Loading...
HomeMy WebLinkAboutLD23-6119Permit Number: LD23-6119 LD - Utilities/ Excavation - Street Crossing Issued: 11/07/2023 Expired: 06/03/2024 Job Address: 27717 Jefferson Ave Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Sandy Khoury 1801 Atlantic Blvd Monterey Park, CA 91754 Applicant: Contractor: Utility Work Order Number: 52-3490761 Description: SoCal Gas; 52-3490761 After the Fact- Leak Repaired- Paving Needed (1) 12x3 Asphalt Cut. (1) 3x3 Asphalt cut All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD23-6119 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project. Page 1 of 2*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD23-6119 LD - Utilities/ Excavation - Street Crossing Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date City Engineer or Authorized Representative Date 11/07/2023 Page 2 of 2 PERMIT SKETCH Work Order Number: Address: 520003490761 27717 JEFFERSON AVE,TEM Type of Cut: Cut Size: Property Line 1: Property Line 2: ASPHALT 12X3 VIA MONTEZUMA JEFFERSON AVE ASPHALT 3X3 VIA MONTEZUMA JEFFERSON AVE SCG 21’ E/W PL OF JEFFERSON AVE LANE CLOSED ROAD WORK AHEAD ROAD WORK AHEAD LANE CLOSED S T O P STOP S T O P STOP ROAD CLOSED JEFFE R S O N A V E (40 M . P . H . ) LEGEND:GENERAL NOTES-TRAFFIC CONTROL 80'0 1" = 80 DURATION WORK DAYS: NIGHT TIME HOURS WORK HOURS:ALL DRIVEWAYS TO BE ACCESSIBLE FOR TRAFFIC DURING WORKING HOURS (TYP. FOR ALL DWYS) Know what's below. Call before you dig. 1 2 TRAFFIC CONTROL PLAN TEMPORARY TRAFFIC CONTROL PLAN DIMENSION GUIDELINES (12 FOOT WIDTH) SPEED MPH (2) DIMENSION A/B/C/ ADVANCE WARNING SIGN SPACING (5) DIMENSION L MERGING TAPER LENGTH (7) DIMENSION L/2 SHIFTING TAPER LENGTH (7) DIMENSION L/3 MINIMUM SHOULDER TAPER (7) DIMENSION "E" BUFFER SPACE (4-A) AND FLAGGER STATION STOPPPING SIGHT DISTANCE (4-B) (0%) (-3%) (-6%) MAXIMUM CHANNELIZER TAPER SPACING (3) MAXIMUM CHANNELIZER TANGENT SPACING (3) MAXIMUM CHANNELIZER CONFLICT SPACING (6) MPH Ft Ft Ft Ft Ft Ft Ft Ft 25 100 125 65 45 (155) (160) (165)25 50 12 30 250 180 90 60 (200) (205) (215)30 60 15 35 250 245 125 85 (250) (260) (275)35 70 17 40 250 320 160 110 (305) (315) (335)40 80 20 45 350 540 270 180 (360) (380) (400)45 90 22 50 350 600 300 200 (425) (450) (475)50 100 25 55 350 660 330 220 (495) (520) (555)50 100 25 60 350 720 360 240 (570) (600) (640)50 100 25 65 350 780 390 260 (645) (685) (730)50 100 25 (1)WORK ON FREEWAYS AND EXPRESSWAYS SHALL MEET THE CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS REQUIREMENTS (2)POSTED SPEED OR OBSERVED OPERATING SPEED (WHICHEVER IS GREATER) (3) CHANNELIZER SPACING SHALL BE REDUCED BY HALF AT AREAS WHERE WORK IS TAKING PLACE ON CURVES OR AREAS OF HEAD-ON CONFLICT. DOWNSTREAM CHANNELIZER SPACING IS A MAXIMUM OF 20FT (4-A)BUFFER SPACE MAY BE INSERTED IN LOW-SPEED URBAN AREAS AND SHOULD BE INSERTED IN HIGH SPEED URBAN AND RURAL AREAS (4-B)THE STOPPING SIGHT DISTANCE SHOULD ENABLE ROAD USERS TO SEE THE PRIMARY FLAGGER STATION AND SAFELY STOP (5)FOR URBAN AREAS. SIGN SPACING ON FREEWAYS SHOULD CONFORM TO CAMUTCD AND SIGN SPACING IN RURAL AREAS SHOULD BE 500 FT (6)**TABLE 6F-101(CA) (7)FOR TAPER WIDTH DIFFERENT THAN 12FT, TAPER LENGTH SHALL BE CALCULATED USING THE FORMULA L=WS2/60 FOR SPEEDS 40MPH OR LESS, AND THE FORMULA L=WS FOR SPEEDS 45MPH OR MORE. L = TAPER LENGTH IN FEET W = WIDTH IN FEET S = SPEED CITY OF TEMECULA, CA 27717 JEFFERSON AVE LEGEND:GENERAL NOTES-TRAFFIC CONTROL 1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694 -6411. 13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH. J E F F E R S O N A V E ( 4 0 M . P . H . ) MA T C H L I N E - S E E S H E E T 2 VIA M O N T E Z U M A (30 M . P . H . ) 18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20.IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. ROAD WORK AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD RIGHT LANE CLOSED AHEAD BIKE LANE CLOSED LEGEND: 80'0 1" = 80 DURATION WORK DAYS:WORK HOURS:ALL DRIVEWAYS TO BE ACCESSIBLE FOR TRAFFIC DURING WORKING HOURS (TYP. FOR ALL DWYS) Know what's below. Call before you dig. 2 2 TRAFFIC CONTROL PLAN CITY OF TEMECULA, CA 27717 JEFFERSON AVE LEGEND: MA T C H L I N E - S E E S H E E T 1 JEFFERSON AVE (40 M.P.H.) JEFFER S O N A V E (40 M . P . H . ) NIGHT TIME HOURS Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\FORMS\Permit Applications\Encroachment Permit App.docx Page 1 of 2 Revised: 06/03/2019 APPLICATION INFORMATION PA No.: PERMIT NO.: Type of Encroachment:  Street/Storm Drain  Sewer/Water  Utility Trenching  Signing & Striping  Traffic Signal  Miscellaneous (SPECIFY BELOW) The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as follows: Name(s) of street(s) and/or street address: Utility Work Order #: Start Date: End Date: In consideration of granting this application, all applicants including utility companies hereby agree to: 1. If applicable, submit two (2) sets of Construction Drawings along with two (2) sets of the appropriate Traffic Control Plans, proof of City Business License for all parties involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control Plan Checklist for details. 2. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or dam age to persons or property happening or occurring as a proximate result of any work under taken under the permit granted pursuant to this application. (See below for specific liability insurance requirements.) 3. Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City Engineer. 4. Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The developer/general contractor must be present for the timely request of inspections. 5. Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction. LIABILITY INSURANCE REQUIREMENTS PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED. THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT ENCROACH MENT PERMIT. After the Fact- Leak Repaired- Paving Needed (1) 12x3 Asphalt cut, (1) 3x3 Asphalt cut. 27717 Jefferson Ave Cross St: Via Montezuma 52-3490761 ASAP (Pending Permit) ASAP (Pending Permit) LD23-6119 CLEARED BY CITY OF TEMECULA PUBLIC WORKS david.pina 09/21/2023 09/21/2023 09/21/2023 09/21/20 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\FORMS\Permit Applications\Encroachment Permit App.docx Page 2 of 2 Revised: 06/03/2019 Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum limits of insurance coverage shall be as follows: a.General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b.Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage. c.Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident for bodily injury or disease. d.Course of Construction: Completed value of the project. There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approach located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the encroachment permit: BODILY INJURY $250,000.00 EACH PERSON $500,000.00 EACH OCCURANCE $500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS PROPERTY DAMAGE $100,000.00 EACH OCCURANCE $250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing the City named as an additional insured shall be attached to the application. The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges that this application will be made a part of the encroachment permit. APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED) Company Name: Mailing Address: Contact: Phone #: E-mail: I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the permittee and bind the permittee to the agreements contained herein and any conditions of the permit. Authorized Signature: Date Applied: CONTRACTOR’S INFORMATION Company Name: Mailing Address: Contact: Phone #: 24-HR Emergency #: State Contractor’s License #: Class: City Business License #: Shane Lyman 1-951-727-0305 A 1801 Atlantic Blvd, Monterey Park CA 91754 Sandy Khoury 213-231-3448 skhoury@socalgas.com Southern California Gas Company NPL Construction Co. 19820 N. 7th Ave, Phoenix AZ 85027 732974 09/21/2023