HomeMy WebLinkAboutLD23-1387Permit Number: LD23-1387
LD - Utilities/ Excavation - Parallel
Issued: 05/10/2023
Expired: 01/02/2024
Job Address: 43890 Butterfield Stage Rd
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Boudreau Pipeline Corporation
Jim Mihld
463 N Smith Ave
Corona, CA 92878
Applicant:
Boudreau Pipeline Corporation
463 N. Smith Avenue
Corona, CA 92880
(951) 493-6780
Contractor:
Utility Work Order Number: 86272
Description:
Pothole
WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am
Location: Temecula Parkway SB Lanes and Intersection N/O Butterfield Stage Road
Proposed work:
Six (6) 1'x1' exploratory pot holes as shown on "BUTTERFIELD STAGE ROAD, POTHOLE EXHIBIT,
LD23-1387"
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD23-1387
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
Public Works Inspector.
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities*****
Permit Number: LD23-1387
LD - Utilities/ Excavation - Parallel
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
Page 2 of 3
Permit Number: LD23-1387
LD - Utilities/ Excavation - Parallel
City Engineer or Authorized Representative Date
05/10/2023
Page 3 of 3
1. All traffic control devices shall conform to the latest edition of the California Manual on Unifo rm Traffic Control
Devices (California MUTCD) and the Standard Specifications for Public Works Construction.
2. The City Engineer or his representative has the authority to initiate field changes to assure pub lic safety.
3. All traffic control devices shall be removed from view when not in use.
4. Work hours shall be restricted to the period between 8:30 a.m. and 3:30 p.m., Monday through Frid ay, unless
approved otherwise. When night work is required, work hours shall be 9 p.m. to 5 a.m., Sunday throug h
Thursday.
5. Trenches must be back filled or plated during non-working hours. Steel plates shall have asphaltic concrete
berm on all edges. All dirt, dust, and debris shall be removed from street at end of each day and at the end
of the job. The street shall be in drivable condition at all times.
6. Pedestrian controls shall be provided as shown on the plans.
7. Temporary "NO PARKING" signs will be posted 24 hours prior to commencing work.
8. Access to driveways will be maintained at all times unless other arrangements are made.
9. The contractor shall replace within 72 hours, all traffic signal loop detectors damaged during construction.
10. The contractor shall replace within 24 hours, all striping removed or damaged by construction work. (Striping
may be replaced temporarily with tape.)
11. All Workers shall be equipped with an orange vest (or a reflective vest at night). All flaggers shall also be
equipped with a hard hat, C28 "Stop/Slow" paddle and shall be trained in the proper fundamentals of flagging
traffic.
12. Any work that disturbs normal traffic signal operations shall be coordinated with the City of Temecula’s Traffic
Division, 48 hours prior to beginning construction. Contact the City’s Traffic Division at (951) 694 -6411.
13. The contractor shall maintain all traffic control devices 24 hours per day and 7 days per week.
14. A minimum of twelve (12) foot travel lanes must be maintained unless otherwise approved by the
Department of Public Works.
15. All night work will require written approval from the Department of Public Works. Lane closures,road
detours, road closures, and traffic signal modifications associated with overnight construction activities will
require warning signs be placed at least one week in advance of starting construction.
16. A solar powered flashing arrow board shall be required on all arterial street lane closures.
17. If the permit applicant determines that conduit installation will be by the boring machine metho d, the trench
patch for the utility observation excavation will be the same as for open trench excavation method. This will
provide a single continuous surface restoration eliminating the multiple penetration into the public roadway to
all requirements in City Standard Drawing # 407 (sheet 1 and 2) for trench patch.
18. Any work that creates an undue safety risk or creates severe congestion may be shut down by City Traffic
Engineers, City Field Inspection, or the Police Department.
19. Cones and delineators shall have reflectorized sleeves for night work.
20. If parking is allowed in advance warning area, advance warning signs shall be mounted on high level devices.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS
SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE
LANES.
Boudreau PipelinePotholing plan
N
Recommended By:
Accepted By:
Acknowledgement of ApprovalCivil Engineer Stamp
Phase:
Page:
Phase:
Scale:
Plan Number:
Job Number:
Permit #:
Boudreau PipelineContractor:
Juan NavarreteField Contact:
951-733-8695Contact Number:
5-26-2020Start Date:
6-12-2020End Date:
9PM to 5AMWork Hours:
SUNDAY -THURSDAY
1 of 1
None
23JW006
86272
Date:
Date:Nicolas M. Minicilli
Traffic Engineer
R.T.E. NO.2647
1 of 1
Cover Page
Location of work
www.invarion.com
GILBE R T M .HERN
A
N
D
E
Z
24
24
April 26, 2023
5/8/2023
05/08/23
N
*
LANE
CLOSED
LANE
CLOSED
600'
LA
N
E
CL
O
S
E
D
LA
N
E
CL
O
S
E
D
LA
N
E
CL
O
S
E
D
600'
LA
N
E
CL
O
S
E
D
LA
N
E
CL
O
S
E
D
LANE
CLOSED
LANE
CLOSED
LANE
CLOSED
PH-1
PH-2
PH-3
PH-4
PH-5
PH-6
LA
N
E
CL
O
S
E
D
Pr
i
v
a
t
e
Private
Private
Private
Private
Pr
i
v
a
t
e
Pr
i
v
a
t
e
B
u
t
t
e
r
f
i
e
l
d
S
t
a
g
e
R
d
5
0
M
P
H
Temecula Pkwy SR-79 50MPH
Pr
i
v
a
t
e
*
*
*
= Turn pockets to be closed only when PH-6 is being
worked on
= Maintain 12' minimum for travel lane
20
25
30
35
40
45
50
55
60
65
70
75
80
125
180
245
320
540
600
660
720
780
840
900
40
63
90
123
160
270
300
330
360
390
420
450
27
42
60
82
107
180
200
220
240
260
280
300
50
50
50
50
50
50
50
50
50
50
50
50
Speed*
S(mph)
Minimum Taper Length**
for Width of Offset 12 feet (W)
Merging
L(feet)
Shifting
L/2(feet)
Shoulder
L/3(feet)
Down
Stream(feet)***
Road Type Distance Between Signs**
A B C
Urban: 25mph or less
More than 25mph
to 40mphUrban:
Urban:More than 40mph
(Feet)
100 100 100
250
350
500
1000
250
350
500
1500
250
350
500
2640
Rural
Expressway/Freeway
Table 6C-1, Suggested Advance Warning Sign Spacing (2014 CAMUTCD)
MA
TC
H
L
I
N
E
1
SE
E
S
H
E
E
T
2
MA
TC
H
L
I
N
E
2
SE
E
S
H
E
E
T
2
MATCHLINE 3
SEE SHEET 3
MATCHLINE 4
SEE SHEET 3
= Work Area -Approximate Pothole Locations
= Cone spacing = 40'
Merge taper
Merge taper
600'Merge taper
S
Coordinate with the City of Temecula
Public Works department to place
the signalized intersection of flash
operation during work hours
Recommended By:
Accepted By:
Acknowledgement of ApprovalCivil Engineer Stamp
Phase:
Page:
Phase:
Scale:
Plan Number:
Job Number:
Permit #:
Boudreau PipelineContractor:
Juan NavarreteField Contact:
951-733-8695Contact Number:
5-26-2020Start Date:
6-12-2020End Date:
9PM to 5AMWork Hours:
SUNDAY -THURSDAY
1 of 1
None
23JW006
86272
Date:
Date:Nicolas M. Minicilli
Traffic Engineer
R.T.E. NO.2647
1 of 1
1 of 3
Boudreau PipelinePotholing plan
www.invarion.com
GILBE R T M .HERN
A
N
D
E
Z
24
24
April 26, 2023
5/8/2023
05/08/23
Pr
i
v
a
t
e
Pr
i
v
a
t
e
Temecula Pkwy SR-79 50MPH
Ma
h
l
o
n
V
ai
l
R
d
2
5
M
P
H
N
20
25
30
35
40
45
50
55
60
65
70
75
80
125
180
245
320
540
600
660
720
780
840
900
40
63
90
123
160
270
300
330
360
390
420
450
27
42
60
82
107
180
200
220
240
260
280
300
50
50
50
50
50
50
50
50
50
50
50
50
Speed*
S(mph)
Minimum Taper Length**
for Width of Offset 12 feet (W)
Merging
L(feet)
Shifting
L/2(feet)
Shoulder
L/3(feet)
Down
Stream(feet)***
MA
TC
H
L
I
N
E
1
SE
E
S
H
E
E
T
1
Road Type Distance Between Signs**
A B C
Urban: 25mph or less
More than 25mph
to 40mphUrban:
Urban:More than 40mph
(Feet)
100 100 100
250
350
500
1000
250
350
500
1500
250
350
500
2640
Rural
Expressway/Freeway
Table 6C-1, Suggested Advance Warning Sign Spacing (2014 CAMUTCD)
350'350'RO
A
D
WO
R
K
AH
E
A
D
LE
F
T
L
A
N
E
CL
O
S
E
D
AH
E
A
D
350'
200'
350'350'350'
RI
G
H
T
L
A
N
E
CL
O
S
E
D
AH
E
A
D
RO
A
D
WO
R
K
AH
E
A
D
Tem
e
c
u
l
a
C
r
e
e
k
R
d
2
5
M
P
H
Pa
c
i
f
i
c
S
u
n
s
e
t
D
r
2
5
M
P
H
Temecula Pkwy SR-79 50MPH
MA
TC
H
L
I
N
E
2
SE
E
S
H
E
E
T
1
= Maintain 12' minimum for travel lane
= Work Area -Approximate Pothole Locations
= Cone spacing = 40'
Shoulder Taper
Boudreau PipelinePotholing plan
Recommended By:
Accepted By:
Acknowledgement of ApprovalCivil Engineer Stamp
Phase:
Page:
Phase:
Scale:
Plan Number:
Job Number:
Permit #:
Boudreau PipelineContractor:
Juan NavarreteField Contact:
951-733-8695Contact Number:
5-26-2020Start Date:
6-12-2020End Date:
9PM to 5AMWork Hours:
SUNDAY -THURSDAY
1 of 1
None
23JW006
86272
Date:
Date:Nicolas M. Minicilli
Traffic Engineer
R.T.E. NO.2647
1 of 1
1 of 3
www.invarion.com
GILBE R T M .HERN
A
N
D
E
Z
24
24
April 26, 2023
5/8/2023
05/08/23
R
O
A
D
W
O
R
K
A
H
E
A
D
R
O
A
D
W
O
R
K
A
H
E
A
D
ROAD
WORK
AHEAD
350'
350'
350'
LEFT LANE
CLOSED
AHEAD
B
u
t
t
e
r
f
i
e
l
d
S
t
a
g
e
R
d
5
0
M
P
H
De Portola R
d
4
5
M
P
H
Private
Pr
i
v
a
t
e
Pr
i
v
a
t
e
ROAD
WORK
AHEAD
Wolf Store Rd
N
20
25
30
35
40
45
50
55
60
65
70
75
80
125
180
245
320
540
600
660
720
780
840
900
40
63
90
123
160
270
300
330
360
390
420
450
27
42
60
82
107
180
200
220
240
260
280
300
50
50
50
50
50
50
50
50
50
50
50
50
Speed*
S(mph)
Minimum Taper Length**
for Width of Offset 12 feet (W)
Merging
L(feet)
Shifting
L/2(feet)
Shoulder
L/3(feet)
Down
Stream(feet)***
MATCHLINE 3
SEE SHEET 1
MATCHLINE 4
SEE SHEET 1
Road Type Distance Between Signs**
A B C
Urban: 25mph or less
More than 25mph
to 40mphUrban:
Urban:More than 40mph
(Feet)
100 100 100
250
350
500
1000
250
350
500
1500
250
350
500
2640
Rural
Expressway/Freeway
Table 6C-1, Suggested Advance Warning Sign Spacing (2014 CAMUTCD)
= Maintain 12' minimum for travel lane
= Work Area -Approximate Pothole Locations
= Cone spacing = 40'
Boudreau PipelinePotholing plan
Recommended By:
Accepted By:
Acknowledgement of ApprovalCivil Engineer Stamp
Phase:
Page:
Phase:
Scale:
Plan Number:
Job Number:
Permit #:
Boudreau PipelineContractor:
Juan NavarreteField Contact:
951-733-8695Contact Number:
5-26-2020Start Date:
6-12-2020End Date:
9PM to 5AMWork Hours:
SUNDAY -THURSDAY
1 of 1
None
23JW006
86272
Date:
Date:Nicolas M. Minicilli
Traffic Engineer
R.T.E. NO.2647
1 of 1
1 of 3
www.invarion.com
GILBE R T M .HERN
A
N
D
E
Z
24
24
April 26, 2023
600'Merge taper
5/8/2023
05/08/23
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020
APPLICATION INFORMATION PERMIT NO.:
Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching
Signing & Striping Traffic Signal Miscellaneous (SPECIFY BELOW)
The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as
follows:
Name(s) of street(s) and/or street address:
Utility Work Order #: Start Date: End Date:
In consideration of granting this application, all applicants including utility companies hereby agree to:
1.If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties
involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control
Plan Checklist for details.
2.Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from
and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident,
loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application. (See below for specific liability insurance requirements.)
3.Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City
Engineer.
4.Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working
days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The
developer/general contractor must be present for the timely request of inspections.
5.Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works
Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all
applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction.
LIABILITY INSURANCE REQUIREMENTS
PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED
EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE
CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED.
THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR
BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT
ENCROACHMENT PERMIT.
x
6 - 1' x 1' potholes over existing utilities to verify existing utilities
Temecula Pkwy & Butterfield Stage Rd
LD23-1387
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
tricia.ortega 04/09/2023
04/09/2023 04/09/2023
04/09/20
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020
Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum
limits of insurance coverage shall be as follows:
a.General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If
Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it
shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
b.Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage.
c.Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident
for bodily injury or disease.
d.Course of Construction: Completed value of the project.
There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approac h
located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at
least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the
encroachment permit:
BODILY INJURY $250,000.00 EACH PERSON
$500,000.00 EACH OCCURANCE
$500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
PROPERTY DAMAGE $100,000.00 EACH OCCURANCE
$250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to
the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing
the City named as an additional insured shall be attached to the application.
The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this
application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges
that this application will be made a part of the encroachment permit.
APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED)
Company Name:
Mailing Address:
Contact: Phone #: E-mail:
I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the
permittee and bind the permittee to the agreements contained herein and any conditions of the permit.
Authorized Signature: Date Applied:
CONTRACTOR’S INFORMATION
Company Name:
Mailing Address:
Contact: Phone #: 24-HR Emergency #:
State Contractor’s License #: Class: City Business License #:
Boudreau Pipeline Corporation
463 N Smith Ave , Corona Ca
Juan Navarrete (951)733-8695 JuanN@boudreaupipeline.com
Boudreau Pipeline Corporation
463 N Smith Ave , Corona Ca
Juan Navarrete (951)733-8695
A
(951)733-8695
3/1/2023
791842 032830
SS
SS
E
E
E
E
E
CA
T
V
CA
T
V
W
E
E
E
E
SS
SS
SS SS SS SS SS SS SS SS
SS
W W W W W W W W W W W W W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
W
W W
CA
T
V
CA
T
V
CA
T
V
EEEE
E
E
CATV
CATV
CA
T
V
G
G
G G G G
G G G G G G G G
E
E
E
E E E
E W
E EEE
W
TTTTTTTTTTT
T
T
W
W
W
W
W
W
W
SS
W W W W W W W W W W W W W W W W W
WWWWW
G
E
E
E
E
EW
W
W
W
W
W
W
W
W
G
G
G
G
G
W
E
E
WW
W
G
SS
W
W
W
W W
W W W W W W W W W W W W W W W W W W W W W
E E E E E E E EEEEEEEEE
40810 COUNTY CENTER DR.,
SUITE 200
TEMECULA, CA 92591
PHONE: (951) 676-8042
MBAKERINTL.COM
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
tricia.ortega 04/09/2023
04/09/2023 04/09/2023
04/09/20