Loading...
HomeMy WebLinkAboutLD24-0670Permit Number: LD24-0670 LD - Utilities/ Excavation - Parallel Issued: 03/04/2024 Expired: 08/31/2024 Job Address: Pechanga Pkwy Sw/S Se/O Via Eduardo Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Patrick Mulvey 43410 Business Park Drive Temecula, CA 92590 Applicant: Contractor: Utility Work Order Number: TCP Revision only to LD23-2411 Description: RCWD D2093, See LD23-2411 Traffic Control Plan Revisions Page 1 of 2*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD24-0670 LD - Utilities/ Excavation - Parallel Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date City Engineer or Authorized Representative Date 03/04/2024 Page 2 of 2 Rancho Water REVISIONS VICINITY MAP RANCHO CALIFORNIA WATER DISTRICT TRAFFIC CONTROL PLAN PECHANGA PERMANENT CAPACITY IMPROVEMENTS CITY OF TEMECULA, CA. (PROJECT No. D2093) TITLE SHEET TCP1 PROPOSED 16" AND 20" CML&C STEEL WATERLINES INDEX MAPTRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20) PECHANGA PARKWAY VI A E D U A R D O WO L F V A L L E Y RO A D HU R O N ST R E E T N C A S I N O DR I V E GENERAL STRIPING NOTES: SHEET 1-2 LEGEND: WORK HOURS WARNING SIGNS LEGEND: ROAD WORK AHEAD LEFT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT USE CROSSWALK CONSTRUCTION NOTES: SHEET INDEX LEFT LANE MUST TURN LEFT RIGHT CLOSED 2 LANE AHEAD JOB DURATION BIKE LANE CLOSED TC PHASING SCOPE OF WORK SIDEWALK CLOSED USE OTHER SIDE OK 12/21/23 12/21/23 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK RIGHT LANE MUST TURN RIGHT USE CROSSWALK ROAD WORK AHEAD USE CROSSWALK ROAD WORK AHEAD RIGHT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT BIKE LANE CLOSED Rancho Water REVISIONS TCP2 LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE I - STA 10+00 TO 10+35± TRAFFIC CONTROL PHASING SCOPE OF WORK SUP E R S E D E D B Y S H E E T T C P 2 A 12/21/23 12/21/23 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK USE CROSSWALK ROAD WORK AHEAD USE CROSSWALK LANE CLOSED LEFT LANE MUST TURN LEFT OK ROAD WORK AHEAD LEFT CLOSED 2 LANE AHEAD LANE CLOSED LANE CLOSED Rancho Water REVISIONS TCP2A LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE I - STA 10+00 TO 12+50± TRAFFIC CONTROL PHASING SCOPE OF WORK ERICK ESCOBEDO 3002 02/29/24 ROAD WORK AHEAD RIGHT CLOSED 1 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED ROAD WORK AHEAD BIKE LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT LANE CLOSED ROAD WORK AHEAD SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED CROSS HERE AHEAD SIDEWALK CLOSED CROSS HERE AHEAD Rancho Water REVISIONS TCP3 LEGEND: PHASE II- STA 10+35 ±TO 12+87, AND WATER METER/BACKFLOW ASSEMBLY PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] VI A E D U A R D O [ 2 5 M P H ] TRAFFIC CONTROL PHASING SCOPE OF WORK 12/21/23 12/21/23 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK RIGHT LANE MUST TURN RIGHT ROAD WORK AHEAD SIDEWALK CLOSED CROSS HERE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED CROSS HERE AHEAD ROAD WORK AHEAD RIGHT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT BIKE LANE CLOSED LANE CLOSED Rancho Water REVISIONS TCP4 LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE III - STA 20+00 TO 20+28±, AND WATER METER ASSMBLY TRAFFIC CONTROL PHASING SCOPE OF WORK 12/21/23 12/21/23