HomeMy WebLinkAboutLD22-6672Permit Number: LD22-6672
LD - Utilities/ Access to Utility Agency Facilities
Issued: 01/15/2023
Expired: 08/08/2023
Job Address: 41593 Winchester Rd
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Andrea Magana
1980 Orange Tree Ln., STE 210
Redlands, CA 92374
Applicant:
Frontier Communications
(Utility Billing)
Network Engineering – Bldg. A. 1400 E. Phillips Blvd, Building A
Pomona, CA 91766
(909) 469-6327
Contractor:
Utility Work Order Number: 70147-5319125
Description:
Frontier 70147-5319125
WORK HOURS SHALL BE SUNDAY - THURSDAY, NO HOLIDAYS, 9:00pm - 5:00am
Location:
MH422 - Winchester Rd SE/S 130' NE/O Enterprise Cir N
MH642 - Enterprise Cir N NE/S 350' NW/O Winchester Rd
MH643 - Enterprise Cir N NE/S 990' SW/O Winchester Rd
Proposed work:
Access three (3) manholes as shown on Frontier "SITE PLAN, LD22-6672".
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD22-6672
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
Public Works Inspector.
Page 1 of 3
Permit Number: LD22-6672
LD - Utilities/ Access to Utility Agency Facilities
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Page 2 of 3
Permit Number: LD22-6672
LD - Utilities/ Access to Utility Agency Facilities
Permitee Date
City Engineer or Authorized Representative Date
01/15/2023
Page 3 of 3
MH# 422
STA: 101+30
WIN
C
H
E
S
T
E
R
R
D
(40
M
P
H
)
E
N
T
E
R
P
R
I
S
E
C
I
R
N
(
2
5
M
P
H
)
CL-CL INTERSECTION
STA 10+00 ENTERPRISE CIR N 1=
STA 100+00 WINCHESTER RD 2
0
9
+
0
0
1
1
+
0
0
99+
0
0
101
+
0
0
102
+
0
0
28'
28'56'
34'
34'
68'
5
0
'
5
0
'
1
0
0
'
5
6
'
5
6
'
1
1
2
'
28'
28'56'
34'
34'68'
5
0
'
5
0
'
1
0
0
'
5
2
'
5
6
'
1
0
7
'
F
O
C
C
/
L
F
O
C
R
/
W
R
/
W
FOC
C/L
FOCR/W
R/W
FOC
C/L
FOCR/W
R/W
F
O
C
C
/
L
F
O
C
R
/
W
R
/
W
UNITS / ACCT CODES
REVISIONS
DESIGNED BY DYNAMIC TELCO
FTR ENGINEER:RAUL RIVAS (909) 406-3178
FTR INSPECTOR:
CONSTRUCTION NOTE:
AT MH422 SPLICE FIBERS FC721,349-350 FROM 144F
IPID 240632 TO THE NEW 48F STRAP TO 216F IPID
242063 TO MH 642.
GABRIEL ORTIZ (951) 434-9873
LD22-6672
CITY OF TEMECULA
SITE PLAN
WINCHESTER RD @
ENTERPRISE CIR N
COMMUNICATIONS
TLS-PLACE & SPLICE
70147-5319125
1:60
10/31/20221 1 OF 2
PROJECT
NUMBER:
DRAWN DATE:
SCALE:
TWNSHP:----
ENGR: RAUL RIVAS
PHONE: 909-406-3178
TAX DISTRICT:----
RNG: ----
C.O.AREA: RNCACAXF
EXCH. CODE: MURRIETA
CNTY: RIVERSIDE
FILE:
DWG
SEC: ----
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
tricia.ortega 12/01/2022
12/01/2022 12/01/2022
12/01/20
UNITS / ACCT CODES
REVISIONS
DESIGNED BY DYNAMIC TELCO
FTR ENGINEER:RAUL RIVAS (909) 406-3178
FTR INSPECTOR:GABRIEL ORTIZ (951) 434-9873
LD22-6672
CITY OF TEMECULA
SITE PLAN
WINCHESTER RD
COMMUNICATIONS
TLS-PLACE & SPLICE
70147-5319125
2
Land Development
Utility Plan General Notes
41000 Main Street
Temecula, CA 92590
Phone: 951-694-6444
www.temeculaca.gov
Revised: 03/19/2022
Utility Construction/Site plans shall be submitted for review and include the following, but not be limited to:
1. The City Engineer or their representative has the authority to initiate field changes to assure public safety.
2. BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133
3. Where there is conflict with the permit language and approved plans, the approved plans shall govern.
4. Trench repair shall be in accordance with City Standard Drawing 407.
5. All facilities shall be installed in accordance with City Standard Drawing 117.
6. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction
shall be removed from joint to joint and reconstructed in accordance with City Standards and the
Greenbook.
7. All disturbed landscaping and other improvements shall be removed or repaired and replaced to the
satisfaction of Public Works.
8. Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard
Drawing 402 and meet current ADA Standards.
9. Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified
professional pursuant to the California Business and Professions Code Section 8771.
10. Final compaction test results shall be provided by a soils engineer.
11. A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@temeculaca.gov to schedule a meeting.
12. All U.S.A. mark outs shall be removed prior to completion of project.
13. A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to
verify completion of project.
14. Standard Inspection Request shall include:
If using a blanket permit indicate whether work is Emergency, Emergent, or Maintenance.
Permit Number:
Work Order Number:
Inspection Date:
Inspection Time (if applicable):
Inspection Type (Storm Drain, Precise
Grade, NPDES, etc.):
Inspection Location:
On-site location:
Requestor Name:
Requestor Company:
Contact Number:
10/31/2022
2 OF 2
PROJECT
NUMBER:
DRAWN DATE:
SCALE:
TWNSHP:----
ENGR: RAUL RIVAS
PHONE: 909-406-3178
TAX DISTRICT:----
RNG: ----
C.O.AREA: RNCACAXF
EXCH. CODE: MURRIETA
CNTY: RIVERSIDE
FILE:
DWG
SEC: ----
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
FOR
TRAFFIC CONTROL PLANS
PLACEMENT OF FIBER OPTIC CABLE & SPLICE
ENTERPRISE CIR N
TRAFFIC CONTROL PLANS
ENTERPRISE CIR N
AREA MAP:
EXISTING NO TURN LANE
FLASHING ARROW SIGN TRAILER (TYP.)
C L O S E D
R O A D
CLOSED
LEFT LANE
AHEAD
END
DETOURROAD WORK
ONLY
CREW
SURVEY
CLOSED
ROAD
AHEAD
RIGHT
AHEAD
DETOUR
RIGHT
KEEP
TURN RIGHT
M U S T
RIGHT LANE
NOT
PASS
DO
STOP SLOW
CLOSED
LANE
TO STOP
PREPARED
SHOULDER
WORK
WORK
AHEAD
ROAD
MACHINERY
AHEAD
END
ROAD CLOSED
LOCAL TRAFFIC ONLY
TO
THRU TRAFFIC
ROAD CLOSED
ROAD
DETOUR
SHOULDER
SOFTPAVEMENT
ENDS AHEAD
TRAFFIC CONE
FLASHING ARROW SIGN (FAS)
EXISTING TURN ONLY LANE
BARRICADE
WORK ZONE
(FAS)
TRAFFIC SIGNAL
HIGH LEVEL WARNING DEVICE
(WITH CALTRANS & MUTCD CODE)
SIGN (WITH CALTRANS CODE)
TRAFFIC FLOW DIRECTION
FLAGGER
S
(HLWD)
HIGH LEVEL WARNING DEVICE
TRAFFIC CONE
POST TUBE
LANE
CLOSED
ROAD
ROUGH XX
MPH
NARROWS
ROAD
W20-2
R11-2 R11-3A R11-4
W21-3
M4-8A
C9A(CA)
M4-10
W21-7
AHEAD
UTILITY
WORK
G20-2
W20-4
W20-1
W21-5W21-1A
W20-5W20-3
ONE LANE
AHEAD
ROAD
W3-4
C30(CA)C28B(CA)
W21-6
W8-7
BE
R3-5
R4-7BR4-1 R9-3A
R1-1 R3-7R3-2R3-1 R3-4
R3-18
W6-4
W5-1W4-2
W13-1
W1-2 W1-4W1-3W1-1
W8-4W8-3 W8-8
W4-1W1-8
W9-3
W1-6
W12-1W6-3
R3-17
BIKE LANE
R5-6
GRAVEL
LOOSE
MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP)L WOS
DAEHA
(CMS)
CHANGEABLE MESSAGE SIGN TRAILER (TYP.)
R3-6
SIDEWALK
R9-9
CLOSED
R9-11A
CENTER
DETOUR
M4-8
C28A(CA)
ENDS
AHEAD
R3-17B
R3-17A
BEGIN
RIGHT TURN LANE
YIELD TO BIKES
R4-4
RIGHT
KEEP
R4-7AR4-7
CROSS HERE
SIDEWALK CLOSED
AHEAD
LANE
NARROW
C12(CA)
TRENCH
OPEN
C27(CA)
WARNING SIGNS
MISCELLANEOUS DEVICES
DETAIL SHEET LEGEND
PERMIT NO. LD22-6672
CONTRACTOR:
CONE SPACING - 25' MAXIMUM
TELEPHONE
COMMUNICATIONS
NO SCALE
NAME
DATE
R.C.E. NUMBER
FIRM
ADDRESS
C29570
D. Lynn Parker
04-14-2021
P.O.Box 1666, Cottonwood, AZ
86326 Phone (909) 472-9983
WORK TO BE DONE:
1)ACCESS MH# 642 LOCATED ON THE E/S/O ENTERPRISE CIR N @
WINCHESTER RD AND MH# 643 LOCATED ON THE N/S/O
ENTERPRISE CIR N @ WINCHESTER RD TO SPLICE FIBER. NO
EXCAVATION REQUIRED.
TRAFFIC CONTROL GENERAL NOTES (REVISED: 08/26/2020)
1.All traffic control devices shall conform to the latest edition of the California Manual on Uniform Traffic Control Devices (California MUTCD) and the Standard
Specifications for Public Works Construction.
2.The City Engineer or his representative has the authority to initiate field changes to assure public safety.
3.All traffic control devices shall be removed from view when not in use.
4.Work hours shall be restricted to the period between 8:30 a.m. and 3:30 p.m., Monday through Friday, unless approved otherwise. When night work is
required, work hours shall be 9 p.m. to 5 a.m., Sunday through Thursday.
5.Trenches must be back filled or plated during non-working hours. Steel plates shall have asphaltic concrete berm on all edges. All dirt, dust, and debris shall be
removed from street at end of each day and at the end of the job. The street shall be in drivable condition at all times.
6.Pedestrian controls shall be provided as shown on the plans.
7.Temporary "NO PARKING" signs will be posted 24 hours prior to commencing work.
8.Access to driveways will be maintained at all times unless other arrangements are made.
9.The contractor shall replace within 72 hours, all traffic signal loop detectors damaged during construction.
10.The contractor shall replace within 24 hours, all striping removed or damaged by construction work. (Striping may be replaced temporarily with tape.)
11.All Workers shall be equipped with an orange vest (or a reflective vest at night). All flaggers shall also be equipped with a hard hat, C28 "Stop/Slow" paddle
and shall be trained in the proper fundamentals of flagging traffic.
12.Any work that disturbs normal traffic signal operations shall be coordinated with the City of Temecula's Traffic Division, 48 hours prior to beginning
construction. Contact the City's Traffic Division at (951) 694 -6411.
13.The contractor shall maintain all traffic control devices 24 hours per day and 7 days per week.
14.A minimum of twelve (12) foot travel lanes must be maintained unless otherwise approved by the Department of Public Works.
15.All night work will require written approval from the Department of Public Works. Lane closures, road detours, road closures, and traffic signal modifications
associated with overnight construction activities will require warning signs be placed at least . one week in advance of starting construction .
16.A solar powered flashing arrow board shall be required on all arterial street lane closures.
17.If the permit applicant determines that conduit installation will be by the boring machine method, the trench patch for the utility observation excavation will be
the same as for open trench excavation method. This will provide a single continuous surface restoration eliminating the multiple penetration into the public
roadway to all requirements in City Standard Drawing # 407 (sheet 1 and 2) for trench patch.
18.Any work that creates an undue safety risk or creates severe congestion may be shut down by City Traffic Engineers, City Field Inspection, or the Police
Department.
19.Cones and delineators shall have reflectorized sleeves for night work.
20.If parking is allowed in advance warning area, advance warning signs shall be mounted on high level devices.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO
EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES.
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS MINICILLI
SENIOR TRAFFIC ENGINEER
2647
NO SCALE
FRONTIER WORK ORDER NO. 70147-5319125
1
3
MH 642
WIN
C
H
E
S
T
E
R
RD
( 40
M
P
H
)
ENT
E
R
P
R
I
S
E
CI
R
N
( 2
5
M
P
H
)
MH 643
CONSTRUCTION NOTES:
1) WORK CREW TO UTILIZE STEEL
PLATES FOR VEHICLE INGRESS AND
EGRESS FOR DRIVEWAYS.
2) WORK CREW TO PLACE TEMPORARY
NO PARKING ANY TIME SIGNS ALONG
ENTIRE WORK AREA 72 HOURS BEFORE
CONSTRUCTION.
WORK
ROAD
S
TRAFFIC CONE
TEMPORARY SIGN
DIRECTION OF TRAVEL
WORK AREA
FLASHING ARROW SIGN
(FAS)
TYPE III BARRICADE
WITH SIGN
SIGNALIZED
INTERSECTION
FLAGGER
HIGH LEVEL
WARNING DEVICE
(HLWD)
LEGEND
DRIVEWAY TYPICAL
DWY
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE)
THROUGHOUT TRAFFIC CONTROL ZONE.
CONSTRUCTION NOTES:
1) WORK CREW TO UTILIZE THIS
TYPICAL FOR THE WORK LOCATION(S)
DEFINED TO THE LEFT.
2) WORK CREW TO UTILIZE STEEL
PLATES FOR VEHICLE INGRESS AND
EGRESS FOR DRIVEWAYS.
3) WORK CREW TO PLACE TEMPORARY
NO PARKING ANY TIME SIGNS ALONG
ENTIRE WORK AREA 72 HOURS BEFORE
CONSTRUCTION.
4) WORK CREW TO COMBINE TYPICALS
AS NEEDED TO ACHIEVE ADEQUATE
TRAFFIC CONTROL.
5) WORK CREW TO ROTATE TYPICALS
AS NEEDED TO MATCH STREET
CONDITIONS.
LOCATION 1
NTS
WORK CREW TO UTILIZE THIS TYPICAL FOR ACCESS TO MH 642 ON THE
E/S/O ENTERPRISE CIR N @ WINCHESTER RD TO SPLICE FIBER.
JOB ID:
DRAWN BY:
EST. #:SHEET#:
TITLE:
DATE: 12/14/2022
OF
70147-5319125
STREET ADDRESS:
CITY/STATE:TEMECULA, CA 92590
DYNAMIC TELCO 951-992-1472
3
COMMUNICATIONS
FTR ENGINEER:
FTR INSPECTOR:
.
RAUL RIVAS (909) 406-3178
GABRIEL ORTIZ (951) 434-9873
TRAFFIC CONTROL PLAN
2
MH 642
SCALE: N.T.S.
ENTERPRISE CIR N @ WINCHESTER RD
WIN
C
H
E
S
T
E
R
RD
( 40
M
P
H
)
E
N
T
E
R
P
R
I
S
E
C
I
R
N
(
2
5
M
P
H
)
TCP
12
'
**
TO BE DETERMINED BY
THE CITY OF TEMECULA**
100'100'100'
65'155'
100'100'100'
65'
JOB ID:
DRAWN BY:
EST. #:SHEET#:
TITLE:
DATE: 12/14/2022
OF
70147-5319125
STREET ADDRESS:
CITY/STATE:TEMECULA, CA 92590
DYNAMIC TELCO 951-992-1472
3
COMMUNICATIONS
FTR ENGINEER:
FTR INSPECTOR:
.
RAUL RIVAS (909) 406-3178
GABRIEL ORTIZ (951) 434-9873
TRAFFIC CONTROL PLAN
3
MH 643
SCALE: N.T.S.
ENTERPRISE CIR N @ WINCHESTER RD
CONSTRUCTION NOTES:
1) WORK CREW TO UTILIZE STEEL
PLATES FOR VEHICLE INGRESS AND
EGRESS FOR DRIVEWAYS.
2) WORK CREW TO PLACE TEMPORARY
NO PARKING ANY TIME SIGNS ALONG
ENTIRE WORK AREA 72 HOURS BEFORE
CONSTRUCTION.
WORK
ROAD
S
TRAFFIC CONE
TEMPORARY SIGN
DIRECTION OF TRAVEL
WORK AREA
FLASHING ARROW SIGN
(FAS)
TYPE III BARRICADE
WITH SIGN
SIGNALIZED
INTERSECTION
FLAGGER
HIGH LEVEL
WARNING DEVICE
(HLWD)
LEGEND
DRIVEWAY TYPICAL
DWY
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE)
THROUGHOUT TRAFFIC CONTROL ZONE.
CONSTRUCTION NOTES:
1) WORK CREW TO UTILIZE THIS
TYPICAL FOR THE WORK LOCATION(S)
DEFINED TO THE LEFT.
2) WORK CREW TO UTILIZE STEEL
PLATES FOR VEHICLE INGRESS AND
EGRESS FOR DRIVEWAYS.
3) WORK CREW TO PLACE TEMPORARY
NO PARKING ANY TIME SIGNS ALONG
ENTIRE WORK AREA 72 HOURS BEFORE
CONSTRUCTION.
4) WORK CREW TO COMBINE TYPICALS
AS NEEDED TO ACHIEVE ADEQUATE
TRAFFIC CONTROL.
5) WORK CREW TO ROTATE TYPICALS
AS NEEDED TO MATCH STREET
CONDITIONS.
LOCATION 1
NTS
WORK CREW TO UTILIZE THIS TYPICAL FOR ACCESS TO MH 643 ON THE
N/S/O ENTERPRISE CIR N @ WINCHESTER RD TO SPLICE FIBER.
WIN
C
H
E
S
T
E
R
RD
( 40
M
P
H
)
E
N
T
E
R
P
R
I
S
E
C
I
R
N
(
2
5
M
P
H
)
TCP
12
'
**
TO BE DETERMINED BY
THE CITY OF TEMECULA**
100'100'100'
65'155'
100'100'100'
65'
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
FOR
TRAFFIC CONTROL PLANS
PLACEMENT OF FIBER OPTIC CABLE & SPLICE
WINCHESTER RD
TRAFFIC CONTROL PLANS
WINCHESTER RD
AREA MAP:
EXISTING NO TURN LANE
FLASHING ARROW SIGN TRAILER (TYP.)
C L O S E D
R O A D
CLOSED
LEFT LANE
AHEAD
END
DETOURROAD WORK
ONLY
CREW
SURVEY
CLOSED
ROAD
AHEAD
RIGHT
AHEAD
DETOUR
RIGHT
KEEP
TURN RIGHT
M U S T
RIGHT LANE
NOT
PASS
DO
STOP SLOW
CLOSED
LANE
TO STOP
PREPARED
SHOULDER
WORK
WORK
AHEAD
ROAD
MACHINERY
AHEAD
END
ROAD CLOSED
LOCAL TRAFFIC ONLY
TO
THRU TRAFFIC
ROAD CLOSED
ROAD
DETOUR
SHOULDER
SOFTPAVEMENT
ENDS AHEAD
TRAFFIC CONE
FLASHING ARROW SIGN (FAS)
EXISTING TURN ONLY LANE
BARRICADE
WORK ZONE
(FAS)
TRAFFIC SIGNAL
HIGH LEVEL WARNING DEVICE
(WITH CALTRANS & MUTCD CODE)
SIGN (WITH CALTRANS CODE)
TRAFFIC FLOW DIRECTION
FLAGGER
S
(HLWD)
HIGH LEVEL WARNING DEVICE
TRAFFIC CONE
POST TUBE
LANE
CLOSEDROAD
ROUGH XX
MPH
NARROWS
ROAD
W20-2
R11-2 R11-3A R11-4
W21-3
M4-8A
C9A(CA)
M4-10
W21-7
AHEAD
UTILITY
WORK
G20-2
W20-4
W20-1
W21-5W21-1A
W20-5W20-3
ONE LANE
AHEAD
ROAD
W3-4
C30(CA)C28B(CA)
W21-6
W8-7
BE
R3-5
R4-7BR4-1 R9-3A
R1-1 R3-7R3-2R3-1 R3-4
R3-18
W6-4
W5-1W4-2
W13-1
W1-2 W1-4W1-3W1-1
W8-4W8-3 W8-8
W4-1W1-8
W9-3
W1-6
W12-1W6-3
R3-17
BIKE LANE
R5-6
GRAVEL
LOOSE
MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP)L WOS
DAEHA
(CMS)
CHANGEABLE MESSAGE SIGN TRAILER (TYP.)
R3-6
SIDEWALK
R9-9
CLOSED
R9-11A
CENTER
DETOUR
M4-8
C28A(CA)
ENDS
AHEAD
R3-17B
R3-17A
BEGIN
RIGHT TURN LANE
YIELD TO BIKES
R4-4
RIGHT
KEEP
R4-7AR4-7
CROSS HERE
SIDEWALK CLOSED
AHEAD
LANE
NARROW
C12(CA)
TRENCH
OPEN
C27(CA)
WARNING SIGNS
MISCELLANEOUS DEVICES
DETAIL SHEET LEGEND
PERMIT NO. LD22-6672
CONTRACTOR:
CONE SPACING - 25' MAXIMUM
TELEPHONE
COMMUNICATIONS
NAME
DATE
R.C.E. NUMBER
FIRM
ADDRESS
C29570
D. Lynn Parker
04-14-2021
P.O.Box 1666, Cottonwood, AZ
86326 Phone (909) 472-9983
WORK TO BE DONE:
1)ACCESS MH# 422 LOCATED ON THE S/S/O WINCHESTER RD @
ENTERPRISE CIR N TO SPLICE FIBER. NO EXCAVATION
REQUIRED.
TRAFFIC CONTROL GENERAL NOTES (REVISED: 08/26/2020)
1.All traffic control devices shall conform to the latest edition of the California Manual on Uniform Traffic Control Devices (California MUTCD) and the Standard
Specifications for Public Works Construction.
2.The City Engineer or his representative has the authority to initiate field changes to assure public safety.
3.All traffic control devices shall be removed from view when not in use.
4.Work hours shall be restricted to the period between 8:30 a.m. and 3:30 p.m., Monday through Friday, unless approved otherwise. When night work is
required, work hours shall be 9 p.m. to 5 a.m., Sunday through Thursday.
5.Trenches must be back filled or plated during non-working hours. Steel plates shall have asphaltic concrete berm on all edges. All dirt, dust, and debris shall be
removed from street at end of each day and at the end of the job. The street shall be in drivable condition at all times.
6.Pedestrian controls shall be provided as shown on the plans.
7.Temporary "NO PARKING" signs will be posted 24 hours prior to commencing work.
8.Access to driveways will be maintained at all times unless other arrangements are made.
9.The contractor shall replace within 72 hours, all traffic signal loop detectors damaged during construction.
10.The contractor shall replace within 24 hours, all striping removed or damaged by construction work. (Striping may be replaced temporarily with tape.)
11.All Workers shall be equipped with an orange vest (or a reflective vest at night). All flaggers shall also be equipped with a hard hat, C28 "Stop/Slow" paddle
and shall be trained in the proper fundamentals of flagging traffic.
12.Any work that disturbs normal traffic signal operations shall be coordinated with the City of Temecula's Traffic Division, 48 hours prior to beginning
construction. Contact the City's Traffic Division at (951) 694 -6411.
13.The contractor shall maintain all traffic control devices 24 hours per day and 7 days per week.
14.A minimum of twelve (12) foot travel lanes must be maintained unless otherwise approved by the Department of Public Works.
15.All night work will require written approval from the Department of Public Works. Lane closures, road detours, road closures, and traffic signal modifications
associated with overnight construction activities will require warning signs be placed at least . one week in advance of starting construction .
16.A solar powered flashing arrow board shall be required on all arterial street lane closures.
17.If the permit applicant determines that conduit installation will be by the boring machine method, the trench patch for the utility observation excavation will be
the same as for open trench excavation method. This will provide a single continuous surface restoration eliminating the multiple penetration into the public
roadway to all requirements in City Standard Drawing # 407 (sheet 1 and 2) for trench patch.
18.Any work that creates an undue safety risk or creates severe congestion may be shut down by City Traffic Engineers, City Field Inspection, or the Police
Department.
19.Cones and delineators shall have reflectorized sleeves for night work.
20.If parking is allowed in advance warning area, advance warning signs shall be mounted on high level devices.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO
EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES.
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS MINICILLI
SENIOR TRAFFIC ENGINEER
2647
2
1
ENGINEER OF WORK'S CERTIFICATE
I, D. Lynn Parker, hereby declare that I am the engineer of Work for this project, that I have
exercised responsible charge over the design of the project as defined in Section 6703 of the
Business and Professions Code, and the design is consistent with current standards and City of
Temecula.
I understand that the check of project drawings and specifications by the City of Temecula is
confined to a review only and does not relieve me of responsibilities for project design.
Signed______________________________________________ Date_______________
R.C.E. Exp.__3/31/23____R.C.E.#29570___
Firm__Parker Engineering, LLC_________________________________
Address_P. O. Box 1666, Cottonwood, AZ 86326_______________________________
Telephone____(909) 472-9983__________________________
FRONTIER WORK ORDER NO. 70147-5319125
WIN
C
H
E
S
T
E
R
RD
(40
M
P
H
)
MH 422
N.T.S.
E
N
T
E
R
P
R
I
S
E
C
I
R
N
(
2
5
M
P
H
)
12/28/2022
12/28/2022
1/3/2023
1/3/2023
350
'
WOR
K
A
R
E
A
MH# 422
STOP
STOP
DW
Y
SID
E
W
A
L
K
SID
E
W
A
L
K
SID
E
W
A
L
K
SID
E
W
A
L
K
S
I
D
E
W
A
L
K
SID
E
W
A
L
K
SID
E
W
A
L
K
S
I
D
E
W
A
L
K
S
I
D
E
W
A
L
K
S
I
D
E
W
A
L
K
CUR
B
E
D
M
E
D
I
A
N
CUR
B
E
D
M
E
D
I
A
N
250
'
2
5
0
'
2
5
0
'
C30(CA)
LANE
CLOSED
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
WIN
C
H
E
S
T
E
R
R
D
(40
M
P
H
)
E
N
T
E
R
P
R
I
S
E
C
I
R
N
(
2
5
M
P
H
)
250
'
250
'
WORK
ROAD
AHEAD
W20-1
RIGHT LANE
CLOSED
AHEAD
C20(CA)(RT)
ROAD WORK
END
G20-2
C30(CA)
LANE
CLOSED
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
CITY OF TEMECULAENGINEER'S INFORMATION
FOR
TRAFFIC CONTROL PLANS
PLACEMENT OF FIBER OPTIC CABLE & SPLICE
WINCHESTER RD @ ENTERPRISE CIR N
CONTRACTOR:
TELEPHONE
COMMUNICATIONS
NAME
DATE
R.C.E. NUMBER
FIRM
ADDRESS
C29570
D. Lynn Parker
04-14-2021
P.O.Box 1666, Cottonwood, AZ
86326 Phone (909) 472-9983
RECOMMENDED BY:DATE:
ACCEPTED BY:DATE:
R.T.E. NO.
NICOLAS MINICILLI
SENIOR TRAFFIC ENGINEER
2647
2
2
SCALE: 1"=60'
WORK
ROAD
S
TRAFFIC CONE
TEMPORARY SIGN
DIRECTION OF TRAVEL
WORK AREA
FLASHING ARROW SIGN
(FAS)
TYPE III BARICADE
WITH SIGN
SIGNALIZED
INTERSECTION
FLAGGER
HIGH LEVEL
WARNING DEVICE
(HLWD)
LEGEND
DRIVEWAY TYPICAL
DWY
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE)
THROUGHOUT TRAFFIC CONTROL ZONE.
TCP NOTE:
1)WORK CREW TO USE THIS TCP TO ACCESS MH 422 LOCATED ON
THE S/S/O WINCHESTER RD @ ENTERPRISE CIR N TO SPLICE
FIBERS.
2)WORK CREW TO PLACE TEMPORARY NO PARKING SIGNS ALONG
ENTIRE WORK AREA 72 HOURS PRIOR TO COMMENCING WORK.
ENGINEER'S SEAL
FRONTIER WORK ORDER NO. 70147-5319125
PERMIT NO. LD22-6672
TCP
12/28/2022
1/3/2023
1/3/2023
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020
APPLICATION INFORMATION PERMIT NO.:
Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching
Signing & Striping Traffic Signal Miscellaneous (SPECIFY BELOW)
The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as
follows:
Name(s) of street(s) and/or street address:
Utility Work Order #: Start Date: End Date:
In consideration of granting this application, all applicants including utility companies hereby agree to:
1.If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties
involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control
Plan Checklist for details.
2.Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from
and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident,
loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application. (See below for specific liability insurance requirements.)
3.Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City
Engineer.
4.Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working
days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The
developer/general contractor must be present for the timely request of inspections.
5.Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works
Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all
applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction.
LIABILITY INSURANCE REQUIREMENTS
PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED
EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE
CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED.
THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR
BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT
ENCROACHMENT PERMIT.
X
WORK CREW TO ACCESS EXISTING MH #642, #643, AND #422 TO SPLICE FIBER CABLE.
ENTERPRISE CIR N AND WINCHESTER RD
70147-5319125 11/28/2022 12/28/2022
LD22-6672
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
tricia.ortega 11/28/2022
11/28/2022 11/28/2022
11/28/20
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020
Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum
limits of insurance coverage shall be as follows:
a.General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If
Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it
shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
b.Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage.
c.Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident
for bodily injury or disease.
d.Course of Construction: Completed value of the project.
There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approac h
located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at
least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the
encroachment permit:
BODILY INJURY $250,000.00 EACH PERSON
$500,000.00 EACH OCCURANCE
$500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
PROPERTY DAMAGE $100,000.00 EACH OCCURANCE
$250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to
the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing
the City named as an additional insured shall be attached to the application.
The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this
application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges
that this application will be made a part of the encroachment permit.
APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED)
Company Name:
Mailing Address:
Contact: Phone #: E-mail:
I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the
permittee and bind the permittee to the agreements contained herein and any conditions of the permit.
Authorized Signature: Date Applied:
CONTRACTOR’S INFORMATION
Company Name:
Mailing Address:
Contact: Phone #: 24-HR Emergency #:
State Contractor’s License #: Class: City Business License #:
FRONTIER COMMUNICATIONS, INC. C/O DYNAMIC TELCO (FRONTIER AGENT)
1177 IDAHO STREET, SUITE 102, REDLANDS, CA 92374
951-992-1715 DTPERMITS@DYNAMICTELCO.COM
FRONTIER COMMUNICATIONS, INC.
1400 E PHILLIPS BLVD, POMONA, CA 91766
ANDREA MAGANA
11/2/2022
WI
N
C
H
E
S
T
E
R
R
D
(4
0
M
P
H
)
ENTERPRISE CIR N
(25 MPH)
99+0098+0097+0096+00 101+00
09
+
0
0
11
+
0
0
MH# 642
STA: 96+49
CL-CL INTERSECTION
STA 10+00 WINCHESTER RD1
STA 100+00 ENTERPRISE CIR N 2
28
'
28
'
56
'
34
'
34
'
68
'
50'50'
100'
56'56'
112'
28
'
28
'
56
'
34
'
34
'
67
'
49'50'
98'
47'56'
102'
FOC
C/L
FOC
R/W
R/W FOC
C/L
FOC
R/W
R/W
FO
C
C/
L
FO
C
R/
W
R/
W
UNITS / ACCT CODES
REVISIONS
DESIGNED BY DYNAMIC TELCO
FTR ENGINEER:RAUL RIVAS (909) 406-3178
FTR INSPECTOR:GABRIEL ORTIZ (951) 434-9873
LD22-TBD
CITY OF TEMECULA
SITE PLAN
ENTERPRISE CIR N
@ WINCHESTER RD
1:60
10/25/2022
1 OF 3
PROJECT
NUMBER:
DRAWN DATE:
SCALE:
TWNSHP:----
ENGR: RAUL RIVAS
PHONE: 909-406-3178
TAX DISTRICT:----
RNG: ----
C.O.AREA: RNCACAXF
EXCH. CODE: MURRIETA
CNTY: RIVERSIDE
FILE:
DWG
SEC: ----
COMMUNICATIONS
TLS-PLACE & SPLICE
70147-5319125
1
CONSTRUCTION NOTE:
AT MH# 642 SPLICE FIBERS FC721,349-350 FROM
216F IPID 242063 TO 96F IPID 241599 TO MH643.
FO
C
C/
L
FO
C
R/
W
R/
W
SCALE: 1"=60'
LD22-6672
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
tricia.ortega 11/28/2022
11/28/2022 11/28/2022
11/28/20
91+0090+0089+00
MH# 643
STA: 90+11
28
'
28
'
56
'
34
'
34
'
68
'
28
'
28
'
56
'
34
'
34
'
68
'
ENTERPRISE CIR N
(25 MPH)
CL-CL INTERSECTION
STA 10+00 WINCHESTER RD1
STA 100+00 ENTERPRISE CIR N 2
1000' TO WINCHESTER RD C/L
FOC
C/L
FOC
R/W
R/W
FOC
C/L
FOC
R/W
R/W
UNITS / ACCT CODES
REVISIONS
DESIGNED BY DYNAMIC TELCO
FTR ENGINEER:RAUL RIVAS (909) 406-3178
FTR INSPECTOR:GABRIEL ORTIZ (951) 434-9873
LD22-TBD
CITY OF TEMECULA
SITE PLAN
ENTERPRISE CIR N
@ WINCHESTER RD
1:60
10/25/2022
2 OF 3
PROJECT
NUMBER:
DRAWN DATE:
SCALE:
TWNSHP:----
ENGR: RAUL RIVAS
PHONE: 909-406-3178
TAX DISTRICT:----
RNG: ----
C.O.AREA: RNCACAXF
EXCH. CODE: MURRIETA
CNTY: RIVERSIDE
FILE:
DWG
SEC: ----
COMMUNICATIONS
TLS-PLACE & SPLICE
70147-5319125
2
CONSTRUCTION NOTE:
AT MH# 643 SPLICE FIBERS FC721,349-350 FROM 96F
IPID 241599 TO THE NEW 8-PORT 1000' TERMINAL
BEING PLACED TO CUSTOMERS MPOE.
SCALE: 1"=60'
LD22-6672
UNITS / ACCT CODES
REVISIONS
DESIGNED BY DYNAMIC TELCO
FTR ENGINEER:RAUL RIVAS (909) 406-3178
FTR INSPECTOR:GABRIEL ORTIZ (951) 434-9873
LD22-TBD
CITY OF TEMECULA
SITE PLAN
ENTERPRISE CIR N
COMMUNICATIONS
TLS-PLACE & SPLICE
70147-5319125
3
Land Development
Utility Plan General Notes
41000 Main Street
Temecula, CA 92590
Phone: 951-694-6444
www.temeculaca.gov
Revised: 03/19/2022
Utility Construction/Site plans shall be submitted for review and include the following, but not be limited to:
1. The City Engineer or their representative has the authority to initiate field changes to assure public safety.
2. BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133
3. Where there is conflict with the permit language and approved plans, the approved plans shall govern.
4. Trench repair shall be in accordance with City Standard Drawing 407.
5. All facilities shall be installed in accordance with City Standard Drawing 117.
6. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction
shall be removed from joint to joint and reconstructed in accordance with City Standards and the
Greenbook.
7. All disturbed landscaping and other improvements shall be removed or repaired and replaced to the
satisfaction of Public Works.
8. Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard
Drawing 402 and meet current ADA Standards.
9. Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified
professional pursuant to the California Business and Professions Code Section 8771.
10. Final compaction test results shall be provided by a soils engineer.
11. A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@temeculaca.gov to schedule a meeting.
12. All U.S.A. mark outs shall be removed prior to completion of project.
13. A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to
verify completion of project.
14. Standard Inspection Request shall include:
If using a blanket permit indicate whether work is Emergency, Emergent, or Maintenance.
Permit Number:
Work Order Number:
Inspection Date:
Inspection Time (if applicable):
Inspection Type (Storm Drain, Precise
Grade, NPDES, etc.):
Inspection Location:
On-site location:
Requestor Name:
Requestor Company:
Contact Number:
10/25/2022
3 OF 3
PROJECT
NUMBER:
DRAWN DATE:
SCALE:
TWNSHP:----
ENGR: RAUL RIVAS
PHONE: 909-406-3178
TAX DISTRICT:----
RNG: ----
C.O.AREA: RNCACAXF
EXCH. CODE: MURRIETA
CNTY: RIVERSIDE
FILE:
DWG
SEC: ----
LD22-6672