HomeMy WebLinkAboutLD24-1576Permit Number: LD24-1576
LD - Utilities/ Utility Maintenance
Issued: 04/15/2024
Expired: 10/28/2024
Job Address: Wellington Cir S/S 150' W/O Calle Medusa
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Southern California Edison
(Utility Billing)
24487 Prielipp
Wildomar, CA 92595
(951) 440-9074
Applicant:
Ferreira Construction Co., Inc.
10370 Commerce Center Drive, B-200
Rancho Cucamonga, CA 91730
(909) 606-5900
Contractor:
Utility Work Order Number: 904313078
Description:
SCE 904313078: Wellington Cir S/S 150' W/O Calle Medusa
WORK HOURS SHALL BE MONDAY – FRIDAY, NO HOLIDAYS, 8:30am - 3:30pm
Proposed work:
Replace damaged pullbox
Permitee Date
City Engineer or Authorized Representative Date
04/15/2024
Page 1 of 1
UCC #: 904313078 -200 D: 88 / SH
PR245005 / C-3317
WO #: 904313078
DIMP due date: 07/04/24
DIMP
1
Michelle Y Ramirez
From:Environmental Requirements
Sent:Friday, January 5, 2024 11:54 AM
To:Sarah Stark
Cc:Environmental Requirements; UG Civil Mailbox San Jacinto Region; Greg Cagle; Scott
Hyde; Kenneth Hansen; Daniel Mariscal
Subject:eERD Environmental Standard Measures: O&M Environmental Requirements: San
Jacinto 5 order numbers and 5 structures 06/11/2024
Attachments:411660336.pdf; 413117920.pdf; 412383186.pdf; 411694958.pdf; 412268270.pdf
Note: This is email 1 of 2 for the below request and includes structures 5358713, 5624470, 5357910, 5056895, and
5367690 ONLY. The additional structure (1894800E) will be addressed in a separate email.
Sarah,
Thank you for your request. The following work will not require environmental support:
Order number Structure number Scope of work Working
date
904313077 5358713 Replace secondary handhole 6/11/2024
904308591 5624470 Install bollards around splice box 6/22/2024
904313076 5357910 Handhole replacement 6/27/2024
904313071 5056895 Replace secondary handhole 7/1/2024
904313078 5367690 Splice box lid replacement and grade ring/retaining wall 7/4/2024
Please have the crew follow the environmental standard measures listed below. Please contact (833)SCE-2ENC for any
change in the scope of work or if you have any additional questions or concerns.
The following Environmental Standard Measures must be available on-site at all times and be read and understood by
the crew before work commences. You may proceed with the following environmental requirements:
Tailboard Briefing: The Environmental Requirements must be kept on site and be read to the crew prior to starting work. If any of
the requirements create a safety or scope concern, please contact Environmental Services. If additional ground disturbing or
vegetation clearing activities are proposed during project activities, stop work and contact Environmental Services.
No Overland Travel or Cutting Paths: Stay on existing paved or maintained dirt roads (two-tracks routes are overland travel and not
approved under this measure). No trimming or removal of vegetation to create new or widen existing foot paths can occur. Overland
routes must be approved by SCE Environmental Services prior to work.
No Vegetation Impacts: No vegetation/tree removal or trimming/mowing/brushing may occur. If there is a change in scope, contact
Environmental Services.
Scope of Work Authorization: The following ERD conditions apply to the work outlined in the Scope of Work provided to ESD. Any
changes or additions, including but not limited to construction means and methods, equipment identified, materials used, extent of
grading, scope of vegetation impacting activities, add-ons, or proposed access routes, must be reviewed and released by SCE
Environmental prior to the start of work.
Minimize work area: The work area shall be minimized to the smallest area necessary to complete the work.
2
Crew Check: Prior to starting work, crews will check the workspace for bird nests (e.g., pole cavities, vegetation to be
removed). Contact the biological monitor or call the number above prior to work within 200 feet of an active nest.
Cavity Nests: Prior to starting work, crews will check the workspace for cavities in poles and trees. Crews will tap l oudly on poles and
trees with potential cavity nests and watch for wildlife leaving the cavity or the sounds of young birds inside the cavity. If an active
cavity nest is suspected, crew must STOP WORK and contact SCE Environmental Services prior to work.
Injured/Trapped Wildlife: Prior to the start of work, crews will inspect their workspace for any injured or dead wildlife. In addition,
look in holes and trenches, construction material, and equipment for any trapped wildlife. Call the number above if you observed
dead, injured, or trapped wildlife.
Spill Release/Prevention: Vehicles/equipment must be inspected for leaks (e.g., fuel, oil, hydraulic fluids, etc.) and repaired prior to
work. Storing, fueling, and maintenance shall not occur locations where spilled materials could potentially enter a wetland,
waterway, or riparian area. Spill kits/absorbent clean-up materials shall be available on-site and if used, disposed of properly. All
releases to the environment must be reported to your SCE Representative and 844-GOT-SPIL (844-468-7745).
Avoid Waters and Wetlands: No work is allowed within waters or riparian vegetation unless there are Site-Specific Environmental
Requirements authorizing such work and all necessary permits have been issued. If wetlands, waters, and riparian vegetation are
encountered with no Site-Specific Environmental Requirements – STOP WORK and contact SCE Environmental Services.
Driving on road through waters (wet or dry): Only rubber wheeled vehicles and equipment are allowed to travel through drivable
water crossings on existing access roads. No grading or road improvements/repairs/alterations (e.g., damming, diversions, fill,
placement of plates or boards, etc.) are allowed within these areas unless reviewed and released by SCE Environmental. No sto pping
within flowing or standing water. Crews shall avoid water crossings when soils are too wet/muddy to support the vehicle without
creating ruts or causing the vehicle to become stuck.
Unanticipated groundwater: For ground disturbance work, if unanticipated groundwater is encountered, STOP WORK and contact
SCE Environmental.
Archaeological/Human Remains/Paleontological Discoveries: If Archaeological resources (Native American or historical artifacts),
fossils, or human remains are encountered, STOP WORK, and call 833-SCE-2ENC and ask for an on-call Archaeologist.
Site re-contouring: Upon project completion, all disturbed areas must be returned to meet pre-existing contours (i.e., original line
and grade).
Weed Maintenance and Prevention: Use certified weed-free materials (e.g., gravel, straw, and fill) to the extent practicable.
Maintain facilities and infrastructure to limit the introduction and spread of weeds.
Dust Control: No visible dust plumes are allowed. If dust plumes are observed, then slow speeds on dirt roads, water dirt/work
areas, or work when the soil is not extremely dry.
Generator Usage: Generators are not allowed unless a Generator Ordering Form (GOF) has been completed 20 days prior to
work. Contact Transportation Services Department (951) 440-8370 to verify if a form has been received; if no form has been
submitted, contact the SCE representative to complete this form immediately.
From: Sarah Stark <sarah.p.stark@sce.com>
Sent: Friday, January 5, 2024 7:30 AM
To: Environmental Requirements <EnvironmentalRequirements@sce.com>
Cc: UG Civil Mailbox San Jacinto Region <UGCivilMailboxSanJacintoRegion@sce.com>; Greg Cagle
<Greg.Cagle@sce.com>; Scott Hyde <Scott.Hyde@sce.com>; Kenneth Hansen <Kenneth.Hansen@sce.com>; Daniel
Mariscal <Daniel.Mariscal@sce.com>
Subject: RE: Request for Information: 88 - Civil Request for DIMP (1.4.2024 request)
Good morning,
3
Notification 411660336 is there now. Sorry about the oversight.
Sarah P. Stark
Performance & Resource Specialist
Wildomar Service Center
Southern California Edison
Sarah.P.Stark@sce.com
O: 951.249.8442 | C: 951.397.1326
From: Environmental Requirements <EnvironmentalRequirements@sce.com>
Sent: Friday, January 5, 2024 7:26 AM
To: Sarah Stark <sarah.p.stark@sce.com>
Cc: Environmental Requirements <EnvironmentalRequirements@sce.com>; UG Civil Mailbox San Jacinto Region
<UGCivilMailboxSanJacintoRegion@sce.com>; Greg Cagle <Greg.Cagle@sce.com>; Scott Hyde <Scott.Hyde@sce.com>;
Kenneth Hansen <Kenneth.Hansen@sce.com>; Daniel Mariscal <Daniel.Mariscal@sce.com>
Subject: Request for Information: 88 - Civil Request for DIMP (1.4.2024 request)
Hi Sarah,
Notification 411660336 – 904313077 is not located in the link below. Please attach or upload the notification document.
Thank you.
From: Sarah Stark <sarah.p.stark@sce.com>
Sent: Thursday, January 4, 2024 5:25 PM
To: UG Civil Mailbox San Jacinto Region <UGCivilMailboxSanJacintoRegion@sce.com >; Environmental Requirements
<EnvironmentalRequirements@sce.com>
Cc: Greg Cagle <Greg.Cagle@sce.com>; Scott Hyde <Scott.Hyde@sce.com>; Kenneth Hansen
<Kenneth.Hansen@sce.com>; Sarah Stark <sarah.p.stark@sce.com>; Daniel Mariscal <Daniel.Mariscal@sce.com>
Subject: 88 - Civil Request for DIMP (1.4.2024 request)
Good afternoon,
We are requesting civil for the following DIMP notification:
NOTIFICATION ORDER DUE DATE
1. 411660336 904313077 06/11/2024
2. 413117920 904308591 06/22/2024
3. 412383186 904313076 06/27/2024
4. 411694958 904313071 07/01/2024
5. 412268270 904313078 07/04/2024
6. 412944253 904313117 07/07/2024
@Environmental Requirements please provide civil with clearance for this job.
Please access link for notification: 2024 CIVIL DIMPS
(IF YOU ARE UNABLE TO ACCESS THE FILE LINK, PLEASE EMAIL ME DIRECTLY).
Sarah P. Stark
Performance & Resource Specialist
4
Wildomar Service Center
Southern California Edison
Sarah.P.Stark@sce.com
O: 951.249.8442 | C: 951.397.1326
STOP
**
TO BE DETERMINED BY
THE CITY OF TEMECULA**
RE
V
'
D
0
4
/
0
3
/
23