HomeMy WebLinkAboutLD23-6148Permit Number: LD23-6148
LD - Utilities/ Excavation - Parallel
Issued: 01/10/2024
Expired: 07/08/2024
Job Address: 41301 Butterfield Stage Rd
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Kala JainApplicant:
Frontier Communications
(Utility Billing)
Network Engineering – Bldg. A. 1400 E. Phillips Blvd, Building A
Pomona, CA 91766
(909) 469-6327
Contractor:
Utility Work Order Number: 5340503 WO1243194
Description:
Frontier WO1243194
WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am
Location: Butterfield Stage Rd W/S 1050' S/O Nicolas Rd
Proposed work:
Replace pull box lid per Frontier plans "LD23-6148"
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD23-6148
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
Public Works Inspector.
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities*****
Permit Number: LD23-6148
LD - Utilities/ Excavation - Parallel
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
Page 2 of 3
Permit Number: LD23-6148
LD - Utilities/ Excavation - Parallel
City Engineer or Authorized Representative Date
01/10/2024
Page 3 of 3
14'18'18'14'18'18'10'
28'50'32'
110'
14'18'18'14'18'18'10'
32'50'28'
110'
P/
L
C/
L
C/
F
P/
L
C/
F
C/
F
C/
F
C/
L
P/
L
P/
L
C/
F
C/
F
C/
F
C/
F
C/
L
C/
L
14
'
C
R
B
L
14
'
C
S
W
ON
P
/
L
10
'
C
R
B
L
10
'
C
S
W
ON
P
/
L
10
'
C
R
B
L
10
'
C
S
W
ON
P
/
L
14
'
C
R
B
L
14
'
C
S
W
ON
P
/
L
BU
T
T
E
R
F
I
E
L
D
S
T
A
G
E
R
D
BU
T
T
E
R
F
I
E
L
D
S
T
A
G
E
R
D
STREET LIGHT
SIGNBOARD
SIGNBOARD
EXISTING 3X5 PULLBOX RNCACAXF 1499
33.543546,-117.101309
3'
5'
26'
3'
8'
10
2
0
'
N
S
\O
C
\L
O
F
C
L
L
C
H
A
P
O
S
1
76'
POST MILE# RIV M6.787
92591 CONTRACTOR / OWNER:
FRONTIER COMMUNICATIONS INC - CA
JEFFREY MELTON - ENGR, NETWORK SR
201 Flynn Rd
Camarillo, CA 93012
951-434-9963 Jeffrey.A.Melton@ftr.com
FIRE HYDRANT
DWG BY:DATE:
WIRE CENTER NAME:
FRONTIER WORK ORDER
SCALE:
W.O. TITLE:AND DESCRIPTION
SHEET
1"=30'01/03/2023 01 OF 03CYIENT
92591
SITE PLAN FOR REPLACE
PULLBOX LID AT 39655
BUTTERFIELD STAGE RD
5340503_WO1243194
CITY
TEMECULA
UNDERGROUND
SERVICE ALERT
CALL 1-800-422-4133
AT LEAST 2 BUSINESS DAYS
BEFORE YOU DIG
OF SOUTHERN CALIFORNIA
PROPOSED PLACEMENT
1
N
ADDRESS
39655 BUTTERFIELD
STAGE RD
REPLACE PULLBOX LID. CURRENT PULLBOX ELEVATION WILL STAY THE SAME. AT 39655 BUTTERFIELD STAGE RD
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
Tricia.ortega 01/09/2024
01/09/2024 01/09/2024
01/09/20
DWG BY:DATE:
WIRE CENTER NAME:
FRONTIER WORK ORDER
SCALE:
W.O. TITLE:AND DESCRIPTION
SHEET
1"=20'01/03/2023 02 OF 03CYIENT
92591
SITE PLAN FOR REPLACE
PULLBOX LID AT 39655
BUTTERFIELD STAGE RD
5340503_WO1243194
CITY
TEMECULA
UNDERGROUND
SERVICE ALERT
CALL 1-800-422-4133
AT LEAST 2 BUSINESS DAYS
BEFORE YOU DIG
OF SOUTHERN CALIFORNIA N
ADDRESS
39655 BUTTERFIELD
STAGE RD
SOUTH SIDE OR WEST SIDE
R/W
12' (TYP.)7'
6'
C
1.5'
MIN.
L
1'
FIRE
HYD.
JOINT
UTILITIES
TRENCH
LOCATE IN ACCORDANCE
WITH ORD. 546 SEC. 901
WATER
MAIN
DEPTH VARIES
STROM
DRAIN 6'6'SEWER
MAIN
6.5'
NORMAL MIN.
SIDEWALK
CURBE & GUTTER
VALVE BOX
3.0' NORMAL MIN.
CL
SIDEWALK
CURB & GUTTER
2.5' NORMALMIN.
NORTH SIDE OR EAST SIDE
6'12'
6'
(TYP.)
R/W
GAS MAIN
2.5' MIN. COVER
OVER FACILITIES *STREET LIGHT
BASE
JOINT
UTILITIES
TRENCH
1'
*NOTE:
SEE C.O.T. STD. 800 OR 801 FOR ARTERIAL HIGHWAY
AND RESIDENTIAL LIGHTING DETAILS.
NOTES:
1.LOCATION AND DEPTH OF EXISTING AND PROPOSED UTILITIES MUST BE PROVIDED BY THE SUBDIVIDER
AND SHOWN ON ALL PLANS SUBMITTED FOR APPROVAL TO THE DEPARTMENT OF PUBLIC WORKS.
2.CHANGES MAY BE PERMITTED BY THE DEPT. OF PUBLIC WORKS IN CASES OF CONFLICTING FACILITIES.
3.CONFLICTS BETWEEN UTILITY COMPANIES FACILITIES, EXISTING AND PROPOSED, MUST BE MUTUALLY
RESOLVED BY THE UTILITY COMPANIES.
4.FOR COMMERCIAL SIDEWALKS, THE FIRE HYDRANT SHALL BE PLACED WITHIN THE SIDEWALK 1.5' BEHIND
FACE OF CURB. MUST ALLOW FOR AT LEAST 48" OF CLEAR PATHWAY AROUND THE FIRE HYDRANT.
5.MAXIMUM 2" DIAMETER GAS MAINS MAY BE PLACED IN JOINT UTILITIES TRENCH SUBJECT
TO APPROVAL OF DIRECTOR OF PUBLIC WORK (IN TRACTS).
6.ALL UTILITY PIPES SHALL BE MARKED WITH TRACEABLE WIRE OR TAPE
7.REFER TO STD. 407 FOR TRENCH REPAIR REQUIREMENTS.
APPROVED BY:
OCTOBER 12, 2011
GREG BUTLER DIRECTOR OF PUBLIC WORKS/CITY ENGINEER DATE
R.C.E. NO. 47109
REVISIONS
10/98, 12/06
RVE.
1
2
3
4
5
6
BY:APPR'D DATE RVE.BY:APPR'D DATE
STANDARD NO. 117
Public Works Standards - All Drawings_202310041310389455-26.dwg-1-1.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-2.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-3.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-4.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-5.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-6.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-7.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-8.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-9.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-10.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-11.jpg
Public Works Standards - All Drawings_202310041310389455-26.dwg-1-12.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-13.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-14.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-15.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-16.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-17.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-18.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-19.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-20.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-21.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-22.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-23.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-24.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-25.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-26.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-27.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-28.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-29.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-30.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-31.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-32.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-33.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-34.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-35.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-36.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-37.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-38.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-39.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-40.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-41.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-42.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-43.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-44.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-45.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-46.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-47.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-48.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-49.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-50.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-51.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-52.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-53.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-54.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-55.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-56.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-57.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-58.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-59.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-60.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-61.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-62.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-63.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-64.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-65.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-66.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-67.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-68.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-69.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-70.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-71.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-72.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-73.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-74.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-75.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-76.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-77.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-78.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-79.jpg Public Works Standards - All Drawings_202310041310389455-26.dwg-1-80.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-81.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-82.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-83.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-84.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-85.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-86.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-87.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-88.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-89.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-90.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-91.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-92.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-93.jpg
Public Works Standards - All Drawings_202310041310389455-26.dwg-1-94.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-95.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-96.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-97.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-98.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-99.jpg
Public Works Standards - All Drawings_202310041310389455-26.dwg-1-100.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-101.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-102.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-103.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-104.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-105.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-106.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-107.jpg
Public Works Standards - All Drawings_202310041310389455-26.dwg-1-108.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-109.jpg
Public Works Standards - All Drawings_202310041310389455-26.dwg-1-110.jpgPublic Works Standards - All Drawings_202310041310389455-26.dwg-1-111.jpg CITY OF TEMECULADEPARTMENT OF PUBLIC WORKS
STANDARD LOCATION OF
UNDERGROUND UTILITIES
DWG BY:DATE:
WIRE CENTER NAME:
FRONTIER WORK ORDER
SCALE:
W.O. TITLE:AND DESCRIPTION
SHEET
1"=20'01/03/2023 03 OF 03CYIENT
92591
SITE PLAN FOR REPLACE
PULLBOX LID AT 39655
BUTTERFIELD STAGE RD
5340503_WO1243194
CITY
TEMECULA
UNDERGROUND
SERVICE ALERT
CALL 1-800-422-4133
AT LEAST 2 BUSINESS DAYS
BEFORE YOU DIG
OF SOUTHERN CALIFORNIA N
ADDRESS
39655 BUTTERFIELD
STAGE RD
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020
APPLICATION INFORMATION PERMIT NO.:
Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching
Signing & Striping Traffic Signal Miscellaneous (SPECIFY BELOW)
The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as
follows:
Name(s) of street(s) and/or street address:
Utility Work Order #: Start Date: End Date:
In consideration of granting this application, all applicants including utility companies hereby agree to:
1. If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties
involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control
Plan Checklist for details.
2. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from
and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident,
loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application. (See below for specific liability insurance requirements.)
3. Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City
Engineer.
4. Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working
days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The
developer/general contractor must be present for the timely request of inspections.
5. Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works
Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all
applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction.
LIABILITY INSURANCE REQUIREMENTS
PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED
EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE
CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED.
THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR
BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT
ENCROACHMENT PERMIT.
x
Frontier requests to replace pull box lid on Butterfield Stage Rd. Work duration approximately 1 day.
FRONTIER RBO 5340503 WO1243194
Butterfield Stage Rd
WO1243194 9/28/23 1/28/24
LD23-6148
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
Tricia.ortega 10/17/2023
10/17/2023 10/17/2023
10/17/20
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020
Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum
limits of insurance coverage shall be as follows:
a. General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If
Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it
shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
b. Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage.
c. Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident
for bodily injury or disease.
d. Course of Construction: Completed value of the project.
There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approac h
located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at
least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the
encroachment permit:
BODILY INJURY $250,000.00 EACH PERSON
$500,000.00 EACH OCCURANCE
$500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
PROPERTY DAMAGE $100,000.00 EACH OCCURANCE
$250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to
the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing
the City named as an additional insured shall be attached to the application.
The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this
application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges
that this application will be made a part of the encroachment permit.
APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED)
Company Name:
Mailing Address:
Contact: Phone #: E-mail:
I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the
permittee and bind the permittee to the agreements contained herein and any conditions of the permit.
Authorized Signature: Date Applied:
CONTRACTOR’S INFORMATION
Company Name:
Mailing Address:
Contact: Phone #: 24-HR Emergency #:
State Contractor’s License #: Class: City Business License #:
Frontier Communications Inc.
201 Flynn Rd Camarillo CA 93012
Erika Lucas 209-679-0046 IEATEng@cyient.com
Frontier will be doing the work
9/22/23
DWG BY:DATE:
WIRE CENTER NAME:
FRONTIER WORK ORDER
SCALE:
W.O. TITLE:AND DESCRIPTION
SHEET
1"=100'10/24/2023 01 OF 02CYIENT
CITY
TEMECULA
WORK IN PULL BOX LOCATED AT
+/-1020 NORTH OF THE C/L OF CLL
CHAPOS ALONG BUTTERFIELD STAGE
RD.
WO1243194_5340503
PULL BOX
LAT: 34.543547
LONG:-117.101308
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULA
1
2
ENGINEER'S INFORMATIONENGINEER'S SEALCONTRACTOR:
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
TRAFFIC CONTROL PLAN GENERAL NOTES
PERMIT NO.LD23-6148
PERMIT NO. LD23-6148
1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY.
3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED
OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY.
5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL
EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE
IN DRIVABLE CONDITION AT ALL TIMES.
6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK.
8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION.
10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE
REPLACED TEMPORARILY WITH TAPE.)
11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A
HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC.
12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48
HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694 -6411.
13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK.
14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC
WORKS.
15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD
CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE
PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION.
16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE
UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS
SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD
DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH.
18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD
INSPECTION, OR THE POLICE DEPARTMENT.
19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20.IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT
LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES.
FOR
TRAFFIC CONTROL PLANS
REPLACING PULL BOX LID.
BUTTERFIELD STAGE RD
FRONTIER COMMUNICATIONS INC - CA
JEFFREY MELTON - ENGR, NETWORK SR
201 Flynn Rd
Camarillo, CA 93012
951-434-9963 Jeffrey.A.Melton@ftr.com
MATT BAUMGARDNER RCE
CONTACT NUMBER: 805 -358-3680
ADDRESS: 1525 CAMPBELL AVE,
THOUSAND OAKS, CA 91360
FIRM: BAUMGARDNER ENGINEERING
12/18/23
12/21/23
PB
BU
T
T
E
R
F
I
E
L
D
S
T
A
G
E
R
D
50
M
P
H
SIDEWALK
SIDEWALK
SIDEW
A
L
K
SID
E
W
A
L
K
SID
E
W
A
L
K
SI
D
E
W
A
L
K
SI
D
E
W
A
L
K
SI
D
E
W
A
L
K
SI
D
E
W
A
L
K
SID
E
W
A
L
K
SID
E
W
A
L
K
BU
T
T
E
R
F
I
E
L
D
S
T
A
G
E
R
D
50
M
P
H
S
O
M
M
E
R
S
B
N
D
40
M
P
H
S
NI
C
O
L
A
S
R
D
40
M
P
H
SID
E
W
A
L
K
SID
E
W
A
L
K
40'100' BUFFER 200' SHOULDER TAPER
200' BIKE
T
A
P
E
R
350'
42
0
'
250
'
250
'
25' MAX
14
'
BIK
E
L
A
N
E
PULL BOX
LAT: 33.543547
LONG: -117.101308
RAISED
M
E
D
I
A
N
RAISED MEDIAN
ROW
BOC
BOC
ROW
B
O
C
R
O
W
B
O
C
R
O
W
B
O
C
R
O
W
B
O
C
R
O
W
BO
CRO
W
BO
C
RO
W
BO
C
RO
W
BO
CRO
W
BO
CRO
W
BO
C
RO
W
BO
C
RO
W
BO
CRO
W
BOC
ROW
BOC
ROW
250'
RAISED MEDIAN
R
A
I
S
E
D
M
E
D
I
A
N
PLACE ON THE N/W CORNER OF BUTTERFIELD STAGE
RD & CLL CHAPOS INTERSECTION.
86
'
10
0
'
ROAD WORK
END
G20-2
WORK
ROAD
W20-1
AHEAD
SCALE: 1"=100'
0 60'80'100'
R9-3A
R9-3A
WORK ZONE: 40'x24'
14'
13'
12'
11'
CLOSED
SHOULDER
C30A(CA)
LANE
CLOSED
BIKE
C30(BIKE)THE
SHARE
ROAD
W11-1
W16-1
LANE
CLOSED
BIKE
AHEAD
C20(BIKE)
WORK
SHOULDER
W21-5
SIDEWALK CLOSED
R9-11(L)
CROSS HERE
AHEAD
ROAD WORK
END
G20-2
WORK
ROAD
W20-1
AHEAD
WORK
ROAD
W20-1
AHEAD
ROAD WORK
END
G20-2
WORK
ROAD
W20-1
AHEAD
ROAD WORK
END
G20-2
SIDEWALK CLOSED
R9-11(R)
CROSS HERE
AHEAD 92
'
11
4
'
4'
21'
13'
10'
11'
13'
9'
CONTRACTOR / OWNER:
FRONTIER COMMUNICATIONS INC - CA
JEFFREY MELTON - ENGR, NETWORK SR
201 Flynn Rd
Camarillo, CA 93012
951-434-9963 Jeffrey.A.Melton@ftr.com
DWG BY:DATE:
WIRE CENTER NAME:
FRONTIER WORK ORDER
SCALE:
W.O. TITLE:AND DESCRIPTION
SHEET
1"=100'10/24/2023 02 OF 02CYIENT
CITY
TEMECULA
WORK IN PULL BOX LOCATED AT
+/-1020 NORTH OF THE C/L OF CLL
CHAPOS ALONG BUTTERFIELD STAGE
RD.
WO1243194_5340503
REPLACE PULL BOX LID.
PERMIT NO.LD23-6148
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULA
2
2
ENGINEER'S INFORMATIONENGINEER'S SEAL
PERMIT NO. LD23-6148
CONTRACTOR:
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
EXISTING NO TURN LANE
TRAFFIC CONE
FLASHING ARROW SIGN (FAS)
EXISTING TURN ONLY LANE
BARRICADE
WORK ZONE
TRAFFIC SIGNAL
HIGH LEVEL WARNING DEVICE
(WITH CALTRANS & MUTCD CODE)
SIGN (WITH CALTRANS CODE)
TRAFFIC FLOW DIRECTION
FLAGGER
S
DETAIL SHEET LEGEND
CONE SPACING - 25' MAXIMUM
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
12/14/2023STAMP DATE:
FRONTIER COMMUNICATIONS INC - CA
JEFFREY MELTON - ENGR, NETWORK SR
201 Flynn Rd
Camarillo, CA 93012
951-434-9963 Jeffrey.A.Melton@ftr.com
MATT BAUMGARDNER RCE
CONTACT NUMBER: 805 -358-3680
ADDRESS: 1525 CAMPBELL AVE,
THOUSAND OAKS, CA 91360
FIRM: BAUMGARDNER ENGINEERING
FOR
TRAFFIC CONTROL PLANS
REPLACING PULL BOX LID.
BUTTERFIELD STAGE RD
12/18/23
12/21/23