Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
29676 Rancho California Rd B18-0965 Storage Racks
i CITY OF TEMECULA Building Permit Number 41000 Main Street, Temecula, CA 92590 B 1 8-0965 Type: BLDG - Building (C) Workclass:Storage Racks Project Name: r� Status:Issued Issued: 05/25/18 Expires: 11/26/18 I� 1989 Final: Job Address Address: 29676 Rancho California Rd Pm 22863-11 Location: Parcel Number: 921-320-053 Contact Information Business: Target #359 Owner: Dayton Hudson Corp. Applicant: Permit Advisors Contractor: Colorado West Construction Description Storage racks 10' x 55 If / 12' x 210 If/ 5'9 x 3,500 If/ Target Construction Information Construction Type: MISC Miscellaneous Construction Type Occupancy: Square Feet: Setbacks Front 113ack I I Right Left Fee Summary BS-(MISC)Storage Racks(0-8'high)-Permit $862.20 BS-(MISC)Storage Racks(8'+high)-Permit $233,40 FIREBLDG-Supplemental Plan Check Fee(1st 1 hr) $137.00 BS-(MISC)Storage Racks(0-8 high)-PC:IH $574.80 BS-(MISC)Storage Racks(8'+high)-PC:IH $155,60 I This permit becomes null and void if work or construction is not commenced within 180 days (6 months) or if construction or work is suspended or abandoned for a period of 180 days(6 months)at any time after permit issuance. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. CITY OF TEMECULA LICENSED DECLARATION (Section 7044, Business and Professions Code: The Contractor's State hereby affirm under penalty of perjury that I am licensed under provisions License Law does not apply to an owner of a property who, through of Chapter 9 (commencing with section 7000) of Division 3 of the Business employees' or personal effort, builds or improves the property, provided that and Professions Code and my license is in full force and effect. the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the License Class A-General erin Contr r License No. 908987 Owner-Builder will have the burden of proving that it was not built or Expires 01/31/2020 Signature ���J improved for the purpose of sale). WORKERS'COMPENSATION DECLARATION ❑ I, as owner of the property, am exclusively contracting with licensed I hereby affirm under penalty of perjury one of the following declarations: contractors to construct the project (Section 7044, Business and Professions Code. The Contractor's License Law does not apply to an ❑ 1 have and will maintain a certificate of consent to self-insure for owner of a property who builds or improves thereon, and who contracts workers' compensation, issued by the Director of Industrial Relations as for the projects with a licensed contractor(s) pursuant to the Contractor's provided for by Section 3700 of the Labor Code, for the performance of the State License Law). work for which this permit is issued. Policy# ❑ I am exempt from licensure under the Contractors' State License Law ElI have and will maintain workers' compensation insurance, as required for the following reason: by Section 3700 of the Labor Code, for the performance of the work for By my signature below I acknowledge that, except for my personal which this permit is issued. My workers' compensation insurance carrier residence in which I must have resided for at least one year prior to and policy number are: completion of the improvements covered by this permit, I cannot legally sell a Carrier employee service group structure that I have built as an owner-builder if it has not been constructed Expires 07/01/2018 Policy#RWCC6438837A in its entirety by licensed contractors. I understand that a copy of the Name of Agent Phone# applicable law, Section 7044 of the Business and Professions Code, is (This section need not be completed if the permit is for available upon request when this application is submitted or at the following one-hundred dollars($100)or less) Web site: http://www leginfo ca gov/calaw.html. ❑ 1 certify that in the performance of the work for which this permit is 05/25/2018 issued. I shall not employ any person in any manner so as to become Property Owner or Authorized Agent Date subject to the workers' compensation laws of California. and agree that if I should become subject to the workers' compensation provisions of Section ❑ By my signature below, I certify to each of the following: I am the 3700 of the labor Code, I shall forthwith comply with those provisions. property owner or authorized to act on the property owner's behalf. I have c � \ C read this application and the information I have provided is correct I agree to Date: 05/25/2018 Applicant: 1 L^C/�— comply with all applicable city and county ordinances and state laws WARNING: FAILURE TO SECURE WORKERS' COMPENSATION relating to building construction. I authorize representatives of this city or COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO ' county to enter the above-identified property for inspection purposes. CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED� �`�B�� 05/25/2018 THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF Agent Date Property Owner or Authorized COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF City Business License# rued THE LABOR CODE, INTEREST,AND ATTORNEY'S FEES. 00296 HAZARDOUS MATERIAL DECLARATION CONSTRUCTION LENDING AGENCY ❑ YES WILL THE APPLICANT OR FUTURE BUILDING OCCUPANT I hereby affirm that under penalty of perjury there is a construction lending ❑ NO HANDLE A HAZARDOUS MATERIAL OR A MIXTURE agency for the performance of the work for which this permit is issued CONTAINING A HAZARDOUS MATERIAL EQUAL TO OR (Section 3097 Civil Code) GREATER THAN THE AMOUNTS SPECIFIED ON THE Lender's Name HAZARDOUS MATERIALS INFORMATION GUIDE? Lender's Address El YES WILLTHE INTENDED USE OFTHEBUILDINGBYTHEAPPLICANT OWNER BUILDER DECLARATION El NO OR FUTURE BUILDING OCCUPANT REQUIRE A PERMIT FOR CONSTRUCTION OR MOD IFICATION FROM THE SOUTH COAST I hereby affirm under penalty of perjury that I am exempt from the AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) SEE Contractor's License Law for the reason(s) indicated below by the PERMITTING CHECKLIST FOR GUIDE LINES. checkmark(s) I have placed next to the applicable item(s) (Section 7031.5. Business and Professions Code Any city or county that requires a permit to PRINT NAME: Colorado West Construction construct. alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement ❑ YES WILL THE PROPOSED BUILDING OR MODIFIED FACILITY BE that he or she is licensed pursuant to the provisions of the Contractor's ❑ NO WITHIN 1000 FEET OF THE OUTER BOUNDARY OF A SCHOO State License Law(Chapter 9 (commencing with Section 7000) of Division 3 1 1 HAVE READ THE HAZARDOUS MATERIAL INFORMATION of the Business and Professions Code) or that he or she is exempt from ❑ YES GUIDE AND THE SCAQMD PERMITTING CHECKLIST. I licensure and the basis for the alleged exemption. Any violation of Section ❑ NO UNDERSTAND MY REQUIREMENTS UNDER THE STATE OF 7031.5 by any applicant for a permit subjects the applicant to a civil penalty CALIFORNIA HEALTH&SAFETY CODE, SECTION 25505, 255, of not more than five hundred dollars($500).) AND 25534 CONCERNING HAZARDOUS MATERIAL REPORTIP PROPERTY OWNER OR AUTHORIZED AGENT ❑ I, as owner of the property, or my employees with wages as their sole X compensation, will do ( ) all of or ( ) portions of the work, and the structure is not intended or offered for sale. r 41000 Main Street Temecula, 92590 Building Permit � 951-694-6476 76 Community Development TemeculaCA.gov/build Department permits@TemeculaCA.gov Application Project Information: Jobsite Address (include Bldg. /Suite#): Permit#: Plan Check: 29676 Rancho California Rd. Temecula, CA 92591 f)o ,V p� j nSHoluse Map & Lot Number/Assessor's Parcel (APN)#: PA#: PRJ #: • Business Name (for commercial use only): Type of Business: Target Retail Description_of Proceed Work (include all_areas -_ _ SQ. FT.:111,933 ---------------------------------------.------------------------------------------- - --.... Fixture and racking locations for proposed Target store remodel. - .............-...--------------------------------------------- ------------------------------------------------------------------ TI under separate permit 1318-0368 & 1318-0370 -- - ----- - - ----- ----- - -------------------------------------------------------------------- - ---------------------------------------------- ` .. Valuation: 100,000 - - ''- -�-------------------------------------- -- - -� (-2- -------------- --Lod----(�----------------------------------------------------------------- Work Includes: ❑ Mechanical [IElectrical ❑ Plumbing JDStructural Property Owner's Name: Mailing Address: Phone: Target - Bob Meza 150 S. 10th St.,Ste 400 TP3-0783, Minneapolis, MN 55403 (612) 761 -2031 Applicant/Agent/Contractor Information: City Business License#: Contractor's License#: ❑✓ Applicant/Agent ❑ Contractor 0 Owner/Builder TB D TB D Primary Contact: Email: Phone: Jasmine Alvarado jasmine@permitadvisors.com (818)916-7825 Company/Firm Name: Mailing Address: Phone: Permit Advisors 8370 Wilshire Blvd.Ste#330, Beverly Hills, CA 90211 (310) 275-7774 Architect/Engineer's Name: Mailing Address: Phone: Callison RTKL 1717 Pacific Ave. Dallas, TX 75201 ;(214)468-7787 C1eaIrances: The following will be required prior to permit issuance. Fees may be reauired for these clearances. Building &Safety ® permits@TemeculaCA.gov or 9 (951)694-6476 &R(required trash disposal service for all construction debris) (800)755-8112 Fire Dept. (sprinkler system, driveway approaches, etc.) (951)694-6405 4 Planning(project approvals, etc.) (951)694-6400 5 Land Development(grading plan, encroachments, etc.) (951) 308-6395 6 Eastern Municipal Water District(EMWD) (sewer and/or water) (951) 928-3777 x2081 7 Rancho Calif.Water District(RCWD)(sewer and/or water) (951)296-6900 8 Riverside County Health Dept. (septic system) (951)955-8980 9 Environmental Health Dept. (food prep., public pools, etc.) (951)461-0284 10 Temecula Valley Unified School District(TVUSD) (951) 506-7915 11 Agent/Employee Authorization when representing the Contractor 12 Electrical contractor is required for any commercial project(owner/builders) 13 Homeowner's Association(HOA)-check HOA CC&R's 14 re-construction meeting to be scheduled at issuance(new homes/commercial) caner/Builder Form/Letter of Authorization for Owner Builder Projects (notarization is required for commercial projects) SIGNATURE OF APPLICANT. DATE: D�) $ The Community Development Technician will act a appftear&when the plans are ready for correc ance CD-1 Rev 11122/16 X 18uilding&Safetff orms_Handouts\CD Forms\CD_1_Building_Permit\CD_1_Building_Permit.docx 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)7676300 CQuesiConsultantslnc_ www.cquestinc.com ENGINEERING. TESTING, AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target Project Number: 1618-0368 Project Location: 29676 Rancho California Rd Date: 11.07.18 Site Contact: Craig wiii,ams Time: 11:30pm Weather: I Inspector: Natividad Gamez Jr Permit Number: ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑Wood-frame ❑Concrete Sampling ❑Masonry Sampling ❑ Welding ❑Shearwall ❑ Prestressed Concrete ❑High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑Fireproofing ® Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments As requested by Client, CCI was present to perform torque testing for anchors at racks. Performed torque test on anchors installed at racks at isles E 5-22, F 2-33 & K 5-30. Anchors tested were 3" Screw-bolt+ by Powers. Anchors were tested to 35 ft-lbs using a 100 ft-lb torque wrench with calibration date of 9.19.18. All anchors tested passed successfully. Torque testing for Rack anchors is now complete and this was the final inspection. Deficiencies: ❑ Yes / ❑✓ No Samples: ❑Concrete ❑Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. l�jA� 8325365 Inspector Signature Superintendent Signature C9 ' CQuest Consultants Inc. CC 1342 N. Benson Ave.,Unit B Upland,CA 91786 CQuestConsultantsinc. Office I Fax:(909)767-6300 ENGINEERING,TESTING, AND INSPECTION October 30,2018 Job No. 1618-0368 Mr. Bob Meza Target Corporation Property Development Phone: (612) 760-5060 1000 Nicollet Mall E-mail: bob.meza@target.com Minneapolis, MN Subject: FINAL SPECIAL INSPECTION REPORT TARGET T-0359 29676 RANCHO CALIFORNIA ROAD TEMECULA,CALIFORNIA Dear Mr. Meza: As per your request,CQuest Consultants Inc. has provided this final quality control and testing status report for the above-referenced project site.We have prepared this report with our findings based on the inspection(s)performed during the period of April 27,2018 through September 28, 2018.The inspection(s) performed included: • Visual inspection of structural steel welding and anchor bolt torque testing, as noted on the field reports; • Inspection of epoxy anchors; • Concrete and masonry placement observations, as well as concrete and grout sampling and testing; To the best of our professional knowledge, the required quality control testing services are in compliance with specified requirements, construction documents and the 2016 California Building Code and other government and/or city requirements. *CQUEST accepts no responsibility for areas not observed or tested by a representative of our firm. If you should have any questions or need further assistance, please do not hesitate to contact our office at (909) 767-6300. Sincerely, Darren W. Coleman Technical Director ICC No. 8178003 . 1342 N. Benson Ave.,Unit B Upland,CA 91786 Office ) Fax:(909)767-6300 www.cquestinc.com CQuestConsultantslnc. ENGINEERING, TESTING, ANO INSPECTION SPECIAL INSPECTION REPORT Project Name: Target T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California RD,Temecula,CA Date: Friday,April 27,2018 Site Contact: Justin Lee w/CWC Time: Weather: Clear/Cool Inspector: DC L�l Concrete Reinforcement ❑ Masonry Reinforcement LJ Structural Steel ❑ Wood-frame ❑ Concrete Sampling ❑ Masonry Sampling ❑ Welding ❑ Shearwall ❑ Prestressed Concrete ❑ High Strength Grout High Strength Bolts ❑ Roofing Epoxy Bolts/Anchors ❑ Fireproofing Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Per request of CWC,a CQuest representative has arrived on site to conduct inspections and observe and sample concrete. Epoxy dowel pour back 6.5/J.2: Contractor has drilled 4 1/2" holes for#3 12"dowels @ 16"O.C..Holes have been blown,brushed clean,and is free from debris. Epoxy placed was Hilti HIT-HY 200,date has been verified. Rebar has been placed per plan Sheet S501 detail 1. Concrete placement for pour back SOG 6.5/J.2: Contractor has hand mixed 3 yards of concrete. 1 set of(3)samples have been made for compression testing. Mix:Sir Mix 65015 Slump:4" PSI:4,500 Work in progress. DEFICIENCIES: ❑ YES / (] NO SAMPLES: LJ CONCRETE ❑ GROUT L] MORTAR L I MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. Justin Lee w/CWC Inspector/Technician Superintendent/Representative 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)767-6300 cQuesiconsultantslnc. www•cquestinc.com ENGINEERING.TESTING. AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California RD,Temecula,CA Date: Wednesday,May 9,2018 Site Contact: Justin Lee w/CWC Time: 8 Weather: Clear/Cool Inspector: DC ❑� Concrete Reinforcement ❑ Masonry Reinforcement ❑ Structural Steel ❑Wood-frame ❑� Concrete Sampling ❑ Masonry Sampling ❑ Welding ❑ Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing Epoxy Bolts/Anchors ❑ Fireproofing ❑ Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Per request of CWC,a CQuest representative has arrived on site to conduct inspections and observe and sample concrete. Epoxy placement and concrete reinforcement B.2-B.9/1.2-1.9 and B-C/2-2.2 in-store Starbucks: Contractor has drilled 4 1/2"holes for#3 12"dowels @ 16"O.C..Holes have been blown,brushed clean,and is free from debris.Epoxy placed was Hilti HIT-HY 200,date has been verified.#3 rebar mat has been placed at 16"O.C.. Rebar has been placed per plan Sheet S501 detail 1. Concrete placement for pour back SOG B.2-B.9/1.2-1.9 and B-C/2-2.2 In-store Starbucks: Contractor has poured 4 yards of concrete by tailgating. 1 set of(3)samples have been made for compression testing. Mix:30451C Slump:4" PSI:3,000 Work in progress. DEFICIENCIES: ❑ YES / ❑✓ NO SAMPLES: E CONCRETE ❑ GROUT ❑ MORTAR ❑ MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. Justin Lee w/CWC Inspector/Technician Superintendent/Representative 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)76-A6300 CQues Monsultantslnc. www•cquestinc.com ENGINEERING, TESTING. AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target Expansion T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California Rd.Temecula CA Date: 5-29-18 Site Contact: Nickwicwc Time: 700am-900am Weather: 6oF sunny Inspector: Craiq Moellenkamp ICC#8406858 Permit Number: B18-0368 ❑✓ Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑Wood-frame ❑Concrete Sampling ❑Masonry Sampling ❑Welding ❑Shearwall ❑ Prestressed Concrete ❑High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑Fireproofing ❑Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Observed the installation of A615 qrade 60 rebar for continuous footings and column/pad footings along gridline 11 from A.84 along A.7 line from 10.6-11 and alonq J line from 10.7-11. Inspected rebar size, type, grade, spacinq and clearances and column anchor bolt size and embedment with all locations in compliance. Reference sheet S112 foundation plan and footinq schedule S501 details and S523 detail 6. The above mentioned work was performed accordinq to approved plans and specifications to the best of my knowledge at this time. Deficiencies: ❑ Yes / ❑✓ No Samples: ❑Concrete ❑Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. 8406858 � Inspector Signature Superintendent Signature 1342 N.Benson ST.,Unit B . Upland,CA 91786 Office ( Fax:(909)767-6300 CQuestConsultantslnc_ www.cquestinc.com ENGINEERING. TESTING, AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target T-03S9 Project Number: 1618-0368 Project Location: 29676 Rancho California RD,Temecula,CA Date: Tuesday,May 29,2018 Site Contact: Nick w/CWC Time: 4 Weather: Clear/Cool Inspector: 1D Concrete Reinforcement ❑ Masonry Reinforcement ❑ Structural Steel ❑ Wood-frame Concrete Sampling ❑ Masonry Sampling ❑ Welding ❑ Shearwall Prestressed Concrete ❑ High Strength Grout High Strength Bolts ❑ Roofing Epoxy Bolts/Anchors ❑ Fireproofing _J Anchor Torque Test El Special Inspection Items, Locations, and Comments Per request of CWC,a CQuest representative has arrived on site to observe and sample concrete pour. Concrete placement for footings @ Line A.8-/10.8-11 and 11/A.8-J: Contractor has poured 40 yards of concrete by tailgating. . Concrete was consolidated with a mechanical vibratory i set of(4)samples have been made for compression testing Mix:52303 Slump:4" PSI:3,000 Work in progress. DEFICIENCIES: ❑ YES / ❑� NO SAMPLES: CONCRETE ❑ GROUT ❑ MORTAR ❑ MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. r Nick w/CWC Inspector/Technician Superintendent/Representative 1342 N.Benson Ave., Unit B . Upland,CA 91786 Office ( Fax:(909)767-6300 cQueStconsultantslnc. www.cquestinc.com ENGINEENING, TESTING, AND INSrECTION SPECIAL INSPECTION REPORT Project Name: Target T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California RD,Temecula,CA Date: Thursday,May 31,2018 Site Contact: Nick F.w/CWC Time: 4 Weather: Clear/Cool Inspector: DC ❑Concrete Reinforcement ❑ Masonry Reinforcement ❑ Structural Steel ❑ Wood-frame ❑Concrete Sampling ❑ Masonry Sampling ❑ Welding ❑ Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing 0 Epoxy Bolts/Anchors [—, Fireproofing ❑ Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Per request of CWC,a CQuest representative has arrived on site to observe installation of epoxy dowels,and verify installation of steel reinforcement for the footings along gridline 1/10.1-11 Contractor has drilled out two(2)holes into the existing footing to allow for a minimum embedment of 6"for the epoxied deformed steel reinforcement used for the bottom bars for the footing reinforcement.Holes were brushed and blown free and clear of debris under observation.Contractor used Set XP epoxy with a verified expiration of 11/2018.Steel bars were inserted into the epoxy filled holes with a slight twist,and secured in place. Dowels were installed per detail 16,page SS01 of the approved plans at GL J/10.1 The remaining top bars will be installed at a later date. Performed observation of two(2)#5 deformed steel reinforcement used for the bottom bars for the continuous footings along GL J/10.1-11.Steel reinforcement was found to have a minimum lap of 40 inches,and secured properly and in accordance with the footing schedule F2 on page S112 of the approved plans.Work is ongoing. DEFICIENCIES: `J YES / ❑ NO SAMPLES: 1 I CONCRETE GROUT MORTAR ] MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. Nick F. w/CWC Inspector/Technician Superintendent/Representative 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)7676300 www.cquestinc.com cQuestconsultantsinc_ ENGINEENING. TENTING. AMR INSPECTION SPECIAL INSPECTION REPORT Project Name: Target Project Number: 1618-0368 Project Location: 29676 Rancho California Rd Date: 6 1 18 Site Contact: N,,k F,nl,!y Time: r,rn Weather: Cloudy Inspector: Natividad Gamez Jr Permit Number: ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑Wood-frame ❑Concrete Sampling ❑Masonry Sampling ❑Welding ❑Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing Epoxy Bolts/Anchors ❑ Fireproofing ❑ Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments As requested by Client, CCI was present to perform inspection of reinforcing steel. Observed reinforcing steel placed @ perimeter brace frame column piers. Reinforcing steel was placed per detail 13/S501. All reinforcing steel was verified to have proper clearance per code as well as proper laps Concrete wall reinforcing steel was also verified to be in compliance per detail 15/S501. All work observed was in accordance with approved contract documents. Deficiencies: ❑ Yes / ❑✓ No Samples: ❑Concrete ❑ Grout ❑ Mortar ❑ Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. 8325365 � Tim Finley Inspector Signature Superintendent Signature 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)7676300 CQulestConsuftantslnc www.cquestinc.com ENGINEERING. TESTING, AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target Expansion T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California Rd.Temecula CA Date: 6-2-18 Site Contact: NickWICWC Time: 700am-900am Weather: 60F sunny Inspector: Craiq Moellenkamp ICC#8406858 Permit Number: B18-0368 ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑wood-frame ❑✓ Concrete Sampling ❑Masonry Sampling ❑ Welding ❑Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing ❑Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Observed the placement and mechanical consolidation of approximately 10 vards of concrete mix design #38121 provided by Robertsons. Location of pour todav for column pedestals at ciridlines 11/H and 11/J and continuous footinq along J line from 10.3-11. A 3000 psi mix desiqn was placed with placement performed by chute. Took one set of four 4" x 8" cylinders for testinq with a slump of 4 1/2" and a temperature of 68F. The above mentioned work was performed according to approved plans and specifications to the best of my knowledge at this time. Deficiencies: ❑ Yes No Samples: 0 Concrete ❑ Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. 8406858 uwadei 60 Godracto` Inspector Signature Superintendent Signature 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)767-6300 CQusStConsultantslnc. www•cquestinc.com ENCINEERINC.TESTING, AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California RD,Temecula,CA Date: Friday,June 08,2018 Site Contact: Nick F.w/CWC Time: 4 Weather: Clear/Cool Inspector: DC El Concrete Reinforcement ❑ Masonry Reinforcement ❑ Structural Steel ❑ Wood-frame P] Concrete Sampling ❑ Masonry Sampling ❑ Welding ❑ Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing 0 Epoxy Bolts/Anchors ❑ Fireproofing ❑ Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Per request of CWC,a CQuest representative has arrived on site to observe installation of epoxy dowels,verify installation of steel reinforcement,and to observe placement and provide quality control for the concrete pour. Contractor has drilled out 120 holes to receive#3 deformed steel bars for the trench pour back near gridlines 4-5/A-B,3-4/A-B, 4-5/13-D. Holes spaced at 16"CC, per detail 1 on S501, were brushed and blown clear of debris prior to placement of Hilti HIT-HY 20OR with an expiration of 2/2019.Bars were inserted into the epoxy filled hole with a slight twist,and with an embedment of 4.5", and secured in place. Contractor has installed#3 Deformed steel bars at 16"OC each way in areas of the trenches larger than 18".Steel reinforcement was secured in place,and tied every 16"each way. Contractor has pumped approximately 4 cubic yards of Robertson's product 80083,4500 PSI concrete,and has consolidated using handheld tools. Material was placed in a timely manner with testing being conducted at regular intervals to verify slump,and temperature,with one set of compressive strength specimens cast for laboratory testing. DEFICIENCIES: ❑ YES / NO SAMPLES: ❑� CONCRETE(1) ❑ GROUT ❑ MORTAR ❑ MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. Nick F. w/CWC Inspector/Technician Superintendent/Representative j I 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)7676300 CQuesMonsultantslnc_ www.cquestinc.com ENGINEERING. TESTING. AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target Expansion T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California Rd.Temecula CA Date: 6 14-18 Site Contact: Nickw/Cwc Time: 11 ooa1 30pm Weather: 9OF sunny Inspector: Craiq Moellenkamp ICC#8406858 Permit Number: B18-0368 ✓❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑Wood-frame ❑✓ Concrete Sampling ❑Masonry Sampling ❑ Welding ❑Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing ❑ Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Observed the installation of A615 grade 60 rebar for column pedestals at gridlines 10.5/J and 10.2/J. Inspected rebar size, type, grade, soacinq and clearances with all locations in compliance. Reference sheet S501 detail 13 and 16. Also observed the placement and mechanical consolidation of approximately 2 yards of concrete mix desiqn #38121 provided by Robertsons. Location of pour today for column pedestals at qridlines 10.5/J and 10.2/J. A 3000 psi mix design was placed with placement performed by chute. Took one set of four 4" x 8" cylinders for testinq with a slump of 4" and a temperature of 82F. The above mentioned work was performed accordinq to approved plans and specifications to the best of my knowledqe at this time. Deficiencies: ❑ Yes / No Samples: ✓❑Concrete ❑ Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. L 8406858 Inspector Signature Superintendent Signature 1342 N.Benson Ave.,Unit B C Upland,CA 91786 Office I Fax:(90909)7676300 www.cquestinc.com CQuestConsultants SPECIAL INSPECTION REPORT Project Name: Project Number: Project Location:7-1- V p Date: -2-Z- Site Contact: sl -11 [ Time: $ Weather: L Inspector:ttVp,0W c Permit Number: Qv jg Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑wood-frame Concrete Sampling ❑Masonry Sampling ❑Welding ❑Shearwall ❑ Prestressed Concrete ❑High Strength Grout ❑High Strength Bolts ❑Roofing ❑Epoxy Bogs/Anchors ❑Fireproofing ❑Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments A ---9 L f>d CoW-T. PI�X-,T)wr, e A. P� f i Deficiencies: ❑Yes / No Samples: b0roncrete ❑Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. Inspector Signature Superintendent Signet 1551 West 13th Street,Unit 201 ■ Upland,CA 91786 Office I Fax:(909)767-7-6300 eOp �aA��nC_ www.cquestinc.com Er irEEhire.rEsrIwa. AND rNa►ECTra0 SPECIAL INSPECTION REPORT Project Name: _ Al Project Number: Project Locatior, ,�� Date: Site Contact: Weather: 6r5 a,� Inspector: J '— Miscellaneous: W'fll�.ncrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑Wood-frame �ncrete Sampling Masonry sampling ❑Welding ❑Shearwall ❑ Prestressed Concrete ❑High Strength Grout ❑High Strength Bolts ❑Roofing ❑Epoxy Bolts/Anchors ❑Fireproofing ❑Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments 1 G Deficiencies: ❑ ves / o I Samples: lil<oncrete Lj Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this Inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this prollect. nspector Signature Superintendent Signature 4=1=0 1SS1 West 13th Street,Unit 201 Upland,CA 91786 Office j Fax:(909)767.63DO CQliAstCDD—i/1t o 11,-nC_ www.cquestinc.com [M�IMIrIIIr�,TrsTINE. •rD rMs►rtr10A SPECIAL INSPECTION REPORT Project Name: _ Project Number: a Project Location: ; Date: - Site Contact: !i le Time: Weather: 'S /ir�►/� Inspector: Miscellaneous: ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑wood-frame ❑Concrete Sampling E]Masonry Sampling ❑Welding ❑Shearwall Pre essed Cr.-crete ❑High Strength Grout ❑High Strength Bolts ❑Roofing poxy Bolts/Anchors Fireproofing ❑Anchor Torque Test ❑ Special Inspection items, Locations, and Comments r ems- Al Ac Deficiencies: ❑Yes / o Samples: ❑Concrete ❑Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. nspector Signature _ Superintendent Signature 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)76T6300 CQu®sMonsultantslnc. www.cquestinc.com ENCINEENINC. TESTING. AND INSrECT1ON SPECIAL INSPECTION REPORT Project Name: Target Expansion T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California Rd.Temecula CA Date: 6-29-18 Site Contact: Nick w/CWC Time: 8 o0am-10 30am Weather: 70F sunny Inspector: Craig Moellenkamp ICC#8406858 Permit Number: B18-0368 ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑Wood-frame ❑Concrete sampling ❑Masonry Sampling ❑ Welding ❑Shearwall ❑ Prestressed Concrete ❑✓ High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing ❑ Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Observed the placement of SikaGrout 212 high strength grout for column base plates at widlines 10/J, 10/H, 10/G, 10.4/G, 10/F.6, 10/F.4 and 10/F. All base plate areas were properly cleaned prior to placement. Contractor was observed for proper mixing procedures. Took one set of four 2" x 4" samples for testing. No exceptions taken. Deficiencies: ❑ Yes / ❑ No Samples: ❑Concrete ❑✓ Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. 8406858 Inspector Signature Superintendent Signature i I 1342 North Benson Ave,Unit B Upland,CA 91796 Office I Fax:(909)767-6300 C0--m-Monsultantsinc. www.cquestinc.com ENSINEERING. TESTING. AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Project Num C 3 Project Location: Z (c-HC Ph,111 c+1,}, Date: t -2 —1liS Site Contact: %1. Vt:I C,W Time: Lt L r Weather: �� (_ ,u Inspector: Concrete Reinforcement ] Masonry Reinforcement ❑Structural Steel ❑Wood-frame 2toncrete Sampling ]Masonry Sampling ❑Welding ❑ Shearwall ❑ Prestressed Concrete ) High Strength Grout ❑High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing ❑Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments 'Ur CC C- O S.a v ita— n Icl,,, Its o l.l,CtS �J2�r I�i..L W L DEFICIENCIES: F] YES SAMPLES: (CONCRETE 1 I i GROUT I MORTAR L_ i MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. L77 ` Ins:A1 hnician S perintendent/Representative 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)7676300 CQuezWonsultantslnc. www.cquestinc.com ENGINEERING. TESTING, AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target Expansion T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California Rd Temecula CA Date: i 5-18 Site Contact: Nickw/CWC Time: 11 ooam-1 00pm Weather: 90F sunny Inspector: Craiq Moellenkamp ICC#8406858 Permit Number: B18-0368 ❑Concrete Reinforcement ❑Masonry Reinforcement ❑✓ Structural Steel ❑Wood-frame ❑Concrete Sampling ❑Masonry Sampling ❑✓ Welding ❑Shearwall ❑ Prestressed Concrete ❑High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing ❑Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Observed the ongoinci field welding of 1/4" fillet welds for diagonal brace frame column to gusset plate connections at the brace frame alonq 10 line from A.8-B.4. Certified welders were observed for proper weldinq techniques and procedures using the FCAW process with E71t-8 wire electrode. Completed welds are beinq checked for size, location and visual acceptance criteria per AWS D1.1 . Work and inspection are onqoinq at locations referenced above. Certified Welder- Serqio Ceia Licens #P030895/Exp. 3-6-19. Deficiencies: ❑ Yes / ✓❑ No Samples: ❑Concrete ❑ Grout ❑ Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. — 8406858 Inspector Signature Superintendent Signature 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)76}6300 www.cquestinc.com CQuestConsultantslnc. ENGINEERING. TESTING. AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target Expansion T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho Califomia Rd Temecula CA Date: 7-6-18 Site Contact: Nickw/CWC Time: 900a 1zo0pm Weather: 95F sunny Inspector: Craiq Moellenkamp ICC#8406858 Permit Number: B18-0368 ❑Concrete Reinforcement ❑Masonry Reinforcement ❑✓ Structural Steel ❑Wood-frame ❑Concrete Sampling ❑Masonry Sampling ✓❑Welding ❑Shearwall ❑ Prestressed Concrete ✓❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing ❑ Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Observed the ongoinq field welding of 1/4" fillet welds for diagonal brace frame column to gusset plate connections at the brace frame along 10 line from A.8-13.4- Certified welders were observed for proper weldinq techniques and procedures usinq the FCAW process with E71t-8 wire electrode. Completed welds are beinq check for size, location and visual acceptance criteria per AWS D1.1. Work and inspection are ongoinq at locations referenced above. Certified Welder: Serqio Ceia Observed the placement of SikaGrout 212 high strength grout for column base plates at qridlines D/10.4, D/10, C/10, B.4/10 and .8/10. All base plate areas were properly cleaned prior to placement. Contractor was observed for proper mixinq procedures. Took one set of four 2" x 4" samples for testing. No exceptions taken. Deficiencies: ❑ Yes / I] No Samples: ❑Concrete ❑✓ Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. 8406858 Inspector Signature Superintendent Signature i 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)767.6300 CQusstConsuftantslnc_ www.cquestinc.com ENGINEERING. TESTING, AND INS►ECIOUN SPECIAL INSPECTION REPORT Project Name: Target Expansion T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California Rd.Temecula CA Date: i-17-18 Site Contact: "Ick w/Cwc Time: 6 ooam-9 ooam Weather: 80-90F sunny Inspector: Craig Moellenkamp ICC#8406858 Permit Number: B18-0368 ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑wood-frame ❑Concrete Sampling ❑Masonry Sampling ❑Welding ❑Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing ❑Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Observed the onaoina field weldina of 3/16"-1/4" fillet welds for diaconal brace frame column to ausset plate connections along 10 line, 11 line, A.8 line and J line. Certified welders were observed for proper welding techniques and procedures usinq the FCAW process with E71t-8 wire electrode. Completed welds are beinq check for size, location and visual acceptance criteria per AWS D1.1. Work and inspection are onqoinq at locations referenced above. Certified Welder: Serqio Ceia Lic. #P030895/exp. 3-6-19, Ramirez Mendoza Lic. #P035039/exp. 6-27-19 Deficiencies: ❑ Yes / ❑✓ No Samples: ❑Concrete ❑ Grout ❑Mortar ❑ Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. 8406858 ewal6M to codracto` Inspector Signature Superintendent Signature 1342 N.Benson Ave.,Unit B Moor . Upland,CA 91786 llor�f== Office I Fax:(909)7676300 cQusstconsultantslnc www.cquestinc.com ENGINEERING. TESTING, AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target Expansion T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho Califomia Rd Temecula CA Date: 1"18 Site Contact: Nickwicwc Time: e00—11 00— Weather: 80-90F sunny Inspector: Craiq Moellenkamp ICC#8406858 Permit Number: B18-0368 ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑Wood-frame ❑Concrete Sampling ❑Masonry Sampling ❑✓ Welding ❑Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing ❑Anchor Torque Test ❑ i Special Inspection Items, Locations, and Comments Observed the ongoing field welding of 3/16"-1/4" fillet welds for diagonal brace frame column to gusset plate connections along 10 line, 11 line, A.8 line and J line. Work is also ongoinq for the installation of joist bridqinq throughout gridlines 10-11 and A.8-J, foist to beam connections along 10 line, and roof closure anqle to beam connections throuqhout. Certified welders were observed for proper welding techniques and procedures using the FCAW process with E71t-8 wire electrode. Completed welds are being check for size, location and visual acceptance criteria per AWS D1.1. Work and inspection are ongoinq at locations referenced above. Certified Welder- Sergio Ceia Lic. #P030895/Exp. 3-6-19, Jose Ramirez Mendoza Lic. #P035039/6-27-19 Deficiencies: ❑ Yes / ❑✓ No Samples: ❑Concrete ❑ Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. 8406858 e�rarCeol to co�rt`acto` Inspector Signature Superintendent Signature 8333 Foothill Blvd.Ste.100 Rancho Cucamonga,CA 0 Office I Fax:(909) 76767-6306300 www.cquestinc.com CQuestConsuitantsinrr- I MI;INI(.tMq I%I II%I; aNO IN'LI r,IIfiN SPECIAL INSPECTION REPORT Project Name: - -T- - Project Number: b l —03b8 Project Location:2 b A Date: ZpI i Site Contact: Time: Bather: Inspector: A Permit Number: SO ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑Wood-frame Concrete Sampling ❑Masonry Sampling ❑Welding ❑Shearwall Prestressed Concrete ❑High Strength Grout ❑High Strength Bolts ❑Roofing Epoxy Bolts/Anchors Fireproofing ❑Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Or- AfrISWI O - /1 1 t-15 A uxn ikom !� OF SUlfb pt4 A to iA IU - t Z SSVI i>fl Utz Iv S 1. �S S R tru t4 t, vV (oM- Sy- { vL P 7ntt, ,e-LZ MUTt - -i C 3 Deficiencies: ❑Yes / No Samples: ❑Concrete ❑Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. Inspector signature Superintendent Signature�.- - • 1342 North Benson Ave,Unit B . Upland,CA 91786 Office I Fax:(909)767-6300 CQueStConsultantalnc. www.cquestinc.com ENGINEERING.TESTING. ANTI INSPECTION SPECIAL INSPECTION REPORT Project Name: Target a0359 Project Number: 1618-0368 Project Location: 29676 Rancho California Rd.Temecula Date: Saturday,July 21,2018 Site Contact: Nick F.w/CWC Time: 8 Weather: Hot/Clear Inspector: A.Olson ❑ Concrete Reinforcement ❑ Masonry Reinforcement ❑ Structural Steel ❑ Wood-frame Fa-1 Concrete Sampling ❑ Masonry Sampling ❑ Welding ❑ Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors [ Fireproofing ❑ Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Per the request of CWC,a Cquest representative has arrived onsite to observe placement, provide quality control,and to cast test specimens for the Slab on Grade pour for the building expansion. Contractor has pumped approximately 190 cubic yards of Robertson's product 54041C,4500 PSI concrete,and has mechanically consolidated material using a Laser Screed.Steel reinforcement was verified secure in place,free and clear of debris,and lifted ' onto dobies where needed.Testing was conducted at regular intervals to verify slump,and temperature with two sets of compressive strength test specimens cast for laboratory testing. Material was delivered, placed,and finished in a timely manner. DEFICIENCIES: YES / ' NO SAMPLES: C CONCRETE(2) I 1 GROUT MORTAR L_� MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. �O Nick F.w/CWC Inspector/Technician Superintendent/Representative 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)7676300 CQuastConsultantslnc_ www.cquestinc.com ENGINEERING. TESTING. AND ONSPECT4004 SPECIAL INSPECTION REPORT Project Name: Target Expansion T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California Rd.Temecula CA Date: 1-23-18 Site Contact: Nickw/CWC Time: 800am-1100am Weather: 9OF sunny Inspector: Craig Moellenkamp ICC#8406858 Permit Number: B18-0368 ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑Wood-frame ❑Concrete Sampling ❑Masonry Sampling ❑✓ Welding ❑Shearwall ❑ Prestressed Concrete ❑High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑Fireproofing ❑Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Observed the ongoing field welding of 3/16"-1/4" fillet welds for diagonal brace frame column to qusset plate connections along 10 line, 11 line, A.8 line and J line, ioist bridging throughout gridlines 10-11 and A.84 foist to beam connections along 10 and 11 line, and roof closure angle to beam connections throughout. Certified welders were observed for proper techniques and procedures usinq the FCAW process with E71t-8 wire electrode. Completed welds are beinq checked for size, location and visual acceptance criteria per AWS D1 .1. Work was performed according to approved plans and specifications to the best of my knowledge at this time for joist to beam connections along 10 and 11 line from A-J. Work and inspection are ongoinq at additional locations referenced above. Certified Welder: Serqio Ceja Lic. #P030895/Exp. 3-6-19, Jose Ramirez Mendoza Lic. #P035039/Exp. 6-27-19 Additional items: welds from the joist to column stabilizer plates are to be removed, RFI pending for column to beam connection where column bolt holes do not line up with beam at gridline 10/13.4 Deficiencies: ❑ Yes / ❑ No Samples: ❑Concrete ❑ Grout ❑Mortar ❑Masonry Prisms To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. 8406858 Inspector Signature Superintendent Signature 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)767-6300 CQusstConsultantslnC_ www.cquestinc.com ENGINEERING, TESTING, AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California RD,Temecula,CA Date: Tuesday,July 31,2018 Site Contact: Justin Lee w/CWC Time: 8 Weather: Clear/warm Inspector: DC Concrete Reinforcement ❑ Masonry Reinforcement ❑ Structural Steel ❑ Wood-frame Concrete Sampling ❑ Masonry Sampling ❑ Welding ❑ Shearwall Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing Epoxy Bolts/Anchors ❑ Fireproofing ❑ Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Per request of CWC,a CQuest representative has arrived on site for anchor torque testing. Gondola racks: Have met with contractor to discuss requirement for anchor bolt placement and testing. Plans have been reviewed and all required anchors and tools have been verified as per plan Sheet SR53 detail 11 and note 3. Contractor to mark completed gondola racks and call for periodic inspection to confirm placement required torque. Work in progress. DEFICIENCIES: YES / NO SAMPLES: Ll CONCRETE ❑ GROUT ❑ MORTAR ❑ MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. L Justin Lee w/CWC Inspector/Technician Superintendent/Representative 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)767-6300 cQueStconsultantslnc. www.cquestinc.com ENGINEERIIIG, TESTING, AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California RD,Temecula,CA Date: Thursday,August 16,2018 Site Contact: Justin Lee w/CWC Time: 8 Weather: Clear/Cool Inspector: DC ❑ Concrete Reinforcement ❑ Masonry Reinforcement ❑ Structural Steel ❑ wood-frame ❑ Concrete Sampling ❑ Masonry Sampling ❑ Welding ❑ Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors E] Fireproofing El Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Per request of CWC,a CQuest representative has arrived on site to conduct anchor torque testing. Gondola Racks:H-J/6.5-7.5 Contractor has drilled and blown clean holes for plates of gondola racks Power Fasteners wedge bolt+3/8x 3"was used for anchoring racks. All testing conducted with a torque wrench has met the required manufactures specs of 35 ft-Lb. Work in progress. DEFICIENCIES: ❑ YES / ❑ NO SAMPLES: ] CONCRETE ❑ GROUT ❑ MORTAR ❑ MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. Justin Lee w/CWC Inspector/Technician Superintendent/Representative 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office [ Fax:(909)767-6300 CQll eStConsultantslnc. www•cquestinc.com kNClNEERIN6.TESTING, AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California RD,Temecula,CA Date: Friday,August 31,2018 Site Contact: Justin Lee w/CWC Time: 8 Weather: Clear/Cool Inspector: DC ❑ Concrete Reinforcement ❑ Masonry Reinforcement ❑ Structural Steel ❑ Wood-frame ❑ Concrete Sampling ❑ Masonry Sampling ❑ Welding ❑ Shearwall ❑ Prestressed Concrete [] High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing U Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Per request of CWC,a CQuest representative has arrived on site to conduct anchor torque testing. Gondola Racks:HA/4-4.7&7.5-8, F.5-G.5/5.2-6.8, G.2/6.9-7.1,and F.5-G.5/10-11 Contractor has drilled and blown clean holes for plates of gondola racks Power Fasteners wedge bolt+3/8x 3"was used for anchoring racks. All testing conducted with a torque wrench has met the required manufactures specs of 35 ft-Lb. Work in progress. DEFICIENCIES: ❑ YES / L NO SAMPLES: ❑ CONCRETE ❑ GROUT ❑ MORTAR ❑ MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. 1 " Justin Lee w/CWC Inspector/Technician Superintendent/Representative 40 1342 N.Benson Ave.,Unit B 4C4�==n Upland,CA 91786 Office I Fax:(909)767-6300 CQueStConsultantslnc. www.cquestinc.com ENGINEERING,TESTING, AND INSPECTION SPECIAL INSPECTION REPORT Project Name: Target T-0359 Project Number: 1618-0368 Project Location: 29676 Rancho California RD,Temecula,CA Date: Friday,September 28,2018 Site Contact: Justin Lee w/CWC Time: 8 Weather: Clear/Cool Inspector: DC ❑ Concrete Reinforcement E Masonry Reinforcement ❑ Structural Steel ❑ Wood-frame ❑ Concrete Sampling ❑ Masonry Sampling LJ Welding ❑ Shearwall ❑ Prestressed Concrete [ ] High Strength Grout ❑ High Strength Bolts ❑ Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing U Anchor Torque Test ❑ Special Inspection Items, Locations, and Comments Per request of CWC,a C4uest representative has arrived on site to conduct anchor torque testing. Gondola Racks:4.6/B.2-C.2,7.2/B.2-C.2 8.2/E.5-G.5,8-8.7/H-1,8.2-9/G.5,AND 8.2-9/F.5: Contractor has drilled and blown clean holes for plates of gondola racks Power Fasteners wedge bolt+3/8x 3"was used for anchoring racks. All testing conducted with a torque wrench has met the required manufactures specs of 35 ft-Lb. Work in progress. DEFICIENCIES: ❑ YES / L] NO SAMPLES: (J CONCRETE LJ GROUT ❑ MORTAR ❑ MASONRY PRISMS To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. Justin Lee w/CWC Inspector/Technician Superintendent/Representative i l Inland Air Balance, Inc. I Test and Balance Report I i I TARGET T-0359 TEMECULA Job Address: 29676 RANCHO CALIFORNIA RD Job Number: 1802-148 Technician: D. JONES, R. BOGLE, A. ABEL,A. NASH Contractor RHINO MECHANICAL Date: 11/15/2018 THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING,ADJUSTING,AND BALANCING OF ENVIROMENTAL SYSTEMS.THE MEASURMENTS SHOWN,AND THE INFORMATION GIVEN,IN THIS REPORT ARE CERTIFIED TO BE ACCURATE AND COMPETE,AT THE TIME AND DATE INFORMATION WAS GATHERED.ANY VARIANCES FROM DESIGN QUANTITIES,WHICH EXCEED NEBB TOLERANCES,ARE NOTED IN THE TEST-ADJUST-BALANCE REPORT PROJECT SUMMARY. Inland Air Balance, Inc. SYMBOL SHEET AK Free Area Factor BHP Brake Horse Power CFM Cubic Feet per Minute CHWR Chilled Water Return CHWS Chilled Water Supply CSD Ceiling Supply Diffuser CSG Ceiling Supply Grille CWR Condensor Water Return CWS Condensor Water Supply D.A. Direct Acting DNA Data Not Available DT Duct Traverse EAT Entering Air Temperature EG Exhaust Grill ESP External Static Pressure EWT Entering Water Temperature FLA Full Load Amps FPM Feet per Minute GF Grease Filter HP Horse Power HWR Hot Water Return HWS Hot Water Supply LAT Leaving Air Temperature LSD Linear Slot Diffuser LWT Leaving Water Temperature MAT Mixed Air Temperature N.A. Not Accessible N.I. Not Installed N.L. Not Listed N.S. Not Shown OSA Outside Air R.A Reverse Acting RA Return Air RG Return Grill RPM Revolutions per Minute SA Supply Air SID Static Pressure SWG Sidewall Diffuser T.B.D. To Be Determined TSP Total Static Pressure T-STAT Thermostat UTR Unable to Read V Volts VAV Variable Air Volume jVP I lVelocity Pressure i Inland Air Balance, Inc. PROJECT: TARGET T-0359 LOCATION: 29676 RANCHO CALIFORNIA ROAD, TEMECULA JOB NUMBER: 1802-148 DATE: 11/15/2018 FAN DATA Fan Number: RTU-1 RTU-2 RTU-3 Location ROOF ROOF ROOF Service MEZZANINE EXCHANGES, REGISTERY SALES Manufacturer CARRIER CARRIER CARRIER Model Number 48HJD015J 48HJD015J 48HGDT14AA Serial Number 36071-127778 3107U23401 287G300051 Classification Motor Make/Frame MARATHON-56 MARATHON-56 GE- 56 HZ Motor HP W /RPM N/S- 1725 N/S- 1725 N/S- 1725 Volts/Phase/Hertz 460-3-60 460-3-60 460-3-60 F.L. Amps/S.F. 4.8- 1.15 4.8- 1.15 4.8- 1.15 Motor Sheave Make N/S N/S BROWNING Motor Sheave Diam./Bore 4 3/4"OD-7/8" 4 3/4"OD-7/8" IVL 40-7/8" Fan Sheave Make N/S N/S BROWNING Fan Sheave Diam./ Bore 6 1/2"OD- 1 3/8" 6 1/2"OD- 1 3/8" BK 110- 1 3/16" No. Belts/Make/Size 1 - BROWNING- B 46 1 - BROWNING- B 46 1 - BANDO-B 46 Sheave &Distance 0% CLOSED 16" 0% CLOSED 16" 0% CLOSED 13" TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL CFM N/S 2682 N/S 2316 6000 3668 1 Outside Air CFM N/S 386 N/S 468 0 0 Fan RPM N/S 1206 N/S 1220 N/S 541 Total S.P. N/S 0.65" N/S 1.801, N/S 1.42" Voltage 460 478-472-478 460 480-480-480 460 480-481-481 Amperage T1/T2/T3 4.8 3.9-4.4-4.3 4.8 4.5-4.6-4.5 4.8 4.5-4.3-4.4 VFD Set Point SUCTION SP 0.15 0.20 0.62 DISCHARGE SP 0.50 1.60 0.80 NOTE: (1)MOTOR @ FULL LOAD AMPS READINGS BY: DJ, RB,AA, AN Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-1 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY MEZZANINE 1 1S X 48 X 1 1.0 LD N/S * 127 MEZZANINE 2 1S X 48 X 1 1.0 LD N/S * 142 MEZZANINE 3 1S X 48 X 1 1.0 LD N/S * 270 MEZZANINE 4 1S X 48 X 1 1.0 LD N/S * 250 MEZZANINE 5 1S X 48 X 1 1.0 LD N/S * 250 MEZZANINE 6 1S X 48 X 1 1.0 LD N/S * 220 MEZZANINE 7 1S X 48 X 1 1.0 LD N/S * 200 MEZZANINE 8 1S X 48 X 1 1.0 LD N/S * 250 MEZZANINE 9 1S X 48 X 1 1.0 LD N/S * 190 MEZZANINE 10 1S X 48 X 1 1.0 LD N/S * 200 MEZZANINE 11 1S X 48 X 1 1.0 LD N/S * 190 MEZZANINE 12 1S X 48 X 1 1.0 LD N/S * 110 MEZZANINE 13 1S X 48 X 1 1.0 LD N/S * 108 MEZZANINE 14 1S X 48 X 1 1.0 LD N/S * 175 TOTAL N/S 2682 RETURN MEZZANINEI 1 30 X 16 1.0 RG N/S * 160 MEZZANINE 2 30 X 20 1.0 RG N/S * 877 MEZZANINE 3 20 X 10 1.0 RG N/S * 263 MEZZANINE 4 30 X 20 1.0 RG N/S * 805 TOTAL N/S 2105 OSA ROOF 1 63 X 17 7.43 SO N/S N/S 386 52 TOTAL N/S 386 Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-2 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY EXCHANGES 1 2408 1.0 CD N/S * 105 EXCHANGES 2 2408 1.0 CD N/S * 125 EXCHANGES 3 2408 1.0 CD N/S * 150 EXCHANGES 4 2408 1.0 CD N/S * 75 EXCHANGES 5 2408 1.0 CD N/S * 100 REGISTRY 6 2408 1.0 CD N/S * 55 REGISTRY 7 2408 1.0 CD N/S * 200 REGISTRY 8 2408 1.0 CD N/S 200 REGISTRY 9 2408 1.0 CD N/S * 90 REGISTRY 10 2408 1.0 CD N/S * 39 REGISTRY 11 2408 1.0 CD N/S * 110 MEZZANINE 12 1S X 48 X 1 1.0 LD N/S * 95 MEZZANINE 13 1S X 48 X 1 1.0 LD N/S 35 MEZZANINE 14 1S X 48 X 1 1.0 LD N/S * 20 MEZZANINE 15 1S X 48 X 1 1.0 LD N/S * 115 MEZZANINE 16 1S X 48 X 1 1.0 LD N/S * 115 MEZZANINE 17 1S X 48 X 1 1.0 LD N/S * 185 MEZZANINE 18 1S X 48 X 1 1.0 LD N/S 1 125 MEZZANINE 19 1S X 48 X 1 1.0 LD N/S * 85 MEZZANINE 20 1S X 48 X 1 1.0 LD N/S * 105 MEZZANINE 21 1S X 48 X 1 1.0 LD N/S 85 MEZZANINE 22 1 S X 48 X 1 1.0 LD N/S * 0 MEZZANINE 23 1 S X 48 X 1 1.0 LD N/S * 102 TOTAL N/S 2316 RETURN OPEN 1 24 X 24 1.0 RG N/S * 905 2 24 X 12 1.0 RG N/S 320 3 24 X 12 1.0 RG N/S 316 4 24 X 12 1.0 RG N/S * 283 TOTAL N/S 1824 OSA ROOF 1 63 X 17 7.43 SO N/S N/S 468 63 TOTAL N/S 468 I I Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-3 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD N/S 851 I SALES 2 2416 1 1.0 CD N/S 820 SALES 3 2S X 60 X 1 1.0 LD N/S 387 SALES 4 2S X 60 X 1 1.0 LD N/S 410 SALES 5 2S X 60 X 1 1.0 LD N/S 419 SALES 6 2S X 60 X 1 to ID N/S 380 SALES 7 2S X 60 X 1 1.0 LD N/S 401 TOTAL 6000 3668 RETURN SALES 1 24 X 24 1.0 RG N/S 1768 SALES 2 24 X 24 1.0 RG N/S 1662 TOTAL N/S 3430 OSA ROOF 1 54 X 24 9.0 so 0 0 0 0 TOTAL MIR 0 Inland Air Balance, Inc. PROJECT: TARGET T-0359 LOCATION: 29676 RANCHO CALIFORNIA ROAD, TEMECULA JOB NUMBER: 1802-148 DATE: 11/15/2018 FAN DATA Fan Number: RTU-4 RTU-5 RTU-6 Location ROOF ROOF ROOF Service SALES SALES SALES Manufacturer CARRIER CARRIER MUNTERS Model Number 48HGDT14AA 50HG-T14 CIIEHCUC59824 Serial Number 2007G30073 2907G20030 287G300051 Classification I I I Motor Make/Frame GE-56 HZ GE -56 HZ US MOTORS- 184 T Motor HP W /RPM N/S- 1725 N/S- 1725 5- 1760 Volts/Phase/Hertz 460-3-60 460-3-60 460-3-60 F.L. Amps/S.F. 4.8- 1.15 4.8- 1.15 6.2- 1.15 Motor Sheave Make BROWNING BROWNING MASTER DRIVE Motor Sheave Diam./ Bore IVL 40-7/8" 4 1/2"OD-3/4" IVP 60- 1 1/8" Fan Sheave Make BROWNING BROWNING N/S Fan Sheave Diam./Bore BK 110- 1 3/16" BK 140- 1 3/16" 6"OD- 1" No. Belts/Make/Size 1 - BANDO- B 46 1 -BROWNING- B 51 1 - BROWNING -B 48 Sheave &Distance 0% CLOSED 13" FIXED 19" 40% CLOSED 16 1/4" TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL CFM 6000 3563(1) 4700 3399(1) N/S 3737 Outside Air CFM 0 0 0 0 N/S 3737 Fan RPM N/S 521 N/S 570 N/S N/A Total S.P. N/S 0.62" N/S 0.57" N/S 2.20" Voltage 460 478-480-478 460 477-471-471 460 477-480-480 Amperage T1/T2/T3 4.8 4.2-4.3-4.1 4.8 4.2-4.4-4.3 6.2 5.6-5.8-5.4 VFD Set Point SUCTION SP 0.24 0.37 0.80 DISCHARGE SP 0.38 0.20 1.40 NOTE: (1) DIRTY FILTER, MOTOR @ FULL LOAD AMPS READINGS BY: DJ, RB,AA, AN I Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-4 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD N/S * 738 1 SALES 2 2416 1.0 CD N/S * 669 * 1 SALES 3 2416 1.0 CD N/S 389 * 1 SALES 4 2416 1.0 CD N/S * 400 * 1 SALES 5 2416 1.0 CD N/S * 364 * 1 SALES 6 2416 1.0 CD N/S * 296 * 1 SALES 7 2416 1.0 CD N/S * 707 * 1 TOTAL 6000 3563 RETURN SALES 1 24 X 24 1.0 RG N/S 1742 SALES 2 24 X 24 1.0 RG N/S * 1706 TOTAL N/S 3448 OSA ROOF 1 58 X 24 9.67 SO 0 0 0 0 TOTAL 0 0 (1)DIRTY FILTER,FAN MOTOR FULL LOAD AMPS Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-5 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD N/S 916 SALES 2 2416 1.0 CD N/S * 827 SALES 3 2416 1.0 CD N/S 800 SALES 4 2416 1.0 CD N/S * 856 TOTAL 4700 3399 1 RETURN SALES 1 24 X 24 1.0 RG N/S * 1640 SALES 2 24 X 24 1.0 RG N/S * 1500 TOTAL N/S 3140 OSA ROOF 1 58 X 24 9.67 SO 0 0 0 0 TOTAL 0 0 (1)DIRTY FILTERS Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-6 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 24 X 4 1.0 CD N/S 320 SALES 2 24 X 4 1.0 CD N/S 400 SALES 3 24 X 4 1.0 CD N/S 364 SALES 4 24 X 4 1.0 CD N/S 329 SALES 5 24 X 4 1.0 CD N/S 411 SALES 6 24 X 4 1.0 CD N/S 244 SALES 7 24 X 4 1.0 CD N/S 300 SALES 8 24 X 4 1.0 CD N/S 266 SALES 9 loxio 1.0 SD N/S 235 SALES 10 loxio 1.0 SD N/S 260 SALES 11 loxio 1.0 SD N/S 298 SALES 12 loxio 1.0 SD N/S 310 TOTAL N/S 3737 RETURN TOTAL N/S 0 OSA 3737 TOTAL N/S 3737 (1)100%OSA i Inland Air Balance, Inc. PROJECT: TARGET T-0359 LOCATION: 29676 RANCHO CALIFORNIA ROAD,TEMECULA JOB NUMBER: 1802-148 DATE: 11/15/2018 FAN DATA Fan Number: RTU-7 RTU-8 RTU-9 Location ROOF ROOF ROOF Service SALES SALES SALES Manufacturer ADDISON CARRIER CARRIER Model Number PROA210C5A4A 50HG-T14A 50HG-T14A Serial Number 171212701001 2707G20023 2707G20024 Classification I I I Motor Make/Frame WEG- 184 4T GE-56 HZ GE- 56 HZ Motor HP W /RPM 3.0- 1765 N/S- 1725 N/S- 1725 Volts/Phase/Hertz 460-3-60 460-3-60 460-3-60 F.L. Amps/S.F. 3.86- 1.15 4.8- 1.15 4.8- 1.15 Motor Sheave Make DIRECT DRIVE BROWNING BROWNING Motor Sheave Diamd Bore DIRECT DRIVE 4 1/2"OD-3/4" 4 1/2"OD-3/4" Fan Sheave Make DIRECT DRIVE BROWNING BROWNING Fan Sheave Diam./ Bore DIRECT DRIVE BK 140- 1 3/16" BK 140- 1 3/16" No. Belts/Make/Size DIRECT DRIVE 1 - BROWNING- B 51 1 - BROWNING - B 51 Sheave &Distance DIRECT DRIVE FIXED 19" FIXED 19" TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL CFM 3600 3435 3500 3614(1) 3500 3575(1) I Outside Air CFM 3600 3435 380 396 340 360 I Fan RPM N/S NVL N/S 582 N/S 574 Total S.P. 1.00" 0.38" N/S 0.60" N/S 0.70" Voltage 460 478-478-478 460 478-480-480 460 480-480-480 Amperage T1/T2/T3 3.86 2.0-2.0-2.1 4.8 4.5-4.8-4.2 4.8 4.4-4.1-4.3 VFD Set Point 49 HZ SUCTION SP 0.31 0.30 0.45 DISCHARGE SP 0.07 0.30 0.25 NOTE: (1) DIRTY FILTER READINGS BY: DJ, RB,AA,AN i i Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-7 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD 900 849 SALES 2 2416 1.0 CD 900 * 890 SALES 3 2416 1.0 CD 900 * 836 SALES 4 2416 1.0 CD 900 * 860 TOTAL 3600 3435 RETURN TOTAL N/S 0 1 OSA 3600 3435 TOTAL 3600 3435 i (1)100%OSA i I Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-8 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD 875 * 915 SALES 2 2416 1.0 CD 875 * 877 SALES 3 2416 1.0 CD 875 * 942 SALES 4 2416 1.0 CD 875 880 TOTAL 3500 3614 RETURNI SALES 1 24 X 24 1.0 RG N/S * 1509 SALES 2 24 X 24 1.0 RG N/S * 1564 TOTAL N/S 3073 OSA ROOF 1 54 X 24 9.0 SO 380 42 396 44 TOTAL 380 396 �I i I i Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-9 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD 875 909 SALES 2 2416 1.0 CD 875 * 923 SALES 3 2416 1.0 CD 875 * 862 SALES 4 2416 1.0 CD 875 881 TOTAL 3500 3575 RET RN U SALES 1 24 X 24 1.0 RG N/S 1604 � SALES 2 24 X 24 1.0 RG N/S * 1556 TOTAL N/S 3160 OSA ROOF 1 54 X 24 9.0 SO 340 38 1 360 40 TOTAL 340 360 Ilh Inland Air Balance, Inc. PROJECT: TARGET T-0359 LOCATION: 29676 RANCHO CALIFORNIA ROAD,TEMECULA JOB NUMBER: 1802-148 DATE: 11/15/2018 FAN DATA Fan Number: RTU-10 RTU-1 1 RTU-12 Location ROOF ROOF ROOF Service SALES SALES SALES Manufacturer CARRIER CARRIER CARRIER Model Number 50HG-T14A 48HG-T14AA 50HG-T14A Serial Number 2807G400 2807G30049 2907G20032 Classification I I I Motor Make/Frame GE-56 HZ MARATHON-56 GE-56 HZ Motor HP(W)/RPM N/S- 1725 N/S- 1725 N/S- 1725 Volts/Phase/Hertz 460-3-60 460-3-60 460-3-60 F.L. Amps/S.F. 4.8- 1.15 4.8- 1.15 4.8- 1.15 Motor Sheave Make N/S N/S N/S Motor Sheave Diam./Bore 4 1/2"OD-3/4" 4 3/4"OD-7/8" 4 1/2"OD-3/4" Fan Sheave Make BROWNING N/S BROWNING Fan Sheave Diam./ Bore BK 140- 1 3/16" 6 1/2"OD- 1 3/16" BK 140- 1 3/16" No. Belts/Make/Size 1 - BROWNING-B 51 1 - BROWNING-B 46 1 - BROWNING - B 57 Sheave &Distance 20% CLOSED 11 1/2" 1 0% CLOSED 16" 20% CLOSED 11 ELi TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL CFM 4700 3220(1) 3780 3627 4700 4460(1) Outside Air CFM 0 0 0 0 0 0 Fan RPM N/S 580 N/S 1215 N/S 569 Total S.P. N/S 0,58" N/S 0.61" N/S 0.72" Voltage 460 477-478-480 460 478-480-480 460 478-480-480 Amperage T1/T2/T3 4.8 4.6-4.7-4.6 4.8- 4.0-4.3-4.3 4.8 4.0-4.0-4.0 VFD Set Point SUCTION SP 0.42 0.18 0.32 DISCHARGE SP 0.16 0.43 0.40 NOTE: (1) DIRTY FILTER READINGS BY: DJ, RB,AA,AN Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-10 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD 1175 * 680 SALES 2 2416 1.0 CD 1175 948 SALES 3 2416 1.0 CD 1175 * 823 SALES 4 2416 1.0 CD 1175 * 769 TOTAL 4700 3220 RETURN SALES 1 24 X 24 1.0 RG N/S * 1506 SALES 2 24 X 24 1.0 RG N/S * 1600 TOTAL N/S 3106 OSA ROOF 1 54 X 24 9.0 SO 0 0 0 0 TOTAL 0 0 Inland Air Balance, Inc. i TARGET T-0359 j TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-11 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD 870 * 831 SALES 2 2416 1.0 CD 870 800 SALES 3 2416 1.0 CD 870 856 SALES 4 2416 1.0 CD 870 * 819 SALES 5 12 X 6 1.0 SD 300 * 321 TOTAL 3780 3627 RETURN SALES 1 24 X 24 1 1.0 RG N/S * 1701 SALES 2 24 X 24 1.0 RG N/S * 1746 TOTAL N/S 3"7 OSA ROOF 1 54 X 24 9.0 SO 0 0 0 0 TOTAL 0 0 I i Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-12 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD N/S * 1168 SALES 2 2416 1.0 CD N/S * 1100 SALES 3 2416 1.0 CD N/S * 1079 SALES 4 2416 1.0 CD N/S * 1113 TOTAL 4700 4460 RETURN SALES 1 24 X 24 1.0 RG N/S * 2109 SALES 2 24 X 24 1.0 RG N/S 2009 TOTAL N/S 4118 OSA ROOF 1 54 X 24 9.0 SO 0 0 0 0 TOTAL 0 0 i Inland Air Balance, Inc. PROJECT: TARGET T-0359 LOCATION: 29676 RANCHO CALIFORNIA ROAD, TEMECULA JOB NUMBER: 1802-148 DATE: 11/15/2018 FAN DATA Fan Number: RTU-13 RTU-14 RTU-15 Location ROOF ROOF ROOF Service SALES SALES STOCK Manufacturer CARRIER CARRIER CARRIER Model Number 50HG-T14A 50HG-T14A 48HG-T14AA Serial Number 2907G20033 2907G20031 2207G50072 1 Classification I I I Motor Make/Frame GE-56 HZ GE- 56 HZ GE-56 HZ 1 Motor HP W /RPM N/S- 1725 N/S- 1725 N/S- 1725 Volts/Phase/Hertz 460-3-60 460-3-60 460-3-60 F.L. Amps/S.F. 4.8- 1.15 4.8- 1.15 4.8- 1.15 Motor Sheave Make BROWNING BROWNING BROWNING Motor Sheave Diam./Bore 4 1/2"OD-3/4" 4 1/2"OD-3/4" AK 46-7/8" j Fan Sheave Make BROWNING BROWNING FENNER DRIVE Fan Sheave Diam./Bore BK 140- 1 3/16" BK 140- 1 3/16" AFD 84- 1" No. Belts/Make/Size 1 - BROWNING-B 51 1 - BROWNING- B 51 1 -BROWNING-A 51 Sheave &Distance FIXED 19" FIXED 19" FIXED 17" TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL CFM 4700 2745(1) 4300 4074 N/S 2725(2) Outside Air CFM 0 0 0 0 0 0 Fan RPM N/S 572 N/S 584 N/S 1206 Total S.P. N/S 1.30" N/S 0.92" N/S 0.92" Voltage 460 478-481-480 460 477-480-468 460 480-480-480 Amperage T1/T2/T3 4.8 4.7-4.6-4.6 4.8 4.4-4.2-4.1 4.8 4.4-4.5-4.5 VFD Set Point SUCTION SP 0.48 0.24 0.40 DISCHARGE SP 0.82 0.68 0.52 NOTE: (1)BLOWER DIRTY, DIRTY FILTER, MOTOR @ FULL LOAD AMPS (2) MOTOR @ FULL LOAD AMPS READINGS BY: DJ, RB,AA,AN Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-13 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD N/S * 665 SALES 2 2416 1.0 CD N/S * 608 SALES 3 2416 1.0 CD N/S * 763 SALES 4 2416 1.0 CD N/S * 709 TOTAL 4700 2745 1 RETURN SALES 1 24 X 24 1.0 RG N/S 1330 SALES 2 24 X 24 1.0 RG N/S * 1294 TOTAL N/S 2624 OSA ROOF 1 54 X 24 9.0 SO 0 0 0 0 TOTAL 0 0 i I (1)DIRTY FILTERS-BLOWER WHEEL DIRTY Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-14 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD 1175 1078 SALES 2 2416 1.0 CD 775 808 SALES 3 2416 1.0 CD 1175 1090 SALES 4 2416 1.0 CD 1175 1098 TOTAL 4300 4074 RETURNI SALES 1 24 X 24 1.0 RG N/S 1987 SALES 2 24 X 24 1.0 RG N/S 1890 TOTAL N/S 3877 OSA ROOF 1 54 X 24 9.0 so 0 0 0 0 TOTAL 0 0 Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-15 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY STOCK 1 12 X 18 1.5 SWS N/S N/S 322 215 STOCK 2 18 X 9 1.12 SWS N/S N/S 345 308 STOCK 3 12 X 18 1.5 SWS N/S N/S 300 200 STOCK 4 18 X 10 1.25 SWS N/S N/S 280 224 STOCK 5 20 X 9 1.25 SWS N/S N/S 195 156 STOCK 6 18 X 10 1.25 SWS N/S N/S 213 170 STOCK 7 24 X 7 1.17 1 SWS N/S N/S 162 138 STOCK 8 24 X 7 1.17 SWS N/S N/S 195 167 STOCK 9 24 X 7 1.17 SWS N/S N/S 210 179 STOCK 10 12"0 0.79 DO N/S N/S 213 270 STOCK 11 12"W 0.79 DO N/S N/S 290 367 TOTAL N/S 2725 RETURN STOCK 1 74 X 24 12.0 SO N/S N/S 2676 223 TOTAL N/S 2676 OSA ROOF 1 54 X 24 9.0 SO N/S N/S 0 0 TOTAL N/S 0 Inland Air Balance, Inc. PROJECT: TARGET T-0359 LOCATION: 29676 RANCHO CALIFORNIA ROAD,TEMECULA JOB NUMBER: 1802-148 DATE: 11/15/2018 FAN DATA Fan Number: RTU-16 RTU-17 RTU-18 Location ROOF ROOF ROOF Service STOCK STOCK PHARMACY Manufacturer CARRIER AAON AAON Model Number 48HG-T14AA 14837 17074 Serial Number 3607G21763 200207-AKGV20914 200207-AKGB21005 Classification I I I Motor Make/Frame GE-56 HZ MARATHON- 142 T N/S-N/S Motor HP W /RPM N/S- 1725 2- 1735 N/S-N/S Volts/Phase/Hertz 460-3-60 460-3-60 460-3-60 F.L. Amps/S.F. 4.8- 1.15 2.9- 1.15 1.7-N/S Motor Sheave Make BROWNING N/S DIRECT DRIVE Motor Sheave Diam./ Bore AK 46-7/8" BK 36-7/8" DIRECT DRIVE Fan Sheave Make FENNER DRIVE N/S DIRECT DRIVE Fan Sheave Diam./ Bore AFD 84- 1" N/A- N/A DIRECT DRIVE No. Belts/Make/Size 1 -BROWNING-A 51 1 -BROWNING-B 59 DIRECT DRIVE Sheave &Distance FIXED 17" FIXED N/A DIRECT DRIVE TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL CFM N/S 3480 N/S 3823 N/S 1597 Outside Air CFM N/S 0 N/S 0 N/S 0 Fan RPM N/S 1213 N/S N/A N/S VARIABLE Total S.P. N/S 1.05" N/S 0.62" N/S 0.72" Voltage 460 477-480-480 460 480-480-480 460 480-480-480 Amperage T1/T2/T3 4.8 4.4-4.3-4.2 2.9 2.6-2.6-2.6 1.7 1.3-1.4-1.3 VFD Set Point SUCTION SP 0.41 0.40 0.32 DISCHARGE SP 0.64 0.22 0.40 NOTE: I READINGS BY: DJ, RB, AA, AN Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-16 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY STOCK 1 24 X 8 1.13 SG N/S N/S 305 270 STOCK 2 24 X 8 1.12 SG N/S N/S 346 306 STOCK 3 20 X 8 0.94 SG N/S N/S 270 1 287 STOCK 4 20 X 8 0.94 SG N/S N/S 410 436 STOCK 5 20 X 14 1.65 SG N/S N/S 416 252 STOCK 6 24 X 8 1.13 SG N/S N/S 300 265 STOCK 7 24 X 8 1.13 SG N/S N/S 306 271 STOCK 8 24 X 8 1.13 SG N/S N/S 280 248 STOCK 9 24 X 8 1.13 SG N/S N/S 213 188 STOCK 10 12"0 0.79 SG N/S N/S 309 391 STOCK 11 12"0 0.79 SG N/S N/S 325 411 TOTAL N/S 3480 RETURN TOTAL N/S 0 OSA ROOF 1 54 X 24 9.0 so N/S N/S 0 0 TOTAL N/S 0 (1)NO ACCESS Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-17 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY STOCK RM 1 12"0 0.79 DUCT N/S N/S 951 1204 STOCK RM 2 12"0 0.79 DUCT N/S N/S 980 1241 STOCK RM 3 12"0 0.79 DUCT N/S N/S 932 1180 STOCK RM 4 12"0 0.79 DUCT N/S N/S 960 1215 TOTAL N/S 3823 RETURN STOCK RM 1 BIRDSCREEN N/S N/S TOTAL N/S 0 2 OSA ROOF 1 20 X 40 5.56 SO N/S N/S 0 0 1 TOTAL N/S 0 I (1)OSA 100%CLOSED (2)NO ACCESS TO RETURN ABOVE STOCK ROOM SHELVING Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-18 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY PHARMACY 1 2416 1.0 CD N/S * 825 PHARMACY 2 1S X 48 X 1 1.0 LD N/S * 194 PHARMACY 3 1S X 48 X 1 1.0 LD N/S * 206 PHARMACY 4 1S X 48 X 1 1.0 LD N/S * 118 PHARMACY 5 1S X 48 X 1 1.0 LD N/S * 92 PHARMACY 6 1S X 48 X 1 1.0 LD N/S * 78 PHARMACY 7 1S X 48 X 1 1.0 LD N/S * 84 TOTAL N/S 1597 RETURN SALES 1 24 X 24 1.0 RG N/S * 1430 TOTAL US 1430 OSA ROOF 1 30 X 20 4.17 SO N/S N/S 0 0 TOTAL N/S 0 Inland Air Balance, Inc. PROJECT: TARGET T-0359 LOCATION: 29676 RANCHO CALIFORNIA ROAD,TEMECULA JOB NUMBER: 1802-148 DATE: 111/15/2018 FAN DATA Fan Number: RTU-19 RTU-20 RTU-21 Location ROOF ROOF ROOF Service STOCK FOOD SERVICE ENTRY Manufacturer AAON AAON YORK Model Number 17074 14837 ZJ090N12 Serial Number 200207-AKGB21006 200207-AKGV20915 NIF8913740 Classification I I I Motor Make/Frame N/S- N/S MARATHON- 145 T CENTURY- 56HZ Motor HP(W)/RPM N/S- N/S 2- 1735 3.0- 1725 Volts/Phase/Hertz 460-3-60 460-3-60 460-3-60 F.L. Amps/S.F. 1.7- N/S 2.9- 1.15 4.7- 1.15 Motor Sheave Make DIRECT DRIVE N/S POWER DRIVE Motor Sheave Diam./ Bore DIRECT DRIVE BK 36-7/8" IVM 50-7/8" Fan Sheave Make DIRECT DRIVE N/S POWER DRIVE Fan Sheave Diam./Bore DIRECT DRIVE N/A- N/A 6 3/4"OD- 1" No. Belts/Make/Size DIRECT DRIVE 1 - BROWNING-B 59 1 - BROWNING-A 54 -Sheave &Distance DIRECT DRIVE FIXED N/A 80% CLOSED 191/2' TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL CFM N/S 1230 N/S 3677 3000 3103 Outside Air CFM N/S 270 N/S 0 N/S 409 Fan RPM N/S VARIABLE N/S N/A 957 N/A Total S.P. N/S 0.44" N/S 1.43" 0.60" 0.76" Voltage 460 478-478-478 460 478-478-478 460 478-480-480 Amperage T1/T2/T3 1.7 1.5-1.4-1.5 2.9— 2,1-2.1-2.1 4.7 3.2-3.1-3.3 VFD Set Point SUCTION SP 0.24 0.51 0.40 DISCHARGE SP 0.20 0.92 0.36 NOTE: READINGS BY: DJ, RB,AA, AN Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-19 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 1S X 48 X 1 1.0 LD N/S 360 SALES 2 1 S X 48 X 1 1.0 LD N/S 395 SALES 3 2408 1.0 CD N/S 139 SALES 4 2408 1.0 CD N/S 151 SALES 5 2408 1.0 CD N/S 185 TOTAL N/S 1230 RETURN SALES 1 24 X 24 1.0 RG N/S- 935 TOTAL N/S 935 OSA ROOF 1 36 X 12 3.0 so N/S N/S 270 90 TOTAL N/S 270 Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-20 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY STARBUCKS 1 2412 1.0 CD 400 * 370 STARBUCKS 2 2412 1.0 CD 400 * 365 STARBUCKS 3 2412 1.0 CD 400 * 388 STARBUCKS 4 2412 1.0 CD 400 * 375 STARBUCKS 5 2412 1.0 CD 400 * 370 STARBUCKS 6 2412 1.0 CD 400 380 STARBUCKS 7 12 X 12 1.0 CD 200 * 202 STARBUCKS 8 12 X 12 1.0 CD 200 * 220 STARBUCKS 9 2412 1.0 CD 600 495 STARBUCKS 10 2416 1.0 CD 600 * 512 TOTAL 4000 3677 RETURN STARBUCKS 1 24 X 24 1 1.0 RG N/S * 556 OPEN 2 24 X 48 1.0 RG N/S 2265 TOTAL N/S 2821 OSA ROOF 1 20 X 4 SO N/S N/S 0 0 TOTAL N/S 0 1 l i (1)OSA CLOSED 100% Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET S RTU-21 DATE: 11/1 5 2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY ENTRY 1 1 S X 48 X 1 1.0 LD 200 * 213 ENTRY 2 1 S X 48 X 1 1.0 LD 200 208 ENTRY 3 1SX48X11 1.0 LD 200 210 ENTRY 4 1S X 48 X 1 1.0 LD 200 213 ENTRY 5 1S X 48 X 1 1.0 LD 200 * 195 ENTRY 6 1S X 48 X 1 1.0 LD 500 536 ENTRY 7 1S X 48 X 1 1.0 LD 500 * 540 ENTRY 8 1 S X 48 X 1 1.0 LD 500 * 504 ENTRY 9 1SX48X11 1.0 LD 500 * 484 TOTAL 3000 3103 RETURN ENTRY 1 30 X 24 1.0 RG N/S * 1551 ENTRY 2 30 X 24 1.0 RG N/S * 1490 TOTAL N/S 3041 OSA ROOF 1 30 X 20 4.17 SO N/S N/S 409 98 TOTAL N/S 409 Inland Air Balance, Inc. PROJECT: TARGET T-0359 LOCATION: 29676 RANCHO CALIFORNIA ROAD,TEMECULA JOB NUMBER: 1802-148 DATE: 11/15/2018 FAN DATA Fan Number: RTU-22 Location ROOF Service SALES Manufacturer ADDISON Model Number PROA210C5A4A Serial Number 171212701002 Classification I Motor Make/Frame WEG- 182 4T Motor HP W /RPM 3.0- 1765 Volts/Phase/Hertz 460-3-60 F.L. Amps/S.F. 3.86- 1.15 Motor Sheave Make DIRECT DRIVE Motor Sheave Diam./ Bore DIRECT DRIVE Fan Sheave Make DIRECT DRIVE Fan Sheave Diam./ Bore DIRECT DRIVE No. Belts/Make/Size DIRECT DRIVE Sheave&Distance DIRECT DRIVE TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL CFM 3600 3969 1 Outside Air CFM 3600 3969 Fan RPM N/S NVL Total S.P. 1.001, 0.25" Voltage 460 480-480-479 Amperage T1/T2/T3 3.86 2.4-2.1-2.2 VFD Set Point 56 HZ SUCTION SP 0.05 DISCHARGE SP 0.20 NOTE: (1)SCHEDULE DOES NOT MATCH PRINTS READINGS BY: DJ RB AA AN Inland Air Balance, Inc. TARGET T-0359 TEST AND BALANCE REPORT TEMECULA DIFFUSER AND GRILLE TEST SHEET RTU-22 DATE: 11/15/2018 Readings by: JOB NO: 1802-148 ZONE ROOM OUTLET SIZE AK TYPE REQUIRED TEST RESULTS NOTES FACTOR CFM FPM CFM FPM SUPPLY SALES 1 2416 1.0 CD 1200 * 1238 SALES 2 2416 1.0 CD 1200 1210 SALES 3 2416 1.0 CD 1200 * 1106 STOCK 4 10 X 10 1.0 SG 400 * 415 TOTAL 4000 3969 I RETURN TOTAL N/S 0 1 OSA 3969 TOTAL N/S 3969 I I (1)100%OSA Inland Air Balance,Inc. VAV TERMINAL TEST REPORT Project TARGET T-0359 System EXISTING 29676 RANCHO CALIFORNIA ROAD, TEMECULA Date 11/15/2018 Job# 1802-148 VAV TERMINAL DATA NUMBER VAV-8-01 DESIGN ACTUAL NOTES TYPE DDC PRIMARY MAX AIRFLOW C.F.M. 400 418 SIZE 6" PRIMARY MIN AIRFLOW C.F.M. 105 1 DDC CORRECTION FACTOR 1 HEATING AIRFLOW C.F.M. 105 _ 1 VAV OUTLET DATA ROOM OUTLET SIZE AK TYPE REQUIRED ACTUAL FACTOR' MAX MIN MAX MIN 249 1 1 S X 48 X 1 1.0 LD 200 210 249 2 1S X 48 X 1 1.0 LD 200 208 TOTAL 400 105 418 1 VAV TERMINAL DATA NUMBER VAV-9-01 DESIGN ACTUAL NOTES TYPE DDC PRIMARY MAX AIRFLOW C.F.M. 300 327 SIZE 6" PRIMARY MIN AIRFLOW C.F.M. 80 1 DDC CORRECTION FACTOR 1 HEATING AIRFLOW C.F.M. 80 1 VAV OUTLET DATA ROOM OUTLET SIZE AK TYPE REQUIRED ACTUAL FACTOR' MAX MIN MAX MIN 244 1 1S X 48 X 1 1.0 LD 150 161 244 2 1 S X 48 X 1 1.0 LD 150 166 TOTAL 300 80 327 1 NOTE If AK=1 0,Velocity information and measurements are not required Readings By: DJ,RB,AA,AN NOTES- (1)UNABLE TO CONTROL i Inland Air Balance, Inc. 482 W.Arrow Hwy.St.C San Dimas,CA.91773 (909)305-4881 LIC#837772 Air Balance Project Summary PROJECT: TARGET T-0359-RANCHO CALIFORNIA-TEMECULA(TAB) JOB# 1802-148 TECHNICIAN: DJ, RB,AA,AN DATE 11/15/2018 CONTRACTOR: RHINO MECHANICAL RTU-3 MOTOR @ FULL LOAD AMPS RTU-4 FILTER DIRTY-MOTOR @ FULL LOAD AMPS RTU-5 FILTER DIRTY-MOTOR @ FULL LOAD AMPS RTU-7 100%OSA RTU-8 FILTER DIRTY-MOTOR @ FULL LOAD AMPS RTU-9 FILTER DIRTY-MOTOR @ FULL LOAD AMPS RTU-10 FILTER DIRTY-MOTOR @ FULL LOAD AMPS RTU-12 FILTER DIRTY-MOTOR @ FULL LOAD AMPS RTU-13 BLOWER DIRTY-FILTER DIRTY-OSA SHUT-MOTOR @ FULL LOAD AMPS RTU-15 MOTOR @ FULL LOAD AMPS RTU-17 OSA CLOSED 100% NO ACCESS TO RETURN ABOVE STOCK ROOM SHELVING RTU-20 OSA CLOSED 100% ' RTU-22 SCHEDULE DOES NOT MATCH PRINTS I i r September 21, 2017 EIN: 26-1350484 CSLB#: 908987 WC Policy#: RWC C6438837A I:E. :ivi0i'aC10 VvcSt CJIiSti iiCii�i�—i3iiiiulf�� r�erlfliLs All, I, Kevin Fox, President of Colorado West Construction, Inc. authorize Christina Serrano to pull permits and/or business licenses for any and all Colorado West Construction projects. Thank you, Y Kevin Fox President KF/Ik Attachments(s) License # 908987 0. 951.514.4942 F. 951.848.9334 GENERAL CONSTRUCTION • TENANT IMPROVEMENTS RE-MODELS Drive27705 Commerce Center CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE§ 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness, accuracy,or validity of that document. State of Calif nia ) County of 'L_-I\JO On — before me, U Date `— Here Insert Name nd Title of th Officer personally appeared V Name(s)of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s)on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. a AL L.E.KUSSMAN NotaryPublic-California z SignatujSigna s Riverside County = Commission#2179912 re of Nota�Publ�ic � My Comm.Expires Jan 15,2021 Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Signer's Name: ❑ Corporate Officer — Title(s): F1 Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑General Ll Partner — ❑ Limited CI General ❑ Individual ❑Attorney in Fact ❑ Individual ❑Attorney in Fact ❑Trustee ❑ Guardian or Conservator ❑Trustee ❑ Guardian or Conservator ❑Other: 11 Other: Signer Is Representing: Signer Is Representing: 02016 National Notary Association •www.NationalNotary.org • 1-800-US NOTARY(1-800-876-6827) Item #5907 I CQuest Consultants Inc. 1342 N.Benson Ave.,Unit B CCM Upland,CA 91786 CQuestConsultantslnc. �' ~ G` ��� Office I Fax:(909)767-6300 ENGINFERING,TESTING, AND INSPECTION I June 2, 2020 CQuest Job No.: 1620-0559 Mr. Bob Meza c/o Colorado West Construction 2775 Commerce Center Drive Temecula, CA 92590 Subject: FINAL SPECIAL INSPECTION REPORT(SPECIALS) TARGET#0359 T.I. 29676 RANCHO CALIFORNIA RD. TEMECULA,CALIFORNIA PERMIT NO.: B18-0965 Dear Mr. Meza: As per your request, CQuest Consultants Inc. has provided this final inspection report for the above-referenced project site. We have prepared this report with our findings based on the inspection(s) performed on the dates of January 31, 2020 and February 25,2020. The inspection(s) performed included: • Bolt torque testing, as noted on the field reports; To the best of our professional knowledge, the required quality control testing services are in compliance with specified requirements, construction documents and the 2019 California Building Code and other government and/or city requirements. *CQUEST accepts no responsibility for areas not observed or tested by a representative of our firm. If you should have any questions or need further assistance, please do not hesitate to contact our office at (909) 767-6300. Sincerely, i) _ Darren Coleman Technical Director ICC No. 8178003 will, 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)7676300 CQUeStCOnSlultantSine_ www.cquestinc.com ENGINEERING. TFSTINH AND INSPFCTIDN SPECIAL INSPECTION REPORT Project Name: Target#0359 Project Number: 1619-0559 Project Location: 29676 Rancho California Rd.,Temecula Date: 1-31-2020 Site Contact: Adamw/cwc Time: 4 Weather: Mild/Clear Inspector: D. Coleman (ICC 8178003) Misc: ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑Wood-frame ❑ Concrete Sampling ❑Masonry Sampling ❑ Welding ❑Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing ✓❑Anchor Torque Test ❑ Special Inspection Items, Locations, and Comr—nt, Per the request of CWC, a CQuest representative has arrived to perform Torque Testinq on the Rackinq/Shelving in the warehouse areas. Testinq is being performed per ESR 3889 on selected Bolts. Testinq conducted has found the bolts to not be properly installed, and will require further work before passinq results can be achieved. Contractor is to reschedule inspection when ready. Deficiencies: ❑✓ Yes / ❑ No Bolts not tightened to proper Torque, per plans and specifications. Samples: ❑Concrete ❑ Grout ❑ Mortar ❑ Masonry Prisms ❑ To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. Inspector Signature Representative/Superintendent Signature 1342 N.Benson Ave.,Unit B . Upland,CA 91786 Office I Fax:(909)7676300 CQuestConsultantslnc. www.cquestinc.com ENGINFFRING. TESTING. ANO INSPECTION SPECIAL INSPECTION REPORT Project Name: Target#0359 Project Number: 1619-0559 Project Location: 29676 Rancho California Rd.,Temecula Date: 2-25-2020 Site Contact: Adamwicwc Time: 4 Weather: Mild/Clear Inspector: D. Coleman (ICC 8178003) Misc: ❑Concrete Reinforcement ❑Masonry Reinforcement ❑Structural Steel ❑wood-frame ❑ Concrete Sampling ❑Masonry Sampling ❑ Welding ❑Shearwall ❑ Prestressed Concrete ❑ High Strength Grout ❑ High Strength Bolts ❑Roofing ❑ Epoxy Bolts/Anchors ❑ Fireproofing ✓❑ Anchor Torque Test ❑ Special Inspection Items, Locations, and Lji'ii rents Per the request of CWC, a CQuest representative has arrived to perform Torque Testinq on the Rackinq/Shelvinq in the warehouse areas. Testinq is being performed per ESR 3889 on selected Bolts. Testinq conducted has found the bolts to be properly installed meeting or exceeding the requirements of the Approved plans and specifications. Deficiencies: ❑✓ Yes / ❑ No Samples: ❑concrete ❑ Grout ❑ Mortar ❑ Masonry Prisms ❑ To the best of my professional knowledge this inspection was performed in accordance with the Plans,Specifications,and Governing Codes for this project. Inspector Signature Representative/Superintendent Signature J IHIt Vr I,HLWUKMIH p, O%F OUTDOOR AIR ACCEPTANCE //��/J .101 CEC-NRCA-MCH-02-A(Revised 12115) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 1 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tog: System Location or Area Served: DHU-22 Sales Floor Note:Submit one Certificate of Acceptance for each system Enforcement Agency Use: Checked by/Date that must demonstrate compliance. Intent: Verify measured outside airflow reading is within 10%of the total required outside airflow.Required for all newly installed HVAC units. Reference MECH-3C(Column H or Column I)or Mechanical Equipment Schedules. I A. Construction Inspection Note:MCH-02-A can be performed in conjunction with MCH-07-A Supply Fan VFD Acceptance(if applicable)since testing activities overlap. 1. Supporting documentation needed to perform test includes: a. As-built and/or design documents(for example,Mechanical Equipment Schedules,Equipment Start-Up Sheets or Balancing Reports). b. 2013 Building Energy Efficiency Standards Nonresidential Compliance Manual(NA7.5.1.1 Ventilation Systems:Variable Air Systems At-A-Glance and NA7.5.1.2 Constant Volume Systems Outdoor Air Acceptance At-A-Glance). C. 2013 Building Energy Efficiency Standards. 2. Instrumentation needed to perform test includes: a. Watch b. Calibrated means to measure airflow(i.e.hot-wire anemometer,velocity pressure probe,etc.). i. Method and equipment used: anemometer ii. Equipment calibration date(must be within one year): 3. System type(check either VAV or CAV): ❑ VAV ❑✓ CAV a. Check if Variable Air Volume(VAV)and complete the following: i. Outside airflow is either factory calibrated or field calibrated. ❑ Check if factory calibrated and attach calibration certification. ❑ Check if field calibrated and attach calibration results. ii. Damper Control(must be checked): ✓❑ Dynamic damper control is being used to control outside air. (This is NOT a fixed minimum position). iii. One of the following dynamic controls is being utilized to control outside air(check method used) F✓ Outdoor Air CFM Compensation ❑ Energy Balance Method ❑ Demand Control Ventilation ❑ Return Fan Tracking ❑ Injection Fan Method ❑ Dedicated Minimum Ventilation Damper with Pressure Control ❑ Other Active Control,Describe: b. Check if Constant Air Volume(CAV)and verify the following: © System is designed to provide a fixed minimum OSA when the unit is on. 4. Method of delivering outside air to the unit(check one of the following): ❑ Outside air is ducted to the return air plenum. Confirm that outside air is ducted to either(check one of the following): ❑ i Within five ft.of the unit. ❑ Within 15 ft.of the unit,with the air directed substantially toward the unit. ❑t/ Return air plenum is NOT used to distribute outside air to the unit. Le.outside air is ducted directly to the unit or outside air is provided independent of the unit. 5. Pre-occupancy purge has been programmed for the 1-hour period immediately before the building is normally occupied to provide(one of the following methods must be verified and checked): ❑ The conditioned floor area times the ventilation rate from the 2013 Building Energy Efficiency Standards TABLE 120.1-A,or 15 cfm per person times the expected number of occupants,whichever is less. © 3 complete air changes to the zone served by the air handler. CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 J IAI t Ur UAL.It-UKNIA OUTDOOR AIR ACCEPTANCE .1 lilt CEC-NRCA-MCH-02-A Revised 12/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 2 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: DHU-22 Sales Floor B. NA7.5.1.1 Outdoor Air Acceptance Functional Testing © cav ❑ vAv Step 1:Disable demand control ventilation(if applicable) Ste 2:Verify unit is not in economizer mode during test economizer disabled).P fY g ( ❑ ❑ Note:Shaded boxes do not apply for CAV systems Step 3:CAV and VAV testing at full supply airflow Adjust supply air to achieve design airflow or maximum airflow at full a. cooling. Record VFD speed(Hz). Hz b. Measured outdoor airflow reading(cfm) 3969 cfm cfm C. Required outdoor airflow(cfm)(from MECH-3C, Column 1,or 3600 Mechanical Equipment Schedules). cfm cfm d Time for outside air damper to stabilize after full supply airflow is achieved (minutes): min Step 4:VAV testing at reduced supply airflow CAV VAV a. Adjust supply airflow to either the sum of the minimum zone airflows,full heating,or 30%of the total design airflow. Record VFD speed(Hz). Hz b. Measured outdoor airflow reading(cfm) cfm C. Required outdoor airflow(cfm)(from MECH-3C, Column 1,or mechanical equipment schedules). cfm d. Time for outside air damper to stabilize after reduced supply airflow is achieved(minutes): min Step 5:Return to initial conditions(check) © ❑ C. Testing Calculations& Results Determine Percent Outside Air at full supply airflow(%OAFA)for Step 3 a. %OAFA=Measured outdoor airflow reading/Required outdoor airflow(Step3b/Step3c) 1.10 % % b. %OAFA is within 10%of design Outside Air. (%OAFA<_110%) Yes Q No Q Yes p No p C. Outside air damper position stabilizes within 5 minutes(Step 3d<5 minutes) Yes p No O Determine Percent Outside Air at reduced supply airflow(%OARA)for Step 4(VAV only) a. %OARA=Measured outdoor airflow reading/Required outdoor airflow reading(Step4b/Step4c) % b. %OARA is within 10%of design Outside Air. (OARA<_110%) Yes p No Q C. Outside air damper position stabilizes within 5 minutes(Step 4d<5 minutes) Yes Q No Q Note:The intent of this test is to ensure that 1)all air handlers provide the minimum amount of OSA and 2)VAV air handlers use dynamic controls to avoid over ventilation. D. Evaluation F PASS:All Construction Inspection responses are complete and Testing Calculations&Results responses are positive (Y-yes) CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 A IAIt Ut-LALIf-UKN1A OUTDOOR AIR ACCEPTANCE A& CEC-NRCA-MCH-02-A(Revised 12/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 3 of 3) Project Name:Target T0359 Enforcement Agency City of Temecula Permit Number, Project Address. City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: DHU-22 Sales Floor DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name:Jonathan Koop Documentation Author Signature _1/ � A/& /1 Documentation Author Company Name: Date Signed: Rhino Mechanical,Inc. 11-16-18 Address:1638-A W 9th Street ATT Certification Identification(If applicable): City/State/zip:Upland,CA 91786 Phone:909 920-6004 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. I am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: Field Technician Signature: Aaron Per Inland Air Balance report Field Technician Company Name:Inland Air Balance Position with Company(Title):Technician Address: ATT Certification Identification(if applicable): 482 W Arrow Hwy I city/state/Zip:San Dimas,CA 91773 Phone:909 305-4881 Date Signed:11-16-18 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. 1 am the Field Technician,or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,construction or installation of features,materials,components,or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement(responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. 5. 1 will ensure that a completed,signed copy of this Certificate of Acceptance shall be posted,or made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: Responsible Acceptance Person Signature: Jonathan Koop BB Responsible Acceptance Person Company Name: Position with Company(Title): Rhino Mechanical,Inc. Estimato roject Manager Address: CSLB License: 1638-A W 9th Street 551799 city/State/Zip:Upland,CA 91786 Phone:909 920-6004 Date Signed:11-16-18 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 J IAI t Vr UALIrVKNIA OUTDOOR AIR ACCEPTANCEIffil CEC-NRCA-MCH-02-A Revised 12/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 1 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification rag: System Location or Area Served: DHU-7 Sales Floor Note:Submit one Certificate of Acceptance for each system Enforcement Agency Use: Checked by/Date that must demonstrate compliance. Intent: Verify measured outside airflow reading is within 10%of the total required outside airflow.Required for all newly installed HVAC units. Reference MECH-3C(Column H or Column/)or Mechanical Equipment Schedules. A. Construction Inspection Note:MCH-02-A can be performed in conjunction with MCH-07-A Supply Fan VFD Acceptance(if applicable)since testing activities overlap. i 1. Supporting documentation needed to perform test includes: a. As-built and/or design documents(for example,Mechanical Equipment Schedules,Equipment Start-Up Sheets or Balancing Reports). b. 2013 Building Energy Efficiency Standards Nonresidential Compliance Manual(NA7.5.1.1 Ventilation Systems:Variable Air Systems At-A-Glance and NA7.5.1.1 Constant Volume Systems Outdoor Air Acceptance At-A-Glance). C. 2013 Building Energy Efficiency Standards. 2. Instrumentation needed to perform test includes: a. Watch i b. Calibrated means to measure airflow(i.e.hot-wire anemometer,velocity pressure probe,etc.). i. Method and equipment used: anemometer ii. Equipment calibration date(must be within one year): 3. System type(check either VAV or CAV): ❑ VAV ❑✓ CAV a. Check if Variable Air Volume(VAV)and complete the following: I i. Outside airflow is either factory calibrated or field calibrated. ❑ Check if factory calibrated and attach calibration certification. ❑ Check if field calibrated and attach calibration results. ii. Damper Control(must be checked): ❑✓ Dynamic damper control is being used to control outside air. (This is NOT a fixed minimum position). iii. One of the following dynamic controls is being utilized to control outside air(check method used) ❑✓ Outdoor Air CFM Compensation ❑ Energy Balance Method ❑ Demand Control Ventilation ❑ Return Fan Tracking ❑ Injection Fan Method ❑ Dedicated Minimum Ventilation Damper with Pressure Control ❑ Other Active Control,Describe: b. Check if Constant Air Volume(CAV)and verify the following: © System is designed to provide a fixed minimum OSA when the unit is on. 4. Method of delivering outside air to the unit(check one of the following): ❑ Outside air is ducted to the return air plenum. Confirm that outside air is ducted to either(check one of the following): ❑ Within five ft.of the unit. ❑ Within 15 ft.of the unit,with the air directed substantially toward the unit. © Return air plenum is NOT used to distribute outside air to the unit. Le.outside air is ducted directly to the unit or outside air is provided independent of the unit. 5. Pre-occupancy purge has been programmed for the 1-hour period immediately before the building is normally occupied to provide(one of the following methods must be verified and checked): ❑ The conditioned floor area times the ventilation rate from the 2013 Building Energy Efficiency Standards TABLE 120.1-A,or 15 cfm person times the expected number of occupants, per p p ccupa ts,whichever is less. © 3 complete air changes to the zone served by the air handier. CA BuildingEnergy Efficient Standards-2013 Nonresidential Compliance gY Y December 2015 JIAIt VY I,HLIrVKNIH OUTDOOR AIR ACCEPTANCE fill CEC-NRCA-MCH-02-A(Revised 12/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 2 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. 92591 System Name or Identification/Tag: System Location or Area Served: DHU-7 Sales Floor B. NA7.5.1.1 Outdoor Air Acceptance Functional Testing © cav ❑ VAV Step 1:Disable demand control ventilation(if applicable) Step 2:Verify unit is not in economizer mode during test(economizer disabled). ❑ ❑ Note:Shaded boxes do not apply for CAV systems Step 3:CAV and VAV testing at full supply airflow Adjust supply air to achieve design airflow or maximum airflow at full a' cooling. Record VFD speed(Hz). Hz b. Measured outdoor airflow reading(cfm) 3435 cfm cfm C. Required outdoor airflow(cfm)(from MECH-3C,Column 1,or 3600 Mechanical Equipment Schedules). cfm cfm d Time for outside air damper to stabilize after full supply airflow is achieved (minutes): min Step 4:VAV testing at reduced supply airflow CAV VAV a. Adjust supply airflow to either the sum of the minimum zone airflows,full heating,or 30%of the total design airflow. Record VFD speed(Hz). Hz b. Measured outdoor airflow reading(cfm) cfm C. Required outdoor airflow(cfm)(from MECH-3C,Column 1,or mechanical equipment schedules). cfm d. Time for outside air damper to stabilize after reduced supply airflow is achieved(minutes): min Step 5:Return to initial conditions(check) © ❑ C. Testing Calculations& Results Determine Percent Outside Air at full supply airflow(%OAFA)for Step 3 a. %OAFA=Measured outdoor airflow reading/Required outdoor airflow(Step3b/Step3c) 0.95 % % b. %OAFA is within 10%of design Outside Air. (%OAFA S 110%) Yes Q No Q Yes Q No p C. Outside air damper position stabilizes within 5 minutes(Step 3d<5 minutes) Yes p No Q Determine Percent Outside Air at reduced supply airflow(%OARA)for Step 4(VAV only) a. %OARA=Measured outdoor airflow reading/Required outdoor airflow reading(Step4b/Step4c) % b. %OARA is within 10%of design Outside Air. (OARA S 110%) Yes Q No Q C. Outside air damper position stabilizes within 5 minutes(Step 4d<5 minutes) Yes O No Q ' Note:The intent of this test is to ensure that 1)all air handlers provide the minimum amount of OSA and 2)VAV air handlers use dynamic j controls to avoid over ventilation. i D. Evaluation PASS:All Construction Inspection responses are complete and Testing Calculations&Results responses are positive (Y-yes) l I CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 JIAIt Vr UTALIrVKNIH OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A(Revised 12/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 3 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: DHU-7 Sales Floor DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Jonathan Koop 'Ot� 04 Documentation Author Company Name: Date Signed: Rhino Mechanical,Inc. 11-16-18 Address:1638-A W 9th Street ATT Certification Identification(If applicable): City/State/Zip:Upland,CA 91786 Phone:909 920-6004 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: Field Technician Signature: Aaron Per Inland Air Balance report Field Technician Company Name: Position with Company(Title): Inland Air Balance Technician Address:482 W Arrow Hwy ATT Certification Identification(if applicable): City/State/Zip:San Dimas,CA 91773 Phone:909 305-4881 Date Signed:11-16-18 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. 1 am the Field Technician,or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,construction or installation of features,materials,components,or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement(responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s)issued for the building. 5. 1 will ensure that a completed,signed copy of this Certificate of Acceptance shall be posted,or made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: Responsible Acceptance Person Signature: Jonathan Koop Responsible Acceptance Person Company Name: Position with Company(Title): Rhino Mechanical,Inc. EstimatorA1040ject Manager Address:1638-A W 9th Street CSLB License:551799 City/State/zip:Upland,CA 91786 Phone:909 920-6004 Date Signed:11-16-18 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 J 1AIt Ur't.HLII-VKNIt% CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A Revised 12/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume,Single Zone, Unitary(Packaged and Split)Air Conditioner and Heat Pump Systems (Page 1 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: DHU-7 Sales Floor Note: Submit one Certificate of Acceptance for each system that must Enforcement Agency Use: Checked by/Date demonstrate compliance. A. Construction Inspection 1. Supporting documentation needed to perform test includes,but not limited to: a. 2013 Building Energy Efficiency Standards Nonresidential Compliance Manual(NA7.5.2 Constant Volume,Single-zone, Unitary Air Conditioner and Neat Pumps Systems Acceptance At-A-Glance). b. 2013 Building Energy Efficiency Standards Manual. 2. Instrumentation to perform test includes,but not limited to: a. Temperature Meter b. Amp Meter 3. Installation(check if applies): Q Thermostat is located within the space-conditioning zone that is served by the HVAC system. 4. Programming(check all those that apply): ❑✓ Thermostat meets the temperature adjustment and dead band requirements of 2013 Building Energy Efficiency Standards Manual section 120.2(b). Minimum heating setpoint: 0F. Maximum cooling setpoint 0F. Deadband: 0F. ❑✓ Occupied,unoccupied,and holiday schedules have been programmed per the facility's schedule. © Pre-occupancy purge has been programmed to meet the requirements of 2013 Building Energy Efficiency Standards Manual section 120.1(c)2. 1. Check method used to determine pre-occupancy purge: ❑ Lesser of:conditioned floor area times ventilation rate from 2013 Building Energy Efficiency Standards TABLE 120.1-A or 15cfm per person times the expected number of occupants. ❑ 3 complete air changes. Notes: CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 a i N t t yr�HurvnntH CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A Revised 12/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume,Single Zone, Unitary(Packaged and Split)Air Conditioner and Heat Pump Systems (Page 2 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number. Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: DHU-7 Sales Floor B. Functional Testing Requirements Operating Modes Step 1:Disable economizer control and demand-controlled ventilation(if applicable)to prevent unexpected interactions. Occupied Mode Step 2:Heating load during occupied condition Step 3: No-load during occupied condition Step 4:Cooling load during occupied condition Unoccupied Mode Step 5:No-load during unoccupied condition Step 6: Heating load during unoccupied condition Step 7: Cooling load during unoccupied condition Step 8: Manual override 8 7 6 5 4 3 2 Step 2—8:Check and verify the following for each simulation mode required a. Supply fan operates continually b. Supply fan turns off C. Supply fan cycles on and off Y/ I/ d. System reverts to'occupied"mode to satisfy any condition e. System turns off when manual override time period expires f. Gas-fired furnace, heat pump,or electric heater stages on g. No heating is provided by the unit �/ V/ h. No cooling is provided by the unit �/ V/ V/ ,/ i. Compressor stages on V/ j. Outside air damper is open to minimum position �/ V/ V/ V/ V/ k. Outside air damper closes completely V V( Step 9:System returned to initial operating conditions after all tests have been completed: Yes Q No O E Testing Results a 7 615 aE31icate if Passed(P), Failed(F),or N/A(X),fill in appropriate letter P P P D. Evaluation L� I PASS:All Construction Inspection responses are complete and all applicable Testing Results responses are"Pass"(P) CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 J I H I t Vr k ALtt-UKNIH CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A Revised 12/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume,Single Zone, Unitary(Packaged and Split)Air Conditioner and Heat Pump Systems (Page 3 of 3) Project Name Target T0359 EnforcementCity of Temecula Agency: Permit Number Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag. System Location or Area Served: DHU-7 Sales Floor DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Jonathan Koop Documentation Author Company Name:Rhino Mechanical,InC. Date Signed:11-12-18 Address:1638-A W 9th Street ATT Certification Identification(If applicable): City/state/zip:Upland,CA 91786 Phone:909-920-6004 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name:Jose Alfaro Field Technician Signature: Field Technician Company Name: Position with Company(Title): Rhino Mechanical,Inc. Service Technician I Address: ATT Certification Identification(if applicable): 1638-A W 9th Street City/State/zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. 1 am the Field Technician,or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,construction or installation of features,materials,components,or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement(responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s)issued for the building. 5. 1 will ensure that a completed,signed copy of this Certificate of Acceptance shall be posted,or made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name:Jonathan Koop Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Position with Company(Title): Rhino Mechanical,Inc. Estimator roject Manager i Address:1638-A W 9th Street CSLB License: 551799 City/State/Zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 I/A I t:UP-t,/ALI1-UKNI/A CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A(Revised 12/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume,Single Zone, Unitary(Packaged and Split)Air Conditioner and Heat Pump Systems (Page 1 of 3) Project Name: Enforcement Agency: Permit Number: Target T0359 City of Temecula —Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag:DHU-22 System Location or Area Served:Market/Sales Floor Note: Submit one Certificate of Acceptance for each system that must Enforcement Agency Use: Checked by/Date demonstrate compliance. A. Construction Inspection 1. Supporting documentation needed to perform test includes,but not limited to: a. 2013 Building Energy Efficiency Standards Nonresidential Compliance Manual(NA7.5.2 Constant Volume,Single-zone, Unitary Air Conditioner and Heat Pumps Systems Acceptance At-A-Glance). b. 2013 Building Energy Efficiency Standards Manual. 2. Instrumentation to perform test includes,but not limited to: a. Temperature Meter b. Amp Meter 3. Installation(check if applies): 7 Thermostat is located within the space-conditioning zone that is served by the HVAC system. 4. Programming(check all those that apply): Thermostat meets the temperature adjustment and dead band requirements of 2013 Building Energy Efficiency Standards Manual section 120.2(b). Minimum heating setpoint: 0 F. Maximum cooling setpoint OF. Deadband: 0 F. Occupied,unoccupied,and holiday schedules have been programmed per the facility's schedule. Pre-occupancy purge has been programmed to meet the requirements of 2013 Building Energy Efficiency Standards Manual section 120.1(c)2. 1. Check method used to determine pre-occupancy purge: ❑ Lesser of:conditioned floor area times ventilation rate from 2013 Building Energy Efficiency Standards TABLE 120.1-A or 15cfm per person times the expected number of occupants. 3 complete air changes. Notes: CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 J IAIt VF U/i L It UK IVIH CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A Revised 12/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume,Single Zone, Unitary(Packaged and Split)Air Conditioner and Heat Pump Systems (Page 2 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served. DHU-22 Market/Sales Floor B. Functional Testing Requirements Operating Modes Step 1:Disable economizer control and demand-controlled ventilation(if applicable)to prevent unexpected interactions. Occupied Mode Step 2: Heating load during occupied condition Step 3: No-load during occupied condition Step 4:Cooling load during occupied condition Unoccupied Mode Step 5:No-load during unoccupied condition Step 6: Heating load during unoccupied condition Step 7: Cooling load during unoccupied condition Step 8: Manual override 8 7 6 5 4 3 2 Step 2—8:Check and verify the following for each simulation mode required a. Supply fan operates continually ✓ V/ b. Supply fan turns off C. Supply fan cycles on and off d. System reverts to'occupied"mode to satisfy any condition e. System turns off when manual override time period expires f. Gas-fired furnace, heat pump,or electric heater stages on g. No heating is provided by the unit h. No cooling is provided by the unit i. Compressor stages on j. Outside air damper is open to minimum position V V V k. Outside air damper closes completely ✓ �/ Step 9:System returned to initial operating conditions after all tests have been completed: Yes (�j) No O E. Testing Results s 7 6 5 4 3 2 Indicate if Passed(P),Failed(F),or N/A(X),fill in appropriate letter P P P P P P P D. Evaluation U PASS:All Construction Inspection responses are complete and all applicable Testing Results responses are"Pass"(P) CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 I .71HIt Vt'I.HLIrVKNIH CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A Revised 12/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume,Single Zone, Unitary(Packaged and Split)Air Conditioner and Heat Pump Systems (Page 3 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address, City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or I dent ification/Tag. System Location or Area Served: DHU-22 Market/Sales Floor DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Jonathan Koop 619 Documentation Author Company Name:Rhino Mechanical,Inc. Date Signed:11-12-18 Address:1638-A W 9th Street ATT Certification Identification(If applicable): City/state/zip:Upland,CA 91786 Phone:909-920-6004 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name:Jose Alfaro Field Technician Signature: Field Technician Company Name:Rhino Mechanical,Inc. Position with Company(Title):Technician Address:1638-A W 9th Street ATT Certification Identification(if applicable): City/state/Zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. 1 am the Field Technician,or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,construction or installation of features,materials,components,or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement(responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s)issued for the building. 5. 1 will ensure that a completed,signed copy of this Certificate of Acceptance shall be posted,or made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: Responsible Acceptance Person Signature: Jonathan Koop Responsible Acceptance Person Company Name: Position with Company(Title): Rhino Mechanical,Inc. Estimator roject Manager Address:1638-A W 9th Street CSLB License:551799 City/State/zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A(Revised 12/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume,Single Zone, Unitary(Packaged and Split)Air Conditioner and Heat Pump Systems (Page I of 3) Project Name:Target T0359 Enforcement Agency:City of Temecula Permit Number: Project Address: Zip Code: 29676 Rancho California Rd. City:Temecula 92591 System Name or Identification/Tag:RTU-21 System Location or Area Served:New Entry Note., Submit one Certificate of Acceptance for each system that must Enforcement Agency use: Checked by/Date demonstrate compliance. A. Construction Inspection 1. Supporting documentation needed to perform test includes,but not limited to: a. 2013 Building Energy Efficiency Standards Nonresidential Compliance Manual(NA75.2 Constant Volume,Single-zone, Unitary Air Conditioner and Heat Pumps Systems Acceptance At-A-Glance). b. 2013 Building Energy Efficiency Standards Manual. 2. Instrumentation to perform test includes,but not limited to: a. Temperature Meter b. Amp Meter 3. installation(check if applies): Z Thermostat is located within the space-conditioning zone that is served by the HVAC system. 4. Programming(check all those that apply): nv( Thermostat meets the temperature adjustment and dead band requirements of 2013 Building Energy Efficiency Standards Manual section 120.2(b). Minimum heating setpoint: OF. Maximum cooling setpoint OF. Deadband: OF. Z Occupied,unoccupied,and holiday schedules have been programmed per the facility's schedule. Z Pre-occupancy purge has been programmed to meet the requirements of 2013 Building Energy Efficiency Standards Manual section 120.1(c)2. 1. Check method used to determine pre-occupancy purge: F1 Lesser of:conditioned floor area times ventilation rate from 2013 Building Energy Efficiency Standards TABLE 120.1-A or 15cfm per person times the expected number of occupants. Z 3 complete air changes. Notes: CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 .1.I H I t�r l,HurvKnlH CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A Revised 12/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume,Single Zone, Unitary(Packaged and Split)Air Conditioner and Heat Pump Systems (Page 2 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency. Permit Number. Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92541 System Name or Identification/Tag. System Location or Area Served: RTU-21 New Entry B. Functional Testing Requirements Operating Modes Step 1:Disable economizer control and demand-controlled ventilation(if applicable)to prevent unexpected interactions. Occupied Mode Step 2: Heating load during occupied condition Step 3: No-load during occupied condition Step 4:Cooling load during occupied condition Unoccupied Mode Step 5: No-load during unoccupied condition Step 6: Heating load during unoccupied condition Step 7: Cooling load during unoccupied condition Step 8: Manual override 1 8 7 6 5 4 3 2 Step 2—8:Check and verify the following for each simulation mode required a. Supply fan operates continually �/ �/ V/ b. Supply fan turns off C. Supply fan cycles on and off ✓ d. System reverts to"occupied"mode to satisfy any condition e. System turns off when manual override time period expires ✓ f. Gas-fired furnace, heat pump,or electric heater stages on g. No heating is provided by the unit I/ V/ V/ / h. No cooling is provided by the unit �/ ✓ v/ V/ I. Compressor stages on �/ j. Outside air damper is open to minimum position �/ �/ V V/ V k. Outside air damper closes completely I/ V/ Step 9:System returned to initial operating conditions after all tests have been completed: Yes No O C. Testing Results 8 7 6 5 4 3 2 Indicate if Passed(P),Failed(F),or N/A(X),fill in appropriate letter P P P P P P P D. Evaluation U PASS:All Construction Inspection responses are complete and all applicable Testing Results responses are"Pass"(P) CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 J I H I t ill-I.HLIr VKNIH CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS 41& CEC-NRCA-MCH-03-A Revised 12/15 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary(Packaged and Split)Air Conditioner and Heat Pump Systems (Page 3 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency. Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag. System Location or Area Served: RTU-21 New Entry DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name:Jonathan Koop Documentation Author Signature: �� �BB Documentation Author Company Name: Date Signed: Rhino Mechanical,Inc. 11-12-18 Address:1638-A W 9th Street ATT Certification Identification(If applicable): City/state/zip:Upland,CA 91786 Phone:909-920-6004 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name:Jose Alfaro Field Technician Signature: Field Technician Company Name:Rhino Mechanical,Inc. Position with Company(Title):Service Technician Address:1638-A W 9th Street ATT Certification Identification(if applicable): City/State/zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. 1 am the Field Technician,or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,construction or installation of features,materials,components,or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement(responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s)issued for the building. 5. 1 will ensure that a completed,signed copy of this Certificate of Acceptance shall be posted,or made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: Responsible Acceptance Person Signature: Jonathan Koop Af't , 9d Responsible Acceptance Person Company Name:Rhino Mechanical,Inc. Position with Company(Title):Estimator roject Manager Address:1638-A W 9th Street CSLB License:551799 City/State/Zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance December 2015 JIAIt:Ur I ALIT VKNIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A(Revised 01/16) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 1 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: RTU-21 New Entry Note:Submit one Certificate of Acceptance for each system that must Enforcement Agency Use:Checked by/Date demonstrate compliance. A. Construction Inspection 1. Supporting documentation needed to perform test includes: a. 2013 Building Energy Efficiency Standards Nonresidential Compliance Manual(NA7.5.4 Air Economizer Controls Acceptance At-A- Glance). b. 2013 Building Energy Efficiency Standards. 2. Instrumentation to perform test includes: a. Hand-held temperature probe Calibration Date: (must be within last year) b. Device capable of calculating enthalpy Calibration Date: (must be within last year) c. 1.2 k Ohm Resistor(when specified by the manufacturer) 3. Installation:(all of the following boxes should be checked) rV Economizer high limit shutoff control complies with Table 140.4-B found in the 2013 Building Energy Efficiency Standards Section 140.4(e)3. Economizer reliability features are present per 2013 Building Energy Efficiency Standards Section 140.4(e)4: a.5-year manufacturer warranty of economizer assembly b.Provide a product specification sheet proving capability of at least 60,000 actuations c.Provide a product specification sheet proving compliance with AMCA Standard 500 damper leakage at 10 cfm/sf at 1.0 in w.g. A product specification sheet showing the manufacturer's results after following the testing procedures of AMCA Standard 500 or AMCA certification by a third party under AMCA Publication 511 can be used to satisfy this requirement(Class 1A, 1,and 2 are acceptable). d.If the high limit setpoint is fixed dry-bulb or fixed enthalpy+fixed dry-bulb then the control shall have an adjustable setpoint e.Outdoor air,return air,mixed air,and supply air sensors shall be calibrated as follows: i.Drybulb and wetbulb temperatures accurate to±2°F over the range of 40°F to 80'F ii.Enthalpy accurate to±3 Btu/Ib over the range of 20 Btu/Ib to 36 Btu/Ib iii.Relative humidity(RH)accurate to±5%over the range of 20%to 80%RH f.Check that the sensor performance curve(s)is provided by the factory and sensor output values measured during sensor calibration are plotted on the performance curve(s) g.Sensors used for high limit control shall be located to prevent false readings,including but not limited to being properly shielded from direct sunlight. © Unitary systems with an economizer have control systems,including two-stage or electronic thermostats,that cycle compressors off when economizers can provide partial cooling ✓� System has return fan speed control,relief dampers,or dedicated relief fans to prevent building over pressurization in full economizer mode. Q For systems with DDC controls,sensor used for economizer lockout has been factory or field calibrated. ❑ For systems with non-DDC controls,manufacturer's startup and testing procedures have been applied. CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 J IAIt Ur 1.AL.Ir VKMA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A(Revised 01/16) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 2 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or IdentificationJTag: System Location or Area Served: RTU-21 New Entry B. Functional Testing Results Step 1:Disable demand control ventilation systems(if applicable) Step 2:Enable the economizer and simulate a cooling demand large enough to drive the economizer fully open.Verify the following: a. Economizer damper modulates 100%open. Yes e No 0 b. Return air damper modulates 100%closed. Yes @ No 0 C. For systems that meet the criteria of 2013 Building Energy Efficiency Standards Section 140.4(e)1,verify that the economizer remains 100%open with the use of mechanical cooling. This occurs when the cooling demand can no longer be met by the economizer alone. Yes 0 No O d. All applicable fans and dampers operate as intended to maintain building pressure. Yes E) No e• The unit heating is disabled(if applicable). Yes Q No®NA Step 3:Disable the economizer and simulate a cooling demand.Verify the following: a• Economizer damper closes to its minimum position. Yes Q No b. All applicable fans and dampers operate as intended to maintain building pressure. Yes No C. The unit heating is disabled(if applicable). Yes No NA Step 4:If the unit is equipped with heating,simulate a heating demand and enable the economizer.Verify the following: a. Economizer damper closes to its minimum position. Yes Q No© NA Q b. Return air damper opens. Yes(.Q No©NA Q Step 5:Turn off the unit and verify the following: a. Economizer damper closes completely. Yes Q No Q Step 6:System returned to initial operating conditions Yes 0 No C.Testing Results PASS / FAIL Step 2:Simulate cooling load and enable the economizer(all answers are Y). e O Step 3:Simulate cooling load and disable the economizer(all answers are Y). 0 O j Step 4:Simulate heating demand and enable the economizer(all answers are Y). (i) 0 Step 5:Turn off the unit(all answers are Y). 0 D. Evaluation © PASS:All Construction Inspection responses are complete and all Testing Results responses are"Pass" Notes: CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 I b I A It:UF'I,AL I r-UKIVIA AIR ECONOMIZER CONTROLS ACCEPTANCE CEC-NRCA-MCH-05-A(Revised 01/16) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-05-A Air Economizer Controls Acceptance (Page 3 of 3) Project Name-Target T0359 Enforcement Agency:City of Temecula Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or dentification/Tag. System Location or Area Served New New Entry DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature Jonathan Koop �y{�J Documentation Author Company Name: Date Signed: Rhino Mechanical,Inc. 11-12-18 Address:1638-A W 9th Street ATT Certification Identification(If applicable): City/State/zip:Upland,CA 91786 Phone:909 920-6004 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name:Jose Alfaro Field Technician Signature: Field Technician Company Name:Rhino Mechanical,Inc. Position with Company(Title):Service Technician Address:1638-A W 9th Street ATT Certification Identification(if applicable): City/State/Zip: Phone: Date Signed: Upland,CA 91786 909 920-6004 11-12-18 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. 1 am the Field Technician,or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,construction or installation of features,materials,components,or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement(responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building O g. I p p g permit s Issued for the building. i 5. 1 will ensure that a completed,signed copy of this Certificate of Acceptance shall be posted,or made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name:Jonathan Koop Responsible Acceptance Person Signature: t�„� �jBB /1 Responsible Acceptance Person Company Name: Position with Company(Title): Rhino Mechanical,Inc. EstimatogWroject Manager Address CSLB license: 1638-A W 9th Street 551799 I City/State/Zip:Upland,CA 91786 Phone:909 920-6004 Date Signed:11-12-18 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 JIAIt Ur-l./1urlJKn1A DEMAND CONTROL VENTILATION SYSTEMS ACCEPTANCE CEC-NRCA-MCH-06-A(Revised 01/16) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-06-A Demand Control Ventilation Systems Acceptance (Page 1 of 2) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served. DHU-21 New Entry Note:Submit one Certificate of Acceptance for each system that Enforcement Agency Use:Checked by/Date must demonstrate compliance. fased thot systems required to employ demand Controlled ventilation(refer to§121(c)3)can vary outside ventilation flow rates Intent: on maintaining interior carbon dioxide(CO2)concentration setpoints A.Construction Inspection 1 Instrumentation to perform test may include, but not limited to: a.Calibrated hand-held CO'analyzer b.Manufacturer's calibration kit c.Calibrated CO2/air mixtures 2 Installation ❑✓ The sensor is located in the high density space between aft and 6 ft above the floor or at the anticipated level of the occupants' heads. 3 Documentation of all carbon dioxide control sensors includes(check one of the following): a.Calibration method ✓❑ Factory-calibration(certificate calibration cert must be attached) ❑ Field calibrated b.Sensor accuracy ✓❑ Certified by manufacturer to be no more than+/-75 ppm calibration cert must be attached B. Functional Testing Results a. Disable economizer controls b. Outside air CO2 concentration(measured dynamically using CO2 sensor) 400 ppm c. Interior CO2 concentration setpoint(Outside CO2 concentration+600 ppm) 1000 ppm Step 1:Simulate a signal at or slightly above the CO2 setpoint or follow manufacturers recommended testing procedures. ✓❑ For single zone units,outdoor air damper modulates opens to satisfy the total ventilation air called for in the Certificate of Compliance. ❑ For multiple zone units,either outdoor air damper or zone damper modulate open to satisfy the zone ventilation requirements. Step 2:Simulate signal well below the CO2 setpoint or follow manufacturers recommended procedures. ✓❑ For single zone units,outdoor air damper modulates to the design minimum value. ❑ For multiple zone units,either outdoor air damper or zone damper modulate to satisfy the reduced zone ventilation requirements. Step 3:System returned to initial operating conditions Yes © No 0 C. Testing Results PASS / FAIL ❑ Step 1:Simulate a high CO2 load(check box complete) 6i) 0 ❑ Step 2:Simulate a low CO2 load(check box complete) Q 0 D. Evaluation ❑✓ PASS:All Construction Inspection responses are complete and all Testing Results responses are"Pass" CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 J IAI t Ur UAL-It-UK[MIA DEMAND CONTROL VENTILATION SYSTEMS ACCEPTANCE CEC-NRCA-MCH-06-A(Revised 01/16) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-06-A Demand Control Ventilation Systems Acceptance (Page 2 of 2) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: DHU-21 New Entry DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: Jonathan Koop IL 99 Documentation Author Company Name:Rhino Mechanical,Inc. Date Signed:11-12-18 Address:1638-A W 9th Street ATT Certification Identification(If applicable): City/State/zip:Upland,CA 91786 Phone:909-920-6004 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name:Jose Alfaro Field Technician Signature: Field Technician Company Name:Rhino Mechanical,Inc. Position with Company(Title):Service Technician Address:1638-A W 9th Street ATT Certification Identification(if applicable): City/state/zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. 1 am the Field Technician,or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,construction or installation of features,materials,components,or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement(responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s)issued for the building. 5. 1 will ensure that a completed,signed copy of this Certificate of Acceptance shall be posted,or made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: Responsible Acceptance Person Signature: Jonathan Koop Responsible Acceptance Person Company Name:Rhino Mechanical,Inc. Position with Company(Title):Estimator roject Manager Address:1638-A W 9th Street CSLB License:551799 City/State/zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 AB - C Building Energy Efficiency Standards 2013 Nonresidential Compliance January 2016 FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS to CEC-NRCA-MCH-12-A Revised 01/16 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics(FDD)for Packaged Direct Expansion Units (Page 1 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: DUH-7 Sales Floor Note:Submit one Certificate of Acceptance for each system that must Enforcement Agency Use:Checked by/Date demonstrate compliance. i A. Construction Inspection 1.Prior to functional testing,verify and document the following: © The Fault Detection and Diagnostics(FDD)hardware is installed on the unit. © The FDD system is certified to the California Energy Commission. 2.The following air temperature sensors are permanently installed: Q Outside Air Sensor i © Supply Air Sensor Q Return Air Sensor(applicable for differential economizer operation only) B. Functional Testing Air Temperature Sensor Failure/Fault Step 1: Verify the FDD system indicates normal operation Step 2: Disconnect outside air temperature sensor from unit controller. Verify the following: © FDD system reports a fault Step 3: Connect outside air temperature sensor to unit controller. Verify the following: © FDD system indicates normal operation Excess Outside Air Step 1: Coordinate this test with NRCA-MCH-02-A(NA 7.5.1 Outdoor Air),if NRCA-MCH-02-A indicates"pass"then verify the following: ® FDD system indicates normal operation Economizer Operation Step 1: Coordinate this test with NRCA-MCH-05-A(NA 7.5.4 Air Economizer Controls),and simulate failure by immobilizing the outdoor air economizer damper by disconnecting the control signal from the damper actuator(or another method specified by the manufacturer). Verify the following: R✓ FDD system reports a fault Step 2: Successfully complete and pass NRCA-MCH-05-A and verify the following: Q✓ FDD system reports normal operation C.Testing Results PASS / FAIL Test passes if all boxes are checked under Functional Testing. Q CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS CEC-NRCA-MCH-12-A Revised 01/16 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics(FDD)for Packaged Direct Expansion Units (Page 2 of 3) Project Name: Enforcement Agency: Permit Number: Target T0359 City of Temecula Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: DUH-7 Sales Floor D Evaluation 0✓ PASS:All Construction Inspection responses are complete and Testing Results is"Pass" Notes: I CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 i l FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS CEC-NRCA-MCH-12-A Revised 01/16 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics(FDD)for Packaged Direct Expansion Units (Page 3 of 3) Project Name:Target T0359 Enforcement Agency.City of Temecula Permit Number i Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or[dent ificat ion/Tag. System Location or Area Served: DUH-7 Sales Floor DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: KBB Jonathan Koop Documentation Author Company Name:Rhino Mechanical,Inc. Date Signed:11 12 18 Address: ATT Certification Identification(If applicable): 1638-A W 9th Street City/State/zip:Upland,CA 91786 Phone:909 920-6004 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name: Field Technician Signature: Jose Alfaro Field Technician Company Name:Rhino Mechanical,Inc. Position with Company(Title):Service Technician Address:1638-A W 9th Street ATT Certification Identification(if applicable): City/State/Zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. 1 am the Field Technician,or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,construction or installation of features,materials,components,or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement(responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s)issued for the building. 5. 1 will ensure that a completed,signed copy of this Certificate of Acceptance shall be posted,or made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name:Jonathan Koop Responsible Acceptance Person Signature: Responsible Acceptance Person Company Name: Position with Company(Title): Rhino Mechanical,Inc. Estimator roject Manager Address:1638-A W 9th Street CSLB License:551799 city/state/zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS CEC-NRCA-MCH-12-A Revised 01/16 CALIFORNIA ENERGY COMMISSION 10 CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics(FDD)for Packaged Direct Expansion Units (Page 1 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification rag: System location or Area Served DHU-22 Sales Floor Note:Submit one Certificate of Acceptance for each system that must Enforcement Agency Use:Checked by/Date demonstrate compliance. A. Construction Inspection 1.Prior to functional testing,verify and document the following: Q The Fault Detection and Diagnostics(FDD)hardware is installed on the unit. i j © The FDD system is certified to the California Energy Commission. 2.The following air temperature sensors are permanently installed: ❑✓ Outside Air Sensor ® Supply Air Sensor © Return Air Sensor(applicable for differential economizer operation only) B. Functional Testing Air Temperature Sensor Failure/Fault Step 1: Verify the FDD system indicates normal operation Step 2: Disconnect outside air temperature sensor from unit controller. Verify the following: I © FDD system reports a fault I Step 3: Connect outside air temperature sensor to unit controller. Verify the following: © FDD system indicates normal operation Excess Outside Air Step 1: Coordinate this test with NRCA-MCH-02-A(NA 7.5.1 Outdoor Air),if NRCA-MCH-02-A indicates"pass"then verify the following: © FDD system indicates normal operation Economizer Operation Step 1: Coordinate this test with NRCA-MCH-05-A(NA 7.5.4 Air Economizer Controls),and simulate failure by immobilizing the outdoor air economizer damper by disconnecting the control signal from the damper actuator(or another method specified by the manufacturer). Verify the following: © FDD system reports a fault Step 2: Successfully complete and pass NRCA-MCH-05-A and verify the following: ❑✓ FDD system reports normal operation C.Testing Results PASS / FAIL Test passes if all boxes are checked under Functional Testing. 0 i I i CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS CEC-NRCA-MCH-12-A Revised 01/16 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics(FDD)for Packaged Direct Expansion Units (Page 2 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification(Tag: System location or Area Served: OHU-22 Sales Floor D Evaluation PASS:All Construction Inspection responses are complete and Testing Results is"Pass" Notes: CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS Lft CEC-NRCA-MCH-12-A Revised 01/16 CALIFORNIA ENERGY COMMISSION -4111111111111 CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics(FDD)for Packaged Direct Expansion Units (Page 3 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: C ty: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tagg. System Location or Area Served: DHU-22 Sales Floor DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: 11��W[.(e z B� Jonathan Koop Documentation Author Company Name: Date Signed: Rhino Mechanical,Inc. 11-12-18 Address:1638-A W 9th Street ATT Certification Identification(If applicable): City/State/zip:Upland,CA 91786 Phone:909-920-6004 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name:Jose Alfaro Field Technician Signature: Field Technician Company Name: Position with Company(Title): / Rhino Mechanical,Inc. Service Technician Address:1638-A W 9th Street ATT Certification Identification(if applicable): City/State/zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. 1 am the Field Technician,or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,construction or installation of features,materials,components,or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement(responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. 5. 1 will ensure that a completed,signed copy of this Certificate of Acceptance shall be posted,or made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. .I Responsible Acceptance Person Name:Jonathan Koop Responsible Acceptance Person Signature: `21AWLWY BB Responsible Acceptance Person Company Name: Position with Company(Title): Rhino Mechanical,Inc. Estimator/ oject Manager Address:1638-A W 9th Street CSLB License:551799 City/State/Zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS is CEC-NRCA-MCH-12-A Revised 01/16 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics(FDD)for Packaged Direct Expansion Units (Page 1 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: RTU-21 New Entry Note:Submit one Certificate of Acceptance for each system that must Enforcement Agency Use:Checked by/Date demonstrate compliance. A. Construction Inspection 1.Prior to functional testing,verify and document the following: ® The Fault Detection and Diagnostics(FDD)hardware is installed on the unit. ✓[� The FDD system is certified to the California Energy Commission. 2.The following air temperature sensors are permanently installed: i © Outside Air Sensor © Supply Air Sensor © Return Air Sensor(applicable for differential economizer operation only) B. Functional Testing Air Temperature Sensor Failure/Fault Step 1: Verify the FDD system indicates normal operation Step 2: Disconnect outside air temperature sensor from unit controller. Verify the following: © FDD system reports a fault Step 3: Connect outside air temperature sensor to unit controller. Verify the following: © FDD system indicates normal operation Excess Outside Air Step 1: Coordinate this test with NRCA-MCH-02-A(NA 7.5.1 Outdoor Air),if NRCA-MCH-02-A indicates"pass"then verify the following: © FDD system indicates normal operation Economizer Operation Step 1: Coordinate this test with NRCA-MCH-05-A(NA 7.5.4 Air Economizer Controls),and simulate failure by immobilizing the outdoor air economizer damper by disconnecting the control signal from the damper actuator(or another method specified by the manufacturer). Verify the following: © FDD system reports a fault Step 2: Successfully complete and pass NRCA-MCH-05-A and verify the following: © FDD system reports normal operation C.Testing Results PASS / FAIL Test passes if all boxes are checked under Functional Testing. CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 FAULT DETECTION AND DIAGNOSTICS FOR PACKAGED DIRECT EXPANSION UNITS CEC-NRCA-MCH-12-A Revised 01/16 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics(FDD)for Packaged Direct Expansion Units (Page 2 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency: Permit Number: Project Address: City: Zip Code: '.. 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag: System Location or Area Served: RTU-21 New Entry D Evaluation PASS:All Construction Inspection responses are complete and Testing Results is"Pass" Notes: CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 FAULT DETECTIONCEC-NRCA-MCH-12-A(Revised �AND DIAGNOSTICS FOR PACKAGED DIRECT EXPDANSION UNRNIA ITS ION Qpj� ENERGY COM CERTIFICATE OF ACCEPTANCE NRCA-MCH-12-A Fault Detection and Diagnostics(FDD)for Packaged Direct Expansion Units (Page 3 of 3) Project Name:Target T0359 City of Temecula Enforcement Agency. Permit Number: Project Address: City: Zip Code. 29676 Rancho California Rd. Temecula 92591 System Name or Identification/Tag. System Location or Area Served'. RTU-21 New Entry DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name:j Documentation Author Signature: At ��Jonathan Koop �� 10- Documentation Author Company Name: Date Signed: Rhino Mechanical,Inc. 11-12-18 Address:1638-A W 9th Street ATT Certification Identification(If applicable): City/state/zip:Upland,CA 91786 Phone:909-920-6004 i FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Acceptance is true and correct. j 2. 1 am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3. The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name:Jose Alfaro Field Technician Signature: Field Technician Company Name:Rhino Mechanical,Inc. Position with Company(Title):Service Technician 1 Address:1638-A W 9th Street ATT Certification Identification(if applicable): City/State/Zip: Phone: Date Signed: Upland,CA 91786 909-920-6004 11-12-18 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury,under the laws of the State of California: 1. 1 am the Field Technician,or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design,construction or installation of features, materials,components,or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement(responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency,and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. 1 have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s)issued for the building. 5. 1 will ensure that a completed,signed copy of this Certificate of Acceptance shall be posted,or made available with the building permit(s)issued for the building,and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: Responsible Acceptance Person Signature: -1/L�� i �BB Jonathan Koop �yf�J 116- Responsible Acceptance Person Company Name: Position with Company(Title): Rhino Mechanical,Inc. Estimator/ oject Manager Address:1638-A W 9th Street CSLB License:551799 City/State/zip:Upland,CA 91786 Phone:909-920-6004 Date Signed:11-12-18 I CA Building Energy Efficiency Standards-2013 Nonresidential Compliance January 2016 ERTIFICATE OF ACCEPTANCE RCA-LTI-02-A 'ghang c trol qm-t Name.Target Temmulu Lnhacement Agency CITY OF TEMECULA Pennn Number b180368 ProjmlAddress 29616r choadn'nard Cav tanE Uh 92S91 �.n36 Enforcement Agency Use: Checked by/Date LIGHTING CONTROL ACCEPTANCE DOCUMENT Automatic Shut-off Controls: Automatic Time Switch Control and Occupant Sensor Intent: Lights are turned off or set to a lower level when not needed per Section 110.9(a) & 130.1(c). A. Construction Inspection Fill out Section A to cover spaces 1 through 3 that are functionally tested under Section B. Instruments needed to perform tests include, but are not limited to: hand-held amperage meter, power meter, or light meter 1: Automatic Time Switch Controls Construction Inspection—confirm for all listed in Section B i a. All automatic time switch controls are programmed for (check all): i r Weekdays V Weekend F Holidays b. Document for the owner automatic time switch programming (check all): Weekday settings R Weekend settings R Holidays settings rOr Set-up settings r Preference program setting 17 Verify the correct time and date is properly set in the time switch J r Verify the battery is installed and energized R Override time limit is no more than 2 hours r Occupant Sensors and Automatic Time Switch Controls have been certified to the Energy Commission in accordance with the applicable provision in Section 110.9 of the Standards, and model numbers for all such controls are listed on the Commission database as Certified Appliance and Control Devices 2.Occupancy Sensor Construction Inspection—confirm for all listed in Section B r Occupancy sensors are not located within 4 feet of any HVAC diffuser r Ultrasonic occupancy sensors do not emit audible sound 5 feet from source i it I i I CAL TP CaliforniaCoControls Advanced Lighting ntroolss Training Program This is page 1 of 7 [CERTIFICATE OF ACCEPTANCE RCA-LTI-02-A glMing Carmol ect Neme:Target Temecula orcentemt Agency:CITY OF TEMECULA Number b180368 "eat Address 2%16 rancho califomia rd KY W.I. ip Code.92591 B. Functional Testing of Lighting Controls �I For every space in the building,conduct functional tests 1 through 5 below if applicable. If there are several geometrically similar spaces that use the same lighting controls, test only one space and list in the cells below which"untested spaces"are represented by that tested space. EXCEPTION: For buildings with up to seven (7) occupancy sensors, all occupancy sensors shall be tested. (NA7.6.2.3) Representative Spaces Selected Tested space/room name: sales floor Space Type (office, corridor, etc) retail Untested areas/rooms Confirm compliance for all control system types (1-5) present in each space: 1. Automatic Time Switch Controls Step 1:Simulate occupied condition a. All lights can be turned on and off by their respective area control switch Fr Fb. Verify the switch only operates lighting in the ceiling-height partitioned area in which the switch is located. i pr I Step 2:Simulate unoccupied condition a. All lighting, including emergency and egress lighting, turns off. Exempt lighting may remain on per Section 130.1(c)1 and 130.1(a)1. I b. Manual override switch controls only the lights in the selected ceiling height partitioned space where the override switch is located and the lights remain on no longer than 2 hours(unless serving public areas and override switch is captive key type). R Step 3: System returned to initial operating conditions 2. Occupancy Sensors Step 1:Simulate an unoccupied condition a. Lights controlled by occupancy sensors turn off within a maximum of 20 minutes from start of an unoccupied condition per Standard Section 110.9(b) r F he occupant sensor does not trigger a false'on'from movement in an area djacent to the controlled space or from HVAC operation. r Step 2:Simulate an occupied condition a. Status indicator or annunciator operates correctly r b. Lights controlled by occupancy sensors turn on immediately upon an occupied condition OR sensor indicates space is 'occupied' and lights may be turned on manually r CAL TP California Advanced Lighting Controls Training Program This is page 2 of 7 � ERTI FICATE OF ACCEPTANCE RCA-LTI-02-A Pghtirrg Comrol Lftojcct Name:Target Temecula Enforcemem Agency:CITY OF TEMECULA Number:b180368 'em Address 29616 rancho califomia rd ity tamewia ip Code M91 Step 3: System returned to initial operating conditions 3. Partial Off Occupancy Sensor Step 1:Simulate an unoccupied condition a. Lights go to partial off state within a maximum of 20 minutes from start of an unoccupied condition per Standard Section 110.9(a) r b.The occupant sensor does not trigger a false 'on'from movement in an area adjacent to the controlled space or from HVAC operation. For library book stacks or warehouse aisle, activity beyond the stack or aisle shall not activate the lighting in the aisle or stack. r i c. In the partial off state, lighting shall consume no more than 50%of installed lighting power, or: No more than 60%of installed lighting power for metal halide or high pressure sodium lighting in warehouses. No more than 60%of installed lighting power for corridors and stairwells in which the installed lighting power is 80%or less of the value allowed under the Area Category Method. Light level may be used as a proxy for lighting power when measurements are taken r Step 2:Simulate an occupied condition The occupant sensing controls shall turn lights fully ON in each separately controlled areas, Immediately upon an occupied condition r 4. Partial On Occupancy Sensors i Step 1.-Simulate an occupied condition.Verity partial on operation. a. Immediately upon an occupied condition, the first stage activates between 50 to 70%of the lighting automatically. r b. After the first stage occurs, manual switches allow an occupant to activate the alternate set of lights, activate 100%of the lighting power, and manually deactivate all of the lights. r Step 2.Simulate an unoccupied condition a. Both stages (automatic on and manual on) lights turn off within a maximum of 20 minutes from start of an unoccupied condition per Standard Section 110.9(a) r b. The occupant sensor does not trigger a false 'on' from movement in an area adjacent to the controlled space or from HVAC operation. r California Advanced Lighting C� GTP Controls Training Program This is page 3 of 7 CERTIFICATE OF ACCEPTANCE NRCA-LFI-02-A L�ghur�,Ca�rtol Project Name Target Temecula lnhKcement Agency CITY OF TEMECULA Pemut Number bIRo 36}t Prnloct Address 29616 rancho CA omia rd 1 Zip C«le 92591 5. Additional test for Occupancy Sensors Serving Small Zones in Office Spaces Larger than 250 ft , to Qualify for a Power Adjustment Factor (PAF) Step O:First,complete Functional Test 2(above)for each controlled zone. Step 1:Verify area served and compare actual PAF with claimed PAF.Refer to Functional Test 2. a. Area served by controlled lighting ft2 b. Enter PAF corresponding to controlled area from line (a) above (<125 ft2 for PAF=0.4, 126-250 ft2 for PAF=0.3, 251-500 ft2 for PAF-0.2). c. Enter PAF claimed for occupant sensor control in this space from the Certificate of Compliance. d. The PAF corresponding to the controlled area (line b), is greater than or equal to the PAF claimed in the compliance documentation (line c). r e. Sensors shall not trigger in response to movement in adjacent walkways or workspaces r f. All steps are conducted in Functional Test 2 'Occupancy Sensor (On Off Control)' and all answers are Yes. r CAL TP California Advanced Lighting Controls Training Program This is page 4 of 7 CERTIFICATE OF ACCEPTANCE RCA-LTI-02-A -g Conmol jProject Name:Target Temecula Rpiforcement Agency:CITY OF TEMECULA Number.b180368 Project Address 2%16 rancho calrfomia rd -uv temecula '_gip Code.92591 C. Testing Results 1. Automatic Time Switch Controls (all answers must be Yes). 2. Occupancy Sensor (On Off Control) (all answers must be Yes). r 3. Partial Off Occupancy Sensor(all answers must be Yes). For warehouses, library book stacks, corridors, stairwells in nonresidential buildings must also be accompanied by passing Test 1 or Test 2. r 4. Partial On Occupant Sensor for PAF(all answers must be Yes), r 5. Occupant Sensor serving small zones for PAF (all answers must be Yes). Also must pass Test 2. r D. Evaluation R PASS: All applicable Construction Inspection responses are complete and all applicable Equipment Testing Requirements responses are positive. C C�LC�TPalifornia Advanced Lighting Controls Training Program This is page 5 of 7 CERTIFICATE OF ACCEPTANCE RCA-LT1112-A Lightinhhng Control o Name:Target Temecula •nforcement Agency CITY OF TEMECULA Pemut Number.-b180368 1'rowt Address 29616,-1 -hfinurr rd ity terrux:ula Tip Cade 92591 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Company Name Name Arthur Hayes Plug-N-Switch Address City po box 431 paradise Zip Code 95967 Phone (619)277-8551 CEA/ATT Certification 813839 Author Signature Identification (if applicable) i Ddte of Signature: 1110112018 FIELD TECHNICIAN'S DECLARATION STATEMENT 1 certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Acceptance is true and correct. 2. I am the person who performed the acceptance verification reported on this Certificate of Acceptance(Field Technician). 3.The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. l 4. I have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed acid signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building. Field Technician Name Arthur Hayes Company Name plug-N-Switch Address: City po box 431 paradise Zip Code 95967 Phone (619)277-6551 ATT Certification Position with Company Identification (Title) ceo Field Technician Signat,-, Date of Signature: 11/01/2018 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and 1 have reviewed the information provided on this Certificate of Acceptance. 2. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). 3. The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complie,, with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4. I have confirmed that the Certificate(s)of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and posted or made available with the building permit(s) issued for the building. 5. I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s)issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Company Name Person Name Arthur Hayes Plug-N-Switch Address: City po box 431 paradise Zip Code Phone 95967 (619)277-8551 CSLB License Position with Company c10911715 (Title) ceo Responsible Acceptance Person S Lure Date of Signature- 11/01/2018 CAL \` TP California Advanced Lighting Controls Training Program This is page 6 of 7 i iCiRTIFIC-ATIE OF ACCEPTANCE RCA-LTt-o2-A µWag Contml oleo Name:Target Temecula Agency:CITY OF TEMECULA Pemut Number.b180368 1---t Address 2%16 rancho calif mia rd ICity:tan=la Evp Cade:W591 I i it i I r A pp \` TP California Training� ProancLd gram -- -- Thls Is page 7 of 7