HomeMy WebLinkAboutLD23-7461Permit Number: LD23-7461
LD - Utilities/ Excavation - Parallel
Issued: 04/17/2024
Expired: 10/21/2024
Job Address: Temecula Pkwy
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Micom, Inc.
6150 Quail Valley Court
Riverside, CA 92507
(951) 867-3100
Applicant:
Micom, Inc.
6150 Quail Valley Court
Riverside, CA 92507
(951) 867-3100
Contractor:
Utility Work Order Number: a028enf
Description:
AT&T A028ENF
WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am
Location: Temecula Pkwy Westbound Ln#2 425' SE/O La Paz Rd
Proposed work:
Conduit repair per Micom "SITE PLAN - CONDUIT REPAIR, LD24-7461"
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD23-7461
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
Public Works Inspector.
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities*****
Permit Number: LD23-7461
LD - Utilities/ Excavation - Parallel
project
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
Page 2 of 3
Permit Number: LD23-7461
LD - Utilities/ Excavation - Parallel
City Engineer or Authorized Representative Date
04/17/2024
Page 3 of 3
CITY OF TEMECULA
1
2
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
AREA MAP:
CONTRACTOR:
CITY OF TEMECULA
ENCROACHMENT PERMIT
SITE PLAN
TEMECULA PKWY
UTILITY WORK ORDER NO.
1.The City Engineer or their representative has the authority to initiate field changes to assure public safety.
2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133
3.Where there is conflict with the permit language and approved plans, the approved plans shall govern.
4.Trench repair shall be in accordance with City Standard Drawing 407.
5.All facilities shall be installed in accordance with City Standard Drawing 117.
6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall
be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the
satisfaction of Public Works.
8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing
402 and meet current ADA Standards.
9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified
professional pursuant to the California Business and Professions Code Section 8771.
10.Final compaction test results shall be provided by a soils engineer.
11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@temeculaca.gov to schedule a meeting.
12.All U.S.A. mark outs shall be removed prior to completion of project.
13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to
verify completion of project.
14.Standard Inspection Request shall be submitted via email to LDInspections@temeculaca.gov two (2)
business days prior to any scheduled work with the following information:
ØPermit Number:
ØRequested Date (of work proposed):
ØRequested Time (am, pm, or specific time):
ØInspection Type (Pre-construction, Repair, Restorations, Traffic Control, Final, etc.):
ØInspection Location:
ØRequestor Name/Company:
ØField Contact Name/Number:
CITY OF TEMECULA UTILITY PLAN GENERAL NOTES
WORK HOURS
MONDAY - FRIDAY
NO HOLIDAYS
8:30am - 3:30pm
PERMIT NO. LD2x-xxxx
UTILITY COMPANY:
TE
M
E
C
U
L
A
P
K
W
Y
LA
P
A
Z
JOB SITE
PUBLIC WORKS - LAND DEVELOPMENT
SITE PLAN - CONDUIT REPAIR
TEMECULA PKWY
Micom Inc
6150 Quail Valley CtRiverside Ca 92507
24 hour contact Jim Cirivello 714-713-4652
AT&T Long Line
A028ENF
WORK HOURS
SUNDAY - THURSDAY
NO HOLIDAYS
9:00pm - 5:00am
LD24-7461
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
Tricia.ortega 04/09/2024
04/09/2024 04/09/2024
04/09/20
AT LEAST TWO DAYS
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
BEFORE YOU DIG
DIGALERT
Call: TOLL FREE
1-800-227-2600
CITY OF TEMECULA
2
2
CONTRACTOR:
SITE PLAN - CONDUIT REPAIR
TEMECULA PKWY
PUBLIC WORKS - LAND DEVELOPMENT
WORK HOURS
MONDAY - FRIDAY
NO HOLIDAYS
8:30am - 3:30pm
UTILITY COMPANY:
UTILITY WORK ORDER NO.
6150 Quail Valley CtRiverside Ca 92507
24 hour contact Jim Cirivello 714-713-4652
Micom Inc
A028ENF
AT&T Long Line
2ND HALF
DWG 527
Conduit repair Location
WORK HOURS
SUNDAY - THURSDAY
NO HOLIDAYS
9:00pm - 5:00am
LD23-7461
03/28/24
04/02/24
LD23-7461
03/28/24
04/02/24
LD23-7461
03/28/24
04/02/24
LD23-7461
03/28/24
04/02/24
LD23-7461
03/28/24
04/02/24