HomeMy WebLinkAboutLD24-3231Permit Number: LD24-3231
LD - Utilities/ Utility Maintenance
Issued: 07/18/2024
Expired: 02/18/2025
Job Address: 45436 Via Jaca
Legal Description: Tract Map 23063-7:21
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Southern California Edison
(Utility Billing)
24487 Prielipp
Wildomar, CA 92595
(951) 440-9074
Applicant:
Ferreira Construction Co., Inc.
10370 Commerce Center Drive, B-200
Rancho Cucamonga, CA 91730
(909) 606-5900
Contractor:
Utility Work Order Number: 904501382
Description:
SCE 904501382-200
WORK HOURS SHALL BE MONDAY – FRIDAY, NO HOLIDAYS, 8:30am - 3:30pm
Proposed work:
Transformer pad change
Permitee Date
City Engineer or Authorized Representative Date
07/18/2024
Page 1 of 1
STOP
**
TO BE DETERMINED BY
THE CITY OF TEMECULA**
RE
V
'
D
0
4
/
0
3
/
23
Permit Number: LD24-0223
LD - Utilities/ Annual Permit
Issued: 01/19/2024
Expired: 01/31/2025
Job Address: 41000 Main St
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Southern California Edison
(Utility Billing)
24487 Prielipp
Wildomar, CA 92595
(951) 440-9074
Applicant:
Contractor:
Utility Work Order Number:
Description:
SCE I/O 421066 2024 ANNUAL BLANKET ENCROACHMENT PERMIT
Permit covers maximum of 5 ft x 6 ft size bell holes and maintenance work. Including vegetation Management
as necessary per General Order 95 Rule 35, PRC 4293, PRC 4292, and any other vegetation requirements for
Health, Welfare and Safety of the Public. All work will conform with ANSI A 300 pruning Standards.
This permit does not allow the relocation or removal of a tree within the public right away, without prior approval
of the City.
All work within the city right-of-way requires an Encroachment Permit Application and inspections by a city
inspector, including emergency work.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
ALL PERMITS REQUIRE NOTIFICATION VIA LDInspections@temeculaca.gov :
•For maintenance work contact LDInspections@temeculaca.gov one (1) business day prior to any work.
•For emergency work contact LDinspections@temeculaca.gov immediately.
Traffic Control
•For emergency or maintenance work on residential streets, refer to City of Temecula approved Standard
Traffic Control Plans.
•For maintenance work on non-residential or major streets, site specific traffic control plans may be required
at the discretion of the Director of Public Works/City Engineer or designated appointee. Work area plans shall
be submitted to determine if site-specific plans are required.
Page 1 of 2*****See Page 2 of this Permit for Permittee Responsibilities*****
Permit Number: LD24-0223
LD - Utilities/ Annual Permit
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
City Engineer or Authorized Representative Date
01/19/2024
Page 2 of 2