HomeMy WebLinkAbout2022-28 PC ResolutionPC RESOLUTION NO.2022-28 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA22-0494, A HOME PRODUCT REVIEW FOR PLANNING AREA 19 OF THE RORIPAUGH RANCH SPECIFIC PLAN TO ALLOW FOR FOUR (4) UNIQUE DETACHED SINGLE-FAMILY PLANS WITH THREE (3) ARCHITECTURAL STYLES CONSISTING OF 16 LOTS, AND MAKING FINDINGS OF CONSISTENCY WITH THE EIR AND ADDENDA AND DETERMINING THAT NO FURTHER ENVIRONMENTAL REVIEW IS REQUIRED PURSUANT TO CEQA GUIDELINES SECTION 15162 Section 1. Procedural Findings. The Planning Commission of the City of Temecula does hereby find, determine and declare that: A. On May 3, 2022, Woodside Homes filed Planning Application No. PA22-0494 a Home Product Review (Development Plan) in a manner in accord with the City of Temecula General Plan and Development Code. B. The Application was processed including, but not limited to a public notice, in the time and manner prescribed by State and local law. C. The Planning Commission, at a regular meeting, considered the Application and environmental review on October 19, 2022, at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to and did testify either in support or in opposition to this matter. D. At the conclusion of the Planning Commission hearing and after due consideration of the testimony, the Planning Commission approved Planning Application No. PA22-0494, subject to and based upon the findings set forth hereunder. E. All legal preconditions to the adoption of the Resolution have occurred. Section 2. Further Findings. The Planning Commission, in approving the Home Product Review Application hereby finds, determines and declares that: Development Plan, Development Code Section 17.05.010.F A. The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City; The proposed single-family homes are permitted in the land use designation standards contained in the Roripaugh Ranch Specific Plan and the City's Development Code. The project is also consistent with General Plan land use of Specific Plan Implementation. The site is properly planned and zoned and, as conditioned, is physically suitable for the type and density of residential development proposed. The project, as conditioned, is also consistent with other applicable requirements of State law and local ordinances, including the California Environmental Quality Act (CEQA), the City Wide Design Guidelines, and fire and building codes. B. The overall development of the land is designed for the protection of the public health, safety, and general welfare; The overall design of the single-family homes, including the site, building, parking, circulation and other associated site improvements, is consistent with, and intended to protect the health and safety of those working in and around the site. The project has been reviewed for and, as conditioned, has been found to be consistent with all applicable policies, guidelines, standards and regulations intended to ensure that the development will be constructed and function in a manner consistent with the protection of the public health, safety, and welfare. Nothing proposed in the Home Product Review is anticipated to have an adverse impact to the original Environmental Impact Report or addenda prepared for the project. Section 3. Environmental Findings. The Planning Commission hereby makes the following environmental findings and determinations in connection with the approval of the Home Product Review: The Roripaugh Ranch Specific Plan was formally adopted in 2002. An Environmental Impact Report (EIR) was prepared and certified on December 17, 2002 as part of this effort. Since that time, five EIR Addendums have been prepared for the project area with the most recent adopted on January 14, 2020. The proposed project has been determined to be consistent with the previously adopted Roripaugh Ranch EIR Addendum and is exempt from further environmental review (Section 15162, Subsequent EIRs and Negative Declarations). Staff has reviewed the EIR, the First Addendum to the EIR adopted on April 23, 2013, the Second Addendum to the EIR adopted on March 22, 2016, the Third Addendum to the EIR adopted on January 23, 2018, the Fourth Addendum to the EIR adopted on November 6, 2019, the Fifth Addendum to the EIR adopted on January 14, 2020 (collectively, "Addenda'), and has determined that the proposed project is consistent with the EIR and Addenda as the proposed project merely implements the development that was already contemplated and analyzed by the EIR and Addenda. The EIR and Addenda analyzed the impacts ofthe construction ofsingle family homes on 16lots of Planning Area 19. As such, the proposed project does not require the preparation of a subsequent Environmental Impact Report or Mitigated Negative Declaration as none of the conditions described in Section 15162 of the CEQA Guidelines (14 Cal. Code Regs. 15162) exist. Additionally, the proposed project does not require the preparation of an addendum to the EIR as there are no changes or additions to the proposed project from what was analyzed by the EIR and the Addenda. Therefore, no further environmental review is required as all environmental impacts of the proposed project were analyzed, disclosed, and mitigated as set forth in the EIR and Addenda. Moreover, the mitigation measures imposed as part of the EIR and Addenda remain valid and applicable to the proposed project. Section 4. Conditions. The Planning Commission of the City of Temecula approves Planning Application No. PA22-0494, Home Product Review for Planning Area 19 of the Roripaugh Ranch Specific Plan to allow for four (4) unique detached single-family plans with three (3) architectural styles consisting of 16 lots, subject to the Conditions of Approval set forth on Exhibit A, attached hereto, and incorporated herein by this reference. PASSED, APPROVED AND ADOPTED by the City of Temecula Planning Commission this 19th day of October, 2022. Jam, /J46 Gary Wats, %C/11,airperson ATTES . e Watson Secretary [SEAL] STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE )ss CITY OF TEMECULA ) I, Luke Watson, Secretary of the Temecula Planning Commission, do hereby certify that the forgoing PC Resolution No. 2022-28 was duly and regularly adopted by the Planning Commission of the City of Temecula at a regular meeting thereof held on the 19th day of October, 2022, by the following vote: AYES: 4 PLANNING COMMISSIONERS: NOES: 0 PLANNING COMMISSIONERS: ABSTAIN 0 PLANNING COMMISSIONERS: ABSENT: I PLANNING COMMISSIONERS: Hagel, Ruiz, Turley-Trejo, Watts None None Telesio Luke Watson Secretary EXHIBIT A CITY OF TEMECULA FINAL CONDITIONS OF APPROVAL Planning Application No.: PA22-0494 Project Description: Sommers Bend PA19 Shawood HPR: Home Product Review for Planning Area 19 of the Roripaugh Ranch Specific Plan to allow for four (4) unique detached single-family plans with three (3) architectural styles consisting of 16 lots. Assessor's Parcel No.: 964-640-004 MSHCP Category: Exempt Per Development Agreement (DA) No. 2016-0156276 DIF Category: Residential Detached Per DA No. 2016-0156276 TUMF Category: Exempt Per DA No. 2016-0156276 Quimby Category: Exempt Per DA No. 2016-0156276 New Street In -lieu of Fee: N/A (Not located within the Uptown Temecula Specific Plan) Approval Date: October 19, 2022 Expiration Date: October 19, 2025 PLANNING DIVISION Within 48 Hours of the Approval Page 1 of 11 Applicant Filing Notice of Determination. APPLICANT ACTION REQUIRED: The applicant/developer is responsible for filing the Notice of Determination as required under Public Resources Code Section 21152 and California Code of Regulations Section 15062 within 48 hours of the project approval. If within said 48-hour period the applicant/ developer has not filed the Notice of Determination as required above, the approval for the project granted shall be void due to failure of this condition. Failure to submit the Notice of Exemption will result in an extended period of time for legal challenges. FEES: Fees for the Notice of Exemption include the Fifty Dollar County ($50.00) administrative fee. The County of Riverside charges additional fees for credit card transactions. FILING: The City shall provide the applicant with a Notice of Determination within 24 hours of approval via email. If the applicant/developer has not received the Notice of Determination within 24 hours of approval, they shall contact the case Planner immediately. All CEQA documents must be filed online with the Riverside County Assessor — County Clerk- Recorder. A direct link to the CEQA filings page is available at TemeculaCA.gov/CEQA. COPY OF FILINGS: The applicant shall provide the City with a digital copy of the required filings within 48 hours. General Requirements Indemnification of the City. Indemnity, Duty to Defend and Obligation to Pay Judgments and Defense Costs, Including Attorneys' Fees, Incurred by the City. The Applicant shall defend, indemnify, and hold harmless the City, its elected officials, officers, employees, volunteers, agents, and those City agents serving as independent contractors in the role of City officials (collectively "Indemnitees") from and against any claims, damages, actions, causes of actions, lawsuits, suits, proceedings, losses, judgments, costs, and expenses (including, without limitation, attorneys' fees or court costs) in any manner arising out of or incident to the Planning Commission's actions, this approval and the City Council's actions, related entitlements, or the City's environmental review thereof. The Applicant shall pay and satisfy any judgment, award or decree that may be rendered against City or the other Indemnitees in any such suit, action, or other legal proceeding. The City shall promptly notify the Applicant of any claim, action, or proceeding and the City shall reasonably cooperate in the defense. If the City fails to promptly notify the Applicant of any claim, action, or proceeding, or if the City fails to reasonably cooperate in the defense, the Applicant shall not thereafter be responsible to defend, indemnify, or hold harmless the City or the Indemnitees. The City shall have the right to select counsel of its choice. The Applicant shall reimburse the City, and the other Indemnitees, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Nothing in this condition shall be construed to require the Applicant to indemnify Indemnitees for any claim arising from the sole negligence or willful misconduct of the Indemnitees. In the event such a legal action is filed challenging the City's determinations herein or the issuance of the approval, the City shall estimate its expenses for the litigation. The Applicant shall deposit said amount with the City or, at the discretion of the City, enter into an agreement with the City to pay such expenses as they become due. Page 2 of 11 3. Expiration. This approval shall be used within three years of the approval date; otherwise, it shall become null and void. Use means the beginning of substantial construction contemplated by this approval within the three year period, which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval, or use of a property in conformance with a Conditional Use Permit. A modification made to an approved development plan does not affect the original approval date of a development plan. 4. Time Extension. The Director of Community Development may, upon an application being filed prior to expiration, and for good cause, grant a time extension of up to five (5) extensions of time, one year at a time. A modification made to an approved development plan does not affect the original approval date of a development plan. 5. Consistency with Specific Plans. This project and all subsequent projects within this site shall be consistent with Specific Plan No. 11. 6. Block Wall Coating. All perimeter constructed block walls in the public view shall be finished with an anti -graffiti coating and shall provide documentation confirming the installation of the coating. 7. Consistency with Development Agreements. The project and all subsequent projects within this site shall be subject to Development Agreement No. 2016 0156276 recorded on April 20, 2016 and Operating Memorandums. 8. Compliance with EIR. The project and all subsequent projects within this site shall comply with all mitigation measures identified within EIR No. SCH# 97121030. 9. Conformance with Approved Plans. The development of the premises shall substantially conform to the approved site plan and elevations contained on file with the Planning Division. 10. Landscape Maintenance. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Director of Community Development. If it is determined that the landscaping is not being maintained, the Director of Community Development shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. 11. Water Quality and Drainage. Other than stormwater, it is illegal to allow liquids, gels, powders, sediment, fertilizers, landscape debris, and waste from entering the storm drain system or from leaving the property. To ensure compliance with this Condition of Approval: a. Spills and leaks shall be cleaned up immediately. b. Do not wash, maintain, or repair vehicles onsite. c. Do not hose down parking areas, sidewalks, alleys, or gutters. d. Ensure that all materials and products stored outside are protected from rain. e. Ensure all trash bins are covered at all times. Page 3 of 11 12. Materials and Colors. The Conditions of Approval specified in this resolution, to the extent architectural style, materials, equipment, finishes or similar matters as specified in the Home Product Review plans, shall be deemed satisfied by City staffs prior approval of the use or utilization of an architectural style, materials, equipment, or finishes that City staff determines to be the substantial equivalent of that required by the Conditions of Approval. Staff may elect to reject the request to substitute, in which case the real party in interest may appeal, after payment of the regular cost of an appeal, the decision to the Planning Commission for its decision. 13. Modifications or Revisions. The developer shall obtain City approval for any modifications or revisions to the approval of this project. 14. Construction and Demolition Debris. The developer shall contact the City's franchised solid waste hauler for disposal of construction and demolition debris and shall provide the Planning Division verification of arrangements made with the City's franchise solid waste hauler for disposal of construction and demolition debris. Only the City's franchisee may haul demolition and construction debris. 15. Property Maintenance. All parkways, including within the right-of-way, entryway median, landscaping, walls, fencing, recreational facilities, and on -site lighting shall be maintained by the property owner or maintenance association. Prior to Issuance of Building Permit 16. Transportation Uniform Mitigation Fee (TUMF). The Western Riverside County of Governments administers and collects the Transportation Uniform Mitigation Fee (TUMF). The City of Temecula adopted an ordinance on March 31, 2003 for a Riverside County area wide Transportation Uniform Mitigation Fee (TUMF). This project is subject to payment of these fees at the time of building permit issuance (paid to WRCOG). The fees are subject to the provisions of Chapter 15.08 of the Temecula Municipal Code and the fee schedule in effect at the time of building permit issuance. Additional information on payment, fees, and points of contact can be found at http://www.wrcog.cog.ca.us/174/TUMF 17. Development Impact Fee (DIF). The developer shall comply with the provisions of Title 15, Chapter 15.06 of the Temecula Municipal Code and all its resolutions by paying the appropriate City fee. 18. Quimby Requirements. The developer shall satisfy the City's parkland dedication (Quimby) requirement through the payment of in lieu fees based upon the City's then current land evaluation. Said requirement includes a credit for private recreational opportunities provided. 19. Construction Landscaping and Irrigation Plans. Four (4) copies of Construction Landscaping and Irrigation Plans shall be reviewed and approved by the Planning Division. These plans shall be submitted as a separate submittal, not as part of the building plans or other plan set. These plans shall conform to the approved conceptual landscape plan, or as amended by these conditions. The location, number, height and spread, water usage or KC value, genus, species, and container size of the plants shall be shown. The plans shall be consistent with the Water Efficient Ordinance and Water Storage Contingency Plan per the Eastern Municipal Water District. The plans shall be accompanied by the appropriate filing fee (per the City of Temecula Fee Schedule at time of submittal) and one copy of the approved Grading Plan. Page 4 of 11 20. Landscaping Site Inspections. The Landscaping and Irrigation Plans shall include a note stating, "Three landscape site inspections are required. The first inspection will be conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection, for common HOA area only, will verify property landscape maintenance for release of the one year landscape maintenance bond." The applicant/owner shall contact the Planning Division to schedule inspections. 21. Agronomic Soils Report. The Landscaping and Irrigation Plans shall include a note on the plans stating, "The contractor shall provide two copies of an agronomic soils report at the first irrigation inspection." 22. Water Usage Calculations. The Landscaping and Irrigation Plans shall include water usage calculations per Chapter 17.32 of the Development Code (Water Efficient Ordinance), the total cost estimate of plantings and irrigation (in accordance with approved plan). Applicant shall use evapotranspiration (ETo) factor as defined in the Eastern Municipal Water District water use guidelines. 23. Irrigation. The landscaping plans shall include automatic irrigation for all landscaped areas and complete screening of all ground mounted equipment from view of the public from streets and adjacent property for private common areas; front yards and slopes within individual lots, - shrub planting to completely screen perimeter walls adjacent to a public right of way equal to 66 feet or larger; and, all landscaping excluding City maintained areas and front yard landscaping which shall include, but may not be limited to, private slopes above three (3) feet and common areas. 24. Wall and Fence Plans. Wall and fence plans shall be consistent with the Conceptual Landscape Plans as shown in the Roripaugh Ranch Specific Plan showing the height, location and the following materials for all walls and fences: a. Decorative block for the perimeter of the project adjacent to a public right of way equal to 66 feet or larger and the side yards for corner lots. b. Wrought iron, tubular steel, or decorative block and wrought iron combination to take advantage of views for side and rear yards. c. Wood and/or vinyl fencing shall be used for all side and rear yard fencing when not restricted/conditioned outlined above. 25. WQMP Landscape Compliance. The construction landscape plans shall be consistent with Appendix A, Table 31 of the Low Impact Development (LID) Manual for Southern California for plant materials and treatment facilities, and shall reference the approved precise grading plan for WQMP features. 26. Roof -Mounted Mechanical Equipment. Roof mounted mechanical equipment shall not be permitted within the subdivision; however, solar equipment or any other energy saving devices shall be permitted. Prior to Release of Power, Building Occupancy or Any Use Allowed by This Permit Page 5 of 11 27. Performance Securities. Performance securities, in amounts to be determined by the Director of Community Development, to guarantee the maintenance of the plantings in accordance with the approved construction landscape and irrigation plan, shall be filed with the Planning Division for a period of one year from final Certificate of Occupancy. After that year, if the landscaping and irrigation system have been maintained in a condition satisfactory to the Director of Community Development, the bond shall be released upon request by the applicant. 28. Installation of Site Improvements. All site improvements, including but not limited to, parking areas and striping shall be installed. 29. Compliance with Conditions of Approval. All of the foregoing conditions shall be complied with prior to occupancy or any use allowed by this approval. 30. Front Yard and Slope Landscaping. Front yard and slope landscaping for slopes greater than three (3) feet within individual lots shall be completed for inspection. 31. Private Common Area Landscaping. Private common area landscaping shall be completed. 32. HOA Landscaping. HOA landscaping shall be installed for inspection for those lots adjacent to HOA landscaped area. PUBLIC WORKS DEPARTMENT General Requirements 33. Conditions of Approval. The developer shall comply with all Conditions of Approval, the Engineering and Construction Manual and all City codes/standards at no cost to any governmental agency. 34. Entitlement Approval. The developer shall comply with the approved site plan and other relevant documents approved during entitlement. Any significant omission to the representation of site conditions may require the plans to be resubmitted for further review and revision. 35. Precise Grading Permit. A precise grading permit for on site improvements (outside of public right-of-way) shall be obtained from Public Works. 36. Haul Route Permit. A haul route permit may be required when soils are moved on public roadways to or from a grading site. The developer/contractor is to verify if the permit is required. If so, he shall comply with all conditions and requirements per the City's Engineering and Construction Manual and as directed by Public Works. 37. Encroachment Permits. Prior to commencement of any applicable construction, encroachment permit(s) are required and shall be obtained from Public Works for public offsite improvements. 38. Private Drainage Facilities. All onsite drainage and water quality facilities shall be privately maintained. Page 6 of 11 39. Underlying Approvals. If, in applying these conditions, there is any conflict between the requirements of (i) the project's Development Agreement, as amended to date, (ii) the Specific Plan, as amended to date, (iii) Tentative Tract Map No. 29593, (iv) Tentative Tract Map No. 37368, and/or (v) Tentative Tract Map No. 37341, the prevailing requirement shall be determined as follows: a. First priority goes to the provisions of the Development Agreement b.Second priority goes to the provisions of the Specific Plan, then c.Third priority goes to the provisions of Tentative Tract Map No. 29353 d.Fourth priority goes to the provisions of Tentative Tract Map No. 37368 e.Fifth priority goes to the provisions of Tentative Tract Map No. 37341 Prior to Issuance of a Grading Permit 40. Environmental Constraint Sheet (ECS). The developer shall comply with all constraints per the recorded ECS with any underlying maps related to the subject property. 41. Grading/Erosion & Sediment Control Plan. The developer shall submit a grading/erosion & sediment control plan(s) to be reviewed and approved by Public Works. All plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site. The approved plan shall include all construction -phase pollution -prevention controls to adequately address non -permitted runoff. Refer to the City's Engineering & Construction Manual at: www.TemeculaCA.gov/ECM 42. Erosion & Sediment Control Securities. The developer shall comply with the provisions of Chapter 18, Section 18.24.140 of the Temecula Municipal Code by posting security and entering into an agreement to guarantee the erosion & sediment control improvements. 43. NPDES General Permit Compliance. The developer shall obtain project coverage under the State National Pollutant Discharge Elimination System (NPDES) General Permit for Construction Activities and shall provide the following: a. A copy of the Waste Discharge Identification Number (WDID) issued by the State Water Resources Control Board (SWRCB); b. The project's Risk Level (RL) determination number; and c. The name, contact information and certification number of the Qualified SWPPP Developer (QSD) Pursuant to the State Water Resources Control Board (SWRCB) requirements and City's storm water ordinance, a Storm Water Pollution Prevention Plan (SWPPP) shall be generated and submitted to the Board. Throughout the project duration, the SWPPP shall be routinely updated and readily available (onsite) to the State and City. Review www.cabmphandbooks.com for SWPPP guidelines. Refer to the following link: http://www.waterboards.ca.gov/water issues/programs/stormwater/construction.shtml 44. Water Quality Management Plan (WQMP) and O&M Agreement. The developer shall submit a final WQMP (prepared by a registered professional engineer) with the initial grading plan submittal, based on the conceptual WQMP from the entitlement process. It must receive acceptance by Public Works. A copy of the final project -specific WQMP must be kept onsite at all times. In addition, a completed WQMP Operation and Maintenance (O&M) Agreement shall be submitted for review and approval. Upon approval from City staff, the applicant shall record the O&M agreement at the County Recorder's Office in Temecula. Refer to the WQMP template and agreement link: www.TemeculaCA.gov/WQMP. As part of the WQMP approval, the Engineer of Record shall report and certify BMP construction per City of Temecula NPDES requirements. Should the project require Alternative Compliance, the developer is responsible for execution of an approved Alternative Compliance Agreement. Page 7 of 11 45. Drainage. All applicable drainage shall be depicted on the grading plan and properly accommodated with onsite drainage improvements and water quality facilities, which shall be privately maintained. Alterations to existing drainage patterns or concentration and/or diverting flows is not allowed unless the developer constructs adequate drainage improvements and obtains the necessary permissions from the downstream property owners. All drainage leaving the site shall be conveyed into a public storm drain system, if possible. The creation of new cross lot drainage is not permitted. 46. Drainage Study. A drainage study shall be prepared by a registered civil engineer and submitted to Public Works with the initial grading plan check in accordance with City, Riverside County and engineering standards. The study shall identify storm water runoff quantities (to mitigate the 10 and 100-year storm event for 24 hour storm duration peak flow) from the development of this site and upstream of the site. It shall identify all existing or proposed offsite or onsite, public or private, drainage facilities intended to discharge this runoff. Runoff shall be conveyed to an adequate outfall capable of receiving the storm water runoff without damage to public or private property. The study shall include a capacity analysis verifying the adequacy of all facilities. Any upgrading or upsizing of drainage facilities necessary to convey the storm water runoff shall be provided as part of development of this project. 47. Soils Report. A soils report, prepared by a registered soil or civil engineer, shall be submitted to Public Works with the initial grading plan submittal. The report shall address the site's soil conditions and provide recommendations for the construction of engineered structures and preliminary pavement sections. 48. Driveways. All units shall be provided with zero clearance garage doors and garage door openers if the driveway is less than 18' in depth from back of sidewalk. 49. Sight Distance. The developer shall limit landscaping in the corner cut-off area of all street intersections and adjacent to driveways to provide for minimum sight distance and visibility. Prior to Issuance of Encroachment Permit(s) 50. Public Utility Agency Work. The developer shall submit all relevant documentation due to encroaching within City right-of-way; and is responsible for any associated costs and for making arrangements with each applicable public utility agency. 51. Street Trenching. All street trenches shall conform to City Standard No. 407; refer to the City's Paving Notes. Prior to Issuance of Building Permit(s) 52. Certifications. Certifications are required from the registered civil engineer -of -record certifying the building pad elevation(s) per the approved plans and from the soil's engineer -of -record certifying compaction of the building pad(s). Prior to Issuance of a Certificate of Occupancy 53. Completion of Improvements. The developer shall complete all work per the approved plans and Conditions of Approval to the satisfaction of the City Engineer. This includes all on site work (including water quality facilities), public improvements and the executed WQMP Operation and Maintenance agreement. 54. Utility Agency Clearances. The developer shall receive written clearance from applicable utility agencies (i.e., Rancho California and Eastern Municipal Water Districts, etc.) for the completion of their respective facilities and provide to Public Works. Page 8 of 11 55. Replacement of Damaged Improvements/Monuments. Any appurtenance damaged or broken during development shall be repaired or removed and replaced to the satisfaction of Public Works. Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professional Code Section 8771. 56. Certifications. All necessary certifications and clearances from engineers, utility companies and public agencies shall be submitted as required by Public Works. 57. Water Quality Management Plan (WQMP) Verification. As part of the the WQMP approval, the Engineer of Record shall report and certify BMP construction per City of Temecula NPDES requirements. Should the project require alternative compliance, the developer is responsible for execution of an approved Alternative Compliance Agreement. BUILDING AND SAFETY DIVISION General Requirements 58. Final Building and Safety Conditions. Final Building and Safety conditions will be addressed when building construction plans are submitted to Building and Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. 59. Compliance with Code. All design components shall comply with applicable provisions of the most current edition of the California Building, Plumbing and Mechanical Codes; California Electrical Code; California Administrative Code, Title 24 Energy Code, California Title 24 Disabled Access Regulations, and Temecula Municipal Code as identified in Title 15 of the Temecula Municipal Code. 60. County of Riverside Mount Palomar Ordinance. Applicant shall submit, at time of plan review, a complete exterior site lighting plan showing compliance with County of Riverside Mount Palomar Ordinance Number 655 for the regulation of light pollution. All streetlights and other outdoor lighting shall be shown on electrical plans submitted to the Building and Safety Division. Any outside lighting shall be hooded and aimed not to shine directly upon adjoining property or public rights -of -way. All exterior LED light fixtures shall be 3,000 kelvin or below. 61. Street Addressing. Applicant must obtain street addressing for all proposed buildings by requesting street addressing and submitting a site plan for commercial or multi -family residential projects or a recorded final map for single-family residential projects. 62. Clearance from TVUSD. A receipt or clearance letter from the Temecula Valley Unified School District shall be submitted to the Building and Safety Department to ensure the payment or exemption from School Mitigation Fees. 63. Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work. 64. Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards, and any block walls will require separate approvals and permits. Solid covers are required over new and existing trash enclosures. 65. Sewer and Water Plan Approvals. On -site sewer and water plans will require separate approvals and permits. Page 9 of 11 66. Hours of Construction. Signage shall be prominently posted at the entrance to the project, indicating the hours of construction, as allowed by the City of Temecula Code Section 9.20.060, for any site within one -quarter mile of an occupied residence. The permitted hours of construction are Monday through Saturday from 7:00 a.m. to 6:30 p.m. No work is permitted on Sundays and nationally recognized Government Holidays. 67. Garage Dimensions. Parking spaces within enclosed garages shall have an interior dimension of at least ten feet wide and twenty feet long. All measurements shall be made from the interior walls and any obstructions (including stem walls) shall not satisfy this requirement. The interior wall dimensions shall be on the plans for each garage. The following notes are required on the plans: -Two car garages shall note, "20' x 20' clear with no obstructions (including stem walls)" -Single car garages shall note, "10' x 20' clear with no obstructions (including stem walls)" FIRE PREVENTION General Requirements 68. Life Safety Conditions. Final fire and life safety conditions will be addressed when building plans are reviewed by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC), and related codes which are in force at the time of building plan submittal 69. Fire Hydrants. The Fire Prevention Bureau is required to set minimum fire hydrant distances per CFC Appendix C. Super fire hydrants (6" x 4" x (2) 2 112" outlets) shall be located on fire access roads and adjacent public streets. For all Commercial and multi -family projects hydrants shall be spaced at 350 feet apart, and shall be located no more than 210 feet from any point on the street or Fire Department access road(s) frontage to a hydrant for all and for single family dwellings and tract homes hydrants shall be 500 feet apart, and shall be located no more than 250 feet from any point on the street or Fire Department access road(s) frontage to a hydrant. The required fire flow shall be available from any adjacent hydrant(s) in the system. The fire line may be required to be a looped system. The upgrade of existing fire hydrants may be required (CFC Appendix C and Temecula Municipal Code Section 15.16.020). 70. Construction Phasing. If construction is phased, each phase shall provide approved access and fire protection prior to any building construction (CFC Chapter 5) Prior to Issuance of Grading Permit(s) 71. All Weather Access Roads. Fire apparatus access roads and driveways shall be designed and maintained to support the imposed loads of fire apparatus and shall be with a surface to provide all-weather driving capabilities. Access roads shall be 60,000 lbs. GVW with a minimum of AC thickness of .25 feet. In accordance with Section 3310.1, prior to building construction, all locations where structures are to be built shall have fire apparatus access roads. (CFC Chapter 5 and Temecula Municipal Code Section 15.16.020). 72. Access Road Widths. Fire Department vehicle access roads shall have an unobstructed width of not less than 24 feet for residential track home roads with an unobstructed vertical clearance of not less than 13 feet 6 inches (CFC Chapter 5 and Temecula Municipal Code Section 15.16.020). Prior to Issuance of Building Permit(s) Page 10 of 11 73. Required Fire Systems (Residential Fire Sprinkler Systems). All Residential structures are now required under the most current edition of the California Residential Code (identified in Title 15 of the Temecula Municipal Code), to be equipped throughout with an automatic fire sprinkler system. 74. Two Point Access. This development and any street within serving more than 35 homes or any commercial developments shall have two points of access, via all-weather surface roads, as approved by the Fire Prevention Bureau (CFC Chapter 5). 75. Required Submittals (Residential Fire Sprinkler Systems). Fire sprinkler plans shall be submitted electronically to the Fire Prevention Bureau for review and approval. Sprinkler plans must be submitted electronically by the installing contractor and a set of plans and hydraulic calculations are required for each structure (building). These plans must be submitted prior to release of building permit. Prior to Issuance of Certificate of Occupancy 76. Hydrant Markers. Hydrant locations shall be identified by the installation of reflective markers (blue dots per Temecula Municipal Code Section 15.16.020) 77. Knox Box. All manual and electronic gates on required Fire Department access roads or gates obstructing Fire Department access shall be provided with the Knox Rapid entry system for emergency access by firefighting personnel (CFC Chapter 5) Page 11 of 11