HomeMy WebLinkAboutLD23-4046Permit Number: LD23-4046
LD - Utilities/ Excavation - Parallel
Issued: 06/14/2023
Expired: 01/10/2024
Job Address: 41461 Buecking St
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Musashi Liu
620 Newport Center Drive 15Th Floor
Newport Beach, CA 92660
Applicant:
Greystar Lp
380 Stevens Ave, 305
Solana Beach, CA 92075
(713) 479-8990
Contractor:
Utility Work Order Number: TBD
Description:
Potholing - Jefferson Buecking
WORK HOURS SHALL BE MONDAY – FRIDAY, NO HOLIDAYS, 8:30am - 3:30pm
Location: Jefferson Ave, Buecking Dr, and McCabe Ct
Proposed work:
Exploratory pot holes as shown on ", POTHOLE EXHIBIT, LD23-4046"
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD23-0528
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
Public Works Inspector.
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities*****
Permit Number: LD23-4046
LD - Utilities/ Excavation - Parallel
project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
Page 2 of 3
Permit Number: LD23-4046
LD - Utilities/ Excavation - Parallel
City Engineer or Authorized Representative Date
06/14/2023
Page 3 of 3
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 12/10/2021
APPLICATION INFORMATION PERMIT NO.:
Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching
Signing & Striping Traffic Signal Miscellaneous (SPECIFY BELOW)
The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as follows:
Name(s) of street(s) and/or street address:
Utility Work Order #: Start Date: End Date:
In consideration of granting this application, all applicants including utility companies hereby agree to:
1.If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties
working within the city right-of-way, proof of Contractor’s License along with this application at the time of submittal.
See the Traffic Control Plan Checklist for details.
2.Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from
and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident,
loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application. (See below for specific liability insurance requirements.)
3.Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City
Engineer.
4.Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working
days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The
developer/general contractor must be present for the timely request of inspections.
5.Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works
Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all
applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction.
LIABILITY INSURANCE REQUIREMENTS
PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED
EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE
CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED.
THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR
BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT
ENCROACHMENT PERMIT.
Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum
Buecking and Jefferson - and Mccabe court
xxx
x
Installing underground utility connections to existing utility mains beneath street.
Demo and Street improvements for sidewalks along Jefferson and Beucking
TBD 1/2023 5/2025
x
. Also potholing required to
verify existing utilities
Potholing
LD23-4046
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
Tricia.ortega 06/13/2023
06/13/2023 06/13/2023
06/13/20
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 12/10/2021
limits of insurance coverage shall be as follows:
a.General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If
Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it
shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
b.Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage.
c.Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident
for bodily injury or disease.
d.Course of Construction: Completed value of the project.
There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approach
located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at
least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the
encroachment permit:
BODILY INJURY $250,000.00 EACH PERSON
$500,000.00 EACH OCCURANCE
$500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
PROPERTY DAMAGE $100,000.00 EACH OCCURANCE
$250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to
the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing
the City named as an additional insured shall be attached to the application.
The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this
application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges
that this application will be made a part of the encroachment permit.
APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED)
Company Name:
Mailing Address:
Contact: Phone #: E-mail:
I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the
permittee and bind the permittee to the agreements contained herein and any conditions of the permit.
Authorized Signature: Date Applied:
CONTRACTOR’S INFORMATION
Company Name:
Mailing Address:
Contact: Phone #: 24-HR Emergency #:
State Contractor’s License #: Class: City Business License #:
Greystar LP
750 Bering Drive Suite 200 Houston Texas 77057
949114
Derek Holloway
053668
619-980-9907
Greystar Development West LLC
Musashi Liu 202-680-0620 musashi.liu@greystar.com
380 Stevens Ave | Suite 305| Solana Beach, CA 92075
6/13/23
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
RW
R
W
R
W
R
W
R
W
R
W
R
W
R
W
D
W
D
W
D
W
D
W
D
W
D
W
S
S
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
S
S
S
S
S
S
S
S
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SD SD
D
W
D
W
D
W
D
W
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
G
G
G
G
G
G
G
G
G
G
G
DW
DW
RW
RW
G
G
DW
DW
G
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
S
S
S
S
S
S
S
S
S
S
S
FH
FH
FH
FH
SD
W
W
W
W
W
W
W
W
W
W
0
G
W
D
WDW
DW
D
W
D
W
D
W
RW RW
SD
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
DW
DW
D
W
D
W
D
W
D
W
D
W
D
W
FIRE
FIRE
F
I
R
E
F
I
R
E
F
I
R
E
F
I
R
E
F
I
R
E
F
I
R
E
FIR
E
FIR
E
FIR
E
FIR
E
F
I
R
E
F
I
R
E
F
I
R
E
FIR
E
FIR
E
FIR
E
FIR
E
S
S
S
S
S
S
S
S
S
S
S
S
S
G
G
G
G
G
G
DW
DW
DW
DW
DW
DW
D
W
F
I
R
E
D
W
E
S
S
S
SD
FIR
E
S
S
D
S
D
DW
DW
DW
DW
DW
DW
D
W
D
W
D
W
DW
D
W
D
W
D
W
D
W
S
DW
R
W
S
SD
SD
SD
S
S
S
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
G
G
G
G
G
G
G
G
G
G
G
G
G
SD
4
'
'
4
'
'
6
'
'
1
0
'
'
1
2
'
'
6
'
'
12''
12''
8'
'
12''
12''
8
'
'
FIR
E
D
W
S
8''
8''
1
2
'
'
1
2
'
'
12''12''
FIR
E
D
W
DW
FIR
E
DW
CITY OF TEMECULA
BUILDING AND SAFETY
TWO WORKING DAYS BEFORE YOU DIG
UNDERGROUND SERVICE ALERT
1-800-422-4133CALL TOLL FREE
LD22 - 3146
21
PARCEL MAP 23561-2
ROUGH GRADING PLAN
PARCELS 4, 5, 9, 10, 14 & BURBAN
Phone: 949-727-9095
2923 SATURN STREET, Suite H
BREA, CA 92821
RESOURCE
CONSULTING CIVIL ENGINEERS
4POTHOLE EXHIBIT
1
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
Tricia.ortega 06/13/2023
06/13/2023 06/13/2023
06/13/20
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
SD
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
D
W
D
W
G
G
G
G
G
G
S
S
S
S
S
S
S
S
S
S
S
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
G
G
G
G
G
G
G
G
G
G
DW
DW
DW
DW
DW
DW
DW
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
FH
FH
FH
SD
SD
W
W
W
W
W
W
W
W
SD
SD
SD
D
W
D
W
D
W
D
W
SD
SD
SD
S
D
S
D
S
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
D
S
D
DW
DW
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
D
W
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
DW
FIRE
FIRE
F
I
R
E
F
I
R
E
F
I
R
E
F
I
R
E
F
I
R
E
DW
DW
DW
DW
DW
SD
SD
FIR
E
FIR
E
FIR
E
FIR
E
FIR
E
FIR
E
FIR
E
FIR
E
FIR
E
S
D
S
D
DW
D
W
D
W
D
W
DW
DW
DW
DW
DW
DW
DW
S
S
S
SD
DW
C
C
C
C
C
C
C
C
C
C
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
SD
SD
SD
SD
SD
SD
SD
SD
SD
DW FIR
E
G
G
G
G
G
G
G
SD
SD
SD
S
D
S
D
SD
SD
S
D
SD
SD
SD
SD
12''
6''
8'
'
1
0
'
'
6''
6''
1
2
'
'
1
2
'
'
1
2
'
'
1
2
'
'
8'
'
12''
12''
D
W
D
W
DW
S
S
S
S
4
'
'
D
W
FIR
E
DW
DW
DW
DW
DW
CITY OF TEMECULA
BUILDING AND SAFETY
TWO WORKING DAYS BEFORE YOU DIG
UNDERGROUND SERVICE ALERT
1-800-422-4133CALL TOLL FREE
LD22 - 3146
21
PARCEL MAP 23561-2
ROUGH GRADING PLAN
PARCELS 4, 5, 9, 10, 14 & BURBAN
Phone: 949-727-9095
2923 SATURN STREET, Suite H
BREA, CA 92821
RESOURCE
CONSULTING CIVIL ENGINEERS
4POTHOLE EXHIBIT
2
= WORK AREA
= TYPE ll BARRICADE W/SIGN
= TRAFFIC CONE
= HIGH LEVEL WARNING DEVICE
= FLASHING ARROW BOARD
= TYPE III BARRICADES W/SIGN
= FLAGGER
= DIRECTION OF TRAFFIC FLOW CMS = CHANGEABLE MESSAGE SIGN
= EXISTING SIGN
= TYPE III BARRICADES
= PORTABLE SIGN R/C
= EXISTING RED CURB
= DOUBLE YELLOW LANE LINES
= EXISTING STRIPING
= EXISTING LANE FLOW DIRECTION
= SIGNALIZED INTERSECTION
= EXISTING DRIVEWAY
= TYPE II BARRICADE
= POST TEMPORARY TOW AWAY
NO STOPPING ANY TIME SIGNS
LEGEND:
TEMPORARY TRAFFIC CONTROL PLAN
CITY OF TEMECULA
MONDAY TO FRIDAY
WORK HOURS: 8:30 AM TO 3:30 PM
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL
FOR
TRAFFIC CONTROL PLANS
CONTRACTOR:
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
Updated Traffic Control Notes to rev 11/28/11 AJP AJP 1/26/12
7
1STREET IMPROVEMENTS
JEFFERSON AVE. & BUECKING DR.
GREYSTAR
620 NEWPORT CITY DR.
NEWPORT BEACH, CA 92660
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
AREA MAP:
FLASHING ARROW SIGN TRAILER (TYP.)
C L O S E D
R O A D
CLOSED
LEFT LANE
AHEAD
END
DETOURROAD WORK
ONLY
CREW
SURVEY
CLOSED
ROAD
AHEAD
RIGHT
AHEAD
DETOUR
USE OTHER SIDE
RIGHT
KEEP
TURN RIGHT
M U S T
RIGHT LANE
NOT
PASS
SIDEWALK CLOSED
DO
STOP SLOW
CLOSED
LANE
TO STOP
PREPARED
SHOULDER
WORK
WORK
AHEAD
ROAD
MACHINERY
AHEAD
END
ROAD CLOSED
LOCAL TRAFFIC ONLY
TO
THRU TRAFFIC
ROAD CLOSED
FRESH
OIL
ROAD
DETOUR
SHOULDER
SOFTPAVEMENT
ENDS AHEAD
(FAS)
(HLWD)
HIGH LEVEL WARNING DEVICE
TRAFFIC CONE
POST TUBE
LANE
CLOSED
ROAD
ROUGH XX
MPH
NARROWS
ROAD
W20-2
R11-2 R11-3A R11-4
W21-3
M4-8A
C9A(CA)
M4-10
W21-2
W21-7
AHEAD
UTILITY
WORK
G20-2
W20-4
W20-1
W21-5W21-1A
W20-5W20-3
ONE LANE
AHEAD
ROAD
W3-4
C30(CA)C28B(CA)
W21-6
W8-7
BE
R3-5
R9-10
R4-7BR4-1 R9-3A
R1-1 R3-7R3-2R3-1 R3-4
R3-18
W6-4
W5-1W4-2
W13-1
W1-2 W1-4W1-3W1-1
W8-4W8-3 W8-8
W4-1W1-8
W9-3
W1-6
W12-1W6-3
R3-17
BIKE LANE
R5-6
GRAVEL
LOOSE
MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP)
L WOS
DAEHA
(CMS)
CHANGEABLE MESSAGE SIGN TRAILER (TYP.)
R3-6
SIDEWALK
R9-9
CLOSED
R9-11A
CENTER
DETOUR
M4-8
C28A(CA)
ENDS
AHEAD
R3-17B
R3-17A
BEGIN
RIGHT TURN LANE
YIELD TO BIKES
R4-4
RIGHT
KEEP
R4-7AR4-7
CROSS HERE
SIDEWALK CLOSED
R9-11
AHEAD
CROSS HERE
SIDEWALK CLOSED
AHEAD
LANE
NARROW
C12(CA)
TRENCH
OPEN
C27(CA)
WARNING SIGNS MISCELLANEOUS DEVICES
REGULATORY SIGNS
TRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20):
PERMIT NO. LD23-0528
CONE SPACING - 25' MAXIMUM
1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY.
3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED
OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY.
5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL
EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE
IN DRIVABLE CONDITION AT ALL TIMES.
6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK.
8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION.
10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE
REPLACED TEMPORARILY WITH TAPE.)
11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A
HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC.
12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48
HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694 -6411.
13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK.
14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC
WORKS.
15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD
CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE
PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION.
16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE
UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS
SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD
DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH.
18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD
INSPECTION, OR THE POLICE DEPARTMENT.
19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT
LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES.
WORK AREA
24
6/6/2023
SD
SD
SD
CI
T
Y
O
F
M
U
R
R
I
E
T
A
E
N
C
R
O
A
C
H
M
E
N
T
P
E
R
M
I
T
#
3
6
6
9
0
CI
T
Y
O
F
T
E
M
E
C
U
L
A
JEFFERSON AVE.
(45 MPH)
BU
E
C
K
I
N
G
D
R
.
(2
5
M
P
H
)
S
FR
E
N
C
H
V
A
L
L
E
Y
P
K
W
Y
(3
0
M
P
H
)
CH
E
R
R
Y
S
T
.
(3
0
M
P
H
)
313' BUFFER
11
0
'
-
6
"
350'
25
0
'
25
0
'
25'25'
CLOSED
LANE
CLOSED
LANE
END
ROAD WORK
END
ROAD WORK
12
'
END
ROAD WORK
SIDEWALK
CLOSED
SIDEWALK
CLOSED
SIDEWALK
CLOSED
408' CONSTRUCTION ZONE595' CONSTRUCTION ZONE
FALGGER TO ASSIST PEDESTRIANS
ACROSS CHERRY ST.
UTILITY
CONNECTION
JEFFERSON AVE.
(45 MPH)
SA
N
B
O
R
N
A
V
E
(3
0
M
P
H
)
S
540' MERG
E
T
A
P
E
R
25
0
'
CLOSED
LANE
END
ROAD WORK
END
ROAD WORK
SHARE
THE
ROAD
180'
BIKE TA
P
E
R
350'
350'
350'
= WORK AREA
= TYPE ll BARRICADE W/SIGN
= TRAFFIC CONE
= FLASHING ARROW BOARD
= TYPE III BARRICADES W/SIGN
= DIRECTION OF TRAFFIC FLOW CMS = CHANGEABLE MESSAGE SIGN
= EXISTING SIGN
= CONE W/ SIGN = DOUBLE YELLOW LANE LINES
= EXISTING STRIPING
= EXISTING LANE FLOW DIRECTION
= SIGNALIZED INTERSECTION
= EXISTING DRIVEWAY
= POST TEMPORARY TOW AWAY
NO STOPPING ANY TIME SIGNS
LEGEND:
= PORTABLE SIGN
TEMPORARY TRAFFIC CONTROL PLAN
PHASE 1CITY OF TEMECULA
MA
T
C
H
L
I
N
E
"
A
"
B
E
L
O
W
MA
T
C
H
L
I
N
E
"
A
"
A
B
O
V
E
N
MONDAY TO FRIDAY
WORK HOURS: 8:30 AM TO 3:30 PM
DURATION: 3 MONTHS
TYPE OF WORK: STREET IMPROVEMENTS (LANDSCAPING,
NEW CURB AND GUTTER, STREET LIGHTS) ROAD EXTENSION.
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL
FOR
TRAFFIC CONTROL PLANS
STREET IMPROVEMENTS
JEFFERSON AVE. & BUECKING DR.
CONTRACTOR:
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
Updated Traffic Control Notes to rev 11/28/11 AJP AJP 1/26/12
2
7
GREYSTAR
620 NEWPORT CITY DR.
NEWPORT BEACH, CA 92660
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
PERMIT NO. LD23-0528
24
6/6/2023
SD
SD
SD
CI
T
Y
O
F
M
U
R
R
I
E
T
A
E
N
C
R
O
A
C
H
M
E
N
T
P
E
R
M
I
T
#
3
6
6
9
0
CI
T
Y
O
F
T
E
M
E
C
U
L
A
JEFFERSON AVE.
(45 MPH)
S
FR
E
N
C
H
V
A
L
L
E
Y
P
K
W
Y
(3
0
M
P
H
)
AU
T
O
M
A
L
L
P
K
W
Y
(3
0
M
P
H
)
CH
E
R
R
Y
S
T
.
(3
0
M
P
H
)
25
0
'
25
0
'
150' BUFFER
540' MERGE TAPER 300' BUFFER
25
0
'
CLOSED
LANE
CLOSED
LANE
CLOSED
LANE
CLOSED
LANE
END
ROAD WORK
END
ROAD WORK
END
ROAD WORK
12
'
MI
N
12
'
MI
N
176' CONSTRUCTION ZONE
350'350'350'
UTILITY
CONNECTION
JEFFERSON AVE.
(45 MPH)
BU
E
C
K
I
N
G
D
R
.
(2
5
M
P
H
)
10
0
'
540' MERGE TAPER 350'
25'
CLOSED
LANE
CLOSED
LANE
END
ROAD WORK
END
ROAD WORK
ONLY
350'350'
= WORK AREA
= TYPE ll BARRICADE W/SIGN
= TRAFFIC CONE
= FLASHING ARROW BOARD
= TYPE III BARRICADES W/SIGN
= DIRECTION OF TRAFFIC FLOW CMS = CHANGEABLE MESSAGE SIGN
= EXISTING SIGN
= CONE W/ SIGN = DOUBLE YELLOW LANE LINES
= EXISTING STRIPING
= EXISTING LANE FLOW DIRECTION
= SIGNALIZED INTERSECTION
= EXISTING DRIVEWAY
= POST TEMPORARY TOW AWAY
NO STOPPING ANY TIME SIGNS
LEGEND:
= PORTABLE SIGN
TEMPORARY TRAFFIC CONTROL PLAN
PHASE 2CITY OF TEMECULA
MA
T
C
H
L
I
N
E
"
A
"
B
E
L
O
W
MA
T
C
H
L
I
N
E
"
A
"
A
B
O
V
E
N
TYPE OF WORK: WET UTILITY CONNECTION TO
EXISTING MAIN.
MONDAY TO FRIDAY
WORK HOURS: 8:30 AM TO 3:30 PM
DURATION: 2 WEEKS
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL
FOR
TRAFFIC CONTROL PLANS
STREET IMPROVEMENTS
JEFFERSON AVE. & BUECKING DR.
CONTRACTOR:
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
Updated Traffic Control Notes to rev 11/28/11 AJP AJP 1/26/12
GREYSTAR
620 NEWPORT CITY DR.
NEWPORT BEACH, CA 92660 7
3
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
PERMIT NO. LD23-0528
24
6/6/2023
CI
T
Y
O
F
M
U
R
R
I
E
T
A
E
N
C
R
O
A
C
H
M
E
N
T
P
E
R
M
I
T
#
3
6
6
9
0
CI
T
Y
O
F
T
E
M
E
C
U
L
A
S
FR
E
N
C
H
V
A
L
L
E
Y
P
K
W
Y
(3
0
M
P
H
)
AU
T
O
M
A
L
L
P
K
W
Y
(3
0
M
P
H
)
CH
E
R
R
Y
S
T
.
(3
0
M
P
H
)
25
0
'
25
0
'
540' MERGE TAPER 300' BUFFER
25
0
'
CLOSED
LANE
CLOSED
LANE
END
ROAD WORK
END
ROAD WORK
END
ROAD WORK
180' MERGE TAPER
SHARE
THE
ROAD
350'350'350'
SD
SD
SD
JEFFERSON AVE.
(45 MPH)
350'
25'
END
ROAD WORK
12
'
167' CONSTRUCTION ZONE
UTILITY
CONNECTION
= WORK AREA
= TYPE ll BARRICADE W/SIGN
= TRAFFIC CONE
= FLASHING ARROW BOARD
= TYPE III BARRICADES W/SIGN
= DIRECTION OF TRAFFIC FLOW CMS = CHANGEABLE MESSAGE SIGN
= EXISTING SIGN
= CONE W/ SIGN = DOUBLE YELLOW LANE LINES
= EXISTING STRIPING
= EXISTING LANE FLOW DIRECTION
= SIGNALIZED INTERSECTION
= EXISTING DRIVEWAY
= POST TEMPORARY TOW AWAY
NO STOPPING ANY TIME SIGNS
LEGEND:
= PORTABLE SIGN
TEMPORARY TRAFFIC CONTROL PLAN
PHASE 3CITY OF TEMECULA
MA
T
C
H
L
I
N
E
"
A
"
B
E
L
O
W
MA
T
C
H
L
I
N
E
"
A
"
A
B
O
V
E
N
TYPE OF WORK: WET UTILITY CONNECTION TO
EXISTING MAIN.
MONDAY TO FRIDAY
WORK HOURS: 8:30 AM TO 3:30 PM
DURATION: 2 WEEKS
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL
FOR
TRAFFIC CONTROL PLANS
STREET IMPROVEMENTS
JEFFERSON AVE. & BUECKING DR.
CONTRACTOR:
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
Updated Traffic Control Notes to rev 11/28/11 AJP AJP 1/26/12
GREYSTAR
620 NEWPORT CITY DR.
NEWPORT BEACH, CA 92660 7
4
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
PERMIT NO. LD23-0528
24
6/6/2023
BUECKING DR
(25 MPH)
J
E
F
F
E
R
S
O
N
A
V
E
(
4
5
M
P
H
)
MA
D
I
S
O
N
A
V
E
(2
5
M
P
H
)
SD
SD
SD
3
5
0
'
3
5
0
'
10
0
'
10
0
'
END
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
ROAD WORK
ROAD
CLOSED
SIDEWALK
CLOSED
SIDEWALK
CLOSED
565' CONSTRUCTION ZONE
25'
15
'
TO BE PLACED CLOSE TO CROSSWALK
BETWEEN JEFFERSON AVE & SANBORN AVE
CMS
BUECKING DR.
CLOSED AHEAD
CMS
DETOUR AT
SANBORN AVE.
CMS (CHANGEABLE MESSAGE SIGN)
TO BE PLACED 300' BEFORE SANBORN AVE.
UTILITY
CONNECTION
PLACE " TEMPORARY NO PARKING" SIGNS
72 HOURS PRIOR TO CONSTRUCTION, ON BOTH SIDES OF THE STREET.
BUE
C
K
I
N
G
D
R
.
J
E
F
F
E
R
S
O
N
A
V
E
.
V
A
N
O
W
E
N
S
T
.
SAN
B
O
R
N
A
V
E
.
DETOUR
END
DETOUR
DETOUR
= WORK AREA
= TYPE ll BARRICADE W/SIGN
= TRAFFIC CONE
= FLASHING ARROW BOARD
= TYPE III BARRICADES W/SIGN
= DIRECTION OF TRAFFIC FLOW CMS = CHANGEABLE MESSAGE SIGN
= EXISTING SIGN
= CONE W/ SIGN = DOUBLE YELLOW LANE LINES
= EXISTING STRIPING
= EXISTING LANE FLOW DIRECTION
= SIGNALIZED INTERSECTION
= EXISTING DRIVEWAY
= POST TEMPORARY TOW AWAY
NO STOPPING ANY TIME SIGNS
LEGEND:
= PORTABLE SIGN
TEMPORARY TRAFFIC CONTROL PLAN
PHASE 4CITY OF TEMECULA
N
DETOUR MAP
N
TYPE OF WORK: STREET IMPROVEMENTS, UTILITY
CROSSING.
MONDAY TO FRIDAY
WORK HOURS: 8:30 AM TO 3:30 PM
DURATION: 1 MONTHS
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL
FOR
TRAFFIC CONTROL PLANS
STREET IMPROVEMENTS
JEFFERSON AVE. & BUECKING DR.
CONTRACTOR:
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
Updated Traffic Control Notes to rev 11/28/11 AJP AJP 1/26/12
GREYSTAR
620 NEWPORT CITY DR.
NEWPORT BEACH, CA 92660 7
5
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
PERMIT NO. LD23-0528
24
6/6/2023
BUECKING DR
(25 MPH)
J
E
F
F
E
R
S
O
N
A
V
E
(
4
5
M
P
H
)
MA
D
I
S
O
N
A
V
E
(2
5
M
P
H
)
SD
SD
SD
2
5
0
'
2
5
0
'
10
0
'
10
0
'
END
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
ROAD WORK
ROAD
CLOSED
SIDEWALK
CLOSED
SIDEWALK
CLOSED
TO BE PLACED CLOSE TO CROSSWALK
BETWEEN JEFFERSON AVE & FRENCH
VALLEY PKWY
565' CONSTRUCTION ZONE
15
'
25'
MAINTAIN ACCESS TO
DRIVEWAYS AT ALL TIMES.
UTILITY
CONNECTION
PLACE " TEMPORARY NO PARKING" SIGNS
72 HOURS PRIOR TO CONSTRUCTION, ON BOTH SIDES OF THE STREET.
BUE
C
K
I
N
G
D
R
.
J
E
F
F
E
R
S
O
N
A
V
E
.
V
A
N
O
W
E
N
S
T
.
SAN
B
O
R
N
A
V
E
.
DETOUR
DETOUR
END
DETOUR
= WORK AREA
= TYPE ll BARRICADE W/SIGN
= TRAFFIC CONE
= FLASHING ARROW BOARD
= TYPE III BARRICADES W/SIGN
= DIRECTION OF TRAFFIC FLOW CMS = CHANGEABLE MESSAGE SIGN
= EXISTING SIGN
= CONE W/ SIGN = DOUBLE YELLOW LANE LINES
= EXISTING STRIPING
= EXISTING LANE FLOW DIRECTION
= SIGNALIZED INTERSECTION
= EXISTING DRIVEWAY
= POST TEMPORARY TOW AWAY
NO STOPPING ANY TIME SIGNS
LEGEND:
= PORTABLE SIGN
DETOUR MAP
TEMPORARY TRAFFIC CONTROL PLAN
PHASE 5CITY OF TEMECULA
N
N
TYPE OF WORK: STREET IMPROVEMENTS, UTILITY
CROSSING.
MONDAY TO FRIDAY
WORK HOURS: 8:30 AM TO 3:30 PM
DURATION: 1 MONTHS
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL
FOR
TRAFFIC CONTROL PLANS
STREET IMPROVEMENTS
JEFFERSON AVE. & BUECKING DR.
CONTRACTOR:
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
Updated Traffic Control Notes to rev 11/28/11 AJP AJP 1/26/12
GREYSTAR
620 NEWPORT CITY DR.
NEWPORT BEACH, CA 92660 7
6
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
PERMIT NO. LD23-0528
24
6/6/2023
MCCABE CT
(25 MPH)
MA
D
I
S
O
N
A
V
E
(2
5
M
P
H
)
SD
SD
SD
ROAD
CLOSED
100'
UTILITY
CONNECTION
= WORK AREA
= TYPE ll BARRICADE W/SIGN
= TRAFFIC CONE
= FLASHING ARROW BOARD
= TYPE III BARRICADES W/SIGN
= DIRECTION OF TRAFFIC FLOW CMS = CHANGEABLE MESSAGE SIGN
= EXISTING SIGN
= CONE W/ SIGN = DOUBLE YELLOW LANE LINES
= EXISTING STRIPING
= EXISTING LANE FLOW DIRECTION
= SIGNALIZED INTERSECTION
= EXISTING DRIVEWAY
= POST TEMPORARY TOW AWAY
NO STOPPING ANY TIME SIGNS
LEGEND:
= PORTABLE SIGN
N
TEMPORARY TRAFFIC CONTROL PLAN
PHASE 6CITY OF TEMECULA
MONDAY TO FRIDAY
TYPE OF WORK: STREET IMPROVEMENTS (LANDSCAPING,
NEW CURB AND GUTTER) ROAD EXTENSION.
WORK HOURS: 8:30 AM TO 3:30 PM
DURATION: 6 MONTHS
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL
FOR
TRAFFIC CONTROL PLANS
STREET IMPROVEMENTS
JEFFERSON AVE. & BUECKING DR.
CONTRACTOR:
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
Updated Traffic Control Notes to rev 11/28/11 AJP AJP 1/26/12
GREYSTAR
620 NEWPORT CITY DR.
NEWPORT BEACH, CA 92660 7
7
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
PERMIT NO. LD23-0528
24
6/6/2023