Loading...
HomeMy WebLinkAboutLD24-2928Permit Number: LD24-2928 LD - Utilities/ Utility Maintenance Issued: 07/08/2024 Expired: 02/10/2025 Job Address: 29880 Camino Del Sol Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Southern California Edison (Utility Billing) 24487 Prielipp Wildomar, CA 92595 (951) 440-9074 Applicant: Guzman Grading And Paving Corp 14030 Rose Ave Fontana, CA 92337 (909) 428-5960 Contractor: Utility Work Order Number: 904500926-200 Description: WO: 904500926-200; Bad Cable, New Duct Work Permitee Date City Engineer or Authorized Representative Date 07/08/2024 Page 1 of 1 Distribution Repair Order Information:CAD ID:GO 062924-00444 Incident Date:06//29//2024 Time:19:29 Structure No:5001455 RO Date:06//29//2024 Time:19:29 Reported by:Douglass, Trazell Radio No:9496 Cell Number:(951) 3971871 Problem:No Lights Area Cause:Damaged/Broken UG Primary Cable Circuit:ALCALDE 12KV Code:00274 Sub:MORAGA Location:29880 CAMINO DEL SOL, TEMECULA Access:Street Seq No:#8881 Foreman:Radio No:Cell Number: Duration:7 Crew Size:4 Crews Needed:1 Crew Type:DISTRIBUTION Enviromental Release?No Enviromental Other?No District Notified?No- Tree Crew Needed?No Grounding Needed for Tree Crew?No Load Off (Individual or Downstream): Y Other Departments: TeleComm Transmission Other Utility Other Equipment Needed: X Double/Tub Bucket Traffic Control Flatbed EasyHauler Y2K Ped Control Snow Cat Fork Lift Auger Truck P/L Dolly Air Ops Power Dolly X UG Van P/LPole Dolly FWD Crane Material: 600 ft-1/c #2 XLP Cable Material Code - _________________ 2-Elbow Deadbreak 2 220MIL Material Code - _________________ Remarks:(Status of Line, Access Instructions, Special Instructions) REPLACE BAD PRIMARY CABLE FROM B1455 TO B1456 LOAD SIDE IS ISOLATED AT B1455 # of Attachments -2 Pg 1 of 2 RO Ver 7.1.0.6 D: 88/ SH UCC #: 904500926-200 / TS AGMT: C-3315 WO #: 904500926 1 Michelle Y Ramirez From:Tristan Goedert Sent:Monday, July 1, 2024 6:49 AM To:Dwayne Horton Cc:SCE Emergency Subject:(External):904500926 Private Lands Temecula Camino Del Sol Trenching 5001455 ❚❛❜ CAUTION: This is an external email. Be careful when opening links or attachments This message was received from outside Edison. Report Suspicious Hi Dwayne, Thanks for alerting us to the emergency trenching at structure 5001455, 29880 Camino Del Sol, Temecula, CA. Please provide:  Confirmation if work was previously entered into ESF/EHSync We have reviewed for bio, waters, and cultural resources concerns. You are approved to proceed with additional guidance if needed and the following standard environmental requirements: Tailboard Briefing: The Environmental Requirements must be kept on site and be read to the crew prior to starting work.  If any of the requirements create a safety or scope concern, please contact Environmental Services. If additional ground disturbing or vegetation clearing activities are proposed during project activities, stop work and contact Environmental Services. Scope of Work Authorization: The following ERD conditions apply to the work outlined in the Scope of Work provided to ESD. Any changes or additions, including but not limited to construction means and methods, equipment identified, materials used, extent of grading, scope of vegetation impacting activities, add-ons, or proposed access routes, must be reviewed and released by SCE Environmental prior to the start of work.  Minimize work area: The work area shall be minimized to the smallest area necessary to complete the work.  Crew Check: Prior to starting work, crews will check the workspace for bird nests (e.g., pole cavities, vegetation to be removed). Contact the biological monitor or call the number above prior to work within 200 feet of an active nest. Cavity Nests: Prior to starting work, crews will check the workspace for cavities in poles and trees. Crews will tap loudly on poles and trees with potential cavity nests and watch for wildlife leaving the 2 cavity or the sounds of young birds inside the cavity. If an active cavity nest is suspected, crew must STOP WORK and contact SCE Environmental Services prior to work. Injured/Trapped Wildlife: Prior to the start of work, crews will inspect their workspace for any injured or dead wildlife. In addition, look in holes and trenches, construction material, and equipment for any trapped wildlife. Call the number above if you observed dead, injured, or trapped wildlife. Spill Release/Prevention: Vehicles/equipment must be inspected for leaks (e.g., fuel, oil, hydraulic fluids, etc.) and repaired prior to work. Storing, fueling, and maintenance should not occur near a wetland, waterway, or riparian area. Spill kits/absorbent clean-up materials shall be available on-site and if used, disposed of properly. Contact 1-844-GOT-SPIL for any potential hazardous material or spills that cannot be cleaned up by spill kits alone. Avoid Waters and Wetlands: No work is allowed within waters or riparian vegetation unless reviewed and released by SCE Environmental and all necessary permits have been issued. If unanticipated wetlands, waters, and riparian vegetation are encountered STOP WORK and contact SCE Environmental.  Driving on road through waters (wet or dry): Only rubber wheeled vehicles and equipment are allowed to travel through drivable water crossings on existing access roads. No grading or road improvements/repairs/alterations (e.g., damming, diversions, fill, placement of plates or boards, etc.) are allowed within these areas unless reviewed and released by SCE Environmental. No stopping within flowing or standing water.  Unanticipated groundwater: If unanticipated groundwater is encountered, STOP WORK and contact SCE Environmental.  Archaeological/Human Remains/Paleontological Discoveries: If Archaeological resources (Native American or historical artifacts), fossils, or human remains are encountered, stop work, and call the number above or the SCE Operator 626-302-1212 and ask for an on-call Archaeologist. Site re-contouring: Upon project completion, all disturbed areas must be returned to meet pre-existing contours (i.e., original line and grade).  Weed Maintenance and Prevention: Use certified weed-free materials (e.g., gravel, straw, and fill) to the extent practicable. Maintain facilities and infrastructure to limit the introduction and spread of weeds. Dust Control: No visible dust plumes are allowed. If dust plumes are observed, then slow speeds on dirt roads, water dirt/work areas, or work when the soil is not extremely dry. Generator Usage: Generators are not allowed unless a Generator Ordering Form (GOF) has been completed 20 days prior to work. Contact Transportation Services Department (951) 440-8370 to verify if a form has been received; if no form has been submitted, contact the SCE representative to complete this form immediately. Please let me know if you have any questions, 3 Tristan 1 Michelle Y Ramirez From:Workflow System <WF-BATCH@SCE.COM> Sent:Saturday, June 29, 2024 11:33 PM To:Trazell Douglass Cc:GMC_RepairOrderSE; Field Tool Support; 88RepairOrder Group List Subject:D88*#8881*000904500926-0010*EMERGENT EMERGENT Work Order ‐000904500926‐0010 has been generated successfully.  District   88  RO   #8881  GO   GO 062924‐00444  Problem Statement REPLC DAMAGE PRI CBL/CND BURD Capital  Yes    Pg 2 of 2 Permit Number: LD24-0223 LD - Utilities/ Annual Permit Issued: 01/19/2024 Expired: 01/31/2025 Job Address: 41000 Main St Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Southern California Edison (Utility Billing) 24487 Prielipp Wildomar, CA 92595 (951) 440-9074 Applicant: Contractor: Utility Work Order Number: Description: SCE I/O 421066 2024 ANNUAL BLANKET ENCROACHMENT PERMIT Permit covers maximum of 5 ft x 6 ft size bell holes and maintenance work. Including vegetation Management as necessary per General Order 95 Rule 35, PRC 4293, PRC 4292, and any other vegetation requirements for Health, Welfare and Safety of the Public. All work will conform with ANSI A 300 pruning Standards. This permit does not allow the relocation or removal of a tree within the public right away, without prior approval of the City. All work within the city right-of-way requires an Encroachment Permit Application and inspections by a city inspector, including emergency work. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. ALL PERMITS REQUIRE NOTIFICATION VIA LDInspections@temeculaca.gov : •For maintenance work contact LDInspections@temeculaca.gov one (1) business day prior to any work. •For emergency work contact LDinspections@temeculaca.gov immediately. Traffic Control •For emergency or maintenance work on residential streets, refer to City of Temecula approved Standard Traffic Control Plans. •For maintenance work on non-residential or major streets, site specific traffic control plans may be required at the discretion of the Director of Public Works/City Engineer or designated appointee. Work area plans shall be submitted to determine if site-specific plans are required. Page 1 of 2*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD24-0223 LD - Utilities/ Annual Permit Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date City Engineer or Authorized Representative Date 01/19/2024 Page 2 of 2