENT VIBRATION ISOLATOR EQUIPMENT LEVEL 22 GA GI FLASHING PAN O/ MODIFIED BITUMEN MEMBRANE O/ FIBERGLASS BASE SHEET O/ 3/4" PLYWOOD FASTENER THROUGH NEOPRENE WASHER TYP. CURB FLASHING REQUIREMENT SHAPED 4x WOOD CURB WITH 2x8 JOISTS @ 12" O.C. MIN. BUR O/ PLYWOOD DECK BLOCKING / FRAMING PER STRUCTURAL NOTES: 1. SEE STRUCTURAL DRAWINGS FOR FURTHER INFORMATION. 2. ANY SECURMENT OF UNITS OR SUPPORTS INTO THE HORIZONTAL PLATFORM SURFACE SHALL BE THRU A SOLID 1/4" NEOPRENE GASKET. APPLY ELASTOMERIC SEALANT ON UNDERSIDE AND TOP OF GASKET IMMEDIATELY PRIOR TO INSTALLING BOLTS. 3. INSTALL PLYWOOD OR PERLITE CRICKET ON HIGH SIDE OF CURBS WIDER THAN 24" - MITER PLYWOOD TO MEET FLUSH W/ DECK - RAISE CURB TO MAINTAIN MIN. 8" CLR. ABOVE TOP OF CRICKET. EQUIPMENT PLATFORM SCALE: 3" = 1'-0"03311 8" M I N . 17 - VENT PIPE & FLASHING SCALE: 1-1/2" = 1'-0"03200 LEAD SLEEVE WITH FLANGE SET IN CEMENT FLASHING PITCH ROOFING CEMENT W/ PROTECTIVE WHITE-ACRYLIC COATING 2-PLYS AND CAP EMBEDED IN ASPHALT BUILT-UP ROOFING O/ PLYWOOD DECK SHEET METAL COLLAR O/ ROOFING HOT MOP VENT PIPE 4" 6" 6" NOTE: PROVIDE PROTECTIVE WHITE ACRYLIC COATING TO ALL EXPOSED ROOF CEMENT APPLICATIONS. 03305 CAP SHEET FLASHING PLY - SET INTO HOT ASPHALT FIBERGLASS FELT FLASHING PLIES - SET INTO HOT ASPHALT BUILT-UP ROOFING (SEE TYPICAL SECTION) OSB DECK WOOD CURB ASSEMBLY (CURB TO MAINTAIN A 8" MIN. HEIGHT ABOVE COMPLETED ROOF SYSTEM) UNIT COUNTERFLASHING BASE FLASHING FASTENERS AT 6" O.C. 24 GA. G.I. COUNTERFLASHING INSERT SECURED USING 3/8" HEAD SCREW THROUGH 5/8" STEEL/ EPDM WASHER AT 12" O.C. 4" FIBER CANT STRIP UNIT COUNTERFLASHING 2"X2" WOOD NAILER BASE FLASHING FASTENERS AT 6" O.C. METAL CURB ASSEMBLY 24 GA. G.I. COUNTERFLASHING INSERT SECURED USING 3/8" HEAD SCREW THROUGH 5/8"STEEL/EPDM WASHER AT 12" O.C. SLOPE CURB SIMPSON A-35 8" M I N . (1 0 " N O M I N A L L U M B E R ) 4" 2"2"2" 2"2"2" 2' O R MO R E TYPICAL ROOF CURBS SCALE: 3" = 1'-0" 8" M I N . 4" TAPERED PERLITE ROOF INSULATION CRICKET W/ MIN. 1/2" PER FT. SLOPE ALONG THE UPPER SLOPE OF ALL CURBS CRICKET PLAN VIEW FACTORY STEEL CURB WOOD FRAMED CURB NOTE: 1. WOOD CURBS SHALL BE MINIMUM 2" X 10" LUMBER FOR USE AT CURB MOUNTED SKYLIGHT AND SMOKEHATCH ASSEMBLIES. ONLY CURB MOUNTED SKYLIGHT AND SMOKE HATCH ASSEMBLIES SHALL BE ACCEPTED. 2. ALTERNATE 3-LAYER INVERTED CAPSHEET CRICKETS SHALL ONLY BE CONSIDERED IF APPROVED IN ADVANCE BY THE OWNER IN WRITING. SKYLIGHT / SMOKE VENT SCALE: 1-1/2" = 1'-0"03300 SKYLIGHT / SMOKE VENT DOME - TRANSLUCENT WHITE DOME U.N.O. - ACRYLIC OR PRISMATIC POLYCARBONATE AS SPECIFIED GALV. STORM-RESISTANT LOUVERS ONLY WHERE SPECIFIED TYP. CURB REQUIREMENT FASTENERS THRU NEOPRENE WASHERS 2X10 NOMINAL WOOD FRAMED CURB W/ METAL COUNTER FLASHING PROVIDE 12" SIMPSON STRAP CONNECTION AT EACH INSIDE CORNER AND MIDDLE. OPENING FRAMING - SEE STRUCT NOTES: 1. PROVIDE ICC LISTED FIXED NON-VENTILATING SKYLIGHTS BY (BRISTOLITE / SUNOPTICS / ACRALIGHT) - SEE ROOF PLAN. 2. PROVIDE SMOKE AND HEAT VENTS W/ UL 793 LISTING BY (BRISTOLITE / SUNOPTICS / ACRALIGHT) - SEE ROOF PLAN. 2. SKYLIGHT DOMES SHALL PROVIDE MIN. VISIBLE LIGHT TRANSMITTANCE OF 60% - ACRYLIC / 70%- POLYCARBONATE. 3. PROVIDE CRICKET ON HIGH SIDE OF CURBS CONSISTING OF MITERED PERLITE TO MEET FLUSH W/ DECK. MAX. HEIGHT OF CRICKET AT CURB TO BE 2" ABOVE DECK. ALTERNATE CRICKET OF THREE LAYERS OF INVERTED CAP SHEET (FULL, 2/3 & 1/3 WIDTH SHEETS) SET INTO ASPHALT SHALL ONLY BE CONSIDERED IF APPROVED BY THE OWNER IN ADVANCE IN WRITING. 4. PROVIDE CONT. SEALANT BEAD AT PERIMETER MOUNTING OF WOOD ROOF CURB. 5. PROVIDE ALT. ADD COST FOR BURGLAR BARS FOR OWNERS CONSIDERATION. NOTES SPECIFIC TO SMOKE AND HEAT VENTS ONLY: 6. PROVIDE MANUAL RELEASE WHERE REQD. BY FIRE DEPT. 7. CONTRACTOR SHALL COORDINATE FUSIBLE LINK TEMPERATURES WITH THE FIRE PROTECTION CONTRACTOR AND FIRE DEPARTMENT. 17 -CRICKET PLAN VIEW SLOPE TAPERED PERLITE ROOF INSULATION CRICKET W/ MIN. 1/2" PER FT. SLOPE ALONG THE UPPER SLOPE OF ALL CURBS 8' - 0 " T Y P U . N . O . CAP SHEET FLASHING PLY - SET INTO HOT ASPHALT MINIMUM 1/2" ROOF WALKPAD MATERIAL - 4'X4' WIDE FIBERGLASS FELT FLASHING PLIES - SET INTO HOT ASPHALT OSB DECK 4" FIBER CANT STRIP BUILT-UP ROOFING (SEE TYPICAL SECTION) MIN. 1/2" PLYWOOD BACKER UNIT COUNTERFLASHING 3/8" HEAD SCREW THROUGH 5/8" STEEL/NEOPRENE WASHER - MIN. 3 PER SIDE BASE FLASHING FASTENERS AT 8" O.C. 24 GA. G.I. COUNTERFLASHING INSERT ROOF HATCH FLASHING SCALE: N.T.S.03321 STEEL LADDER - SEE DETAIL EXTERIOR TILT-UP WALL 4" FIBER CANT STRIP EA. SIDE PREFAB. STEEL GRAB BAR ASSEMBLY ATTACHED TO SIDE OF ROOF HATCH ASSEMBLY - ACRAGRAB OR EQUAL - MIN. 30" HIGH ABOVE ROOF DECK ROOF HATCH ASSEMBLY - 30" X 36" PER ROOF PLAN 10" MIN.7" MIN. TOE-SPACE 3"3" FIN. GR. ROOF / OVERFLOW DRAIN - SEE PLANS FOR SIZE - PAINT TO MATCH INT. WALLS OUTLET ABOVE GRADE: CUT PIPE FLUSH W/ WALL, SACK, PATCH, AND SEAL AROUND PIPE - PAINT PIPE INTERIOR TO MATCH BLDG SEAL OPENINGS - TYP. PIPE OUTLET BELOW SLAB TO FACE OF CURB, STORM DRAIN, OR FACE OF PANEL - SEE PLANS. SLOPE DRAIN MIN 1/8" PER FOOT 12 " M I N . NOTES: 1. SEE SITE PLAN FOR CONFIGURATION @ EACH DRAIN LOCATION. 2. PIPING TO BE NO-HUB CAST IRON ASSEMBLIES U.N.O. DRAIN DIA. + 2" CONC. TILT-UP WALL. STENCIL PAINT "OVERFLOW" ON EXT. PANEL ABOVE OVERFLOW OUTLETS - 2" HIGH LETTERS OR PROVIDE ACRYLIC SIGN G.I. DRYER VENT TYPE FLASHING PAINTED TO MATCH THE BUILDING CONC. SPLASH BLOCK OR RIP-RAP AT LANDSCAPE CONDITIONS SEE SITE PLAN ROOF DRAIN THROUGH CONCRETE WALL SCALE: 1" = 1'-0"03050 SHEET: SHEET TITLE RGA Office of Architectural Design 15231 Alton Parkway, Suite 100 Irvine, CA 92618 T 949-341-0920 FX 949-341-0922 RGA, OFFICE OF ARCHITECTURAL DESIGN COPYRIGHT CHK'D BY: DRAWN BY: CAD FILE NAME: OWNER PROJECT NO: RGA PROJECT NO: MARK DESCRIPTIONDATE PROJECT NAME CONSULTANT PROFESSIONAL SEALS MS-MOUNTAIN VIEW LLC C/O SILAGI DEVELOPMENT & MANAGMENT, INC. 16130 VENTURA BLVD. SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS MOUNTAIN VIEW PARK AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA MG CP 00000.00 19073.00.AD-1 19073.00 11/24/2020 PLAN CHECK SUBMITTALPC DETAILS AD-2 18 719 81216 17 1 2 3 4 14 5 6 20 11 10 13 9 HOLLOW METAL DOOR HEAD (JAMB SIM.) SCALE: 3" = 1'-0"02320 CONCRETE TILT-UP PANEL T-FRAME ANCHORS PER MANUF. SPECS - @ 32" O.C. MIN. 3/4" CHAMFER - TYP. METAL DRIP SHIELD AT HEAD W/ CAULKING 16 GA. MIN COLD ROLLED H.M. DOOR FRAME - PAINT PER FIN. SCHED. H.M. DOOR PER SCHED. NOTES: 1. ALL EXIT DOORS SHALL HAVE A MIN. WIDTH OF 36" AND MIN. HEIGHT OF 6'-8" CONCRETE REVEAL SCALE: 1' = 1'-0"02101 TOP OF REVEAL C.L. OF REVEAL BOTTOM OF REVEAL 3/ 8 " VA R I E S - S E E E L E V A T I O N S F O R W I D T H 3/ 8 " EQ U A L EQ U A L 3/4" TYPICAL PAINT COLOR CHANGE LOCATION M B SEALANT PER SPECS. O/ JOINT BACKING - COLOR TO BE APPROVED BY ARCHITECT CONDITION AT BUTT END JOINT 1 1/2" 3/ 4 " 3/ 4 " T Y P 3/4" NOTES: 1. AT 3 AND 4 HR RATED WALLS/JOINTS WHEN NOTED ON FLOOR PLAN USE 3M FIRE BARRIER 2000+ SILICONE SEALANT O/ 4 PCF MINERAL WOOL BATT - SEE FLOOR PLANS FOR LOCATIONS. FIRESTOP TESTED TO 3 HOURS IN ACCORDANCE WITH ASTM E 814 (UL 1479). FIRE RESISTANCE TESTED TO 4 HOURS FOR CONSTRUCTION JOINT SYSTEMS IN ACCORDANCE WITH ASTM 3 1996 (UL 2079). 2. AT 1 AND 2 HR RATED WALLS/JOINTS WHEN NOTED ON FLOOR PLAN, USE PECORA JOINT SYSTEM FF-S-0006 CONFIGURATION #2 UL2079 LISTED, OR APPROVED UL2079 LISTED EQUAL SYSTEM. 3. SEE STRUCTURAL DRAWINGS FOR FURTHER NOTES. CONCRETE PANEL JOINT SCALE: 1-1/2" = 1'-0"02100 SCALE: 1-1/2" = 1'-0"02200.02 GRANULAR SURFACED TORCH-APPLIED MODIFIED BITUMEN MEMBRANE STRIP OVER ROOF FLASHING W/ FLASHING FASTENERS @ 6" O.C. CAP SHEET WALL FLASHING O/ FIBERGLASS WALL FLASHING PLY - BOTH SET INTO HOT ASPHALT (INSTALL MODIFIED BITUMEN FLASHING SHT. O/ PANEL JOINTS - SEE 4/AD-3) 3-COURSE APPLICATION - BASE FLASHING ATTACHED WITH FASTENERS @ 6" O.C. PRIMED CONCRETE SURFACE 2 REINFORCEMENT PLIES SET IN ASPHALT MODIFIED BITUMEN CAPSHEET- SET INTO HOT ASPHALT BUILT-UP ROOFING O/ PLYWOOD DECK O/ ROOF STRUCT. - SEE STRUCT. DWGS. PROVIDE ADD'L PLY @ WATERWAY, 36" ROOF STRUCTURE 2"2"2"2" 12 " 24 " - 4 8 " 4" 4" 4" FIBER CANT STRIP - NAIL TO DECK @ 12" O.C. SCALE: 1-1/2" = 1'-0"02201.01 CONC. TILT-UP PANEL W/ ELASTOMERIC COATING ON TOP & INSIDE SURFACE URETHANE SEALANT TAPCON FASTENER THROUGH 5/8" STEEL/NEOPRENE WASHER @ 16" O.C. 24 GA G.I. 2 PC. SURFACE MTD. COUNTER- FLASHING SYSTEM W/ WITH WIND CLIPS @ 3 PER 10' SECTION 3-COURSE APPLICATION WITH TOP SEAL- BASE FLASHING ATTACHED WITH 1" HEAD NAIL @ 6" O.C. PRIMED CONCRETE SURFACE 2 INDEPENDENT REINFORCEMENT PLIES SET IN ASPHALT INDEPENDENT FIBERGLASS CAPSHEET SET INTO HOT ASPHALT BUILT-UP ROOFING O/ PLYWOOD DECK O/ ROOF STRUCT. - SEE STRUCT. DWGS. PROVIDE ADD'L PLY @ WATERWAY, 36" ROOF STRUCTURE NOTES: 1. USE THIS DETAIL WHERE HEIGHT OF PARAPET WALL EXCEEDS 48" ABOVE ROOF DECK. WHERE PARAPET IS LESS THAN 48" USE DETAILS 2 AND 3, THIS SHEET. 2. TYPICAL DECK ROOFING: GRANULAR SURFACE FIBERGLASS CAP SHEET O/ 2 (OR 3) PLIES TYPE IV OR TYPE VI FIBERGLASS PLY SHEET O/ FIBERGLASS BASE SHEET. SEE PROJECT SPECIFICATIONS. 3. AFTER FULLY CURING (30 DAY MIN.) PROVIDE WHITE ACRYLIC COATING O/ ALL EXPOSED ROOF CEMENT. 4. SEE DETAIL 3/AD-2 FOR PARAPET FLASHING TRANSITIONS, AND 4/AD-2 FOR FLASHING OVER PANEL JOINTS. 5. SEE WALL SECTIONS FOR PANEL REVEALS. 2"2"2"2" 18 " GR E A T E R T H A N 4 8 " 4" 4" FIBER CANT STRIP - NAIL TO DECK @ 12" O.C. SCALE: 1-1/2" = 1'-0"02200.02 GRANULAR SURFACED TORCH-APPLIED MODIFIED BITUMEN MEMBRANE STRIP OVER ROOF FLASHING W/ FLASHING FASTENERS @ 6" O.C. CAP SHEET WALL FLASHING PLY - SET INTO HOT ASPHALT O/ 3-COURSE APPLICATION (INSTALL MODIFIED BITUMEN FLASHING SHT. O/ PANEL JOINTS - SEE 4/AD-3) PRIMED CONCRETE SURFACE 2 REINFORCEMENT PLIES SET IN ASPHALT MODIFIED BITUMEN CAPSHEET- SET INTO HOT ASPHALT BUILT-UP ROOFING O/ PLYWOOD DECK O/ ROOF STRUCT. - SEE STRUCT. DWGS. PROVIDE ADD'L PLY @ WATERWAY, 36" ROOF STRUCTURE 2"2"2"2" LE S S T H A N 2 4 " 4" 4" FIBER CANT STRIP - NAIL TO DECK @ 12" O.C. PARAPET / WALL FLASHING - HEIGHT > 48" PARAPET FLASHING - HEIGHT < 24" PARAPET FLASHING - HEIGHT 24"-48" NOTES: 1. USE THIS DETAIL WHERE HEIGHT OF PARAPET WALL IS BETWEEN 24" AND 48" ABOVE ROOF DECK. WHERE PARAPET IS LESS THAN 24" USE DETAILS 2 THIS SHEET. WHERE GREATER THAN 48", USE DETAIL 4 THIS SHEET. 2. TYPICAL DECK ROOFING: GRANULAR SURFACE FIBERGLASS CAP SHEET O/ 2 (OR 3) PLIES TYPE IV OR TYPE VI FIBERGLASS PLY SHEET O/ FIBERGLASS BASE SHEET. SEE PROJECT SPECIFICATIONS. 3. AFTER FULLY CURING (30 DAY MIN.) PROVIDE WHITE ACRYLIC COATING O/ ALL EXPOSED ROOF CEMENT. 4. SEE DETAIL 3/AD-2 FOR PARAPET FLASHING TRANSITIONS, AND 4/AD-2 FOR FLASHING OVER PANEL JOINTS. 5. SEE WALL SECTIONS FOR PANEL REVEALS. 6. APPLY CONCRETE SEALER OR PAINT TO TOP OF PARAPET. NOTES: 1. USE THIS DETAIL WHERE HEIGHT OF PARAPET WALL IS LESS THAN 24" ABOVE ROOF DECK. WHERE PARAPET IS GREATER THAN 24" ABOVE THE ROOF DECK, USE DETAILS 3 AND 4 THIS SHEET. 2. TYPICAL DECK ROOFING: GRANULAR SURFACE FIBERGLASS CAP SHEET O/ 2 (OR 3) PLIES TYPE IV OR TYPE VI FIBERGLASS PLY SHEET O/ FIBERGLASS BASE SHEET. SEE PROJECT SPECIFICATIONS. 3. AFTER FULLY CURING (30 DAY MIN.) PROVIDE WHITE ACRYLIC COATING O/ ALL EXPOSED ROOF CEMENT. 4. SEE DETAIL 3/AD-2 FOR PARAPET FLASHING TRANSITIONS, AND 4/AD-2 FOR FLASHING OVER PANEL JOINTS. 5. SEE WALL SECTIONS FOR PANEL REVEALS. 6. APPLY CONCRETE SEALER OR PAINT TO TOP OF PARAPET. 1" 1" OFFSET STOREFRONT MULLION SCALE: 3" = 1'-0"02535 C.L. M IMONOLITHIC INSULATED IN T E R I O R EX T E R I O R IN T E R I O R EX T E R I O R GLAZING PER ELEVATIONS 2" X 4-1/2" ALUMINUM STOREFRONT MULLION GLAZING PER ELEVATIONS 2" X 4-1/2" ALUMINUM STOREFRONT MULLION BLACK SILICON SEALANT AT BUTT-JOINT CONDITION W/ BACKER ROD IN T E R I O R EX T E R I O R IN T E R I O R EX T E R I O R M IMONOLITHIC INSULATED BUTT-GLAZED STOREFRONT MULLION SCALE: 3" = 1'-0" C.L. IN T E R I O R EX T E R I O R IN T E R I O R EX T E R I O R SPANDREL GLAZING O/ CONCRETE PANEL LEG SCALE: 3" = 1'-0" CONCRETE TILT-UP PANEL PAINT FLAT BLACK BEHIND GLAZING SHIM W/ SEALANT & BACKING ROD EA. SIDE 2" X 4-1/2" ALUMINUM STOREFRONT MULLION GLAZING PER ELEVATIONS 1/4"2"3/4" 3" 1/4"2"3/4" 3" A BOFFSET MULLION BUTT-GLAZED MULLION IN T E R I O R EX T E R I O R IN T E R I O R EX T E R I O R STOREFRONT HEAD (JAMB & SILL SIM.) SCALE: 3" = 1'-0"02560.5 3/4"3/4" M IMONOLITHIC INSULATED 3/ 8 " 3/ 4 " CONCRETE TILT-UP PANEL SHIM W/ SEALANT & BACKING ROD EA. SIDE 2" X 4-1/2" ALUMINUM STOREFRONT MULLION GLAZING PER ELEVATIONS 3/ 8 " 3/ 4 " STOREFRONT HEAD @ SPANDREL (JAMB & SILL SIM.) SCALE: 3" = 1'-0"02561 CONCRETE WALL PANEL SHIM W/ SEALANT & BACKING ROD EA. SIDE 2" X 2" ALUM. STOREFRONT MULLION SPANDREL GLAZING PER ELEVATIONS CONCRETE TILT-UP PANEL - PAINT FLAT BLACK BEHIND GLAZING 3" 2 1/4"3/4" 3/ 8 " 3/ 4 " SCALE: 3" = 1'-0" C.L. STOREFRONT O/ CONCRETE PANEL 02533 FACE OF PANEL BEYOND CONCRETE TILT-UP PANEL - PAINT FLAT BLACK BEHIND GLAZING GLAZING PER ELEVATIONS 2" X 2" ALUM. STOREFRONT MULLION - SEE ELEVATIONS FOR BUTT GLAZED VS. CAPPED CONDITIONS SHIM AS REQD. 1/4"2"3/4" A B 1/4"2"3/4" 3"3" OFFSET MULLION BUTT-GLAZED MULLION STOREFRONT OUTSIDE CORNER MULLION SCALE: 3" = 1'-0" MONOLITHIC GLAZING 2-1/2" CORNER MULLION MONOLITHIC GLAZING SILICON BUTT GLAZED CORNER INSULATED GLAZING 3-1/4" CORNER MULLION INSULATED GLAZING SILICON BUTT GLAZED CORNER 00000 4 1 / 2 " 4 1 / 2 " 4 1 / 2 " 4 1 / 2 " A B C D 2 1/2"3 1/4" ANODIZED ALUMINUM FLASHING CAP - FINISH TO MATCH STOREFRONT 2" X 2" ALUM. STOREFRONT SYSTEM SET O/ SHIM W/ SEALANT & BACKING ROD EA. SIDE SPANDREL GLAZING PER ELEVATIONS CONCRETE WALL PANEL STOREFRONT HEAD @ PARAPET SCALE: 3" = 1'-0"02561 SLOPE 2 /3 /4 - SEE FOR ROOFING 1/ 2 " MA X . HOLLOW METAL DOOR PER SCHED. CONC. FLOOR SLAB 1/2" MAX. THRESHOLD W/ 1/4" BEVEL COMPLYING W/ CBC SECTION 11B-303 1/2" EXP. JOINT 1/ 4 " 1/2" HOLLOW METAL DOOR SILL SCALE: 3" = 1'-0"02310 MA X . REFERENCE 11B-303 STOREFRONT SILL @ GRADE SCALE: 3" = 1'-0"02501 NOTES: 1. GLAZING AND STOREFRONT SHALL CONFORM TO THE CBC. 2. CONCRETE WALK SHALL SLOPE AWAY FROM STOREFRONT AT 0.5% MIN. / 2% MAX. 3. SEE WALL SECTIONS FOR ADDITIONAL REQUIREMENTS. GLAZING - SEE ELEV. FOR TEMPERED GLASS LOCATIONS ALUM. STOREFRONT PER ELEVATIONS SHIM AS REQUIRED W/ SEALANT O/ BACKER ROD CONCRETE SLAB LANDSCAPE SET 3" BELOW F.F. WHERE OCCURS 3/4" 3/ 4 " 3/ 8 " 1/2" EXPANSION JOINT WHERE CONCRETE PAVING OCCURS AT EDGE OF FLOOR SLAB 1/2" 3" GLAZING PER ELEVATIONS ALUMINUM TRANSOM SILL / JAMB (SIM) STOP W/ WEATHER STRIPPING ON ALL SIDES OF DOOR ENTRY DOOR - SEE DOOR SCHEDULE FOR DOOR TYPE WEATHERSTRIP SWEEP 1/2" HIGH ALUM. THRESHOLD SET IN MASTIC W/ MAX. 1:2 BEVEL OF 1/4" MIN. HT. - SEE DETAIL 7 FOR SIM. REQ. CONCRETE LANDING - SLOPE AWAY FROM BUILDING 0.5% MIN. / 2% MAX. 1/2" EXPANSION JOINT CONC. FLOORS: SADDLE THRESHOLD: PEMKO 171 OR APPROVED EQUAL ENTRY DOOR HEAD (JAMB SIM.) / SILL SCALE: 3" = 1'-0"02300 1/ 2 " 10 " TILE FINISH: HALF SADDLE THRESHOLD: PEMKO 229 OR APPROVED EQUAL 1/ 2 " 2 1 2 1 SHEET: SHEET TITLE RGA Office of Architectural Design 15231 Alton Parkway, Suite 100 Irvine, CA 92618 T 949-341-0920 FX 949-341-0922 RGA, OFFICE OF ARCHITECTURAL DESIGN COPYRIGHT CHK'D BY: DRAWN BY: CAD FILE NAME: OWNER PROJECT NO: RGA PROJECT NO: MARK DESCRIPTIONDATE PROJECT NAME CONSULTANT PROFESSIONAL SEALS DETAILS AD-3 MG CP 00000.00 19073.00.AD-3 19073.00 11/24/2020 SCHEMATIC DESIGNPC AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA MS MOUNTAIN VIEW PARK MS-MOUNTAIN VIEW LLC C/O SILAGI DEVELOPMENT & MANAGMENT, INC. 16130 VENTURA BLVD. SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 18 71519 81216 17 1 2 4 14 5 6 20 11 10 9 NOTES: 1. USE 6" DIA. GUARD POST U.N.O. ON PLAN 2. PROVIDE GUARDPOSTS AT END OF ALL RAMP WALLS, AT HYDRANTS IN DRIVEWAYS AND AT ALL TRANSFORMERS PER FIRE DEPT. AND ELECTRIC UTILITY PROVIDER STANDARDS. 3. PRIMER AND PAINT ENAMEL SAFETY YELLOW U.N.O. ON PLANS. PIPE DIA. 4" 6" 8" FTG. DIA. 18" 24" 30" SQ. PLATE 6" SQ 8" SQ 10" SQ STEEL PIPE GUARD POST SCALE: 3/4" = 1'-0" SLOPE TOP OF CONCRETE CONCRETE FILLED GALV. STEEL PIPE SLOPE TOP OF FTG. AWAY FROM BOLLARD 0.5% AT EXT. LOCATIONS ONLY CONCRETE FLOOR SLAB / APRON SLAB TYPICAL. WHERE OCCURRING IN LANDSCAPE, TOP OF FTG. SHALL BE 2" ABV. FIN. GRADE W/ 1/2" TOOLED EDGE 2500 MIN. PSI CONC. FOOTING - SEE SCHEDULE SCHEDULE 01902 3" M I N . 6' - 9 " 3' - 0 " 4' - 0 " SEE SCHEDULE GUARDPOST @ FIRE HYDRANT SCALE: 1" = 1'-0"01908 35" 35" 35 " 35 " 6" STEEL PIPE, CONCRETE FILLED GUARDPOST PAINTED OSHA YELLOW OR PER CITY STANDARDS. SEE BOLLARD DETAIL FOR SIZE AND DIA. OF FOOTING FIRE HYDRANT OR P.I.V. PER FIRE PROTECTION PLANS OMIT 2- GUARDPOSTS @ HYDRANT OR P.I.V. IF CURB OR WALL PROVIDES PROTECTION NOTE: 1. CONTRACTOR TO VERIFY ALL DIMENSIONS WITH THE LOCAL FIRE DEPARTMENT STANDARDS. 50" NOTES: 1. SEE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION. 2. SEE SITE PLAN FOR LOCATIONS 3. SEE STRUCTURAL DRAWINGS FOR "H" DIMENSION & REINFORCING REQUIREMENTS. TWIN OR QUAD-TOP POLES WHERE INDICATED PER ELECTRICAL SITE PLAN REFER TO ELECTRICAL DWGS. FOR POLE & FIXTURE - TAPERED STEEL POLE U.N.O. HANDHOLE AND GROUND CONNECTOR 1" GROUT AT BASE PLATE WITH MATCHING COVER PLATE CONC. POLE BASE W/ 3/4" CHAMFERED EDGE. PROVIDE MED. SANDBLAST FINISH CONCRETE BASE, UNLESS NOTED TO PAINT ON THE SITE PLAN CONCRETE CURB FINISH GRADE - SEE CIVIL REINFORCING CAGE & A-BOLTS AT CONC. LIGHT POLE BASE PER STRUCTURAL DRAWING DETAIL ELECTRICAL CONDUIT WITH 24" MIN. COVER - 3/4" SCHED. 40 PVC U.N.O. ON ELECTRICAL PLANS LIGHT POLE & BASE SCALE: 1/2" = 1'-0"01903 2'-0" CLR. @ AUTO STALL "H " - S E E S T R U C T . SE E E L E C T R I C A L D R A W I N G S 30 " @ A U T O P K G . A R E A S 54 " @ T R U C K C O U R T S 16 SD-1 24 " T Y P . UN O PLAN VIEW @ AUTO PARKING SCALE: 1/8" = 1'-0" C. L . S T A L L ST R I P I N G C. L . P O L E BA S E 24" DIA. CONC. POLE BASE PER SITE PLAN CURB AUTO STALL STRIPING PER DETAIL 11 AD-1 NOTES: 1. BICYCLE RACKS MUST BE CAPABLE OF LOCKING BOTH THE FRAME AND THE WHEELS OF A BICYCLE USING EITHER A "U" TYPE BIKE LOCK OR A "CABLE / CHAIN" TYPE BIKE LOCK WHILE MAINTAINING THE BIKE IN AN UPRIGHT POSITION. 2. BICYCLE RACKS SHALL BE INSTALLED WITH ADEQUATE SPACE (12" MINIMUM) BESIDE THE PARKED \ BICYCLE SO THAT A BICYCLIST WILL BE ABLE TO REACH AND OPERATE THE LOCKING MECHANISM. 3. A HARD - SURFACE PARKING AREA IS REQUIRED. 4. A RAMP, AT LEAST TWO FEET WIDE, SHALL CONNECT ALL OUTDOOR BICYCLE PARKING AREAS TO THE NEAREST ACCESS ROADWAY IN ORDER TO PROVIDE SAFE AND CONVENIENT ACCESS FROM EXTERNAL CIRCULATION SYSTEMS TO ON SITE BUILDINGS OR INTERNAL STREETS AND SIDEWALKS. 5. BICYCLE LOCKERS AND RACKS SHALL BE LOCATED NEAR THE PRIMARY BUILDING ENTRANCES, BUT NOT IN MAIN WALKWAY AREA. 3' - 0 " 12" MIN.2" = MAXIMUM SIZE PIPE DIAMETER TYPICAL BICYCLE RIBBON RACK SCALE: 1/2" = 1'-0"01909 (3) 3/4" DIA. STEEL PIPE X 1" WELDED TO GATE - PAINT TO MATCH - TYP 5/8" DIA. X 8" LONG STEEL PIN LATCH W/ 8" LONG HANDLE - PAINT TO MATCH 5/8" DIA X 10" MIN. LONG CANE BOLT @ EA. GATE W/ 4" HANDLE - PAINT TO MATCH - TYP 3/4" DIA. STEEL PIPE X 2" WELDED TO GATE - PAINT TO MATCH - TYP 3" 2" 1" 2" 2" 1" 1"3/4" 1/2" 3/4"1"3"1" TRASH GATE LATCHES - 6 FT. HIGH GATES SCALE: 3" = 1'-0"01204 RINGS FOR PADLOCK 6' - 0 " A . F . F . + / - 3"3" 2" CONCRETE TILT-UP OR CMU WALL - SEE STRUCTURAL DRAWINGS 4" X 4" X 1/2" STEEL ANGLE - CONT. ATTACH TO WALL WW/ #4 BARS AT EA. HINGE POINT 3 STEEL HINGES @ EA. GATE - WELD TO GATE AND WALL 3" X 3" X 3/8" STEEL ANGLE GATE FRAME 1" T Y P . NOTES: 1. PROVIDE HINGES WITH GREASE ZERTS. 2. PAINT ALL METAL TO MATCH BUILDING. 3. SEE STRUCTURAL DWGS FOR FURTHER NOTES. TRASH ENCLOSURE GATE & HINGE SCALE: 3" = 1'-0"01202 PAINTED METAL GATE - 3" X 3" X 3/8" ANGLE FRAME WITH 16 GA. CORRUGATED PANEL - PROVIDE CROSS BRACE AS SHOWN CONCRETE TILT-UP OR CMU WALL - SEE STRUCTURAL DRAWINGS 6' - 0 " 4" 2" 6" 2' - 0 " 2' - 0 " 6" 5" 1" 10 - 11 - 10 - TYPICAL TRASH ENCLOSURE GATE ELEVATION SCALE: 1/2" = 1'-0"01201 CONCRETE CURB AT TRUCK COURT SCALE: 1" = 1'-0"01001.5 CONC. TRUCK COURT APRON - SEE SITE PLAN 6" - 7" THK. TYPICAL CONT. CONCRETE CURB TOOLED 1/2" DIA. EDGES FINISH GRADE 1" @ SOD, 1-1/2" @ GROUND COVER MIN. #3 BARS TOP & BOT. NOTES: 1.PROVIDE 1/2" EXPANSION JOINTS AT 16'-0" O.C.. 2.FINISH BACKSIDE OF CURB A MIN. 3" DOWN FROM TOP. 3.SEE SOILS REPORT FOR STEEL REINFORCING RECOMMENDATIONS. 4.SEE CIVIL DRAWINGS FOR LOCATIONS AND ADDITIONAL REQUIREMENTS/INFORMATION THIS DETAIL REPRESENTS MIN. REQUIREMENTS - SEE CIVIL DWGS. FOR ACTUAL CONSTRUCTION DETAILS. 12"3/4" 12 " SE E S I T E P L A N AP R O N T H K . + 1 2 " TRANSITION MANIFOLD AND PIPE SCHEDULE DRAIN SIZE 4" 5" 6" 8" 10" RECTANGULAR SECTION 4" X 4" 4" X 6" 4" X 8" 4" X 14" 4" X 20" SLOPE 1/8" PER FT. MIN. CURB-O-LET MANIFOLD BY SOUTHWEST MANUF. HUNTINGTON BEACH. USE EITHER RECTANGULAR OR ROUND CONFIG. - DO NOT REDUCE DRAINAGE CROSS SECTIONAL AREA. STENCIL PAINT OR STAMP 'OVERFLOW' AT OVERFLOW OUTLETS BERM UP LANDSCAPING AS REQD. TO PROVIDE MIN. 2" COVER TRANSITION FROM ROUND TO RECTANGULAR PIPE NOTES: 1. SEE SITE PLAN AND CIVIL DRAWINGS FOR LOCATIONS AND ADDITIONAL REQUIREMENTS / INFO. 2. PROVIDE PAINTED OR STAMPED MARKINGS AT OUTLETS INDICATING "OVERFLOW". 3. WHERE DRAIN PIPES PASS UNDER CONCRETE WALKS: PROVIDE CONTROL JOINT IN WALK CENTERED OVER PIPE CROSSINGS. THIS DETAIL REPRESENTS MIN. REQUIREMENTS - SEE CIVIL / PLUMBING DWGS. FOR ADDITIONAL REQUIREMENTS. PREFABRICATED DRAIN PIPE OUTLET @ CURB SCALE: 1" = 1'-0"01005 1400 FLAGPOLE SCALE: 3/8" = 1'-0" SPECIFICATIONS: 1. POLES MANUF. BY AMERICAN FLAGPOLE OR APPROVED EQUAL CONFORMING TO AMERICAN FLAGPOLE STANDARD SPECIFICATIONS FOR AN INTERNAL HALYARD POLE. 2. POLES TO BE SATIN ALUMINIUM ALLOY 6063-T6 WITH UNIFORM CONICAL TAPER. 3. POLES TO HAVE INTERNAL HALYARD - GROUND SET WITH CAM CLEAT: STAINLESS STEEL AIRCRAFT CABLE WITH TWO CHROME PLATED BRONZE SWIVEL SNAP HOOKS, PLASTIC COVERED COUNTERWEIGHT AND BEADED SLING. 4. POLE & FOUNDATION SHALL BE SIZED FOR MIN. 5' X 8' FLAG (FLAG PROVIDED BY OWNER). 5. FOUNDATION TO BE APPROX. 36" DIA. X 48" DEEP. MANUF. RESPONSIBLE TO PROVIDE STRUCTURAL CALCS TO DETERMINE THE FINAL FOOTING SIZE AND POLE THICKNES BASED UPON LOCAL CONDITIONS. 6. TRUCK: REVOLVING WITH STAINLESS STEEL BEARING CONCEALED INSIDE A CYLINDRICAL HOOD. 7. WINCH: INSIDE POLE WITH AUTOMATIC BRAKE SYSTEM AND REMOVABLE CRANK. 35 ' - 0 " - N . T . S . PE R M A N U F . PER MANUF. 54 " M A X . CLEAR ANODIZED ALUMINUM BALL W/ FLUSH SEAMS AT TOP TAPERED ALUM. POLE SEE NOTES WINCH ACCESS DOOR UPLIGHT(S) PER ELECT. DRAWINGS - G.C. TO PROVIDE CONCRETE PAD AS REQUIRED SPUN ALUMINUN COLLAR AT POLE BASE FOOTING AS PER MANUF.- SEE ADJACENT NOTES NOTES: 1. SEE SITE PLAN FOR LOCATION. 2. GRIND ALL WELDS SMOOTH. 3. ALL STEEL WORK TO BE A-434 & SHOP PRIMED. PAINT FLAT BLACK TWO COATS. 4. CONTRACTOR TO SUBMIT DETAILED SHOP DWGS. FOR APPROVAL PRIOR TO FABRICATION. 5. PROVIDE CONT. 6" X 6" CONC. MOW STRIP UNDER FENCE ONLY WHEN FENCE IS ADJACENT TO TURF AREAS. 6. USE 4" SQ. 11 GA. STEEL POST W/ PRESSED STEEL CAP AT ALL END AND CORNER CONDITIONS OF THE FENCE PATH. 2-1/2" SQ. 11 GA. STEEL POST AT 8'-0" O.C. W/ PRESSED STEEL CAP - SEE NOTES BELOW FOR ADDITIONAL REQUIREMENTS 2" SQ. 14 GA HORIZONTAL TUBE SUPPORTS INTERMEDIATE 1" SQ. 16 GA STEEL VERTICALS AT 6" O.C. W/ PLASTIC CAPS LANDSCAPE CONCRETE FOOTING - TOP OF FOOTING SHALL BE 3" ABOVE GRADE W/ 1/2" TOOLED EDGES 3' - 0 " 8' - 0 " 6" 2' - 6 " 13 " 8" 8" STREETSITE 5" STEEL FENCE SCALE: 1/2" = 1'-0"01230 PREFAB. DRAIN PIPE THRU CURB @ SIDEWALK NOTES: 1. SEE SITE PLAN FOR LOCATIONS. 2. CONTRACTOR SHALL TRANSITION FROM ROOF DRAIN SIZE TO AS MANY 3" DIA. DRAINS AS REQUIRED SO AS NOT TO REDUCE THE TOTAL AREA OF DRAINAGE PROVIDED. 3. PROVIDE PAINTED OR STAMPED MARKINGS OUT OUTLETS INDICATING EITHER "ROOF DRAIN" OR "OVERFLOW". CURB-O-LET MANIFOLD BY SOUTHWEST MANUF. HUNTINGTON BEACH. USE EITHER RECTANGULAR OR ROUND CONFIG. - DO NOT REDUCE DRAINAGE CROSS SECTIONAL AREA. CONCRETE SIDEWALK WITH #3 REBAR PERPENDICULAR TO DRAINS AT 12" O.C. - EXTEND REBAR AND DEEPENED SLAB 24" MIN EACH SIDE OF DRAINS. PROVIDE CONTROL JOINT ALONG TOP OF EACH DRAIN PIPE BELOW SLAB. 3" MAX DIA. DRAIN THROUGH CURB - SLOPE 1/8" PER FT. MIN. 3" 3" SCALE: 1" = 1'-0"01006.5 7-1/4" MIN. SEE STRUCT. 3" + / - 1 " 3 0 " MA X . 34 " - 3 8 " 1-1/2" PIPE STEEL HANDRAIL PRIMED AND PAINTED U.N.O. SPECIFICATIONS - GRIND ALL WELDS SMOOTH AND FILL ALL PITS 1-1/2" VERTICAL PIPE STEEL SUPPORTS @ 6'-0" O.C. MAX.. TOP 3" OF VERTICAL SUPPORTS SHALL BE SMALLER THAN HANDRAIL FOR CONTINUOUS GRIPPING SURFACE MIN. 12" HANDRAIL EXTENSION AT TOP & BOT. OF RAMP - RETURN TO WALL, GUARD OR THE LANDING SURFACE OR SHALL BE CONT. TO HANDRAIL OF AN ADJACENT RAMP RUN. CONC. WALK & CURB 2" DIA X 12" LONG STEEL PIPE SLEEVE CAST IN CONC. - INSERT PIPE-RAIL AND FILL W/ GROUT FOR FIXED RAIL 3" BEYOND END OF RAMP @ TOP & BOT. 12" MIN. 3" RAD. TYP. HANDRAIL @ ACCESSIBLE RAMP SCALE: 1" = 1'-0"01345 4'-0" CLEAR CONCRETE RAMP SURFACE - MEDIUM BROOM FINISH 18 - ACCESSIBLE RAMP SCALE: 3/4" = 1'-0" 4" 30 " - 3 4 " 34 " - 3 8 " 30 " M A X . 1" M I N . NOTES: 1. RAMP RUNS HAVE A RUNNING SLOPE NOT STEEPER THAN 1:12. 2. CROSS SLOPE OF RAMP RUNS ARE NOT STEEPER THAN 1:48. 3. THE RISE OF ANY RAMP RUN IS 30" MAX. 4. RAMPS HAVE LANDINGS AT THE TOP AND BOTTOM OF EACH RAMP RUN - SEE SITE PLAN. 5. CHANGES IN LEVEL AT RAMP LANDINGS GREATER THAN 1:48 ARE NOT PERMITTED. 01344 CONTINUOUS CONCRETE CURB & CHANNEL TOOLED 1/2" DIA. EDGES FINISH GRADE 1" @ SOD, 1-1/2" @ GROUND COVER NOTES: 1. PROVIDE 1/2" EXPANSION JOINTS AT 16'-0" O.C.. 2. FINISH BACKSIDE OF CURB A MIN. 3" DOWN FROM TOP. 3. SEE SOILS REPORT FOR STEEL REINFORCING RECOMMENDATIONS. 4. SEE CIVIL DRAWINGS FOR LOCATIONS AND ADDITIONAL REQUIREMENTS/INFORMATION THIS DETAIL REPRESENTS MIN. REQUIREMENTS - SEE CIVIL DWGS. FOR ACTUAL CONSTRUCTION DETAILS. 6"6" 1-1/2"1-1/2" 1'-9" 6" M I N . CONCRETE DRAINAGE CHANNEL SCALE: 1" = 1'-0"01007.50 MAX. SCALE: 1-1/2" = 1'-0"01245 TUBE STEEL SUPPORTS PER CONTRACT FABRICATOR'S CALCULATIONS. PROVIDE MIN. TWO SPACED AT 4'-0" O.C. MIN. BRACED TO CONC. WALL RUBBER ROLLER GUIDE ASSEMBLY PAINTED STRUCT. STEEL SLIDING GATE FRAME - 6" X 4" X 1/8" MIN. W/ 16 GA. 3/4" SQ. PICKETS. PROVIDE MIN. TWO WHEEL CARRIERS @ 48" O.C. VERT. MAX. OPT A: 1" SQ. PICKETS @ 3" O.C. W/O MESH OPT B: 1" SQ. PICKETS @ 6" O.C. W/ PERFORATED STEEL MESH BY MCNICHOLS OR EQUIV. CONCRETE TILT-UP WALL PANEL BEYOND 6" V GROOVE GREASABLE GATE WHEEL W/ WHEEL GUARD / COVER GALV. V-TRACK PROVIDE CONCRETE CURB BEYOND WHERE GATE OPENS INTO LANDSCAPE - SEE SITE PLAN 1/4" X 6" CONT. MTL. PLATE W/ 1/8"X1 1/2" GALV. V-TRACK. 1/2" DIA. BENT ANCHORS @ 4' O.C. AND ATTACH PLACE TO CONC. W/ 1/4" C.S. SCREWS INTO LEAD INSERTS IN PRE-DRILLED HOLES INTO CONCRETE, TYP. THICKENED APRON SLAB WHERE RECESSED V-TRACK OCCUR - MIN. 10" THK. X 24"W FOR THE LENGTH OF THE TRACK CONC. WALL FOOTING (N.T.S.) GATE DESIGN-BUILD SUBCONTRACTOR TO PROVIDE DESIGN DETAILS / CALCULATIONS FOR SUPPORT POST EMBEDMENT NOTES: 1. PERFORATED MESH, WHERE PROVIDED, SHALL BE BY MCNICHOLS OR EQUIV. PAINTED BLACK TO MATCH THE GATE. 2. PROVIDE SHOP DRAWINGS & STRUCTURAL DETAILS & CALCULATIONS INCLUDING WIND-LOAD CRITERA FOR ALL GATES PRIOR TO FABRICATION FOR REVIEW AND APPROVAL BY ARCHITECT. 3. COORDINATE GATE HEIGHTS WITH GRADE ELEVATIONS PER CIVIL DWGS. 4. SHOP FINISH W/ MINIMUM ONE COAT OF PRIMER AND ONE COAT BLACK SATIN ENAMEL U.N.O. PROVIDE ALTERNATE FOR POWDER COAT FINISH. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND CONSTRUCTION OF ALL GATE SUPPORTS AND SAFETY MECHANISMS. 6. BUILDING OWNER SHALL BE RESPONSIBLE FOR MAINTAINING GATE TRACK FREE FROM DEBRIS TO ALLOW FOR SAFE OPERATION OF GATE. 7. SLIDING VEHICLE GATES INTENDED FOR AUTOMATION SHALL COMPLY WITH CBC SECTION 3110.3 AND ASTM F2200, INCLUDING: A. COVER GATE WHEELS W/ COVER GUARDS. B. PROVIDE MESH OR PICKET SPACING WITH MAX. OPENINGS LESS THAN 2.25". C. PROVIDE POSITIVE STOPS AT BOTH FULLY OPEN AND FULLY CLOSED POSITIONS. D. GATE DOES NOT MOVE / SLIDE / FALL OVER ON ITS OWN IF DISCONNECTED FROM OPERATOR. 8. VEHICLE GATE OPERATORS, WHERE PROVIDED, SHALL BE LISTED IN ACCORDANCE WITH UL 325. 9. VEHICLE GATE OPERATORS, WHERE PROVIDED, SHALL BE PROVIDED WITH KNOX KEY SWITCH ACCESS FOR EMERGENCY VEHICLE ACCESS. SINGLE ROLLING GATE 24" 2" 10 " 6" SE E CI V I L 8' - 0 " T Y P . - S E E E L E V A T I O N S H E E T S 2-1/4" STEEL PICKET SITE ACCESS / EXIT GATE SCALE: 3/8" = 1'-0" NOTES: 1. SEE SITE PLAN FOR LOCATION. 2. GRIND ALL WELDS SMOOTH. 3. ALL STEEL WORK TO BE A-434 & SHOP PRIMED. PAINT FLAT BLACK TWO COATS. 4. INCLUDE EXTERIOR DOOR / GATE CLOSER, HEAVY DUTY HINGES, AND EXTERIOR DOOR STOP. 5. CONTRACTOR TO SUBMIT DETAILED SHOP DWGS. FOR APPROVAL PRIOR TO FABRICATION. 8' - 0 " 8" 5" 8" 40 " 6'-0" 24" MIN.3'-0" McNICHOLS METAL MESH TACK WELDED TO BACK OF FENCE & GATE TO PREVENT PEDESTRIANS FROM REACHING THROUGH PANIC BAR EGRESS HARDWARE AT INT. LOCKABLE LEVER TYPE HARDWARE AT EXT. TYP. 2'-0" EA. SIDE 6 - 01235 10 " NO PARKING ACCESSIBLE FUTURE EV CHARGING STATION STALL SCALE: 1/8" = 1'-0"01114 NOTES: 1. SURFACE SLOPES SHALL NOT EXCEED 1/4" PER FOOT IN ANY DIRECTION. 2. SEE SITE PLAN FOR LAYOUT VARIATIONS 3. ALL STRIPING FOR BORDERS OF DISABLED ACCESS LOADING STALLS SHALL BE WHITE. BLUE STRIPING IS NOT PERMISSIBLE AT EV CHARGING STATIONS 6" CURB, TYP. LOCATION OF FUTRE EV CHARGING STATION CONDUITS PER ELECTRICAL DRAWINGS. CONCRETE WHEEL STOP WHERE OCCURS ON SITE PLAN 12" HIGH LETTERS. PAINT WITH WHITE TRAFFIC PAINT. 3" WIDE WHITE STRIPING 6" WIDE WHITE TRAFFIC PAINT STRIPING 5'-0" CLEAN AIR/ VANPOOL/EV 12'-0"9'-0" 24 " 48 " M I N . 18 ' - 0 " M I N . 12 " 12 AD-1 8 AD-1 48 " M I N . 5-C AD-1 36" 36 "CLEAN AIR/ VANPOOL/EV 36 " S E E PL A N SHEET: SHEET TITLE RGA Office of Architectural Design 15231 Alton Parkway, Suite 100 Irvine, CA 92618 T 949-341-0920 FX 949-341-0922 RGA, OFFICE OF ARCHITECTURAL DESIGN COPYRIGHT CHK'D BY: DRAWN BY: CAD FILE NAME: OWNER PROJECT NO: RGA PROJECT NO: MARK DESCRIPTIONDATE PROJECT NAME CONSULTANT PROFESSIONAL SEALS DETAILS AD-4 MS-MOUNTAIN VIEW LLC C/O SILAGI DEVELOPMENT & MANAGMENT, INC. 16130 VENTURA BLVD. SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS MOUNTAIN VIEW PARK AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA MG CP 00000.00 19073.00.AD-4 19073.00 12/01/2020 PLAN CHECK SUBMITTALPC 18 715 81216 17 1 2 4 14 5 6 20 11 10 13 9 TYPICAL INTERIOR DOOR DETAILS SCALE: 1-1/2" = 1'-0"04201 HEAD - GYP. BD. O/ METAL STUDS - SEE WALL LEGENDS METAL DOOR FRAME PER SCHEDULE - ATTACH PER MANUF. SPECS. DOOR PER NOTES GYP. BD. O/ METAL STUDS - SEE WALL LEGENDS METAL DOOR FRAME & HINGES PER SCHEDULE - ATTACH PER MANUF. SPECS DOOR PER NOTES METAL DOOR FRAME PER SCHEDULE - ATTACH PER MANUF. SPECS. DOOR PER NOTES - UNDERCUT DOORS 3/4" EXCEPT @ FIRE RATED COND. PROVIDE THRESHOLD OR CARPET BAR WHERE REQD. AND AT CHANGE OF FLR. MAT. - CHANGE OF MAT. TO OCCUR AT C.L. OF DOOR. BEVEL TOP 1/4" AT MAX 1:2 38 " GYP. BD. O/ METAL STUDS - SEE WALL LEGENDS GLASS STOP - 4 SIDES 1/4" TEMPERED GLASS - SEE WINDOW SCHEDULE METAL DOOR / TRANSOM FRAME PER SCHEDULE - ATTACH PER MANUF. SPECS. DOOR PER NOTES NOTES: 1. CONTRACTOR TO COORDINATE ROUGH OPENING REQUIREMENTS WITH DOOR / WINDOW FRAME MANUFACTURER PRIOR TO FRAMING. 2. CONTRACTOR SHALL PROVIDE SHIMS, FIELD ADJUSTMENTS AS NECESSARY TO PROVIDE EVEN ALIGMENT OF DOOR, WINDOW, AND SIDELITE FRAMES. CORNER INTERSECTIONS SHALL BE TIGHT. GAPS IN STEEL FRAME CASINGS PIECES WILL NOT BE ACCEPTED. 3. DOOR FRAMES ARE STEEL TIMELY (TA-08) ALUMITONE COLOR U.N.O. ON THE DOOR SCHEDULE / DOOR NOTES. HEAD (W/ TRANSOM)HEAD DETAIL JAMB DETAIL SILL DETAIL JAMB - SILL - TRANSOM WHERE NOTED IN DOOR SCHEDULE 1/ 2 " M A X : B E V E L TO P 1 / 4 " A T M A X 1 : 2 ELECTRICAL ROOM CEILING FRAMING SCALE: 1" = 1'-0"04123 NOTES: 1. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL NOTES. ONE LAYER OF 5/8" TYPE "X" GYP. BOARD OVER ONE LAYER 1/2" PLYWOOD CONCRETE WALL BLOCKING CEILING JOIST PER STRUCT. JOIST SCHEDULE CONT. 3" X 3" X 1/4" STEEL ANGLE W/ MIN. 3/4" DIA WEJ-IT ANCHORS @ 16" O.C. SEE STRUCTURAL FOR ADD'L DETAILS WALL FRAMING PER FLOOR PLAN "NO STORAGE ABOVE" SIGNS ON WAREHOUSE SIDE OF WALL @ 8'-0" O.C. LETTERS TO BE MIN 3" TALL. 5/8" THK. GYP. BD. PER PLAN 1/2" FIRE TREATED PLYWOOD BACKING BD. WHERE REQUIRED FOR EQUIPMENT MOUNTING 5" PARTITION @ FLOOR SCALE: 3" = 1'-0"04000 NOTES: 1. SEE FLOOR PLANS FOR LOCATION OF INSULATION AND FIRE RATINGS. 2. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL FRAMING NOTES. GYP BD OVER METAL STUDS AS NOTED ON FLOOR PLAN. PROVIDE INSULATION WHEN NOTED ON FLOOR PLAN. ATTACH STUDS TO TRACK WITH #8 SCREWS THROUGH FLANGE CONT. METAL TRACK RUNNER. ATTACH TO FLOOR WITH 0.180" POWER DRIVEN SHOT PINS @ 16" O.C. MAX. AT CONCRETE FLOOR SLAB. (ESR-1799) W/ MIN. 1-1/2" EMBEDMENT. BASE MOULDING FINISH FLOOR SEALANT 15" MIN 18 ' - 0 " M A X . F R O M F I N I S H F L R . T O L A N D I N G 6' - 0 " 30 " 4' - 0 " O . C . M A X . 12 " O. C . 36 " 42 " OPEN1' - 3 " 1' - 3 " 1' - 3 " 1' - 9 " 2'-6" CLR SECTION @ ROOF PENETRATION LANDING B-B PLAN VIEW AT LANDING 30 " M A X PR O V I D E S A F E T Y C A G E O N L Y W H E N G R E A T E R T H A N 2 4 ' - 0 " 30 " M I N 48 " 4' - 0 " O . C . M A X TY P . E A . H O R I Z . 6" 7" MIN 42" MIN F. V . 4" MIN FLARE LADDER ELEVATION A-A PLAN VIEW AT CAGE 15" CLR 2'-6"9 1 / 2 " O.C . M A X 18" F.V. INTERIOR ROOF ACCESS LADDER SCALE: 1/4" = 1'-0"05204 1'-4" KEYNOTES 1. FOR ADDITIONAL SPECIFICATION REGARDING ACCESS LADDERS. SEE CALIFORNIA MECHANICAL CODE SECTION 304.2 AND CALIFORNIA PLUMBING CODE. 2. ALL LADDER INSTALLATION AND CONSTRUCTION TO COMPLY W/ LOCAL CODES AND APPLICABLE OSHA. REGULATIONS. 3. CONTRACTOR TO ENGINEER AND FABRICATE ASSEMBLY - THIS DETAIL IS FOR GUIDELINES ONLY. CONTRACTOR TO SUBMIT COMPLETE SHOP DRAWINGS FOR REVIEW. 4. PAINT ASSEMBLY RED OXIDE PRIMER - FINISH ENAMEL COAT - COLOR TO BE VERIFIED PRIOR TO PAINTING. 1. 2'-6" X 3'-0" TYPE S BILCO ROOF HATCH WITH RIGID INSULATION - INSTALL PER MANUF. SPECS. 2. BILCO 'LADDER UP' EXTENSION POST OR EQUAL 3. BLOCKING FOR OPENING AND LADDER ATTACHMENT - SEE STRUCTURAL DRAWINGS. 4. 3/8" X 3" STEEL BAR LADDER WITH 3/4" DIA. X 16" WIDE RUNGS AT 12" O.C. RUNGS TO BE KNURLED OR DIMPLED. 5. 3/8" X 3" STEEL BAR WELDED TO LADDER & ATTACHED TO WALL W/ 3/8" DIA. ANCHORS - MIN 4" EMBEDMENT. 6. 3" X 3" X 1/4" STEEL ANGLE WELDED TO LADDER, ANCHOR TO FLOOR W/ 3/8" DIA. BOLTS 7. CHECKER PLATE STEEL LANDING STEEL GUARDRAIL ASSEMBLY AND 4" HIGH TOE KICK PLATES. 8. SAFETY CAGE: 3"X1/4" HORIZ. STRAPS @ 48" O.C. VERT. MAX. 1-1/2" X 3/16" VERT. STRAPS @ 9.5" O.C. HORIZ. MAX. SECURE TO VERTICAL SIDE BARS OF LADDER. GENERAL NOTES A-A -- B-B -- 18 AD-5 17 - 000 6 5 4 7 4 7 4 8 8 4 3 1 2 STEEL PROTECTION AT DOWNSPOUTS 1-1/2" = 1'-0" PAINTED CONCRETE TILT WALL DOWNSPOUT - CONTRACTOR TO VERIFY SIZE OF DOWNSPOUT (MAY VARY) PRIOR TO FABRICATION OF STEEL GUARDS. 4' HIGH X 3/8" THK. STRUCTURAL STEEL BENT PLATE GUARD TO + 4'-0" PAINTED (2) COATS GLOSS ENAMEL TO MATCH BUILDING. MOUNT BOTTOM OF STEEL GUARD AT 2" ABOVE THE DOWNSPOUT OPENING. ATTACH EA. SIDE WITH THREE 1/2" DIA. WEDGE ANCHORS AT 20" O.C. AND 4" MAX. FROM TOP & BOT. NOTES: 1. PROVIDE STEEL PROTECTION AT DOWNSPOUTS ONLY WHERE LOCATED SUCH THAT THEY ARE NOT PROTECTED BY STAIR WALLS OR CURBS / PLANTERS. 03004 FOIL AT UNDERSIDE OF ROOF DECK SCALE: 1/2" = 1'-0"03700.2 METAL SUB-PURLIN HANGERS EXPOSED AT ENDS WOOD ROOF DECKING SCRIM FOIL ENDS LEFT OPEN FOR AIR FLOW SCRIM FOIL ATTACHED UNDERSIDE OF WOOD SUB-PURLINS ROOF JOISTS WOOD SUB-PURLIN @ 24" O.C. 8'-0" TYP. (OR 10'-0" - SEE STRUCT. ROOF FRAMING PLANS 5"5"86" WIDTH OF SCRIM @ TYP. 8'-0" JOIST SPACING CONCRETE WALL PANEL SHIM AS REQUIRED GALVANIZED FORMED STEEL LOUVER ASSEMBLY: L&L LOUVER MODEL FG-4004 18 GA. 4" WIDE 45 DEGREE BLADE WITH 18 GA. CHANNEL FRAME. BLADES TO HAVE 3/4" FACE AND TO BE SPACED AT 4.5" O.C. SEALANT O/ BACKING ROD ON BOTH INTERIOR AND EXTERIOR PERIMETERS 3/ 8 " 3/4" 3/ 8 " 3/4" .060 GALVANIZED PANELS AROUND PERIMETER OF FILTER FRAME TO BLANK OFF ANY UNFILTERED AREAS OF THE LOUVERS. 1" DISPOSABLE FILTERS SET IN 16 GA. CALVANIZED FRAME ASSEMBLY ATTACHED TO BACKSIDE OF LOUVER ASSEMBLY. USE GLASFLOSS INDUSTRIES Z-LINE HV SERIES. 1/2" MESH REMOVABLE BIRD SCREEN 19 GA. ZINC COATED WIRE. WALL VENT SECTION SCALE: 1 1/2" = 1'-0"02560 TYPICAL WET-SEAL METAL PANEL JOINTS SCALE: 1" = 1" NOTES: 1. CONTRACTOR SHALL PROVIDE DETAILED SHOP DRAWINGS SHOWING ALL CONNECTIONS. 2. SYSTEM SHALL BE INSTALLED ACCORDING TO MANUF. SPECIFICATIONS. 3. SEE PROJECT MANUAL FOR METAL COMPOSITE MATERIAL BUILDING PANEL REQUIREMENTS. 4. PANEL COLOR: SEE ELEVATIONS. SEALANT COLOR TO MATCH PANEL COLOR. HORIZONTAL VERTICAL ROUT & RETURN COMPOSITE METAL PANEL PANEL JOINT W/ SEALANT & BACKER ROD MOUNTING BRACKET ASSEMBLY PER MANUF. C.L. OF STUD / JOIST / GIRT FRAMING SUPPORTS OR 1/2" PLYWOOD MOUNTING SURFACE. SEE WALL SECTIONS & STRUCT. G.C. TO COORDINATE TRADES W/ METAL PANEL SHOP DRAWINGS ROUT & RETURN COMPOSITE METAL PANEL PANEL JOINT W/ SEALANT & BACKER ROD MOUNTING BRACKET ASSEMBLY PER MANUF. C.L. OF STUD / JOIST / GIRT FRAMING SUPPORTS. CONTRACTOR TO COORD. LOCATIONS OF LT. GUAGE FRAMING W/ P.J. LOCATIONS AS REQUIRED. REVIEW METAL PANEL SHOP DRAWINGS FOR COORDINATION PRIOR TO CONSTRUCTION. 1 1 / 2 " 1/2" 1 1 / 2 " 1/2" 02800 SCALE: 3" = 1'-0"02335 OVERHEAD DOOR HEAD NOTES: 1. SEE STRUCTURAL DWGS. FOR ADDITIONAL NOTES. PE R M A N U F . OVERHEAD DOOR - HARDWARE & MOUNTING PER MANUF. - SEE DOOR SCHEDULE FOR ROLL-UP OR VERTICAL LIFT DESIGNATION 3/4" CHAMFER - TYP. CONC. TILT-UP PANEL 3/4" V-GROOVE DRIP OVERHEAD DOOR JAMB HARDWARE PER MANUFACTURER 12 " M I N . P E R S P E C S 3/4" X 3/4" CHAMFER @ EXTERIOR EDGE OF BENT METAL JAMB. 3/4" CHAMFER - TYP. 3/16" GALVANIZED BENT METAL JAMB FROM FLR. TO 5'-0" A.F.F. W/ 5/8" DIA. X 6" LONG W.S. ANCHORS @ 12" O.C. & 4 - #3 BARS WELDED @ EA. SIDE, EQUALLY SPACED PROVIDE CAULKING AT ANY DAYLIGHT BETWEEN TRACK & BACK OF PANEL O.H. DOOR JAMB - HARDWARE & MOUNTING PER MANUF. SPECS. DOOR W/ RIB REINFORCING & CONT. END STILE REQUIRED DOOR OVERLAP AT ROUGH OPENING 3/8" STRUCTURAL STEEL BENT PLATE JAMB GUARD TO + 4'-0" PAINTED (2) COATS GLOSS ENAMEL. ATTACH WITH THREE 1/2" DIA. WEDGE ANCHORS AT EQUAL SPACING 4" OVERHEAD DOOR JAMB SCALE: 3" = 1'-0"02332 NOTES: 1. SEE STRUCTURAL DWGS FOR FURTHER NOTES. 2. DOOR JAMBS TO BE BOLTED OR WELDED TO WALLS - SHOT PINS NOT ALLOWED. DOOR MOUNTING TO PROVIDE FOR SPECIFIED DOOR LIFECYCLE. 3. PROVIDE MANUF. WIND SEALS AT JAMBS, SILL, HEAD. 4"4" 8" 6" (VERIFY W/ DR. MANUF) 3" 2" MIN. 2- 1 / 2 " M I N 4"X8"X 3/8" THK. STL. BASEPLATE WELDED AT BOT. OF Z-GUARD 5/8" DIA. EXP. BOLT W/ MIN. 2-1/2" EMBED. DOCK DOOR W/ BOTTOM SEAL GALV. STL. JAMB O/ CONC. TILT-UP PANEL - SET INTO SLAB MIN 1" SLOPE CONC. FLR. 1/2" FROM FIN. FLR. C10X20 CONT. STL CHANNEL - SEE STRUCT FOR ANCHORS MIN. 24"W X 12"H X 6" THK. RUBBER DOCK BUMPERS W/ STL. MOUNTING FLANGES. WELD TO C-CHANNEL OR ATTACH W/ EXP. BOLTS PER MANUF. - TWO BUMPERS PER TRUCK STALL CONCRETE TILT-UP PANEL FIN. FLR.1/ 2 " SLOPE FLOOR IN WIDTH OF PANEL NOTES: 1. SEE STRUCTURAL DWGS. FOR FURTHER NOTES. 2. ALL BUMPER HARDWARE IS TO BE PAINTED BLACK 48 " A B V . F I N . GR A D E U . N . O . 10 - TRUCK DOCK BUMPER @ OVERHEAD DOOR SILL SCALE: 3" = 1'-0"02331 NOTES: 1. SEE STRUCTURAL DWGS. FOR FURTHER NOTES. OVERHEAD DOOR SILL @ CONCRETE APRON SCALE: 3" = 1'-0"02330 SLOPE FLOOR IN WIDTH OF PANEL 10 - FIN. FLR.1/ 2 " GRADE DOOR W/ BOTTOM SEAL GALV. STL. JAMB O/ CONC. TILT-UP PANEL - SET INTO SLAB MIN 1" SLOPE CONC. FLR. 1/2" FROM FIN. FLR. 1/2" EXPANSION JOINT - DOWEL SLABS PER STRUCT. CONCRETE TILT-UP PANEL ACCESSIBLE EXIT DIRECTIONAL SIGNAGE SCALE: N.T.S.01122 NOTES: 1. THE SIGN SHALL COMPLY WITH CBC SECTIONS 1009.10. 2. THE SIGN SHALL COMPLY WITH CBC SECTIONS CHAPTER 11B SECTIONS 11B-703.1, 11B-703.3 AND 11B703.5 DIVISION 7. AND 1011 CBC. 3. THE SIGN SHALL BE LOCATED ADJACENT TO THE LATCH SIDE OF A SINGLE DOOR AND RIGHT SIDE OF DOUBLE DOORS 40" MIN. A.F.F. TO BOTTOM OF LOWEST VISUAL CHARACTER. A PERSON SHALL BE ABLE TO APPROACH WITHIN 3" OF THE SIGN WITHOUT ENCOUNTERING A PROTRUDING OBJECT OR BE WITHIN THE SWING OF THE DOOR PER CBC SECTION 11B-703.4.2. 4. VISUAL CHARACTERS ON SIGNS SHALL BE SELECTED FROM FONTS WHERE THE WIDTH OF THE UPPERCASE LETTER "O" IS 60% MIN. AND 110% MAX. OF THE HEIGHT OF THE UPPERCASE LETTER "I". STROKE THICKNESS OF THE UPPERCASE LETTER "I" SHALL BE 10% MIN. AND 20% MAX. OF THE HEIGHT OF THE CHARACTER. WHEELCHAIR ACCESSIBLE EXITS 6" MIN. FIN. FLR. 40 " M I N . INTERNATIONAL SYMBOL FOR ACCESSIBILITY - BACKGROUND COLOR SHALL BE BLUE 15090 IN FEDERAL STANDARD 595C. SYMBOL, LETTERS AND BRAILLE SHALL BE WHITE. CHARACTERS AND SYMBOLS SHALL HAVE A NON GLARE FINISH AND SHALL BE RAISED 1/32". 1" HIGH MIN. SANS SERIF CHARACTERS WITH A WIDTH TO HEIGHT RATIO OF BETWEEN 3:5 AND 1:1 AND A STROKE WIDTH TO HEIGHT RATIO OF BETWEEN 1:5 AND 1:10. DIRECTION ARROWS TO POINT IN DIRECTION OF NEAREST ACCESSBILE EXIT. TO BE VERIFIED IN FIELD BY CONTRACTOR PRIOR TO ORDERING AND PLACING SIGNS LOCATION ADJACENT TO THE DOOR, UNDERNEATH THE TACTILE EGRESS SIGN PROVIDED PER 1/AD-4 6" M I N . ACCESSIBLE EXITSWHEELCHAIR HAND RAIL @ ROOF HATCH SCALE: 1/2" = 1'-0"01346.1 3' - 6 " M I N . 1"1" 8" 4" 1" PAINTED PIPE RAIL, TYP. TOP OF PARAPET ROOF TOP ROOF HATCH 3/8" THK. PLATE W/ (4) 3/4" HILTI KWIK-BOLT-TZ 6" EMBEDMENT (ESR-1917) 3' - 6 " M I N . 3" TOP & BOTTOM ROOF LINE 5'-0" 6" NOTES: 1. PAINT RAIL TO MATCH PARAPET WALL. 2. RAIL SHALL BE DESIGNED TO PREVENT THE PASSAGE OF A 21" DIA. SPHERE PER CBC SECTION 1015.7. 3. WHERE MECHANICAL EQUIPMENT IS LOCATED WITHIN 10' OF A ROOF EDGE AND PARAPET IS LESS THAN 42", PROVIDE GUARDRAIL ALONG EDGE OF EQUIPMENT & EXTENDING 30" PAST EACH EDGE. 21 " M A X . 10'-0" OUTSIDEINSIDE 30" MIN. 5'-0" ADD'L INTERMEDIATE HORIZONTAL'S WHERE SPACING EXCEEDS 21" ONLY PROVIDE WHERE REQUIRED TO PREVENT OPENING LARGER THAN 21" 3" TOP & BOTTOM SHEET: SHEET TITLE RGA Office of Architectural Design 15231 Alton Parkway, Suite 100 Irvine, CA 92618 T 949-341-0920 FX 949-341-0922 RGA, OFFICE OF ARCHITECTURAL DESIGN COPYRIGHT CHK'D BY: DRAWN BY: CAD FILE NAME: OWNER PROJECT NO: RGA PROJECT NO: MARK DESCRIPTIONDATE PROJECT NAME CONSULTANT PROFESSIONAL SEALS MG CP 00000.00 19073.00.AD-5 19073.00 11/24/2020 PLAN CHECK SUBMITTALPC MS-MOUNTAIN VIEW LLC C/O SILAGI DEVELOPMENT & MANAGMENT, INC. 16130 VENTURA BLVD. SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 MS MOUNTAIN VIEW PARK AVENIDA ALVARADO CITY OF TEMECULA, CALIFORNIA DETAILS AD-5 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW 10-21-2020 11/24/2020 PLAN CHECK SUBMITTAL 04/17/2021 PLAN CHECK COMMENTS (NOT FOR BID OR CONSTRUCTIONS) 1S0.0 STRUCTURAL ISOMETRIC (BUILDING-1) MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 PHONE: 805-494-7704 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver BUILDING-1 BUILDING-2 BUILDING-3 BUILDING-7 SCALE: STRUCTURAL ISOMETRIC MARK DATE DESCRIPTION 1-E 1-E 1-3 1-3 1-D 1-D 1-C 1-C 1-B 1-B 1-B.1 1-A 1-A 1-1.9 1-2 1-2 1-1 1-1 3 4 ' - 0 " 65 ' - 0 " 4 8 ' - 0 " 4 8 ' - 0 " 1 0 ' - 0 " 18 ' - 0 " 23 ' - 0 " 27 ' - 0 " 2 7 ' - 0 " 2 3 ' - 0 " 5 ' - 0 " 26 ' - 0 " 2 ' - 0 " 39' - 4"36' - 8" 10' - 4 1/8"28' - 7 7/8"19' - 0"18' - 0" 3' - 5" F . O .P . P . J . F . O .P . W.P . F . O .P . W.P. P.J. P.J. P.J. F.O.P. F.O.P. F.O.P. P -1 P -2 P-3P-4P -6 P -7 P -8 P -9 P -1 0 P -1 1 P-12 P-13 P-14 P-15 P -1 6 P -1 7 P -1 8 P -1 9 P -20 P -2 1 P -2 2 P -2 3 P-24P-25 1 9 ' - 0 " 1 5 ' - 0 " P.J. F.O.P. 3 4 ' - 0 " 65 ' - 0 " 4 8 ' - 0 " 4 8 ' - 0 " 2 8 ' - 0 " 5 ' - 0 " 2 4 ' - 3 " 3 1 ' - 9 " 25 ' - 0 " 25 ' - 0 " 31 ' - 0 " 2 5 ' - 0 " SD1.0 15 ELECTRICAL RM. SEE DETAIL 3 ' - 6" 39' - 4"36' - 8" 2' - 0"26' - 0"5' - 0"32' - 8"5' - 4"5' - 0" F .O .P . F .O .P . F .O .P . E .O .P . E .O .P . F .O .P . E.O.P. E.O.P. P.J. P.J. P.J. P.J. P.J. F.O.P. F.O.P. #4 DOWELS @ 18" O.C. TYP. AT THIS LINE U.N.O. TERMINATE SLAB REINF. AT POUR STRIP TYP. AT THIS LINE U.N.O. DOWELS @ 24" O.C. FROM PANEL TO CLAB TYP. AT THIS LINE U.N.O. 10' - 2" 1 SD1.0 TYP U.N.O. E Q. E Q . E Q . E Q. E Q . E Q . E Q . #4 DOWELS @ 18" O.C. TYP. AT THIS LINE U.N.O. TERMINATE SLAB REINF. AT POUR STRIP TYP. AT THIS LINE U.N.O. DOWELS @ 24" O.C. FROM PANEL TO CLAB TYP. AT THIS LINE U.N.O. 1 SD2.1 1 SD2.1 TYP U.N.O. TYP U.N.O. 3'-0"W x 18"D CONT. FOOTING 4'-0"WIDE POUR STRIP 1 SD2.1 1 SD2.1 TYP U.N.O. TYP U.N.O. 3'-0"W x 18"D CONT. FOOTING 4'-0"WIDE POUR STRIP #4 DOWELS @ 18" O.C. TYP. AT THIS LINE U.N.O. TERMINATE SLAB REINF. AT POUR STRIP TYP. AT THIS LINE U.N.O. DOWELS @ 24" O.C. FROM PANEL TO CLAB TYP. AT THIS LINE U.N.O. #4 SLAB DOWELS TYP. BETWEEN DOCK LEVELER AT THIS LINE U.N.O. (NO. OF DOWELS TO MATCH W/ DOWELS FROM PANEL) F1 C1 F1 C1 X-1 X-1 F4 - F3 - F3 - F4 - F2 - S LO P E 0. 5 0 % S E E C IVIL 1 SD2.1 TYP U.N.O. 4'-0"W x 18"D CONT. FOOTING AT OFFICE 1 SD2.1 TYP U.N.O. 4 '-0 "W x 1 8 "D C O NT. F O O TING AT O F FIC E 16 SD2.0 16 SD2.0 TYP U.N.O . TYP U. N. O . 4 '-0 "W x 2 4 "D G R ADE BE AM 4'-0 "WIDE P O UR S TR IP 1 SD2.1 1 SD2.1 TYP U.N.O . TYP U.N.O . 3 '-0 "W x 18 "D C O NT. FO O TING 4 '-0"W IDE P O UR S TR IP E XTENS IO N 2 ' - 0 " 16 SD2.0 16 SD2.0 TYP U.N.O. TYP U.N.O. 4'-0"W x 18"D GRADE BEAM 10'-0"WIDE POUR STRIP SD1.0 11 FUTURE DOCK LEVELER 1S4.4 A 5A SD1.0 SEE ARCHT'L' & CIVIL FOR THE EXTENT OF TRUCK COURT SLAB 1 SD2.1 5'-5" WIDE POUR STRIP 1 SD2.1 TYP U.N.O . 3'-0 "W x 18 "D CO NT. F O O TING 1 SD2.1 TYP U.N.O . 7'-5 " WIDE P O UR S TR IP 76' - 0" 76' - 0" EQ.EQ.EQ. 1 9 5 ' - 0 " 1 E Q . 1EQ. 1EQ. 2EQ. 2 E Q . 2 E Q . 2 E Q . P.J. P -5 45° 5 " 4" W.P. 1S4.3 A RAMP WALL SEE SHEET TRASH ENCLOSURE SEE SHEET 14' - 1 11/16"W.P.W.P.5 SD1.0 FOUNDATION NOTES: LEGENDS: DENOTES 6" THK. MIN. REINFORCED CONCRETE SLAB FOR ADD. INFO SEE DETAIL DENOTES OFFICE AREA 6" THK. MIN. REINFORCED CONCRETE SLAB FOR ADD. INFO SEE DETAIL DENOTES 6" THK. MIN. REINFORCED CONCRETE SLAB RAMP FOR ADD. INFO SEE DETAIL 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. FOR GENERAL NOTES SEE SHEET "SD-0.0", & "SD-0.1" PERIMETER POUR STRIP TO BE POURED AFTER ALL PANELS HAVE BEEN ERECTED. PROVIDE GROUT UNDER THE PANELS FOR THE FULL LENGTH OF THE FOOTING BEFORE PANELS HAVE BEEN ERECTED. AS AN ALTERNATE FOR CONTINUOUS GROUT, USE 18" SQ. GROUT PADS LOCATED AT 6'-0" O.C. MAX., 3'-0" FROM PANEL JOINT, AND AT EACH SIDE OF PANEL OPENING. THEN GROUT FULL LENGTH OF THE PANEL AFTER PANELS ARE ERECTED. SEE DETAIL "19/SD2.0" SEE ARCHITECTURAL, ELECTRICAL, PLUMBING MECHANICAL DRAWINGS FOR SIZE AND LOCATION OF SLAB DEPRESSION AND OPENINGS REQUIRED FOR DUCTS, PIPES SLEEVES, ELECTRICAL CONDUITS AND OTHER EMBEDDED IN CONCRETE, UNLESS NOTED OTHERWISE. F.O.P.= DENOTES FACE OF CONC. PANEL. E.O.P.= DENOTES EDGE OF CONC. PANEL. P.J. = DENOTES PANEL JOINTS. W.P. = DENOTES WORKING POINT K.O.P.= DENOTES KNOCK OUT PANEL CONTRACTOR SHALL VERIFY BOTTOM OF PANEL WITH THE LATEST GRADING PLAN. CONTRACTOR SHALL VERIFY ALL DIMENSIONS WITH THE LATEST ARCHITECTURAL AND STRUCTURAL DRAWINGS BEFORE FORMING OF PRECAST CONCRETE PANELS. CONTRACTOR TO COORDINATE LOCATION OF SPRINKLER MAIN RISER W/FIRE PROTECTION DWG'S. SEE DETAIL "9/SD-1". CONTRACTOR TO COORDINATE LOCATION OF ELECTRICAL TRENCH W/ELECTRICAL DWG'S. SEE DETAIL "10/SD-1" FOR TYPICAL FOOTING BLOCK-OUT. FOR FINISH FLOOR ELEVATION SEE CIVIL DRAWING. WHERE SLOPED FLOOR OCCURS ,SEE DETAIL "12/SD-2". PROVIDE SURVEY STAKES PRIOR TO FOUNDATION INSPECTION TO VERIFY LOT LINES. SEE DETAIL "5A/SD-1" FOR TYPICAL EDGE OF SLAB. CONTRACTOR REFER TO DETAIL "11/SD-1" FOR SAW-CUT OPENING OF FUTURE DOCK LEVELER. CONTRACTOR TO BE RESPONSIBLE FOR DAMAGE TO SLAB FROM HEAVY LOADING DURING CONSTRUCTION. ALL FOUNDATION EXCAVATIONS SHALL BE INSPECTED AND APPROVED BY THE GEOTECHNICAL ENGINEER OF RECORD PRIOR TO THE PLACEMENT OF ANY REINFORCING STEEL. A WRITTEN REPORT PREPARED BY THE GEOTECHNICAL ENGINEER OF RECORD STATING THE RESULTS OF THE GEOTECHNICAL ENGINEER'S INSPECTION SHALL BE PROVIDED TO THE CITY INSPECTOR PRIOR TO THE PERFORMANCE OF ANY FOUNDATION INSPECTION. EXCAVATION SHALL BE MADE IN COMPLIANCE WITH CAL/OSHA REGULATIONS. A LINE AND GRADE CERTIFICATION PREPARED BY CIVIL ENGINEER OF RECORD SHALL BE GIVEN TO THE CITY INSPECTOR PRIOR TO PERFORMANCE OF ANY FOUNDATION INSPECTION. THIS CERTIFICATION SHALL STATE THAT THE CORRECT LOCATION FOR ALL STRUCTURES IS ESTABLISHED IN ACCORDANCE WITH THE CITY APPROVED PRECISE GRADING PLAN. THE FINAL COMPACTION REPORT AND GEOTECHNICAL ENGINEER EXCAVATION INSPECTION REPORT MUST BE SUBMITTED TO THE BUILDING INSPECTOR PRIOR TO FOUNDATION INSPECTION AND THAT CITY INSPECTOR MUST INSPECT EXCAVATIONS BEFORE POURING ANY CONCRETE. PRIOR TO THE CONTRACTOR REQUESTING A FOUNDATION INSPECTION, THE GEOTECHNICAL ENGINEER SHALL ADVISE THE BUILDING OFFICIAL IN WRITING THAT; A) THE BUILDING PAD WAS PREPARED IN ACCORDANCE WITH THE GEOTECHNICAL REPORT. B) THE UTILITY TRENCHES HAVE BEEN PROPERLY BACKFILLED AND COMPACTED. C) THE FOUNDATION EXCAVATION WAS MADE TO COMPLY THE RECOMMENDATION FOR EXPANSIVE CHARACTERISTICS AND BEARING CAPACITY. PERIMETER POUR STRIP AT DOCK LEVELERS SHALL BE FREE OF ALL UNDERGROUND PIPING, CONDUIT ETC. TO ALLOW FOR FUTURE RECESSED DOCK LEVELERS (MINIMUM 10'-0" WIDE). ROOF LADDER DESIGN, OF MEMBERS, BRACES AND CONNECTIONS TO STRUCTURE WILL BE DONE BY THE SUPPLIER IN ACCORDANCE WITH THE BUILDING CODE. CONTRACTOR TO RE-RUN SAW BLADE THROUGH CONTROL JOINTS FOR PROPER CLEAN-OUT AT END OF PROJECT. CONTROL JOINT SHALL BE 15'-0" MAX. 3 SD1.0 4 SD1.0 MARK FOOTING (WxLxT) REINFORCING DETAIL FOOTING SCHEDULE COLUMN SCHEDULE MARK COLUMN HEIGHT BASE PLATE SIZE ANCHOR BOLTS DETAIL 7'-0" x 7'-0" x 18"(7)-#6 E.W. HSS 8 x 8 x 5/16 TO ROOF 7/8" x 14" x 14"(4)-7/8" DIA. A.B. F* C* DENOTES FOOTING TYPE, SEE SCHEDULE DENOTES COLUMN TYPE, SEE SCHEDULE 1 SD1.0F1 C1 8'-0" x 8'-0" x 18"(8)-#6 E.W.F2 5'-0" x 7'-0" x 18" (5)-#6 LONG. (7)-#6 TRANS.F3 9'-6" x 13'-6" x 18" (10)-#6 LONG. (14)-#6 TRANS.F4 8 SD1.0 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW 10-21-2020 11/24/2020 PLAN CHECK SUBMITTAL 04/17/2021 PLAN CHECK COMMENTS (NOT FOR BID OR CONSTRUCTIONS) 1S1.1 FOUNDATION PLAN (BUILDING-1) MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 PHONE: 805-494-7704 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver SCALE: 1" = 10'-0" FOUNDATION PLAN P RO J E C T NO R TH MARK DATE DESCRIPTION 1-E 1-E 1-3 1-3 1-D 1-D 1-C 1-C 1-B 1-B.1 1-B.1 1-A 1-A 1-1.9 1-2 1-2 1-1 1-1 T .S .= 2 2'-5 " T . S . = 2 4 '- 0 " P -1 P -2 P-3P-4P -6 P -7 P -8 P -9 P -1 0 P -11 P-12 P-13 P-14 P-15 P -16 P -1 7 P -1 8 P -19 P -2 0 P -21 P -2 2 P -2 3 P-24P-25 3 4 ' - 0" 6 5' - 0 " 4 8 ' - 0" 4 8 ' - 0" 1 0' - 0 " 1 8 ' - 0" 2 3' - 0" 2 7' - 0" 2 7 ' - 0" 2 3 ' - 0 " 5' - 0 " 2 6' - 0 " 2' - 0" 39' - 4"36' - 8" 10' - 0"29' - 0"19' - 0"18' - 0" 3' - 5" 1 9 ' - 0" 1 5' - 0 " 3 4 ' - 0" 6 5' - 0 " 4 8 ' - 0" 4 8 ' - 0" 2 8 ' - 0" 5' - 0 " 2 4 ' - 3 " 3 1' - 9 " 2 5' - 0" 2 5' - 0" 3 1' - 0" 2 5 ' - 0" 3 ' - 6 " 39' - 4"36' - 8" 2' - 0"26' - 0"5' - 0"32' - 8"5' - 4"5' - 0" F.O .P . P .J . F.O .P . W.P . F.O .P . F.O.P. W.P. P.J. P.J. P.J. F.O.P. F.O.P. F.O.P. P.J. F.O.P. F . O . P . F . O . P .F .O .P . E . O . P . E . O . P . F . O . P . E.O.P. E.O.P. P.J. P.J. P.J. P.J. P.J. F.O.P. F.O.P. T .S .= 2 2 '-5 " T .S .= 2 4 '-0 " T.S.= 23'-1" T.S.= 23'-1" T . S . = 2 3'- 3 " T . S . = 2 4 ' - 8 " W36X135 W30X99 W27X84 T.S .= 2 5'-0 " T.S.= 2 6'-0" 1 SD4.0 1 SD4.0 1 SD4.0 2A SD4.0 2 SD4.0 2 SD4.0 TYP U.N.O. TYP U.N.O. TYP U.N.O. TYP U.N.O. TYP U.N.O. TYP U.N.O. 1 SD6.0 2 SD6.0 4 SD5.0 1 SD5.0 2 SD5.0 6 SD4.0 7 SD6.0 7 SD6.0 3 SD5.0 4 SD4.0 TYP U.N.O. 8 SD4.0 TYP U.N.O. 16 SD4.0 TYP U.N.O. TYP IN THIS LINE U.N.O.TYP IN THIS LINE U.N.O. 12B SD4.0 STRAPS TYP. @ 4'-0" O.C. BETWEEN GRIDS "1-1" & "1-2" 20'-0" CLEAR HEIGHT X-1 X-1 J5 J5 J5 J5 T . S . = 2 5'- 0 " 8 ' - 0" 8 ' - 0" 8' - 0 " J3 9 ' - 0" 8' - 0 " 8' - 0 " 9 ' - 5 " 8' - 0" 8' - 0 " 8' - 0 " 8 ' - 0 " 8 ' - 0" 8 ' - 0" 12B SD4.0 STRAPS TYP. @ 4'-0" O.C. BETWEEN GRIDS "1-2" & "1-3" 12B SD4.0 STRAPS TYP. @ 4'-0" O.C. BETWEEN GRIDS "1-1" & "1-2" 12B SD4.0 STRAPS TYP. @ 4'-0" O.C. BETWEEN GRIDS "1-2" & "1-3" 6 SD6.0 6 SD6.0 T .S .= 2 5 '-0 " 2 SD5.0 HS S 3 1 /2 " x 2 1 /2 " x 1/4 " HS S 3 1 /2 " x 2 1 /2 " x 1/4 " 8 SD6.0 4 SD6.0 5 SD6.0 9 SD6.0 HS S 3 1/2 " x 2 1 /2" x 1 /4 " 3 SD6.0 15 SD4.0 76' - 0" W24X68 T.S.= 22'-9" E .O . P . T . S . = 2 6 ' - 0 " T .S .= 2 4'-3 " T . S . = 2 5 ' - 0 " T . S . = 2 4 ' - 1 0 " 8 ' - 7 " P.J. J6 J6 J6 J6 J6 J6 J6 J6 J5 J5 J5 J5 J4 J3 J1J2 J3 5" 14' - 1 11/16"W.P.W.P.11 1S4.1 LEGENDS: ROOF FRAMING NOTES: DENOTES OFFICE AREA U.N.O. DENOTES EXHAUST FAN VERIFY LOCATIONS & NO. OF UNITS W/ LATEST ARCHT'L. DWG'S & MECH'L. DWG'S SEE DETAIL 1. 2. 3. 4. 5. 6. 7. FOR GENERAL NOTES SEE SHEET "SD-0" & "SD-0.1". FOR TYPICAL ROOF FRAMING DETAILS SEE SHEET "SD.4" AND "SD.6". FOR GIRDER JOIST SCHEDULE, ROOF NAILING DIAGRAM AND NOTES SEE SHEET T.S. = DENOTES TOP OF SHEATHING ALL ROOF ELEVATIONS ARE TAKEN DIRECTLY FROM THE FINISH FLOOR RIGHT BELOW REFERENCE POINT SEE ARCHT'L AND MECHANICAL DRAWINGS FOR EXACT LOCATION OF MECH. EQUIPMENTS FOR DETAIL SEE SEE SPRINKLER DRAWINGS FOR EXACT LOCATION & WEIGHT OF SPRINKLER MAINS SEE ARCH'L FOR SKYLIGHT LOCATION FOR OPENING SEE DETAIL ADEQUACY OF SUPPORTS FOR SPRINKLER SYSTEM DESIGN LOADS SHALL BE REVISED AND APPROVED BY ENGINEER OF RECORD PRIOR TO FIELD INSTALLATION AND INSPECTION. MECH'L UNIT SCHEDULE UNIT NO. OPER. W T. (LBS) NOTE: VERIFY WEIGHT OF MECH. UNITS W/ LATEST MECHANICAL. & ARCHITECTURAL. DWG'S. HP 1 610 EF 1 EF 2 THRU 14 SD4.0 10 SD4.0 5 SD4.0 14 SD4.0 7 EF 3 45 EF 4 280 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW 10-21-2020 11/24/2020 PLAN CHECK SUBMITTAL 04/17/2021 PLAN CHECK COMMENTS (NOT FOR BID OR CONSTRUCTIONS) 1S2.1 ROOF FRAMING PLAN (BUILDING-1) MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 PHONE: 805-494-7704 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver SCALE: 1" = 10'-0" ROOF FRAMING PLAN (20'-0" CLEAR HEIGHT) P RO J E C T NO R TH MARK DATE DESCRIPTION HP 1 EF 4 EF 3 AROOF NAILING SCHEDULE REMARKSEDGEINTERM. BOUND.CONT. EDGE A AREA ROOF NAILING NOTES: NOMINAL UNIT (PLF) DETAIL 1ROOF WIND NET UPLIFT PRESSURE 2 ROOF NAILING DIAGRAM SCALE: N.T.S.B C D E MEMBER ZONE A ZONE B ZONE C JOIST GIRDER GIRDER AND JOIST PURLIN SCHEDULE F NOTES: TYPICAL PANEL EDGE AT BOUNDARY 3" & 4" NOMINAL-TWO LINES NAILING TYPICAL INTERIOR PANEL JOINT SHEAR CAPACITIES * * MAX. SPANRAFTER U.N.O. ROOF NOTES: ZONE D MEMBER ZONE A ZONE B JOIST GIRDER ROOF WIND DOWNWARD PRESSURE 3 northnorth E B.1 A 321 E B.1 A 321 F A C F F F F A Wx S T R U T S Wx STRUTS JOIST SCHEDULE JOIST NUMBER DESIGNATION SEISMIC AXIAL (LRFD) *MIN. GROSS MOMENT OF INERTIA AT MID SPAN (IN4) *TOP CHORD BEND-CHECK LOAD (IF REQ.): LR *BOTTOM CHORD BEND-CHECK LOAD (IF REQ.) COMMENTS J1 24LH 242/146 18.0 K -0.25 K 0.25 K J2 26LH 238/142 20.5 K -0.25 K 0.25 K J3 24LH 260/155 20.5 K -0.25 K 0.25 K J4 26LH 256/151 23.0 K -0.25 K 0.25 K J5 26LH 270/142 20.5 K -0.25 K 0.25 K OFFICE J6 26LH 274/146 18.0 K -0.25 K 0.25 K OFFICE C CC RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 1S-3.1 ROOF NAILING DIAGRAM GIRDER AND BAR JOIST SCHEDULE 1-B 1-B.11-A 34' - 0"5" P-2 C1 9 1/4" P-1 D2 9 1/4" 19' - 0"15' - 0" T.S.= 25'-0" T.S.= 24'-3" T.S.= 24'-7 1/4" 1/2"18' - 11 1/8"3/4"14' - 10 7/8"3/4" 2 8 ' - 0 " 5 ' - 0 " 1 4' - 0 " 5' - 0"12' - 0"2' - 0"4' - 0"9' - 0"2' - 0" 8A SD3 8A SD3 3 SD2.0 10 SD3 10 SD3 7C SD310 SD3 7B SD3 10 SD3 7C SD3 3 SD2.0 2A SD3 2C SD3 2B SD3 5 SD3 1 SD5.0 1 SD4.0 TYP U.N.O. TYP U.N.O. 16 SD2.0 1 0' - 0 " 5 ' - 0 " 2 8 ' - 0 " 1 SD7.0 1 SD7.08-#4 PANEL TO FOOTING DOWELS AT EACH END #4 PANEL TO FOOTING DOWELS @ 18" O.C. IN LIEU OF TYP 3 SD7.0 2-#7 HOLD DOWN BARS (1 E.F.) 10-#7 DRAG BARS FULL WIDTH OF PANEL (5 E.F.) 6-#7 DRAG BARS FULL WIDTH OF PANEL (3 E.F.) 7A SD3 #3 TIES AT 4" O.C. IN LIEU OF #3 TIES AT 6" O.C. PANEL NOTES: 1. 2. 3. 4. 5. 6. 7. 8. 9. FOR GENERAL NOTES, SEE SHEETS "SD-0.0", & "SD-0.1" FOR TYPICAL PANEL NOTES AND TYPICAL PANEL REINFORCEMENT SEE DETAIL T.S. = DENOTES TOP OF SHEATING. FOR REVEALS AND TEXTURES SEE ARCHITECTURAL DRAWINGS. ALL ROOF ELEVATIONS ARE TAKEN DIRECTLY FROM FINISH FLOOR RIGHT BELOW REFERENCE POINT. PANELS ARE VIEWED FROM INTERIOR. FOR TYPICAL PANEL OPENING FOR DOWNSPOUT AND OVERFLOW SCUPPER SEE DETAIL FOR TYPICAL LEDGER SPLICE AT HIGH POINT AND LOW POINT, SEE DETAIL NOTES: 1. CONTRACTOR SHALL VERIFY BOTTOM OF THE PANEL WITH LATEST GRADING PLAN. 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS WITH THE LATEST ARCHITECTURAL & STRUCTURAL DRAWINGS BEFORE FORMING OF PRECAST CONCRETE PANELS. 3. CONTRACTOR TO COORDINATE LOCATION OF SPRINKLER MAIN RISER WITH FIRE PROTECTION DWGS. SEE DETAIL "9/SD-1". 4. CONTRACTOR TO COORDINATE LOCATION OF ELECTRICAL TRENCH WITH ELECTRICAL DWGS. SEE DETAIL "10/SD-1" FOR TYPICAL FOOTING BLOCK-OUT. 5. CONTRACTOR REFER TO DETAIL "11/SD-1" FOR OPENING OF FUTURE DOCK LEVELER. P-1 A 10" DENOTES PANEL NUMBER DENOTES PANEL THICKNESS DENOTES PANEL TYPE FOR REINFORCEMENT NOTES: CONTRACTOR TO COORDINATE LOCATION OF TORSION SPRING CENTER BRACKET ATTACHMENT WITH ARCH TO CLEAR THE OPENING/K.O.P. ADJUST THE VERTICAL TRACKS AS NEEDED. THE CONTRACTOR WILL BE RESPONSIBLE FOR DOOR AND BRACKET ATTACHMENT TO CONRETE WALL. LEGENDS: DENOTES FUTURE KNOCK-OUT PANEL DENOTES 3" RECESS. DENOTES PANEL OPENING FOR REINF. ALL AROUND OPENINGS SEE DET. 3/SD3.0 DENOTES THICKENED PIER FOR THICKNESS, SEE PANEL ELEVATION. NOTE: FOR EXACT DIMENSION/ LOCATION OF EMBEDDED PLATES, SEE CANOPY FRAMING PLAN AT SHEET "S5.1" NOTE: CONTRACTOR TO PROVIDE SLEEVE AT ALL INTERIOR DRAINS THRU PANEL. COORDINATE LOCATIONS WITH ARCHITECT AND PLUMBING PLANS. 1 SD3 13 SD3 13 SD6.0 NOTE: BOTTOM OF PANEL MAY NEED TO BE ADJUSTED PER LATEST CIVIL GRADING PLAN. 1-1.91-2 P-3 A4 9 1/4"" 4" 4' - 0"7' - 10" 2A SD4.0 16 SD2.0 8A SD3 18 SD2.0 2B SD3 1 SD5.0 TYP U.N.O. TYP U.N.O. 1 SD7.0 1 SD7.0 2-#7 HOLD DOWN BARS (1 E.F.) 18' - 8" 1' - 6 " 8 ' - 0 " 5 ' - 0 " 2 8 ' - 0 " W.P .T.S.= 24'-3" T.S.= 22'-9" 30' - 6" 10-#7 DRAG BARS FULL WIDTH OF PANEL (5 E.F.) P-4 A4 9 1/4" 14' - 7 9/16" T.S.= 22'-9" T.S.= 22'-5" 5 ' - 0 " 2 8 ' - 0 " 3 SD6.0 1-D 22' - 0"3' - 0"2' - 0" 2' - 1" 12' - 0"3' - 11"3' - 0"2' - 0" P-8 A1 8" P-9 E 8" 15' - 0" 27' - 0"23' - 0" 3/4"26' - 11 1/4"3/4"22' - 11 5/8" 1 SD4.0 1 SD2.1 TYP U.N.O. TYP U.N.O. 8 SD3 8A SD3 8 SD3 8A SD3 8 SD3 8 SD3 4 SD7.0 T.S.= 22'-5" T.S.= 22'-7" T.S.= 23'-1" T.S.= 23'-6 1/2" 4' - 8" 1 ' - 0 " 2 7 ' - 0" 7 ' - 6 " 1 ' - 8 " 9 ' - 4 " 7' - 0 " 2 ' - 6" 8' - 0 " 11 SD2.1 11 SD2.1 11 SD2.1 7A SD3 7C SD3 6 SD3 2' - 0" 7A SD3 7A SD3 7C SD3 4 SD3 7A SD3 8 " 10 SD2.0 7A SD3 7A SD3 35' - 0" 3 ' - 0 " 5 ' - 0 " 1-1 1 SD4.0 4 SD3 5 SD6.0 2 8' - 0" 8' - 0 " 1 ' - 0 " 1 1 1 /4 " 3/4" 1 SD2.1 2B SD3 4 SD7.0 6' - 5" 3' - 5" 3' - 4 1/4" 3/4" RETURN - P-8 8" T . S . = 2 3 ' - 1 " T.S.= 23'-1" P-10 A 8" 6' - 4" 1 SD4.0 5 SD6.0 9 SD6.0 8' - 0 " 2 7 ' - 0" 1 ' - 0 " 2B SD3 2B SD3 1 SD2.1 2' - 0 " T . S . = 2 3 ' - 1 " T.S.= 23'-3" 8"5' - 0"8" 1-1 8' - 0 " 2 9 ' - 0 " 2' - 0 " 3 /4"1 ' - 1 1 1 /4 " 2' - 0"3' - 6" 2' - 1" 3/4" 1' - 4 1/4" 7 SD7.0 1 SD4.0 9 SD6.0 4 SD3 2B SD3 4 SD7.0 1 SD2.0 RETURN - P-11 8" T.S.= 23'-3" 1-E P-11 D 8" 8' - 0 " 9 ' - 6" 9 ' - 6 " 1 0' - 0" 26' - 0"2' - 0" 25' - 11 1/2"1/2" 5' - 0"16' - 0"5' - 0" 1 SD4.0 T.S.= 23'-3" T.S.= 24'-0" 4 SD3 5 SD3 9 SD7.0 10A SD7.05 SD1.0 10A SD7.0 10A SD7.0 2C SD3 8' - 0 " 2 9 ' - 0 " 1 SD2.0 7C SD3 7C SD3 S5.1 1 CANOPY BEYOND 1 ' - 6" 15 SD7.0 15 SD7.0 A 1S4.1 A 1S4.1 SLAB EDGE 26' - 0" 1/2"25' - 11 1/2" 5' - 0"16' - 0"5' - 0" 1 0' - 0" 9 ' - 6 " 9 ' - 6" 1 ' - 6" 2 9 ' - 0 " 8' - 0 " P-12 D 8" T.S.= 24'-8" T.S.= 24'-0" 2 SD4.0 9 SD7.05 SD3 2C SD3 5 SD1.0 10A SD7.0 10A SD7.0 4 SD3 1 SD2.0 7C SD3 7C SD3 4 SD7.0 S5.1 1 CANOPY BEYOND 15 SD7.0 15 SD7.0 B 1S4.1 B 1S4.1 SLAB EDGE 1-E 2' - 0"3' - 6" 3/4" 2' - 0" 2' - 0 " 1 ' - 1 1 1 /4 " 3 /4" 8' - 0 " 2 9 ' - 0 " 7 SD7.0 2 SD4.0 4 SD3 8 SD6.0 4 SD7.0 2B SD3 1 SD2.0 RETURN - P-12 8" 1-C 4' - 0"7' - 7 1/2"7' - 3"3' - 0"6' - 7"3' - 0"7' - 2" P-6 A1 8" P-7 A3 8" 54' - 7 7/8" 40' - 7 7/8"27' - 0" 17' - 7 7/8"22' - 11 5/8"3/4"26' - 11 1/4"3/4" W.P . 14 SD7.0 4 SD2.1 4 SD2.1 4 SD2.1 9 SD3 9 SD3 9 SD3 T.S.= 23'-6 1/2" T.S.= 24'-0" T.S.= 22'-11 1/8" 14' - 0" 5 ' - 0 " 2 8 ' - 0 " 1' - 0 " 2 7' - 0 "2A SD3 TYP U.N.O. 5' - 0" 7 ' - 0 " 6 SD3 6 SD3 7A SD310" THK. PIER 2' - 2"5' - 0" 1 0 " 8 " 8" 2' - 0" P-5 A1 8" T.S.= 22'-5" T.S.= 23'-7 1/8" 1 SD6.0 13' - 0" 1-1 1-E RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW 10-21-2020 11/24/2020 PLAN CHECK SUBMITTAL 04/17/2021 PLAN CHECK COMMENTS (NOT FOR BID OR CONSTRUCTIONS) 1S4.1 PANEL ELEVATIONS (BUILDING-1) MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 PHONE: 805-494-7704 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver SCALE: 1/8" = 1'-0" WEST PANEL ELEVATION AT GL. "1-2" SCALE: 1/8" = 1'-0" SOUTH PANEL ELEVATION AT GL. "1-B" SCALE: 1/8" = 1'-0" S-WEST PANEL AT GL. "1-X" SCALE: 1/8" = 1'-0" WEST PANEL ELEVATION AT GL. "1-1" SCALE: 1/8" = 1'-0" NORTH PANEL ELEVATION AT GL. "1-E" PLAN PLAN SLAB EDGESLAB EDGE MARK DATE DESCRIPTION SCALE: 1/8" = 1'-0" WEST PANEL ELEVATION AT GL. "1-1" SCALE: 1/8" = 1'-0" SECTION-A SCALE: 1/8" = 1'-0" SECTION-B 1 SD2.1 2 SD4.0 8 SD6.0 4 SD6.0 2B SD3 2B SD3 2 ' - 0 " 2 7' - 0 " 8 ' - 0 " 6' - 4" P-13 A 8" T.S.= 24'-8" T.S.= 24'-8" 8"5' - 0"8" 1-E 5' - 6" 2' - 0" 3/4" 3' - 5 1/4" 8 ' - 0 " 2 8' - 0 " 1 ' - 0 "1 1 1 /4 " 3 /4" 1 SD2.1 7 SD7.0 2 SD4.0 2B SD3 4 SD7.0 4 SD6.0 4 SD3 RETURN - P-14 8" T.S.= 24'-10" T . S . = 2 4 ' - 8 " 1-2 6' - 4" 33' - 0"5' - 0" P-14 C 8" 2' - 10"3' - 0"4' - 8"12' - 0"4' - 8"3' - 0"2' - 6"5' - 4" SD5.0 3 2 ' - 0 " 1 ' - 0" 2 8 ' - 0 " 8 ' - 0 " 7 ' - 6" 1' - 8 " 9' - 4 " 7 ' - 0 " 2 ' - 6 " 2 9 ' - 0 " 2 SD4.0 TYP U.N.O. 1 SD2.1 18 SD2.1 18 SD2.1 8A SD3 8 SD3 8 SD3 8A SD3 8 SD3 8 SD3 4 SD3 TYP U.N.O. T.S.= 25'-8 3/4" T.S.= 25'-10 7/8" P-15 A 8" P-15 1' - 0"1' - 0" 7' - 0" 7D SD3 7D SD3 4 SD7.0 7D SD3 7D SD3 7A SD3 7B SD3 T.S.= 25'-0" 18 SD2.1 6 SD6.0 6 SD6.0 T.S.= 24'-10" 8"5' - 0"8" 2' - 10"3' - 0"4' - 8"12' - 0"4' - 8"3' - 0"2' - 10" P-16 RETURN 32' - 4" 7A SD3 7A SD3 7A SD3 1-E 1-D 1-C 48' - 0"48' - 0"43' - 0 3/8" 28' - 0"5' - 0"24' - 3"31' - 9"25' - 0"25' - 0" 27' - 0"7' - 0"23' - 2 5/8"3/4"31' - 8 1/4"3/4"24' - 11 1/4"3/4"24' - 11 1/4"3/4" 1 ' - 0 " 1 ' - 0 " 1 ' - 0 " 2 8 ' - 0 " 1 ' - 0 " 1 ' - 0 " 2 8 ' - 0 " 8 ' - 0 " 2 9 ' - 0 " 1 9' - 0 " 5' - 0"18' - 0"5' - 0"3' - 0"3' - 0"19' - 0"6' - 0" P-16 A2 8" P-17 A 8" P-18 A 8" P-19 A2 8" P-20 A 8" P-21 A 8" 25' - 9"6' - 0" T.S.= 26'-0" T.S.= 26'-0" T.S.= 26'-0" T.S.= 26'-0" T.S.= 26'-0" T.S.= 26'-0" T.S.= 26'-0" 4 SD3 12 SD7.0 12 SD7.0 7 SD6.0 7 SD6.0 1 SD4.0 1 SD2.1 4 SD2.1 9 SD3 7B SD3 14 SD7.0 2A SD3 TYP U.N.O. TYP U.N.O. TYP U.N.O. 4 SD7.0 P-18 P-19P-17 1' - 0"5' - 0"1' - 0" 7' - 0" 7D SD3 7D SD3 7A SD3 2' - 0"6' - 0" 10" THK. PIER 1 0" 8"8" 2' - 0" 6 SD3 6 SD3 6 SD3 10 SD2.0 8 ' - 0 " 11B SD7.0 8C SD3 2' - 0 " 6' - 0 " 10 SD2.0 10 SD2.0 2' - 0 " 4 ' - 0 " 2 ' - 0 " 2 ' - 0 " 1-B.1 1-A 31' - 0"25' - 0" 3/4"30' - 11 1/4"3/4"24' - 11 1/8"1/2" 1 ' - 0" 2 8 ' - 0" 2' - 0 " SD5.0 4 21' - 7" 21' - 7"34' - 5" T.S.= 26'-0" T.S.= 26'-0" T.S.= 26'-0" T.S.= 26'-0" 5 ' - 0 " 2 9 ' - 0" 5 SD3 1 SD4.0 1 SD2.1 14 SD7.0 12 SD7.0 2C SD3 2A SD3 TYP U.N.O. TYP U.N.O. TYP U.N.O. P-22 A 8"P-23 A2 8" 7A SD3 6' - 0"2' - 0" 10" THK. PIER 1 0 " 8 " 8 " 2' - 0" 6 SD3 10 SD2.0 5 ' - 0 " 3' - 0" 2' - 0 " 1-3 1-1.91-2 5 ' - 0 " 2 9 ' - 0" 7 ' - 0 " 5' - 0"3' - 0"4' - 0"4' - 0"3' - 0"18' - 0" P-24 A 8" P-25 A 8" 19' - 0"18' - 0" 4"36' - 8" 1/2"18' - 11 1/8"3/4"17' - 11 1/8"1/2" 2 SD4.0 1 SD2.1 4 SD2.1 9 SD3 8 SD3 18 SD2.1 1 ' - 0" 2A SD3 2C SD3 2C SD3 5 SD3 5 SD3 T.S.= 26'-0" T.S.= 25'-6 1/8" 5 ' - 0 " 2 8 ' - 0" TYP U.N.O. TYP U.N.O. 1 ' - 4 " 8 ' - 0 " T.S.= 25'-0" 7B SD3 7C SD3 7A SD3 NOTE: 1. FOR PANEL NOTES AND LEGENDS SEE SHEET "1S4.1" 1-3 5' - 0" RETURN - P-16 8" 2 ' - 0 " 2 7' - 0 " 1 SD4.0 1 SD2.0 4 SD3 4 SD7.0 T . S . = 2 5 ' - 1 0 7 / 8 " T.S.= 26'-0" 2B SD3 8"3' - 8"8" 6 SD6.0 2 9 ' - 0 " 8 ' - 0 " 1' - 0"5' - 0" P-16 RETURN RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW 10-21-2020 11/24/2020 PLAN CHECK SUBMITTAL 04/17/2021 PLAN CHECK COMMENTS (NOT FOR BID OR CONSTRUCTIONS) 1S4.2 PANEL ELEVATIONS (BUILDING-1) MS MOUNTAIN VIEW PARK Checker Author 19073.00 AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 101 HODENCAMP ROAD, SUITE 200 THOUSAND OAKS, CA 91360 PHONE: 805-494-7704 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. Approver SCALE: 1/8" = 1'-0" NORTH PANEL ELEVATION AT GL. "1-E" SCALE: 1/8" = 1'-0" EAST PANEL ELEVATION AT GL."1-3" SCALE: 1/8" = 1'-0" EAST PANEL ELEVATION AT GL."1-3" SCALE: 1/8" = 1'-0" SOUTH PANEL ELEVATION AT GL. "1-A" MARK DATE DESCRIPTION CONTROL JOINT AT RAMP SLAB 1 PANEL ELEVATIONS SCALE: 1/8"= 1'-0" THICKNESS = 6" TYP. U.N.O. 1-1.9 P - 4 X-1 1-B 1-B.1 1-1.9 1-2 1-1 RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 S4.3 RAMP PLAN, ELEVATION, AND DETAILS 4 3DETAIL 2TRASH ENCLOSURE DETAIL 1DETAIL 8 7BDETAIL 5DETAIL DETAIL ROOF METAL DECK NOTES: PLAN A-A B-B PANEL CONNECTION 7ADETAIL 6DETAIL 7DETAIL RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 S4.4 TRASH ENCLOSURE PLANS, ELEV. & DETAILS northnorth TRASH ENCLOSURE FOUNDATION PLAN, & FRAMING PLAN TRASH ENCLOSURE PANEL ELEVATIONS 1-1 1-E RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 S-5.1 CANOPY PLANS & DETAILS A 1 CONCRETE SURFACE WATER EVAPORATION DESIGN CRITERIA GENERAL FOUNDATION CONCRETE MIX DESIGN STRUCTURAL STEEL STRUCTURAL LUMBER REINFORCING STEEL CONCRETE SLAB ON GRADE PRECAST PANELS STATEMENT OF SPECIAL INSPECTION AND STRUCTURAL TEST STRUCTURAL OBSERVATION NOTES PER CBC SECTION 1704.6 DEFERRED SUBMITTAL ITEMS VERIFICATION AND INSPECTION TASK TABLE 1705.6 (CBC-2019) REQUIRED VERIFICATION AND INSPECTION OF SOILS CONTINUOUS DURING TASK LISTED PERIODICALLY DURING TASK LISTED _X _X _X _X X _ TYPE TABLE 1705.2.3 (CBC-2019) REQUIRED SPECIAL INSPECTIONS OF OPEN-WEB STEEL JOISTS AND JOIST GIRDERS SPECIAL REFERENCED STANDARD X CONTINUOUS INSPECTION SPECIAL PERIODIC INSPECTION a _ _ X_ X a: _ _ X REFERENCE IBC REFERENCED STANDARDSPERIODICCONTINUOUSVERIFICATION AND INSPECTION TABLE 1705.3 (CBC-2019) REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION X _ X _ _X _X _X _X X _ a: a _X X X b: X _X X _ b,c X X _ _ c: £ £ £ £ £ 1SD-0.0 GENERAL NOTES RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 TABLE N5.4-1 (ANSI/AISC 360-16) INSPECTION TASKS PRIOR TO WELDING Inspection Tasks Prior to Welding QC QA P P P P O O O O O O O O O O O TABLE N5.6-2 (ANSI/AISC 360-16) INSPECTION TASKS DURING BOLTING Inspection Tasks During Bolting QC QA TABLE N5.6-3 (ANSI/AISC 360-16) INSPECTION TASKS AFTER BOLTING Inspection Tasks After Bolting QC QA P P O O O O O O O O TABLE N5.6-1 (ANSI/AISC 360-16) INSPECTION TASKS PRIOR to BOLTING Inspection Tasks Prior to Bolting QC QA O P O O O O O O O O P O O O TABLE J6-1 (ANSI/AISC 341-16) VISUAL INSPECTION TASKS PRIOR to WELDING QC QA TASK DOC.TASK DOC. O O VISUAL INSPECTION TASKS PRIOR TO WELDING -- -- P/O**O O O -- O O-- P/O**O-- TABLE J6-2 (ANSI/AISC 341-16) VISUAL INSPECTION TASKS DURING WELDING QC QA TASK DOC.TASK DOC.VISUAL INSPECTION TASKS DURING WELDING O O-- O O-- O O-- O O-- O O-- O O-- TABLE N5.4-2 (ANSI/AISC 360-16) INSPECTION TASKS DURING WELDING Inspection Tasks During Welding QC QA O O O O O O O O O O O O TABLE N5.4-3 (ANSI/AISC 360-16) INSPECTION TASKS AFTER WELDING Inspection Tasks After Welding QC QA O O P P O O P P O O O O O O O O _ SPECIAL INSPECTION FOR COLLECTOR ELEMENTS TABLE 1705.2.2 REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION OTHER THAN STRUCTURAL STEEL VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED STANDARD X_Applicable ASTM Material Standards X_ X_ X_ AWS D1.3 AWS D1.4 ACI 318: Section 3.5.2 X _ X_ X _ SPECIAL INSPECTION FOR COLLECTOR ELEMENTS TABLE J7-3 (ANSI/AISC 341-16) INSPECTION TASKS AFTER BOLTING INSPECTION TASKS AFTER BOLTING QC QA TASK DOC.TASK DOC. P D P D TABLE J7-2 (ANSI/AISC 341-16) INSPECTION TASKS DURING BOLTING INSPECTION TASKS DURING BOLTING QC QA TASK DOC.TASK DOC. O -O - O -O - O -O - O -O - TABLE J7-1 (ANSI/AISC 341-16) INSPECTION TASKS PRIOR to BOLTING INSPECTION TASKS PRIOR to BOLTING QC QA TASK DOC.TASK DOC. O -O - O -O - O -O - P O O -O - TABLE J6-3 (ANSI/AISC 341-16) VISUAL INSPECTION TASKS AFTER WELDING QC QA TASK DOC.TASK DOC. O O VISUAL INSPECTION TASKS AFTER WELDING -- P P-- P PD D P PD D P PD D P P D- D D P PD D 1SD-0.1 GENERAL NOTES RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 COLUMN TO FOOTING 1 4CONSTRUCTION & CONTROL JOINT (OFFICE AREA) CONCRETE SLAB EDGE 5 PIPE TRENCH DETAIL 14 CONCRETE STAIR DETAIL 7 SPRINKLER MAIN RISER 9 FOOTING BLOCK OUT 10 OPENING FOR FUTURE DOCK LEVELER 11 13 ELECTRICAL ROOM DETAIL 15 LIGHT POLE DETAIL 16 TYPICAL REINFORCING WELDING TYP. REBAR, HOOK, BENT AND LAP SPLICE 12 NOTE: CONSTRUCTION JOINT TYPICAL CONTROL JOINT A B SLAB THK. CONSTRUCTION JOINT TYPICAL CONTROL JOINT A B CONSTRUCTION & CONTROL JOINTS (WAREHOUSE REINFORCED) CONSTRUCTION JOINT 2 3 COVER dsc (7)(6) "T" =SLAB THICKNESS SLAB REINFORCING WELDED WIRE (5) (4) REBARS SLAB THK.COVER dsc (7)(6)SLAB REINFORCING WELDED WIRE (5) (4) REBARS SLEEVE SIZECOLUMN SIZE COLUMN AND SLEEVE SCHEDULE ³ < COLUMN TO FOOTING 17(ALTERNATE DETAIL) SECTION A CONSTRUCTION & CONTROL JOINT 8 CONSTRUCTION JOINT A CONTROL JOINT B CONSTRUCTION JOINT DIAMOND LOAD PLATE DOWELSMOOTH ROUND DOWEL SLAB THICKNESS DOWEL SCHEDULE (TRUCK COURT SLAB UNREINFORCED) 1SD-1 FOUNDATION DETAILS RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 PANEL AT CONT. FOOTING 1 PANEL AT LOADING DOCK 3RAMP PANEL TO FOOTING 7 PANEL AT OPENING DETAIL 5CONC. SLAB PANEL REINF. 4 TRASH ENCLOSURE PANEL 8 TRASH ENCLOSURE DETAIL 9 STEPPED PANEL FOOTING 10 PANEL AT OPENING DETAIL 11 STEPPED BOTTOM OF PANEL 13 PANEL AT SLOPED FLOOR 12 19 NOTE: PANEL AT OPENING DETAIL 18 SETTING PAD DETAIL NOTE: GRID GRID NOTES: NOTES: FOR BOTTOM OF PANEL 3'-0" OR LESS BELOW F.F. FOR BOTTOM OF PANEL GREATER THAN 3'-0" BELOW F.F. BOTTOM OF PANEL GREATER THAN 3'-0" BELOW F.F.BOTTOM OF PANEL 3'-0" OR LESS BELOW F.F. BOTTOM OF PANEL 3'-0" OR LESS BELOW F.F. BOTTOM OF PANEL GREATER THAN 3'-0" BELOW F.F.FOR STEPPED PANEL FOOTING LESS THAN 1'-6"FOR STEPPED PANEL FOOTING GREATER THAN 1'-6" PLAN AT CORNER PLAN AT PANEL JOINT 4950 PSI4400 PSI 5500 PSITHICKNESS CONCRETE STRENGTH ³ PANEL FOOTING DOWEL SCHEDULE (56 DAYS STRENGTH) BOTTOM OF PANEL 3'-0" OR LESS BELOW F.F. BOTTOM OF PANEL GREATER THAN 3'-0" BELOW F.F. SHEAR WALL CONT. FOOTING 16 1SD-2 PANEL TO FOOTING DETAILS RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 PANEL AT CONT. FOOTING 1 PANEL AT LOADING DOCK 37 PANEL AT OPENING DETAIL 5 4 8 9 10 11 13 1216 19 PANEL AT OPENING DETAIL 18 STEPPED PANEL FOOTING PANEL AT RE-ENTRANT CORNER FOR BOTTOM OF PANEL 3'-0" OR LESS BELOW F.F. FOR BOTTOM OF PANEL GREATER THAN 3'-0" BELOW F.F. BOTTOM OF PANEL 3'-0" OR LESS BELOW F.F. BOTTOM OF PANEL GREATER THAN 3'-0" BELOW F.F. PANEL AT OPENING DETAIL BOTTOM OF PANEL GREATER THAN 3'-0" BELOW F.F.BOTTOM OF PANEL 3'-0" OR LESS BELOW F.F. PLAN AT CORNER PLAN AT PANEL JOINT 4950 PSI4400 PSI 5500 PSITHICKNESS CONCRETE STRENGTHPANEL FOOTING DOWEL SCHEDULE 4950 PSI4400 PSI 5500 PSI SLAB DOWEL SCHEDULE (56 DAYS STRENGTH) SECTION BOTTOM OF PANEL 3'-0" OR LESS BELOW F.F. SECTION BOTTOM OF PANEL GREATER THAN 3'-0" BELOW F.F. 1SD-2.1 PANEL TO FOOTING DETAILS RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 1 PANEL JOINT DETAILS 2 TYPICAL OPENING 3 LEDGER CONNECTION 4UNEVEN PANEL THICKNESS 6 TYPICAL CORNER CONNECTION 5 TYPICAL PIER REINFORCEMENT SCHEDULE 7 TYPICAL LINTEL DETAIL 8 TYPICAL DOOR GUARD 10KNOCK-OUT PANEL 11TYPICAL MAN DOOR OPENING 14 DETAIL 13 TYPICAL DOOR HEAD AND JAMB 9 SECTION PIER REINFORCING SCHEDULE TYPICAL PANEL REINFORCEMENT AND SCHEDULE 1A PLAN BELOW LEDGER MITER JOINT C BUTT JOINT PLAN AT PANEL JOINT INTERIOR EXTERIOR INTERIOR EXTERIOR EXTERIOR INTERIOR B A DFOR PIERS WITH WIDTH GREATER THAN 2'-0" FOR PIERS WITH WIDTH OF 2'-0" OR LESS* PANEL TYPE "A" PANEL BOTTOM HORIZ. REBAR SCHEDULE 1A INTERIOR EXTERIOR PANEL REBAR SCHEDULE 1SD-3 TYPICAL PANEL DETAILS RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 1 2 TYP. ROOF OPENING DETAIL 3 PANELIZED ROOF DETAIL 4DETAIL6 TYPICAL SKYLIGHT OPENING 5 SUB-PURLIN TO CONCRETE PANEL STEEL BAR JOIST TO CONCRETE PANEL STEEL BAR JOIST TO GIRDER 7 SUB-PURLIN TO JOIST 8STRAP AT ROOF DETAIL 12 13 14 BRACE FRAMING DETAIL 15 BRACE FRAMING DETAIL 16 TYPICAL GIRDER NAILER DETAIL GIRDER TO CONCRETE PANEL 9 MECHANICAL PLATFORM DETAIL 10 ROOF FRAMING DETAIL 11 NOTES: 9A EXHAUST FAN PLATFORM DETAIL ASECTION PLAN 8A ELEVATION SECTION JOIST AT LEDGER SPLICE ELEVATION NOTE: ANGLE TIE CONNECTION NOTE:ANGLE TIE CONNECTION AT CONTRACTOR'S OPTION SECTION SECTION PLAN NOTES: SECTION WELDED STUD SCHEDULE NOTE:- 1SD-4 TYPICAL ROOF FRAMING DETAILS RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 2 4BEAM TO CONC. PANEL JOINT DETAIL 8 DETAIL NOTES: GRID GRID ROOF SHEATHING LAY OUT 5BEAM TO BEAM CONNECTION AND SCHEDULE9 BEAM TO CONC. PANEL DETAIL BEAM TO COLUMN CONNECTION AUXILIARY WEB DETAIL ALLOWABLE METHODS & LOCATIONS FOR SUPPORTING ADDITIONAL LOADS FROM OPEN WEB STEEL JOIST 3BEAM TO CONC. PANEL DETAILROOF FRAMING AT DRAINS AELEVATION BELEVATION 10 11 BEAM SPLICE AT RIDGE 12 LEDGER SPLICE AT HIGH OR LOW POINT 13 STRUT DETAIL 6 1 PLAN VIEW BOLTS NO. OF SPLICE PLATE THICKNESS SPLICE PLATE LENGTH "L" SPLICE CONNECTION TABLE FILLET WELD SIZE "D" CANT. DIM. "C"SIZE BEAM 1 SECTION 1 BEAM PENETRATION DETAIL 7 GIRDER TO CONC. NEAR PANEL JOINT 8A WF BEAM AND WF BEAM TO CONCRETE PANEL CONNECTION SEE ROOF FRAMING PLAN FOR DETAIL ORIENTATION 1 EMBED DEPTH = GREATER BEAM DEPTH + 7" RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 1SD-5 TYPICAL ROOF FRAMING DETAILS ROOF FRAMING DETAIL AT SKEWED WALL SEE ROOF FRAMING PLAN FOR DETAIL ORIENTATION TUBE TO LEDGER AT CORNER PANEL JOINT PLAN VI EW 2 3 LEDGER AT CORNER PANEL JOINT 1 SECTIONELEVATIONPLAN VIEW 4HSS TUBE TO CONCRETE PANEL CONNECTION SEE ROOF FRAMING PLAN FOR DETAIL ORIENTATION HSS TUBE AND STEEL BAR JOIST TO CONCRETE PANEL CONNECTION X-X SEE ROOF FRAMING PLAN FOR DETAIL ORIENTATION X X 5 7 6OFFSET WALL DETAIL OFFSET WALL DETAIL9CORNER DETAIL 8OFFSET WALL DETAIL 1SD-6 TYPICAL ROOF FRAMING DETAILS RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 1PANEL HOLD DOWN CONNECTION 2PANEL HOLD DOWN CONNECTION SECTION EMBED SCHEDULE EMBED SCHEDULE SECTION 3 SECTION 4 5 6 DETAILDETAIL DETAIL DETAIL 7DETAIL 8DETAIL SECTION PLAN DETAIL 10 DETAIL 9 ELEVATION A ELEVATION B C D WELDED BAR SCHEDULE WELDED BAR SCHEDULE PLAN 4A 11DETAIL 12DETAIL 13 PLAN FENCE DETAIL DETAIL 14 PLAN SECTIONEMBED SCHEDULE 15DETAIL 16DETAIL A B PLAN PLAN AB 1SD.7 MISCELLANEOUS DETAILS RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 DETAIL 12 DETAIL 1 PARTITION WALL DETAIL 2 DETAIL 3(PARTIAL HEADER DETAIL) JOIST TO STUD DETAIL 5 4 DETAIL 68 DETAIL 7(DRY WALL CEILING) DETAIL 9 DETAIL 10 DETAIL 11 U-SECTIONS CHANNEL 162 S-SECTIONS C-STUD / JOIST T-SECTIONS TRACK STYLE: 600 T F U S EXAMPLE: MEMBER DEPTH: S FLANGE WIDTH: F-SECTIONS FURRING CHANNEL 54- MATERICAL THICKNESS: DETAIL REQUIRED WALL BRACING DETAILSREQUIRED WALL BRACING DETAILS RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 1SD-8 METAL STUD DETAILS WIRE LOCATIONS 1 WIRE AT STEEL BEAM 2 WIRE AT RAFTERS 3 WIRE AT STEEL BARJOIST 4 WIRE AT METAL STUDS 5 6 7 8 DETAIL DETAIL T-BAR CEILING STRUT DETAIL & SCHED. DETAIL (T-BAR CEILING ) CEILING STRUT DETAILS RGA PROJECT NO: CONSULTANT OWNER PROJECT NO: DRAWN BY: CHEK'D BY: COPYRIGHT RGA, OFFICE OF ARCHITECTURAL DESIGN SHEET TITLE: PROJECT NAME PROFESSIONAL SEALS SHEET: OWNER Darin Fong and Associates Inc. Consulting Structural Engineers 3230 E. Imperial Highway, Suite 302 Brea, CA 92821-6747 (714) 494-4888 office (951) 219-2849 cell DFA PROJECT NO. : 20-140 DRAWN BY : PM/JM/MW DATE DESCRIPTIONMARK MS MOUNTAIN VIEW PARK 19073.00 Approver Author Checker PLAN CHECK SUBMITTAL11/24/2020 PLAN CHECK COMMENTS04/17/2021 16130 VENTURA BLVD, SUITE 510 ENCINO, CA 91436 PHONE: 805-494-7704 (NOT FOR CONSTRUCTION) 42433 MS-MOUNTAIN VIEW, LLC C/O SILAGI DEVELOPMENT & MANAGEMENT, INC. AVENIDA ALVARADO CITY OF TEMECULA CALIFORNIA 04-05-2021 1SD-9 T-BAR CEILING DETAILS Staples® ST 2173800-2173802 1 BLACK 01/31/2020 FRANK R. CRAIG C-36 451426 Lic. Exp. 2022 S T ATE OF CA L I F O R NIA P ROFESSIO N A L P L U MBING CO N T R A C T OR C R AIG M E CHANI C A L I N C. 4/2/21 Frank Craig Staples® ST 2173800-2173802 1 BLACK 01/31/2020 FRANK R. CRAIG C-36 451426 Lic. Exp. 2022 S T ATE OF CA L I F O R NIA P ROFESSIO N A L P L U MBING CO N T R A C T OR C R AIG M E CHANI C A L I N C. 4/2/21 Frank Craig