Loading...
HomeMy WebLinkAboutLD22-7399Permit Number: LD22-7399 LD - Utilities/ Excavation - Parallel Issued: 02/13/2023 Expired: 10/31/2023 Job Address: 27455 Bostik Ct Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Charter Spectrum (Utility Billing) (951) 547-3816 Applicant: John Griffin Construction Inc 244 Jason Ct Corona, CA 92879 (951) 278-2377 Contractor: Utility Work Order Number: PID#3984682 Description: Charter 3984682 WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am Location: Winchester Rd and Bostik Ct Proposed work: Place three (3) new vaults per Charter "SITE PLAN 27455 BOSTIK CT, LD22-7399" All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD22-7399 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD22-7399 LD - Utilities/ Excavation - Parallel Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project. Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date Page 2 of 3 Permit Number: LD22-7399 LD - Utilities/ Excavation - Parallel City Engineer or Authorized Representative Date 02/13/2023 Page 3 of 3 VICINITY MAP Spectrum Charter N.T.S. WORK AREA UNDERGROUND SERVICE ALERT 811 www.call811.com TWO WORKING DAYS BEFORE YOU DIG C A L L B E F O R E YO U D I G ! Call:TOLL FREE LEGEND VAULT PED FH MANHOLE VALVES POLES STREETLIGHTS TREES WATER GAS ELECTRIC TELCO SEWER STORM DRAIN W W G G E E T T S S SD SD CENTER LINE RIGHT OF WAY CURB & GUTTER BOUNDARY LINE CL CL P V BORE LINE TRENCH LINE R/WR/W BORE PITS POTHOLES EX. VAULT V ADA RAMP PROJECT#3984682 ADDRESS: DATE:11/24/22 OF 2 REVISIONS:ENGINEERING CONSTRUCTION PERMIT# LD22-7399 27455 BOSTIK CT, TEMECULA, CA 92590 1/10/2023 1 24" 3" 18" 33 5 8 " 261 4" 38 1 8 " 35 5 8 " MFG LOGO CUSTOMER LOGO LIFT PIN (2X) COVER BOLT DOWN (4X) POLYMER CONCRETE BOX (WITH OPEN BOTTOM) POLYMER CONCRETE COVER (WITH NON-SKID SURFACE) 24"X36" VAULT 22" 6" VARIES 36 " MI N C O V E R 6" 18"MIN ASPHALT BORE PIT/POTHOLE DETAIL N.T.S 3" MIN 3" MIN *REMOVE AND REPLACE EXISTING A.C IF REMNANT IS 2' OR LESS AND REPLACE PVC CONDUIT CHARTER CURB & GUTTER CONTRACTOR TO VERIFY DEPTH OF ALL UTILITY CROSSINGS AND KEEP A MIN OF 12" CLEARANCE SAWCUT EDGES 12 " MI N . *NOTE: WHERE CUT IS 24” OR LESS FROM THE EDGE OF AN EXISTING PATCH, CURB & GUTTER, CONCRETE PAVEMENT, CONCRETE CROSSWALKS AND/OR DECORATIVE PAVERS, REMOVE THE EXISTING A.C. BETWEEN THE CUT AND THIS EDGE AND REPLACE. EXISTING ASPHALT AT A MIN. MATCH EXISTING ASPHALT THICKNESS 12" A.B. @ 95% COMPACTION NATIVE SOIL BACKFILL @ 90% COMPACTION CITY OF TEMECULA SITE PLAN 27455 BOSTIK CT Land Development Utility Plan General Notes 41000 Main Street Temecula, CA 92590 Phone: 951-694-6444 www.temeculaca.gov Utility Construction/Site plans shall be submitted for review and include the following, but not be limited to: 1. The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2. BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3. Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4. Trench repair shall be in accordance with City Standard Drawing 407. 5. All facilities shall be installed in accordance with City Standard Drawing 117. 6. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7. All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8. Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9. Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10. Final compaction test results shall be provided by a soils engineer. 11. A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12. All U.S.A. mark outs shall be removed prior to completion of project. 13. A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project. 14. Standard Inspection Request shall include: ➢ Permit Number: ➢ Inspection Date: ➢ Inspection Type: ➢ Project: ➢ On-Site Location: ➢ Requestor Name: ➢ Requestor Company: ➢ Contact Number: Utility Plan General Notes.docx Page 1 of 1 Revised: 03/19/2022 SIDEWALK BORE PIT/POTHOLE DETAIL N.T.S 12" MIN 3" MIN 3" MIN SIDEWALK TO BE REPLACED FROM SCORE LINE TO SCORE LINE EXISTING CONC. S.W. 36 " MI N C O V E R TWC PVC CONDUIT TIME WARNER CABLE CONTRACTOR TO VERIFY DEPTH OF ALL UTILITY CROSSINGS AND KEEP A MIN OF 12" CLEARANCE VARIES VARIES NATIVE SOIL BACKFILL @ 90% COMPACTION CLEARED BY CITY OF TEMECULA PUBLIC WORKS tricia.ortega 02/01/2023 02/01/2023 02/01/2023 02/01/20 RW RW RW RW E RW RW RW RW G G G G G G G G G G C L CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL E E E E E E E E E E E W W W W W W W W W W W W W W W W W W CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL RW RW RW RW RW RW RW RW G G G G G G G G G G G G G G G G G D/ W W W W S S S S S S S S S S S S S S S D/W D/W S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PED W W W W W W W W W W W W W W W W W W W W W S S S S S SG E E E E G G G W W W W W E E E E E E S D S D S D S D CATV CATV CATV E E E E E E W W PH PH PH PH SIDE W A L K SI D E W A L K LAND S C A P E SIDEWALK LANDSCAPE SIDEWALK LANDSCAPE SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E SI D E W A L K SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E S I D E W A L K 8'14 ' 46 ' 30 '34 ' V V 10 0 ' 76 ' 38 ' 38 ' 12 ' 12 ' 10 0 ' 76 ' 38 ' 38 ' 12 ' 12 ' SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E G G G G G G G BP BP BP PLACE NEW 24"X36" VAULT BORE 175'1-3" TIE POINT LOCATION AT EXISTING VAULT CONTRACTOR TO PULL NEW CABLE THRU EXISTING CONDUIT V TIE IN POINT AT EXISTING VAULT 72 ' BORE 243'1-3" BP 22' 26 '12 ' 6' 2' 3' 30' 10' 37' 3' 30' L / S R W G G G G R W R W R W R W RW R W E E E E E E E E E E E E E R W R W R W G G G G G G G G G C L C L C L C L C L C L C L C L C L C L C L C L C L C L C L C L D / W D / W D/W D / W R W W W W W S S S S S S P W R W W W W W W W W D / W S S S S S S S S S S S W W W W W W W W W W W W W W W W W D / W W W PH S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SID E W A L K LA N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K SI D E W A L K L/S BP PLACE NEW 24"X36" VAULT TRENCH 3'1-2" V STUB OUT TO PRIVATE PROPERTY BP BORE 251'1-3" PLACE NEW 24"X36" VAULT V 10'37' 2' L / S L / S 4' 31' 9 ' S/W 6' 78' 54' Spectrum Charter NORTHSCALE 1"-50' UNDERGROUND SERVICE ALERT 811 www.call811.com TWO WORKING DAYS BEFORE YOU DIG C A L L B E F O R E YO U D I G ! Call:TOLL FREE LEGEND VAULT PED FH MANHOLE VALVES POLES STREETLIGHTS TREES WATER GAS ELECTRIC TELCO SEWER STORM DRAIN W W G G E E T T S S SD SD CENTER LINE RIGHT OF WAY CURB & GUTTER BOUNDARY LINE CL CL P V BORE LINE TRENCH LINE R/WR/W BORE PITS POTHOLES EX. VAULT V ADA RAMP PROJECT#3984682 ADDRESS: DATE:11/24/22 OF 2 REVISIONS:ENGINEERING CONSTRUCTION PERMIT# LD22-7399 27455 BOSTIK CT, TEMECULA, CA 92590 1/10/2023 2 CITY OF TEMECULA SITE PLAN 27455 BOSTIK CT A MATCHLINE A-A A A MATCHLINE A-A A VICINITY MAP TRAFFIC CONTROL PLANS FOR UNDERGROUND CONSTRUCTION 27455 BOSTIK CTAREA MAP: TRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20): NO SCALE 1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS , ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694 -6411. 13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH. 18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES. AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS UNDERGROUND CONSTRUCTION 27455 BOSTIK CT PERMIT NO. LD22-7399 CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS M. MINICILLI TRAFFIC ENGINEER 2647 Spectrum Charter ENGINEERING CONSTRUCTION 5 JOB SITE 1 EXISTING NO TURN LANE FLASHING ARROW SIGN TRAILER (TYP.) C L O S E D R O A D CLOSED LEFT LANE AHEAD END DETOURROAD WORK ONLY CREW SURVEY CLOSED ROAD AHEAD RIGHT AHEAD DETOUR USE OTHER SIDE RIGHT KEEP TURN RIGHT M U S T RIGHT LANE NOT PASS SIDEWALK CLOSED DO STOP SLOW CLOSED LANE TO STOP PREPARED SHOULDER WORK WORK AHEAD ROAD MACHINERY AHEAD END ROAD CLOSED LOCAL TRAFFIC ONLY TO THRU TRAFFIC ROAD CLOSED FRESH OIL ROAD DETOUR SHOULDER SOFTPAVEMENT ENDS AHEAD TRAFFIC CONE FLASHING ARROW SIGN (FAS) EXISTING TURN ONLY LANE BARRICADE WORK ZONE (FAS) TRAFFIC SIGNAL HIGH LEVEL WARNING DEVICE (WITH CALTRANS & MUTCD CODE) SIGN (WITH CALTRANS CODE) TRAFFIC FLOW DIRECTION FLAGGER S (HLWD) HIGH LEVEL WARNING DEVICE TRAFFIC CONE POST TUBE LANE CLOSED ROAD ROUGH XX MPH NARROWS ROAD W20-2 R11-2 R11-3A R11-4 W21-3 M4-8A C9A(CA) M4-10 W21-2 W21-7 AHEAD UTILITY WORK G20-2 W20-4 W20-1 W21-5W21-1A W20-5W20-3 ONE LANE AHEAD ROAD W3-4 C30(CA)C28B(CA) W21-6 W8-7 BE R3-5 R9-10 R4-7BR4-1 R9-3A R1-1 R3-7R3-2R3-1 R3-4 R3-18 W6-4 W5-1W4-2 W13-1 W1-2 W1-4W1-3W1-1 W8-4W8-3 W8-8 W4-1W1-8 W9-3 W1-6 W12-1W6-3 R3-17 BIKE LANE R5-6 GRAVEL LOOSE MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP) L WOS DAEHA (CMS) CHANGEABLE MESSAGE SIGN TRAILER (TYP.) R3-6 SIDEWALK R9-9 CLOSED R9-11A CENTER DETOUR M4-8 C28A(CA) ENDS AHEAD R3-17B R3-17A BEGIN RIGHT TURN LANE YIELD TO BIKES R4-4 RIGHT KEEP R4-7AR4-7 CROSS HERE SIDEWALK CLOSED R9-11 AHEAD CROSS HERE SIDEWALK CLOSED AHEAD LANE NARROW C12(CA) TRENCH OPEN C27(CA) WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGENDREGULATORY SIGNS CONE SPACING - 25' MAXIMUM STOP CITY OF TEMECULA signed 1/12/2023conumonu7371 1/23/23 1/23/23 DW SIDEWAL K LANDSCA P E SIDEWAL K LANDSCA P E SIDEWAL K LANDSCA P E SIDEWAL K LANDSCA P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E STOP STOP 5 0 5 0 DW DW SIDE W A L K LAN D S C A P E 1 0 0 ' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK 2 5 M P H C O L T C T 50MPHWINCHES T E R R D PAINTED ME D I A N PAINTE D M E D I A N PAIN T E D M E D I A N P A I N T E D M E D I A N 600' MERG I N G T A P E R 2 0 ' 1 2 ' LANE C30 (CA) CLOSED R9-11(R) CROSS HERE SIDEWALK CLOSED AHEAD DW DW D W CATV CATV CATV D W S I D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E SIDE W A L K SIDE W A L K LAND S C A P E SIDEWALK LANDSCAPE SIDEWALK LANDSCAPE SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E LA N D S C A P E LAND S C A P E DW STOP STOP 11' 11' 50MPH WINCHESTER RD 83' AHEAD D W D W S I D E W A L K L A N D S C A P E D W 10 0 ' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK 29' 25 M P H BO S T I K C T P EX.VAULT #1 EX.VAULT #2 V V P A I N T E D M E D I A N PAIN T E D M E D I A N PAINTED MEDIA N PA I N T E D M E D I A N FLIP SIGN R9-9 CLOSED SIDEWALK R9-11(R) CROSS HERE SIDEWALK CLOSED AHEAD R9-11(L) CROSS HERE SIDEWALK CLOSED AHEAD PLACE SIGN AT CROSS STREET MICKEY MOUSE BLVD ADD AS NEEDED (TT)- TCP SIGNS AND NOTES STRIPE SOLID (L or R TURN) BIKE LANE TCP LINETYPES BIKE LANE DASHED 35 0 100' D O W N S T R E A M T A P E R PLACE SIGN AT CROSS STREET REMINGTON AVE 20 ' 12 ' 425' BUFFER LANE C30 (CA) CLOSED LANE C30 (CA) CLOSED 50 5 0 DW DW DW DW LAN D S C A P E SID E W A L K SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E LAN D S C A P E DW LAN D S C A P E DW LAN D S C A P E W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK DW DW 50MPH WIN C H E S T E R R D SID E W A L K LAN D S C A P E PAI N T E D M E D I A N PAI N T E D M E D I A N PAI N T E D M E D I A N 350 ' 380 ' C20(CA) (RT) CLOSED RIGHT LANE AHEAD STO P 5 0 50 DW DW DW DW DW DW DW SIDE W A L K LAN D S C A P E SIDE W A L K LAN D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E LAN D S C A P E SID E W A L K SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E LAN D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E 1 0 0 ' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK 2 5 M P H F U L L E R D R 50MPH WIN C H E S T E R R D PAIN T E D M E D I A N PAI N T E D M E D I A N 350 ' 350 ' W4-2(R) SCALE: 1"=50' 0 20' 40' 60' AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS UNDERGROUND CONSTRUCTION 27455 BOSTIK CT PERMIT NO. LD22-7399 CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS M. MINICILLI TRAFFIC ENGINEER 2647 Spectrum Charter ENGINEERING CONSTRUCTION 5 WORKING HOURS SUNDAY - THURSDAY NO HOLIDAYS NOTE: WORK DURATION: 1-2 DAYS 9:00 P.M. - 5:00 A.M. PHASE 1 OF 4 SCOPE OF WORK ACCESSING EXISTING VAULT#1 TO PULL NEW CABLE THRU EXISTING CONDUIT TO EXISTING VAULT #2 AN INDIVIDUAL WILL BE ASSIGNED TO MAINTAIN THE CONES WHILE THE WORK ZONE IS IN PLACE CONTRACTOR TO PROVIDE ACCESS TO DRIVEWAYS AT ALL TIMES TEMPORARY "NO PARKING" SIGNS SHALL BE INSTALLED AT LEAST 72 HOURS BEFORE ENFORCEMENT. BM A T C H L I N E B - B BC M A T C H L I N E C - C C C M A T C H L I N E C - C C 2 BM A T C H L I N E B - B B AM A T C H L I N E A - A A AM A T C H L I N E A - A A signed 1/12/2023conumonu7371 1/23/23 1/23/23 W4-2(L) 5 0 50 370 ' DW DW DW DW DW DW DW SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E LAN D S C A P E SID E W A L K SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E LAN D S C A P E DW LAN D S C A P E DW LAN D S C A P E W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK C20 (LT) CLOSED LEFT LANE AHEAD 400 ' SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E DW DW PAI N T E D M E D I A N PAI N T E D M E D I A N PAI N T E D M E D I A N PAI N T E D M E D I A N SID E W A L K LAN D S C A P E 50MPH WIN C H E S T E R R D 390 ' SID E W A L K LAN D S C A P E DW DW DW D W D W S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K SI D E W A L K LA N D S C A P E SID E W A L K LA N D S C A P E SID E W A L K LA N D S C A P E SIDE W A L K SIDE W A L K LAND S C A P E SIDEWALK LANDSCAPE SIDEWALK LANDSCAPE SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E LA N D S C A P E LAN D S C A P E DW STOP STOP 50MPH WINCHESTER RD AHEAD 100'DOW N S T R E A M T A P E R D W D W S I D E W A L K L A N D S C A P E 35 0 ' 10 0 ' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK P P LANE C30 (CA) CLOSED LANE C30 (CA) CLOSED LANE C30 (CA) CLOSED P A I N T E D M E D I A N PAIN T E D M E D I A N PAINTED MEDIA N PA I N T E D M E D I A N POTHOLE 25 M P H BO S T I K C T 10 ' 25 18 ' 1 4 ' 425' BUFFER 18 ' 18 ' W12-1 R3-7(L) MUST LEFT LANE TURN LEFT 100' TURN POCKET DW SIDEWAL K LANDSCA P E SIDEWAL K LANDSCA P E SIDEWAL K LANDSCA P E SIDEWAL K LANDSCA P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E STOP STOP STO P 5 0 5 0 DW DW DW DW SIDE W A L K LAN D S C A P E SIDE W A L K LAN D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SID E W A L K LAN D S C A P E SID E W A L K S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E 1 0 0 ' 1 0 0 ' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK 2 5 M P H C O L T C T 2 5 M P H F U L L E R D R PAINTED ME D I A N PAINTE D M E D I A N PAIN T E D M E D I A N P A I N T E D M E D I A N SID E W A L K LAN D S C A P E 50MPHWINCH E S T E R R D 25 600' MERGING T A P E R 390 ' SID E W A L K LAN D S C A P E W12-1 R3-7(L) MUST LEFT LANE TURN LEFT 100' TURN P O C K E T SCALE: 1"=50' 0 20' 40' 60' AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS UNDERGROUND CONSTRUCTION 27455 BOSTIK CT PERMIT NO. LD22-7399 CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS M. MINICILLI TRAFFIC ENGINEER 2647 Spectrum Charter ENGINEERING CONSTRUCTION 5 CONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TO START OF WORK AN INDIVIDUAL WILL BE ASSIGNED TO MAINTAIN THE CONES WHILE THE WORK ZONE IS IN PLACE CONTRACTOR TO PROVIDE ACCESS TO DRIVEWAYS AT ALL TIMES TEMPORARY "NO PARKING" SIGNS SHALL BE INSTALLED AT LEAST 72 HOURS BEFORE ENFORCEMENT. WORKING HOURS SUNDAY - THURSDAY NO HOLIDAYS NOTE: WORK DURATION: 1-2 DAYS 9:00 P.M. - 5:00 A.M. PHASE 2 OF 4 3 SCOPE OF WORK NEW BORING CONSTRUCTION CROSSING WINCHESTER RD DM A T C H L I N E D - D D E M A T C H L I N E E - E E E M A T C H L I N E E - E ED M A T C H L I N E D - D D signed 1/12/2023conumonu7371 1/23/23 1/23/23 STOP STOP AHEAD AHEAD STOP STOP STOP S T O P S T O P 4 0 S T O P S T O P STOP STOPSTOP W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK W4-2(R) C20(CA) (RT) CLOSED RIGHT LANE AHEAD 5 0 M P H W I N C H E S T E R R D 40MPH REMIN G T O N A V E 5 0 M P H W I N C H E S T E R R D P A I N T E D M E D I A N P A I N T E D M E D I A N SIDEW A L K LANDS C A P E SIDEW A L K LANDS C A P E SIDEW A L K LAND S C A P E SIDEW A L K LAND S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E 40? DW DWSIDEWALK LANDSCAP E SIDEWALK LANDSCAPE SIDEWALK LANDSCAPE S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E 250' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK 250' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E 3 5 0 ' 3 5 0 ' 3 5 0 ' R9-11(L) CROSS HERE SIDEWALK CLOSED AHEAD 40MP H REM I N G T O N A V E DW D W DW D W D W D W SI D E W A L K L A N D S C A P E SI D E W A L K SI D E W A L K LA N D S C A P E SID E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E SIDE W A L K SIDE W A L K LAND S C A P E SIDEWALK LANDSCAPE SIDEWALK LANDSCAPE SI D E W A L K LA N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K S I D E W A L K L A N D S C A P E SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E LA N D S C A P E LA N D S C A P E LAND S C A P E DW LANDSCA P E STOP STOP STOP 50MPHWINCHESTER RD AHEAD 2 5 M P H B O S T I K C T P P V W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK LANE C30 (CA) CLOSED W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK 15 ' 16 ' 15' 16' 8' R9-9 CLOSED SIDEWALK R9-9 CLOSED SIDEWALK R9-9 CLOSED SIDEWALK P A I N T E D M E D I A N PAIN T E D M E D I A N PAINTED MEDIA N PA I N T E D M E D I A N P A I N T E D M E D I A N NEW VAULT #1 8' 9' 12 ' 6' 5' 4' 6'7' P A I N T E D M E D I A N R9-9 CLOSED SIDEWALK R9-11(L) CROSS HERE SIDEWALK CLOSED AHEAD PLACE PLACE SIGN AT CROSS STREET MICKEY MOUSE BLVD 42 5 ' BU F F E R 10 0 ' DO W N S T R E A M T A P E R 1 3 5 ' 350' PLACE SIGN AT CROSS STREET DIAZ RD R9-11(R) CROSS HERE SIDEWALK CLOSED AHEAD 12' D W D W S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E SID E W A L K LA N D S C A P E LA N D S C A P E D W D W S I D E W A L K L A N D S C A P E D W S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S T O P S T O P 4 5 S T O P S T O P W4-2(R) LANE C30 (CA) CLOSED LANE CLOSED 40MP HROIC K D R 45MP HZEVO D R W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK 15' 16' PAIN T E D M E D I A N P A I N T E D M E D I A N P A I N T E D M E D I A N S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SIDEW A L K LAND S C A P E SIDEW A L K LAND S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SIDEW A L K LAND S C A P E SIDEW A L K LAND S C A P E P A I N T E D M E D I A N 5 0 M P H W I N C H E S T E R R D S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E 42 5 ' BU F F E R 6 0 0 ' M E R G I N G T A P E R 3 5 0 ' S T O P A H E A D DW DW DW SIDEWAL K LANDSCA P E SIDEWAL K LANDSC A P E 350' 250' SID E W A L K LAN D S C A P E SIDE W A L K LAN D S C A P E PAINTE D M E D I A N SCALE: 1"=50' 0 20' 40' 60' AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS UNDERGROUND CONSTRUCTION 27455 BOSTIK CT PERMIT NO. LD22-7399 CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS M. MINICILLI TRAFFIC ENGINEER 2647 Spectrum Charter ENGINEERING CONSTRUCTION 5 SCOPE OF WORK NEW BORING CONSTRUCTION, AND PLACING 1 NEW VAULT CONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TO START OF WORK AN INDIVIDUAL WILL BE ASSIGNED TO MAINTAIN THE CONES WHILE THE WORK ZONE IS IN PLACE CONTRACTOR TO PROVIDE ACCESS TO DRIVEWAYS AT ALL TIMES TEMPORARY "NO PARKING" SIGNS SHALL BE INSTALLED AT LEAST 72 HOURS BEFORE ENFORCEMENT. WORKING HOURS SUNDAY - THURSDAY NO HOLIDAYS NOTE: WORK DURATION: 2-3 DAYS 9:00 P.M. - 5:00 A.M. PHASE 3 OF 4 4 F MATCH L I N E F - F F F MATCH L I N E F - F F G MA T C H L I N E G - G G G MA T C H L I N E G - G G signed 1/12/2023conumonu7371 1/23/23 1/23/23 STOP STOP AHEAD AHEAD STOP STOP STOP S T O P S T O P ROIC K D R 5 0 M P H W I N C H E S T E R R D 3 5 0 ' NARROW C12 LANE W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK P A I N T E D M E D I A N SIDEW A L K LAND S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E 3 5 0 ' D W D W DW D W DW D W DW DW D W D W D W S I D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E SIDE W A L K SIDE W A L K LAND S C A P E SIDEWALK LANDSCAPE SIDEWALK LANDSCAPE SI D E W A L K LA N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SID E W A L K LA N D S C A P E S I D E W A L K S I D E W A L K L A N D S C A P E SIDEWALK S I D E W A L K L A N D S C A P E SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E LANDSCAPE LA N D S C A P E LA N D S C A P E LAND S C A P E DW STOP STOP STOP 50MPHWINCHESTER RD AHEAD D W W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK 2 5 M P H B O S T I K C T V V P 2 7 ' 8' 12' 12 ' 8' 8'12' 12' 8' 8' 350' R4-8a KEEP LEFT R9-9 CLOSED SIDEWALK R9-9 CLOSED SIDEWALK R9-9 CLOSED SIDEWALK R9-9 CLOSED SIDEWALK R9-9 CLOSED SIDEWALK R9-9 CLOSED SIDEWALK R9-11(L) CROSS HERE SIDEWALK CLOSED AHEAD P A I N T E D M E D I A N PAIN T E D M E D I A N PAINTED MEDIA N PA I N T E D M E D I A N P A I N T E D M E D I A N S I D E W A L K L A N D S C A P E POTHOLE NEW VAULT #2 NEW VAULT #3 5' 5' 12'8' 6 ' 13'5' 6' 11 ' 425' BUF F E R D W D W S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K L A N D S C A P E SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E SI D E W A L K LA N D S C A P E LA N D S C A P E D W D W S I D E W A L K L A N D S C A P E D W S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S T O P S T O P 4 5 S T O P S T O P 40MP HROIC K D R 45MP HZEVO D R WINCHESTER R D 8' 12' W5-1 ROAD NARROWS NARROW C12 LANE 12' 8' R4-8a KEEP LEFT R4-8a KEEP LEFT PAIN T E D M E D I A N P A I N T E D M E D I A N P A I N T E D M E D I A N S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SIDEW A L K LAND S C A P E SIDEW A L K LAND S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E S I D E W A L K L A N D S C A P E SIDEW A L K LAND S C A P E SIDE W A L K LAND S C A P E R4-8a KEEP LEFT 5 0 M P H W I N C H E S T E R R D W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK SID E W A L K LAN D S C A P E SID E W A L K LAN D S C A P E W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK S T O P A H E A D DW DW SIDEWALK LANDSCA P E SIDEWAL K LANDSCA P E 350' 425' BU F F E R 3 0 0 ' S H I F T I N G T A P E R 3 5 0 ' 3 5 0 ' SCALE: 1"=50' 0 20' 40' 60' AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS UNDERGROUND CONSTRUCTION 27455 BOSTIK CT PERMIT NO. LD22-7399 CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS M. MINICILLI TRAFFIC ENGINEER 2647 Spectrum Charter ENGINEERING CONSTRUCTION 5 SCOPE OF WORK NEW BORING CONSTRUCTION, AND PLACING 2 NEW VAULTS CONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TO START OF WORK AN INDIVIDUAL WILL BE ASSIGNED TO MAINTAIN THE CONES WHILE THE WORK ZONE IS IN PLACE CONTRACTOR TO PROVIDE ACCESS TO DRIVEWAYS AT ALL TIMES TEMPORARY "NO PARKING" SIGNS SHALL BE INSTALLED AT LEAST 72 HOURS BEFORE ENFORCEMENT. WORKING HOURS SUNDAY - THURSDAY NO HOLIDAYS NOTE: WORK DURATION: 2-4 DAYS 9:00 P.M. - 5:00 A.M. PHASE 4 OF 4 5 H MATCH L I N E H - H H H MATCH L I N E H - H H IMATCHLINE I-II IMATCHLINE I-I I signed 1/12/2023conumonu7371 1/23/23 1/23/23 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020 APPLICATION INFORMATION PERMIT NO.: Type of Encroachment:  Street/Storm Drain  Sewer/Water  Utility Trenching  Signing & Striping  Traffic Signal  Miscellaneous (SPECIFY BELOW) The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as follows: Name(s) of street(s) and/or street address: Utility Work Order #: Start Date: End Date: In consideration of granting this application, all applicants including utility companies hereby agree to: 1. If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control Plan Checklist for details. 2. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. (See below for specific liability insurance requirements.) 3. Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City Engineer. 4. Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The developer/general contractor must be present for the timely request of inspections. 5. Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction. LIABILITY INSURANCE REQUIREMENTS PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED. THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT ENCROACHMENT PERMIT. x TIE IN POINT AT EXISTING VAULT, BORE 108'(1-3"), PLACE NEW 24"X36" VAULT, BORE 298'(1-3"), PLACE NEW 24'X36' VAULT, BORE 241'(1-3"), PLACE 24"X36" VAULT, REMOVE AND RESTORE SIDEWALK, TRENCH 7'(1-2") AND STUB OUT TO PRIVATE PROPERTY. 27455 BOSTIK CT PID#3984682 1/6/23 1/20/23 LD22-7399 CLEARED BY CITY OF TEMECULA PUBLIC WORKS tricia.ortega 01/05/2023 01/05/2023 01/05/2023 01/05/20 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020 Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum limits of insurance coverage shall be as follows: a.General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b.Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage. c.Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident for bodily injury or disease. d.Course of Construction: Completed value of the project. There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approac h located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the encroachment permit: BODILY INJURY $250,000.00 EACH PERSON $500,000.00 EACH OCCURANCE $500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS PROPERTY DAMAGE $100,000.00 EACH OCCURANCE $250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing the City named as an additional insured shall be attached to the application. The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges that this application will be made a part of the encroachment permit. APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED) Company Name: Mailing Address: Contact: Phone #: E-mail: I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the permittee and bind the permittee to the agreements contained herein and any conditions of the permit. Authorized Signature: Date Applied: CONTRACTOR’S INFORMATION Company Name: Mailing Address: Contact: Phone #: 24-HR Emergency #: State Contractor’s License #: Class: City Business License #: Charter / United Fiber Comm 7337 Central Ave, Riverside, CA 92504 permits@unitedfibercomm.comJS Collins/ Hanan Takla (951)406-1703/(951)742-5836 12/9/22 John Griffin Construction, Inc. 244 Jason Ct , Corona, CA 92879 David Pagliei (951) 278-2377 (909) 322-6792 618983 C10, B, C-7, A 030631