Loading...
HomeMy WebLinkAboutLD23-1278Permit Number: LD23-1278 LD - Utilities/ Access to Utility Agency Facilities Issued: 06/06/2023 Expired: 12/04/2023 Job Address: 31625 De Portola Rd Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Frontier California Inc. 401 Merritt 7 Norwalk, CT 06851 (000) 000-0000 Applicant: Gulbranson Services Inc. 15371 Bonanza Rd Unit A, Victorville, CA 92392 (760) 843-0330 Contractor: Utility Work Order Number: ASR 3855361 Description: Frontier ASR 3855361 WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am Location: MH14 - Meadows Pkwy W/S 380' S/O Campanula Way MH41 - Campanula Way S/S 240' W/O Meadows Pkwy MH92 - Campanula Way NE/S 610' S/O De Portola Rd MH580 - Temecula Pkwy S/S 120' E/O Meadows Pkwy MH1020 - Margarita Rd W/S 385' S/O De Portola Rd MH1167 - De Portola Rd S/S 385' W/O Margarita Rd MH1183 - De Portola Rd S/S 170' E/O Campanula Way Proposed work: Access seven (7) manholes as shown on Frontier "SITE PLAN, LD23-1278" All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD23-1278 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. Page 1 of 3 Permit Number: LD23-1278 LD - Utilities/ Access to Utility Agency Facilities All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project. Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Page 2 of 3 Permit Number: LD23-1278 LD - Utilities/ Access to Utility Agency Facilities ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Permitee Date City Engineer or Authorized Representative Date 06/06/2023 Page 3 of 3 CONTRACTOR: FOR CITY USE ONLY: PERMIT NO. SHEET OF 5 SHEET CITY OF TEMECULA PUBLIC WORKS ASR-3855361 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 MARK REVISIONS BY APPR.DATE MH #14 LOCATION MH #590 LOCATION 46' M E A D O W S P K W Y TEMEC U L A P K W Y 1 4 0 ' 7 0 ' 7 0 ' 1 0 8 ' 5 4 ' 5 4 ' 6 4 ' 119' SITE PLAN TEMECULA PKWY & MEADOWS PKWY 1 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN FOR TEMECULA PKWY & MEADOWS PKWY LD23-1278 CLEARED BY CITY OF TEMECULA PUBLIC WORKS tricia.ortega 05/15/2023 05/15/2023 05/15/2023 05/15/20 CONTRACTOR: FOR CITY USE ONLY: PERMIT NO. SHEET OF 5 SHEET CITY OF TEMECULA PUBLIC WORKS ASR-3855361 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 MARK REVISIONS BY APPR.DATE 5 8 ' 4 0 ' 8 0 ' 2 9 ' 4 0 ' 3 1 ' MH #14 LOCATION MH #41 LOCATION CAM P A N U L A W A Y M E A D O W S P K W Y 2 9 ' 46' 100' 50' 50' 75' 36' 38' 3 8 0 ' T O C A M P A N U L A W A Y 240' T O M E A D O W P K Y M E A D O W S P K W Y SITE PLAN MH #14 32240 TEMECULA PKWY MH #41 3220 CAMPANULA WAY 2 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN FOR CAMPANULA WAY & MEADOWS PKWY LD23-1278 CONTRACTOR: FOR CITY USE ONLY: PERMIT NO. SHEET OF 5 SHEET CITY OF TEMECULA PUBLIC WORKS ASR-3855361 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 MARK REVISIONS BY APPR.DATE 108+00 MH #92 LOCATION 33 ' 80' 40' 40' 56' 28' 28' 61 0 ' T O D e P O R T O L A R D C A M P A N U L A W A Y SITE PLAN 31941 CAMPANULA WAY 3 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN FOR CAMPANULA WAY & De PORTOLA RD LD23-1278 CONTRACTOR: FOR CITY USE ONLY: PERMIT NO. SHEET OF 5 SHEET CITY OF TEMECULA PUBLIC WORKS ASR-3855361 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 MARK REVISIONS BY APPR.DATE MH #1183 LOCATION DeP O R T O L A R D C A M P A N U L A W A Y 4 6 ' 172' 9 2 ' 4 6 ' 4 6 ' 7 6 ' 3 8 ' 3 8 ' SITE PLAN 32105 De PORTOLA RD 4 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN FOR CAMPANULA WAY & De PORTOLA RD LD23-1278 CONTRACTOR: FOR CITY USE ONLY: PERMIT NO. SHEET OF 5 SHEET CITY OF TEMECULA PUBLIC WORKS ASR-3855361 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 MARK REVISIONS BY APPR.DATE MH #1167 LOCATION MH #1020 LOCATION DePOR T O L A R D M A R G A R I T A R D 3 9 ' 376' 41' 3 8 4 ' 9 0 ' 4 5 ' 4 5 ' 6 8 ' 3 4 ' 3 4 ' 112' 56' 56' 84' 42' 42' SITE PLAN 31388 De PORTOLA RD 44077 MARGARITA RD 5 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN FOR De PORTOLA RD & MARGARITA RD LD23-1278 ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF 6 SHEET CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70147-5328331 D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3176 2647 NICOLAS M. MINICILLI TRAFFIC ENGINEER LD23-1278 W.O.#DRAWN BY:T.G. PAGE:SHEET#:TITLE:OFTRAFFIC CONTROL PLAN#####-#######LOCATION:CITY/STATE:*CITY*, CA#MTCSCOMMUNICATIONSDATE: 5/17/2023FTR ENGINEER:CHOOSE ENGINEERFTR INSPECTOR:CHOOSE INSPECTORMountain TopCommunication Services LLC ENGINEER'S INFORMATIONCONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:DRAWINGNO.SHEETOF6SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION70147-5328331D. LYNN PARKERP.O. BOX 1666COTTONWOOD, AZ 86326(909) 472-9983FRONTIER ENGINEER:RAUL RIVAS (909) 406-31762647NICOLAS M. MINICILLITRAFFIC ENGINEERLD23-1278 VICINITY MAP NTS PROJECT LOCATION TRAFFIC CONTROL PLANS 1 REGULATORY SIGNS BIKE LANE R3-17 R5-6 WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND CONE SPACING-25' MAXIMUM STOP TRAFFIC CONTROL PLANS FOR OLD TOWN FRONT ST, DE PORTOLA RD, TEMECULA PKWY, & DE PORTOLA RD W11-1 W16-1SHARETHE ROAD WORK TO BE DONE: FRONTIER TO ACCESS (5) EX. MANHOLES TO SPLICE EX. CABLE TO SERVICE A CUSTOMER LOCATED AT 31625 DE PORTOLA RD. TRAFFIC CONTROL GENERAL NOTES (REV'D 08/26/20): 1. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2. THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4. WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE, WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5. TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM THE STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6. PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8. ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9. THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10. THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11. ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT.) ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12. ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694-6411. 13. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14. A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15. ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16. A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH. 18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. WORK HOURS VARY SEE SHEETS FOR DETAILS ENGINEER OF WORK'S CERTIFICATE I, D. LYNN PARKER , hereby declare that I am the engineer of Work for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and the design is consistent with current standards and City of Temecula. I understand that the check of project drawings and specifications by the City of Temecula is confined to a review only and does not relieve me of responsibilities for project design. Signed R.C.E. Firm___ 5/17/2023 Date_______________ 29570 3/31/25Exp.________________ __________________________PARKER ENGINEERING, LLC ______ Address__P. Telephone (909) 472-9983______________________________ ______________________________O BOX 1666, COTTONWOOD, AZ 86326 5/17/2023 5/23/23 5/23/23 ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF 6 SHEET CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70147-5328331 D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3176 2647 NICOLAS M. MINICILLI TRAFFIC ENGINEER LD23-1278 2 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. N.T.S. DURATION OF WORK: 2 DAYS WORK HOURS MONDAY-FRIDAY 8:30 AM - 3:30 PM TRAFFIC CONTROL PLANS FOR OLD TOWN FRONT ST & MORENO RD 350' SIGN SPACING 350' SIGN SPACING 50' MIN. GAP BETWEEN CHANNELIZERS WORK AREA CONCRETE MEDIAN CURB CURB 12 ' 48' TO C/L CURB CURB LANDSCAPE MEDIAN 396' TO C/L MEADOWS PKWY (40 MPH) CA M P A N U L A W A Y S WORKROAD AHEAD W20-1 WORKROAD AHEAD W20-1 TURN RIGHT M U S T RIGHT LANE R3-7R ROAD WORKEND G20-2 ROAD WORK END G20-2 ROAD WORK END G20-2 WORKROAD AHEAD W20-1 W12-1 C30(CA) LANECLOSED 320' MERGING TAPER RIGHT LANECLOSEDAHEAD C20 CLOSED BIKE SC11 (MOD) LANE W11-1 W16-1 W11-1 ASSEMBLY SHARE THE ROAD BIKE LANE BIKE LANE SIDEWALK 180' BIKE LANE TAPER SIDEWALK WO R K RO A D WORKROAD AHEAD W20-1 ROAD WORK END G20-2 C30(CA) LANECLOSED CROSS HERE SIDEWALK CLOSED R9-11 AHEAD MH #14 LOCATION CO N C R E T E M E D I A N CO N C R E T E M E D I A N R9-3A R9-3A W4-2 350' SIGN SPACING NO HOLIDAYS 5/17/2023 5/23/23 5/23/23 ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF 6 SHEET CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70147-5328331 D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3176 2647 NICOLAS M. MINICILLI TRAFFIC ENGINEER LD23-1278 3 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. N.T.S. VI A T A M P A R I T E ROAD WORK END G20-2 C30A(CA) SHOULDER CLOSED INSTALL TEMP. NO PARKING 72 HOURS PRIOR TO COMMENCING WORK WORK AREA MH#1183 LOCATION 50 ' TO C / L CURB 176' TO C/L CURB CURB BIKE LANE 12 ' MI N . 270' SHIFTING TAPER WORKROAD AHEAD W20-1 WORKROAD AHEAD W20-1 WORKROAD AHEAD W20-1 ROAD WORK END G20-2 ROAD WORK END G20-2 ROAD WORKEND G20-2 WO R K RO A D RAISED MEDIAN 12 ' MI N . INSTALL TEMP. NO PARKING 72 HOURS PRIOR TO COMMENCING WORK SIDEWALK R9-3AR9-3A DE PORTOLA RD (45 MPH)LA N D S C A P E M E D I A N STOP STOPSTOP CO N C R E T E M E D I A N TRAFFIC CONTROL PLANS FOR DE PORTOLA RD & VIA TAMPARITE 38 ' 76 ' 38 ' 76 ' RAISED MEDIAN R3-4 R3-4 WORKROAD AHEAD W20-1 CLOSED BIKE SC11 (MOD) LANEW11-1 W16-1 W11-1 ASSEMBLY SHARE THE ROAD BIKE LANE 180' BIKE TAPER 250' W5-1 ROAD NARROWS C12(CA) NARROWLANE 250'250' BIKE LANECLOSEDAHEAD C20(CA)BIKE DURATION OF WORK: 1 DAY WORK HOURS MONDAY-FRIDAY 8:30 AM - 3:30 PM NO HOLIDAYS 5/17/2023 5/23/23 5/23/23 ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF 6 SHEET CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70147-5328331 D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3176 2647 NICOLAS M. MINICILLI TRAFFIC ENGINEER LD23-1278 4 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. N.T.S. DURATION OF WORK: 1 DAY WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM 50' WORK AREA 200' BIKE LANE TAPER CURB CURB 350' 660' MERGING TAPER 2 5 ' T O C / L MH#590 LOCATION 100' TO C/L CONCRETE MED I A N CONCRETE MED I A N CURB 1 2 ' ROAD WORK END G20-2 ROAD WORK END G20-2 ROAD WORK END G20-2 ROAD WORK END G20-2 WORKROAD AHEAD W20-1 WORKROAD AHEAD W20-1 WORKROAD AHEAD W20-1 S P A I N T E D M E D I A N W O R K R O A D M E A D O W S P K W Y TEMECULA PKW Y ( 5 0 M P H ) SIDEWALK 350' C30(CA) LANECLOSED 1 2 ' C30(CA) LANECLOSED A P I S R D P A I N T E D M E D I A N R9-3A R9-3A TRAFFIC CONTROL PLANS FOR TEMECULA PKWY & MEADOWS PKWY R3-4 R3-4 425' BUFFER BIKE LANE BIKE LANE CLOSED BIKE SC11 (MOD) LANE W11-1 W16-1P SHARE THE ROAD 1 6 ' RIGHT LANECLOSEDAHEAD C20-R W4-2R 350' WORKROAD AHEAD W20-1 LANE CLOSED AHEAD C20 (CA) BIKE1 5/17/2023 5/23/23 5/23/23 ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF 6 SHEET CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70147-5328331 D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3176 2647 NICOLAS M. MINICILLI TRAFFIC ENGINEER LD23-1278 5 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. N.T.S. DURATION OF WORK: 2 DAYS WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM ROAD WORKEND G20-2 C30A(CA) SHOULDER CLOSED W11-1 W16-1 W11-1 ASSEMBLY SHARE THE ROAD WORK AREA MH#1167 LOCATION PAINTED MEDIAN 30 ' TO C / L CURB CONCRETE MEDIAN 376' TO C/L CURB CURB WO R K RO A D DE PORTOLA RD (45 MPH) MA R G A R I T A R D BIKE LANEBIKE LANE 12 ' MI N . S ROAD WORK END G20-2 ROAD WORK END G20-2 ROAD WORK END G20-2 WORKROAD AHEAD W20-1 WORKROAD AHEAD W20-1 WORKROAD AHEAD W20-1 350' CURB CO N C R E T E M E D I A N CO N C R E T E M E D I A N TRAFFIC CONTROL PLANS FOR DE PORTOLA RD & MARGARITA RD RIGHT LANECLOSEDAHEAD C20 WORKROAD AHEAD W20-1 BIKE LANE CLOSEDAHEAD C20 (CA) (BIKE)350' 5/17/2023 5/23/23 5/23/23 ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF 6 SHEET CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70147-5328331 D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3176 2647 NICOLAS M. MINICILLI TRAFFIC ENGINEER LD23-1278 6 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. N.T.S. DURATION OF WORK: 1 DAY WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM DE P O R T O L A R D ROAD WORK END G20-2 CLOSED BIKE SC11 (MOD) LANE INSTALL TEMP. NO PARKING 72 HOURS PRIOR TO COMMENCING WORK 50' WORK AREA RAISED MEDIAN 37 ' TO C / L CURB 383' TO C/L CURB CURB BIKE LANE BIKE LANE 540' MERGING TAPER WORKROAD AHEAD W20-1 WORKROAD AHEAD W20-1 WORKROAD AHEAD W20-1 ROAD WORKEND G20-2 ROAD WORK END G20-2 ROAD WORK END G20-2 WO R K RO A D RAISED MEDIAN INSTALL TEMP. NO PARKING 72 HOURS PRIOR TO COMMENCING WORK CO N C R E T E M E D I A N 350'350' MARGARITA RD (45 MPH) LA N D S C A P E M E D I A N BI K E L A N E BI K E L A N E S MH #1020 LOCATION TRAFFIC CONTROL PLANS FOR MARGARITA RD & DE PORTOLA RD R3-4 R3-4 180' BIKE TAPER WORKROAD AHEAD W20-1 W4-2R 350' W11-1 W16-1P SHARE THE ROAD RIGHT LANECLOSEDAHEAD C20-R LANE CLOSEDAHEAD C20 (CA) BIKE1 350' 5/17/2023 5/23/23 5/23/23 CONTRACTOR: FOR CITY USE ONLY: PERMIT NO. SHEET OF 4 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70147-5328331 ENGINEER'S INFORMATION MARK REVISIONS BY APPR.DATE D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 TRAFFIC CONTROL PLANS 1 REGULATORY SIGNS BIKE LANE R3-17 R5-6 WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND CONE SPACING-25' MAXIMUM STOP VICINITY MAP NTS TRAFFIC CONTROL GENERAL NOTES (REV'D 08/26/20): 1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE, WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM THE STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT.) ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694-6411. 13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH. 18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM PROJECT LOCATION WORK CREW TO ACCESS 2 EX. MANHOLES TO SPLICE EX. CABLE TO SERVICE A CUSTOMER LOCATED AT 31625 DE PORTOLA RD. LD23-1278 TRAFFIC CONTROL PLANS FOR CAMPANULA WAY & MEADOWS PKWY PERMIT NO. SHEET OF 4 SHEETS 70147-5328331 2 TRAFFIC CONTROL PLANS FOR CAMPANULA WAY & MEADOWS PKWY WORK HOURS SUNDAY-THURSDAY 9:00 AM - 5:00 PM DURATION OF WORK: 1 DAY FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 CAMPANULA WY (30 MPH) ME A D O W S P K W Y MH#41 LOCATION 240' TO C/L 250' 31 ' TO C / L 250'90' 100' 250' 250' N LD23-1278 50' PERMIT NO. SHEET OF 4 SHEETS 70147-5328331 3 TRAFFIC CONTROL PLANS FOR CAMPANULA WAY & DE PORTOLA RD WORK HOURS SUNDAY-THURSDAY 9:00 AM - 5:00 PM DURATION OF WORK: 1 DAY FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 CAMPANULA WY (EAST CROSSING) (30 MPH) DE P O R T O L A R D MH#92 LOCATION 610' TO C/L 250' 33 ' TO C / L 250'90' 100' 250' 250' N LD23-1278 50' PERMIT NO. SHEET OF 4 SHEETS 70147-5328331 4 LD23-1278