Loading...
HomeMy WebLinkAboutLD23-2411Permit Number: LD23-2411 LD - Utilities/ Excavation - Parallel Issued: 01/10/2024 Expired: 05/27/2025 Job Address: Pechanga Pkwy Sw/S Se/O Via Eduardo Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Patrick Mulvey 43410 Business Park Drive Temecula, CA 92590 Applicant: Teichert Energy & Utilities Group Inc (916) 484-3011 Contractor: Utility Work Order Number: D2093 Description: RCWD D2093 WORK HOURS SHALL BE MONDAY – FRIDAY, NO HOLIDAYS, UPDATED HOURS 9/10 PER RM 7:30am - 4:30pm Proposed work: Install new 16" and 20" waterlines per approved RCWD plans "PECHANGA PERMANENT CAPACITY IMPROVEMENTS, PROJECT No. D2093". The waterlines will be owned and operated by the Rancho California Water District. All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD23-1968 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD23-2411 LD - Utilities/ Excavation - Parallel Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project. Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date Page 2 of 3 Permit Number: LD23-2411 LD - Utilities/ Excavation - Parallel City Engineer or Authorized Representative Date 01/10/2024 Page 3 of 3 Rancho Water REVISIONS VICINITY MAP RANCHO CALIFORNIA WATER DISTRICT TRAFFIC CONTROL PLAN PECHANGA PERMANENT CAPACITY IMPROVEMENTS CITY OF TEMECULA, CA. (PROJECT No. D2093) TITLE SHEET TCP1 PROPOSED 16" AND 20" CML&C STEEL WATERLINES INDEX MAPTRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20) PECHANGA PARKWAY VI A E D U A R D O WO L F V A L L E Y RO A D HU R O N ST R E E T N C A S I N O DR I V E GENERAL STRIPING NOTES: SHEET 1-2 LEGEND: WORK HOURS WARNING SIGNS LEGEND: ROAD WORK AHEAD LEFT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT USE CROSSWALK CONSTRUCTION NOTES: SHEET INDEX LEFT LANE MUST TURN LEFT RIGHT CLOSED 2 LANE AHEAD JOB DURATION BIKE LANE CLOSED TC PHASING SCOPE OF WORK SIDEWALK CLOSED USE OTHER SIDE OK 12/21/23 12/21/23 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK RIGHT LANE MUST TURN RIGHT USE CROSSWALK ROAD WORK AHEAD USE CROSSWALK ROAD WORK AHEAD RIGHT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT BIKE LANE CLOSED Rancho Water REVISIONS TCP2 LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE I - STA 10+00 TO 10+35± TRAFFIC CONTROL PHASING SCOPE OF WORK SUP E R S E D E D B Y S H E E T T C P 2 A 12/21/23 12/21/23 2 7 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK USE CROSSWALK ROAD WORK AHEAD USE CROSSWALK LANE CLOSED LEFT LANE MUST TURN LEFT OK ROAD WORK AHEAD LEFT CLOSED 2 LANE AHEAD LANE CLOSED LANE CLOSED Rancho Water REVISIONS TCP2A LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE I - STA 10+00 TO 12+50± TRAFFIC CONTROL PHASING SCOPE OF WORK 12/21/23 12/21/23 THIS S H E E T I S S U P E R S E D E D BY S H E E T S T C P 2 B A N D T C P 2 C LANE CLOSED ROAD WORK AHEAD USE CROSSWALK ROAD WORK AHEAD USE CROSSWALK LANE CLOSED LEFT LANE MUST TURN LEFT OK LANE CLOSED LANE CLOSED OK OK LEFT CLOSED 1 LANE AHEAD Rancho Water REVISIONS TCP2B LEGEND: VI A E D U A R D O [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE I - STA 10+00 TO 12+50± TRAFFIC CONTROL PHASING SCOPE OF WORK PARISPPANY CT ROAD WORK AHEAD LEFT CLOSED 2 LANE AHEAD LANE CLOSED LANE CLOSED TCP2C LEGEND: PECHANGA PKWY [45 MPH] HU R O N S T [ 2 5 M P H ] PHASE I - STA 10+00 TO 12+50± TRAFFIC CONTROL PHASING SCOPE OF WORK Rancho Water REVISIONS ROAD WORK AHEAD RIGHT CLOSED 1 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED ROAD WORK AHEAD BIKE LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT LANE CLOSED ROAD WORK AHEAD SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED CROSS HERE AHEAD SIDEWALK CLOSED CROSS HERE AHEAD Rancho Water REVISIONS TCP3 LEGEND: PHASE II- STA 10+35 ±TO 12+87, AND WATER METER/BACKFLOW ASSEMBLY PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] VI A E D U A R D O [ 2 5 M P H ] TRAFFIC CONTROL PHASING SCOPE OF WORK 12/21/23 12/21/23 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK RIGHT LANE MUST TURN RIGHT ROAD WORK AHEAD SIDEWALK CLOSED CROSS HERE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED CROSS HERE AHEAD ROAD WORK AHEAD RIGHT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT BIKE LANE CLOSED LANE CLOSED Rancho Water REVISIONS TCP4 LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE III - STA 20+00 TO 20+28±, AND WATER METER ASSMBLY TRAFFIC CONTROL PHASING SCOPE OF WORK 12/21/23 12/21/23 Rancho Water REVISIONS VICINITY MAP RANCHO CALIFORNIA WATER DISTRICT TRAFFIC CONTROL PLAN PECHANGA PERMANENT CAPACITY IMPROVEMENTS CITY OF TEMECULA, CA. (PROJECT No. D2093) TITLE SHEET TCP1 PROPOSED 16" AND 20" CML&C STEEL WATERLINES INDEX MAPTRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20) PECHANGA PARKWAY VI A E D U A R D O WO L F V A L L E Y RO A D HU R O N ST R E E T N C A S I N O DR I V E GENERAL STRIPING NOTES: SHEET 1-2 LEGEND: WORK HOURS WARNING SIGNS LEGEND: ROAD WORK AHEAD LEFT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT USE CROSSWALK CONSTRUCTION NOTES: SHEET INDEX LEFT LANE MUST TURN LEFT RIGHT CLOSED 2 LANE AHEAD JOB DURATION BIKE LANE CLOSED TC PHASING SCOPE OF WORK SIDEWALK CLOSED USE OTHER SIDE OK 12/21/23 12/21/23 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK RIGHT LANE MUST TURN RIGHT USE CROSSWALK ROAD WORK AHEAD USE CROSSWALK ROAD WORK AHEAD RIGHT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT BIKE LANE CLOSED Rancho Water REVISIONS TCP2 LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE I - STA 10+00 TO 10+35± TRAFFIC CONTROL PHASING SCOPE OF WORK SUP E R S E D E D B Y S H E E T T C P 2 A 12/21/23 12/21/23 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK USE CROSSWALK ROAD WORK AHEAD USE CROSSWALK LANE CLOSED LEFT LANE MUST TURN LEFT OK ROAD WORK AHEAD LEFT CLOSED 2 LANE AHEAD LANE CLOSED LANE CLOSED Rancho Water REVISIONS TCP2A LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE I - STA 10+00 TO 12+50± TRAFFIC CONTROL PHASING SCOPE OF WORK ERICK ESCOBEDO 3002 02/29/24 ROAD WORK AHEAD RIGHT CLOSED 1 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED ROAD WORK AHEAD BIKE LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT LANE CLOSED ROAD WORK AHEAD SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED CROSS HERE AHEAD SIDEWALK CLOSED CROSS HERE AHEAD Rancho Water REVISIONS TCP3 LEGEND: PHASE II- STA 10+35 ±TO 12+87, AND WATER METER/BACKFLOW ASSEMBLY PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] VI A E D U A R D O [ 2 5 M P H ] TRAFFIC CONTROL PHASING SCOPE OF WORK 12/21/23 12/21/23 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK RIGHT LANE MUST TURN RIGHT ROAD WORK AHEAD SIDEWALK CLOSED CROSS HERE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED CROSS HERE AHEAD ROAD WORK AHEAD RIGHT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT BIKE LANE CLOSED LANE CLOSED Rancho Water REVISIONS TCP4 LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE III - STA 20+00 TO 20+28±, AND WATER METER ASSMBLY TRAFFIC CONTROL PHASING SCOPE OF WORK 12/21/23 12/21/23 Rancho Water REVISIONS VICINITY MAP RANCHO CALIFORNIA WATER DISTRICT TRAFFIC CONTROL PLAN PECHANGA PERMANENT CAPACITY IMPROVEMENTS CITY OF TEMECULA, CA. (PROJECT No. D2093) TITLE SHEET TCP1 PROPOSED 16" AND 20" CML&C STEEL WATERLINES INDEX MAPTRAFFIC CONTROL GENERAL NOTES (REV'D. 08/26/20) PECHANGA PARKWAY VI A E D U A R D O WO L F V A L L E Y RO A D HU R O N ST R E E T N C A S I N O DR I V E GENERAL STRIPING NOTES: SHEET 1-2 LEGEND: WORK HOURS WARNING SIGNS LEGEND: ROAD WORK AHEAD LEFT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT USE CROSSWALK CONSTRUCTION NOTES: SHEET INDEX LEFT LANE MUST TURN LEFT RIGHT CLOSED 2 LANE AHEAD JOB DURATION BIKE LANE CLOSED TC PHASING SCOPE OF WORK SIDEWALK CLOSED USE OTHER SIDE 12/21/23 12/21/23 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK RIGHT LANE MUST TURN RIGHT USE CROSSWALK ROAD WORK AHEAD USE CROSSWALK ROAD WORK AHEAD RIGHT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT BIKE LANE CLOSED Rancho Water REVISIONS TCP2 LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE I - STA 10+00 TO 10+35± TRAFFIC CONTROL PHASING SCOPE OF WORK 12/21/23 12/21/23 ROAD WORK AHEAD RIGHT CLOSED 1 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED ROAD WORK AHEAD BIKE LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT LANE CLOSED ROAD WORK AHEAD SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE Rancho Water REVISIONS TCP3 LEGEND: PHASE II- STA 10+35 ±TO 12+87, AND WATER METER/BACKFLOW ASSEMBLY PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] VI A E D U A R D O [ 2 5 M P H ] TRAFFIC CONTROL PHASING SCOPE OF WORK 12/21/23 12/21/23 LANE CLOSED ROAD WORK AHEAD USE CROSSWALK RIGHT LANE MUST TURN RIGHT ROAD WORK AHEAD SIDEWALK CLOSED CROSS HERE SIDEWALK CLOSED USE OTHER SIDE SIDEWALK CLOSED USE OTHER SIDE ROAD WORK AHEAD RIGHT CLOSED 2 LANE AHEAD SHARE THE ROAD BIKE LANE CLOSED AHEAD LANE CLOSED RIGHT LANE MUST TURN RIGHT RIGHT LANE MUST TURN RIGHT BIKE LANE CLOSED Rancho Water REVISIONS TCP4 LEGEND: PECHANGA PKWY [45 MPH] VI A E D U A R D O [ 2 5 M P H ] HU R O N S T [ 2 5 M P H ] WO L F V A L L E Y R D [ 4 0 M P H ] PECHANGA PKWY [45 MPH] CA S I N O D r [ 2 5 M P H ] PHASE III - STA 20+00 TO 20+28±, AND WATER METER ASSMBLY TRAFFIC CONTROL PHASING SCOPE OF WORK 12/21/23 12/21/23 Rancho Water REVISIONS APPROVED FOR CONSTRUCTION: RANCHO CALIFORNIA WATER DISTRICT LOCATION MAP LEGEND BENCHMARK BASIS OF BEARING VICINITY MAP SHEET INDEX RANCHO CALIFORNIA WATER DISTRICT PECHANGA PERMANENT CAPACITY IMPROVEMENTS (PROJECT No. D2093) ABBREVIATIONS TITLE SHEET 1 Operations & Maintenance Date Engineering Manager Date Engineering Date Contracts & Inspection Date SURVEY BY LD23-2411 Digitally signed by Dan Ruiz DN: C=US, OU=Director of Engineering, O=Rancho California Water District, CN=Dan Ruiz, E=ruizd@ranchowater.com Reason: I am the author of this document Location: your signing location here Date: 2023.12.19 15:58:07-08'00' Foxit PDF Editor Version: 11.2.7 Dan Ruiz Digitally signed by Dan Ruiz DN: C=US, OU=Director of Engineering, O=Rancho California Water District, CN=Dan Ruiz, E=ruizd@ranchowater.com Reason: I am the author of this document Location: your signing location here Date: 2023.12.19 15:58:19-08'00' Foxit PDF Editor Version: 11.2.7 Dan Ruiz Casey Arndt Digitally signed by Casey Arndt Date: 2023.12.20 08:48:27 -08'00' Adobe Acrobat version: 2017.012.30262 Jordan Farrell Digitally signed by Jordan Farrell Date: 2023.12.20 09:55:21 -08'00' CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 12/21/2023 12/21/2023 12/21/2023 12/21/20 ’ GENERAL NOTES: PIPELINE AND APPURTENANCES: UTILITIES: CONSTRUCTION DRAWINGS: CONSTRUCTION TOLERANCES: NOTIFICATIONS: Rancho Water REVISIONS APPROVED FOR CONSTRUCTION: Engineering Date RANCHO CALIFORNIA WATER DISTRICT 2 SECTION AND DETAIL IDENTIFICATION SYSTEM SHEET INDEX MAP A P N 9 1 8 - 3 1 2 - 0 1 6 A P N 9 6 1 - 0 2 0 - 0 2 7 A P N 9 6 2 - 0 1 0 - 0 3 7 A P N 9 1 8 - 1 8 0 - 0 5 9 ’ ’ ’ STAGING AREA NOTES: GENERAL NOTES AND SHEET INDEX PLAN CITY OF TEMECULA NOTES SEQUENCE OF WORK NOTES: LD23-2411 Digitally signed by Dan Ruiz DN: C=US, OU=Director of Engineering, O=Rancho California Water District, CN=Dan Ruiz, E=ruizd@ranchowater.com Reason: I am the author of this document Location: your signing location here Date: 2023.12.19 15:58:33-08'00' Foxit PDF Editor Version: 11.2.7 Dan Ruiz Rancho Water REVISIONS APPROVED FOR CONSTRUCTION: Engineering Date RANCHO CALIFORNIA WATER DISTRICT 20"/16" CML&C STEEL WATERLINE PLAN & PROFILE NOTES: 3 ROAD CL DATA PIPELINE CL DATA PECHANGA PKWY WO L F V A L L E Y R D VI A E D U A R D O APN 918-312-016 APN 961-020-027 APN 962-010-037 APN 918-180-059 PECHANGA PKWY PECHANGA RESORT LD23-2411 Digitally signed by Dan Ruiz DN: C=US, OU=Director of Engineering, O=Rancho California Water District, CN=Dan Ruiz, E=ruizd@ranchowater.com Reason: I am the author of this document Location: your signing location here Date: 2023.12.19 15:58:45-08'00' Foxit PDF Editor Version: 11.2.7 Dan Ruiz Rancho Water REVISIONS APPROVED FOR CONSTRUCTION: Engineering Date RANCHO CALIFORNIA WATER DISTRICT 10" WATER METER ASSEMBLY DETAILS MATERIAL LIST: 4 NOTES: LD23-2411 Digitally signed by Dan Ruiz DN: C=US, OU=Director of Engineering, O=Rancho California Water District, CN=Dan Ruiz, E=ruizd@ranchowater.com Reason: I am the author of this document Location: your signing location here Date: 2023.12.19 15:59:03-08'00' Foxit PDF Editor Version: 11.2.7 Dan Ruiz Rancho Water REVISIONS APPROVED FOR CONSTRUCTION: Engineering Date RANCHO CALIFORNIA WATER DISTRICT 10" WATER METER AND BACKFLOW ASSEMBLY DETAILS 5 MATERIAL LIST: NOTES: LD23-2411 Digitally signed by Dan Ruiz DN: C=US, OU=Director of Engineering, O=Rancho California Water District, CN=Dan Ruiz, E=ruizd@ranchowater.com Reason: I am the author of this document Location: your signing location here Date: 2023.12.19 15:59:18-08'00' Foxit PDF Editor Version: 11.2.7 Dan Ruiz Rancho Water REVISIONS APPROVED FOR CONSTRUCTION: Engineering Date RANCHO CALIFORNIA WATER DISTRICT CIVIL DETAILS 6 CONNECTION DETAIL (STA 10+00)CONNECTION DETAIL (STA 20+00) INSULATING FLANGE SET ADJUSTABLE PIPE/FLANGE SUPPORTSAIR RELEASE VALVE SAMPLE CONNECTION EXISTING DEMO PROPOSED LD23-2411 Digitally signed by Dan Ruiz DN: C=US, OU=Director of Engineering, O=Rancho California Water District, CN=Dan Ruiz, E=ruizd@ranchowater.com Reason: I am the author of this document Location: your signing location here Date: 2023.12.19 15:59:32-08'00' Foxit PDF Editor Version: 11.2.7 Dan Ruiz CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 01/09/2024 01/09/2024 01/09/2024 01/09/20