HomeMy WebLinkAboutLD24-3735Permit Number: LD24-3735
LD - Utilities/ Access to Utility Agency Facilities
Issued: 10/17/2024
Expired: 04/15/2025
Job Address: 27165 Madison Ave
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Frontier Communications
(Utility Billing)
Network Engineering – Bldg. A. 1400 E. Phillips Blvd, Building A
Pomona, CA 91766
(909) 469-6327
Applicant:
Gulbranson Services Inc.
15371 Bonanza Rd Unit A,
Victorville, CA 92392
(760) 843-0330
Contractor:
Utility Work Order Number: 70147-5364248
Description:
Frontier 70147-5364248
WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am
Location:
MH310 - Jefferson Ave NE/S 115' NW/O Sanborn Ave
MH825 - Buecking Dr N/S 375' W/O Madison Ave
MH826 - Madison Ave W/S 290' N/O Buecking Dr
Proposed work:
Access three (3) manholes as shown on Frontier "SITE PLAN 27165 MADISON AVE., LD24-3735"
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD24-3735
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
the City Engineer or their designated assignee.
Page 1 of 3
Permit Number: LD24-3735
LD - Utilities/ Access to Utility Agency Facilities
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection to verify completion of project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Page 2 of 3
Permit Number: LD24-3735
LD - Utilities/ Access to Utility Agency Facilities
Permitee Date
City Engineer or Authorized Representative Date
10/17/2024
Page 3 of 3
CONTRACTOR:
FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
4 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70147-5364248
FRONTIER ENGINEER:
RAUL RIVAS (909) 406-3178
TRAFFIC CONTROL PLANS
FOR
*CORRESPONDING STREETS*
TRAFFIC CONTROL PLANS
1
REGULATORY SIGNS
BIKE LANE
R3-17
R5-6
WARNING SIGNS
MISCELLANEOUS DEVICES
DETAIL SHEET LEGEND
CONE SPACING-25' MAXIMUM
STOP
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O.BOX 1666
COTTONWOOD, AZ 86326
(909) 472- 9983
WORK TO BE DONE:
FRONTIER TO ACCESS (2) EXISTING MANHOLES TO PLACE AND SPLICE +/- 759 L.F. OF
NEW CABLE WITHIN EXISTING CONDUIT INSIDE CITY ROW TO SERVICE A CUSTOMER
LOCATED AT 27165 MADISON AVE.
VICINITY MAP
NTS
WORK HOURS
SUNDAY-THURSDAY
9:00 PM - 5:00 AM
PROJECT LOCATION
TRAFFIC CONTROL GENERAL NOTES (REV'D 06/06/24):
1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION.
2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE
PUBLIC SAFETY.
3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY,
UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY
THROUGH THURSDAY.
5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE
ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END
OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES.
6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK.
8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING
CONSTRUCTION.
10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION
WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.)
11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS
SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER
FUNDAMENTALS OF FLAGGING TRAFFIC.
12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF
TEMECULA’S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY’S TRAFFIC DIVISION
AT (951) 694 -6411.
13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK.
14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE
DEPARTMENT OF PUBLIC WORKS.
15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE
CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT
CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING
CONSTRUCTION.
16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,
THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION
METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION
INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (REFERENCE ALL SHEETS) FOR
TRENCH PATCH.
18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY
CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT.
19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20.IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH
LEVEL DEVICES.
12
'
**TO BE DETERMINED BY
THE CITY OF TEMECULA**
RE
V
'
D
0
4
/
0
3
/
2
3
100'
MH#825
LOCATION
MA
D
I
S
O
N
A
V
E
375'
100'100'
45'
100'100'100'45'
33
'
BUEKING DR (25 MPH)
N
**
TO BE DETERMINED BY
THE CITY OF TEMECULA**
12
'
NOTE: THIS STANDARD IS ONLY APPLICABLE AT
LOCATIONS WITH WITH DIRT SHOULDERS
WHERE VEHICLES, EQUIPMENT AND PROPOSED
WORK WILL BE OFF OF THE ROADWAY.
RE
V
'
D
0
4
/
0
3
/
2
3
100'
MH#826
LOCATION
BU
ECK
I
N
G
D
R
291'
100'100'
45'
44
'
MADISON AVE (25 MPH)
N
RE
V
'
D
0
4
/
0
3
/
23