HomeMy WebLinkAboutLD24-0572Permit Number: LD24-0572
LD - Utilities/ Access to Utility Agency Facilities
Issued: 04/17/2024
Expired: 11/25/2024
Job Address: 31795 Rancho California Rd
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Mountain Top Communications Services
1902 Orange Tree Ln, 140
Redlands, CA 92374
(909) 798-4400
Applicant:
Gulbranson Services Inc.
15371 Bonanza Rd Unit A,
Victorville, CA 92392
(760) 843-0330
Contractor:
Utility Work Order Number: 70116-5350519
Description:
Frontier 70116-5350519
WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am
Location:
MH140 - Rancho California Rd/Margarita Rd NW corner
MH308 - Rancho California Rd N/S 1055' W/O Margarita Rd
MH324 - Rancho California Rd #2 Eastbound lane 40' W/O Moraga Rd
MH395 - Rancho California Rd N/S 1050' W/O Portofino
MH397 - Rancho California Rd N/S 600' W/O Humber Dr
MH478 - Rancho California Rd N/S 250' W/O Tee Dr
MH481 - Rancho California Rd N/S 590' W/O Meadows Pkwy
MH482 - Rancho California Rd N/S 1245' W/O Riesling Ct
MH1519 - Meadows Pkwy E/S 1280' N/O Rancho Vista Rd
MH1520 - Rancho California Rd N/S 160' W/O Paseo De Las Olas
Proposed work:
taccess (6) existing manholes to splice existing cable. Access (4) existing manholes to place and splice +/-
2022 linear feet of new cable
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD24-0572
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Page 1 of 3
Permit Number: LD24-0572
LD - Utilities/ Access to Utility Agency Facilities
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
Public Works Inspector.
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
Page 2 of 3
Permit Number: LD24-0572
LD - Utilities/ Access to Utility Agency Facilities
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
City Engineer or Authorized Representative Date
04/17/2024
Page 3 of 3
CONTRACTOR:
FOR CITY USE ONLY:
SHEET OF
6 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
TRAFFIC CONTROL PLANS
FOR
RANCHO CALIFORNIA RD / HONORS DR
PERMIT NO.
LD
70116-5350519
FRONTIER ENGINEER:
RAUL RIVAS
(909) 406-3178
TRAFFIC CONTROL PLANS
1
REGULATORY SIGNS
BIKE LANE
R3-17
R5-6
WARNING SIGNS
MISCELLANEOUS DEVICES
DETAIL SHEET LEGEND
CONE SPACING-25' MAXIMUM
STOP
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O.BOX 1666
COTTONWOOD, AZ 86326
(909) 472- 9983
VICINITY MAP
NTS
TRAFFIC CONTROL GENERAL NOTES (REV'D 08/26/20):
1. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2. THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY.
3. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4. WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS
APPROVED OTHERWISE, WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY.
5. TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM
ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM THE STREET AT END OF EACH DAY AND AT THE END OF THE JOB.
THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES.
6. PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK.
8. ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9. THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING
MAY BE REPLACED TEMPORARILY WITH TAPE.)
11. ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT.) ALL FLAGGERS SHALL ALSO BE
EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC.
12. ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC
DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694-6411.
13. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK.
14. A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC
WORKS.
15. ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD
CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING
SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION.
16. A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,THE TRENCH PATCH FOR THE UTILITY
OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE
RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407
(SHEET 1 AND 2) FOR TRENCH PATCH.
18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC
ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT.
19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES.
WORK HOURS
SUNDAY-THURSDAY
9:00 PM - 5:00 AM
PROJECT LOCATION
NOTE: WORK CREW TO ACCESS (1) EXISTING MANHOLE TO SPLICE AND (2)
EXISTING MANHOLES TO PLACE AND SPLICE 914 L.F +/- OF CABLE WITHIN
EXISTING SUBSTRUCTURE WITHIN RIGHT OF WAY TO PROVIDE SERVICE TO
31795 RANCHO CALIFORNIA RD.
NOTE: NOT TO BE USED ON STREETS
CLASSIFIED ABOVE COLLECTOR OR AT
SIGNALIZED INTERSECTIONS WITHOUT
APPROVAL FROM THE CITY OF TEMECULA.
12'12'
W5-1
ROAD
NARROWS
W5-1
RE
V
'
D
0
4
/
0
3
/
2
3
N
249' TO C/L
MH #478
TE
E
D
R
RANCHO CALIFORNIA RD (50 MPH)
350'350'350'300'
10
0
'
10
0
'
350'
50' TO C/L
DURATION OF WORK: 1 DAY
WORK HOURS
MON- FRI 8:30AM-3:30PM
W5-1
ROAD
NARROWS
W5-1
12
'
M
I
N
.
100'**TO BE DETERMINED BY
THE CITY OF TEMECULA**
RE
V
'
D
0
4
/
0
3
/
2
3
MANHOLE #481
LOCATION
48
'
TO
C
/
L
CA
L
L
E
T
A
J
O
867'
TO C/L
350'350'350'300'
350'
NDURATION OF WORK: 1 DAY
WORK HOURS
MON- FRI 8:30AM-3:30PM
RANCHO CALIFORNIA RD (50 MPH)
W5-1
ROAD
NARROWS
W5-1
12
'
M
I
N
.
100'**TO BE DETERMINED BY
THE CITY OF TEMECULA**
RE
V
'
D
0
4
/
0
3
/
2
3
MANHOLE #482
LOCATION
48
'
TO
C
/
L
ME
A
D
O
W
P
K
W
Y
136'
TO C/L
350'350'350'300'
RANCHO CALIFORNIA RD (50 MPH)350'
N
DURATION OF WORK: 1 DAY
WORK HOURS
MON- FRI 8:30AM-3:30PM
W5-1
ROAD
NARROWS
W5-1
12
'
M
I
N
.
100'**TO BE DETERMINED BY
THE CITY OF TEMECULA**
RE
V
'
D
0
4
/
0
3
/
2
3
MEADOWS PKWY (45 MPH)
350'350'350'
350'
DURATION OF WORK: 1 DAY
WORK HOURS
MON- FRI 8:30AM-3:30PM
N
RA
N
C
H
O
C
A
L
I
F
O
R
N
I
A
R
D
58
'
TO
C
/
L
191'
TO C/L
MANHOLE #1519
LOCATIONMANHOLE #1520
LOCATION
488'
W-W
270'
RE
V
'
D
0
4
/
0
3
/
23
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
6 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70116-5350519
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
FRONTIER ENGINEER:
RAUL RIVAS (909) 406-3178
2647
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
ENGINEER'S SEAL
VICINITY MAP
NTS
TRAFFIC CONTROL PLANS
1
REGULATORY SIGNS
BIKE LANE
R3-17
R5-6
WARNING SIGNS
MISCELLANEOUS DEVICES
DETAIL SHEET LEGEND
CONE SPACING-25' MAXIMUM
STOP
W11-1
W16-1SHARE
THE ROAD
WORK TO BE DONE:
FRONTIER TO ACCESS (5) EXISTING MANHOLES TO SPLICE CABLE
WITHIN EXISTING SUBSTRUCTURE TO PROVIDE SERVICE TO
CUSTOMER.
TRAFFIC CONTROL GENERAL NOTES (REV'D 08/26/20):
1. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2. THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY.
3. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4. WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS
APPROVED OTHERWISE, WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY.
5. TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM
ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM THE STREET AT END OF EACH DAY AND AT THE END OF THE JOB.
THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES.
6. PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK.
8. ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9. THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING
MAY BE REPLACED TEMPORARILY WITH TAPE.)
11. ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT.) ALL FLAGGERS SHALL ALSO BE
EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC.
12. ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC
DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694-6411.
13. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK.
14. A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC
WORKS.
15. ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD
CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING
SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION.
16. A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,THE TRENCH PATCH FOR THE UTILITY
OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE
RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407
(SHEET 1 AND 2) FOR TRENCH PATCH.
18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC
ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT.
19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES.
WORK HOURS
SUNDAY-THURSDAY
9:00 PM - 5:00 AM
PROJECT LOCATION
TRAFFIC CONTROL PLANS
FOR
RANCHO CALIFORNIA RD/MORAGA RD/COSMIC DR/YUKON DR
MARGARITA RD
ENGINEER OF WORK'S CERTIFICATE
I, D. LYNN PARKER , hereby declare that I am the engineer of Work for this project, that I have
exercised responsible charge over the design of the project as defined in Section 6703 of the
Business and Professions Code, and the design is consistent with current standards and City of
Temecula.
I understand that the check of project drawings and specifications by the City of Temecula is
confined to a review only and does not relieve me of responsibilities for project design.
Signed Date_______________
R.C.E. 29570 3/31/25Exp.________________
Firm_________
Address__P.
Telephone (909) 472-9983______________________________
__________________________PARKER ENGINEERING, LLC
______________________________O BOX 1666, COTTONWOOD, AZ 86326
3/28/2024
3/28/2024
04/04/24
04/04/24
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
6 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70116-5350519
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
FRONTIER ENGINEER:
RAUL RIVAS (909) 406-3178
2647
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
ENGINEER'S SEAL
MANHOLE #
3
9
5
LOCATION
RANCHO CA
L
I
F
O
R
N
I
A
R
D
(
4
5
M
P
H
)
D/W
D/W
WORK
AREA50'MIN/100'
M
A
X
DOWNSTRE
A
M
TAPER
360'
BUFFER SP
A
C
E
180'
SHOULDER
T
A
P
E
R
180'
BIKE TAPER
350'
SIGN SPAC
I
N
G
350'
SIGN SPAC
I
N
G
350'
SIGN
SPACING
STOP
LANDSCAP
E
M
E
D
I
A
N
350'
SIGN SPA
C
I
N
G
1
0
0
'
S
I
G
N
S
P
A
C
I
N
G
BIKE LANE
BIKE LANE
BIKE LANE
BIKE LANE
BIKE LANE
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
C12(CA)
NARROW
LANE
BIKE LANE
CLOSED
AHEAD
C20(CA)BIKE
W5-1
NARROWS
ROADW11-1
W16-1
W11-1 ASSEMBLY
SHARE
THE ROAD
20'
1
3
'
M
O
R
A
G
A
R
D
(
2
5
M
P
H
)
TRAFFIC CONTROL PLANS
FOR
RANCHO CALIFORNIA RD & MORAGA RD
2
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
SCALE: 1"=40'
DURATION OF WORK:
1 DAY
WORK HOURS
SUNDAY-THURSDAY
9:00 PM - 5:00 AM
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
3/28/2024
04/04/24
04/04/24
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
6 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70116-5350519
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
FRONTIER ENGINEER:
RAUL RIVAS (909) 406-3178
2647
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
ENGINEER'S SEAL
D/W
B
I
K
E
L
A
N
E
S
WORK
AREA
320'
MERG
I
N
G
T
A
P
E
R
208'
BUFFE
R
S
P
A
C
E
S
3
5
0
'
S
I
G
N
S
P
A
C
I
N
G
3
5
0
'
S
I
G
N
S
P
A
C
I
N
G
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
W12-1
C30(CA)
LANE
CLOSED
350'
SIGN SP
A
C
I
N
G
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
1
0
0
'
S
I
G
N
S
P
A
C
I
N
G
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
C30(CA)
LANE
CLOSED
W
O
R
K
R
O
A
D
CROSS HERE
SIDEWALK CLOSED
R9-11(LT)
AHEAD
R9-3A
CROSS HERE
SIDEWALK CLOSED
R9-11(RT)
AHEAD
RANC
H
O
C
A
L
I
F
O
R
N
I
A
R
D
(
4
0
M
P
H
)
M
O
R
A
G
A
R
D
(
4
0
M
P
H
)
L
Y
N
D
I
E
L
N
(
2
5
M
P
H
)
242'
TAN
G
E
N
T
CONC
R
E
T
E
M
E
D
I
A
N
CONC
R
E
T
E
M
E
D
I
A
N
C30(CA)
LANE
CLOSED
C30(CA)
LANE
CLOSED
W12-1
100'
CHAN
N
E
L
I
Z
E
R
MH#324
LOCATION
350
'
SIG
N
S
P
A
C
I
N
G
350
'
SIG
N
S
P
A
C
I
N
G
350
'
SIG
N
S
P
A
C
I
N
G
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
W12-1
320'
MER
G
I
N
G
T
A
P
E
R
242'
TAN
G
E
N
T
LANE
CLOSED
AHEAD
W20-5
INTERCHANGEABLE WITH
C20A (CA)
W4-2L
2
LEFT
1
0
0
'
S
I
G
N
S
P
A
C
I
N
G
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
1
0
0
'
S
I
G
N
S
P
A
C
I
N
G
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
S
CON
C
R
E
T
E
M
E
D
I
A
N
CON
C
R
E
T
E
M
E
D
I
A
N
C30(CA)
LANE
CLOSED
100'
CHA
N
N
E
L
I
Z
E
R
RAN
C
H
O
C
A
L
I
F
O
R
N
I
A
R
D
(
4
0
M
P
H
)
V
I
A
L
A
S
C
O
L
I
N
A
S
(
2
5
M
P
H
)
3
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
SCALE: 1"=40'
WORK HOURS
SUNDAY-THURSDAY
9:00 PM - 5:00 AM
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
TRAFFIC CONTROL PLANS
FOR
RANCHO CALIFORNIA RD & MORAGA RD
DURATION OF WORK:
1 DAY
3/28/2024
04/04/24
04/04/24
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
6 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70116-5350519
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
FRONTIER ENGINEER:
RAUL RIVAS (909) 406-3178
2647
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
ENGINEER'S SEAL
PAINTED MEDIAN
BIKE LANE
PAINTED M
E
D
I
A
N
BIKE LANE
270'
SH IFTING TAPER
RANCHO C
A
L
I
F
O
R
N
I
A
R
D
(45 MPH)
180'
BIKE TAPER
SIDEWALK
522'
BUFFER
MANHOLE #
3
9
7
LOCATION
1
2
'
1
2
'
WORK
ROAD
AHEAD
W20-1
ROAD WORK
END
G20-2
C
O
S
M
I
C
D
R
(
2
5
M
P
H
)
H
U
M
B
E
R
D
R
(
2
5
M
P
H
)
1
0
0
'
S
I
G
N
S
P
A
C
I
N
G
1
0
0
'
S
I
G
N
S
P
A
C
I
N
G
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
ROAD WORK
END
G20-2
1
2
'
BIKE LANE
BIKE LANE
BIKE LANE
R9-3A
R9-3A
CROSS HERE
SIDEWALK CLOSED
R9-11(LT)
AHEAD
9
'
601' TO C/L
S
C30(BIKE)
CLOSED
BIKE LANE
RANCH
O
C
A
L
I
F
O
R
N
I
A
R
D
M
O
R
A
G
A
R
D
CROSS HERE
SIDEWALK CLOSED
R9-11(RT)
AHEAD
W11-1
W16-1
W11-1 ASSEMBLY
SHARE
THE ROAD
PAINTED MEDIAN
WORK
ROAD
AHEAD
W20-1350'
SIGN SPACING
350'
SIGN SPACING
350'
SIGN SPACING
CLOSED
AHEAD
C20 (CA)
INTERCHANGEABLE
WITH W20-5
1
BIKE LANE
ROAD WORK
END
G20-2
C12(CA)
NARROW
LANE
W5-1
NARROWS
ROAD
RANCHO CALIFORNIA RD
(45 MPH)
4
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
SCALE: 1"=40'
WORK HOURS
SUNDAY-THURSDAY
9:00 PM - 5:00 AM
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
ROAD WORK
END
G20-2
R3-4
R3-4
C30(BIKE)
CLOSED
BIKE LANE
TRAFFIC CONTROL PLANS
FOR
RANCHO CALIFORNIA RD & COSMIC DR
DURATION OF WORK:
1 DAY
3/28/2024
04/04/24
04/04/24
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
6 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70116-5350519
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
FRONTIER ENGINEER:
RAUL RIVAS (909) 406-3178
2647
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
ENGINEER'S SEAL
MANHOLE #308
LOCATION
D/W
D/W
D/W
WORK
AREA
360'BUFFE
R
S
P
A
C
E
270'SHIFTI
N
G
T
A
P
E
R
180'
BIKE TA
P
E
R
350'
SIGN S
P
A
C
I
N
G
350'
SIGN
SPACIN
G
350'
SIGN S
P
A
C
I
N
G
BIKE LA
N
E
BIKE L
A
N
E
BIKE LA
N
E
BIKE L
A
N
E
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
C12(CA)
NARROW
LANE
BIKE LANE
CLOSED
AHEAD
C20(CA)BIKE
W5-1
NARROWS
ROAD
W11-1
W16-1
W11-1 ASSEMBLY
SHARE
THE ROAD10
0
'
SI
G
N
S
P
A
C
I
N
G
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
350'
SIGN SPACI
N
G
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
BIKE LANE
BIKE LANE
25
0
'
SI
G
N
S
P
A
C
I
N
G
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
12
'
20'
CONCR
E
T
E
M
E
D
I
A
N
CONCR
E
T
E
M
E
D
I
A
N
CONCR
E
T
E
M
E
D
I
A
N
RANCH
O
C
A
L
I
F
O
R
N
I
A
R
D
(45 MP
H
)
YU
K
O
N
RD
(3
5
MP
H
)
AS
T
R
O
I
D
W
A
Y
(2
5
M
P
H
)
5
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
SCALE: 1"40'
WORK HOURS
SUNDAY-THURSDAY
9:00 PM - 5:00 AM
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
TRAFFIC CONTROL PLANS
FOR
RANCHO CALIFORNIA RD & YUKON RD
DURATION OF WORK:
1 DAY
3/28/2024
04/04/24
04/04/24
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
6 SHEET
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
70116-5350519
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
FRONTIER ENGINEER:
RAUL RIVAS (909) 406-3178
2647
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
ENGINEER'S SEAL
6
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
ROAD WORK
END
G20-2
C30A(CA)
SHOULDER
CLOSED
CLOSED
BIKE
SC11 (MOD)
LANE
W11-1
W16-1
W11-1 ASSEMBLY
SHARE
THE ROAD
350'
SIGN
SPACING
INSTALL TEMP. NO PARKING
72 HOURS PRIOR TO COMMENCING WORK
30' X 8' WORK
AREA
MH #140
LOCATION
52' TO C/L
CURB
CONCRETE MEDIAN
104' TO C/L
CURB
CURB
WO
R
K
RO
A
D
BIKE LANE
200'
BIKE LANE
TAPER
S
300'
SHIFTING TAPER
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
350'
SIGN
SPACING
CURB
350'
SIGN
SPACING
WORK
ROAD
AHEAD
W20-1C12(CA)
NARROW
LANE
W5-1
NARROWS
ROAD
R9-3A
RANCHO CALIFORNIA RD (50 MPH)
MA
R
G
A
R
I
T
A
R
D
BIKE LANE
BIKE LANE
BIKE LANE
CONCRETE MEDIAN
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
R3-4
100'
OPENING
140' TURN LANE W12-1
SCALE: NTS
TURN RIGHT
M U S T
RIGHT LANE
R3-7R
BIKE LANE
CLOSED
AHEAD
C20(CA)BIKE
25' MAX
CROSS HERE
SIDEWALK CLOSED
AHEAD
R9-11(RT)
CROSS HERE
SIDEWALK CLOSED
AHEAD
R9-11(RT)
R9-11(RT) AT INTERSECTION OF
RANCHO CALIFORNIA RD & YUKON RD
NORMAL OPERATION
R9-3A
NIGHT WORK ONLY
SUN- THURS 9PM-5AM
12' MIN12' MIN
12' MIN
TRAFFIC CONTROL PLANS
FOR
RANCHO CALIFORNIA RD & MARGARITA RD
DURATION OF WORK:
1 DAY
3/28/2024
04/04/24
04/04/24