HomeMy WebLinkAboutLD24-3469Permit Number: LD24-3469
LD - Utilities/ Access to Utility Agency Facilities
Issued: 10/17/2024
Expired: 04/15/2025
Job Address: 27560 Ynez Rd
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Frontier California Inc.
401 Merritt 7
Norwalk, CT 06851
(000) 000-0000
Applicant:
Gulbranson Services Inc.
15371 Bonanza Rd Unit A,
Victorville, CA 92392
(760) 843-0330
Contractor:
Utility Work Order Number: 70116-5363358
Description:
Frontier 70116-5363358
WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am
Location: MH511 Ynez Rd & Town Center N. Intersection
Proposed work:
Access one (1) manhole as shown on Frontier "SITE PLAN 27560 YNEZ RD, LD24-3469"
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD24-3469
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
the City Engineer or their designated assignee.
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection to verify completion of project.
Page 1 of 2
Permit Number: LD24-3469
LD - Utilities/ Access to Utility Agency Facilities
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
City Engineer or Authorized Representative Date
10/17/2024
Page 2 of 2
CONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
PERMIT
NO. LD24-3469
SHEET OF
2 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
WO#: 70116-5363358
FRONTIER ENGINEER:
RAUL RIVAS
909-406-3178
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O.BOX 1666
COTTONWOOD, AZ 86326
(909) 472- 9983 3002
ERICK ESCOBEDO
TRAFFIC ENGINEER
VICINITY MAP
NTS
PROJECT LOCATION
TRAFFIC CONTROL PLANS
1
REGULATORY SIGNS
BIKE LANE
R3-17
R5-6
WARNING SIGNS
MISCELLANEOUS DEVICES
DETAIL SHEET LEGEND
CONE SPACING-25' MAXIMUM
STOP
WORK TO BE DONE:
FRONTIER TO ACCESS (1) MANHOLE TO SPLICE EXISTING CABLE TO
SERVICE A CUSTOMER LOCATED AT 27560 YNEZ RD.
WORK HOURS
SUNDAY-THURSDAY
9:00 PM - 5:00 AM
ENGINEER OF WORK'S CERTIFICATE
I, , hereby declare that I am the engineer of Work for this project, that I have
exercised responsible charge over the design of the project as defined in Section 6703 of the
Business and Professions Code, and the design is consistent with current standards and City of
Temecula.
I understand that the check of project drawings and specifications by the City of Temecula is
confined to a review only and does not relieve me of responsibilities for project design.
Signed Date_______________
R.C.E. Exp.________________
Firm___________________________________
Address________________________________
Telephone______________________________
29570
PARKER ENGINEERING, LLC
P.O BOX 1666, COTTONWOOD, AZ 86326
(909) 472-9983
3/31/25
D. LYNN PARKER
TRAFFIC CONTROL PLANS
TRAFFIC CONTROL GENERAL NOTES (REV'D 06/06/24):
1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION.
2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE
PUBLIC SAFETY.
3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY,
UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY
THROUGH THURSDAY.
5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE
ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END
OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES.
6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK.
8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING
CONSTRUCTION.
10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION
WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.)
11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS
SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER
FUNDAMENTALS OF FLAGGING TRAFFIC.
12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF
TEMECULA’S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY’S TRAFFIC DIVISION
AT (951) 694 -6411.
13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK.
14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE
DEPARTMENT OF PUBLIC WORKS.
15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE
CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT
CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING
CONSTRUCTION.
16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,
THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION
METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION
INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (REFERENCE ALL SHEETS) FOR
TRENCH PATCH.
18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY
CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT.
19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20.IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH
LEVEL DEVICES.
9/3/2024
9/3/2024
10/14/24
10/14/20
24
CONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
PERMIT
NO. LD24-3469
SHEET OF
2 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
WO#: 70116-5363358
FRONTIER ENGINEER:
RAUL RIVAS
909-406-3178
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O.BOX 1666
COTTONWOOD, AZ 86326
(909) 472- 9983 3002
ERICK ESCOBEDO
TRAFFIC ENGINEER
37
8
'
B
U
F
F
E
R
100'CH
A
N
N
E
L
I
Z
E
R
S
S
S
DW DW
D
W
STOP
STOP
STOP
WO
R
K
RO
A
D
MH#511
LOCATION
1
0
0
'
C
H
A
N
N
E
L
I
Z
E
R
WOR
KROA
D
11'11'11'10'10'
11'11'12'
11'10'
15'
12'
11'
10'
10'
12'
14'
11'11'12'10'
11'11'10'11'
CON
C
.
M
E
D
I
A
N
2
5
'
2
5
'
2
0
'
1
4
'
1
4
'
P
A
R
K
I
N
G
L
O
T
P
A
R
K
I
N
G
L
O
T
TO
W
N
C
E
N
T
E
R
N
.
(P
R
I
V
A
T
E
)
TO
W
N
P
L
A
Z
A
DR
I
V
E
W
A
Y
11'
11'
11'
10'
10'
11'
13'
1
5
'
1
9
'
1
9
'
28'
28'
PA
R
K
I
N
G
L
O
T
DR
I
V
E
W
A
Y
17'
17'
YN
E
Z
R
O
A
D
(45
M
P
H
)
TO
W
E
R
P
L
A
Z
A
S
.
TO
W
E
R
PL
A
Z
A
S
.
RA
N
C
H
O
C
A
L
I
F
O
R
N
I
A
R
D
.
Y
N
E
Z
R
O
A
D
(4
5
M
P
H
)
3
5
0
'
12
'
M
I
N
.
10
0
'
12'
M
I
N
.
12'
M
I
N
.
10
0
'
WORK
AREA
35
0
'
SI
D
E
W
A
L
K
SI
D
E
W
A
L
K
350'350'
RA
N
C
H
O
H
I
G
H
L
A
N
D
R
D
.
350'
35
0
'
3
0
'
22'
39'
1
0
'
2
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
SCALE: 1"=60'
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
WORK HOURS
SUNDAY - THURSDAY
9:00 PM - 5:00 AM
C L O S E D
R O A D
R11-2
W1-7
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
TURN RIGHT
M U S T
RIGHT LANE
R3-7R
WORK
ROAD
AHEAD
W20-1
TURN RIGHT
M U S T
RIGHT LANE
R3-7R
C30(CA)
LANE
CLOSED
C30(CA)
LANE
CLOSED
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
TURN RIGHT
M U S T
RIGHT LANE
R3-7R
RIGHT LANE
CLOSED
AHEAD
W20-5R
MH #511: YNEZ ROAD & TOWN PLAZA DRIVEWAY
R3-4
PCMS
USE TOWER
PLAZA SOUTH
TO EXIT
C30(CA)
LANE
CLOSED
C30(CA)
LANE
CLOSED
R3-4
R3-4
R3-4
R3-4
WORK
ROAD
AHEAD
W20-1
C30(CA)
LANE
CLOSED
NOTE: WORK CREW TO COORDINATE WITH SHOPPING
CENTER MANAGEMENT WHEN COMMENCING WORK.
COORDINATE WITH THE CITY OF TEMECULA
PUBLIC WORKS DEPARTMENT TO PLACE THE
SIGNALZED INTERSECTION ON FLASH
OPPERATION DURING WORKING HOURS
RIGHT LANE
CLOSED
AHEAD
W20-5R
ROAD WORK
END
G20-2
ROA
D
W
O
R
K
END
G2
0
-
2
W11-1
W16-1P
W11-1 ASSEMBLY
SHARE
THE ROAD
BIKE LANE
CLOSED
AHEAD
C20(CA)BIKE
9/3/2024
10/14/24
10/14/20
24
CONTRACTOR:
FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
1 SHEET
CITY OF TEMECULA
PUBLIC WORKS
70116-5363358
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
SITE PLAN
FOR
YNEZ RD & TOWN CENTER N
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178
MARK REVISIONS BY APPR.DATE
STOP
STOP
STOP
MH#511
LOCATION
CON
C
.
M
E
D
I
A
N
2
5
'
2
5
'
2
0
'
1
4
'
1
4
'
P
A
R
K
I
N
G
L
O
T
P
A
R
K
I
N
G
L
O
T
TO
W
N
C
E
N
T
E
R
N
.
(P
R
I
V
A
T
E
)
TO
W
N
P
L
A
Z
A
DR
I
V
E
W
A
Y
11'
11'
11'
10'
10'
11'
13'
1
5
'
TO
W
E
R
PL
A
Z
A
S
.
Y
N
E
Z
R
O
A
D
1
0
'42'
D
W
Y
108
'
54'
54'
82'
41'
42'
SITE PLAN
27560 YNEZ RD
1
VICINITY MAP
1. The City Engineer or their representative has the
authority to initiate field changes to assure public safety.
2. BEFORE YOU DIG – CALL (TOLL FREE)
(800) 422-4133
3. Where there is conflict with the permit language and
approved plans, the approved plans shall govern.
4. Trench repair shall be in accordance with City
Standard Drawing 407.
5. All facilities shall be installed in accordance with City
Standard Drawing 117.
6. Concrete curbs, walks, gutters, cross gutters and
driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance
with City Standards and the Greenbook.
7. All disturbed landscaping and other improvements
shall be removed or repaired and replaced to the
satisfaction of Public Works.
8. Access ramps shall be removed joint to joint and
reconstructed in accordance with City Standard Drawing
402 and meet current ADA Standards.
9. Any survey monuments damaged or destroyed shall
be reset per City Standards by a qualified professional
pursuant to the California Business and Professions Code
Section 8771.
10. Final compaction test results shall be provided by a
soils engineer.
11. A pre-construction meeting is required two (2)
business days prior to any scheduled work. Permittee shall
contact LDInspections@temeculaca.gov to schedule a
meeting.
12. All U.S.A. mark outs shall be removed prior to
completion of project.
13. A final inspection is required for all projects.
Permittee must contact LDInspections@temeculaca.gov to
verify completion of project.
SCALE: 1"=60'
PROJECT LOCATION
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
Tricia.ortega 08/29/2024
08/29/2024 08/29/2024
08/29/20
LD24-3469