Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LD24-2777
Permit Number: LD24-2777 LD - Utilities/ Access to Utility Agency Facilities Issued: 09/03/2024 Expired: 03/11/2025 Job Address: 42301 Zevo Dr Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Frontier California Inc. 401 Merritt 7 Norwalk, CT 06851 (000) 000-0000 Applicant: Gulbranson Services Inc. 15371 Bonanza Rd Unit A, Victorville, CA 92392 (760) 843-0330 Contractor: Utility Work Order Number: 70116-5360050 Description: Frontier 70116-5360050 WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am Location: MH177 - Rancho California Rd S/S 30' E/O Diaz Rd MH189 - Diaz Rd W/S 255' N/O Black Deer Loop MH232 - Diaz Rd W/S 1370' S/O Rancho Way MH237 - Diaz Rd W/S 400' S/O Black Deer Loop MH243 - Diaz Rd W/S 460' N/O Rancho Way MH245 - Diaz Rd W/S 90' N/O Via Montezuma MH279 - Old Town Front St W/S 90' S/O Moreno Rd MH1080 - Diaz Rd S/S 165' E/I Winchester Rd MH1100 - Winchester Rd E/S 100' N/O Zevo Rd MH1101 - Winchester Rd E/S 230' S/O Remington Ave Access ten (10) manholes as shown on Frontier "SITE PLAN 42301 ZEVO DR, LD24-2777" All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD24-2777 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Page 1 of 3 Permit Number: LD24-2777 LD - Utilities/ Access to Utility Agency Facilities Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project. Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Page 2 of 3 Permit Number: LD24-2777 LD - Utilities/ Access to Utility Agency Facilities ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Permitee Date City Engineer or Authorized Representative Date 09/03/2024 Page 3 of 3 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\FORMS\Permit Applications\Encroachment Permit App.docx Page 1 of 2 Revised: 06/03/2019 APPLICATION INFORMATION PA No.: PERMIT NO.: Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching Signing & Striping Traffic Signal Miscellaneous (SPECIFY BELOW) The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as follows: Name(s) of street(s) and/or street address: Utility Work Order #: Start Date: End Date: In consideration of granting this application, all applicants including utility companies hereby agree to: 1. If applicable, submit two (2) sets of Construction Drawings along with two (2) sets of the appropriate Traffic Control Plans, proof of City Business License for all parties involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control Plan Checklist for details. 2. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or dam age to persons or property happening or occurring as a proximate result of any work under taken under the permit granted pursuant to this application. (See below for specific liability insurance requirements.) 3. Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City Engineer. 4. Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The developer/general contractor must be present for the timely request of inspections. 5. Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction. LIABILITY INSURANCE REQUIREMENTS PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED. THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT ENCROACH MENT PERMIT. Rancho Way; S/S/O Diaz Rd, E/O Winchester Rd; W/S/O Old Town Front St, S/O Rancho California Rd; S/S/O Diaz Rd, W/O Via Montezuma; W/S/O Diaz Rd, S/O Sarah Way; W/S/O Diaz Rd, S/O Ave Alvarado E/S/O Winchester Rd, S/O Remington Rd; E/S/O Winchester Rd, N/O Zevo Dr; S/S/O Rancho California Rd, E/O Vincent Moraga Dr; W/S/O Diaz Rd, S/O Via Dos Picos; W/S/O Diaz Rd, S/O Frontier to access (2) existing manholes to place and splice +/- 650 linear feet of new cable within existing conduit; access (8) existing manholes to splice existing cable to provide service to customer located at 42301 Zevo Dr Duration of Work: 4 Days Frontier Engineer: Raul Rivas (909) 406-3178 70116-5360050 07/09/24 10/09/24 4 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\FORMS\Permit Applications\Encroachment Permit App.docx Page 2 of 2 Revised: 06/03/2019 Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum limits of insurance coverage shall be as follows: a. General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b. Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage. c. Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident for bodily injury or disease. d. Course of Construction: Completed value of the project. There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approach located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the encroachment permit: BODILY INJURY $250,000.00 EACH PERSON $500,000.00 EACH OCCURANCE $500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS PROPERTY DAMAGE $100,000.00 EACH OCCURANCE $250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing the City named as an additional insured shall be attached to the application. The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges that this application will be made a part of the encroachment permit. APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED) Company Name: Mailing Address: Contact: Phone #: E-mail: I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the permittee and bind the permittee to the agreements contained herein and any conditions of the permit. Authorized Signature: Date Applied: CONTRACTOR’S INFORMATION Company Name: Mailing Address: Contact: Phone #: 24-HR Emergency #: State Contractor’s License #: Class: City Business License #: Frontier California Inc 1400 Phillips Blvd, Pomona CA 91766 Debbie WIlliams (909) 798-4400 permits@mountaintcs.com 06/25/24 Gulbranson Services Inc (GSI) 14369 Park Ave, St 201B, Victorville CA 92392 Alexandra Stith (760) 843-0330 ext 5 890841 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 9 SHEET CITY OF TEMECULA PUBLIC WORKS 70116-5360050 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 MARK REVISIONS BY APPR.DATE CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. CITY OF TEMECULA PUBLIC WORKS MARK REVISIONS BY APPR.DATE 10 8 ' 50 ' 58 ' 88 ' 50 ' 38 ' 10 0 ' 50' 50' 76' 38' 38'44 ' 16 5 ' CONTRACTOR:FOR CITY USE ONLY:DRAWINGNO.SHEETOF9SHEETCITY OF TEMECULAPUBLIC WORKS70116-5360050ENGINEER'S INFORMATIOND. LYNN PARKERP.O. BOX 1666COTTONWOOD, AZ 86326(909) 472-9983MARKREVISIONSBYAPPR.DATE 108'50' 58' 88' 50' 38' 100' 50' 50' 76' 38' 38'44'165' 100'50' 50' 76'38' 38' 80' 40' 40'56' 28' 28' 47' 97' 46' 228' 36' 37' 37' 80' 40' 40' 56'28' 28' 80'40' 40' 56' 28' 28' 80' 40' 40' 56' 28' 28' 1,054' TO DIAZ C / L 1,930' TO DIAZ C/L 296' TO WINCHESTER R D C / L CONTRACTOR:FOR CITY USE ONLY:DRAWINGNO.CITY OF TEMECULAPUBLIC WORKSCONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*FRONTIER ENGINEER:??????###-###-####REFERENCE CITY STANDARDDRAWING NO. 18 AND PG. 075CHART ACONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*FRONTIER ENGINEER:??????###-###-####REFERENCE CITY STANDARDDRAWING NO. 18 AND PG. 075CHART A ENGINEER'S INFORMATIONCONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*D. LYNN PARKERP.O. BOX 1666COTTONWOOD, AZ 86326(909) 472-99832295ALI M. SHAHZADTRAFFIC ENGINEERMARKREVISIONSBYAPPR.DATE SITE PLAN FOR DIAZ RD & WINCHESTER RD SITE PLAN 42301 ZEVO DR PROJECT LOCATION 1FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project. SCALE: 1"=40' MH#1080 LOCATION (SPLICE POINT) LD24-2777 CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 08/05/2024 08/05/2024 08/05/2024 08/05/20 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 9 SHEET CITY OF TEMECULA PUBLIC WORKS 70116-5360050 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 MARK REVISIONS BY APPR.DATE CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. CITY OF TEMECULA PUBLIC WORKS MARK REVISIONS BY APPR.DATE 46 ' 228' CONTRACTOR:FOR CITY USE ONLY:DRAWINGNO.SHEETOF9SHEETCITY OF TEMECULAPUBLIC WORKS70116-5360050ENGINEER'S INFORMATIOND. LYNN PARKERP.O. BOX 1666COTTONWOOD, AZ 86326(909) 472-9983MARKREVISIONSBYAPPR.DATE 108'50' 58' 88' 50' 38' 100' 50' 50' 76' 38' 38'44'165' 100'50' 50' 76'38' 38' 80' 40' 40'56' 28' 28' 47' 97' 46' 228' 36' 37' 37' 80' 40' 40' 56'28' 28' 80'40' 40' 56' 28' 28' 80' 40' 40' 56' 28' 28' 1,054' TO DIAZ C / L 1,930' TO DIAZ C/L 296' TO WINCHESTER R D C / L CONTRACTOR:FOR CITY USE ONLY:DRAWINGNO.CITY OF TEMECULAPUBLIC WORKSCONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*FRONTIER ENGINEER:??????###-###-####REFERENCE CITY STANDARDDRAWING NO. 18 AND PG. 075CHART ACONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*FRONTIER ENGINEER:??????###-###-####REFERENCE CITY STANDARDDRAWING NO. 18 AND PG. 075CHART A ENGINEER'S INFORMATIONCONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*D. LYNN PARKERP.O. BOX 1666COTTONWOOD, AZ 86326(909) 472-99832295ALI M. SHAHZADTRAFFIC ENGINEERMARKREVISIONSBYAPPR.DATE PROJECT LOCATION 2FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN FOR WINCHESTER RD & REMINGTON RD MH#1101 LOCATION (SPLICE POINT) SITE PLAN 42301 ZEVO DR LD24-2777 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 9 SHEET CITY OF TEMECULA PUBLIC WORKS 70116-5360050 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 MARK REVISIONS BY APPR.DATE CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. CITY OF TEMECULA PUBLIC WORKS MARK REVISIONS BY APPR.DATE CONTRACTOR:FOR CITY USE ONLY:DRAWINGNO.SHEETOF9SHEETCITY OF TEMECULAPUBLIC WORKS70116-5360050ENGINEER'S INFORMATIOND. LYNN PARKERP.O. BOX 1666COTTONWOOD, AZ 86326(909) 472-9983MARKREVISIONSBYAPPR.DATE 108'50' 58' 88' 50' 38' 100' 50' 50' 76' 38' 38'44'165' 100'50' 50' 76'38' 38' 80' 40' 40'56' 28' 28' 47' 97' 46' 228' 36' 37' 37' 80' 40' 40' 56'28' 28' 80'40' 40' 56' 28' 28' 80' 40' 40' 56' 28' 28' 1,054' TO DIAZ C / L 1,930' TO DIAZ C/L 296' TO WINCHESTER R D C / L CONTRACTOR:FOR CITY USE ONLY:DRAWINGNO.CITY OF TEMECULAPUBLIC WORKSCONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*FRONTIER ENGINEER:??????###-###-####REFERENCE CITY STANDARDDRAWING NO. 18 AND PG. 075CHART ACONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*FRONTIER ENGINEER:??????###-###-####REFERENCE CITY STANDARDDRAWING NO. 18 AND PG. 075CHART A ENGINEER'S INFORMATIONCONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*D. LYNN PARKERP.O. BOX 1666COTTONWOOD, AZ 86326(909) 472-99832295ALI M. SHAHZADTRAFFIC ENGINEERMARKREVISIONSBYAPPR.DATE 1 0 0 ' 5 0 ' 5 0 ' 7 6 ' 3 8 ' 3 8 ' 80' 40'40' 56' 28'28' 47 ' 97' 3FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project. SITE PLAN 42301 ZEVO DR SITE PLAN FOR WINCHESTER RD & ZEVO RD MH#1100 LOCATION (SPLICE POINT) PROJECT LOCATION SCALE: 1"=60' LD24-2777 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 9 SHEET CITY OF TEMECULA PUBLIC WORKS 70116-5360050 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 MARK REVISIONS BY APPR.DATE CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. CITY OF TEMECULA PUBLIC WORKS MARK REVISIONS BY APPR.DATE 21' 31' 134 ' 62' 72' 112' 46' 66' 33' 33' 66' 44' 44'88' 24' MH#279 LOCATION (SPLICE POINT) 3 5 ' 3 2 ' C U R B C / L R O W C U R B R O W DWY DWY 8 9 ' T O C / L 4FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN 42301 ZEVO DR PROJECT LOCATION SITE PLAN FOR OLD TOWN FRONT ST & MORENO RD CUR B C/L R/WCUR B R/W C U R B C / L R / W C U R B R / W LD24-2777 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 9 SHEET CITY OF TEMECULA PUBLIC WORKS 70116-5360050 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 MARK REVISIONS BY APPR.DATE CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. CITY OF TEMECULA PUBLIC WORKS MARK REVISIONS BY APPR.DATE 21' 31' 134' 62' 72' 112' 46' 66' 23' 89'TO C/ L © 2022 Microsoft Corporation © 2022 TomTom MH#243 LOCATION (SPLICE LOCATION) 49' 30' 30' 60' 50' 50' 100 ' 2 8 ' 2 8 ' 5 6 ' 4 0 ' 4 0 ' 8 0 ' 4 5 7 ' T O C / L 5FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN 42301 ZEVO DR PROJECT LOCATION SITE PLAN FOR DIAZ RD & RANCHO WAY LD24-2777 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 9 SHEET CITY OF TEMECULA PUBLIC WORKS 70116-5360050 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 MARK REVISIONS BY APPR.DATE CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. CITY OF TEMECULA PUBLIC WORKS MARK REVISIONS BY APPR.DATE MH#232 LOCATION (SPLICE LOCATION) 50' 50'100' 34' 1 , 3 6 8 ' T O R A N C H O W A Y C / L 100' 40' 50' 80' 40' 40' 21' 31' 134' 62' 72' 112' 46' 66' 23' 89'TO C/ L © 2022 Microsoft Corporation © 2022 TomTom 6FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN 42301 ZEVO DR SITE PLAN FOR DIAZ RD & RANCHO WAY PROJECT LOCATION LD24-2777 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 9 SHEET CITY OF TEMECULA PUBLIC WORKS 70116-5360050 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 MARK REVISIONS BY APPR.DATE CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. CITY OF TEMECULA PUBLIC WORKS MARK REVISIONS BY APPR.DATE 21 ' 31' 13 4 ' 62' 72 ' 112 ' 46' 66 ' 2 1 ' 31' 1 3 4 ' 6 2 ' 7 2 ' 1 1 2 ' 4 6 ' 6 6 ' 7FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN 42301 ZEVO DR SITE PLAN FOR RANCHO CALIFORNIA RD & DIAZ RD CURB C/L R/W CUR B R/W CURB C/L R/W CURB R/W C U R B C / L R / W C U R B R / W MH#177 LOCATION (SPLICE POINT) PROJECT LOCATION LD24-2777 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 9 SHEET CITY OF TEMECULA PUBLIC WORKS 70116-5360050 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 MARK REVISIONS BY APPR.DATE CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. CITY OF TEMECULA PUBLIC WORKS MARK REVISIONS BY APPR.DATE 23' 89'TO C / L 100' 50' 50'50' 25' 25' 23' 8 9 ' T O C / L 8FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN 42301 ZEVO DR SITE PLAN FOR REMINGTON RD & DIAZ RD C / L C U R B R / W C U R B R / W C / L C U R B R / W C U R B R / W MH#245 LOCATION (SPLICE POINT) PROJECT LOCATION LD24-2777 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 9 SHEET CITY OF TEMECULA PUBLIC WORKS 70116-5360050 ENGINEER'S INFORMATION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 MARK REVISIONS BY APPR.DATE CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. CITY OF TEMECULA PUBLIC WORKS MARK REVISIONS BY APPR.DATE 108'50' 58' 88' 50' 38' 100' 50' 50' 76' 38' 38'44' 165' 23' 89'TO C/L 254' TO C/L 17 ' 2' 27 ' 10 0 ' 56 ' 44 ' 38 ' 19 ' 19 ' 18' 9FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 VICINITY MAP 1.The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2.BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3.Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4.Trench repair shall be in accordance with City Standard Drawing 407. 5.All facilities shall be installed in accordance with City Standard Drawing 117. 6.Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7.All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8.Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9.Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10.Final compaction test results shall be provided by a soils engineer. 11.A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12.All U.S.A. mark outs shall be removed prior to completion of project. 13.A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project.SCALE: 1"=60' SITE PLAN 42301 ZEVO DR PROJECT LOCATION SITE PLAN FOR DIAZ RD & BLACK DEER LOOP MH#189 LOCATION MH#237 LOCATION FRONTIER TO PLACE & SPLICE +/- 650' OF NEW CABLE THROUGH EXISTING CONDUIT BETWEEN MH#189 & MH#237 LD24-2777 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 10 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS ENGINEER'S SEAL ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 3002 ERICK ESCOBEDO TRAFFIC ENGINEER RANC H O C A L I F O R N I A R D 20 + 0 0 19 + 0 0 18 + 0 0 17 + 0 0 16 + 0 0 21 + 0 0 22 + 0 0 23 + 0 0 24 + 0 0 9+00 11+00 JE F F E R S O N A V E OL D T O W N F R O N T S T 38' 38' 76' 50' 50' 100' CU R B C/L RO W CU R B RO W 33' 33'66' 44' 44'88' CURB C/L ROWCURB ROW CURB C/L ROWCURB ROW CURB C/L ROWCURB ROW 33' MORE N O R D 24' STA 16+10EXISTING MANHOLE#280(SPLICE POINT) STA 23+70EXISTING MANHOLE#279(SPLICE POINT) PLACE 755+/- L.F. OF NEW CABLE IN EXISTING CONDUIT ROAD WORKEND ROAD WORKEND G20-2 PAI N T E D M E D I A N RANC H O C A L I F O R N I A R D 20 + 0 0 19 + 0 0 18 + 0 0 17 + 0 0 16 + 0 0 21 + 0 0 22 + 0 0 23 + 0 0 24 + 0 0 9+00 11+00 JE F F E R S O N A V E OL D T O W N F R O N T S T 38' 38' 76' 50' 50' 100' CU R B C/ L RO W CU R B RO W 33' 33'66' 44' 44'88' CURB C/L ROWCURB ROW CURB C/L ROWCURB ROW CURB C/L ROWCURB ROW 33' MORE N O R D 24' STA 16+10 EXISTING MANHOLE #280 (SPLICE POINT) STA 23+70 EXISTING MANHOLE#279(SPLICE POINT) PLACE 755+/- L.F. OF NEW CABLE IN EXISTING CONDUIT TRAFFIC CONTROL PLANS 1 REGULATORY SIGNS BIKE LANE R3-17 R5-6 WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND CONE SPACING-25' MAXIMUM STOP FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 W11-1 W16-1SHARE THE ROAD WORK TO BE DONE: WORK CREW TO ACCESS (2) EXISTING MANHOLES TO PLACE AND SPLICE +/-644 L.F. OF NEW CABLE WITHIN EXISTING CONDUIT. ACCESS (6) EXISTING MANHOLES TO SPLICE EXISTING CABLE TO SERVICE A CUSTOMER LOCATED AT 42301 ZEVO D WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM VICINITY MAP NTS LD24-2777 TRAFFIC CONTROL GENERAL NOTES (REV'D 03/13/24): 1. THE CITY ENGINEER OR THEIR REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 2. BEFORE YOU DIG-CALL(TOLL FREE) (800)422-4133. 3. WHERE THERE IS CONFLICT WITH THE PERMIT LANGUAGE AND APPROVED PLANS. THE APPROVED PLANS SHALL GOVERN. 4. TRENCH REPAIR SHALL BE IN ACCORDANCE WITH CITY STANDARD DRAWING 407. 5. ALL FACILITIES SHALL BE INSTALLED IN ACCORDANCE WITH CITY STANDARDS DRAWING 117. 6. CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS AND DRIVEWAY APPROACHES DAMAGED DURING CONSTRUCTION SHALL BE REMOVED FROM JOINT TO JOINT AND RECONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS AND THE GREENBOOK. 7. ALL DISTURBED LANDSCAPING AND OTHER IMPROVEMENTS SHALL BE REMOVED OR REPAIRED AND REPLACED TO THE SATISFACTION OF PUBLIC WORKS. 8. ACCESS RAMPS SHALL BE REMOVED JOINT TO JOINT AND RECONSTRUCTED IN ACCORDANCE WITH CITY STANDARD DRAWING 402 AND MEET CURRENT ADA STANDARDS. 9. ANY SURVEY MONUMENTS DAMAGED OR DESTROYED SHALL BE RESET PER CITY STANDARDS BY A QUALIFIED PROFESSIONAL PURSUANT TO THE CALIFORNIA BUSINESS AND PROFESSIONS CODE SECTION 8771. 10. FINAL COMPACTION TEST RESULTS SHALL BE PROVIDED BY A SOILS ENGINEER. 11.A PRE-CONSTRUCTION MEETING IS REQUIRED TWO (2) BUSINESS DAYS PRIOR TO ANY SCHEDULED WORK. PERMITTEE SHALL CONTACT LDINSPECTIONS@TEMECULACA.GOV TO SCHEDULE A MEETING. 12. ALL U.S.A. MARK OUTS SHALL BE REMOVED PRIOR TO COMPLETION OF PROJECT. 13. A FINAL INSPECTION IS REQUIRED FOR ALL PROJECTS. PERMITTEE MUST CONTACT LDINSPECTIONS@TEMECULACA.GOV TO VERIFY COMPLETION OF PROJECT. 14. STANDARD INSPECTION REQUEST SHALL INCLUDE: PERMIT NUMBER: REQUESTED DATE (OF WORK PROPOSED): REQUESTED TIME (AM, PM, OR SPECIFIC TIME): INSPECTION TYPE (PRE-CONSTRUCTION, REPAIR, RESTORATIONS, TRAFFIC CONTROL, FINAL, ETC.): INSPECTION LOCATION: REQUESTOR NAME/COMPANY: FIELD CONTACT NAME/NUMBER: ENGINEER OF WORK'S CERTIFICATE I, D. LYNN PARKER , hereby declare that I am the engineer of Work for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and the design is consistent with current standards and City of Temecula. I understand that the check of project drawings and specifications by the City of Temecula is confined to a review only and does not relieve me of responsibilities for project design. Signed Date_______________ R.C.E. 29570 Exp.___ _______ Address__P. Telephone (909) 472-9983______________________________ Firm___________________________________PARKER ENGINEERING, LLC ______________________________O BOX 1666, COTTONWOOD, AZ 86326 ______3/31/25 8/8/2024 8/8/2024 08/29/24 TRAFFIC CONTROL PLAN GENERAL NOTES 1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA’S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY’S TRAFFIC DIVISION AT (951) 694 -6411. 13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (ALL SHEETS) FOR TRENCH PATCH. 18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20.IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. WARNING SIGNS 8/29/20 24 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 10 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS ENGINEER'S SEAL ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 3002 ERICK ESCOBEDO TRAFFIC ENGINEER S CONC R E T E MEDI A N 180' BUFFER 320' MERGIN G T A P E R 250' SIGN SPACING RANCH O C A L I F O R N I A R D ( 4 0 M P H ) DI A Z R D V I N C E N T M O R A G A D R EOP EOP DWY EOP EOP E O P E O P E O P E O P MANHOLE #177 LOCATION 90' CHAN N E L I Z E R 250' SIGN SPACING 250' SIGN SPACING 1 2 ' 1 1 ' EO P ST O P EO P LA N D S C A P E M E D I A N 25 0 ' SI G N SP A C I N G D W Y E O P E O P 25 0 ' SIG N SP A C I N G 25 0 ' SI G N SP A C I N G 12' 12' 12' 12' 1 0 0 ' ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 C U R B C U R B C U R B 2 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. SCALE: 1"=40' DURATION OF WORK: 1 OF DAYS WORK ROAD AHEAD W20-1 RIGHT LANE CLOSED AHEAD C20 C30(CA) LANE CLOSED WORK ROAD AHEAD W20-1ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 ROAD WORK END G20-2 C30(CA) LANE CLOSED W4-2 ROAD WORK END G20-2 ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 C30(CA) LANE CLOSED LEFT LANE CLOSED AHEAD C20A C30(CA) LANE CLOSED FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 FOR RANCHO CALIFORNIA RD & DIAZ RD WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM LD24-2777 8/8/2024 08/29/24 8/29/20 24 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 10 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS ENGINEER'S SEAL ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 3002 ERICK ESCOBEDO TRAFFIC ENGINEER MH#243 LOCATION 1 0 3 ' B U F F E R S P A C E 2 5 ' W O R K A R E A 5 4 0 ' M E R G I N G T A P E R S T O P D / W D / W 3 5 0 ' 3 5 0 ' 3 5 0 ' ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 RIGHT LANE CLOSED AHEAD C20(RT) W4-2R 3 5 0 ' ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 350 ' ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 C30(CA) LANE CLOSED 12' MIN 2 0 ' P A I N T E D M E D I A N P A I N T E D M E D I A N W11-1 W16-1 W11-1 ASSEMBLY SHARE THE ROAD 3 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. SCALE: 1"=40' DURATION OF WORK: 1 DAY WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 FOR DIAZ RD & VIA DOS PICOS LD24-2777 8/8/2024 08/29/24 8/29/20 24 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 10 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS ENGINEER'S SEAL ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 3002 ERICK ESCOBEDO TRAFFIC ENGINEER MH#232 LOCATION 2 4 ' W O R K A R E A 3 6 0 ' B U F F E R S P A C E L A N D S C A P E M E D I A N D / W D / W 3 5 0 ' ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 12' 2 0 ' ROAD WORK G20-2 P A I N T E D M E D I A N 3 5 0 ' 3 5 0 ' 3 5 0 ' D / W D / W 5 4 0 ' M E R G I N G T A P E R D / W D / W ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 RIGHT LANE CLOSED AHEAD C20(RT) W4-2R P A I N T E D M E D I A N 19' 2 0 ' W11-1 W16-1 W11-1 ASSEMBLY SHARE THE ROAD 4 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. SCALE: 1"=40' DURATION OF WORK: 1 DAY WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 FOR DIAZ RD & RANCHO WAY LD24-2777 8/8/2024 08/29/24 8/29/20 24 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 10 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS ENGINEER'S SEAL ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 3002 ERICK ESCOBEDO TRAFFIC ENGINEER DIAZ RD (45 MPH) 284' BUFFER SPACE DWY 50' WORK AREA 350' SIGN SPACING 45 ' 166' CURB CURB CU R B CU R B 35 0 ' CU R B CU R B SIDEWALK PAINTED MEDIAN 13 ' 12 ' 25 0 ' 25 0 ' 25 0 ' 600' MERGING TAPER 10'10' 600' MERGING TAPER DWY STOP DIAZ RD (50 MPH) 350' 35 0 ' CURB CURB PAINTED MEDIAN 350'350' PAINTED MEDIAN W11-1 W16-1 W11-1 ASSEMBLY SHARE THE ROAD 5 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. DURATION OF WORK: 1 DAY WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 FOR DIAZ RD & WINCHESTER RD ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 RIGHT LANE CLOSED AHEAD C20(RT)W4-2R SCALE: 1"=40' WH I N C H E S T E R R D ( 5 0 M P H ) ZE V O R D ( 4 5 M P H ) ROAD WORK END G20-2 ROAD WORK END G20-2 ROAD WORK END G20-2 ROAD WORK END G20-2 R10-11 NO TURN ON RED R9-3A R9-3A WORK ROAD AHEAD W20-1 WORK ROAD AHEAD W20-1 W4-2L LEFT LANE CLOSED AHEAD C20A WORK ROAD AHEAD W20-1 WH I N C H E S T E R R D ( 4 0 M P H ) W12-1 C30(CA) LANE CLOSED C30(CA) LANE CLOSED MH#1080 LOCATION WORK ROAD AHEAD W20-1 C30(CA) LANE CLOSED LD24-2777 CR O S S H E R E SI D E W A L K C L O S E D R9 - 1 1 L AH E A D CROSS HERE SIDEWALK CLOSED R9-11L AHEAD 8/8/2024 08/29/24 8/29/20 24 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 10 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS ENGINEER'S SEAL ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 3002 ERICK ESCOBEDO TRAFFIC ENGINEER R A N C H O C A L I F O R N I A R D ( 4 5 M P H ) JEFFERSON AVE (45 MPH) OLD TOWN FRONT ST (25 MPH) M O R E N O R D 320' MERGING TAPER 50' WORK AREA DOWNSTREAM TAPER 50'/ 100' MAX WO R K RO A D 100' S STOP S T O P 1 0 0 ' 2 5 0 ' DW Y 24 ' 12 ' 269' BUFFER 100' 12 ' 80' CHANNELIZER W/ T Y P E I I BA R R I C A D E S 2 5 0 ' 12 ' 12 ' 12 ' 12' 12' W12-1 TURN RIGHT M U S T RIGHT LANE R3-7R TURN RIGHT M U S T RIGHT LANE R3-7R 155' TANGENT 6 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. DURATION OF WORK: 1 DAY WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 FOR JEFFERSON AVE & RANCHO CALIFORNIA RD SCALE: 1"=40' C30(CA) LANE CLOSED C30(CA) LANE CLOSED C30(CA) LANE CLOSED ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 C30(CA) LANE CLOSED C30(CA) LANE CLOSED W/ TYPE II BARRICADE W/ TYPE II BARRICADE MH #279 LOCATION LD24-2777 CLOSED BIKE SC11 (MOD) LANE C30(CA) LANE CLOSED C30(CA) LANE CLOSED 8/8/2024 08/29/24 8/29/20 24 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 10 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS ENGINEER'S SEAL ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 3002 ERICK ESCOBEDO TRAFFIC ENGINEER DW Y DW Y DW Y DW Y DW Y JEFFE R S O N A V E ( 4 0 M P H ) JE F F E R S O N A V E ( 4 0 M P H ) 100' BIKE TANGENT 110' BIKE TA P E R 350'SIG N S P A C I N G 350'SIG N S P A C I N G 35 0 SI G N S P A C I N G WORK ROAD AHEAD W20-1 CLOSED BIKE SC11 (MOD) LANE ROAD WORK END G20-2 W11-1 W16-1 W11-1 ASSEMBLY SHARE THE ROAD RIGHT LANE CLOSED AHEAD C20(RT) LANE CLOSED AHEAD W20-5 INTERCHANGEABLE WITH C20A (CA) 1 BIKE W4-2R 7 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. DURATION OF WORK: 1 DAY WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 FOR JEFFERSON AVE & RANCHO CALIFORNIA RD SCALE: 1"=40' LD24-2777 8/8/2024 08/29/24 8/29/20 24 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 10 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS ENGINEER'S SEAL ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 3002 ERICK ESCOBEDO TRAFFIC ENGINEER DIAZ RD. (45 MPH) WORK ROAD MANHOLE #245 LOCATION 25' TO DIAZ RD. C/L VI A M O N T E Z U M A 87' TO VIA MONTEZUMA C/L 12' MIN E.P. E.O.P. INSTALL TEMP. NO PARKING 48 HRS. PRIOR TO COMMENCING WORK (IF REQUIRED) PAINTED MEDIAN/ LEFT TURN LANE DRIVEWAY PAINTED MEDIAN/ LEFT T U R N L A N E WORK ROAD 8 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. NTS DURATION OF WORK: 1 DAY WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 FOR DIAZ RD & VIA MONTEZUMA 50' WORK AREA 270' SHIFTING TAPER 350'378' MIN. BUFFER 350' 50' DOWNSTREAM TAPER 350' 350' 350' WORK ROAD AHEAD W20-1 LEFT LANE CLOSED AHEAD C20A C30(CA) LANE CLOSED C30(CA) LANE CLOSED WORK ROAD AHEAD W20-1 RIGHT LANE CLOSED AHEAD C20 ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 ROAD WORK END G20-2 R3-2 LD24-2777 C30(CA) LANE CLOSED W24-1 C30(CA) LANE CLOSED C30(CA) LANE CLOSED R4-7A KEEP RIGHT 8/8/2024 08/29/24 8/29/20 24 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 10 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS ENGINEER'S SEAL ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 3002 ERICK ESCOBEDO TRAFFIC ENGINEER 9 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. DURATION OF WORK: 1 DAY WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 FOR DIAZ RD & SARAH WAY 18' TO C/L CURB CURB 17' TO C/L 12' MIN. 12' MIN. 350'270' SHIFTING TAPER 100' BUFFER 350' DIAZ RD. (45 MPH) SA R A H W A Y WORK ROAD AHEAD W20-1 RO A D W O R K EN D G2 0 - 2 ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 350'350' 270' SHIFTING TAPER 350'350' PAINTED MEDIAN 50' WORK AREA MH #237 LOCATION ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 NTS LD24-2777 RIGHT LANE CLOSED AHEAD W20-5R W24-1 RIGHT LANE CLOSED AHEAD W20-5RW24-1 C30(CA) LANE CLOSED W11-1 W16-1 W11-1 ASSEMBLY SHARE THE ROAD R3-2 50' DOWNSTREAM TAPER C30(CA) LANE CLOSED R3-2 R4-7A KEEP RIGHT R4-7A KEEP RIGHT 10' 8/8/2024 08/29/24 8/29/20 24 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 10 SHEETS CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS ENGINEER'S SEAL ENGINEER'S INFORMATIONCONTRACTOR: MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY: DRAWING NO. SHEET OF CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION D. LYNN PARKER P.O. BOX 1666 COTTONWOOD, AZ 86326 (909) 472-9983 3002 ERICK ESCOBEDO TRAFFIC ENGINEER 10 Traffic Cone Temporary Sign Direction of Travel Portable Flashing Beacon LEGEND Flashing Arrow Sign (FAS) FAS Support or Trailer Work Area Flagger Work Vehicle Signalized Intersection Type III Barricade with sign WORK ROAD HLWD High Level Warning Device S CONSTRUCTION NOTE: ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. DURATION OF WORK: 1 DAY WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 FOR DIAZ RD & AVE ALVARADO NTS CURB CURB 41' TO C/L 12' MIN. 12' MIN. 270' SHIFTING TAPER INSTALL TEMP. NO PARKING (BOTH SIDES) 48 HRS. PRIOR TO COMMENCING WORK DIAZ RD. (45 MPH) WO R K RO A D AH E A D W2 0 - 1 WORK ROAD AHEAD W20-1 C12(CA) NARROW LANE R4-7A KEEP RIGHT R4-7A KEEP RIGHT ROAD WORK END G20-2 ROAD WORK END G20-2 350'350'350' 350' AV E A L V A R A D O MH 189 LOCATION WO R K RO A D PAINTED MEDIAN 268' TO C/L CURB ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 PAINTED MEDIAN 20' WORK AREA R4-7A KEEP RIGHT R4-7A KEEP RIGHT 12' MIN. W5-1 ROAD NARROWS C30A(CA) SHOULDER CLOSED LD24-2777 W11-1 W16-1 W11-1 ASSEMBLY SHARE THE ROAD 50' DOWNSTREAM TAPER R4-8A KEEP LEFT 8/8/2024 08/29/24 8/29/20 24 CONTRACTOR: FOR CITY USE ONLY: DRAWING NO. SHEET OF 4 SHEET CITY OF TEMECULA PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION 70116-5360050 TRAFFIC CONTROL PLANS FOR REMINGTON AVE & WINCHESTER RD CONTRACTOR:FOR CITY USE ONLY:DRAWINGNO.SHEETOF4SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION70116-5360050 CONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*FRONTIER ENGINEER:??????###-###-####REFERENCE CITY STANDARDDRAWING NO. 18 AND PG. 075CHART ACONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*FRONTIER ENGINEER:??????###-###-####REFERENCE CITY STANDARDDRAWING NO. 18 AND PG. 075CHART A ENGINEER'S INFORMATIONCONTRACTOR:MARKREVISIONSBYAPPR.DATEFOR CITY USE ONLY:TRAFFIC CONTROL PLANSFOR*CORRESPONDING STREETS*DRAWINGNO.SHEETOF?SHEETCITY OF TEMECULAPUBLIC WORKS-TRAFFIC ENGINEERING DIVISION*WORK ORDER #*D. LYNN PARKERP.O. BOX 1666COTTONWOOD, AZ 86326(909) 472-9983 2295ALI M. SHAHZADTRAFFIC ENGINEERTRAFFIC CONTROL PLANSFORREMINGTON AVE & WINCHESTER RD TRAFFIC CONTROL PLANS 1 REGULATORY SIGNS BIKE LANE R3-17 R5-6 WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND CONE SPACING-25' MAXIMUM STOP FRONTIER ENGINEER: RAUL RIVAS (909) 406-3178 ENGINEER'S INFORMATION D. LYNN PARKER P.O.BOX 1666 COTTONWOOD, AZ 86326 (909) 472- 9983 WORK TO BE DONE: FRONTIER TO ACCESS WORK CREW TO ACCESS (2) EXISTING MANHOLES TO PLACE & SPLICE CABLE TO PROVIDE SERVICE TO A CUSTOMER. VICINITY MAP NTS PROJECT LOCATION TRAFFIC CONTROL GENERAL NOTES (REV'D 08/26/20): 1. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2. THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4. WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE, WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5. TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM THE STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6. PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7. TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8. ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9. THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10. THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11. ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT.) ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12. ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694-6411. 13. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14. A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15. ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16. A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH PATCH. 18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. WORK HOURS SUNDAY-THURSDAY 9:00 PM - 5:00 AM CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 08/05/2024 08/05/2024 08/05/2024 08/05/20 W5-1 ROAD NARROWS W5-1 12 ' M I N . 100'** TO BE DETERMINED BY THE CITY OF TEMECULA** RE V ' D 0 4 / 0 3 / 2 3 WINCHESTER RD (50 MPH) 350'350'350' 425'228' TO C/L 46' TO C/L MH#1101 LOCATION RE M I N G T O N A V E 300' 350' ZE V O D R 810' TO C/L 50' WORK AREA LD24-2777 NOTE: NOT TO BE USED ON STREETS CLASSIFIED ABOVE COLLECTOR OR AT SIGNALIZED INTERSECTIONS WITHOUT APPROVAL FROM THE CITY OF TEMECULA. 12'12' W5-1 ROAD NARROWS W5-1 RE V ' D 0 4 / 0 3 / 2 3 WINCHESTER RD (50 MPH) ZE V O D R ( 4 0 M P H ) 97' TO C/L 47' TO C/L MH#1100 LOCATION 300' 350'350'350'350' 25 0 ' 25 0 ' 50' WORK AREA LD24-2777 RE V ' D 0 4 / 0 3 / 23