Loading...
HomeMy WebLinkAboutLD23-6616Permit Number: LD23-6616 LD - Utilities/ Access to Utility Agency Facilities Issued: 12/04/2023 Expired: 06/01/2024 Job Address: 31300 Rancho Community Way Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Frontier California Inc. 401 Merritt 7 Norwalk, CT 06851 (000) 000-0000 Applicant: Gulbranson Services Inc. 15371 Bonanza Rd Unit A, Victorville, CA 92392 (760) 843-0330 Contractor: Utility Work Order Number: 70147-5343935 Description: Frontier 70147-5343935 WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am Location: MH581 - Temecula Pkwy S/S 525' W/O Rancho Pueblo Rd MH582 - Temecula Pkwy S/S 155' E/O Rancho Pueblo Rd Proposed work: Access two (2) manholes as shown on Frontier "SITE PLAN 31300 RANCHO COMMUNITY WAY, LD23-6616" All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD23-6616 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Page 1 of 3 Permit Number: LD23-6616 LD - Utilities/ Access to Utility Agency Facilities Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project. Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date Page 2 of 3 Permit Number: LD23-6616 LD - Utilities/ Access to Utility Agency Facilities City Engineer or Authorized Representative Date 12/04/2023 Page 3 of 3 PERMIT NO. SHEET OF 70147-5343935 3 SHEETS ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: TRAFFIC CONTROL PLANS FOR TEMECULA PKWY & RANCHO PUEBLO RD SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS 909-406-3178 2647 NICOLAS M. MINICILLI TRAFFIC ENGINEER ENGINEER'S SEAL VICINITY MAP NTS PROJECT LOCATION TRAFFIC CONTROL PLANS 1 REGULATORY SIGNS BIKE LANE R3-17 R5-6 WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND CONE SPACING-25' MAXIMUM STOP FRONTIER ENGINEER: RAUL RIVAS 909-406-3178 NIGHT TIME WORK HOURS: SUNDAY-THURSDAY 9AM-5PM ENGINEER OF WORK'S CERTIFICATE I, , hereby declare that I am the engineer of Work for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and the design is consistent with current standards and City of Temecula. I understand that the check of project drawings and specifications by the City of Temecula is confined to a review only and does not relieve me of responsibilities for project design. Signed Date_______________ R.C.E. Exp.________________ Firm___________________________________ Address________________________________ Telephone______________________________ 29570 PARKER ENGINEERING, LLC P.O BOX 1666, COTTONWOOD, AZ 86326 (909) 472-9983 3/31/25 D. LYNN PARKER TRAFFIC CONTROL GENERAL NOTES (REV'D 08/26/20): 1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE, WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM THE STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT.) ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694-6411. 13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH. 18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. LD23-6616 11/15/2023 11/15/2023 9PM-5AM 11/28/23 11/30/23 PERMIT NO. SHEET OF 70147-5343935 3 SHEETS ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: TRAFFIC CONTROL PLANS FOR TEMECULA PKWY & RANCHO PUEBLO RD SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS 909-406-3178 2647 NICOLAS M. MINICILLI TRAFFIC ENGINEER ENGINEER'S SEAL 200' BIKE LA N E T A P E R 350' WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 LANE CLOSED AHEAD C20 (CA) BIKE 1 RIGHT LANE CLOSED AHEAD C20(RT) W11-1 W16-1 W11-1 ASSEMBLY SHARE THE ROAD 100' TANGE N T CLOSED BIKE SC11 (MOD) LANE CURB CURB S W4-2R 350' 350' 2 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. SCALE: 1"=40' DURATION OF WORK: 1 OF DAY WORK HOURS SUNDAY-FRIDAY 8:30 AM - 3:30 PM NIGHT TIME WORK HOURS: SUNDAY-THURSDAY 9AM-5PM LD23-6616 11/15/2023 9PM-5AM 11/28/23 11/30/23 230' BUFFE R S P A C E 600' MERGIN G T A P E R 100' TANGE N T CLOSED BIKE SC11 (MOD) LANE C30(CA) LANE CLOSED BIKE L A N E BIKE LA N E BIKE LA N E BIKE L A N E BIKE LA N E BIKE L A N E CONCR E T E M E D I A N 1 1 ' 20' MH#58 1 LOCAT I O N WORK AREA C30(CA) LANE CLOSED S WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 410' BUFFE R S P A C E WORK AREA 3 5 0 ' 3 5 0 ' S CONCR E T E M E D I A N MH#58 2 LOCAT I O N BIKE LA N E BIKE LA N E BIKE LA N E CURB GRASS CURB C U R B C U R B C U R B C U R B 350' WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 C O N C R E T E M E D I A N 1 1 ' 1 1 ' 20' C30(CA) LANE CLOSED R3-4 R3-4 CLOSED BIKE SC11 (MOD) LANE PERMIT NO. SHEET OF 70147-5343935 3 SHEETS ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: TRAFFIC CONTROL PLANS FOR TEMECULA PKWY & RANCHO PUEBLO RD SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 FRONTIER ENGINEER: RAUL RIVAS 909-406-3178 2647 NICOLAS M. MINICILLI TRAFFIC ENGINEER ENGINEER'S SEAL 3 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. SCALE: 1"=40'NIGHT TIME WORK HOURS: SUNDAY-THURSDAY 9AM-5PM LD23-6616 11/15/2023 9PM-5AM 11/28/23 11/30/23 LD23-6616 CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 11/09/2023 11/09/2023 11/09/2023 11/09/20 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 2 SHEET CITY OF TEMECULA PUBLIC WORKS 70147-5343935 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 SITE PLAN FOR TEMECULA PKWY & RANCHO PUEBLO RD FRONTIER ENGINEER: RAUL RIVAS 909-406-3178 MARK REVISIONS BY APPR.DATE 1 4 2 ' 7 1 ' 7 1 ' 1 1 0 ' 5 5 ' 5 5 ' 6 3 ' 154' S CONCR E T E M E D I A N MH#58 2 LOCAT I O N C O N C R E T E M E D I A N 525' PLACE AND SPLICE +/- 681 L.F. OF NEW CABLE WITHIN EXISTING CONDUIT 6 5 ' SITE PLAN 31300 RANCHO COMMUNITY WAY 1 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project. SCALE: 1"=60' PROJECT LOCATION CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 11/09/2023 11/09/2023 11/09/2023 11/09/20 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 2 SHEET CITY OF TEMECULA PUBLIC WORKS 70147-5343935 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 SITE PLAN FOR TEMECULA PKWY & RANCHO PUEBLO RD FRONTIER ENGINEER: RAUL RIVAS 909-406-3178 MARK REVISIONS BY APPR.DATE MH#581 LOCAT I O N 6 7 ' DWY PLACE AND SPLICE +/- 136 L.F. OF NEW CABLE WITHIN EXISTING CONDUIT INSIDE CITY ROW 2 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project. SCALE: 1"=60' SITE PLAN 31300 RANCHO COMMUNITY WAY PROJECT LOCATION