Loading...
HomeMy WebLinkAboutLD24-1184Permit Number: LD24-1184 LD - Utilities/ Excavation - Parallel Issued: 06/11/2024 Expired: 01/13/2025 Job Address: 39540 Winchester Rd Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Nikki Sannicolas 4280 Latham St, Suite G Riverside, CA 92501 Applicant: Veronica Barrozo 2042 S. Grove Ave Ontario, CA 91761 (909) 721-3785 Contractor: Utility Work Order Number: 5055315 Description: Charter 5055315 WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am MONDAY - FRIDAY 9:00am - 2:30pm PER J.W. Location: Winchester Rd E/S 975' N/O Willows Ave Proposed work: Traffic control only, work is outside city limits. Only traffic control spills into city. All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD24-1184 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD24-1184 LD - Utilities/ Excavation - Parallel project. Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date Page 2 of 3 Permit Number: LD24-1184 LD - Utilities/ Excavation - Parallel City Engineer or Authorized Representative Date 06/11/2024 Page 3 of 3 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020 APPLICATION INFORMATION PERMIT NO.: Type of Encroachment:  Street/Storm Drain  Sewer/Water  Utility Trenching  Signing & Striping  Traffic Signal  Miscellaneous (SPECIFY BELOW) The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as follows: Name(s) of street(s) and/or street address: Utility Work Order #: Start Date: End Date: In consideration of granting this application, all applicants including utility companies hereby agree to: 1. If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control Plan Checklist for details. 2. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. (See below for specific liability insurance requirements.) 3. Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City Engineer. 4. Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The developer/general contractor must be present for the timely request of inspections. 5. Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction. LIABILITY INSURANCE REQUIREMENTS PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED. THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT ENCROACHMENT PERMIT. X Bore/trench to place new vault. Trench from vault to private property. 39224 Winchester Rd PID # 5055315 4/22/2024 4/26/2024 LD24-1184 CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 04/16/2024 04/16/2024 04/16/2024 04/16/20 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020 Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum limits of insurance coverage shall be as follows: a.General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b.Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage. c.Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident for bodily injury or disease. d.Course of Construction: Completed value of the project. There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approac h located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the encroachment permit: BODILY INJURY $250,000.00 EACH PERSON $500,000.00 EACH OCCURANCE $500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS PROPERTY DAMAGE $100,000.00 EACH OCCURANCE $250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing the City named as an additional insured shall be attached to the application. The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges that this application will be made a part of the encroachment permit. APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED) Company Name: Mailing Address: Contact: Phone #: E-mail: I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the permittee and bind the permittee to the agreements contained herein and any conditions of the permit. Authorized Signature: Date Applied: CONTRACTOR’S INFORMATION Company Name: Mailing Address: Contact: Phone #: 24-HR Emergency #: State Contractor’s License #: Class: City Business License #: 7337 Central Ave, Riverside, CA 92504 permits@unitedfibercomm.com Charter 3/20/24 951-742-5836 HHS 2042 S. Grove Ave Ontario, CA 91761 Veronica Barrozo (909) 721-3785 (909) 721-3785 81890 6 A, B, C-7, C10, C31 049178 Melissa Contreras AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATION FOR TRAFFIC CONTROL PLANS UNDERGROUND CONSTRUCTION 39224 WINCHESTER RD CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. ERICK ESCOBEDO TRAFFIC ENGINEER 3002 Spectrum Charter ENGINEERING CONSTRUCTION 4 CURTIS COOBS, PE STERLING ENGINEERING 951-737-9400 CURTIS@STERLINGSE.COM LD24-118408-24-6-BB-0482CALTRANS PERMIT NO. 5055315 VICINITY MAP TRAFFIC CONTROL PLANS FOR UNDERGROUND CONSTRUCTION 39224 WINCHESTER RDAREA MAP: TRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20): NO SCALE 1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS , ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694 -6411. 13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH. 18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES. JOB SITE 1 EXISTING NO TURN LANE FLASHING ARROW SIGN TRAILER (TYP.) C L O S E D R O A D CLOSED LEFT LANE AHEAD END DETOURROAD WORK ONLY CREW SURVEYCLOSED ROAD AHEAD RIGHT AHEAD DETOUR USE OTHER SIDE RIGHT KEEP TURN RIGHT M U S T RIGHT LANE NOT PASS SIDEWALK CLOSED DO STOP SLOW CLOSED LANE TO STOP PREPARED SHOULDER WORK WORK AHEAD ROAD MACHINERY AHEAD END ROAD CLOSED LOCAL TRAFFIC ONLY TO THRU TRAFFIC ROAD CLOSED FRESH OIL ROAD DETOUR SHOULDER SOFTPAVEMENT ENDS AHEAD TRAFFIC CONE FLASHING ARROW SIGN (FAS) EXISTING TURN ONLY LANE BARRICADE WORK ZONE (FAS) TRAFFIC SIGNAL HIGH LEVEL WARNING DEVICE (WITH CALTRANS & MUTCD CODE) SIGN (WITH CALTRANS CODE) TRAFFIC FLOW DIRECTION FLAGGER S (HLWD) HIGH LEVEL WARNING DEVICE TRAFFIC CONE POST TUBE LANE CLOSEDROAD ROUGH XX MPH NARROWS ROAD W20-2 R11-2 R11-3A R11-4 W21-3 M4-8A C9A(CA) M4-10 W21-2 W21-7 AHEAD UTILITY WORK G20-2 W20-4 W20-1 W21-5W21-1AW20-5W20-3 ONE LANE AHEAD ROAD W3-4 C30(CA)C28B(CA) W21-6 W8-7 BE R3-5 R9-10 R4-7BR4-1 R9-3A R1-1 R3-7R3-2R3-1 R3-4 R3-18 W6-4 W5-1W4-2 W13-1 W1-2 W1-4W1-3W1-1 W8-4W8-3 W8-8 W4-1W1-8 W9-3 W1-6 W12-1W6-3 R3-17 BIKE LANE R5-6 GRAVEL LOOSE MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP) L WOS DAEHA (CMS) CHANGEABLE MESSAGE SIGN TRAILER (TYP.) R3-6 SIDEWALK R9-9 CLOSED R9-11A CENTER DETOUR M4-8 C28A(CA) ENDS AHEAD R3-17B R3-17A BEGIN RIGHT TURN LANE YIELD TO BIKES R4-4 RIGHT KEEP R4-7AR4-7 CROSS HERE SIDEWALK CLOSED R9-11 AHEAD CROSS HERE SIDEWALK CLOSED AHEAD LANE NARROW C12(CA) TRENCH OPEN C27(CA) WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND REGULATORY SIGNS CONE SPACING - 25' MAXIMUM STOP WI N C H E S T E R R D MURRIE T A H O T S P R I N G S R D SKY C A N Y O N D R WORKING HOURS SUNDAY - THURSDAY NOTE: WORK DURATION: 1-2 DAYS 9:00 P.M. - 5:00 A.M. R I S I N G H I L L D R BON A I R E W A Y SCOPE OF WORK: CONT. BORE/TRENCH TO PLACE NEW VAULT. TRENCH FROM VAULT TO PRIVATE PROPERTY. MURRIETA, CA 92563 5/16/24 Exp 6/30/26 05/28/24 6/5/2024 G20-2 END ROAD WORK S RAIS E D M E D I A N RA I S E D M E D I A N 45MP H DW DW SIDE W A L K LAND S C A P E SIDE W A L K SIDE W A L K SIDE W A L K RA I S E D M E D I A N 350' SI D E W A L K G20-2 END ROAD WORK W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK DW DW 45MPH 350' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK SIDEWA L K SIDEWA L K SI D E W A L K ST O P BU S SI D E W A L K 55 M P H WI N C H E S T E R R D NICOL A S R D NICO L A S R D W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK 35 0 ' CLOSED BIKE LANE AHEAD W20-5 (BIKE) RIGHT LANE CLOSED AHEAD C20 (CA)2___ G20-2 END ROAD WORK 35 0 ' DW 55 M P H DW SID E W A L K SI D E W A L K SID E W A L K DW RA I S E D M E D I A N WI N C H E S T E R R D 35 0 ' 35 0 ' W4-2(R) AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATION FOR TRAFFIC CONTROL PLANS UNDERGROUND CONSTRUCTION 39224 WINCHESTER RD CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. ERICK ESCOBEDO TRAFFIC ENGINEER 3002 Spectrum Charter ENGINEERING CONSTRUCTION 4 CURTIS COOBS, PE STERLING ENGINEERING 951-737-9400 CURTIS@STERLINGSE.COM LD24-118408-24-6-BB-0482CALTRANS PERMIT NO. 5055315 2 WORKING HOURS SUNDAY - THURSDAY NOTE: WORK DURATION: 1-2 DAYS 9:00 P.M. - 5:00 A.M. PHASE 1 OF 1 SCALE: 1"=40' 0 20' 40' 60' SCOPE OF WORK: TEMPORARY "NO PARKING" SIGNS SHALL BE INSTALLED AT LEAST 72 HOURS BEFORE ENFORCEMENT. AN INDIVIDUAL WILL BE ASSIGNED TO MAINTAIN THE CONES WHILE THE WORK ZONE IS IN PLACE CONTRACTOR TO PROVIDE ACCESS TO DRIVEWAYS AT ALL TIMES CONT. BORE/TRENCH TO PLACE NEW VAULT. TRENCH FROM VAULT TO PRIVATE PROPERTY. A MATC H L I N E A - A A A MATC H L I N E A - A A B MAT C H L I N E B - B B SEE S H E E T 3 5/16/24 Exp 6/30/26 05/28/24 25 M P H ST O P RA I S E D M E D I A N DW TUCALOTA C R E E K UNDERP A S S DW DW DW 100' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK UNDERPASS TUCALOT A C R E E K SI D E W A L K SI D E W A L K SI D E W A L K SIDE W A L K SIDE W A L K LA N D S C A P E LA N D S C A P E RU S T I C G L E N D R 55 M P H WI N C H E S T E R R D 22 0 ' SH O U L D E R T A P E R 35 0 ' W16-1 ROAD SHARE THE W11-1 RA I S E D M E D I A N RA I S E D M E D I A N LANE C30 (CA) CLOSED 55 M P H WI N C H E S T E R R D W4-2(R) 33 0 ' TA N G E N T 66 0 ' ME R G I N G T A P E R RA I S E D M E D I A N S RA I S E D M E D I A N 25 M P H 35 M P H ST O P BU S S/ W D W L/ S SI D E W A L K LA N D S C A P E LA N D S C A P E SID E W A L K SID E W A L K SI D E W A L K SID E W A L K LA N D S C A P E 55 M P H 66 0 ' ME R G I N G T A P E R 250' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK 100 ' W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK G20-2 END ROAD WORK 12'34' G20-2 END ROAD WORK LANE C30 (CA) CLOSED SET SIGNALIZED INTERSECTION TO FLASH RED DURING WORK HOURS. 10 0 ' TA N G E N T W12-1 R3-7(R) MUST RIGHT LANE TURN RIGHT 22' 12' 12' 34' WI N C H E S T E R R D WIN C H E S T E R C R E E K A V E WIL L O W S A V E AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATION FOR TRAFFIC CONTROL PLANS UNDERGROUND CONSTRUCTION 39224 WINCHESTER RD CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. ERICK ESCOBEDO TRAFFIC ENGINEER 3002 Spectrum Charter ENGINEERING CONSTRUCTION 4 CURTIS COOBS, PE STERLING ENGINEERING 951-737-9400 CURTIS@STERLINGSE.COM LD24-118408-24-6-BB-0482CALTRANS PERMIT NO. 5055315 3 SCALE: 1"=40' 0 20' 40' 60' C MATCHLINE C-C C B MAT C H L I N E B - B B SEE S H E E T 2 C MATCHLINE C-C C D MATCHLINE D-D D D MATCHLINE D-D D E MATCHLINE E-E E SEE SHEET 4 WORKING HOURS SUNDAY - THURSDAY NOTE: WORK DURATION: 1-2 DAYS 9:00 P.M. - 5:00 A.M. PHASE 1 OF 1, CONT. TEMPORARY "NO PARKING" SIGNS SHALL BE INSTALLED AT LEAST 72 HOURS BEFORE ENFORCEMENT. AN INDIVIDUAL WILL BE ASSIGNED TO MAINTAIN THE CONES WHILE THE WORK ZONE IS IN PLACE SCOPE OF WORK: CONT. BORE/TRENCH TO PLACE NEW VAULT. TRENCH FROM VAULT TO PRIVATE PROPERTY. 5/16/24 Exp 6/30/26 05/28/24 RA I S E D M E D I A N ST O P BU S LA N D S C A P E SID E W A L K LA N D S C A P E LA N D S C A P E 86 1 ' BU F F E R LANE C30 (CA) CLOSED 12' 34' 55 M P H WIN C H E S T E R R D 55 M P H RA I S E D M E D I A N DW RA I S E D M E D I A N RA I S E D M E D I A N DW DW DW LA N D S C A P E SI D E W A L K SID E W A L K LA N D S C A P E LA N D S C A P E LA N D S C A P E LA N D S C A P E S 12' 34' 12' 34' 50 0 ' G20-2 END ROAD WORK W20-1 AHEAD ROAD WORK AHEAD ROAD WORK AHEAD ROAD WORK RA I S E D M E D I A N LANE C30 (CA) CLOSED LA N D S C A P E WI N C H E S T E R R D AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATION FOR TRAFFIC CONTROL PLANS UNDERGROUND CONSTRUCTION 39224 WINCHESTER RD CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. ERICK ESCOBEDO TRAFFIC ENGINEER 3002 Spectrum Charter ENGINEERING CONSTRUCTION 4 CURTIS COOBS, PE STERLING ENGINEERING 951-737-9400 CURTIS@STERLINGSE.COM LD24-118408-24-6-BB-0482CALTRANS PERMIT NO. 5055315 4 SCALE: 1"=40' 0 20' 40' 60' E MATCHLINE E-E E SEE SHEET 3 F MATCHLINE F-F F F MATCHLINE F-F F WORKING HOURS SUNDAY - THURSDAY NOTE: WORK DURATION: 1-2 DAYS 9:00 P.M. - 5:00 A.M. PHASE 1 OF 1, CONT. TEMPORARY "NO PARKING" SIGNS SHALL BE INSTALLED AT LEAST 72 HOURS BEFORE ENFORCEMENT. AN INDIVIDUAL WILL BE ASSIGNED TO MAINTAIN THE CONES WHILE THE WORK ZONE IS IN PLACE CONTRACTOR TO PROVIDE ACCESS TO DRIVEWAYS AT ALL TIMES SCOPE OF WORK: CONT. BORE/TRENCH TO PLACE NEW VAULT. TRENCH FROM VAULT TO PRIVATE PROPERTY. AN INDIVIDUAL WILL BE ASSIGNED TO MAINTAIN THE CONES WHILE THE WORK ZONE IS IN PLACE 5/16/24 Exp 6/30/26 05/28/24 1 NORTHSCALE N.T.S. SITE PLAN SCOPE OF WORK: TIE INTO EXISTING POLE. OVERLASH FROM POLE TO POLE. RISER DOWN FROM POLE TO PLACE NEW VAULT. BORE/TRENCH FROM VAULT TO PLACE NEW VAULT. TRENCH FROM VAULT TO PRIVATE PROPERTY. OF 1 PROJECT:5055315 39224 WINCHESTER RD MURRIETA, CA 92563 DATE:03/14/24 ADDRESS: REVISIONS:Spectrum Charter ENGINEERING CONSTRUCTION TARGET LOCATION EXIST. UTILITY POLE NEW VAULT EXIST. UTILITY POLE NEW RISER NEW UNDERGROUND NEW UNDERGROUND NEW VAULT NEW UNDERGROUND OVERLASH STUB OUT CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 04/16/2024 04/16/2024 04/16/2024 04/16/20