HomeMy WebLinkAboutLD23-6632Permit Number: LD23-6632 LD - Utilities/ Excavation - Parallel Issued: 11/14/2023 Expired: 05/12/2024 Job Address: Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Eastern Muncipal Water District Monica Mcgrath P.O. Box 8300 2270 Trumble Rd Perris, CA 92530 Applicant: Eastern Municipal Water District (Utility Billing) P.O. Box 8300 Perris, CA 92572 Contractor: Utility Work Order Number: 476072 Description: EMWD 476072 WORK HOURS SHALL BE MONDAY - SUNDAY: 5AM - 10PM DURATION OF WORK IS SCHEDULED TO BE 3 - 4 MONTHS Location: Diaz Road EMWD's contractor to install 1,280 LF of 15" sewer; 90 LF of 10" sewer; 30 LF of 18" sewer, including all other associated appurtenances. 400 LF of pavement to be cut. EMWD to operate and maintain upon completion of sewer facilities installation and acceptance of work by the District. All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD23-6632 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters, and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works Inspector. Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD23-6632 LD - Utilities/ Excavation - Parallel Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project. Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Page 2 of 3 Permit Number: LD23-6632 LD - Utilities/ Excavation - Parallel Permitee Date City Engineer or Authorized Representative Date 11/14/2023 Page 3 of 3 AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 TRAFFIC CONTROL PLANS FOR DIAZ SEWER MODIFICATION PROJECT DIAZ ROAD AND RANCHO WAY FLASHING ARROW SIGN TRAILER (TYP.) C L O S E D R O A D CLOSED LEFT LANE AHEAD END DETOURROAD WORK ONLY CREW SURVEY CLOSED ROAD AHEAD RIGHT AHEAD DETOUR USE OTHER SIDE RIGHT KEEP TURN RIGHT M U S T RIGHT LANE NOT PASS SIDEWALK CLOSED DO STOP SLOW CLOSED LANE TO STOP PREPARED SHOULDER WORK WORK AHEAD ROAD MACHINERY AHEAD END ROAD CLOSED LOCAL TRAFFIC ONLY TO THRU TRAFFIC ROAD CLOSED FRESH OIL ROAD DETOUR SHOULDER SOFTPAVEMENT ENDS (FAS) S (HLWD) HIGH LEVEL WARNING DEVICE TRAFFIC CONE POST TUBE ROAD ROUGH NARROWS ROAD W20-2 R11-2 R11-3a R11-4 W21-3 M4-8a M4-10 W21-2 W21-7 AHEAD UTILITY WORK G20-2 W20-4 W20-1 W21-5W21-1A C20(CA)W20-3 ONE LANE AHEAD ROAD W3-4 C30(CA)C28B(CA) W21-6 W8-7 BE R3-5 R9-10 R4-7BR4-1 R9-3 R1-1 R3-7R3-2R3-1 R3-4 R3-18 W6-4 W5-1W4-2W1-2 W1-4W1-3W1-1 W8-4W8-3 W8-8 W4-1W1-8W1-6 W12-1W6-3 R81(CA) BIKE LANE R5-6 GRAVEL LOOSE MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP) L WOS DAEHA (CMS) CHANGEABLE MESSAGE SIGN TRAILER (TYP.) R3-6 SIDEWALK R9-9 CLOSED R9-11a DETOUR M4-8 C28A(CA) ENDS BEGIN R81B(CA) R81A(CA) BEGIN RIGHT TURN LANE YIELD TO BIKES R4-4 RIGHT KEEP R4-7AR4-7 CROSS HERE SIDEWALK CLOSED R9-11 AHEAD CROSS HERE SIDEWALK CLOSED AHEAD TRENCH OPEN C27(CA) WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND REGULATORY SIGNS TRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20): CONE SPACING - 25' MAXIMUM 1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4.WORK HOURS SHALL UTILIZE DOUBLE CREW SHIFTS AND SHALL BE RESTRICTED TO THE PERIOD BETWEEN 5:00 A.M. AND 10:00 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694 -6411. 13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH. 18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20.IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES. 15 79 WIN C H E S T E R RD WIN C H E S T E R RD M U R R I E T A C R E E K TVRWRFALV A R A D O A V E RIO N E D O R D SAR A H W A Y D I A Z R D D E L R I O R D ZEV O D R REMI N G T O N AVE VIA D O S PIC O S RAN C H O WY B U S I N E S S P A R K D R RANCHO CALIFORNIA RD V I S T A D E R E S E C A J E F F E R S O N A V E PROJECT LOCATION LOCATION MAP: NO SCALE XWALK R9-9(MOD) CLOSED PORTABLE CONCRETE BARRIER - KRAIL EXISTING NO TURN LANE TRAFFIC CONE AT 25' OC UNLESS FLASHING ARROW SIGN (FAS) EXISTING TURN ONLY LANE BARRICADE WORK ZONE TRAFFIC SIGNAL HIGH LEVEL WARNING DEVICE (WITH CALTRANS & MUTCD CODE) SIGN (WITH CALTRANS CODE) TRAFFIC FLOW DIRECTION FLAGGER BARRICADE WITH SIGN TS-14 CRASH CUSHION ARRAY W11-1 ROAD SHARE W16-1P THE CLOSED LANE BIKE SC11(BIKE) WORK AHEAD BIKE PATH W20-1(MOD) SHOWN OTHERWISE DETOUR M4-9a CLOSED BIKE LANE AHEAD C20(CA)(BIKE) PORTABLE CHANGEABLE MESSAGE SIGN BOARD (WITH CITY APPROVED MESSAGE) DIAZ ROAD SC3(CA)D3-1 1 3 HDR Engineering Inc. 200 E. Santa Clara Street Ventura, CA 93001-5972 (805) 628-3001 Suite 200 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS MINICILLI SENIOR TRAFFIC ENGINEER 2647 DIAZ ROAD SEWER MODIFICATION PROJECT DIAZ ROAD SPECIFICATION NO. 1494S PERMIT NO. LD22-5608 WORK DIRECTIVE - 01, ADD JACK & BORE1 PJK KK 10/13/23 WORK DIRECTIVE - 02, RANCHO WAY NO. 2 LT LANE CLOSURE2 PJK KK 01/23/24 ADJUST CC ARRAY & KRAIL ON DIAZ RD SS SS SSSSSS S 1 3 . 5 ' 1 1 ' 1 1 ' 1 0 ' 1 3 . 5 ' 1 1 ' 1 1 ' 1 0 ' 21 ' 12 ' 13 ' 12 ' SS SS SS SSSS S S S S S2' 12 ' 15 ' 12 ' 12 ' 21 ' 21 ' 12 ' 13 ' 12 ' DIAZ ROAD SEWER MODIFICATION PROJECT AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 DIAZ ROAD 2 3 HDR Engineering Inc. 200 E. Santa Clara Street Ventura, CA 93001-5972 (805) 628-3001 Suite 200 MA T C H L I N E SE E T O P R I G H T INSTALL TS-14 CRASH CUSHION ARRAY PER CALTRANS STD. PLANS T2 MA T C H L I N E SE E B O T T O M L E F T DIAZ ROA D - 4 5 M P H W20-1 WORK ZON E - 950' X 40' SC11(BIKE) 540' TAPER DIAZ R O A D - 4 5 M P H 35 0 ' W4-1 100' SC11(BIKE) 250' W4-2(RT) C20(RT)(CA) W20-1 PROVIDE ACCESS TO DRIVEWAY PROVIDE ACCESS TO DRIVEWAY G20-2 NOTE: 1.CONTRACTOR TO INSTALL BARRICADE WITH SC11(BIKE) SIGN AT BIKE PATH SOUTH TERMINUS AT RANCHO CALIFORNIA ROAD, NORTHERN TERMINUS AT WINCHESTER ROAD, AND NORTH EAST CORNER OF RANCHO WAY. 2.CONTRACTOR SHALL PROTECT-IN-PLACE AND MAINTAIN EXISTING TRAFFIC SIGNAL SYSTEM OPERATION AT THE DIAZ RD./RANCHO WAY INTERSECTION AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR SHALL NOTIFY CITY OF TEMECULA AT LEAST FOUR WEEKS PRIOR TO ANY CONSTRUCTION ACTIVITIES THAT WILL AFFECT THE OPERATION OF THIS EXISTING TRAFFIC CONTROL SIGNAL SYSTEM, AND COORDINATE WITH CITY TO FURNISH AND INSTALL, AND PUT INTO OPERATION A TEMPORARY VIDEO DETECTION SYSTEM. AFTER THE TEMPORARY VIDEO SYSTEM INSTALLATION COMPLETED, TESTED AND APPROVED FOR OPERATION BY THE CITY, CONTRACTOR CAN THEN RESUME CONSTRUCTION WORK ON THIS PROJECT. 250'250'C30(CA) BYPASS PUMP WORK AREA - 30' X 14' C30(CA) MH 2 MH 1 EX MH 01488 EX MH 01479 TRAFFIC CONES @ 10' O.C. TRAFFIC CONES @ 10' O.C. SC11(BIKE) R A N C H O C A L I F O R N I A R O A D EXTENT OF WORK ZONE WITHIN DIAZ ROAD R-O-W EX ROW EX ROW EX ROW EX ROW SC11(BIKE) EXISTING DIKE EXISTING DELINEATORS ROAD WORK ON DIAZ RD EXPECT DELAYS NOTE: DATE AND PHONE NUMBER TBD. XX-XX-23 - XX-XX-23 CALL XXX-XXXX FOR INFO ROAD WORK ON DIAZ RD BIKE PATH CLOSED CALL XXX-XXXX FOR INFO CHANGEABLE MESSAGE SIGN "A" TWO WEEKS PRIOR DURING USE ALT RTE 120' TAPER EXIST DWY 50' PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS MINICILLI SENIOR TRAFFIC ENGINEER 2647 SPECIFICATION NO. 1494S 50' PERMIT NO. LD22-5608 CMS "A" 5 0 0 ' CMS "A" 50 0 ' EX ROW M A T C H L I N E S E E S H E E T 3 WORK DIRECTIVE - 01, ADD JACK & BORE1 PJK KK 10/13/23 1 WORK DIRECTIVE - 02, RANCHO WAY NO. 2 LT LANE CLOSURE2 PJK KK 01/23/24 2 ADJUST CC ARRAY & KRAIL ON DIAZ RD 2 SSSS S SS 11'12'11'22' 13 . 5 ' 11 ' 11 ' 10 ' S 15 ' 11 ' 11 ' 10 ' 15 ' 11 ' 11 ' 10 ' 14 ' SSSS S S S S DIAZ ROAD SEWER MODIFICATION PROJECT PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS MINICILLI SENIOR TRAFFIC ENGINEER 2647 AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 DIAZ ROAD 3 3 HDR Engineering Inc. 200 E. Santa Clara Street Ventura, CA 93001-5972 (805) 628-3001 Suite 200 MA T C H L I N E SE E S H E E T 2 DIAZ ROAD - 45 MPH RANCHO WAY 25 0 ' W20-1 R9-3 W20-1 G20-2 SC11(BIKE) 350' NOTE: 1.CONTRACTOR TO INSTALL BARRICADE WITH SC11(BIKE) SIGN AT EVERY 350' SPANNING TO BOTH BIKE PATH TERMINUS; SOUTHERN TERMINUS AT RANCHO CALIFORNIA ROAD AND NORTHERN TERMINUS AT WINCHESTER ROAD. 2.CONTRACTOR SHALL PROTECT-IN-PLACE AND MAINTAIN EXISTING TRAFFIC SIGNAL SYSTEM OPERATION AT THE DIAZ RD./RANCHO WAY INTERSECTION AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR SHALL NOTIFY CITY OF TEMECULA AT LEAST FOUR WEEKS PRIOR TO ANY CONSTRUCTION ACTIVITIES THAT WILL AFFECT THE OPERATION OF THIS EXISTING TRAFFIC CONTROL SIGNAL SYSTEM, AND COORDINATE WITH CITY TO FURNISH AND INSTALL, AND PUT INTO OPERATION A TEMPORARY VIDEO DETECTION SYSTEM. AFTER THE TEMPORARY VIDEO SYSTEM INSTALLATION COMPLETED, TESTED AND APPROVED FOR OPERATION BY THE CITY, CONTRACTOR CAN THEN RESUME CONSTRUCTION WORK ON THIS PROJECT. WORK ZONE - 435' X 25' MH 4 MH 6 EX MH 01228 EX MH 01864 EXTENT OF WORK ZONE WITHIN DIAZ ROAD R-O-W EX ROW EX ROW J E F F E R S O N A V E N U E WIN C H E S T E R R O A D D I A Z R O A D RANCHO CALIF O R N I A R O A D RAN C H O W A Y VIA M O N T E Z U M A OVE R L A N D D R I V E EN T E R P R I S E CI R C L E S T R E E T SC3(CA) SC3(CA) SC3(CA) D3-1, M4-9a, W1-6(LT) SC3(CA) SC3(CA) D3-1, M4-9a, W1-6(RT) D3-1, M4-9a, W1-6(LT)D3-1, M4-9a, W1-6(LT) SC3(CA) D3-1, M4-9a, W1-6(LT) SC3(CA) M4-8a D3-1, M4-9a, W1-6(RT) SC3(CA) SC3(CA) SC3(CA) D3-1, M4-9a, W1-6(RT) M4-8a DETOUR MAP BIKE PATH CLOSURE N.T.S SPECIFICATION NO. 1494S ROAD WORK ON DIAZ RD EXPECT DELAYS NOTE: DATE AND PHONE NUMBER TBD. XX-XX-23 - XX-XX-23 CALL XXX-XXXX FOR INFO ROAD WORK ON DIAZ RD BIKE PATH CLOSED CALL XXX-XXXX FOR INFO CHANGEABLE MESSAGE SIGN "A" TWO WEEKS PRIOR DURING USE ALT RTE PERMIT NO. LD22-5608 CMS "A" 500' CMS "A" CMS "A" CMS "A" W20-1(MOD) WORK DIRECTIVE - 01, ADD JACK & BORE1 PJK KK 10/13/23 1 R9-11a WORK DIRECTIVE - 02, RANCHO WAY NO. 2 LT LANE CLOSURE2 PJK KK 01/23/24ADJUST CC ARRAY & KRAIL ON DIAZ RD W12-1 C30 2EXIST. R61-13(CA) AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 TRAFFIC CONTROL PLANS FOR DIAZ SEWER MODIFICATION PROJECT DIAZ ROAD AND RANCHO WAY FLASHING ARROW SIGN TRAILER (TYP.) C L O S E D R O A D CLOSED LEFT LANE AHEAD END DETOURROAD WORK ONLY CREW SURVEY CLOSED ROAD AHEAD RIGHT AHEAD DETOUR USE OTHER SIDE RIGHT KEEP TURN RIGHT M U S T RIGHT LANE NOT PASS SIDEWALK CLOSED DO STOP SLOW CLOSED LANE TO STOP PREPARED SHOULDER WORK WORK AHEAD ROAD MACHINERY AHEAD END ROAD CLOSED LOCAL TRAFFIC ONLY TO THRU TRAFFIC ROAD CLOSED FRESH OIL ROAD DETOUR SHOULDER SOFTPAVEMENT ENDS (FAS) S (HLWD) HIGH LEVEL WARNING DEVICE TRAFFIC CONE POST TUBE ROAD ROUGH NARROWS ROAD W20-2 R11-2 R11-3a R11-4 W21-3 M4-8a M4-10 W21-2 W21-7 AHEAD UTILITY WORK G20-2 W20-4 W20-1 W21-5W21-1A C20(CA)W20-3 ONE LANE AHEAD ROAD W3-4 C30(CA)C28B(CA) W21-6 W8-7 BE R3-5 R9-10 R4-7BR4-1 R9-3 R1-1 R3-7R3-2R3-1 R3-4 R3-18 W6-4 W5-1W4-2W1-2 W1-4W1-3W1-1 W8-4W8-3 W8-8 W4-1W1-8W1-6 W12-1W6-3 R81(CA) BIKE LANE R5-6 GRAVEL LOOSE MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP) L WOS DAEHA (CMS) CHANGEABLE MESSAGE SIGN TRAILER (TYP.) R3-6 SIDEWALK R9-9 CLOSED R9-11a DETOUR M4-8 C28A(CA) ENDS BEGIN R81B(CA) R81A(CA) BEGIN RIGHT TURN LANE YIELD TO BIKES R4-4 RIGHT KEEP R4-7AR4-7 CROSS HERE SIDEWALK CLOSED R9-11 AHEAD CROSS HERE SIDEWALK CLOSED AHEAD TRENCH OPEN C27(CA) WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND REGULATORY SIGNS TRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20): CONE SPACING - 25' MAXIMUM 1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4.WORK HOURS SHALL UTILIZE DOUBLE CREW SHIFTS AND SHALL BE RESTRICTED TO THE PERIOD BETWEEN 5:00 A.M. AND 10:00 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694 -6411. 13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH. 18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20.IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES. 15 79 WIN C H E S T E R RD WIN C H E S T E R RD M U R R I E T A C R E E K TVRWRFALV A R A D O A V E RIO N E D O R D SAR A H WAY D I A Z R D D E L R I O R D ZEV O D R REMI N G T O N AVE VIA D O S PIC O S RAN C H O WY B U S I N E S S P A R K D R RANCHO CALIFORNIA RD V I S T A D E R E S E C A J E F F E R S O N A V E PROJECT LOCATION LOCATION MAP: NO SCALE XWALK R9-9(MOD) CLOSED PORTABLE CONCRETE BARRIER - KRAIL EXISTING NO TURN LANE TRAFFIC CONE AT 25' OC UNLESS FLASHING ARROW SIGN (FAS) EXISTING TURN ONLY LANE BARRICADE WORK ZONE TRAFFIC SIGNAL HIGH LEVEL WARNING DEVICE (WITH CALTRANS & MUTCD CODE) SIGN (WITH CALTRANS CODE) TRAFFIC FLOW DIRECTION FLAGGER BARRICADE WITH SIGN TS-14 CRASH CUSHION ARRAY W11-1 ROAD SHARE W16-1P THE CLOSED LANE BIKE SC11(BIKE) WORK AHEAD BIKE PATH W20-1(MOD) SHOWN OTHERWISE DETOUR M4-9a CLOSED BIKE LANE AHEAD C20(CA)(BIKE) PORTABLE CHANGEABLE MESSAGE SIGN BOARD (WITH CITY APPROVED MESSAGE) DIAZ ROAD SC3(CA)D3-1 1 3 HDR Engineering Inc. 200 E. Santa Clara Street Ventura, CA 93001-5972 (805) 628-3001 Suite 200 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS MINICILLI SENIOR TRAFFIC ENGINEER 2647 DIAZ ROAD SEWER MODIFICATION PROJECT DIAZ ROAD SPECIFICATION NO. 1494S PERMIT NO. LD22-5608 WORK DIRECTIVE - 01, ADD JACK & BORE1 PJK KK 10/13/23 10/23/23 10/23/23 SS SS SSSSSS S 1 3 . 5 ' 1 1 ' 1 1 ' 1 0 ' 1 3 . 5 ' 1 1 ' 1 1 ' 1 0 ' 21 ' 12 ' 13 ' 12 ' SS SS SS SSSS S S S S S 2 ' 2' 12 ' 1 2 ' 15 ' 12 ' 12 ' 21 ' 21 ' 12 ' 13 ' 12 ' 2' DIAZ ROAD SEWER MODIFICATION PROJECT AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 DIAZ ROAD 2 3 HDR Engineering Inc. 200 E. Santa Clara Street Ventura, CA 93001-5972 (805) 628-3001 Suite 200 MA T C H L I N E SE E T O P R I G H T INSTALL TS-14 CRASH CUSHION ARRAY PER CALTRANS STD. PLANS T2 MA T C H L I N E SE E B O T T O M L E F T DIAZ ROA D - 4 5 M P H W20-1 WORK ZON E - 950' X 40' SC11(BIKE) 540' TAPER DIAZ R O A D - 4 5 M P H 35 0 ' W4-1 100' SC11(BIKE) 250' W4-2(RT) C20(RT)(CA) W20-1 PROVIDE ACCESS TO DRIVEWAY PROVIDE ACCESS TO DRIVEWAY G20-2 NOTE: 1.CONTRACTOR TO INSTALL BARRICADE WITH SC11(BIKE) SIGN AT BIKE PATH SOUTH TERMINUS AT RANCHO CALIFORNIA ROAD, NORTHERN TERMINUS AT WINCHESTER ROAD, AND NORTH EAST CORNER OF RANCHO WAY. 2.CONTRACTOR SHALL PROTECT-IN-PLACE AND MAINTAIN EXISTING TRAFFIC SIGNAL SYSTEM OPERATION AT THE DIAZ RD./RANCHO WAY INTERSECTION AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR SHALL NOTIFY CITY OF TEMECULA AT LEAST FOUR WEEKS PRIOR TO ANY CONSTRUCTION ACTIVITIES THAT WILL AFFECT THE OPERATION OF THIS EXISTING TRAFFIC CONTROL SIGNAL SYSTEM, AND COORDINATE WITH CITY TO FURNISH AND INSTALL, AND PUT INTO OPERATION A TEMPORARY VIDEO DETECTION SYSTEM. AFTER THE TEMPORARY VIDEO SYSTEM INSTALLATION COMPLETED, TESTED AND APPROVED FOR OPERATION BY THE CITY, CONTRACTOR CAN THEN RESUME CONSTRUCTION WORK ON THIS PROJECT. 250'250' C30(CA) BYPASS PUMP WORK AREA - 30' X 14' C30(CA) MH 2 MH 1 EX MH 01488 EX MH 01479 TRAFFIC CONES @ 10' O.C. TRAFFIC CONES @ 10' O.C. SC11(BIKE) R A N C H O C A L I F O R N I A R O A D EXTENT OF WORK ZONE WITHIN DIAZ ROAD R-O-W EX ROW EX ROW EX ROW EX ROW SC11(BIKE) EXISTING DIKE EXISTING DELINEATORS ROAD WORK ON DIAZ RD EXPECT DELAYS NOTE: DATE AND PHONE NUMBER TBD. XX-XX-23 - XX-XX-23 CALL XXX-XXXX FOR INFO ROAD WORK ON DIAZ RD BIKE PATH CLOSED CALL XXX-XXXX FOR INFO CHANGEABLE MESSAGE SIGN "A" TWO WEEKS PRIOR DURING USE ALT RTE 120' TAPER EXIST DWY 50' PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS MINICILLI SENIOR TRAFFIC ENGINEER 2647 80' TAPER SPECIFICATION NO. 1494S 50' PERMIT NO. LD22-5608 CMS "A" 5 0 0 ' CMS "A" 50 0 ' EX ROW M A T C H L I N E S E E S H E E T 3 WORK DIRECTIVE - 01, ADD JACK & BORE1 PJK KK 10/13/23 1 10/23/23 10/23/23 SSSS S SS 11'12'11'22' 13 . 5 ' 11 ' 11 ' 10 ' S 15 ' 11 ' 11 ' 10 ' 15 ' 11 ' 11 ' 10 ' 14 ' 12 '12 ' SSSS S S S S DIAZ ROAD SEWER MODIFICATION PROJECT PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATIONENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS MINICILLI SENIOR TRAFFIC ENGINEER 2647 AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 DIAZ ROAD 3 3 HDR Engineering Inc. 200 E. Santa Clara Street Ventura, CA 93001-5972 (805) 628-3001 Suite 200 MA T C H L I N E SE E S H E E T 2 DIAZ ROAD - 45 MPH RANCHO WAY 25 0 ' W20-1 R9-3 W20-1 G20-2 SC11(BIKE) 350' NOTE: 1.CONTRACTOR TO INSTALL BARRICADE WITH SC11(BIKE) SIGN AT EVERY 350' SPANNING TO BOTH BIKE PATH TERMINUS; SOUTHERN TERMINUS AT RANCHO CALIFORNIA ROAD AND NORTHERN TERMINUS AT WINCHESTER ROAD. 2.CONTRACTOR SHALL PROTECT-IN-PLACE AND MAINTAIN EXISTING TRAFFIC SIGNAL SYSTEM OPERATION AT THE DIAZ RD./RANCHO WAY INTERSECTION AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR SHALL NOTIFY CITY OF TEMECULA AT LEAST FOUR WEEKS PRIOR TO ANY CONSTRUCTION ACTIVITIES THAT WILL AFFECT THE OPERATION OF THIS EXISTING TRAFFIC CONTROL SIGNAL SYSTEM, AND COORDINATE WITH CITY TO FURNISH AND INSTALL, AND PUT INTO OPERATION A TEMPORARY VIDEO DETECTION SYSTEM. AFTER THE TEMPORARY VIDEO SYSTEM INSTALLATION COMPLETED, TESTED AND APPROVED FOR OPERATION BY THE CITY, CONTRACTOR CAN THEN RESUME CONSTRUCTION WORK ON THIS PROJECT. WORK ZONE - 435' X 25' MH 4 MH 6 EX MH 01228 EX MH 01864 EXTENT OF WORK ZONE WITHIN DIAZ ROAD R-O-W EX ROW EX ROW J E F F E R S O N A V E N U E WIN C H E S T E R R O A D D I A Z R O A D RANCHO CALIF O R N I A R O A D RAN C H O W A Y VIA M O N T E Z U M A OVE R L A N D D R I V E EN T E R P R I S E CI R C L E S T R E E T SC3(CA) SC3(CA) SC3(CA) D3-1, M4-9a, W1-6(LT) SC3(CA) SC3(CA) D3-1, M4-9a, W1-6(RT) D3-1, M4-9a, W1-6(LT)D3-1, M4-9a, W1-6(LT) SC3(CA) D3-1, M4-9a, W1-6(LT) SC3(CA) M4-8a D3-1, M4-9a, W1-6(RT) SC3(CA) SC3(CA) SC3(CA) D3-1, M4-9a, W1-6(RT) M4-8a DETOUR MAP BIKE PATH CLOSURE N.T.S SPECIFICATION NO. 1494S ROAD WORK ON DIAZ RD EXPECT DELAYS NOTE: DATE AND PHONE NUMBER TBD. XX-XX-23 - XX-XX-23 CALL XXX-XXXX FOR INFO ROAD WORK ON DIAZ RD BIKE PATH CLOSED CALL XXX-XXXX FOR INFO CHANGEABLE MESSAGE SIGN "A" TWO WEEKS PRIOR DURING USE ALT RTE PERMIT NO. LD22-5608 CMS "A" 500' CMS "A" CMS "A" CMS "A" W20-1(MOD) WORK DIRECTIVE - 01, ADD JACK & BORE1 PJK KK 10/13/23 1 10/23/23 10/23/23