Loading...
HomeMy WebLinkAboutLD23-7257Permit Number: LD23-7257 LD - Utilities/ Access to Utility Agency Facilities Issued: 02/20/2024 Expired: 08/18/2024 Job Address: 41900 Winchester Rd Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Frontier Communications (Utility Billing) Network Engineering – Bldg. A. 1400 E. Phillips Blvd, Building A Pomona, CA 91766 (909) 469-6327 Applicant: Frontier Communications (Utility Billing) Network Engineering – Bldg. A. 1400 E. Phillips Blvd, Building A Pomona, CA 91766 (909) 469-6327 Contractor: Utility Work Order Number: 70147-5345607 Description: Frontier 70147-5345607 WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am Location: MH941 - Avenida Alvarado SE/S 260' SW/O Tierra Alta Way MH963 - Avenida Alvarado SE/S 475' SW/O Tierra Alta Way MH1029 - Avenida Alvarado SE/S 70' SW/O Aqua Vista Way MH1080 - Diaz Rd S/S 175' SE/O Winchester Rd HH1 - Avenida Alvarado SE/S 410' SW/O Tierra Alta Way Proposed work: Access four (4) manholes and one (1) handhole per Frontier "UTILITY SITE PLAN, LD23-7257" All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD23-7257 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. Page 1 of 3 Permit Number: LD23-7257 LD - Utilities/ Access to Utility Agency Facilities All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project. Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Page 2 of 3 Permit Number: LD23-7257 LD - Utilities/ Access to Utility Agency Facilities ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Permitee Date City Engineer or Authorized Representative Date 02/20/2024 Page 3 of 3 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA 1 3 ENGINEER'S INFORMATIONENGINEER'S SEAL AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 FOR TRAFFIC CONTROL PLANS PLACEMENT OF CONDUIT DIAZ RD @ WINCHESTER RD TRAFFIC CONTROL PLANS WINCHESTER RD & DIAZ RD AREA MAP: EXISTING NO TURN LANE FLASHING ARROW SIGN TRAILER (TYP.) C L O S E D R O A D CLOSED LEFT LANE AHEAD END DETOURROAD WORK ONLY CREW SURVEY CLOSED ROAD AHEAD RIGHT AHEAD DETOUR RIGHT KEEP TURN RIGHT M U S T RIGHT LANE NOT PASS DO STOP SLOW CLOSED LANE TO STOP PREPARED SHOULDER WORK WORK AHEAD ROAD MACHINERY AHEAD END ROAD CLOSED LOCAL TRAFFIC ONLY TO THRU TRAFFIC ROAD CLOSED ROAD DETOUR SHOULDER SOFTPAVEMENT ENDS AHEAD TRAFFIC CONE FLASHING ARROW SIGN (FAS) EXISTING TURN ONLY LANE BARRICADE WORK ZONE (FAS) TRAFFIC SIGNAL HIGH LEVEL WARNING DEVICE (WITH CALTRANS & MUTCD CODE) SIGN (WITH CALTRANS CODE) TRAFFIC FLOW DIRECTION FLAGGER S (HLWD) HIGH LEVEL WARNING DEVICE TRAFFIC CONE POST TUBE LANE CLOSEDROAD ROUGH XX MPH NARROWS ROAD W20-2 R11-2 R11-3A R11-4 W21-3 M4-8A C9A(CA) M4-10 W21-7 AHEAD UTILITY WORK G20-2 W20-4 W20-1 W21-5W21-1A W20-5W20-3 ONE LANE AHEAD ROAD W3-4 C30(CA)C28B(CA) W21-6 W8-7 BE R3-5 R4-7BR4-1 R9-3A R1-1 R3-7R3-2R3-1 R3-4 R3-18 W6-4 W5-1W4-2 W13-1 W1-2 W1-4W1-3W1-1 W8-4W8-3 W8-8 W4-1W1-8 W9-3 W1-6 W12-1W6-3 R3-17 BIKE LANE R5-6 GRAVEL LOOSE MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP)L WOS DAEHA (CMS) CHANGEABLE MESSAGE SIGN TRAILER (TYP.) R3-6 SIDEWALK R9-9 CLOSED R9-11A CENTER DETOUR M4-8 C28A(CA) ENDS AHEAD R3-17B R3-17A BEGIN RIGHT TURN LANE YIELD TO BIKES R4-4 RIGHT KEEP R4-7AR4-7 CROSS HERE SIDEWALK CLOSED AHEAD LANE NARROW C12(CA) TRENCH OPEN C27(CA) WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS M. MINICILLI TRAFFIC ENGINEER CONE SPACING - 25' MAXIMUM NO SCALE TELEPHONE COMMUNICATIONS NAME DATE R.C.E. NUMBER FIRM ADDRESS C29570 D. Lynn Parker P.O.Box 1666, Cottonwood, AZ 86326 Phone (909) 472-9983 TRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/2020): 2647 PERMIT NO. LD23-7257 1.All traffic control devices shall conform to the latest edition of the California Manual on Uniform Traffic Control Devices (California MUTCD) and the Standard Specifications for Public Works Construction. 2. The City Engineer or his representative has the authority to initiate field changes to assure public safety. 3. All traffic control devices shall be removed from view when not in use. 4. Work hours shall be restricted to the period between 8:30 a.m. and 3:30 p.m., Monday through Friday, unless approved otherwise. When night work is required, work hours shall be 9 p.m. to 5 a.m., Sunday through Thursday. 5. Trenches must be back filled or plated during non-working hours. Steel plates shall have asphaltic concrete berm on all edges. All dirt, dust, and debris shall be removed from street at end of each day and at the end of the job. The street shall be in drivable condition at all times. 6. Pedestrian controls shall be provided as shown on the plans. 7. Temporary "NO PARKING" signs will be posted 24 hours prior to commencing work. 8. Access to driveways will be maintained at all times unless other arrangements are made. 9. The contractor shall replace within 72 hours, all traffic signal loop detectors damaged during construction. 10. The contractor shall replace within 24 hours, all striping removed or damaged by construction work. (Striping may be replaced temporarily with tape.) 11. All Workers shall be equipped with an orange vest (or a reflective vest at night). All flaggers shall also be equipped with a hard hat, C28 "Stop/Slow" paddle and shall be trained in the proper fundamentals of flagging traffic. 12. Any work that disturbs normal traffic signal operations shall be coordinated with the City of Temecula's Traffic Division, 48 hours prior to beginning construction. Contact the City's Traffic Division at (951) 694 -6411. 13. The contractor shall maintain all traffic control devices 24 hours per day and 7 days per week. 14. A minimum of twelve (12) foot travel lanes must be maintained unless otherwise approved by the Department of Public Works. 15. All night work will require written approval from the Department of Public Works. Lane closures, road detours, road closures, and traffic signal modifications associated with overnight construction activities will require warning signs be placed at least . one week in advance of starting construction . 16. A solar powered flashing arrow board shall be required on all arterial street lane closures. 17. If the permit applicant determines that conduit installation will be by the boring machine method, the trench patch for the utility observation excavation will be the same as for open trench excavation method. This will provide a single continuous surface restoration eliminating the multiple penetration into the public roadway to all requirements in City Standard Drawing # 407 (sheet 1 and 2) for trench patch. 18. Any work that creates an undue safety risk or creates severe congestion may be shut down by City Traffic Engineers, City Field Inspection, or the Police Department. 19. Cones and delineators shall have reflectorized sleeves for night work. 20. If parking is allowed in advance warning area, advance warning signs shall be mounted on high level devices. APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES. ENGINEER OF WORK'S CERTIFICATE I, D. Lynn Parker, hereby declare that I am the engineer of Work for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and the design is consistent with current standards and City of Temecula. I understand that the check of project drawings and specifications by the City of Temecula is confined to a review only and does not relieve me of responsibilities for project design. Signed______________________________________________ Date_______________ R.C.E. Exp.__3/31/25____R.C.E.#29570___ Firm__Parker Engineering, LLC_________________________________ Address_P. O. Box 1666, Cottonwood, AZ 86326_______________________________ Telephone____(909) 472-9983__________________________ Parker Engineering, LLC. (909) 472-9983TELEPHONE REGULATORY SIGNS FRONTIER WORK ORDER NO.70147-5345607 WIN C H E S T E R R D (4 0 M P H ) DI A Z R D (50 M P H ) TCP NOTE: 1) WORK CREW TO UTILIZE THIS PLAN TO ACCESS MH#1080 ON S/S/O DIAZ RD @ WINCHESTER RD TO SPLICE EXISTING FIBER OPTIC CABLE 2) WORK CREW TO PLACE TEMPORARY NO PARKING SIGNS ALONG ENTIRE WORK AREA 72 HOURS PRIOR TO COMMENCING WORK. 3) REFERENCE WORK PRINT FOR SPECIFICS. MH#1080 1/31/2024 1/31/2024 ERICK ESCOBEDO 3002 02/14/24 STOPSTOP CLOSED AHEAD C20(RT) RIGHT LANE W4-2R 650' MERGING TAPER 350'350'350' WORK ROAD AHEAD W20-1 35 0 ' ROAD WORK END G20-2 DIAZ RD (50 MPH) ZE V O D R (4 5 M P H ) 20 ' WORK ROAD AHEAD W20-1 R3-4 ROAD WORK END G20-2 R3-4 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA 2 3 ENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS CONTRACTOR: COMMUNICATIONS WORK ROAD S TRAFFIC CONE TEMPORARY SIGN DIRECTION OF TRAVEL WORK AREA FLASHING ARROW SIGN (FAS) TYPE III BARICADE WITH SIGN SIGNALIZED INTERSECTION FLAGGER HIGH LEVEL WARNING DEVICE (HLWD) LEGEND DRIVEWAY TYPICAL DWY ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TCP NOTE: 1)WORK CREW TO UTILIZE THIS PLAN TO ACCESS MH#1080 ON S/S/O DIAZ RD @ WINCHESTER RD TO SPLICE EXISTING FIBER. 2)WORK CREW TO PLACE TEMPORARY NO PARKING SIGNS ALONG ENTIRE WORK AREA 72 HOURS PRIOR TO COMMENCING WORK. 3)REFERENCE WORK PRINT FOR SPECIFICS. PLACEMENT OF CONDUIT DIAZ RD @ WINCHESTER RD NAME DATE R.C.E. NUMBER FIRM ADDRESS C29570 D. Lynn Parker Parker Engineering, LLC. P.O.Box 1666, Cottonwood, AZ 86326 Phone (909) 472-9983 TELEPHONE (909) 472-9983 PERMIT NO. LD23-7257 RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. SE E S H E E T 3 MA T C H L I N E A SCALE:1"=60' TCP FOC FOC FO C FO C NICOLAS M. MINICILLI TRAFFIC ENGINEER 2647 1/31/2024 ERICK ESCOBEDO 3002 02/14/24 S C30(CA) LANE CLOSED 425' BUFFER C30(CA) LANE CLOSED 25 0 ' WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 ROAD WORK END G20-2 WORK ROAD AHEAD W20-1350' WI N C H E S T E R R D (4 0 M P H ) DIAZ RD (45 MPH) FO C FO C FOC FOC 12 ' SIDEWALK R9-9 CLOSED C30(CA) LANE CLOSED MH# 1080 50' DOWN STREAM TAPER 60' WORK AREA R3-4 DIAZ RD (50 MPH) WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 FOC FOC 350' CLOSED AHEAD C20(LT) LEFT LANE 350' C30(CA) LANE CLOSED WORK ROAD S TRAFFIC CONE TEMPORARY SIGN DIRECTION OF TRAVEL WORK AREA FLASHING ARROW SIGN (FAS) TYPE III BARICADE WITH SIGN SIGNALIZED INTERSECTION FLAGGER HIGH LEVEL WARNING DEVICE (HLWD) LEGEND DRIVEWAY TYPICAL DWY ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TCP NOTE: 1)WORK CREW TO UTILIZE THIS PLAN TO ACCESS MH#1080 ON S/S/O DIAZ RD @ WINCHESTER RD TO SPLICE EXISTING FIBER. 2)WORK CREW TO PLACE TEMPORARY NO PARKING SIGNS ALONG ENTIRE WORK AREA 72 HOURS PRIOR TO COMMENCING WORK. 3)REFERENCE WORK PRINT FOR SPECIFICS. PLACEMENT OF CONDUIT DIAZ RD @ WINCHESTER RD NAME DATE R.C.E. NUMBER FIRM ADDRESS C29570 D. Lynn Parker Parker Engineering, LLC. P.O.Box 1666, Cottonwood, AZ 86326 Phone (909) 472-9983 TELEPHONE (909) 472-9983 PERMIT NO. LD23-7257 RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA 3 3 ENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS CONTRACTOR: COMMUNICATIONS SCALE:1"=60' TCP SE E S H E E T 2 MA T C H L I N E A SEE UPPER LEFT MATCHLINE B SE E L O W E R R I G H T MA T C H L I N E B NICOLAS M. MINICILLI TRAFFIC ENGINEER 2647 1/31/2024 ERICK ESCOBEDO 3002 02/14/24 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA 1 4 AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 FOR TRAFFIC CONTROL PLANS SPLICING & PLACING FIBER OPTIC CABLE AQUA VISTA WAY & AVENIDA ALVARADO TRAFFIC CONTROL PLANS AQUA VISTA WAY & AVENIDA ALVARADO AREA MAP: EXISTING NO TURN LANE FLASHING ARROW SIGN TRAILER (TYP.) C L O S E D R O A D CLOSED LEFT LANE AHEAD END DETOURROAD WORK ONLY CREW SURVEY CLOSED ROAD AHEAD RIGHT AHEAD DETOUR RIGHT KEEP TURN RIGHT M U S T RIGHT LANE NOT PASS DO STOP SLOW CLOSED LANE TO STOP PREPARED SHOULDER WORK WORK AHEAD ROAD MACHINERY AHEAD END ROAD CLOSED LOCAL TRAFFIC ONLY TO THRU TRAFFIC ROAD CLOSED ROAD DETOUR SHOULDER SOFTPAVEMENT ENDS AHEAD TRAFFIC CONE FLASHING ARROW SIGN (FAS) EXISTING TURN ONLY LANE BARRICADE WORK ZONE (FAS) TRAFFIC SIGNAL HIGH LEVEL WARNING DEVICE (WITH CALTRANS & MUTCD CODE) SIGN (WITH CALTRANS CODE) TRAFFIC FLOW DIRECTION FLAGGER S (HLWD) HIGH LEVEL WARNING DEVICE TRAFFIC CONE POST TUBE LANE CLOSEDROAD ROUGH XX MPH NARROWS ROAD W20-2 R11-2 R11-3A R11-4 W21-3 M4-8A C9A(CA) M4-10 W21-7 AHEAD UTILITY WORK G20-2 W20-4 W20-1 W21-5W21-1A W20-5W20-3 ONE LANE AHEAD ROAD W3-4 C30(CA)C28B(CA) W21-6 W8-7 BE R3-5 R4-7BR4-1 R9-3A R1-1 R3-7R3-2R3-1 R3-4 R3-18 W6-4 W5-1W4-2 W13-1 W1-2 W1-4W1-3W1-1 W8-4W8-3 W8-8 W4-1W1-8 W9-3 W1-6 W12-1W6-3 R3-17 BIKE LANE R5-6 GRAVEL LOOSE MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP) L WOS DAEHA (CMS) CHANGEABLE MESSAGE SIGN TRAILER (TYP.) R3-6 SIDEWALK R9-9 CLOSED R9-11A CENTER DETOUR M4-8 C28A(CA) ENDS AHEAD R3-17B R3-17A BEGIN RIGHT TURN LANE YIELD TO BIKES R4-4 RIGHT KEEP R4-7AR4-7 CROSS HERE SIDEWALK CLOSED AHEAD LANE NARROW C12(CA) TRENCH OPEN C27(CA) WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND CONTRACTOR: CONE SPACING - 25' MAXIMUM NO SCALE COMMUNICATIONS TRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/2020): PERMIT NO. LD23-7257 1.All traffic control devices shall conform to the latest edition of the California Manual on Uniform Traffic Control Devices (California MUTCD) and the Standard Specifications for Public Works Construction. 2.The City Engineer or his representative has the authority to initiate field changes to assure public safety. 3.All traffic control devices shall be removed from view when not in use. 4.Work hours shall be restricted to the period between 8:30 a.m. and 3:30 p.m., Monday through Friday, unless approved otherwise. When night work is required, work hours shall be 9 p.m. to 5 a.m., Sunday through Thursday. 5.Trenches must be back filled or plated during non-working hours. Steel plates shall have asphaltic concrete berm on all edges. All dirt, dust, and debris shall be removed from street at end of each day and at the end of the job. The street shall be in drivable condition at all times. 6.Pedestrian controls shall be provided as shown on the plans. 7.Temporary "NO PARKING" signs will be posted 24 hours prior to commencing work. 8.Access to driveways will be maintained at all times unless other arrangements are made. 9.The contractor shall replace within 72 hours, all traffic signal loop detectors damaged during construction. 10.The contractor shall replace within 24 hours, all striping removed or damaged by construction work. (Striping may be replaced temporarily with tape.) 11.All Workers shall be equipped with an orange vest (or a reflective vest at night). All flaggers shall also be equipped with a hard hat, C28 "Stop/Slow" paddle and shall be trained in the proper fundamentals of flagging traffic. 12.Any work that disturbs normal traffic signal operations shall be coordinated with the City of Temecula's Traffic Division, 48 hours prior to beginning construction. Contact the City's Traffic Division at (951) 694 -6411. 13.The contractor shall maintain all traffic control devices 24 hours per day and 7 days per week. 14.A minimum of twelve (12) foot travel lanes must be maintained unless otherwise approved by the Department of Public Works. 15.All night work will require written approval from the Department of Public Works. Lane closures, road detours, road closures, and traffic signal modifications associated with overnight construction activities will require warning signs be placed at least . one week in advance of starting construction . 16.A solar powered flashing arrow board shall be required on all arterial street lane closures. 17.If the permit applicant determines that conduit installation will be by the boring machine method, the trench patch for the utility observation excavation will be the same as for open trench excavation method. This will provide a single continuous surface restoration eliminating the multiple penetration into the public roadway to all requirements in City Standard Drawing # 407 (sheet 1 and 2) for trench patch. 18.Any work that creates an undue safety risk or creates severe congestion may be shut down by City Traffic Engineers, City Field Inspection, or the Police Department. 19.Cones and delineators shall have reflectorized sleeves for night work. 20.If parking is allowed in advance warning area, advance warning signs shall be mounted on high level devices. APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES. REGULATORY SIGNS FRONTIER WORK ORDER NO.70147-5345607 AVE N I D A A L V A R A D O (25 M P H ) A Q U A V I S T A W A Y ( 2 5 M P H ) MH#1029 AVE N I D A A L V A R A D O (25 M P H ) T I E R R A A L T A V I S T A ( 2 5 M P H ) MH#941MH#963 TCP NOTE: 1) WORK CREW TO UTILIZE THIS PLAN TO ACCESS MH# 1029 LOCATED ON S/S/O AVENIDA ALVARADO @ AQUA VISTA WAY TO SPLICE FIBER OPTIC CABLE IN EXISTING SUBSTRUCTURE. 2) WORK CREW TO UTILIZE THIS PLAN TO ACCESS MH# 941 LOCATED ON S/S/O AVENIDA ALVARADO @ TIERRA ALTA WAY TO PLACE +/- 295 L.F. OF FIBER OPTIC CABLE IN EXISTING SUBSTRUCTURE. 3) WORK CREW TO UTILIZE THIS PLAN TO ACCESS MH# 963 & HH#1 LOCATED ON THE S/S/O AVENIDA ALVARADO @ A ST TO PLACE +/- 65 L.F. OF FIBER OPTIC CABLE FROM MH TO HH IN EXISTING CONDUIT. HH#1 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA 2 4 FOR TRAFFIC CONTROL PLANS CONTRACTOR: COMMUNICATIONS WORK ROAD S TRAFFIC CONE TEMPORARY SIGN DIRECTION OF TRAVEL WORK AREA FLASHING ARROW SIGN (FAS) TYPE III BARICADE WITH SIGN SIGNALIZED INTERSECTION FLAGGER HIGH LEVEL WARNING DEVICE (HLWD) LEGEND DRIVEWAY TYPICAL DWY ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TCP NOTE: 1)WORK CREW TO UTILIZE THIS PLAN TO ACCESS MH#1029 ON S/S/O AVENIDA ALVARADO @ AQUA VISTA WAY TO SPLICE FIBER OPTIC CABLE. 2)WORK CREW TO PLACE TEMPORARY NO PARKING SIGNS ALONG ENTIRE WORK AREA 72 HOURS PRIOR TO COMMENCING WORK. 3)REFERENCE WORK PRINT FOR SPECIFICS. SPLICING OF FIBER OPTIC CABLE AQUA VISTA WAY & AVENIDA ALVARADO PERMIT NO. LD23-7257 250'250'250'150'100' MIN 50' MH# 1029 N AVENIDA ALVARADO (35 MPH) SCALE:1"=60' 250' WORK ROAD S TRAFFIC CONE TEMPORARY SIGN DIRECTION OF TRAVEL WORK AREA FLASHING ARROW SIGN (FAS) TYPE III BARICADE WITH SIGN SIGNALIZED INTERSECTION FLAGGER HIGH LEVEL WARNING DEVICE (HLWD) LEGEND DRIVEWAY TYPICAL DWY ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TCP NOTE: 1)WORK CREW TO UTILIZE THIS PLAN TO ACCESS MH# 941 ON S/S/O AVENIDA ALVARADO @ TIERRA ALTA WAY TO PLACE FIBER OPTIC CABLE INTO EXISTING CONDUIT. 2)WORK CREW TO PLACE TEMPORARY NO PARKING SIGNS ALONG ENTIRE WORK AREA 72 HOURS PRIOR TO COMMENCING WORK. 3)REFERENCE WORK PRINT FOR SPECIFICS. PLACEMENT OF FIBER OPTIC CABLE AVENIDA ALVARADO & TIERRA ALTA WAY PERMIT NO. LD23-7257 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA 3 4 FOR TRAFFIC CONTROL PLANS CONTRACTOR: COMMUNICATIONS SCALE:1"=60' 250'250'250'150'100' MIN 50' MH# 941 N AVENIDA ALVARADO (35 MPH) 250' WORK ROAD S TRAFFIC CONE TEMPORARY SIGN DIRECTION OF TRAVEL WORK AREA FLASHING ARROW SIGN (FAS) TYPE III BARICADE WITH SIGN SIGNALIZED INTERSECTION FLAGGER HIGH LEVEL WARNING DEVICE (HLWD) LEGEND DRIVEWAY TYPICAL DWY ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TCP NOTE: 1)WORK CREW TO UTILIZE THIS PLAN TO ACCESS MH# 963 & HH# 1 LOCATED ON S/S/O AVENIDA ALVARADO @ A ST TO PLACE FIBER OPTIC CABLE INTO EXISTING CONDUIT. 2)WORK CREW TO PLACE TEMPORARY NO PARKING SIGNS ALONG ENTIRE WORK AREA 72 HOURS PRIOR TO COMMENCING WORK. PLACEMENT OF FIBER OPTIC CABLE AVENIDA ALVARADO & A ST PERMIT NO. LD23-7257 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA 4 4 FOR TRAFFIC CONTROL PLANS CONTRACTOR: COMMUNICATIONS SCALE:1"=60' 250'250'250'150'100' MIN 50' 250' HH# 1 N AVENIDA ALVARADO (35 MPH) MH# 963 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020 APPLICATION INFORMATION PERMIT NO.: Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching Signing & Striping Traffic Signal  Miscellaneous (SPECIFY BELOW) The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as follows: Name(s) of street(s) and/or street address: Utility Work Order #: Start Date: End Date: In consideration of granting this application, all applicants including utility companies hereby agree to: 1.If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control Plan Checklist for details. 2.Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. (See below for specific liability insurance requirements.) 3.Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City Engineer. 4.Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The developer/general contractor must be present for the timely request of inspections. 5.Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction. LIABILITY INSURANCE REQUIREMENTS PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED. THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT ENCROACHMENT PERMIT. X WORK CREW TO ACCESS MH#1080, MH#1029, MH#941. MH#963, HH#1 TO PLACE AND SPLICE FIBER OPTIC CABLE INTO EXISTING CONDUIT OR INTO EXISTING SUBSTRUCTURE. WINCHESTER RD & DIAZ RD AQUA VISTA WAY & AVENIDA ALVARADO 70147-5345607 12/19/2023 01/16/2024 LD23-7257 CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 12/14/2023 12/14/2023 12/14/2023 12/14/20 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020 Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum limits of insurance coverage shall be as follows: a.General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b.Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage. c.Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident for bodily injury or disease. d.Course of Construction: Completed value of the project. There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approac h located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the encroachment permit: BODILY INJURY $250,000.00 EACH PERSON $500,000.00 EACH OCCURANCE $500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS PROPERTY DAMAGE $100,000.00 EACH OCCURANCE $250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing the City named as an additional insured shall be attached to the application. The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges that this application will be made a part of the encroachment permit. APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED) Company Name: Mailing Address: Contact: Phone #: E-mail: I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the permittee and bind the permittee to the agreements contained herein and any conditions of the permit. Authorized Signature: Date Applied: CONTRACTOR’S INFORMATION Company Name: Mailing Address: Contact: Phone #: 24-HR Emergency #: State Contractor’s License #: Class: City Business License #: FRONTIER COMMUNICATIONS, INC. C/O DYNAMIC TELCO (FRONTIER AGENT) 1177 IDAHO STREET, SUITE 102, REDLANDS, CA 92374 951-992-1715 DTPERMITS@DYNAMICTELCO.COM FRONTIER COMMUNICATIONS, INC. 1400 E PHILLIPS BLVD, POMONA, CA 91766 PAMELA WELLS/DYNAMIC TELCO 11/21/2023 RAUL RIVAS 909-406-3178 488385 A, C-10 N/A PUBLIC WORKS CITY OF TEMECULA 1 4 FOR UTILITY SITE PLANS SPLICING & PLACING FIBER OPTIC CABLE DIAZ RD @ WINCHESTER RD UTILITY SITE PLAN WINCHESTER RD & DIAZ RD CONTRACTOR: COMMUNICATIONS PERMIT NO. LD23-7257 FRONTIER WORK ORDER NO.70147-5345607 CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 01/17/2024 01/17/2024 01/17/2024 01/17/20 WIN C H E S T E R R D DI A Z R D 10 9 ' 47 ' 62 ' 88 ' 38 ' 50 ' 37' 37' 74' 49' 67' 11 6 ' 12 6 ' 58 ' 68 ' 76 ' 38 ' 38 ' 10 1 ' 44' 57' 74' 37' 37' SI D E W A L K PA R K W A Y SID E W A L K PA R K W A Y PA R K W A Y PA R K W A Y SID E W A L K PA R K W A Y SID E W A L K Ch o o s e Ch o o s e AS P H A L T FO C C/L FO C R/ W R/ W FO C C/L FO C R/ W R/ W FO C C/L FO C R/W R/W FO C C/L FO C R/W R/W CL-CL INTERSECTION STA 10+00 WINCHESTER RD= STA 20+00 DIAZ RD 19 + 0 0 20 + 0 0 10 + 0 0 40 ' STA:18+34 MH# 1080 18 + 0 0 PUBLIC WORKS CITY OF TEMECULA 2 4 FOR UTILITY SITE PLANS CONTRACTOR: COMMUNICATIONS USP NOTE: 1)WORK CREW TO ACCESS MH#1080 ON S/S/ODIAZ RD @ WINCHESTER RD TO SPLICE FIBER OPTIC CABLE IN EXISTING SUBSTRUCTURE. SPLICING OF FIBER OPTIC CABLE DIAZ RD @ WINCHESTER RD PERMIT NO. LD23-7257 SCALE:1"=60' UTILITY SITE PLAN A Q U A V I S T A W A Y D / W CL-CL INTERSECTION STA 10+00 AQUA VISTA WAY= STA 19+31 AVENIDA ALVARADO STA: 19+31 MH# 1029 86'42' 44'64'32' 32' 9 2 ' 4 3 ' 4 9 ' 6 2 ' 3 1 ' 3 1 ' 3 1 ' 3 1 ' 6 2 ' 4 3 ' 4 3 ' 8 6 ' 1 0 + 0 0 20+ 0 0 19+ 0 0 21+ 0 0 1 1 + 0 0 2 7 ' G R A S S G R A S S D/W GRA S S GRA S S D/W PAR K W A Y PAR K W A Y AVE N I D A A L V A R A D O FOC C/L FOC R/W R/W F O C C / L F O C R / W R / W FOC C/L FOC R/W R/W USP NOTE: 1)WORK CREW TO ACCESS MH#1029 ON S/S/O AVENIDA ALVARADO @ AQUA VISTA WAY TO SPLICE FIBER OPTIC CABLE IN EXISTING SUBSTRUCTURE. SPLICING OF FIBER OPTIC CABLE AVENIDA ALVARADO & AQUA VISTA WAY PERMIT NO. LD23-7257 PUBLIC WORKS CITY OF TEMECULA 3 4 FOR UTILITY SITE PLANS CONTRACTOR: COMMUNICATIONS SCALE:1"=60' UTILITY SITE PLAN TI E R R A A L T A W A Y AVENIDA ALVARADO CL-CL INTERSECTION STA 10+00 TIERRA ALTA WAY = STA 50+00 AVENIDA ALVARADO STA: 47+38 MH# 941 10 + 0 0 50+0049+00 48+00 STA: 45+88 HH# 1 47+00 45+00 STA: 45+23 MH# 963 38 ' 39 ' FOC C/L FOC R/W R/W 32 ' FO C C/ L FO C R/ W R/ W FO C C/ L FO C R/ W R/ W FOC C/L FOC R/W R/W 10 + 0 0 46+0984 ' 41 ' 43 ' 54 ' 28 ' 27 ' 38' 18'20' 24' 12'12' 28'28' 56' 52'60' 112' 32 ' 32 ' 64 ' 48 ' 56 ' 10 4 ' A S T 46+00 CL-CL INTERSECTION STA 10+00 A ST = STA 46+09 AVENIDA ALVARADO USP NOTE: 1)WORK CREW TO ACCESS MH# 941 LOCATED ON S/S/O AVENIDA ALVARADO @ AQUA VISTA WAY TO PLACE +/- 295 L.F. OF FIBER OPTIC CABLE IN EXISTING SUBSTRUCTURE. 2)WORK CREW TO ACCESS HH#1 & MH# 963 ON S/S/O AVENIDA ALARADO @ A ST TO PLACE +/- 65 L.F. OF FIBER OPTIC CABLE IN EXISTING SUBSTRUCTURE FROM HH TO MH. SPLICING OF FIBER OPTIC CABLE AVENIDA ALVARADO & TIERRA ALTA WAY PERMIT NO. LD23-7257 PUBLIC WORKS CITY OF TEMECULA 4 4 FOR UTILITY SITE PLANS CONTRACTOR: COMMUNICATIONS SCALE:1"=60' UTILITY SITE PLAN SIDEWALK SIDEWALK D/W D/W D/W D/W D/W D/W D/W D/W SIDEWALK PARKWAY PA R K W A Y SI D E W A L K PA R K W A Y PARKWAYPARKWAY SIDEWALK PARKWAY SIDEWALK PARKWAY SIDEWALK PARKWAY PARK W A Y SIDE W A L K SIDEWALK PARKWAY PARKWAY