Loading...
HomeMy WebLinkAboutLD24-1000Permit Number: LD24-1000 LD - Utilities/ Access to Utility Agency Facilities Issued: 05/01/2024 Expired: 11/18/2024 Job Address: 41925 Motor Car Pky Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Andrea Magana 1980 Orange Tree Ln., STE 210 Redlands, CA 92374 Applicant: Frontier Communications (Utility Billing) Network Engineering – Bldg. A. 1400 E. Phillips Blvd, Building A Pomona, CA 91766 (909) 469-6327 Contractor: Utility Work Order Number: 70116-5352311 Description: Frontier 70116-5352311 WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am Location: MH517 - Solana Way #1 WB Lane 225' E/O Ynez Rd MH750 - Motor Car Pkwy W/S 280' N/O Solana Way Proposed work: Access two (2) manholes per Frontier "UTILITY SITE PLAN, LD24-1000" All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD24-1000 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Page 1 of 3 Permit Number: LD24-1000 LD - Utilities/ Access to Utility Agency Facilities Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project. Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Page 2 of 3 Permit Number: LD24-1000 LD - Utilities/ Access to Utility Agency Facilities Permitee Date City Engineer or Authorized Representative Date 05/01/2024 Page 3 of 3 Y N E Z R D ( 4 5 M P H ) SOLANA W A Y (40 MPH ) PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 FOR TRAFFIC CONTROL PLANS PLACING & SPLICING OF FIBER OPTIC CABLE MOTOR CAR PKWY @ SOLANA WAY TRAFFIC CONTROL PLANS MOTOR CAR PKWY, SOLANA WAY AREA MAP: EXISTING NO TURN LANE FLASHING ARROW SIGN TRAILER (TYP.) C L O S E D R O A D CLOSED LEFT LANE AHEAD END DETOURROAD WORK ONLY CREW SURVEY CLOSED ROAD AHEAD RIGHT AHEAD DETOUR RIGHT KEEP TURN RIGHT M U S T RIGHT LANE NOT PASS DO STOP SLOW CLOSED LANE TO STOP PREPARED SHOULDER WORK WORK AHEAD ROAD MACHINERY AHEAD END ROAD CLOSED LOCAL TRAFFIC ONLY TO THRU TRAFFIC ROAD CLOSED ROAD DETOUR SHOULDER SOFTPAVEMENT ENDS AHEAD TRAFFIC CONE FLASHING ARROW SIGN (FAS) EXISTING TURN ONLY LANE BARRICADE WORK ZONE (FAS) TRAFFIC SIGNAL HIGH LEVEL WARNING DEVICE (WITH CALTRANS & MUTCD CODE) SIGN (WITH CALTRANS CODE) TRAFFIC FLOW DIRECTION FLAGGER S (HLWD) HIGH LEVEL WARNING DEVICE TRAFFIC CONE POST TUBE LANE CLOSEDROAD ROUGH XX MPH NARROWS ROAD W20-2 R11-2 R11-3A R11-4 W21-3 M4-8A C9A(CA) M4-10 W21-7 AHEAD UTILITY WORK G20-2 W20-4 W20-1 W21-5W21-1A W20-5W20-3 ONE LANE AHEAD ROAD W3-4 C30(CA)C28B(CA) W21-6 W8-7 BE R3-5 R4-7BR4-1 R9-3A R1-1 R3-7R3-2R3-1 R3-4 R3-18 W6-4 W5-1W4-2 W13-1 W1-2 W1-4W1-3W1-1 W8-4W8-3 W8-8 W4-1W1-8 W9-3 W1-6 W12-1W6-3 R3-17 BIKE LANE R5-6 GRAVEL LOOSE MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP)L WOS DAEHA (CMS) CHANGEABLE MESSAGE SIGN TRAILER (TYP.) R3-6 SIDEWALK R9-9 CLOSED R9-11A CENTER DETOUR M4-8 C28A(CA) ENDS AHEAD R3-17B R3-17A BEGIN RIGHT TURN LANE YIELD TO BIKES R4-4 RIGHT KEEP R4-7AR4-7 CROSS HERE SIDEWALK CLOSED AHEAD LANE NARROW C12(CA) TRENCH OPEN C27(CA) WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND PERMIT NO. LD24-1000 CONTRACTOR: CONE SPACING - 25' MAXIMUM COMMUNICATIONS NO SCALE WORK TO BE DONE: 1)WORK CREW TO USE THIS TCP TO ACCESS MH# 750 LOCATED ON THE W/S/O MOTOR CAR PKWY @ SOLANA WAY TO PLACE +/- 296' OF NEW 8-PORT TERMINAL TAIL & SPLICE INTO EXISTING SUBSTRUCTURE. MH# 750 TRAFFIC CONTROL GENERAL NOTES (REVISED: 08/26/2020) 1.All traffic control devices shall conform to the latest edition of the California Manual on Uniform Traffic Control Devices (California MUTCD) and the Standard Specifications for Public Works Construction. 2.The City Engineer or his representative has the authority to initiate field changes to assure public safety. 3.All traffic control devices shall be removed from view when not in use. 4.Work hours shall be restricted to the period between 8:30 a.m. and 3:30 p.m., Monday through Friday, unless approved otherwise. When night work is required, work hours shall be 9 p.m. to 5 a.m., Sunday through Thursday. 5.Trenches must be back filled or plated during non-working hours. Steel plates shall have asphaltic concrete berm on all edges. All dirt, dust, and debris shall be removed from street at end of each day and at the end of the job. The street shall be in drivable condition at all times. 6.Pedestrian controls shall be provided as shown on the plans. 7.Temporary "NO PARKING" signs will be posted 24 hours prior to commencing work. 8.Access to driveways will be maintained at all times unless other arrangements are made. 9.The contractor shall replace within 72 hours, all traffic signal loop detectors damaged during construction. 10.The contractor shall replace within 24 hours, all striping removed or damaged by construction work. (Striping may be replaced temporarily with tape.) 11.All Workers shall be equipped with an orange vest (or a reflective vest at night). All flaggers shall also be equipped with a hard hat, C28 "Stop/Slow" paddle and shall be trained in the proper fundamentals of flagging traffic. 12.Any work that disturbs normal traffic signal operations shall be coordinated with the City of Temecula's Traffic Division, 48 hours prior to beginning construction. Contact the City's Traffic Division at (951) 694 -6411. 13.The contractor shall maintain all traffic control devices 24 hours per day and 7 days per week. 14.A minimum of twelve (12) foot travel lanes must be maintained unless otherwise approved by the Department of Public Works. 15.All night work will require written approval from the Department of Public Works. Lane closures, road detours, road closures, and traffic signal modifications associated with overnight construction activities will require warning signs be placed at least . one week in advance of starting construction . 16.A solar powered flashing arrow board shall be required on all arterial street lane closures. 17.If the permit applicant determines that conduit installation will be by the boring machine method, the trench patch for the utility observation excavation will be the same as for open trench excavation method. This will provide a single continuous surface restoration eliminating the multiple penetration into the public roadway to all requirements in City Standard Drawing # 407 (sheet 1 and 2) for trench patch. 18.Any work that creates an undue safety risk or creates severe congestion may be shut down by City Traffic Engineers, City Field Inspection, or the Police Department. 19.Cones and delineators shall have reflectorized sleeves for night work. 20.If parking is allowed in advance warning area, advance warning signs shall be mounted on high level devices. APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES. 2 1 NO SCALE FRONTIER WORK ORDER NO. 70116-5352311 M O T O R C A R P K W Y ( 2 5 M P H ) PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA FOR TRAFFIC CONTROL PLANS CONTRACTOR: COMMUNICATIONS 2 2 DRIVEWAY TYPICAL DWY ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TCP NOTE: 1)WORK CREW TO USE THIS TCP TO ACCESS MH# 750 LOCATED ON THE W/S/O MOTOR CAR PKWY @ SOLANA WAY TO PLACE +/- 296' OF NEW 8-PORT TERMINAL TAIL & SPLICE INTO EXISTING SUBSTRUCTURE. 2)WORK CREW TO PLACE TEMPORARY NO PARKING SIGNS ALONG ENTIRE WORK AREA 72 HOURS PRIOR TO COMMENCING WORK. N MOTOR CAR PKWY (25 MPH) 100' 100'100'100' 45'155'MH#750 MOTOR CAR PKWY @ SOLANA WAY PERMIT NO. LD24-1000 FRONTIER WORK ORDER NO. 70116-5352311 PLACING & SPLICING OF FIBER OPTIC CABLE Y N E Z R D ( 4 5 M P H ) SOLANA W A Y (40 MPH ) PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call: TOLL FREE 1-800-227-2600 FOR TRAFFIC CONTROL PLANS PLACING & SPLICING OF FIBER OPTIC CABLE SOLANA WAY @ YNEZ RD TRAFFIC CONTROL PLANS SOLANA WAY, YNEZ RD AREA MAP: EXISTING NO TURN LANE FLASHING ARROW SIGN TRAILER (TYP.) C L O S E D R O A D CLOSED LEFT LANE AHEAD END DETOURROAD WORK ONLY CREW SURVEY CLOSED ROAD AHEAD RIGHT AHEAD DETOUR RIGHT KEEP TURN RIGHT M U S T RIGHT LANE NOT PASS DO STOP SLOW CLOSED LANE TO STOP PREPARED SHOULDER WORK WORK AHEAD ROAD MACHINERY AHEAD END ROAD CLOSED LOCAL TRAFFIC ONLY TO THRU TRAFFIC ROAD CLOSED ROAD DETOUR SHOULDER SOFTPAVEMENT ENDS AHEAD TRAFFIC CONE FLASHING ARROW SIGN (FAS) EXISTING TURN ONLY LANE BARRICADE WORK ZONE (FAS) TRAFFIC SIGNAL HIGH LEVEL WARNING DEVICE (WITH CALTRANS & MUTCD CODE) SIGN (WITH CALTRANS CODE) TRAFFIC FLOW DIRECTION FLAGGER S (HLWD) HIGH LEVEL WARNING DEVICE TRAFFIC CONE POST TUBE LANE CLOSEDROAD ROUGH XX MPH NARROWS ROAD W20-2 R11-2 R11-3A R11-4 W21-3 M4-8A C9A(CA) M4-10 W21-7 AHEAD UTILITY WORK G20-2 W20-4 W20-1 W21-5W21-1A W20-5W20-3 ONE LANE AHEAD ROAD W3-4 C30(CA)C28B(CA) W21-6 W8-7 BE R3-5 R4-7BR4-1 R9-3A R1-1 R3-7R3-2R3-1 R3-4 R3-18 W6-4 W5-1W4-2 W13-1 W1-2 W1-4W1-3W1-1 W8-4W8-3 W8-8 W4-1W1-8 W9-3 W1-6 W12-1W6-3 R3-17 BIKE LANE R5-6 GRAVEL LOOSE MUTCD [FEDERAL HIGHWAY ADMIN.] DESIGNATION (TYP)L WOS DAEHA (CMS) CHANGEABLE MESSAGE SIGN TRAILER (TYP.) R3-6 SIDEWALK R9-9 CLOSED R9-11A CENTER DETOUR M4-8 C28A(CA) ENDS AHEAD R3-17B R3-17A BEGIN RIGHT TURN LANE YIELD TO BIKES R4-4 RIGHT KEEP R4-7AR4-7 CROSS HERE SIDEWALK CLOSED AHEAD LANE NARROW C12(CA) TRENCH OPEN C27(CA) WARNING SIGNS MISCELLANEOUS DEVICES DETAIL SHEET LEGEND PERMIT NO. LD24-1000 CONTRACTOR: CONE SPACING - 25' MAXIMUM COMMUNICATIONS NO SCALE WORK TO BE DONE: 1) WORK CREW TO USE THIS TCP TO ACCESS MH# 517 LOCATED ON THE N/S/O SOLANA WAY @ MOTOR CAR PKWY TO PLACE +/- 334' OF NEW 8-PORT TERMINAL TAIL & SPLICE INTO EXISTING SUBSTRUCTURE. MH# 517 TRAFFIC CONTROL GENERAL NOTES (REVISED: 08/26/2020) 1.All traffic control devices shall conform to the latest edition of the California Manual on Uniform Traffic Control Devices (California MUTCD) and the Standard Specifications for Public Works Construction. 2. The City Engineer or his representative has the authority to initiate field changes to assure public safety. 3. All traffic control devices shall be removed from view when not in use. 4. Work hours shall be restricted to the period between 8:30 a.m. and 3:30 p.m., Monday through Friday, unless approved otherwise. When night work is required, work hours shall be 9 p.m. to 5 a.m., Sunday through Thursday. 5. Trenches must be back filled or plated during non-working hours. Steel plates shall have asphaltic concrete berm on all edges. All dirt, dust, and debris shall be removed from street at end of each day and at the end of the job. The street shall be in drivable condition at all times. 6. Pedestrian controls shall be provided as shown on the plans. 7. Temporary "NO PARKING" signs will be posted 24 hours prior to commencing work. 8. Access to driveways will be maintained at all times unless other arrangements are made. 9. The contractor shall replace within 72 hours, all traffic signal loop detectors damaged during construction. 10. The contractor shall replace within 24 hours, all striping removed or damaged by construction work. (Striping may be replaced temporarily with tape.) 11. All Workers shall be equipped with an orange vest (or a reflective vest at night). All flaggers shall also be equipped with a hard hat, C28 "Stop/Slow" paddle and shall be trained in the proper fundamentals of flagging traffic. 12. Any work that disturbs normal traffic signal operations shall be coordinated with the City of Temecula's Traffic Division, 48 hours prior to beginning construction. Contact the City's Traffic Division at (951) 694 -6411. 13. The contractor shall maintain all traffic control devices 24 hours per day and 7 days per week. 14. A minimum of twelve (12) foot travel lanes must be maintained unless otherwise approved by the Department of Public Works. 15. All night work will require written approval from the Department of Public Works. Lane closures, road detours, road closures, and traffic signal modifications associated with overnight construction activities will require warning signs be placed at least . one week in advance of starting construction . 16. A solar powered flashing arrow board shall be required on all arterial street lane closures. 17. If the permit applicant determines that conduit installation will be by the boring machine method, the trench patch for the utility observation excavation will be the same as for open trench excavation method. This will provide a single continuous surface restoration eliminating the multiple penetration into the public roadway to all requirements in City Standard Drawing # 407 (sheet 1 and 2) for trench patch. 18. Any work that creates an undue safety risk or creates severe congestion may be shut down by City Traffic Engineers, City Field Inspection, or the Police Department. 19. Cones and delineators shall have reflectorized sleeves for night work. 20. If parking is allowed in advance warning area, advance warning signs shall be mounted on high level devices. APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES. RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS MINICILLI SENIOR TRAFFIC ENGINEER 2647 2 1 NO SCALE ENGINEER OF WORK'S CERTIFICATE I, D. Tracy Lenocker, hereby declare that I am the engineer of Work for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and the design is consistent with current standards and City of Temecula. I understand that the check of project drawings and specifications by the City of Temecula is confined to a review only and does not relieve me of responsibilities for project design. Signed______________________________________________ Date_______________ R.C.E. Exp.__3/31/26____R.C.E.#28043___ Firm__Lenocker Consulting Group, LLC_______________________________________ Address_P. O. Box 1422 Haig Point Circle Banning, CA. 92220____________________ Telephone____(909) 337-0315__________________________FRONTIER WORK ORDER NO. 70116-5352311 M O T O R C A R P K W Y ( 2 5 M P H ) ENGINEER'S INFORMATIONENGINEER'S SEAL TELEPHONE NAME DATE R.C.E. NUMBER FIRM ADDRESS C28043 Tracy Lenocker . P.O. Box 1422 Haig Point Circle Banning, CA. 92220 LENOCKER CONSULTING GROUP, LLC (909) 337-0315 4/15/2024 04/25/24 04/29/24 A H E A D S I G N A L S S I D E W A L K S I D E W A L K S I D E W A L K D W Y D W Y M E D I A N C U R B SIDEWA L K Y N E Z R D ( 4 5 M P H ) ROAD WORK END G20-2 WORK ROAD AHEAD W20-1 WORK ROAD AHEAD W20-1 MEDIAN C U R B MEDIAN C U R B MEDIAN C U R B SIDEWA L K SIDEWA L K SIDEWA L K DWY DWY A H E A D S I G N A L 90' MID - G A P C30(CA) LANE CLOSED SIDEWA L K ROAD WORK END G20-2 9 ' 1 2 ' 1 8 ' 3 5 0 ' 525' BU F F E R W12-1 1 0 0 ' 3 5 0 ' WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 C30(CA) LANE CLOSED SOLANA W A Y (40 MPH ) M O T O R C A R P K W Y ( 2 5 M P H ) STOP C30(CA) LANE CLOSED 12' ROAD WORK END G20-2 30' WORK ROAD AHEAD W20-1 ROAD WORK END G20-2 CLOSED AHEAD C20(LT) LEFT LANE W4-2 SIDEW A L K INSTA L L T E M P . N O P A R K I N G S I G N S 7 2 H O U R S P R I O R T O C O M M E N C I N G W O R K SIDEW A L K 435' ME R G I N G T A P E R 250' 250' 250' PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S INFORMATION FOR TRAFFIC CONTROL PLANS SPLICING OF FIBER OPTIC CABLE SOLANA WAY @ YNEZ RD CONTRACTOR: TELEPHONE COMMUNICATIONS NAME DATE R.C.E. NUMBER FIRM ADDRESS C28043 Tracy Lenocker . P.O. Box 1422 Haig Point Circle Banning, CA. 92220 RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. NICOLAS MINICILLI SENIOR TRAFFIC ENGINEER 2647 2 2 WORK ROAD S TRAFFIC CONE TEMPORARY SIGN DIRECTION OF TRAVEL WORK AREA FLASHING ARROW SIGN (FAS) TYPE III BARICADE WITH SIGN SIGNALIZED INTERSECTION FLAGGER HIGH LEVEL WARNING DEVICE (HLWD) LEGEND DRIVEWAY TYPICAL DWY ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE. TCP NOTE: 1) WORK CREW TO USE THIS TCP TO ACCESS MH# 517 LOCATED ON THE N/S/O SOLANA WAY @ YNEZ RD TO PLACE +/- 334' OF NEW 8-PORT TERMINAL TAIL & SPLICE INTO EXISTING SUBSTRUCTURE. 2) WORK CREW TO PLACE TEMPORARY NO PARKING SIGNS ALONG ENTIRE WORK AREA 72 HOURS PRIOR TO COMMENCING WORK.FRONTIER WORK ORDER NO. 70116-5352311 PERMIT NO. LD24-1000 SCALE: 1"=80' SE E L O W E R L E F T MA T C H L I N E ( A ) SE E U P P E R R I G H T MA T C H L I N E ( A ) ENGINEER'S SEAL LENOCKER CONSULTING GROUP, LLC (909) 337-0315 04/25/24 04/29/24 CITY OF TEMECULA FOR UTILITY SITE PLAN PLACEMENT OF FIBER OPTIC CABLE & SPLICE SOLANA WAY, MOTOR CAR PKWY CITY OF TEMECULA PERMIT NO. LD-24 CONTRACTOR: COMMUNICATIONS 2 1 FRONTIER WORK ORDER NO. 70116-5352311 UTILITY SITE PLAN SOLANA WAY, MOTOR CAR PKWY Land Development Utility Plan General Notes 41000 Main Street Temecula, CA 92590 Phone: 951-694-6444 www.temeculaca.gov Revised: 03/19/2022 Utility Construction/Site plans shall be submitted for review and include the following, but not be limited to: 1. The City Engineer or their representative has the authority to initiate field changes to assure public safety. 2. BEFORE YOU DIG – CALL (TOLL FREE) (800)422-4133 3. Where there is conflict with the permit language and approved plans, the approved plans shall govern. 4. Trench repair shall be in accordance with City Standard Drawing 407. 5. All facilities shall be installed in accordance with City Standard Drawing 117. 6. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. 7. All disturbed landscaping and other improvements shall be removed or repaired and replaced to the satisfaction of Public Works. 8. Access ramps shall be removed joint to joint and reconstructed in accordance with City Standard Drawing 402 and meet current ADA Standards. 9. Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professions Code Section 8771. 10. Final compaction test results shall be provided by a soils engineer. 11. A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@temeculaca.gov to schedule a meeting. 12. All U.S.A. mark outs shall be removed prior to completion of project. 13. A final inspection is required for all projects. Permittee must contact LDInspections@temeculaca.gov to verify completion of project. 14. Standard Inspection Request shall include: If using a blanket permit indicate whether work is Emergency, Emergent, or Maintenance.  Permit Number:  Work Order Number:  Inspection Date:  Inspection Time (if applicable):  Inspection Type (Storm Drain, Precise Grade, NPDES, etc.):  Inspection Location:  On-site location:  Requestor Name:  Requestor Company:  Contact Number: LD24-1000 CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 04/11/2024 04/11/2024 04/11/2024 04/11/20 MH# 517 STA:52+37 1 1 + 0 0 51+00 CL-CL INTERSECTION STA 10+00 YNEZ RD STA 50+00 SOLANA WAY SOLANA W A Y (40 MPH ) M O T O R C A R P K W Y ( 2 5 M P H ) 1 2 + 0 0 0 9 + 0 0 0 8 + 0 0 CL-CL INTERSECTION STA 20+00 MOTOR CAR PKWY STA 54+09 SOLANA WAY 52+00 53+00 54+00 55+00 56+00 1 9 ' 37' 67' 67' 54' 54' 2 1 + 0 0 2 2 + 0 0 2 3 + 0 0 40' 40' 30'30' 5 5 ' 5 5 ' 4 1 ' 4 1 ' 67' 67'55' 55' 4 1 ' 4 1 ' 5 0 ' 5 5 ' Y N E Z R D ( 4 5 M P H ) MH# 750 STA:22+78 134' 108' 80' 60' 1 1 0 ' 8 2 ' 134' 110' 1 0 5 ' 8 2 ' CITY OF TEMECULA FOR UTILITY SITE PLANS PLACEMENT OF FIBER OPTIC CABLE & SPLICE SOLANA WAY @ MOTOR CAR PKWY CONTRACTOR: TELEPHONE COMMUNICATIONS 2 2 SCALE: 1"=80' SCOPE OF WORK: 1)WORK CREW TO ACCESS MH# 517 LOCATED ON THE N/S/O SOLANA WAY @ MOTOR CAR PKWY TO PLACE & SPLICE 334' +/- OF FIBER OPTIC CABLE IN EXISTING SUBSTRUCTURE. 2)WORK CREW TO ACCESS MH# 750 LOCATED ON THE W/S/O MOTOR CAR PKWY @ SOLANA WAY TO PLACE & SPLICE 296' +/- OF FIBER OPTIC CABLE IN EXISTING SUBSTRUCTURE. UTILITY SITE PLAN PERMIT NO. LD-24 FRONTIER WORK ORDER NO. 70116-5352311 FOC C/L FOC R/W R/W F O C C / L F O C R / W R / W F O C C / L F O C R / W R / W F O C C / L F O C R / W R / W LD24-1000 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020 APPLICATION INFORMATION PERMIT NO.: Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching Signing & Striping Traffic Signal  Miscellaneous (SPECIFY BELOW) The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as follows: Name(s) of street(s) and/or street address: Utility Work Order #: Start Date: End Date: In consideration of granting this application, all applicants including utility companies hereby agree to: 1.If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control Plan Checklist for details. 2.Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. (See below for specific liability insurance requirements.) 3.Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City Engineer. 4.Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The developer/general contractor must be present for the timely request of inspections. 5.Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction. LIABILITY INSURANCE REQUIREMENTS PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED. THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT ENCROACHMENT PERMIT. X 4/1/2024 5/1/2024 Work crew to access existing MH #517 and MH #750 to place and splice +/- 630' of fiber cable in existing substructure. Ynez Rd and Solana Way/Motor Car Pkwy 70116-5352311 LD24-1000 CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 04/11/2024 04/11/2024 04/11/2024 04/11/20 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020 Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum limits of insurance coverage shall be as follows: a.General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b.Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage. c.Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident for bodily injury or disease. d.Course of Construction: Completed value of the project. There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approac h located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the encroachment permit: BODILY INJURY $250,000.00 EACH PERSON $500,000.00 EACH OCCURANCE $500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS PROPERTY DAMAGE $100,000.00 EACH OCCURANCE $250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing the City named as an additional insured shall be attached to the application. The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges that this application will be made a part of the encroachment permit. APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED) Company Name: Mailing Address: Contact: Phone #: E-mail: I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the permittee and bind the permittee to the agreements contained herein and any conditions of the permit. Authorized Signature: Date Applied: CONTRACTOR’S INFORMATION Company Name: Mailing Address: Contact: Phone #: 24-HR Emergency #: State Contractor’s License #: Class: City Business License #: FRONTIER COMMUNICATIONS, INC. C/O DYNAMIC TELCO (FRONTIER AGENT) 951-992-1715 DTPERMITS@DYNAMICTELCO.COM FRONTIER COMMUNICATIONS, INC. 1980 ORANGE TREE LN, STE 210, REDLANDS, CA 92374 ANDREA MAGANA 3/7/2024 4 S. 4th St, Redlands, CA 92373 Raul Rivas 909-406-3178 488385 A, C10