HomeMy WebLinkAboutLD23-1165Permit Number: LD23-1165
LD - Utilities/ Access to Utility Agency Facilities
Issued: 04/06/2023
Expired: 10/03/2023
Job Address: 41000 Main St
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Frontier California Inc.
401 Merritt 7
Norwalk, CT 06851
(000) 000-0000
Applicant:
Gulbranson Services Inc.
15371 Bonanza Rd Unit A,
Victorville, CA 92392
(760) 843-0330
Contractor:
Utility Work Order Number: 70116-5327119
Description:
Frontier 70116-5327119; WORK HOURS VARY
Alley between 4th & 5th, traveling Old Town Front St to Mercedes and
Old Town Front Street
WORK HOURS SHALL BE SUNDAY - THURSDAY, NO HOLIDAYS, 9:00pm - 5:00am
Mercedes St
WORK HOURS SHALL BE MONDAY - FRIDAY, NO HOLIDAYS, 8:30am - 3:30pm
Location:
PB262 - Old Town Front St NE/S 50' NW/O 6th St
MH538 - Old Town Front St NE/S 100' NW/O Main St
MH885 - Mercedes St NE/S 80' SE/O 4th St
HUB3040 - 4th St SE/S 130' NE/O Mercedes St
Proposed work:
Access two (2) manholes, one (1) HUB, and one (1) pull box as shown on Frontier "SITE PLAN 41000 MAIN ST,
LD23-1165"
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
Page 1 of 2
Permit Number: LD23-1165
LD - Utilities/ Access to Utility Agency Facilities
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
City Engineer or Authorized Representative Date
04/06/2023
Page 2 of 2
CONTRACTOR:
FOR CITY USE ONLY:
PERMIT
NO.
SHEET OF
2 SHEET
CITY OF TEMECULA
PUBLIC WORKS
70116-5327119
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178
MARK REVISIONS BY APPR.DATE
LD23-1165
STOP
ST
O
P
STOP
ST
O
P
MA
I
N
S
T
MH #538
LOCATION
OLD TOWN FRONT ST (25 MPH)
26
'
94'
20
'
20
'
40
'
28
'
28
'
56
'
MH #885
LOCATION
23
'
90'
MERCEDES ST
4T
H
S
T
20
'
20
'
40
'
30
'
30
'
60
'
STOP
STOP
HUB#3040
LOCATION
21'
14
9
'
SITE PLAN
41000 MAIN ST TEMECULA CA PROJECT LOCATIONS
1
VICINITY MAP
1.The City Engineer or their representative has the
authority to initiate field changes to assure public safety.
2.BEFORE YOU DIG – CALL (TOLL FREE)
(800)422-4133
3.Where there is conflict with the permit language and
approved plans, the approved plans shall govern.
4.Trench repair shall be in accordance with City
Standard Drawing 407.
5.All facilities shall be installed in accordance with City
Standard Drawing 117.
6.Concrete curbs, walks, gutters, cross gutters and
driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance
with City Standards and the Greenbook.
7.All disturbed landscaping and other improvements
shall be removed or repaired and replaced to the
satisfaction of Public Works.
8.Access ramps shall be removed joint to joint and
reconstructed in accordance with City Standard Drawing
402 and meet current ADA Standards.
9.Any survey monuments damaged or destroyed shall
be reset per City Standards by a qualified professional
pursuant to the California Business and Professions Code
Section 8771.
10.Final compaction test results shall be provided by a
soils engineer.
11.A pre-construction meeting is required two (2)
business days prior to any scheduled work. Permittee shall
contact LDInspections@temeculaca.gov to schedule a
meeting.
12.All U.S.A. mark outs shall be removed prior to
completion of project.
13.A final inspection is required for all projects.
Permittee must contact LDInspections@temeculaca.gov to
verify completion of project.
SCALE: 1"=60'
SITE PLAN
FOR
OLD TOWN FRONT ST/MAIN ST & 4TH ST/MERCEDES ST
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
tricia.ortega 04/03/2023
04/03/2023 04/03/2023
04/03/20
CONTRACTOR:
FOR CITY USE ONLY:
PERMIT
NO.
SHEET OF
2 SHEET
CITY OF TEMECULA
PUBLIC WORKS
70116-5327119
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178
MARK REVISIONS BY APPR.DATE
LD23-1165
PB#262
LOCATION
60'
30'
30'
40'
20'
20'
5
2
'
29'
SITE PLAN
FOR
OLD TOWN FRONT ST & 6TH ST
PROJECT LOCATION
2
VICINITY MAP
1. The City Engineer or their representative has the
authority to initiate field changes to assure public safety.
2. BEFORE YOU DIG – CALL (TOLL FREE)
(800) 422-4133
3. Where there is conflict with the permit language and
approved plans, the approved plans shall govern.
4. Trench repair shall be in accordance with City
Standard Drawing 407.
5. All facilities shall be installed in accordance with City
Standard Drawing 117.
6. Concrete curbs, walks, gutters, cross gutters and
driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance
with City Standards and the Greenbook.
7. All disturbed landscaping and other improvements
shall be removed or repaired and replaced to the
satisfaction of Public Works.
8. Access ramps shall be removed joint to joint and
reconstructed in accordance with City Standard Drawing
402 and meet current ADA Standards.
9. Any survey monuments damaged or destroyed shall
be reset per City Standards by a qualified professional
pursuant to the California Business and Professions Code
Section 8771.
10. Final compaction test results shall be provided by a
soils engineer.
11. A pre-construction meeting is required two (2)
business days prior to any scheduled work. Permittee shall
contact LDInspections@temeculaca.gov to schedule a
meeting.
12. All U.S.A. mark outs shall be removed prior to
completion of project.
13. A final inspection is required for all projects.
Permittee must contact LDInspections@temeculaca.gov to
verify completion of project.
SCALE: 1"=60'
SITE PLAN
41000 MAIN ST TEMECULA CA
LD23-1165
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
tricia.ortega 03/13/2023
03/13/2023 03/13/2023
03/13/20
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
TRAFFIC CONTROL PLANS
DRAWING
NO.
SHEET OF
3 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70116-5327119
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 96326
(909) 338-5204
2647
NICOLAS M MINICILLI
TRAFFIC ENGINEER
LD23-1165
VICINITY MAP
NTS TRAFFIC CONTROL PLANS
1
REGULATORY SIGNS
BIKE LANE
R3-17
R5-6
WARNING SIGNS
MISCELLANEOUS DEVICES
DETAIL SHEET LEGEND
CONE SPACING-25' MAXIMUM
STOP
PROJECT LOCATION
WORK HOURS SHALL BE
SUNDAY-THURSDAY
OLD TOWN FRONT STREET
NO HOLIDAYS
9:00 PM - 5:00 AM
MONDAY-FRIDAY
MERCEDES STREET
NO HOLIDAYS
8:30 AM - 3:30 PM
FRONTIER ENGINEER:
RAUL RIVAS
(909) 406-3178
FOR
OLD TOWN FRONT ST & 6TH ST
TRAFFIC CONTROL GENERAL NOTES (REV'D 08/26/20):
1. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2. THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY.
3. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4. WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS
APPROVED OTHERWISE, WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY.
5. TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM
ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM THE STREET AT END OF EACH DAY AND AT THE END OF THE JOB.
THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES.
6. PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK.
8. ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9. THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING
MAY BE REPLACED TEMPORARILY WITH TAPE.)
11. ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT.) ALL FLAGGERS SHALL ALSO BE
EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC.
12. ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC
DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694-6411.
13. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK.
14. A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC
WORKS.
15. ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD
CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING
SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION.
16. A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,THE TRENCH PATCH FOR THE UTILITY
OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE
RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407
(SHEET 1 AND 2) FOR TRENCH PATCH.
18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC
ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT.
19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES.
ENGINEER OF WORK'S CERTIFICATE
I, D. LYNN PARKER , hereby declare that I am the engineer of Work for this project, that I have
exercised responsible charge over the design of the project as defined in Section 6703 of the
Business and Professions Code, and the design is consistent with current standards and City of
Temecula.
I understand that the check of project drawings and specifications by the City of Temecula is
confined to a review only and does not relieve me of responsibilities for project design.
Signed
R.C.E. 29570 3/31/25Exp.________________
Firm_________
Address__P.
Telephone (909) 472-9983______________________________
__________________________PARKER ENGINEERING, LLC
______________________________O BOX 1666, COTTONWOOD, AZ 86326
Date 3/17_______________/2023
3/17/2023
3/30/2023
3/30/2023
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
TRAFFIC CONTROL PLANS
DRAWING
NO.
SHEET OF
3 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70116-5327119
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 96326
(909) 338-5204
2647
NICOLAS M MINICILLI
TRAFFIC ENGINEER
LD23-1165
STOP
ST
O
P
STOP
ST
O
P
MA
I
N
S
T
TEMP. NO PARKING
72 HOURS PRIOR
TO WORK COMMENCING
12
'
89'100'100'
DWY DWY
DWYDWY
100'
MANHOLE #538
LOCATION
OLD TOWN FRONT ST (25 MPH)
26
'
T
O
C/
L
94' TO C/L
36'
WORK
AREA
2
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
SCALE: 1"=20'
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
SIDEWALK
R9-9
CLOSED
W5-1
NARROWS
ROAD
SIDEWALK
R9-9
CLOSED
WORK HOURS SHALL BE
SUNDAY-THURSDAY
OLD TOWN FRONT STREET
NO HOLIDAYS
9:00 PM - 5:00 AM
MONDAY-FRIDAY
MERCEDES STREET
NO HOLIDAYS
8:30 AM - 3:30 PM
C12(CA)
NARROW
LANE
NOTE:
CONTACTOR MUST COORDINATE WITH BUSINESS OWNER AT
28636 OLD TOWN FRONT STREET DUE TO AN OUTDOOR DINING STRUCTURE AT THIS LOCATION
STRUCTURE AT THIS LOCATION
FRONTIER ENGINEER:
RAUL RIVAS
(909) 406-3178
FOR
OLD TOWN FRONT ST & MAIN ST3/17/2023
3/30/2023
3/30/2023
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
TRAFFIC CONTROL PLANS
DRAWING
NO.
SHEET OF
3 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70116-5327119
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 96326
(909) 338-5204
2647
NICOLAS M MINICILLI
TRAFFIC ENGINEER
LD23-1165
STOP
STOP
100'
23
'
TO
C
/
L
MH #885
LOCATION
12
'
MI
N
DWY
90' TO C/L
100'100'
TEMP NO PARKING
72 HOURS TO WORK
COMMENCING
MERCEDES ST (25 MPH)
4T
H
S
T
MA
I
N
S
T
30'
WORK
AREA
3
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
SCALE: 1"=20'
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
SIDEWALK
R9-9
CLOSED
W5-1
NARROWS
ROAD
ROAD WORK
END
G20-2
SIDEWALK
R9-9
CLOSED
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
FOR
MERCEDES ST & 4TH ST
FRONTIER ENGINEER:
RAUL RIVAS
(909) 406-3178
WORK
ROAD
AHEAD
W20-1
WORK HOURS SHALL BE
SUNDAY-THURSDAY
OLD TOWN FRONT STREET
NO HOLIDAYS
9:00 PM - 5:00 AM
MONDAY-FRIDAY
MERCEDES STREET
NO HOLIDAYS
8:30 AM - 3:30 PM
C12(CA)
NARROW
LANE
3/17/2023
3/30/2023
3/30/2023
CONTRACTOR:
FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
3 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70116-5327119
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178
TRAFFIC CONTROL PLANS
FOR
*CORRESPONDING STREETS*
TRAFFIC CONTROL PLANS
1
REGULATORY SIGNS
BIKE LANE
R3-17
R5-6
WARNING SIGNS
MISCELLANEOUS DEVICES
DETAIL SHEET LEGEND
CONE SPACING-25' MAXIMUM
STOP
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O.BOX 1666
COTTONWOOD, AZ 86326
(909) 472- 9983
WORK TO BE DONE:
FRONTIER TO ACCESS 1 EX. HUB AND 1 EX. PULLBOX TO SPLICE EX.
CABLE TO SERVICE A CUSTOMER LOCATED AT 41000 MAIN ST.
VICINITY MAP
NTS
PROJECT LOCATION
TRAFFIC CONTROL GENERAL NOTES (REV'D 08/26/20):
1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY.
3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS
APPROVED OTHERWISE, WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY.
5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM
ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM THE STREET AT END OF EACH DAY AND AT THE END OF THE JOB.
THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES.
6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK.
8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION.
10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING
MAY BE REPLACED TEMPORARILY WITH TAPE.)
11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT.) ALL FLAGGERS SHALL ALSO BE
EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC.
12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC
DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694-6411.
13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK.
14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC
WORKS.
15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD
CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING
SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION.
16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,THE TRENCH PATCH FOR THE UTILITY
OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE
RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407
(SHEET 1 AND 2) FOR TRENCH PATCH.
18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC
ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT.
19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES.
WORK HOURS
SUNDAY-THURSDAY
9:00 PM - 5:00 AM LD23-1165
DRAWING
NO.
SHEET OF
3 SHEET
70116-5327119
2
N
OLD TOWN FRONT ST (25 MPH)6T
H
S
T
(
2
5
M
P
H
)
100'100'100'100'65'
10
0
'
PB#262
LOCATION
29
'
52'
LD23-1165
DRAWING
NO.
SHEET OF
3 SHEET
70116-5327119
3
MERCEDES ST (25 MPH)4T
H
S
T
(
2
5
M
P
H
)
100'100'100'65'100'
10
0
'
10
0
'
N
HUB#3040
LOCATION
21
'
149'
LD23-1165