HomeMy WebLinkAboutLD24-0670Permit Number: LD24-0670
LD - Utilities/ Excavation - Parallel
Issued: 03/04/2024
Expired: 08/31/2024
Job Address: Pechanga Pkwy Sw/S Se/O Via Eduardo
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Patrick Mulvey
43410 Business Park Drive
Temecula, CA 92590
Applicant:
Contractor:
Utility Work Order Number: TCP Revision only to LD23-2411
Description:
RCWD D2093, See LD23-2411
Traffic Control Plan Revisions
Page 1 of 2*****See Page 2 of this Permit for Permittee Responsibilities*****
Permit Number: LD24-0670
LD - Utilities/ Excavation - Parallel
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
City Engineer or Authorized Representative Date
03/04/2024
Page 2 of 2
Rancho Water REVISIONS
VICINITY MAP
RANCHO CALIFORNIA WATER DISTRICT
TRAFFIC CONTROL PLAN
PECHANGA PERMANENT CAPACITY IMPROVEMENTS
CITY OF TEMECULA, CA.
(PROJECT No. D2093)
TITLE SHEET TCP1
PROPOSED 16" AND 20" CML&C STEEL WATERLINES
INDEX MAPTRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20)
PECHANGA PARKWAY
VI
A
E
D
U
A
R
D
O
WO
L
F
V
A
L
L
E
Y
RO
A
D
HU
R
O
N
ST
R
E
E
T
N
C
A
S
I
N
O
DR
I
V
E
GENERAL STRIPING NOTES:
SHEET 1-2
LEGEND:
WORK HOURS
WARNING SIGNS LEGEND:
ROAD
WORK
AHEAD
LEFT
CLOSED
2
LANE
AHEAD
SHARE
THE
ROAD
BIKE LANE
CLOSED
AHEAD
LANE
CLOSED
RIGHT LANE
MUST
TURN RIGHT
USE
CROSSWALK
CONSTRUCTION NOTES:
SHEET INDEX
LEFT LANE
MUST
TURN LEFT
RIGHT
CLOSED
2
LANE
AHEAD
JOB DURATION
BIKE
LANE
CLOSED
TC PHASING SCOPE OF WORK
SIDEWALK CLOSED
USE OTHER SIDE
OK
12/21/23
12/21/23
LANE
CLOSED
ROAD
WORK
AHEAD
USE
CROSSWALK
RIGHT LANE
MUST
TURN RIGHT
USE
CROSSWALK
ROAD
WORK
AHEAD
USE
CROSSWALK
ROAD
WORK
AHEAD RIGHT
CLOSED
2
LANE
AHEAD
SHARE
THE
ROAD
BIKE LANE
CLOSED
AHEAD
LANE
CLOSED RIGHT LANE
MUST
TURN RIGHT
RIGHT LANE
MUST
TURN RIGHT
BIKE
LANE
CLOSED
Rancho Water REVISIONS
TCP2
LEGEND:
PECHANGA PKWY [45 MPH]
VI
A
E
D
U
A
R
D
O
[
2
5
M
P
H
]
HU
R
O
N
S
T
[
2
5
M
P
H
]
WO
L
F
V
A
L
L
E
Y
R
D
[
4
0
M
P
H
]
PECHANGA PKWY [45 MPH]
CA
S
I
N
O
D
r
[
2
5
M
P
H
]
PHASE I - STA 10+00 TO 10+35±
TRAFFIC CONTROL PHASING SCOPE OF WORK
SUP
E
R
S
E
D
E
D
B
Y
S
H
E
E
T
T
C
P
2
A
12/21/23
12/21/23
LANE
CLOSED
ROAD
WORK
AHEAD
USE
CROSSWALK
USE
CROSSWALK
ROAD
WORK
AHEAD
USE
CROSSWALK
LANE
CLOSED
LEFT LANE
MUST
TURN LEFT OK
ROAD
WORK
AHEAD
LEFT
CLOSED
2
LANE
AHEAD
LANE
CLOSED LANE
CLOSED
Rancho Water REVISIONS
TCP2A
LEGEND:
PECHANGA PKWY [45 MPH]
VI
A
E
D
U
A
R
D
O
[
2
5
M
P
H
]
HU
R
O
N
S
T
[
2
5
M
P
H
]
WO
L
F
V
A
L
L
E
Y
R
D
[
4
0
M
P
H
]
PECHANGA PKWY [45 MPH]
CA
S
I
N
O
D
r
[
2
5
M
P
H
]
PHASE I - STA 10+00 TO 12+50±
TRAFFIC CONTROL PHASING SCOPE OF WORK
ERICK ESCOBEDO
3002
02/29/24
ROAD
WORK
AHEAD RIGHT
CLOSED
1
LANE
AHEAD SHARE
THE
ROAD
BIKE LANE
CLOSED
AHEAD
LANE
CLOSED
ROAD
WORK
AHEAD
BIKE
LANE
CLOSED
RIGHT LANE
MUST
TURN RIGHT
RIGHT LANE
MUST
TURN RIGHT
LANE
CLOSED
ROAD
WORK
AHEAD
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
CROSS HERE
AHEAD
SIDEWALK CLOSED
CROSS HERE
AHEAD
Rancho Water REVISIONS
TCP3
LEGEND:
PHASE II- STA 10+35 ±TO 12+87, AND WATER
METER/BACKFLOW ASSEMBLY
PECHANGA PKWY [45 MPH]
VI
A
E
D
U
A
R
D
O
[
2
5
M
P
H
]
HU
R
O
N
S
T
[
2
5
M
P
H
]
WO
L
F
V
A
L
L
E
Y
R
D
[
4
0
M
P
H
]
PECHANGA PKWY [45 MPH]
CA
S
I
N
O
D
r
[
2
5
M
P
H
]
VI
A
E
D
U
A
R
D
O
[
2
5
M
P
H
]
TRAFFIC CONTROL PHASING SCOPE OF WORK
12/21/23
12/21/23
LANE
CLOSED
ROAD
WORK
AHEAD
USE
CROSSWALK
RIGHT LANE
MUST
TURN RIGHT
ROAD
WORK
AHEAD
SIDEWALK CLOSED
CROSS HERE SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
CROSS HERE
AHEAD
ROAD
WORK
AHEAD RIGHT
CLOSED
2
LANE
AHEAD
SHARE
THE
ROAD
BIKE LANE
CLOSED
AHEAD
LANE
CLOSED RIGHT LANE
MUST
TURN RIGHT
RIGHT LANE
MUST
TURN RIGHT
BIKE
LANE
CLOSED
LANE
CLOSED
Rancho Water REVISIONS
TCP4
LEGEND:
PECHANGA PKWY [45 MPH]
VI
A
E
D
U
A
R
D
O
[
2
5
M
P
H
]
HU
R
O
N
S
T
[
2
5
M
P
H
]
WO
L
F
V
A
L
L
E
Y
R
D
[
4
0
M
P
H
]
PECHANGA PKWY [45 MPH]
CA
S
I
N
O
D
r
[
2
5
M
P
H
]
PHASE III - STA 20+00 TO 20+28±, AND WATER METER ASSMBLY
TRAFFIC CONTROL PHASING SCOPE OF WORK
12/21/23
12/21/23