Loading...
HomeMy WebLinkAboutLD24-1273Permit Number: LD24-1273 LD - Utilities/ Utility Maintenance Issued: 03/25/2024 Expired: 10/07/2024 Job Address: Calle Chapos N/S 200’ W/O Butterfield Stage Road Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Southern California Edison (Utility Billing) 24487 Prielipp Wildomar, CA 92595 (951) 440-9074 Applicant: Contractor: Utility Work Order Number: TD2086397 Description: SCE SAP#TD2086397 WORK HOURS SHALL BE MONDAY-FRIDAY, NO HOLIDAYS, 8:30AM-3:30PM Proposed Work: Pothole lines and install hand hole Permitee Date City Engineer or Authorized Representative Date 03/25/2024 Page 1 of 1 1 of 4 | Page PWRD-88 Request for “Underground Civil Contract Construction & Inspection” Form PWRD-88 Request for “Underground Civil Contract Construction & Inspection”, March 2023 District Name Approver’s Name (Print)Title Signature Date SAP Order#:DIMP Y/N:UG Civil Only Work Order: E5 Notification#:DIMP Due Date: DIMP Notifcation#: Requestor:Requestor's Contact Number: Description of Work: Location:City: Structure#: (Must be provided and clearly marked on the maps) SCE GeoView Grid# / FIM#: Circuit: (Must include readable map w/pkg.) Substation:Environmental Requirements Document Required: (For example: Ground and/or vegetation disturbing activities) Permit Required: (Must be included in package) NOTE: All permits including Blankets must be included in package at time of submission. Reason: Private Property, Other *: * IF “OTHER”, PROVIDE COMPLETE, VALID REASON Easement Required: Easement Secured: Work Order Type (Select the appropriate category): i.Customer Out of Power / Immediate Danger to the Public ii.Outage or Electrical Crew Meet Related Contact Name:Ph#: iii.Third-Party Connection Contact Name: Ph#: iv. M&M / Project Proposed Civil Construction Start Date: Emergency Reason: Required Civil Completion Date: MATERIAL TYPE (DESCRIPTION)QUANTITY E-Crew Meet Date:Time: UNIT OF MEASURE UNIT COST (PRICE) EXTENDED COST TOTAL ESTIMATED COST (Sheet A): $ TOTAL ESTIMATED COST (Sheet B): $ GRAND TOTAL ESTIMATED COST (Sheet A+B+C+D): $ Documentation of Actual Cost Required:Send to:Email Address: For Underground Construction Use Only SCE Inspector:UCC Release#P-Req / PO# Contractor:Electrical Partner:QA Included: Construction Comments: Non-Emergency Call Out (ECO) work received (executable work order package) with a required start date of six (6) business days or less (dates cannot be adjusted) Shall be performed under the TEM Contract Please reach out to the area UG Civil Inspector or Advisor for any assistance with completing this form. TOTAL ESTIMATED COST (Sheet C): $ TOTAL ESTIMATED COST (Sheet D): $ Yes No (see below) 88 - WILDOMAR David S. Baker TD2086397 NATALIE MACIAS (909) 469-0309 NEW STRUCTURE (HANDHOLE) INSTALLATION CLL CHAPOS N/S, 200' W/O BUTTERFIELD STAGE RD TEMECULA 2358762E MT - 9011 - H TRITON S HH PLAS 17"X30"X15"1 $ 275.18 SS TAX EXCV CST FOR PLASTIC HH 1 $ 514.82 NO NO N/A SEAWOLF 12KV YES ENTER PERMIT# YES YES ENTER DATE ENTER TIME EACH EACH EACH EACH EACH $ 275.18 $ 514.82 $ 0.00 $ 0.00 $ 0.00 $ 790.00 $ 790.00 NO NO $ 0.00 $ 0.00 $ 0.00 4 DocuSign Envelope ID: 2BCA7571-3FAF-4832-B965-32BE641258F1 Sr Mgr 3/8/2024 03/22/24 03/08/24 SH FCC TD2086397-300 C-3315 / TS ENVIRONMENTAL REQUIREMENTS TD2086397 INFRASTRUCTURE REPLACEMENT - DChange Request: 391780ESF #:ESF Project Details: Detailed Description DistributionProject Type: Infrastructure Replacement Det Pole ReplacemeDistribution Activity Type: SEAWOLF 12KVCircuit / Facility Name: Transmission Activity Type: San JacintoRegion: WildomarDistrict: Transmission Grid: Project Coordinates Unique Id Coordinates Label Unique Id Coordinates Label Unique Id Coordinates Label Unique Id Coordinates Label 001 2358762E Auto-SC+EZ+CSWClearance: Notes N/A Clearance Conditions Proceed with Work. Read and follow the requirements for field work below. Environmental concerns can be answered at ENVIRONMENTALREQUIREMENTS@SCE.COM or call 833-723-2362 (833-SCE2ENC). ENVIRONMENTAL REQUIREMENTS Site Stabilization: Excess soil from ground disturbing activities shall be compacted or stabilized to return the area to pre- construction conditions or disposed of at SCE approved facility per Operating Unit standard practice. For storm water related questions, please call the number above. Tailboard Briefing: This document must be kept on site. The Environmental Requirements will be read to the crew to ensure requirements are understood prior to starting work. If any of these requirements are infeasible given a safety or scope concern, please contact Environmental Services at the email or phone number above. Vegetation: No vegetation/tree removal or trimming/mowing was approved for this project. Work Areas: Vehicles and equipment must remain on the existing access routes and immediate vicinity of towers/work areas identified in the project scope. If any work needs to be conducted outside these access routes or work areas, please contact Environmental Services at the email or phone number above. Crew Check: Prior to starting work, crews will check the workspace for bird nests (e.g., pole cavities, vegetation to be removed). Call the number above prior to work within 200 feet of an active nest. Trapped Wildlife: Prior to the start of work, crews will look in holes and trenches, construction material, and equipment. If wildlife has become trapped call the number above. Spill Release/Prevention: Vehicles/equipment must be inspected for leaks (e.g., fuel, oil, hydraulic fluids, etc.) and repaired prior to work. Fueling should not be conducted near a drainage feature. Spill kits/absorbent clean-up materials shall be available onsite and if used, disposed of properly. Archaeological/Human Remains/Paleontological Discoveries: If Archaeological resources (Native American or historical artifacts), fossils, or human remains are encountered, stop work, and call the number above or the SCE Operator 626-302-1212 and ask for an on-call Archaeologist. Eagle-Safe: This project is within an SCE-defined Eagle Zone. Construct the new structures to be eagle-safe according to SCE Construction Standards. Related Objects Leading Object of the Change Request: Maintenance OrderType:TD2086397Object:INFRASTRUCTURE REPLACEMENT - DET POLE RE Object Type Object Description Added by Maintenance Order TD2086397 INFRASTRUCTURE REPLACEMENT - DET POLE RE David Moore People Involved Role Business Partner Name E-Mail Telephone Initiator 10253113 David Moore DAVID. MOORE@HAMPTONTEDDER. COM ESF Coordinator 10165843 ESF Coordinator ESFCoordinator@sce.com NON HFRA NON HFRA