HomeMy WebLinkAboutLD23-1501Permit Number: LD23-1501
LD - Utilities/ Excavation - Parallel
Issued: 06/23/2023
Expired: 12/20/2023
Job Address: 29600 Courtney Pl
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Michelle Guerra
325 W. Hospitality Lane Suite 206 Suite 206, Suite 206
San Bernardino, CA 92408
Applicant:
Brash Engineering Services
11172 Chico Ave
Pomona, CA 91766
(562) 587-1320
Contractor:
Utility Work Order Number: HBLTXC03-TEM
Description:
Crown Castle HBLTCX03
WORK HOURS SHALL BE MONDAY – FRIDAY, NO HOLIDAYS, 8:30am - 3:30pm
Location: 29600 Courtney Pl
Proposed work:
Maintenance to existing manholes.
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD23-1501
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
Public Works Inspector.
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities*****
Permit Number: LD23-1501
LD - Utilities/ Excavation - Parallel
project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
Page 2 of 3
Permit Number: LD23-1501
LD - Utilities/ Excavation - Parallel
City Engineer or Authorized Representative Date
06/23/2023
Page 3 of 3
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
david.pina 05/04/2023
05/04/2023 05/04/2023
05/04/20
TRAFFIC CONTROL GENERAL NOTES
1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (2019 CALIFORNIA MUTCD) AND
THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2. THE CITY TRAFFIC ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY.
3. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4. WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 9:00 A.M. TO 3:30 P.M., MONDAY TO FRIDAY AND 8:00 A.M. TO 6:00 P.M., SATURDAY UNLESS APPROVED
OTHERWISE. WORK IS NOT PERMITTED ON CITY HOLIDAYS.
5. TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS.
6. PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7. TEMPORARY "T.A.N.S.A.T." SIGNS SHALL BE POSTED BY THE CONTRACTOR 72 HOURS PRIOR TO COMMENCING WORK.
8. ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9. THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING, REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH
TAPE.)
11. ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW"
PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC.
12. ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA 48 HOURS PRIOR TO BEGINNING CONSTRUCTION.
13. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOUR PER DAY AND 7 DAYS PER WEEK.
14. A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE CITY OF TEMECULA.
15. ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF TEMECULA. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL
MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION. ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING
CONSTRUCTION.
16. A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE UTILITY OBSERVATION
EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE
PENETRATION INTO THE THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2 ) FOR TRENCH PATCH.
18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD ISPECTION, OR THE
POLICE DEPARTMENT.
19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUTED ON HIGH LEVEL DEVICES.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING
STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES.
VICINITY MAP
VIA LA VIDA
(30 MPH)
C30-BIKE
BIKE
LANE
CLOSED
CURB
CURB
G20-2
END
ROAD WORK
350'
W20-1
ROAD
WORK
AHEAD
25
0
'
W20-1
ROAD
WORK
AHEAD
G20-2
END
ROAD WORK
EXISTING
HANDHOLE
MARGARITA ROAD
(45 MPH)
EXISTING
HANDHOLE
14
'
C30-BIKE
BIKE
LANE
CLOSED
BIKE LANE
BIKE LANE
RAMSEY CT
(25 MPH)
180'
BIKE LANE T
A
P
E
R
C30-BIKE
BIKE
LANE
CLOSED
C30-BIKE
BIKE
LANE
CLOSED
G20-2
END
ROAD WORK
G20-2
END
ROAD WORK
CARA WAY
(25 MPH)
350'
350'
175'
W20-1
ROAD
WORK
AHEAD
(BIKE)
BIKE
LANE
CLOSED
AHEAD
W20-5
10
0
'
W20-1
ROAD
WORK
AHEAD
1
0
0
'
W20-1
ROAD
WORK
AHEAD
10
0
'
W20-1
ROAD
WORK
AHEAD
DRIVEWAY
CARA WAY
(25 MPH)
W11-1W16-1
SHARE
THE
ROAD
C30-BIKE
BIKE
LANE
CLOSED
G20-2
END
ROAD WORK
G20-2
END
ROAD WORK
NARROW
LANE
C12
EXISTING
HANDHOLE
EXISTING
HANDHOLE
EXISTING
HANDHOLE
EXISTING
MANHOLE
CURB
CURB
14
'
14
'1
4
'
1
4
'
C30-BIKE
BIKE
LANE
CLOSED
BIKE LANE BIKE LANE
BIKE LANE
BIKE LAN
E
BIKE LAN
E
350'
ROAD
NARROW
W5-1
(CA)
NOTE:
PROVIDE FLAGGER TO MAINTAIN
PEDESTRIAN ACCESS, WORK ON POLES
WORK HOURS:
APPROX. DURATION OF WORK:
TYPE OF WORK:
NOTE:
INSTALL TEMPORARY NO PARKING 72 HOURS
PRIOR TO WORK IF NEEDED
8:30 AM TO 3:30 PM MONDAY - FRIDAY
3 DAYS
MANHOLE ACCESS
NOTES
FLASHING ARROW BOARD
DELINEATOR
CONE WITH SIGN
TEMPORARY SIGN
WORK VEHICLE
DIRECTION OF TRAVEL
TYPE II BARRICADE
TYPE III BARRICADE
TYPE III BARRICADE WITH SIGN
WORK AREA
LEGEND:
HIGH-LEVEL WARNING DEVICE
SIGNALIZED INTERSECTIONS
TYPE II BARRICADE WITH SIGN
DIRECTIONAL BORE MACHINE
STEEL PLATES
Drawn By
Plans Prepared Under Supervision Of
Date
CONSTRUCTION RECORD
Contractor:
Inspector
Date Completed
DATE BY REVISIONS BENCH MARKDATEACC'D
Vertical
Horizontal
SCALE
R.C.E. No.
SEAL:Designed By CITY OF TEMECULARECOMMENDED BY:
ACCEPTED BY:
R.T.E. No. 2647
Checked By
DATE:
DATE:
Sheet of
DEPARTMENT OF PUBLIC WORKS
Drawing No.
TRAFFIC ENGINEER
NICOLAS M. MINICILLI
2
DHS108009CA-HBLTCX03-TEM
29600 COURTNEY PL.,TEMECULA, CA 92591
TRAFFIC CONTROL PLANDANIEL EKO
BRASH ENGINEERING SERVICES
PRESIDENT
(714) 446-0635
PERMIT NO. LD23 - 1501
N
1
M
A
R
G
A
R
I
T
A
R
D
.
M
A
R
G
A
R
I
T
A
R
D
.
CARA
W
A
Y
RAM
S
E
Y
C
T
.
CARA
W
A
Y
WORK AREA
0"40' 40'20'
24"x36" SCALE: 1" = 40'-0"
NE
N
E
SE
SWW
NW
SW
SE
NW
6/8/2023
6/15/23
6/15/23
Sheet 1 of 1