Loading...
HomeMy WebLinkAboutParcel Map 23354 Parcel 3 Hydrology ReportVentura Engineering Inland 27393 Ynez Road, Suite 159 Temecula, California 92591 2023-156 Temecula Valley Toyota Page 1 HYDROLOGY LETTER Date: May 6, 2024 Attention: Final Engineering 2nd Submittal Engineering Department City of Temecula Subject: PA23-0382 – Toyota of Temecula MOD 41892 Motor Car Parkway Temecula California 92591 It is my professional opinion as the Engineer of Record for this project that although the proposed project site improvements can be considered major in nature, the confined space of the site warrants the removal of a hydrology report at this time due to the fact that the project site is currently fully developed as a car dealership and only site modifications are proposed that will enhance and upgrade the car dealership and will also include hydromodification practices required and implemented on the project site. The project does not propose and increase in impervious and does not propose and use changes. The project site will not negatively impact downstream properties due to the inclusion of a new 796 sq-ft biofiltration basin. In support of this, the following statements apply to the project site: 1. The hydrologic rational method Runoff Coefficient CEX = CPR because the land use is not changing in the pre- to -post construction designs. 2. The area tributary to the BMP is an area swap due to site constraints. The proposed basin functions as a vegetated conveyance structure that greatly reduces velocity and increases the time of concentration. Additionally, the site flow will discharge through a limited HMP orifice during treatment. 3. The Q100 will be reduced or maintained at the existing Q100 as this is the primary function of hydromodification management planning. 4. The project does not alter the existing drainage pattern; flood depth; nor impact downstream properties as the project still discharges to the public storm drain in Motor Car Parkway. 5. The project site is listed as Zone X on FEMA mapping and no FEMA concerns are present on the site in the pre- or post- construction design configurations. Additionally, the project site is a commercial car dealership and no housing is being proposed by the project as presented. I hereby declare that I am the Engineer of Record for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions code, and that the design is consistent with current standards. 5/6/24 ____________________________ ______________ WILFREDO VENTURA DATE R.C.E. NO. 66532 EXPIRES 6/30/24 APPROVED BY CITY OF TEMECULA PUBLIC WORKS david.pina 05/29/2024 05/29/2024 05/29/2024 05/29/20