HomeMy WebLinkAboutLD23-1557Permit Number: LD23-1557
LD - Utilities/ Excavation - Parallel
Issued: 07/14/2023
Expired: 02/07/2024
Job Address: 33320 Temecula Pky
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Michelle Guerra
325 W. Hospitality Lane Suite 206 Suite 206, Suite 206
San Bernardino, CA 92408
Applicant:
Brash Engineering Services
11172 Chico Ave
Pomona, CA 91766
(562) 587-1320
Contractor:
Utility Work Order Number: HBLAFX45
Description:
Crown Castle HBLAFX45
WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am
Location: 33320 Temecula Parkway
Proposed work:
Maintenance to existing aerial fiber runs along Temecula Pkwy.
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD23-1557
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
Public Works Inspector.
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities*****
Permit Number: LD23-1557
LD - Utilities/ Excavation - Parallel
project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
Page 2 of 3
Permit Number: LD23-1557
LD - Utilities/ Excavation - Parallel
City Engineer or Authorized Representative Date
07/14/2023
Page 3 of 3
TRAFFIC CONTROL PLAN GENERAL NOTES
1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (2019
CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2. THE CITY TRAFFIC ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY.
3. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4. WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 9:00 A.M. TO 3:30 P.M., MONDAY TO FRIDAY AND 8:00 A.M. TO 6:00 P.M., SATURDAY
UNLESS APPROVED OTHERWISE. WORK IS NOT PERMITTED ON CITY HOLIDAYS.
5. TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS.
6. PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7. TEMPORARY "T.A.N.S.A.T." SIGNS SHALL BE POSTED BY THE CONTRACTOR 72 HOURS PRIOR TO COMMENCING WORK.
8. ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9. THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING, REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE
REPLACED TEMPORARILY WITH TAPE.)
11. ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A
HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC.
12. ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA 48 HOURS PRIOR TO
BEGINNING CONSTRUCTION.
13. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOUR PER DAY AND 7 DAYS PER WEEK.
14. A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE CITY OF TEMECULA.
15. ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF TEMECULA. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND
TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION. ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST
ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION.
16. A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE
UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS
SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD
DRAWING # 407 (SHEET 1 AND 2 ) FOR TRENCH PATCH.
18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY
FIELD ISPECTION, OR THE POLICE DEPARTMENT.
19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUTED ON HIGH LEVEL DEVICES.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING,
BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES.
0"40' 40'20'
24"x36" SCALE: 1" = 40'-0"
LEGEND:
FLASHING ARROW BOARD
DELINEATOR
CONE WITH SIGN
TEMPORARY SIGN
WORK VEHICLE
DIRECTION OF TRAVEL
TYPE II BARRICADE
TYPE III BARRICADE
TYPE III BARRICADE WITH SIGN
WORK AREACABLE LASHING
HIGH-LEVEL WARNING DEVICE
SIGNALIZED INTERSECTIONS
TYPE II BARRICADE WITH SIGN
NE
N
ESE
SW W NW
S
WORK HOURS:
APPROX. DURATION OF WORK:
TYPE OF WORK:
NOTE:
INSTALL TEMPORARY TANSAT 72 HOURS
PRIOR TO WORK IF NEEDED
9:00 PM - 5:00 AM SUNDAY - THURSDAY
3 DAYS
POLE MAKE-READY/CABLE LASHING
PHASE 1
VICINITY MAP
TEMECULA P
K
W
Y
(55 MPH)
C30-BIKE
BIKE
LANE
CLOSED
350'
35
0
'
35
0
'
G20-2
END
ROAD WORK
G20-2
END
ROAD WORK
G20-2
END
ROAD WORK
SIDEWALK
TEMECULA P
K
W
Y
(55 MPH)
EXISTING
POLE
BIKE LANE
BIKE LANE
CURB
CURB
PE
D
X
-
I
N
G
PED X-ING
PE
D
X
-
I
N
G
RA
I
S
E
D
M
E
D
I
A
N
EXISTING
POLE
12
'
RAISED MEDIAN S
BIKE LANE
BI
K
E
L
A
N
E
BI
K
E
L
A
N
E
C30 (CA)
LANE
CLOSED
C30-BIKE
BIKE
LANE
CLOSED
SIDEWALK
EXISTING
POLE
EXISTING
POLE
BUTTERFIELD STAGE RD.
(50 MPH)
SIDEWALK SIDEWALK
EXISTINGPOLE
C30-BIKE
BIKE
LANE
CLOSED
C30-BIKE
BIKE
LANE
CLOSED
C30 (CA)
LANE
CLOSED
C30 (CA)
LANE
CLOSED
C30 (CA)
LANE
CLOSED
C30-BIKE
BIKE
LANE
CLOSED
C30 (CA)
LANE
CLOSED
BIKE LANE BIKE LANE BIKE LANE
12
'
12
'
12
'
12
'
NOTE:
PROVIDE FLAGGER TO MAINTAIN
PEDESTRIAN ACCESS, WORK ON POLES
TEMECU
L
A
P
K
W
Y
.
TEMECU
L
A
P
K
W
Y
.
B
U
T
T
E
R
F
I
E
L
D
S
T
A
G
E
R
D
.
E
L
D
S
T
A
G
E
R
D
.
DE P
O
R
T
O
L
A
R
D
.
DE P
O
R
T
O
L
A
R
D
.
WORK AREA
Drawn By
Plans Prepared Under Supervision Of
Date
CONSTRUCTION RECORD DATE BY REVISIONS BENCH MARKDATEACC'D
Vertical
Horizontal
SCALE
R.C.E. No.
SEAL:Designed By CITY OF TEMECULARECOMMENDED BY:
ACCEPTED BY:
Checked By
DATE:
DATE:
Sheet of
DEPARTMENT OF PUBLIC WORKS
Drawing No.
C:
\
U
s
e
r
s
\
U
s
e
r
\
A
p
p
D
a
t
a
\
L
o
c
a
l
\
T
e
m
p
\
A
c
P
u
b
l
i
s
h
_
1
1
9
6
\
D
H
S
1
0
8
0
0
9
C
A
-
H
B
L
T
C
X
4
5
-
T
E
M
_
0
4
2
5
2
0
2
3
.
d
w
g
L
a
s
t
Sa
v
e
d
:
T
h
u
J
u
n
,
2
0
2
3
-
1
2
:
3
0
p
m
TRAFFIC ENGINEER
NICOLAS M. MINICILLI
LD23 - 1557
3
DHS108009CA-HBLTCX45-TEM
42690 MARGARITA ROAD,TEMECULA, CA 92592
TRAFFIC CONTROL PLAN
Contractor:
Inspector
Date Completed
DANIEL EKO
BRASH ENGINEERING SERVICES
PRESIDENT
(714) 446-0635
R.T.E. NO. 2647
N
1
SE
E
M
A
T
C
H
L
I
N
E
S
H
E
E
T
T
C
P
-
2
6/23/2023
6/28/23
06/28/23
0"40' 40'20'
24"x36" SCALE: 1" = 40'-0"
NE
N
ESE
SW W NW
SWORK HOURS:
APPROX. DURATION OF WORK:
TYPE OF WORK:
NOTE:
INSTALL TEMPORARY TANSAT 72 HOURS
PRIOR TO WORK IF NEEDED
9:00 PM - 5:00 AM SUNDAY - THURSDAY
3 DAYS
POLE MAKE-READY/CABLE LASHING
PHASE 2
NOTE:
PROVIDE FLAGGER TO MAINTAIN
PEDESTRIAN ACCESS, WORK ON POLES
LEGEND:
FLASHING ARROW BOARD
DELINEATOR
CONE WITH SIGN
TEMPORARY SIGN
WORK VEHICLE
DIRECTION OF TRAVEL
TYPE II BARRICADE
TYPE III BARRICADE
TYPE III BARRICADE WITH SIGN
WORK AREACABLE LASHING
HIGH-LEVEL WARNING DEVICE
SIGNALIZED INTERSECTIONS
TYPE II BARRICADE WITH SIGN
BUTTERFIELD STAGE RD.
(55 MPH)
SIDEWALK SIDEWALK
EXISTING
POLEEXISTING
POLE
3
5
0
'
3
5
0
'
W20-1
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
G20-2
END
ROAD WORK
G20-2
END
ROAD WORK
DE PORTOLA
R
D
.
(45 MPH)
DE PORTOLA
R
D
.
(45 MPH)
B
I
K
E
L
A
N
E
B
I
K
E
L
A
N
E
CONSTRUCTION TO USE FLAGGER
TO STOP VEHICLES FOR ACROSS
THE STREET CABLE LASHING.
NOTE -CROSSING TO TAKE NO
MORE THAN 30 SECONDS.
S
C30-BIKE
BIKE
LANE
CLOSED
C30 (CA)
LANE
CLOSED
C30-BIKE
BIKE
LANE
CLOSED
C30 (CA)
LANE
CLOSED
660'
MERGING TAPER
B
I
K
E
L
A
N
E
R
A
I
S
E
D
M
E
D
I
A
N
PED X-ING
PED X-ING
P
E
D
X
-
I
N
G
P
E
D
X
-
I
N
G
RAISED MEDIAN
BIKE LANE
BIKE LANE
12
'
12
'
R3-4
R3-4
100'
COORDINATE WITH THE CITY OF TEMECULA
PUBLIC WORKS DEPARTMENT TO PLACE THE
SIGNALIZED INTERSECTION ON FLASH
OPERATION DURING WORK HOURS.
350'350'
175'
220'
BIKE LANE TAPER
350'
W20-1
ROAD
WORK
AHEAD
(BIKE)
BIKE
LANE
CLOSED
AHEAD
W20-5W20-5R
CLOSEDLANE
AHEAD
RIGHT
W4-2RW11-1W16-1
SHARE
THE
ROAD
G20-2
END
ROAD WORK
BUTTERFIELD STAGE RD.
(55 MPH)
CURB
CURB
660'
MERGING TAPER
C30-BIKE
BIKE
LANE
CLOSED
BIKE LANE
BIKE LANE
12
'
RAISED MEDIAN
Drawn By
Plans Prepared Under Supervision Of
Date
CONSTRUCTION RECORD DATE BY REVISIONS BENCH MARKDATEACC'D
Vertical
Horizontal
SCALE
R.C.E. No.
SEAL:Designed By CITY OF TEMECULARECOMMENDED BY:
ACCEPTED BY:
Checked By
DATE:
DATE:
Sheet of
DEPARTMENT OF PUBLIC WORKS
Drawing No.
C:
\
U
s
e
r
s
\
U
s
e
r
\
A
p
p
D
a
t
a
\
L
o
c
a
l
\
T
e
m
p
\
A
c
P
u
b
l
i
s
h
_
1
1
9
6
\
D
H
S
1
0
8
0
0
9
C
A
-
H
B
L
T
C
X
4
5
-
T
E
M
_
0
4
2
5
2
0
2
3
.
d
w
g
L
a
s
t
Sa
v
e
d
:
T
h
u
J
u
n
,
2
0
2
3
-
1
2
:
3
0
p
m
TRAFFIC ENGINEER
NICOLAS M. MINICILLI
LD23 - 1557
3
DHS108009CA-HBLTCX45-TEM
42690 MARGARITA ROAD,TEMECULA, CA 92592
TRAFFIC CONTROL PLAN
Contractor:
Inspector
Date Completed
DANIEL EKO
BRASH ENGINEERING SERVICES
PRESIDENT
(714) 446-0635
R.T.E. NO. 2647 2
SE
E
M
A
T
C
H
L
I
N
E
S
H
E
E
T
T
C
P
-
1
SE
E
M
A
T
C
H
L
I
N
E
A
SE
E
M
A
T
C
H
L
I
N
E
A
BUFFER
6/23/2023
6/28/23
06/28/23
RAISED MEDIAN
EXISTING
POLEEXISTING
POLEEXISTING
POLE
BUTTERFIELD ST
A
G
E
R
D
.
(50 MPH)
3
5
0
'
W20-1
ROAD
WORK
AHEADG20-2
END
ROAD WORK
PED X-ING
PED X-ING
P
E
D
X
-
I
N
G
BUTTERFIELD STA
G
E
R
D
.
(55 MPH)
5
0
0
'
W20-1
ROAD
WORK
AHEAD
DWY
S
TEMECULA PKWY
(55 MPH)
C30A (CA)
SHOULDER
CLOSED
C30A (CA)
SHOULDER
CLOSED
SIDEWALK SIDEWALK SIDEWALK
R
A
I
S
E
D
M
E
D
I
A
N
B
I
K
E
L
A
N
E
B
I
K
E
L
A
N
E
B
I
K
E
L
A
N
E
C30A (CA)
SHOULDER
CLOSED
W11-1W16-1
SHARE
THE
ROAD
BIKE LANE
12
'
12
'
12
'
G20-2
END
ROAD WORK
CONSTRUCTION TO USE FLAGGER
TO STOP VEHICLES FOR ACROSS
THE STREET CABLE LASHING.
NOTE -CROSSING TO TAKE NO
MORE THAN 30 SECONDS.
EXISTING
POLEEXISTINGPOLEEXISTING
POLE
RAISED MEDIAN
350'
CURB
CURB
TEMECULA PKWY
(50 MPH)
SIDEWALK SIDEWALK SIDEWALK
C30A (CA)
SHOULDER
CLOSED
C30A (CA)
SHOULDER
CLOSED
C30A (CA)
SHOULDER
CLOSED
G20-2
END
ROAD WORK
BIKE LANE
BIKE LANE
12
'
12
'
WORK HOURS:
APPROX. DURATION OF WORK:
TYPE OF WORK:
NOTE:
INSTALL TEMPORARY TANSAT 72 HOURS
PRIOR TO WORK IF NEEDED
9:00 PM - 5:00 AM SUNDAY - THURSDAY
3 DAYS
POLE MAKE-READY/CABLE LASHING
PHASE 2
NOTE:
PROVIDE FLAGGER TO MAINTAIN
PEDESTRIAN ACCESS, WORK ON POLES
LEGEND:
FLASHING ARROW BOARD
DELINEATOR
CONE WITH SIGN
TEMPORARY SIGN
WORK VEHICLE
DIRECTION OF TRAVEL
TYPE II BARRICADE
TYPE III BARRICADE
TYPE III BARRICADE WITH SIGN
WORK AREACABLE LASHING
HIGH-LEVEL WARNING DEVICE
SIGNALIZED INTERSECTIONS
TYPE II BARRICADE WITH SIGN
0"40' 40'20'
24"x36" SCALE: 1" = 40'-0"
COORDINATE WITH THE CITY OF TEMECULA
PUBLIC WORKS DEPARTMENT TO PLACE THE
SIGNALIZED INTERSECTION ON FLASH
OPERATION DURING WORK HOURS.
EXISTING
POLE
RAISED MEDIAN
C30A (CA)
SHOULDER
CLOSED
SIDEWALK SIDEWALK
STOP
EXISTING
POLEEXISTING
POLE
TEMECULA CREEK RD.
(25 MPH)
10
0
'
W20-1
ROAD
WORK
AHEAD
G20-2
END
ROAD WORK
RA
I
S
E
D
M
E
D
I
A
N
DIRTDIRT
G20-2
END
ROAD WORK
TEMECULA PKWY
(55 MPH)
CITY OF TEMECULA
COUNTY OF RIVERSIDE
220'
SHOULDER TAPER
W20-1
ROAD
WORK
AHEAD
C30A (CA)
SHOULDER
CLOSED
350'350'350'
C30A (CA)
SHOULDER
CLOSED
C30A (CA)
SHOULDER
CLOSED
SIDEWALK
CURB
EOP
ASPHALT SHOULDER
12
'
12
'
12
'
CI
T
Y
O
F
T
E
M
E
C
U
L
A
CO
U
N
T
Y
O
F
R
I
V
E
R
S
I
D
E
12
'
EXISTING
POLE
DWY
C30A (CA)
SHOULDER
CLOSED
SIDEWALK
NARROW
LANE
C12
ROAD
NARROWS
W5-1
NE
N
E
SE
SW
W
NW
S
S
N
W
Drawn By
Plans Prepared Under Supervision Of
Date
CONSTRUCTION RECORD DATE BY REVISIONS BENCH MARKDATEACC'D
Vertical
Horizontal
SCALE
R.C.E. No.
SEAL:Designed By CITY OF TEMECULARECOMMENDED BY:
ACCEPTED BY:
Checked By
DATE:
DATE:
Sheet of
DEPARTMENT OF PUBLIC WORKS
Drawing No.
C:
\
U
s
e
r
s
\
U
s
e
r
\
A
p
p
D
a
t
a
\
L
o
c
a
l
\
T
e
m
p
\
A
c
P
u
b
l
i
s
h
_
1
1
9
6
\
D
H
S
1
0
8
0
0
9
C
A
-
H
B
L
T
C
X
4
5
-
T
E
M
_
0
4
2
5
2
0
2
3
.
d
w
g
L
a
s
t
Sa
v
e
d
:
T
h
u
J
u
n
,
2
0
2
3
-
1
2
:
3
0
p
m
TRAFFIC ENGINEER
NICOLAS M. MINICILLI
LD23 - 1557
3
DHS108009CA-HBLTCX45-TEM
42690 MARGARITA ROAD,TEMECULA, CA 92592
TRAFFIC CONTROL PLAN
Contractor:
Inspector
Date Completed
DANIEL EKO
BRASH ENGINEERING SERVICES
PRESIDENT
(714) 446-0635
R.T.E. NO. 2647 3
SE
E
M
A
T
C
H
L
I
N
E
B
SE
E
M
A
T
C
H
L
I
N
E
B
6/23/2023
6/28/23
06/28/23
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020
APPLICATION INFORMATION PERMIT NO.:
Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching
Signing & Striping Traffic Signal Miscellaneous (SPECIFY BELOW)
The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as
follows:
Name(s) of street(s) and/or street address:
Utility Work Order #: Start Date: End Date:
In consideration of granting this application, all applicants including utility companies hereby agree to:
1.If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties
involved with this application at the time of submittal. See the Traffic Control
Plan Checklist for details.
2. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from
and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident,
loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application. (See below for specific liability insurance requirements.)
3. Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City
Engineer.
4. Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working
days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The
developer/general contractor must be present for the timely request of inspections.
5. Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works
Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all
applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction.
LIABILITY INSURANCE REQUIREMENTS
PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED
EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE
CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED.
THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR
BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT
ENCROACHMENT PERMIT.
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
david.pina 05/04/2023
05/04/2023 05/04/2023
05/04/20
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020
Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum
limits of insurance coverage shall be as follows:
a.General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If
Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit
shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
b.Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage.
c.One million dollars ($1,000,000) per accident
for bodily injury or disease.
d.Course of Construction:Completed value of the project.
h
located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at
least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the
encroachment permit:
BODILY INJURY $250,000.00 EACH PERSON
$500,000.00 EACH OCCURANCE
$500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
PROPERTY DAMAGE $100,000.00 EACH OCCURANCE
$250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
A $1,000,000.00 will be considered equivalent to
the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing
the City named as an additional insured shall be attached to the application.
The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this
application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges
that this application will be made a part of the encroachment permit.
(THIS SECTION MUST BE COMPLETED)
Company Name:
Mailing Address:
Contact: Phone #: E-mail:
I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the
permittee and bind the permittee to the agreements contained herein and any conditions of the permit.
Authorized Signature: Date Applied:
Company Name:
Mailing Address:
Contact: Phone #: 24-HR Emergency #:
Class: City Business License #: