Loading...
HomeMy WebLinkAboutLD23-4585Permit Number: LD23-4585 LD - Utilities/ Excavation - Parallel Issued: 10/30/2023 Expired: 04/27/2024 Job Address: 32101 Sommers Bend Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Jose Guillen 17890 Valley Blvd Bloomington, CA 92316 Applicant: John Griffin Construction Inc 244 Jason Ct Corona, CA 92879 (951) 278-2377 Contractor: Utility Work Order Number: 4671061 Description: Charter 4671061 WORK HOURS SHALL BE MONDAY – FRIDAY, NO HOLIDAYS, 8:30am - 3:30pm Location: Butterfield Stage Rd & Sommers Bend Proposed work: Bore and place new conduit; relocate vault as shown on Charter/Spectrum "CONSTRUCTION DESIGN, LD23-4585" All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD23-4585 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD23-4585 LD - Utilities/ Excavation - Parallel Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date Page 2 of 3 Permit Number: LD23-4585 LD - Utilities/ Excavation - Parallel City Engineer or Authorized Representative Date 10/30/2023 Page 3 of 3 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020 APPLICATION INFORMATION PERMIT NO.: Type of Encroachment:  Street/Storm Drain  Sewer/Water  Utility Trenching  Signing & Striping  Traffic Signal  Miscellaneous (SPECIFY BELOW) The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as follows: Name(s) of street(s) and/or street address: Utility Work Order #: Start Date: End Date: In consideration of granting this application, all applicants including utility companies hereby agree to: 1. If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control Plan Checklist for details. 2. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. (See below for specific liability insurance requirements.) 3. Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City Engineer. 4. Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The developer/general contractor must be present for the timely request of inspections. 5. Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction. LIABILITY INSURANCE REQUIREMENTS PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED. THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT ENCROACHMENT PERMIT. x Bore 15' to place new 3'' conduit & R&R Vault to relocate for Charter Spectrum (3 working days) Butterfield Stage Rd & Sommers Bnd Temecula, CA 92591 4671061 07-21-2023 07-28-2023 LD23-4585 CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 08/02/2023 08/02/2023 08/02/2023 08/02/20 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020 Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum limits of insurance coverage shall be as follows: a. General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b. Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage. c. Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident for bodily injury or disease. d. Course of Construction: Completed value of the project. There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approac h located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the encroachment permit: BODILY INJURY $250,000.00 EACH PERSON $500,000.00 EACH OCCURANCE $500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS PROPERTY DAMAGE $100,000.00 EACH OCCURANCE $250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing the City named as an additional insured shall be attached to the application. The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges that this application will be made a part of the encroachment permit. APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED) Company Name: Mailing Address: Contact: Phone #: E-mail: I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the permittee and bind the permittee to the agreements contained herein and any conditions of the permit. Authorized Signature: Date Applied: CONTRACTOR’S INFORMATION Company Name: Mailing Address: Contact: Phone #: 24-HR Emergency #: State Contractor’s License #: Class: City Business License #: Charter Spectrum 7337 Central Ave, Riverside, CA 92504 951-565-1681 John Griffin 244 Jason Ct, Corona, CA 92879 030631C10 B C-7 A618983 David Pagliei 909-322-6792 909-322-6792 Tyrone Hawkins Tyrone.Hawkins@charter.com 04-21-2023 N DESIGN ORIENTATION CITY OF TEMECULA PO#: PRISM#: PUBLIC WORKS DEPARTMENT PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS M. MINICILLI TRAFFIC ENGINEER Updated Traffic Control Notes to rev -AJP AJP 1/26/12 TRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20): 1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694 -6411. 13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH. 18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES.  CENTRAL AVE RIVERSIDE CA2 OFFICE () 26-6 CHARTER PTIMUM INC GENERAL ENGINEERING CONTRACTORS OFFICE () -6 CSLB 121 _ CLASS C- A C1 1 VALLEY BLVD BLOOMINGTON CA 1 3 JOHN GRIFFIN OFFICE () 22-62 CSLB 61 _ CLASS C1 B C- A 2 JASON CT CORONA CA 2 UTILITY COMPANY: EXISTING NO TURN LANE TRAFFIC CONE FLASHING ARROW SIGN (FAS) EXISTING TURN ONLY LANE BARRICADE WORK ZONE TRAFFIC SIGNAL HIGH LEVEL WARNING DEVICE (WITH CALTRANS & MUTCD CODE) SIGN (WITH CALTRANS CODE) TRAFFIC FLOW DIRECTION FLAGGER S DETAIL SHEET LEGEND CONE SPACING - 25' MAXIMUM AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call TOLL FREE 1-800-227-2600 WORK HOURS MONDA<  FRIDA< :DP  :SP AREA MAP - JOHN GRIFFIN PENDING BEN FUZZELL CROSS STREETS SOMMERS BEND AND BUTTERFIELD STAGE RD BXtterfield StaJe Rd & SoPPers Bnd MARCOS IBARRA --22 4501720665 4671061 PRISM#: 4671061 PROPOSED SIGNS BU T T E R F I E L D S T A G E R D S O M M E R S B E N D EXCAVATION AREA TCP 11 (SEE PAGE 1) WORK DURATION ·1 DAYS FOR EXCAVATION / BORE / TRENCH WORK ·1 DAY FOR RESTORATION ·1 DAY TO PULL CABLE ·3 DAYS OF TRAFFIC CONTROL SET UP ·TOTAL # OF WORK DAYS: 3 SCOPE OF WORK: ·TRENCH TO INSTALL CONDUITS FOR CHARTER SPECTRUM (15'). ·SET NEW CHARTER VAULTS (1). ·POTHOLE TO EXPOSE EXISTING UTILITIES (TBD). AHEAD CLOSED RIGHT LANE C20(CA) ROAD AHEAD W20-1 WORK LANE CLOSED END ROAD WORK G20-2 W4-2R 1 C(CA) TePecXla CA 21 2647 N I C O L A S R D NOTE SIDEWALKS SHALL REMAIN OPEN DURING CONSTRUCTION SCOPE OF WORK WILL NOT AFFECT PEDESTRIANS PLACE NO PARKING SIGNS 2 HOURS PRIOR TO WORK 10/9/2023awa7770 10/23/23 10/23/23 N DESIGN ORIENTATION ENGINEER'S INFORMATIONENGINEER'S SEALCONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS M. MINICILLI TRAFFIC ENGINEER Updated Traffic Control Notes to rev -AJP AJP 1/26/12  C(NT5A/ A9( 5,9(56,'( CA2 2)),C(  26-6 CHARTER PT,0U0 ,NC *(N(5A/ (N*,N((5,N* C2NT5ACT256 2)),C(  -6 C6/% 121 _ C/A66 C- A C1 1 9A//(< %/9' %/220,N*T2N CA 2 3 UTILITY COMPANY: N.T.S. AT /(A6T T:2 'A<6 U* 6(59,C( A/(5T 2) 62UT+(5N CA/,)25N,A %()25( <2U ',* DIGALERT Call T2// )5(( 1-800-227-2600 J2+N *5,)),N 2)),C(  22-62 C6/% 61 _ C/A66 C1 % C- A 2 JA62N CT C252NA CA 2 PRISM#: 4671061 P52P26(' 6,*N6 WORK HOURS 0O1D$<  )R,D$< DP  SP PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA FOR TRAFFIC CONTROL PLANS CROSS STREETS SOMMERS BEND AND BUTTERFIELD STAGE RD AHEAD CLOSED RIGHT LANE C20(CA) ROAD AHEAD W20-1 WORK LANE CLOSED END ROAD WORK G20-2 W4-2R 1 C CA PROPOSED TCP 1.1 A5(A 0AP BU T T E R F I E L D S T A G E R D S O M M E R S B E N D (;CA9AT,2N A5(A TCP 11 6(( PA*( 1 CITY OF TEMECULA PO#: PRISM#: PUBLIC WORKS DEPARTMENT - J2+N *5,)),N P(N',N* %(N )U==(// %Xtterfield 6taJe 5d 6oPPers %nd 0A5C26 ,%A55A --22 4501720665 4671061 TePecXla CA 21 6  0( 5 * , N * T A P ( 5   6, * N 6P A C , N *   6, * N 6P A C , N *   6, * N 6P A C , N * 0ATC+/,N( 11 6(( PA*(  2647 2 %,.( /AN( TAP(5 N I C O L A S R D N2T( 6,'(:A/.6 6+A// 5(0A,N 2P(N 'U5,N* C2N6T5UCT,2N 6C2P( 2) :25. :,// N2T A))(CT P('(6T5,AN6 P/AC( N2 PA5.,N* 6,*N6 2 +2U56 P5,25 T2 :25. 10/9/2023awa7770 10/23/23 10/23/23 200' BUFFER 15' WORK AREA DOWN STREAM TAPER 50' MIN./ 100' MAX N DESIGN ORIENTATION ENGINEER'S INFORMATIONENGINEER'S SEALCONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS M. MINICILLI TRAFFIC ENGINEER USdated Traffic Control Notes to reY -AJP AJP 1/26/12 7337 CENTRAL AVE RIVERSIDE CA.92504 OFFICE: (833) 267-6097 CHARTER PTIMUM, INC. GENERAL ENGINEERING CONTRACTORS OFFICE: (909) 990-0767 CSLB#: 817291 | CLASS: C-7 A C31 17890 VALLEY BLVD BLOOMINGTON CA 3 3 UTILITY COMPANY: N.T.S. AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 JOHN GRIFFIN OFFICE: (909) 322-6792 CSLB#: 618983 | CLASS: C10 B C-7 A 244 JASON CT, CORONA, CA 92879 PRISM#: 4671061 PROPOSED SIGNS WORK HOURS 0O1D$<  )R,D$< DP  SP PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA FOR TRAFFIC CONTROL PLANS CROSS STREETS SOMMERS BEND AND BUTTERFIELD STAGE RD AHEAD CLOSED RIGHT LANE C20(CA) ROAD AHEAD W20-1 WORK LANE CLOSED END ROAD WORK G20-2 W4-2R 1 C30(CA) PROPOSED TCP 1.1 AREA MAP: BU T T E R F I E L D S T A G E R D S O M M E R S B E N D EXCAVATION AREA TCP 1.1 (SEE PAGE 1) CITY OF TEMECULA PO#: PRISM#: PUBLIC WORKS DEPARTMENT - JOHN GRIFFIN PENDING BEN FUZZELL Butterfield Stage Rd & Sommers Bnd MARCOS IBARRA 07-07-2023 4501720665 4671061 Temecula, CA 92591 MATCHLINE 1.1 (SEE PAGE 2) 17.00' 2647 N I C O L A S R D NOTE: SIDEWALKS SHALL REMAIN OPEN DURING CONSTRUCTION. SCOPE OF WORK WILL NOT AFFECT PEDESTRIANS. PLACE NO PARKING SIGNS 72 HOURS PRIOR TO WORK SI D E W A L K SIDEWALK SIDEWALK SI D E W A L K SIDEWALK CLOSED USE OTHER SIDE R9-10 350' SIGN SPACING 10/9/2023awa7770 10/23/23 10/23/23 CONSTRUCTION TOTALS (TOTAL AMOUNTS OF ENTIRE ROUTE) PRISM#: 4671061 JOB NOTES: 1.The existence and location of any underground utility pipes or structures was obtained by a search of the available records and field conditions. Additional underground facilities may exist, or the location of the facilities may differ from the locations shown on these plans. The contractor shall, at his own expense, determine the exact location of all such underground facilities prior to commencement of any work or any action which may damage such facilities or interfere with their continuous and proper operation. 2.All plans must be checked and approved by the governmental agency, or agencies, having jurisdiction over the roadways shown on this plan being put into effect. All plans are intended to conform to the Manual on Uniform Traffic Control Devices. The customer/contractor is responsible for ascertaining addition agency requirements for work hours allowed, noise abatement, and other rules and regulations. 3.The temporary traffic controls must be installed per the agency approved plan to be effective. Field changes, other than minor adjustment, must be authorized in writing be a representative of the governmental agency, or agencies, having jurisdiction over the roadway. 4.Plan implementation and device placement should be performed by experienced and trained personnel. 5.Temporary traffic control must be monitored and maintained by the customer/contractor to remain effective. Monitoring and maintenance frequency is dictated by field conditions, but not less than daily. 6.Optimum Inc. has no control over, or responsibility for traffic control plan implementation and inspections performed by others. Users agree to indemnify Optimum Inc. for claims made regarding failure to install, maintain or remove controls per approved traffic control plans. VICINITY MAP PTIMUM, INC. GENERAL ENGINEERING CONTRACTORS OFFICE: (909) 990-0767 CSLB#: 817291 | CLASS: C-7 A C31 17890 VALLEY BLVD BLOOMINGTON CA CONSTRUCTION SHEET 1 OF 2 7337 CENTRAL AVE RIVERSIDE CA.92504 OFFICE: (833) 267-6097 Butterfield Stage Rd & Sommers Bnd Temecula, CA 92591 - MARCOS IBARRA JOHN GRIFFIN 6/26/2023 PENDING BEN FUZZELL CITY OF TEMECULA PO#:4501720665 PRISM#:4671061 CHARTER PUBLIC WORKS DEPARTMENT TP TELEPHONE PEDESTAL T TELEPHONE VAULT EV ELECTRIC VAULT CATV VAULT IV IRRIGATION VAULT UTILITY POLE FIRE HYDRANT UNDERGROUND VALVE MAN HOLE F M SL STREET LIGHT VAULT TS TRAFFIC SIGNAL VAULT WV WATER VAULT CATV PEDESTALABOVE GROUND VALVE GV GAS VAULT FO FIBER OPTIC VAULT CV COMMUNICATIONS VAULT ELECTRIC LINEE GAS LINEG TELEPHONE LINET WATER LINEW CATV LINETV TRAFFIC SIGNAL LINETS SEWER LINES STORM DRAIN LINESD FIBER OPTIC LINEFO PETROLUEM LINEP STREET LIGHTSSL INDUSTRIAL WASTEIW OIL LINEO FUEL LINEF RECLAIMED WATERRC T PROPOSED CONSTRUCTION PROPOSED HDD BORE / CONDUIT INSTALLATION PROPOSED TRENCH / CONDUIT INSTALLATION PROPOSED POTHOLE (2'x2') PROPOSED EXIT / MISSILE BORE PIT (2'x4') PROPOSED BORE PIT (3'x6') CATV PROPOSED NEW CATV VAULT (2'x3') UTILITY / LINE LEGENDEXISTING OBJECTS CF EOP EDGE OF PAVEMENT CURB FACE RIGHT OF WAY (CITY) CENTERLINE (C/L) N DESIGN ORIENTATIONREVISIONS REV#DATE DESCRIPTION 36" L E N G T H 24" W I D T H 18 " H E I G H T 3" CONDUIT 36 " T Y P . CO N D U I T D E P T H 18 " D E P T H EXISTING GRADE OR SURFACE OF CONCRETE MOUNT FLUSH WITH GRADE 6" ROCK BASE (3/4" GRAVEL) 36" L E N G T H 18" W I D T H 20 " H E I G H T CO V E R 18 " H E I G H T BA S E 21 " A B O V E GR A D E COVER 3" CONDUIT 36 " T Y P . CO N D U I T D E P T H EXISTING GRADE OR SURFACE OF CONCRETE 17 " D E P T H BASE 6" ROCK BASE (3/4" GRAVEL) Ø 2 . 8 6 4 " Ø 3.164" 0. 3 0 0 " TYPICAL CATV 2'x3' VAULT DETAIL TYPICAL CATV PEDESTAL DETAIL CONDUIT DETAIL 6' 3'2' 4' 3" HDPE MIN. 36" EXIST. GRADESEND BORE PIT RECEIVE BORE PIT 3" CONDUIT FIBER OPTIC CABLE TRACER WIRE 3" HDPE FIBER OPTIC CABLE 3/8" TRACER WIRE 3" CONDUIT 3" CONDUIT TYPICAL DIRECTIONAL BORE DETAIL TRACER WIRE DETAIL INTERDUCT DETAIL EXISTING GRADE HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 4' 36" - 48" COVER C/ L O F S T R E E T 12" CLEARANCE PLACE 1-3" CONDUIT AT 36" - 48" DEPTH EXISTING UTILITIES (NOTE: DEPTH MAY VARY FOR DIFFERENT UTILITIES) TYPICAL UTILITY CLEARANCE (PROTECT IN PLACE AT ALL EX. UTILITY CROSSINGS) N.T.S. WORK DURATION: ·1 DAYS FOR EXCAVATION / BORE / TRENCH WORK ·1 DAY FOR RESTORATION ·1 DAY TO PULL CABLE ·3 DAYS OF TRAFFIC CONTROL SET UP ·TOTAL # OF WORK DAYS: 3 SCOPE OF WORK: ·TRENCH TO INSTALL CONDUITS FOR CHARTER SPECTRUM (15'). ·SET NEW CHARTER VAULTS (1). ·POTHOLE TO EXPOSE EXISTING UTILITIES (TBD). S/W D/W PH R/W EX C/L EOP CF ABBREVIATIONS V PED · · · · · · BU T T E R F I E L D S T A G E R D S O M M E R S B E N D EXCAVATION AREA PIPE AND WIRE TRENCHING:STANDARD NO 117: – ➢ ➢ ➢ ➢ ➢ ➢ ➢ ➢ UTILITY PLAN GENERAL NOTES: PRISM#: 4671061 ELECTRIC LINEE GAS LINEG TELEPHONE LINET WATER LINEW CATV LINETV TRAFFIC SIGNAL LINETS SEWER LINES STORM DRAIN LINESD FIBER OPTIC LINEFO PETROLUEM LINEP STREET LIGHTSSL INDUSTRIAL WASTEIW OIL LINEO FUEL LINEF RECLAIMED WATERRC PROPOSED CONSTRUCTION PROPOSED HDD BORE / CONDUIT INSTALLATION PROPOSED TRENCH / CONDUIT INSTALLATION PROPOSED POTHOLE (2'x2') PROPOSED EXIT / MISSILE BORE PIT (2'x4') PROPOSED BORE PIT (3'x6') CATV PROPOSED NEW CATV VAULT (2'x3') UTILITY / LINE LEGEND CF EOP EDGE OF PAVEMENT CURB FACE RIGHT OF WAY (CITY) CENTERLINE (C/L) N DESIGN ORIENTATIONREVISIONS REV#DATE DESCRIPTION 00 40'80' #-C #-A #-D _____ IN CONCRETE _____ IN ASPHALT _____ IN DIRT/GREENBELT CALLOUT ABBREVIATIONS TREN (TRENCH TO INSTALL 3" UG CONDUIT) BORE (BORE TO INSTALL 3" UG CONDUIT) BP (BORE PIT 3'x6') MBP (MISSILE BORE PIT 2'x4') PH (POTHOLE 2'x2') V (CATV VAULT) | P (CATV PEDESTAL) R&R (REMOVE & REPLACE) ##' ##- CALLOUT DETAILS XX-X ##' CONSTRUCTION TOTALS (TOTAL AMOUNTS FOR ENTIRE ROUTE) CONSTRUCTION SHEET 2 OF 2 JOB NOTES: 1.The existence and location of any underground utility pipes or structures was obtained by a search of the available records and field conditions. Additional underground facilities may exist, or the location of the facilities may differ from the locations shown on these plans. The contractor shall, at his own expense, determine the exact location of all such underground facilities prior to commencement of any work or any action which may damage such facilities or interfere with their continuous and proper operation. 2.All plans must be checked and approved by the governmental agency, or agencies, having jurisdiction over the roadways shown on this plan being put into effect. All plans are intended to conform to the Manual on Uniform Traffic Control Devices. The customer/contractor is responsible for ascertaining addition agency requirements for work hours allowed, noise abatement, and other rules and regulations. 3.The temporary traffic controls must be installed per the agency approved plan to be effective. Field changes, other than minor adjustment, must be authorized in writing be a representative of the governmental agency, or agencies, having jurisdiction over the roadway. 4.Plan implementation and device placement should be performed by experienced and trained personnel. 5.Temporary traffic control must be monitored and maintained by the customer/contractor to remain effective. Monitoring and maintenance frequency is dictated by field conditions, but not less than daily. 6.Optimum Inc. has no control over, or responsibility for traffic control plan implementation and inspections performed by others. Users agree to indemnify Optimum Inc. for claims made regarding failure to install, maintain or remove controls per approved traffic control plans. TP TELEPHONE PEDESTAL T TELEPHONE VAULT EV ELECTRIC VAULT CATV VAULT IV IRRIGATION VAULT UTILITY POLE FIRE HYDRANT UNDERGROUND VALVE MAN HOLE F M SL STREET LIGHT VAULT TS TRAFFIC SIGNAL VAULT WV WATER VAULT CATV PEDESTALABOVE GROUND VALVE GV GAS VAULT FO FIBER OPTIC VAULT CV COMMUNICATIONS VAULT T EXISTING OBJECTS S/W D/W PH R/W EX C/L EOP CF ABBREVIATIONS V PED · · · · · · CF CF CF CF CF CF CF CF CF CF CF EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P CF CF CF CF CF CF CF CF CF CF CF CF EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P EO P V CA T V BU T T E R F I E L D S T A G E R D STA.0+00 @ C/L SOMMERS BEND EX. SPECTRUM VAULT TO BE RELOCATED NEW SPECTRUM VAULT LOCATION 1 | 3" 15' TRENCH EX VAULT TO NEW VAULT LOCATION 110' 55'55' 11' PTIMUM, INC. GENERAL ENGINEERING CONTRACTORS OFFICE: (909) 990-0767 CSLB#: 817291 | CLASS: C-7 A C31 17890 VALLEY BLVD BLOOMINGTON CA 7337 CENTRAL AVE RIVERSIDE CA.92504 OFFICE: (833) 267-6097 Butterfield Stage Rd & Sommers Bnd Temecula, CA 92591 - MARCOS IBARRA JOHN GRIFFIN 6/26/2023 PENDING BEN FUZZELL CITY OF TEMECULA PO#:4501720665 PRISM#:4671061 CHARTER PUBLIC WORKS DEPARTMENT SI D E W A L K SID E W A L K VAULT TO BE PLACED BEHIND CONCRETE SIDEWALK IN DIRT/GRASS SI D E W A L K