Loading...
HomeMy WebLinkAbout02202025 DH AgendaIn compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the office of the City Clerk (951) 694-6444. Notification 48 hours prior to a meeting will enable the City to make reasonable arrangements to ensure accessibility to that meeting [28 CFR 35.102.35.104 ADA Title II]. AGENDA TEMECULA COMMUNITY DEVELOPMENT DIRECTOR'S HEARING MEETING COUNCIL CHAMBERS 41000 MAIN STREET TEMECULA, CALIFORNIA February 20, 2025 - 1:30 PM CALL TO ORDER: Matt Peters, Interim Director of Community Development PUBLIC COMMENTS A total of 15 minutes is provided for members of the public to address the Director of Community Development on items that are not listed on the agenda. Each speaker is limited to three minutes. If the speaker chooses to address the Director of Community Development on an item not listed on the agenda, a Request to Speak form may be filled out and filed with the staff liaison. Once the speaker is called to speak, please come forward. For all items on the agenda, a Request to Speak form may be filed with the staff liaison. On those items, each speaker is limited to five minutes. Item No. 1 1:30 PM Project Number: PA23-0227 Project Type: Development Plan Project Title: Sailhouse DP Applicant: 4M Engineering and Development, Inc. c/o Sherrie Munroe Project Description: Planning Application Number PA23-0227, a Development Plan for an approximately 7,057 square foot warehouse building with office space. Location: 42974 Roick Drive Environmental Action: Categorically Exempt Section 15332, Class 32, In-Fill Development Projects Project Planner: Eric Jones, Case Planner ADJOURNMENT NOTICE TO THE PUBLIC The full agenda packet (including staff reports and any supplemental material available after the original posting of the agenda), will be available for public viewing in the main reception area of the Temecula Civic Center during normal business hours at least 72 hours prior to the meeting. The material will also be available on the City’s website at TemeculaCA.gov and available for review at the respective meeting. If you have questions regarding an item on the agenda, please contact the Community Development Department at (951) 694-6400. ITEM NO. 1 1 STAFF REPORT – PLANNING CITY OF TEMECULA DIRECTOR'S HEARING TO: Matt Peters, Interim Community Development Director FROM: Eric Jones, Associate Planner II DATE OF MEETING: February 20, 2025 PREPARED BY: Eric Jones, Case Planner PROJECT SUMMARY: Planning Application Number PA23-0227, a Development Plan for an approximately 7,057 square foot warehouse building with office space. The project is located at 42974 Roick Drive. RECOMMENDATION: Adopt a Resolution approving the project subject to Conditions of Approval CEQA: Categorically Exempt Section 15332, Class 32, In-Fill Development Projects PROJECT DATA SUMMARY Name of Applicant: 4M Engineering and Development, Inc. c/o Sherrie Munroe General Plan Designation: Industrial Park (IP) Zoning Designation: Light Industrial (LI) Existing Conditions/ Land Use: Site: Vacant Lot / Industrial Park (IP) North: Industrial Building Under Construction / Industrial Park (IP) South: Roick Drive, Vacant Lot / Industrial Park (IP) East: Winchester Road, Existing Industrial Structure / Industrial Park (IP) West: Existing Industrial Structure / Industrial Park (IP) Existing/Proposed Min/Max Allowable or Required Lot Area: 1.94 Acres Existing 0.91 Acres Minimum 2 Total Floor Area/Ratio: 0.21 Proposed 0.40 Maximum Landscape Area/Coverage: 0.26 Proposed 0.20 Minimum Parking Provided/Required: 20 Spaces Proposed 20 Spaces Required Located in Affordable Housing Overlay Zone (AHOZ)? Yes No AHOZ Gain/Loss: +/- N/A BACKGROUND SUMMARY On June 1, 2023, 4M Engineering and Development, Inc., submitted Planning Application No. PA23-0227, a Development Plan to allow for the construction of a building within a parcel zoned Light Industrial (LI). The site will house either research and development uses or a warehousing/distribution uses depending on market interest. Staff has worked with the applicant to ensure that all concerns have been addressed, and the applicant concurs with the recommended Conditions of Approval. ANALYSIS Site Plan The project site is comprised of one vacant parcel located on the northwest corner of the Winchester Road and Roick Drive intersection. The project site slopes up from Winchester Road which elevates the approximately 7,057 square foot structure above the public right-of-way. Vehicles and pedestrians will obtain access to the site via Roick Drive. Once on the property, visitors will enter the parking lot. A gated access point is provided at the end of the parking lot to restrict unauthorized access to the truck yard. The truck yard provides enough space to allow commercial trucks to maneuver. An exterior employee break area is provided along the north side of the structure. As previously mentioned, the uses for the project will be based on market demand. Parking has been analyzed utilizing the most intense possible use allowed in the LI zone (Research and Development). The project will require 20 parking spaces if a Research and Development use with related offices is housed in the structure. The project proposes 20 parking spaces thus meeting the parking requirement. It is important to note that a mezzanine is not included with the project. Any future mezzanine may require additional parking. Architecture The proposed development is architecturally consistent with the surrounding built industrial environment. The project will utilize masonry block as the primary building material with stucco columns and tinted glass as supporting materials. These materials are consistent with neighboring structures. The project also meets the height requirement for the LI zone by not exceeding fifty 3 feet. In addition, all rooftop mechanical equipment will be screened from view from the public right-of-way. Landscaping A portion of the slope fronting Winchester Road already contains landscaping. This landscaping will remain in place and be protected during construction activities. The project will also incorporate new landscaping. Some of the proposed plantings include Bay Laurel and Thornless Palo Verde in 24” boxes, Red Yucca, Dwarf Bottlebrush, and Cat’s Claw Vine. The landscaping for the project is consistent with the City of Temecula Municipal Code requirements. LEGAL NOTICING REQUIREMENTS Notice of the public hearing was published in The Press-Enterprise on February 6, 2025 and mailed to the property owners within the required 600-foot radius. ENVIRONMENTAL DETERMINATION In accordance with the California Environmental Quality Act, the proposed project has been deemed to be categorically exempt from further environmental review (Section 15332, Class 32, In-fill Development Projects). The project is consistent with all applicable General Plan requirements and is located on a site within city limits that totals less than five acres. In addition, the applicant completed the HANS process through the Regional Conservation Authority and the site was found to have no suitable habitat for endangered, rare, or threatened species. Finally, the site will not have any significant effects related to related to traffic, air, noise, or water quality, and the site can be serviced by all utilities. FINDINGS Development Plans (Development Code Section 17.05.010.F) The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City. The project will allow for the construction of a building on a parcel zoned Light Industrial. Industrial uses are permitted within properties zoned Light Industrial. The project has been reviewed and conditioned to ensure conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City. In addition, any future uses for the site will be reviewed to ensure consistency with the General Plan for Temecula during the business license review process. The overall development of the land is designed for the protection of the public health, safety, and general welfare. 4 The project has been designed and conditioned to ensure compliance with the Building, Development, and Fire codes. These codes contain provisions designed to provide for the protection of the public health, safety, and general welfare. Negative impacts are not anticipated. ATTACHMENTS: 1. Vicinity Map 2. DH Resolution 3. Exhibit A - Draft Conditions of Approval 4. Exhibit C - Plan Reductions 5. Notice of Public Hearing 6. Draft Notice of Exemption for County Clerk DH RESOLUTION NO. 2025- A RESOLUTION OF THE DIRECTOR OF COMMUNITY DEVELOPMENT OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA23-0227, A DEVELOPMENT PLAN FOR AN APPROXIMATELY 7,057 SQUARE FOOT WAREHOUSE BUILDING WITH OFFICE SPACE LOCATED AT 42974 ROICK DRIVE AND MAKING A FINDING OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) (APN 909-320- 056) Section 1. Procedural Findings. The Director of Community Development of the City of Temecula does hereby find, determine and declare that: A. On June 1, 2023, 4M Engineering and Development, Inc., c/o Sherrie Munroe on behalf of Sailhouse Temecula, LLC, filed Planning Application No. PA23-0227, a Development Plan Application, in a manner in accord with the City of Temecula General Plan and Development Code. B. The Application was processed including, but not limited to a public notice, in the time and manner prescribed by State and local law. C. The Director of Community Development, at a regular meeting, considered the Application and environmental review on February 20, 2025, at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to and did testify either in support or in opposition to this matter. D. At the conclusion of the Director’s Hearing and after due consideration of the testimony, the Director of Community Development approved Planning Application No. PA23-0227 subject to Conditions of Approval, after finding that the project proposed in Planning Application No. PA23-0227, conformed to the City of Temecula’s General Plan Development Code. Section 2. Further Findings. The Director of Community Development, in approving Planning Application No. PA23-0227, hereby makes the following findings as required by Development Code Section 17.05.010.F (Development Plans). A. The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City; The project will allow for the construction of a building on a parcel zoned Light Industrial. Industrial uses are permitted within properties zoned Light Industrial. The project has been reviewed and conditioned to ensure conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City. In addition, any future uses for the site will be reviewed to ensure consistency with the General Plan for Temecula during the business license review process. B. The overall development of the land is designed for the protection of the public health, safety, and general welfare. The project has been designed and conditioned to ensure compliance with the Building, Development, and Fire codes. These codes contain provisions designed to provide for the protection of the public health, safety, and general welfare. Negative impacts are not anticipated. Section 3. Environmental Findings. The Director of Community Development hereby makes the following environmental findings and determinations in connection with the approval of the Development Plan Application: A. In accordance with the California Environmental Quality Act, the proposed project has been deemed to be categorically exempt from further environmental review (Section 15332, Class 32, In-Fill Development Projects). The project is consistent with all applicable General Plan requirements and is located on a site within city limits that totals less than five acres. In addition, the applicant completed the HANS process through the Regional Conservation Authority and the site was found to have no suitable habitat for endangered, rare, or threatened species. Finally, the site will not have any significant effects related to traffic, air, noise, or water quality, and the site can be serviced by all utilities. Section 4. Conditions. The Director of Community Development of the City of Temecula approves Planning Application No. PA23-0227, a Development Plan, for an approximately 7,066 square foot warehouse building with office space located at 42974 Roick Drive, subject to the Final Conditions of Approval set forth on Exhibit A and the Plans set forth on Exhibit B, attached hereto, and incorporated herein by this reference. Section 5. PASSED, APPROVED AND ADOPTED by the City of Temecula Director of Community Development this 20th day of February, 2025. Matt Peters Interim Director of Community Development I, Denise Jacobo, Secretary of the Temecula Director’s Hearing, do hereby certify that the forgoing DH Resolution No. 2025- was duly and regularly adopted by the Interim Director of Community Development of the City of Temecula at a regular meeting thereof held on the 20th day of February, 2025 Denise Jacobo, Secretary CITY OF TEMECULA CONDITIONS OF APPROVAL ACCEPTANCE Planning Application Number: PA23-0227 By signing below, I/we have agreed to the following Conditions of Approval, including (but not limited to) any referenced documents, local, state, or federal regulations, statement of operations, hours of operation, floor plans, site plans, and Conditions that may require the payment or reimbursement of fees, as described. I/we have read the attached Conditions of Approval and understand them. I/we also understand that violations or non-compliance with these Conditions of Approval, may delay a project, and/or result in the revocation of a permit in accordance with the Temecula Municipal Code. I/we are also responsible for disclosing these Conditions of Approval to any successive owners/operators. I/we agree and commit to the City of Temecula that I/we will implement and abide by the Conditions of Approval, including any indemnification requirements imposed by those conditions. Property Owner Printed Name _________________________ Applicant Printed Name _________________________ Property Owner Signature & Date ___________________________ Applicant Signature & Date ___________________________ Parcel Number(s): 909-320-056 EXHIBIT A CITY OF TEMECULA DRAFT CONDITIONS OF APPROVAL Planning Application No.: Project Description: PA23 -0227 Sailhouse Temecula Development Plan: A Development Plan for an approximately 7,057 square foot warehouse building with office space. The project is located at 42974 Roick Drive. Assessor's Parcel No.: 909-320-056 Industrial MSHCP Category: Business Park/Industrial DIF Category: TUMF Category: Quimby Category: Approval Date: Expiration Date: Per WRCOG Requirements N/A (Non-Residential Project) February 20, 2025 February 20, 2028 New Street In-lieu of Fee: N/A (Not Located within the Uptown Temecula Specific Plan) PLANNING DIVISION Within 48 Hours of the Approval Page 1 of 18 Applicant Filing Notice of Exemption. APPLICANT ACTION REQUIRED: The applicant/developer is responsible for filing the Notice of Exemption as required under Public Resources Code Section 21152 and California Code of Regulations Section 15062 within 48 hours of the project approval. If within said 48-hour period the applicant/ developer has not filed the Notice of Exemption as required above, the approval for the project granted shall be void due to failure of this condition. Failure to submit the Notice of Exemption will result in an extended period of time for legal challenges. FEES: Fees for the Notice of Exemption include the Fifty Dollar County ($50.00) administrative fee. The County of Riverside charges additional fees for credit card transactions. FILING: The City shall provide the applicant with a Notice of Exemption within 24 hours of approval via email. If the applicant/developer has not received the Notice of Exemption within 24 hours of approval, they shall contact the case Planner immediately. All CEQA documents must be filed online with the Riverside County Assessor – County Clerk- Recorder. A direct link to the CEQA filings page is available at TemeculaCA.gov/CEQA. COPY OF FILINGS: The applicant shall provide the City with a digital copy of the required filings within 48 hours. 1. General Requirements ADA Parking. All ADA parking stalls on the premises shall be marked in accordance with Section 22511.8 of the California Vehicle Code. 2. Indemnification of the City. Indemnity, Duty to Defend and Obligation to Pay Judgments and Defense Costs, Including Attorneys’ Fees, Incurred by the City. The Applicant shall defend, indemnify, and hold harmless the City, its elected officials, officers, employees, volunteers, agents, and those City agents serving as independent contractors in the role of City officials (collectively “Indemnitees”) from and against any claims, damages, actions, causes of actions, lawsuits, suits, proceedings, losses, judgments, costs, and expenses (including, without limitation, attorneys’ fees or court costs) in any manner arising out of or incident to the Planning Commission’s actions, this approval and the City Council’s actions, related entitlements, or the City’s environmental review thereof. The Applicant shall pay and satisfy any judgment, award or decree that may be rendered against City or the other Indemnitees in any such suit, action, or other legal proceeding. The City shall promptly notify the Applicant of any claim, action, or proceeding and the City shall reasonably cooperate in the defense. If the City fails to promptly notify the Applicant of any claim, action, or proceeding, or if the City fails to reasonably cooperate in the defense, the Applicant shall not thereafter be responsible to defend, indemnify, or hold harmless the City or the Indemnitees. The City shall have the right to select counsel of its choice. The Applicant shall reimburse the City, and the other Indemnitees, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Nothing in this condition shall be construed to require the Applicant to indemnify Indemnitees for any claim arising from the sole negligence or willful misconduct of the Indemnitees. In the event such a legal action is filed challenging the City’s determinations herein or the issuance of the approval, the City shall estimate its expenses for the litigation. The Applicant shall deposit said amount with the City or, at the discretion of the City, enter into an agreement with the City to pay such expenses as they become due. 3. Page 2 of 18 Test Bond Language. The developer shall comply with the provisions of Chapter 24, Section 18.24.140 of the Temecula Municipal Code by posting security and entering into an agreement to guarantee the erosion & sediment control improvements.” 4. Expiration. This approval shall be used within three years of the approval date; otherwise, it shall become null and void. Use means the beginning of substantial construction contemplated by this approval within the three-year period, which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval, or use of a property in conformance with a Conditional Use Permit. A modification made to an approved development plan does not affect the original approval date of a development plan. 5. Time Extension. The Director of Community Development may, upon an application being filed prior to expiration, and for good cause, grant a time extension of up to five extensions of time, one year at a time. A modification made to an approved development plan does not affect the original approval date of a development plan. 6. Conformance with Approved Plans. The development of the premises shall substantially conform to the approved site plan and elevations contained on file with the Planning Division. 7. Signage Permits. A separate building permit shall be required for all signage. 8. Landscape Maintenance. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Director of Community Development. If it is determined that the landscaping is not being maintained, the Director of Community Development shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. 9. Burrowing Owl Study Submittal. A Burrowing Owl Study shall be submitted prior to plan check approval for the grading permit. If construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. 10. Water Quality and Drainage. Other than stormwater, it is illegal to allow liquids, gels, powders, sediment, fertilizers, landscape debris, and waste from entering the storm drain system or from leaving the property. To ensure compliance with this Condition of Approval: a. Spills and leaks shall be cleaned up immediately. b. Do not wash, maintain, or repair vehicles onsite. c. Do not hose down parking areas, sidewalks, alleys, or gutters. d. Ensure that all materials and products stored outside are protected from rain. e. Ensure all trash bins are covered at all times. 11. Paint Inspection. The applicant shall paint a three-foot-by-three-foot section of the building for Planning Division inspection, prior to commencing painting of the building. 12. Photographic Prints. The applicant shall submit to the Planning Division for permanent filing two 8" X 10" glossy photographic color prints of the approved color and materials board and the colored architectural elevations. All labels on the color and materials board and elevations shall be readable on the photographic prints. 13. Page 3 of 18 Materials and Colors. The Conditions of Approval specified in this resolution, to the extent specific items, materials, equipment, techniques, finishes or similar matters are specified, shall be deemed satisfied by City staff's prior approval of the use or utilization of an item, material, equipment, finish or technique that City staff determines to be the substantial equivalent of that required by the Conditions of Approval. Staff may elect to reject the request to substitute, in which case the real party in interest may appeal, after payment of the regular cost of an appeal, the decision to the Planning Commission for its decision. Masonry Block: Orco Masonry Block, Colors: Natural Gray, Otay Brown, Wheat Glazing: Green Tint Entry Columns: Omega-base 2 Plaster Color: Tavern Taupe 14. Modifications or Revisions. The developer shall obtain City approval for any modifications or revisions to the approval of this project (including, but not limited to, mezzanines). 15. Trash Enclosures. The trash enclosures shall be large enough to accommodate a recycling bin, as well as regular solid waste containers. 16. Trash Enclosures. Trash enclosures shall be provided to house all trash receptacles utilized on the site. These shall be clearly labeled on the site plan. 17. Covered Trash Enclosures. All trash enclosures on site shall include a solid cover and the construction plans shall include all details of the trash enclosures, including the solid cover in accordance with T.M.C. 17.10.020.S 18. Phased Construction. If construction is phased, a construction staging area plan or phasing plan for construction equipment and trash shall be approved by the Director of Community Development. 19. Roof Mounted Mechanical Equipment Screening. The applicant shall be required to screen all roof mounted mechanical equipment from view of all residences and public right of ways. If upon final inspection it is determined that any roof equipment or backs of building parapet walls are visible from any portion of the public right of way adjacent to the project site, the developer shall provide screening that shall be reviewed and approved by the Director of Community Development. 20. Construction and Demolition Debris. The developer shall contact the City’s franchised solid waste hauler for disposal of construction and demolition debris and shall provide the Planning Division verification of arrangements made with the City’s franchise solid waste hauler for disposal of construction and demolition debris. Only the City’s franchisee may haul demolition and construction debris. 21. Public Art Ordinance. The applicant shall comply with the requirements of the City’s Public Art Ordinance as defined in Chapter 5.08 of the Temecula Municipal Code. 22. Property Maintenance. All parkways, including within the right-of-way, entryway median, landscaping, walls, fencing, recreational facilities, and on-site lighting shall be maintained by the property owner or maintenance association. 23. Prior to Issuance of Grading Permit Placement of Transformer. Provide the Planning Division with a copy of the underground water plans and electrical plans for verification of proper placement of transformer(s) and double detector check valves prior to final agreement with the utility companies. 24. Placement of Double Detector Check Valves. Double detector check valves shall be installed at locations that minimize their visibility from the public right-of-way, subject to review and approval by the Director of Community Development. 25. Page 4 of 18 Archaeological/Cultural Resources Grading Note. The following shall be included in the Notes Section of the Grading Plan: “If at any time during excavation/construction of the site, archaeological/cultural resources, or any artifacts or other objects which reasonably appears to be evidence of cultural or archaeological resource are discovered, the property owner shall immediately advise the City of such and the City shall cause all further excavation or other disturbance of the affected area to immediately cease. The Director of Community Development at their sole discretion may require the property owner to deposit a sum of money it deems reasonably necessary to allow the City to consult and/or authorize an independent, fully qualified specialist to inspect the site at no cost to the City, in order to assess the significance of the find. Upon determining that the discovery is not an archaeological/ cultural resource, the Director of Community Development shall notify the property owner of such determination and shall authorize the resumption of work. Upon determining that the discovery is an archaeological/cultural resource, the Director of Community Development shall notify the property owner that no further excavation or development may take place until a mitigation plan or other corrective measures have been approved by the Director of Community Development.” 26. Cultural Resources Treatment Agreement. The developer is required to enter into a Cultural Resources Treatment Agreement with the Pechanga Tribe. The agreement shall be in place prior to issuance of a grading permit. To accomplish this, the applicant should contact the Pechanga Tribe no less than 30 days and no more than 60 days prior to issuance of a grading permit. This Agreement will address the treatment and disposition of cultural resources, the designation, responsibilities, and participation of professional Pechanga Tribal monitors during grading, excavation and ground disturbing activities; project grading and development scheduling; terms of compensation for the monitors; and treatment and final disposition of any cultural resources, sacred sites, and human remains discovered onsite. The Pechanga monitor's authority to stop and redirect grading will be exercised in consultation with the project archaeologist in order to evaluate the significance of any potential resources discovered on the property. Pechanga and archaeological monitors shall be allowed to monitor all grading, excavation and groundbreaking activities, and shall also have the limited authority to stop and redirect grading activities should an inadvertent cultural resource be identified. 27. Discovery of Cultural Resources. The following shall be included in the Notes Section of the Grading Plan: “If cultural resources are discovered during the project construction (inadvertent discoveries), all work in the area of the find shall cease, and the qualified archaeologist and the Pechanga monitor shall investigate the find, and make recommendations as to treatment.” 28. Archaeological Monitoring Notes. The following shall be included in the Notes Section of the Grading Plan: “A qualified archaeological monitor will be present and will have the authority to stop and redirect grading activities, in consultation with the Pechanga Tribe and their designated monitors, to evaluate the significance of any archaeological resources discovered on the property.” 29. Tribal Monitoring Notes. The following shall be included in the Notes Section of the Grading Plan: “A Pechanga Tribal monitor will be present and will have the authority to stop and redirect grading activities, in consultation with the project archaeologist and their designated monitors, to evaluate the significance of any potential resources discovered on the property." 30. Relinquishment of Cultural Resources. The following shall be included in the Notes Section of the Grading Plan: “The landowner agrees to relinquish ownership of all cultural resources, including all archaeological artifacts that are found on the project area, to the Pechanga Tribe for proper treatment and disposition.” 31. Page 5 of 18 Preservation of Sacred Sites. The following shall be included in the Notes Section of the Grading Plan: “All sacred sites are to be avoided and preserved.” 32. MSHCP Pre-Construction Survey. A 30 -day preconstruction survey, in accordance with MSHCP guidelines and survey protocol, shall be conducted prior to ground disturbance. The results of the 30-day preconstruction survey shall be submitted to the Planning Division prior to scheduling the pre-grading meeting with Public Works. If construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. 33. Burrowing Owl Grading Note. The following shall be included in the Notes Section of the Grading Plan: “No grubbing/clearing of the site shall occur prior to scheduling the pre-grading meeting with Public Works. All project sites containing suitable habitat for burrowing owls, whether owls were found or not, require a 30-day preconstruction survey that shall be conducted within 30 days prior to ground disturbance to avoid direct take of burrowing owls. If the results of the survey indicate that no burrowing owls are present on-site, then the project may move forward with grading, upon Planning Division approval. If burrowing owls are found to be present or nesting on-site during the preconstruction survey, then the following recommendations must be adhered to: Exclusion and relocation activities may not occur during the breeding season, which is defined as March 1 through August 31, with the following exception: From March 1 through March 15 and from August 1 through August 31 exclusion and relocation activities may take place if it is proven to the City and appropriate regulatory agencies (if any) that egg laying or chick rearing is not taking place. This determination must be made by a qualified biologist.” If construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. 34. Rough Grading Plans. A copy of the Rough Grading Plans shall be submitted and approved by the Planning Division. 35. Archaeologist Retained. Prior to beginning project construction, the Project Applicant shall retain a Riverside County qualified/City of Temecula approved archaeological monitor to monitor all ground-disturbing activities in an effort to identify any unknown archaeological resources. Any newly discovered cultural resource deposits shall be subject to a cultural resources evaluation. The archaeological monitor's authority to stop and redirect grading will be exercised in consultation with the Pechanga Tribe in order to evaluate the significance of any potential resources discovered on the property. Pechanga and archaeological monitors shall be allowed to monitor all grading, excavation and groundbreaking activities, and shall also have the limited authority to stop and redirect grading activities should an inadvertent cultural resource be identified. The archaeologist shall provide a final monitoring report at the end of all earthmoving activities to the City of Temecula, the Pechanga Tribe and the Eastern Information Center at UC, Riverside. 36. Human Remains. If human remains are encountered, California Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the Riverside County Coroner has made the necessary findings as to origin. Further, pursuant to California Public Resources Code Section 5097.98(b) remains shall be left in place and free from disturbance until a final decision as to the treatment and disposition has been made. If the Riverside County Coroner determines the remains to be Native American, the Native American Heritage Commission must be contacted within 24 hours. The Native American Heritage Commission must then immediately identify the “most likely descendant(s)” of receiving notification of the discovery. The most likely descendant(s) shall then make recommendations within 48 hours, and engage in consultations concerning the treatment of the remains as provided in Public Resources Code 5097.98 and the Treatment Agreement described in these conditions. 37. Page 6 of 18 Prior to Issuance of Building Permit Transportation Uniform Mitigation Fee (TUMF). The Western Riverside County of Governments administers and collects the Transportation Uniform Mitigation Fee (TUMF). The City of Temecula adopted an ordinance on March 31, 2003 for a Riverside County area wide Transportation Uniform Mitigation Fee (TUMF). This project is subject to payment of these fees at the time of building permit issuance (paid to WRCOG). The fees are subject to the provisions of Chapter 15.08 of the Temecula Municipal Code and the fee schedule in effect at the time of building permit issuance. Additional information on payment, fees, and points of contact can be found at http://www.wrcog.cog.ca.us/174/TUMF 38. Development Impact Fee (DIF). The developer shall comply with the provisions of Title 15, Chapter 15.06 of the Temecula Municipal Code and all its resolutions by paying the appropriate City fee. Developers may request an audit of impact fees and/or may request notice for meetings related to the fee account or fund information. 39. Construction Landscaping and Irrigation Plans. Construction Landscaping and Irrigation Plans shall be reviewed and approved by the Planning Division. These plans shall be submitted as a separate submittal, not as part of the building plans or other plan set. These plans shall conform to the approved conceptual landscape plan, or as amended by these conditions. The location, number, height and spread, water usage or KC value, genus, species, and container size of the plants shall be shown. The plans shall be consistent with the Water Efficient Ordinance and Water Storage Contingency Plan per the Rancho California Water District. The plans shall be accompanied by the appropriate filing fee (per the City of Temecula Fee Schedule at time of submittal) and one copy of the approved Grading Plan. 40. Landscaping Site Inspections. The Landscaping and Irrigation Plans shall include a note stating, “Three landscape site inspections are required. The first inspection will be conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection will verify property landscape maintenance for release of the one-year landscape maintenance bond.” The applicant/owner shall contact the Planning Division to schedule inspections. 41. Agronomic Soils Report. The Landscaping and Irrigation Plans shall include a note on the plans stating, “The contractor shall provide two copies of an agronomic soils report at the first irrigation inspection.” 42. Water Usage Calculations. The Landscaping and Irrigation Plans shall include water usage calculations per Chapter 17.32 of the Development Code (Water Efficient Ordinance), the total cost estimate of plantings and irrigation (in accordance with approved plan). Applicant shall use evapotranspiration (ETo) factor of 0.70 for calculating the maximum allowable water budget. 43. Page 7 of 18 Landscape Maintenance Program. A landscape maintenance program shall be submitted to the Planning Division for approval. The landscape maintenance program shall detail the proper maintenance of all proposed plant materials to assure proper growth and landscape development for the long-term esthetics of the property. The approved maintenance program shall be provided to the landscape maintenance contractor who shall be responsible to carry out the detailed program. 44. Specifications of Landscape Maintenance Program. Specifications of the landscape maintenance program shall indicate, “Three landscape site inspections are required. The first inspection will be conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection will verify property landscape maintenance for release of the one-year landscape maintenance bond.” The applicant/owner shall contact the Planning Division to schedule inspections. 45. Irrigation. The landscaping plans shall include automatic irrigation for all landscaped areas and complete screening of all ground mounted equipment from view of the public from streets and adjacent property for private common areas; front yards and slopes within individual lots; shrub planting to completely screen perimeter walls adjacent to a public right-of-way equal to 66 feet or larger; and, all landscaping excluding City maintained areas and front yard landscaping which shall include, but may not be limited to, private slopes and common areas. 46. Hardscaping. The landscape plans shall include all hardscaping for equestrian trails and pedestrian trails within private common areas. 47. Precise Grading Plans. Precise Grading Plans shall be consistent with the approved rough grading plans including all structural setback measurements. 48. Building Construction Plans for Outdoor Areas. Building Construction Plans shall include detailed outdoor areas (including but not limited to trellises, decorative furniture, hardscape, etc.) to match the style of the building subject to the approval of the Director of Community Development. 49. Landscaping Requirement for Phased Development. If any phase or area of the project site is not scheduled for development within six months of the completion of grading, the landscaping plans shall indicate it will be temporarily landscaped (which may include a requirement for regular irrigation) for dust and soil erosion control. 50. WQMP Landscape Compliance. The construction landscape plans shall be consistent with Appendix A, Table 31 of the Low Impact Development (LID) Manual for Southern California for plant materials and treatment facilities, and shall reference the approved precise grading plan for WQMP features. 51. Utility Screening. All utilities shall be screened from public view. Landscape construction drawings shall show and label all utilities and provide appropriate screening. Provide a three-foot clear zone around fire check detectors as required by the Fire Department before starting the screen. Group utilities together in order to reduce intrusion. Screening of utilities is not to look like an after-thought. Plan planting beds and design around utilities. Locate all light poles on plans and ensure that there are no conflicts with trees. 52. Page 8 of 18 Prior to Release of Power, Building Occupancy or Any Use Allowed by This Permit Screening of Loading Areas. The applicant shall be required to screen all loading areas and roof mounted mechanical equipment from view of all residences and public right-of-ways. If upon final inspection it is determined that any mechanical equipment, roof equipment or backs of building parapet walls are visible from any portion of the public right-of-way adjacent to the project site, the developer shall provide screening by constructing a sloping tile covered mansard roof element or other screening reviewed and approved by the Director of Community Development. 53. Landscape Installation Consistent with Construction Plans. All required landscape planting and irrigation shall have been installed consistent with the approved construction plans and shall be in a condition acceptable to the Director of Community Development. The plants shall be healthy and free of weeds, disease, or pests. The irrigation system shall be properly constructed and in good working order. 54. Performance Securities. Performance securities, in amounts to be determined by the Director of Community Development, to guarantee the maintenance of the plantings in accordance with the approved construction landscape and irrigation plan, shall be filed with the Planning Division for a period of one year from final Certificate of Occupancy. After that year, if the landscaping and irrigation system have been maintained in a condition satisfactory to the Director of Community Development, the bond shall be released upon request by the applicant. 55. Installation of Site Improvements. All site improvements, including but not limited to, parking areas and striping shall be installed. 56. Compliance with Conditions of Approval. All of the foregoing conditions shall be complied with prior to occupancy or any use allowed by this approval. 57. Outside Agencies Flood Protection. Flood protection shall be provided in accordance with the Riverside County Flood Control Districts transmittal dated June 13, 2023, a copy of which is attached. The fee is made payable to the Riverside County Flood Control Water District by either a cashier’s check or money order, prior to the issuance of a grading permit (unless deferred to a later date by the District), based upon the prevailing area drainage plan fee. 58. Compliance with Dept. of Environmental Health. The applicant shall comply with the recommendations set forth in the County of Riverside Department of Environmental Health’s transmittal dated June 6, 2024, a copy of which is attached. 59. Compliance with RCWD. The applicant shall comply with the recommendations set forth in the Rancho California Water District’s transmittal dated April 9, 2024, a copy of which is attached. 60. Regional Conservation Authority (RCA) Approval Letter. The project shall be in conformance with all requirements and stipulations described in the RCA approval letter for JPR No. 23-05-12-01 attached herein. 61. PUBLIC WORKS DEPARTMENT General Requirements Conditions of Approval. The developer shall comply with all Conditions of Approval, the Engineering and Construction Manual and all City codes/standards at no cost to any governmental agency. 62. Page 9 of 18 Entitlement Approval. The developer shall comply with the approved site plan, the conceptual Water Quality Management Plan (WQMP) and other relevant documents approved during entitlement. Any significant omission to the representation of site conditions may require the plans to be resubmitted for further review and revision. 63. Precise Grading Permit. A precise grading permit for on site improvements (outside of public right-of-way) shall be obtained from Public Works. 64. Haul Route Permit. A haul route permit may be required when soils are moved on public roadways to or from a grading site. The developer/contractor is to verify if the permit is required. If so, he shall comply with all conditions and requirements per the City’s Engineering and Construction Manual and as directed by Public Works. 65. Encroachment Permits. Prior to commencement of any applicable construction, encroachment permit(s) are required and shall be obtained from Public Works for public offsite improvements. 66. Street Improvement Plans. The developer shall submit public/private street improvement plans for review and approval by Public Works. The plans shall be in compliance with Caltrans and City codes/standards; and shall include, but not limited to, plans and profiles showing existing topography, existing/proposed utilities, proposed centerline, top of curb and flowline grades. 67. Signing & Striping Plan. A signing & striping plan, designed by a registered civil engineer per the latest edition of Caltrans MUTCD standards, shall be included with the street improvement plans for approval. 68. Private Drainage Facilities. All onsite drainage and water quality facilities shall be privately maintained. 69. Prior to Issuance of a Grading Permit Environmental Constraint Sheet (ECS). The developer shall comply with all constraints per the recorded ECS with any underlying maps related to the subject property. 70. Grading/Erosion & Sediment Control Plan. The developer shall submit a grading/erosion & sediment control plan(s) to be reviewed and approved by Public Works. All plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site. The approved plan shall include all construction-phase pollution-prevention controls to adequately address non-permitted runoff. Refer to the City’s Engineering & Construction Manual at: www.TemeculaCA.gov/ECM 71. Erosion & Sediment Control Securities. The developer shall comply with the provisions of Chapter 18, Section 18.24.140 of the Temecula Municipal Code by posting security and entering into an agreement to guarantee the erosion & sediment control improvements. 72. Page 10 of 18 NPDES General Permit Compliance. The developer shall obtain project coverage under the State National Pollutant Discharge Elimination System (NPDES) General Permit for Construction Activities and shall provide the following: a. A copy of the Waste Discharge Identification Number (WDID) issued by the State Water Resources Control Board (SWRCB); b. The project’s Risk Level (RL) determination number; and c. The name, contact information and certification number of the Qualified SWPPP Developer (QSD) Pursuant to the State Water Resources Control Board (SWRCB) requirements and City’s storm water ordinance, a Storm Water Pollution Prevention Plan (SWPPP) shall be generated and submitted to the Board. Throughout the project duration, the SWPPP shall be routinely updated and readily available (onsite) to the State and City. Review www.cabmphandbooks.com for SWPPP guidelines. Refer to the following link: http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.shtml 73. Water Quality Management Plan (WQMP) and O&M Agreement. The developer shall submit a final WQMP (prepared by a registered professional engineer) with the initial grading plan submittal, based on the conceptual WQMP from the entitlement process. It must receive acceptance by Public Works. A copy of the final project-specific WQMP must be kept onsite at all times. In addition, a completed WQMP Operation and Maintenance (O&M) Agreement shall be submitted for review and approval. Upon approval from City staff, the applicant shall record the O&M agreement at the County Recorder's Office in Temecula. Refer to the WQMP template and agreement link: www.TemeculaCA.gov/WQMP. As part of the WQMP approval, the Engineer of Record shall report and certify BMP construction per City of Temecula NPDES requirements. Should the project require Alternative Compliance, the developer is responsible for execution of an approved Alternative Compliance Agreement. 74. Area Drainage Plan (ADP) Fee to RCFC&WCD. The developer shall demonstrate to the City that the flood mitigation charge (ADP fee) has been paid to RCFC&WCD. If the full ADP fee has already been credited to this property, no new charge will be required. 75. Drainage. All applicable drainage shall be depicted on the grading plan and properly accommodated with onsite drainage improvements and water quality facilities, which shall be privately maintained. Alterations to existing drainage patterns or concentration and/or diverting flows is not allowed unless the developer constructs adequate drainage improvements and obtains the necessary permissions from the downstream property owners. All drainage leaving the site shall be conveyed into a public storm drain system, if possible. The creation of new cross lot drainage is not permitted. 76. Drainage Study. A drainage study shall be prepared by a registered civil engineer and submitted to Public Works with the initial grading plan check in accordance with City, Riverside County and engineering standards. The study shall identify storm water runoff quantities (to mitigate the 10 and 100-year storm event for 24-hour storm duration peak flow) from the development of this site and upstream of the site. It shall identify all existing or proposed offsite or onsite, public or private, drainage facilities intended to discharge this runoff. Runoff shall be conveyed to an adequate outfall capable of receiving the storm water runoff without damage to public or private property. The study shall include a capacity analysis verifying the adequacy of all facilities. Any upgrading or upsizing of drainage facilities necessary to convey the storm water runoff shall be provided as part of development of this project. 77. Page 11 of 18 Soils Report. A soils report, prepared by a registered soil or civil engineer, shall be submitted to Public Works with the initial grading plan submittal. The report shall address the site’s soil conditions and provide recommendations for the construction of engineered structures and preliminary pavement sections. 78. Letter of Permission/Easement. The developer shall obtain documents (letters of permission or easements) for any offsite work performed on adjoining properties. The document’s format is as directed by, and shall be submitted to, Public Works for acceptance. The document information shall be noted on the approved grading plan. 79. Sight Distance. The developer shall limit landscaping in the corner cut-off area of all street intersections and adjacent to driveways to provide for minimum sight distance and visibility. 80. Habitat Conservation Fee. The developer shall comply with the provisions of Chapter 8.24 of the Temecula Municipal Code (Habitat Conservation) by paying the appropriate fee set forth in the ordinance or by providing documented evidence that the fees have already been paid. 81. American Disability Act. The developer shall ensure that all frontage areas to the proposed development within the public right of way are ADA compliant. Any sidewalk within the public right of way found to be non-compliant shall be the responsibility of the property owner to be removed and replaced with ADA compliant sidewalk per the Streets and Highway Code Section 5610. 82. Prior to Issuance of Encroachment Permit(s) Public Utility Agency Work. The developer shall submit all relevant documentation due to encroaching within City right-of-way; and is responsible for any associated costs and for making arrangements with each applicable public utility agency. 83. Traffic Control Plans. A construction area traffic control plan (TCP) will be required for lane closures and detours or other disruptions to traffic circulation; and shall be reviewed and approved by Public Works. The TCP shall be designed by a registered civil or traffic engineer in conformance with the latest edition of the Caltrans Manual on Uniform Traffic Control Devices (MUTCD) and City standards. 84. Improvement Plans. All improvement plans (including but not limited to street, storm drain, traffic) shall be reviewed and approved by Public Works. 85. Street Trenching. All street trenches shall conform to City Standard No. 407; refer to the City’s Paving Notes. 86. Prior to Issuance of Building Permit(s) Construction of Street Improvements. All street improvement plans shall be approved by Public Works. The developer shall start construction of all public street improvements, as outlined below, in accordance to the City’s General Plan/Circulation Element and corresponding City standards. All street improvement designs shall provide adequate right-of-way and pavement transitions per Caltrans’ standards to join existing street improvements. a. Roick Drive (Collector (2 lanes undivided) Standard No. 103A – 78’ R/W) to include installation streetlights, drainage facilities, signing and striping and utilities (including but not limited to water and sewer). 87. Page 12 of 18 Streetlights. a. Street Light Plan – Street lighting shall be designed in accordance with the latest City Standards and Specifications for LS-3 street light rates, and as determined by the City Engineer. b. Onsite and Offsite Street Lights Ownership and Maintenance – All proposed public and private streetlights shall be designed in accordance with City approved standards and specifications, or as determined and approved by the City Engineer. The City shall have ownership and maintenance of all proposed public streetlights and associated appurtenances, and shall be provided with adequate service points for power. The design shall be incorporated in the project’s street improvement plans or in a separate street light plan as determined and approved by the City Engineer. c. Streetlight Design as LS-3 Rate Lights – All new streetlights shall be designed as LS-3 rate lights in accordance with approved City standards and specifications, and as determined by the City Engineer. d. Street Light Service Point Addressing – The developer shall coordinate with the PW Department and with Southern California Edison the assignment of addresses to required street light service points. Service points serving public streetlights shall be owned by the City and shall be located within public’s right of way or within duly dedicated public easements. 88. Certifications. Certifications are required from the registered civil engineer-of-record certifying the building pad elevation(s) per the approved plans and from the soil’s engineer-of-record certifying compaction of the building pad(s). 89. Prior to Issuance of a Certificate of Occupancy Completion of Improvements. The developer shall complete all work per the approved plans and Conditions of Approval to the satisfaction of the City Engineer. This includes all on site work (including water quality facilities), public improvements and the executed WQMP Operation and Maintenance agreement. 90. Utility Agency Clearances. The developer shall receive written clearance from applicable utility agencies (i.e., Rancho California and Eastern Municipal Water Districts, etc.) for the completion of their respective facilities and provide to Public Works. 91. Replacement of Damaged Improvements/Monuments. Any appurtenance damaged or broken during development shall be repaired or removed and replaced to the satisfaction of Public Works. Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professional Code Section 8771. 92. Certifications. All necessary certifications and clearances from engineers, utility companies and public agencies shall be submitted as required by Public Works. 93. Water Quality Management Plan (WQMP) Verification. As part of the WQMP approval, the Engineer of Record shall report and certify BMP construction per City of Temecula NPDES requirements. Should the project require alternative compliance, the developer is responsible for execution of an approved Alternative Compliance Agreement. 94. BUILDING AND SAFETY DIVISION General Requirements Final Building and Safety Conditions. Final Building and Safety conditions will be addressed when building construction plans are submitted to Building and Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. 95. Page 13 of 18 Compliance with Code. All design components shall comply with applicable provisions of the most current edition of the California Building, Plumbing and Mechanical Codes; California Electrical Code; California Administrative Code, Title 24 Energy Code, California Title 24 Disabled Access Regulations, and Temecula Municipal Code as identified in Title 15 of the Temecula Municipal Code. 96. ADA Access. Applicant shall provide details of all applicable disabled access provisions and building setbacks on plans to include: a. Disabled access from the public way to the main entrance of the building. b. Van accessible parking located as close as possible to the main entrance of the building. c. Accessible path of travel from parking to the furthest point of improvement. d. Path of accessibility from parking to furthest point of improvement. e. Accessible path of travel from public right-of-way to all public areas on site, such as trash enclosures, clubhouses, and picnic areas. 97. County of Riverside Mount Palomar Ordinance. Applicant shall submit, at time of plan review, a complete exterior site lighting plan showing compliance with County of Riverside Mount Palomar Ordinance Number 655 for the regulation of light pollution. All streetlights and other outdoor lighting shall be shown on electrical plans submitted to the Building and Safety Division. Any outside lighting shall be hooded and aimed not to shine directly upon adjoining property or public rights-of-way. All exterior LED light fixtures shall be 3,000 kelvin or below. 98. Street Addressing. Applicant must obtain street addressing for all proposed buildings by requesting street addressing and submitting a site plan for commercial or multi-family residential projects or a recorded final map for single-family residential projects. 99. Clearance from TVUSD. A receipt or clearance letter from the Temecula Valley Unified School District shall be submitted to the Building and Safety Department to ensure the payment or exemption from School Mitigation Fees. 100. Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work. 101. Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards, and any block walls will require separate approvals and permits. Solid covers are required over new and existing trash enclosures. 102. Sewer and Water Plan Approvals. On-site sewer and water plans will require separate approvals and permits. 103. Hours of Construction. Signage shall be prominently posted at the entrance to the project, indicating the hours of construction, as allowed by the City of Temecula Code Section 9.20.060, for any site within one-quarter mile of an occupied residence. The permitted hours of construction are Monday through Saturday from 7:00 a.m. to 6:30 p.m. No work is permitted on Sundays and nationally recognized Government Holidays. 104. House Electrical Meter. Provide a house electrical meter to provide power for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each building on the site. Developments with single user buildings shall clearly show on the plans how the operation of exterior lighting and fire alarm systems when a house meter is not specifically proposed. 105. Page 14 of 18 Protection of Drains and Penetration. Protection of joints and penetrations in fire resistance-rated assemblies shall not be concealed from view until inspected for all designed fire protection. Required fire seals/fire barriers in fire assemblies at fire resistant penetrations shall be installed by individuals with classification or certification covering the installation of these systems. Provide certification for the installation of each area and certification of compliance for Building Official's approval. 106. FIRE PREVENTION General Requirements Fire Hydrants. The Fire Prevention Bureau is required to set minimum fire hydrant distances per CFC Appendix C. Super fire hydrants (6” x 4” x (2) 2 ½” outlets) shall be located on fire access roads and adjacent public streets. For all Commercial projects hydrants shall be spaced at 350 feet apart, and shall be located no more than 210 feet from any point on the street or Fire Department access road(s) frontage to a hydrant. The required fire flow shall be available from any adjacent hydrant(s) in the system. The fire line may be required to be a looped system. (CFC Appendix C and Temecula Municipal Code Section 15.16.020). 107. Fire Dept. Plan Review. Final fire and life safety conditions will be addressed when building plans are reviewed by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC), and related codes which are in force at the time of building plan submittal. 108. Fire Flow. The Fire Prevention Bureau is required to set a minimum fire flow for the remodel or construction of all commercial buildings per CFC Appendix B. The developer shall provide for this project, a water system capable of delivering 2,400 GPM at 20-PSI residual operating pressure for a 2-hour duration this commercial projects. The fire flow as given above has taken into account all information as provided. (CFC Appendix B and Temecula Municipal Code Section 15.16.020). 109. Fire Requirement - Fire Riser Room. This building will be required to have a fire sprinkler riser room with direct exterior access. This room will house the fire sprinkler riser and fire alarm control panel. It will not share with any other equipment. (Temecula Municipal Code 15.16.020) 110. Prior to Issuance of Grading Permit(s) Access Road Widths. Fire Department vehicle access roads shall have an unobstructed width of not less than 24 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches (CFC Chapter 5 and Temecula Municipal Code Section 15.16.020). 111. All Weather Access Roads. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be with a surface to provide all-weather driving capabilities. Access roads shall be 80,000 lbs. GVW with a minimum of AC thickness of .25 feet. In accordance with Section 3310.1, prior to building construction, all locations where structures are to be built shall have fire apparatus access roads. (CFC Chapter 5 and Temecula Municipal Code Section 15.16.020). 112. Gradient of Access Roads. The gradient for fire apparatus access roads shall not exceed 15 percent (CFC Chapter 5 and Temecula Municipal Code Section 15.16.020). 113. Prior to Issuance of Building Permit(s) Page 15 of 18 Required Submittals (Fire Underground Water). The developer shall furnish electronic copies of the water system plans to the Fire Prevention Bureau for approval prior to installation for all private water systems pertaining to the fire service loop. Plans shall be signed by a registered civil engineer, contain a Fire Prevention Bureau approval signature block, and conform to hydrant type, location, spacing and minimum fire flow standards. Hydraulic calculations will be required with the underground submittal to ensure fire flow requirements are being met for the on-site hydrants. Water model/flow test cannot be any older than 6 months. The plans must be submitted and approved prior to building permit being issued (CFC Chapter 33 and Chapter 5). 114. Required Submittals (Fire Sprinkler Systems). Fire sprinkler plans shall be submitted electronically to the Fire Prevention Bureau for approval. Fire sprinkler plans must be submitted by the installing contractor to the Fire Prevention Bureau. These plans must be submitted prior to the issuance of building permit. The fire sprinkler riser will be located in its own dedicated room, with direct exterior access. This room will house the fire sprinkler riser and fire alarm control panel. It will not share with any other equipment. 115. Required Submittals (Fire Alarm Systems). Fire alarm plans shall be submitted electronically to the Fire Prevention Bureau for approval. Fire alarm plans must be submitted by the installing contractor to the Fire Prevention Bureau. The fire alarm system is required to have a dedicated circuit from the house panel. These plans must be submitted prior to the issuance of building permit. The fire alarm panel will be located in its own dedicated room, with direct exterior access. This room will house the fire sprinkler riser and fire alarm control panel. It will not share with any other equipment. 116. Prior to Issuance of Certificate of Occupancy Gates and Access. All manual and electronic gates on required Fire Department access roads or gates obstructing Fire Department building access shall be provided with the Knox Rapid entry system for emergency access by firefighting personnel (CFC Chapter 5). 117. High Piled Stock (Proposed). Buildings housing high-piles combustible stock shall comply with the provisions of California Fire Code Chapter 32 and all applicable National Fire Protection Association standards. The storage of high-piled combustible stock may require structural design considerations or modifications to the building. Fire protection and life safety features may include some or all of the following: an automatic fire sprinkler system(s) designed for a specific commodity class and storage arrangement, hose stations, alarm systems, smoke vents, draft curtains, Fire Department access doors and Fire Department access roads (CFC Chapter 32 and Temecula Municipal Code Section 15.16.020). 118. Hydrant Verification. Hydrant locations shall be identified by the installation of reflective markers (blue dots) (Temecula Municipal Code Section 15.16.020). 119. Knox Box. A “Knox -Box” shall be provided. The Knox-Box shall be installed a minimum of six feet in height and be located to the right side of the fire riser sprinkler room (CFC Chapter 5). 120. Addressing. New buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Commercial buildings shall have a minimum of 12-inch numbers with suite numbers being a minimum of six inches in size. All suites shall have a minimum of 6-inch high letters and/or numbers on both the front and rear doors. (CFC Chapter 5 and Temecula Municipal Code Section 15.16.020). 121. Page 16 of 18 POLICE DEPARTMENT General Requirements Landscape Height. The applicant shall ensure all landscaping surrounding all buildings are kept at a height of no more than three feet or below the ground floor window sills. Plants, hedges and shrubbery shall be defensible plants to deter would-be intruders from breaking into the buildings utilizing lower level windows. 122. Trees. Applicant shall ensure any trees surrounding building rooftops be kept at a distance to prevent roof accessibility by would-be burglars. Since trees also act as a natural ladder, the branches must be pruned to have a six-foot clearance from the buildings. 123. Exterior Door Illumination. All exterior doors shall have a vandal resistant light fixture installed above the door. The doors shall be illuminated with a minimum one-foot candle illumination at ground level, evenly dispersed. 124. Exterior Building Lighting. All lighting affixed to the exterior of buildings shall be wall mounted light fixtures to provide sufficient lighting during hours of darkness. 125. Graffiti. Any graffiti painted or marked upon the buildings or other structures must be removed or painted over within 24 hours of being discovered. Report all such crimes to the Temecula Police 24-hour dispatch Center at (951) 696-HELP 126. Alarm System. Upon completion of construction, each building or business shall have an alarm system that is monitored by a designated private alarm company to notify the Temecula Police Department of any intrusion. All multi-tenant offices/suites/businesses located within a specific building shall each have their own alarm system. This condition is not applicable if the business is open 24/7. 127. Commercial or Institutional Grade Hardware. All doors, windows, locking mechanisms, hinges, and other miscellaneous hardware shall be commercial or institution grade. 128. ADA Parking. All disabled parking stalls on the premises shall be marked in accordance with Section 22511.8 of the California Vehicle Code. 129. Page 17 of 18 Crime Prevention Through Design. Crime prevention through environmental design, as developed by the National Crime Prevention Institute (NCPI), supports the concept that “the proper design and effective use of the built environment can lead to a reduction in the fear and incidence of crime and an improvement in the quality of life.” The nine primary strategies that support this concept are included below: 1. Provide clear border definition of controlled space. Examples of border definition may include fences, shrubbery, or signs in exterior areas. Within a building, the arrangement of furniture and color definition can serve as a means of identifying controlled space. 2. Provide clearly marked transitional zones. Persons need to be able to identify when they are moving from public to semi-public to private space. 3. Gathering or congregating areas to be located or designated in locations where there is good surveillance and access control. 4. Place safe activities in unsafe locations. Safe activities attract normal users to a location and subsequently render the location less attractive to abnormal users due to observation and possible intervention. 5. Place unsafe activities in safe locations. Placing unsafe activities in areas of natural surveillance or controlled access will help overcome risk and make the users of the areas feel safer. 6. Redesign the use of space to provide natural barriers. Separate activities that may conflict with each other (outdoor basketball court and children’s play area, for example) by distance, natural terrain or other functions to avoid such conflict. 7. Improve scheduling of space. The timing in the use of space can reduce the risk for normal users and cause abnormal users to be of greater risk of surveillance and intervention. 8. Redesign space to increase the perception of natural surveillance. Abnormal users need to be aware of the risk of detection and possible intervention. Windows and clear lines-of-sight serve to provide such a perception of surveillance. 9. Overcome distance and isolation. This strategy may be accomplished through improved communications (portable two-way radios, for example) and design efficiencies, such as the location of restrooms in a public building. 130. Contact. Any questions regarding these conditions should be directed to the Temecula Police Department Crime Prevention and Plans Unit at (951) 694-6480. 131. Business Security Survey. Businesses desiring a business security survey of their location can contact the Crime Prevention and Plans Unit of the Temecula Police Department at (951) 695-2773. 132. Page 18 of 18 JASON E. UHLEY 1995 MARKET STREET General Manager-Chief Engineer RIVERSIDE, CA 92501 951.955.1200 951.788.9965 FAX www.rcflood.org RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT 251461 June 13, 2023 City of Temecula Community Development Department 41000 Main Street Temecula, CA 92590 Attention: Mr. Eric Jones Re: PA 23-0227, APN 909-320-056 The Riverside County Flood Control and Water Conservation District (District) does not normally recommend conditions for land divisions or other land use cases in incorporated cities. The District also does not plan Check city land use cases or provide State Division of Real Estate letters or other flood hazard reports for such cases. District comments/recommendations for such cases are normally limited to items of specific interest to the District including District Master Drainage Plan facilities, other regional flood control and drainage facilities which could be considered a logical component or extension of a master plan system, and District Area Drainage Plan fees (development mitigation fees). In addition, information of a general nature is provided. The District's review is based on the above-referenced project transmittal, received June 5, 2023. The District has not reviewed the proposed project in detail, and the following comments do not in any way constitute or imply District approval or endorsement of the proposed project with respect to flood hazard, public health and safety, or any other such issue: ☐ This project would not be impacted by District Master Drainage Plan facilities, nor are other facilities of regional interest proposed. ☐ This project involves District proposed Master Drainage Plan facilities, namely, . The District will accept ownership of such facilities on written request by the City. The Project Applicant shall enter into a cooperative agreement establishing the terms and conditions of inspection, operation, and maintenance with the District and any other maintenance partners. Facilities must be constructed to District standards, and District plan check and inspection will be required for District acceptance. Plan check, inspection, and administrative fees will be required. All regulatory permits (and all documents pertaining thereto, e.g., Habitat Mitigation and Monitoring Plans, Conservation Plans/Easements) that are to be secured by the Applicant for both facility construction and maintenance shall be submitted to the District for review. The regulatory permits' terms and conditions shall be approved by the District prior to improvement plan approval, map recordation, or finalization of the regulatory permits. There shall be no unreasonable constraint upon the District's ability to operate and maintain the flood control facility(ies) to protect public health and safety. ☐ If this project proposes channels, storm drains 36 inches or larger in diameter, or other facilities that could be considered regional in nature and/or a logical extension a District's facility, the District would consider accepting ownership of such facilities on written request by the City. The Project Applicant shall enter into a cooperative agreement establishing the terms and conditions of inspection, operation, and maintenance with the District and any other maintenance partners. Facilities must be constructed to District standards, and District plan check and inspection will be required for District acceptance. Plan check, inspection, and administrative fees will be required. The regulatory permits' terms and conditions shall be approved by the District prior to improvement plan approval, map recordation, or finalization of the regulatory permits. There shall be no unreasonable constraint upon the District's ability to operate and maintain the flood control facility(ies) to protect public health and safety. City of Temecula - 2 - June 13, 2023 Re: PA 23-0227, APN 909-320-056 251461 ☒ This project is located within the limits of the District's Murrieta Creek/Temecula Valley Area Drainage Plan for which drainage fees have been adopted. If the project is proposing to create additional impervious surface area, applicable fees should be paid (in accordance with the Rules and Regulations for Administration of Area Drainage Plans) to the Flood Control District or City prior to issuance of grading or building permits. Fees to be paid should be at the rate in effect at the time of issuance of the actual permit. ☐ An encroachment permit shall be obtained for any construction related activities occurring within District right of way or facilities, namely, ______. If a proposed storm drain connection exceeds the hydraulic performance of the existing drainage facilities, mitigation will be required. For further information, contact the District's Encroachment Permit Section at 951.955.1266. ☐ The District's previous comments are still valid. GENERAL INFORMATION This project may require a National Pollutant Discharge Elimination System (NPDES) permit from the State Water Resources Control Board. Clearance for grading, recordation, or other final approval should not be given until the City has determined that the project has been granted a permit or is shown to be exempt. If this project involves a Federal Emergency Management Agency (FEMA) mapped floodplain, the City should require the applicant to provide all studies, calculations, plans, and other information required to meet FEMA requirements, and should further require the applicant obtain a Conditional Letter of Map Revision (CLOMR) prior to grading, recordation, or other final approval of the project and a Letter of Map Revision (LOMR) prior to occupancy. The project proponent shall bear the responsibility for complying with all applicable mitigation measures defined in the California Environmental Quality Act (CEQA) document (i.e., Negative Declaration, Mitigated Negative Declaration, Environmental Impact Report) and/or Mitigation Monitoring and Reporting Program, if a CEQA document was prepared for the project. The project proponent shall also bear the responsibility for complying with all other federal, state, and local environmental rules and regulations that may apply. If a natural watercourse or mapped floodplain is impacted by this project, the City should require the applicant to obtain a Section 1602 Agreement from the California Department of Fish and Wildlife and a Clean Water Act Section 404 Permit from the U.S. Army Corps of Engineers, or written correspondence from these agencies indicating the project is exempt from these requirements. A Clean Water Act Section 401 Water Quality Certification may be required from the local California Regional Water Quality Control Board prior to issuance of the Corps 404 permit. Very truly yours, AMY MCNEILL Engineering Project Manager ec: Riverside County Planning Department Attn: Timothy Wheeler EM:mm Office Locations ● Corona ● Hemet ● Indio ● Murrieta ● Palm Springs ● Riverside Phone (888)722-4234 www.rivcoeh.org June 6, 2024 City of Temecula Planning Department Attn: Eric Jones 41000 Main Street Temecula, CA 92590 SUBJECT: CITY OF TEMECULA – DEVELOPMENT PLAN PA23-0227 (APN: 909- 320-056) Dear Mr. Jones: The project listed in the subject heading of this letter is proposing the development of the following: PA23-0227 is a Development Plan for an approximately 7,066 square foot warehouse building with office space. The project is located at 42974 Roick Drive. In accordance with the agreement between the County of Riverside, Department of Environmental Health (DEH) and the City of Temecula, DEH offers the following final comments/recommendations: POTABLE WATER AND SANITARY SEWER SERVICE: A “General Condition” shall be placed on the project indicating that the subject property is proposing to obtain potable water service from Rancho California Water District (Rancho Water/District). It is the responsibility of this facility to ensure that all requirements to for potable water service are met with Rancho Water/District, in addition to all other applicable agencies. Prior to building permit issuance, provide documentation that establishes water service for the entire project from Rancho Water District (ex: First Release Letter). A “General Condition” shall be placed on the project indicating that the subject property is proposing to obtain and sanitary sewer service from Eastern Municipal Water District (EMWD). It is the responsibility of this facility to ensure that all requirements to obtain sanitary sewer service are met with EMWD, in addition to all other applicable agencies. City of Temecula PA23-0227 Prior to building permit issuance, provide documentation that establishes sanitary sewer service for the entire project from EMWD (ex: First Release Letter). HAZARDOUS MATERIALS MANAGEMENT BRANCH Prior to building permit final, this facility shall be required to contact and have a review conducted by the Hazardous Materials Management Branch (HMMB). A business emergency plan for the storage of any hazardous materials, greater than 55 gallons, 200 cubic feet or 500 pounds, or any acutely hazardous materials or extremely hazardous substances will be required. If further review of the site indicates additional environmental health issues, HMMB reserves the right to regulate the business in accordance with applicable County Ordinances. Please contact HMMB at (951) 358-5055 to obtain information regarding any additional requirements. LOCAL ENFORCEMENT AGENCY Ensure the appropriate size and number of refuse/recycle bins are provided at this site, in accordance with SB1383 and that an approved Solid Waste Hauler purveyor is utilized. For additional information please contact our Local Enforcement Agency (LEA) at (951) 955-8980. ENVIRONMENTAL CLEANUP PROGRAMS Based on the information provided in the environmental assessment documents submitted for this project and with the provision that the information was accurate and representative of site conditions, RCDEH-ECP (Riverside County Department of Environmental Health – Environmental Cleanup Program) concludes that no additional site investigations are required for this project (current proposed commercial land use) at this time. If previously unidentified contamination or the presence of a naturally occurring hazardous material is discovered at the site, assessment, investigation, and/or cleanup may be required. Contact RCDEH-ECP at (951) 955-8980, for further information. Should you have any further questions or require further assistance, please contact me by email at Allopez@rivco.org or by phone at (951) 955-8980. Sincerely, Alberto Lopez, MEA, REHS Supervising Environmental Health Specialist Riverside County Department of Environmental Health Environmental Cleanup Program August 14, 2024 Eric Jones City of Temecula 41000 Main Street Temecula, California 92590 Dear Mr. Jones, Please find the following JPR attached: JPR 23-05-12-01. The Local Identifier is LR23-0196 Warehouse/Office. The JPR file attached includes the following: • RCA JPR Findings • Exhibit A, Regional Map • Exhibit B, Vicinity Map with MSHCP Schematic Cores and Linkages • Exhibit C, MSHCP 1994 Baseline Vegetation • Exhibit D, Soil • Exhibit E, Project Detail Thank you, Tricia Campbell Western Riverside County Regional Conservation Authority cc: Karin Cleary-Rose U.S. Fish and Wildlife Service 777 East Tahquitz Canyon Way, Suite 208 Palm Springs, California 92262 Carly Beck California Dept. of Fish and Wildlife 3602 Inland Empire Blvd. #C220 Ontario, California 91764 RCA Joint Project Review (JPR) Findings JPR #: 23-05-12-01 Date: 08/14/24 1 Project Information Permittee: City of Temecula Case Information: LR23-0196 Warehouse/Office Site Acreage1: 1.9 acre (On-site, permanent) Portion of Site Proposed for MSHCP Conservation Area: 0 Criteria Consistency Review Consistency Conclusion: The project is consistent with both the Criteria and Other Plan requirements with implementation of the measures presented in these Findings (including any measures specified in the supporting documentation provided to the Regional Conservation Authority [RCA] by the Permittee for this JPR). Applicable Core/Linkage: Proposed Linkage 10 Area Plan: Southwest Area Plan APN Sub-Unit Cell Group Cell 909-320-056 SU6 - Santa Rosa Plateau Independent 6888 Project Information a. Project Documentation. JPR submittal materials provided by the Permittee included a JPR Application Form (May 4, 2023); a Habitat Assessment and Western Riverside County MSHCP Consistency Analysis prepared by ELMT Consulting, Inc. (Analysis; July 2024); and a Focused Burrowing Owl Survey Report prepared by TeraCor Resource Management (BUOW Report; October 17, 2022); and GIS shapefiles (May 11, 2023). b. Project Location. The proposed project is located in the City of Temecula, on the northwest corner of Winchester Road and Roick Drive (Exhibit A). It is located in the southwestern portion of the MSHCP Area (Exhibit B). 1 Acreage totals may vary from supporting documentation due to rounding. RCA Joint Project Review (JPR) Findings JPR #: 23-05-12-01 Date: 08/14/24 2 c. Project Description. The proposed project will construct a warehouse and office consisting of 20,473 square feet of building area and an approximate 41,085-square-foot concrete storage yard. The project site is undeveloped and is bordered by industrial developments to the west, undeveloped land directly to the north, Winchester Road to the east, and Roick Drive to the south. The topography of the site is relatively flat with elevation ranging from 1,101 feet above mean sea level (amsl) to 1,108 feet amsl. According to the Analysis, the project site consists primarily of non-native grasses, ornamental vegetation, and emergent California buckwheat scrub. MSHCP baseline vegetation communities (1994) within the site consists of grassland and coastal sage scrub (Exhibit C). The soil type within the project site is Greenfield sandy loam, 15 to 25 percent slopes, eroded (Exhibit D). The proposed project would result in approximately 1.9 acre of permanent impact (Exhibit E). The proposed project site is located entirely within the MSHCP Criteria Area, specifically Cell 6888. The project is not adjacent to any existing or proposed conservation area, and no fuel modification or weed abatement zones are proposed. All staging of equipment and construction materials will be located within the project site. Relation to Reserve Assembly a. Reserve Assembly Summary. As stated in Section 3.2.3 of the MSHCP, “Proposed Linkage 10 consists of an upland connection in the southwest region of the Plan Area extending from Existing Core F (Santa Rosa Plateau Ecological Reserve) in the north to Existing Core G (Santa Margarita Ecological Reserve) in the south. Private lands compose the entirety of the Linkage, which consists of upland Habitat complementary to the riparian Linkage provided between these two Cores by Proposed Constrained Linkage 13 (Murrieta Creek). This Linkage, which is only somewhat constrained by existing urban Development, provides for movement between these two Cores for species such as bobcat and mountain lion. Although the Linkage is somewhat lengthy at 5.5 miles, it is also nearly a mile wide and thus provides Live-In Habitat for many species. Surrounding planned land uses are approximately evenly divided between Rural Mountainous and city (Murrieta, Temecula). In areas of the Linkage bordering Cities, treatment of edge conditions will be necessary to maintain the proper Habitat and movement functions of the Linkage”. The project site is located within Cell 6888. As stated in Section 3.3.3 of the MSHCP, “Conservation within this Cell will contribute to assembly of Proposed Linkage 10. Conservation within this Cell will focus on chaparral, coastal sage scrub, grassland, woodland and forest habitat. Areas conserved within this Cell will be connected to chaparral, coastal sage scrub, and grassland habitat proposed for conservation in Cell 6781 to the north and to chaparral and coastal sage scrub habitat proposed for conservation in Cell 6887 to the west. Conservation within this Cell will range from 55%-65% of the Cell focusing in the southwestern portion of the Cell.” Cell 6888 totals approximately 198.1 acres. Using the low-range (55%) conservation goal, approximately 109.0 acres are described for conservation within this Cell. To date, 101.1 acres have been developed or are RCA Joint Project Review (JPR) Findings JPR #: 23-05-12-01 Date: 08/14/24 3 approved for development in this Cell, which includes the 1.9-acre proposed project and 13.3 acres of covered roads. There are currently 75.9 acres conserved lands within the Cell and approximately 21.2 undeveloped acres available within the Cell, which are located within areas described for conservation that would contribute to Proposed Linkage 10. Therefore, to achieve the low-range goal, 11.9 acres are still needed for conservation. Cell 6888 cannot achieve the low-range goal of 109.0 acres of conservation. While Cell 6888 cannot achieve its low-range goal, the proposed project is located outside of the area described for conservation by the MSHCP. It is separated from Proposed Linkage 10 to the west by industrial development and roadways. Additionally, it is separated from Proposed Linkage 10 to the west by an existing development associated with HANS 32 – PA06-0269 (JPR 06-11-15-01) and would not functionally contribute to this Linkage. Development of the project site would not cause fragmentation to existing or future reserve and would not impede the conservation goals for Proposed Linkage 10. The RCA finds the project consistent with reserve assembly. b. Rough Step. The proposed project is within Rough Step Unit 5 which tracks five vegetation types: coastal sage scrub; grasslands; riparian scrub, woodland, forest; Riversidean alluvial fan sage scrub; and woodlands and forests. MSHCP baseline vegetation (1994) within the project site consists of grassland and coastal sage scrub which are tracked for Rough Step (Exhibit C). At the time of these Findings, grassland and coastal sage scrub in Rough Step Unit 5 are in balance and do not conflict with Rough Step. The Rough Steph Unit 5 development allowance may have changed by the time the project submits for a grading permit. As such, the RCA provides the following required Measure to ensure the City does not exceed Rough Step allowances: ROUGH STEP MEASURE. In accordance with MSHCP Volume I, Section 6.7, it is the Permittees responsibility that [i]f the rough step rule is not met during any analysis period (performed annually by the Regional Conservation Authority [RCA]), the Permittees must conserve appropriate lands supporting a specified vegetation community within the analysis unit to bring the Plan back into the parameters of the rule prior to authorizing additional loss of the vegetation community for which the rule was not achieved. The Permittee is encouraged to consult with the RCA on current rough step allowances prior to working with project applicants developing grading plans. The Permittee must not cause additional loss of any rough step vegetation that is out of balance. Prior to issuance of a grading permit, the Permittee will confirm with the RCA that the Project will not impact out-of-balance Rough Step vegetation in the applicable Rough Step unit. RCA Joint Project Review (JPR) Findings JPR #: 23-05-12-01 Date: 08/14/24 4 Other Plan Requirements (MSHCP Volume I) Section 6.1.2 – Was Riparian/Riverine/Vernal Pool Mapping or Information Provided? Yes. There are no Riparian/Riverine areas on the project site. There are no vernal pools on the project site, and the soils and topography present on the site do not support habitat considered suitable for fairy shrimp. There is no suitable riparian bird habitat on the project site. Section 6.1.3 – Was Narrow Endemic Plant Species Survey Information Provided? Yes. The project site is not located within a Narrow Endemic Plant Species Survey Area. Section 6.3.2 – Was Additional Survey Information Provided? Yes. The project site is located in Additional Survey Needs and Procedures Areas for burrowing owl (Athene cunicularia). The project site is not located in a Criteria Area Species Survey Area for plants. The project site is not located in Additional Survey Needs and Procedures Areas for, amphibians or small mammals. The project site does not support Delhi sands (Exhibit D) or in areas that would trigger additional review for Delhi sands flower-loving fly. Section 6.1.4 – Was Information Pertaining to Urban/Wildland Interface Guidelines Provided? Yes. The property is not located adjacent to existing or proposed conservation areas. Comments on Other Plan Requirements: a. Section 6.1.2. The following discusses each requirement under this policy. Riparian/Riverine. According to the Analysis, the project site was assessed for riparian/riverine features on June 13 and July 22, 2022, and did not contain riparian vegetation or definable riparian/riverine features. There were no indications of hydrology, hydric soils, or hydrophytic vegetation that support riparian/riverine areas. Riparian/riverine resources are absent from the project site and the proposed project will not result in impacts to riparian/riverine resources. Vernal Pools/Fairy Shrimp. According to the Analysis, the project site lacks suitable soils and hydrology to support vernal pools. There was no on-site evidence of clay soils, hardpan, bedrock or other impermeable soils observed that could support vernal pool features. No evidence of vernal pools, seasonal depressions, seasonally inundated road ruts or other wetland features that would support fairy shrimp were observed on site. Due to the absence of suitable fairy shrimp habitat, focused surveys for fairy shrimp were not warranted. Riparian Birds. The project site lacks suitable habitat for MSHCP-covered riparian birds, including least Bell’s vireo (Vireo bellii pusillus), southwestern willow flycatcher (Empidonax traillii extimus), and western yellow-billed cuckoo (Coccyzus americanus). Therefore, focused riparian bird surveys were not warranted. RCA Joint Project Review (JPR) Findings JPR #: 23-05-12-01 Date: 08/14/24 5 Based on the information provided in the Analysis, the project demonstrates consistency with Section 6.1.2 of the MSHCP. b. Section 6.1.3 NEPSSA Plants. Based on the information provided in the Analysis, the project demonstrates consistency with Section 6.1.3 of the MSHCP. c. Section 6.3.2. Additional Survey Needs and Procedures. The following describes Additional Survey Needs and Procedures applicable to the proposed project: Burrowing Owl. The project site is located within the Additional Survey Needs and Procedures Area for burrowing owl. According to the BUOW Report, in accordance with the County of Riverside’s Burrowing Owl Survey Instructions for the Western Riverside Multiple Species Habitat Conservation Plan Area (County of Riverside 2006), a Step I Habitat Assessment was conducted on June 13, 2022, within the project site and within an additional 500-foot buffer around the site. According to the BUOW Report, marginally suitable habitat was detected within the project site in the form of non-native ruderal/disturbed land with low growing vegetation, suitable substrate, and suitable burrows for nesting (i.e., features with openings four inches or greater in diameter). Due to the presence of suitable habitat, a Step II-A Focused Burrow Survey was conducted on June 17, 2022. Suitable burrows for nesting were present and Step II-B Focused Burrowing Owl Surveys were conducted between June 13 and July 22, 2022. No burrowing owl or burrowing owl sign (e.g., whitewash, feathers, tracks, or pellets) were observed. No burrowing owls were observed within the project site or adjacent areas. However, because suitable habitat for burrowing owl is present on the site, and owls could colonize the site prior to the start of construction, the following measure is applicable to the project: BURROWING OWL MEASURE. Due to the presence of potentially suitable habitat, a 30-day pre- construction survey for burrowing owls is required prior to initial ground-disturbing activities (including vegetation clearing, clearing and grubbing, tree removal, site watering, equipment staging, grading, etc.) to ensure that no owls have colonized the site in the days or weeks preceding the ground-disturbing activities. If burrowing owls have colonized the project site prior to the initiation of ground-disturbing activities, the project proponent will immediately inform the Regional Conservation Authority (RCA) and the Wildlife Agencies, and will need to coordinate further with RCA and the Wildlife Agencies, including the possibility of preparing a Burrowing Owl Protection and Relocation Plan, prior to initiating ground disturbance. If ground -disturbing activities occur, but the site is left undisturbed for more than 30 days, a pre-construction survey will again be necessary to ensure burrowing owl has not colonized the site since it was last disturbed. If burrowing owl is found, the same coordination described above will be necessary. Based on the information provided in the BUOW Report, the project demonstrates consistency with Section 6.3.2 of the MSHCP. RCA Joint Project Review (JPR) Findings JPR #: 23-05-12-01 Date: 08/14/24 6 d. Section 6.1.4. Urban/Wildlands Interface Guidelines. Although the proposed Project is not adjacent to the MSHCP Conservation Area, the following Urban Wildlands Interface Guidelines (UWIG) may apply during project construction. Accordingly, the Permittee should include the following measures as Project conditions of approval when applicable: SECTION 6.1.4 MEASURE. i. Incorporate measures to control the quantity and quality of runoff from the site entering the MSHCP Conservation Area. In particular, measures shall be put in place to avoid discharge of untreated surface runoff from developed and paved areas into MSHCP Conservation Areas. Best Management Practices (BMPs) will be implemented to prevent the release of toxins, chemicals, petroleum products, exotic plant materials, or other elements that might degrade or harm downstream biological resources or ecosystems. ii. Land uses proposed in proximity to the MSHCP Conservation Area that use chemicals or generate bioproducts, such as manure, that are potentially toxic or may adversely affect wildlife species, Habitat, or water quality shall incorporate measures to ensure that application of such chemicals does not result in discharge to the MSHCP Conservation Area. The greatest risk is from landscaping fertilization overspray and runoff. iii. Night lighting shall be shielded and directed downward and away from the MSHCP Conservation Area to protect species from direct night lighting. Post-project ambient light levels within the MSHCP Conservation Area shall not exceed that of pre -project conditions as a result of light spill from the Project site. iv. Proposed noise-generating land uses affecting the MSHCP Conservation Area, including designated avoidance areas, shall incorporate setbacks, berms, or walls to minimize the effects of noise on MSHCP Conservation Area resources pursuant to applicable rules, regulations, and guidelines related to land use noise standards. v. Avoid use of invasive, non-native plant species listed in Table 6-2 of the MSHCP in approving landscape plans for the portions of the project that are adjacent to the MSHCP Conservation Area, including avoidance areas. Considerations in reviewing the applicability of this list shall include proximity of planting areas to the MSHCP Conservation Areas and designated avoidance areas, species considered in the planting plans, resources being protected within the MSHCP Conservation Area and their relative sensitivity to invasion, and barriers to plant and seed dispersal, such as walls, topography, and other features. vi. Fencing shall be designed to prevent access to the MSHCP Conservation Area by unauthorized public access, domestic animals, and illegal trespass or dumping. vii. Manufactured slopes associated with proposed site development shall not extend into the MSHCP Conservation Area. RCA Joint Project Review (JPR) Findings JPR #: 23-05-12-01 Date: 08/14/24 7 viii. Weed abatement and fuel modification activities are not permitted in the Conservation Area, including designated avoidance areas. c. Appendix C. The following best management practices (BMPs), as applicable, shall be implemented for the duration of construction: APPENDIX C MEASURE. i. A condition shall be placed on grading permits requiring a qualified biologist to conduct a training session for project personnel prior to grading. The training shall include a description of the species of concern and its habitats, the general provisions of the Endangered Species Act (Act) and the MSHCP, the need to adhere to the provisions of the Act and the MSHCP, the penalties associated with violating the provisions of the Act, the general measures that are being implemented to conserve the species of concern as they relate to the project, and the access routes to and project site boundaries within which the project activities must be accomplished. ii. Water pollution and erosion control plans shall be developed and implemented in accordance with RWQCB requirements. iii. The footprint of disturbance shall be minimized to the maximum extent feasible. Access to sites shall be via pre-existing access routes to the greatest extent possible. iv. The upstream and downstream limits of projects disturbance plus lateral limits of disturbance on either side of the stream shall be clearly defined and marked in the field and reviewed by the biologist prior to initiation of work. v. Projects should be designed to avoid the placement of equipment and personnel within the stream channel or on sand and gravel bars, banks, and adjacent upland habitats used by target species of concern. vi. Projects that cannot be conducted without placing equipment or personnel in sensitive habitats should be timed to avoid the breeding season of riparian species identified in MSHCP Global Species Objective No. 7. vii. When stream flows must be diverted, the diversions shall be conducted using sandbags or other methods requiring minimal instream impacts. Silt fencing of other sediment trapping materials shall be installed at the downstream end of construction activity to minimize the transport of sediments off site. Settling ponds where sediment is collected shall be cleaned out in a manner that prevents the sediment from reentering the stream. Care shall be exercised when removing silt fences, as feasible, to prevent debris or sediment from returning to the stream. RCA Joint Project Review (JPR) Findings JPR #: 23-05-12-01 Date: 08/14/24 8 viii. Equipment storage, fueling, and staging areas shall be located on upland sites with minimal risks of direct drainage into riparian areas or other sensitive habitats. These designated areas shall be located in such a manner as to prevent any runoff from entering sensitive habitat. Necessary precautions shall be taken to prevent the release of cement or other toxic substances into surface waters. Project related spills of hazardous materials shall be reported to appropriate entities including but not limited to applicable jurisdictional city, FWS, and CDFG [CDFW], RWQCB and shall be cleaned up immediately and contaminated soils removed to approved disposal areas. ix. Erodible fill material shall not be deposited into water courses. Brush, loose soils, or other similar debris material shall not be stockpiled within the stream channel or on its banks. x. The qualified project biologist shall monitor construction activities for the duration of the project to ensure that practicable measures are being employed to avoid incidental disturbance of habitat and species of concern outside the project footprint. xi. The removal of native vegetation shall be avoided and minimized to the maximum extent practicable. Temporary impacts shall be returned to pre-existing contours and revegetated with appropriate native species. xii. Exotic species that prey upon or displace target species of concern should be permanently removed from the site to the extent feasible. xiii. To avoid attracting predators of the species of concern, the project site shall be kept as clean of debris as possible. All food related trash items shall be enclosed in sealed containers and regularly removed from the site(s). xiv. Construction employees shall strictly limit their activities, vehicles, equipment, and construction materials to the proposed project footprint and designated staging areas and routes of travel. The construction area(s) shall be the minimal area necessary to complete the project and shall be specified in the construction plans. Construction limits will be fenced with orange snow screen. Exclusion fencing should be maintained until the completion of all construction activities. Employees shall be instructed that their activities are restricted to the construction areas. xv. The Permittee shall have the right to access and inspect any sites of approved projects including any restoration/enhancement area for compliance with project approval conditions, including these BMPs. CT/TC Rough Step 5 Rough Step 6 REGIONAL M A L L LOOPRD N G E N E R A L K E A R N Y R D M A R G A R IT A R D LACRUZD R PREECELN R A N C H O C ALIFORNIARD RORIPAU G H RD MERCEDES ST CHERRY ST FIG ST SIXTH ST A V E N I D A D E L O R O HAYES AVE R A M SEY C T PUJOL ST OVERLANDDR GRANADO PL D I A Z RD VIA L A VID A YNEZRD O L D T O W N F R ONTST S O L A N A W A Y DOUGLASS AVE F E L IX V A L D E Z AVE VIASANTA R O S A MORENORD JAN VALERIE RD C HAN TEMARWAY ELCHAVAL P L S ELBYCIR MEADO W L A R K R I D GE E A G L ENE S T R D FIFTH ST C A L L E C O R VE TA DIAZ R D RYCREST D R STONEWOODRD RIDGE P A R K D R EQUITYDR DE LUZ RD V A I L B R OOKDR L A C R UZDRVI A V A Q UERORD FOURTH ST VIAREN ATE CALLEREVA AU T OMALL P K W Y CORNINGPL MAIN ST CAL L E N A CID O TIE R R A VISTA R D OD ES S A D R C O R T E FRESCA B U S I N ESSPARKDR C O M M E R C E C E N TE R D R SANDIACREEKDR DIAZ RD SECOND ST VIAIN D U S T RIA ADAMS AVE M A DIS O N A V ERANCONCENTERBLVD WINCHESTER R D VIA VUELTA S THIRD ST STANFORD DR C AL L E CAPISTRANO PE A R ST ALCALDE LNGLENMEADOWSRD ARJUNA AVE ENTERPRISECIRW CREEKHOLLOW WAY ELM ST JOHN WAYNE RD N I C O L E L N SKEITH W A Y HOBIE CIR SYCAMO R E C R E E K D R RIKI LN COR T E RIALTO C A M I N O C A M P O S VE R DES VIAMONTEZUMA V I A N O R T A D ARD DELRIO R D RIO NEDO L A C OLIMARD JEFFERSON AVE LYNDIEL N A V O Y E R A V E AVENIDA ALVARADO VIAVEGA MANCE RD P R ADERAWAY R E M I N G T O N AV E CHERRY ST RANCHOH I G HLANDD R BUECKIN G D R VIACEJITA MILES ST C A MIN O S E C O ROICK DR VIA NARIZ SKYWOOD DR SYC AM O RE M E S A R D BUTTE R NUTDR REAGAN WAY VIAL A S C O LI N A S VIAVAQUE R O P A R KPLAZA L N SARAH WAY SHAW LN SUGARBERRY LN S I NGLE OAK D R RANCHO WAY WASHINGTON AVE VISTAD E R E S A C A HAYES AVE EASTM AN D R V I A M E D E I R O S VIABOLERO RD WES T E R N B Y P A S S C O RRIDOR C O UNTYCENTERDR ENTERPRISECIRN DENDY PKWY ZEVO DR City ofMurrieta City ofTemecula 0 0 0 665666586659 6779 6780 6781 6782 6783 6887 6888 6890 6891 6988 7005 7008 7021 7063 7066 7069 7075 7076 7077 7078 7079 7147 7148 7150 7158 §¨¦15 ÄÄ79 Cell Group J'Cell Group K' Cell Group L' Cell Group M'Cell Group M' I SOURCE: Western Riverside County Regional Conservation Authority 2023; County of Riverside 2023; Esri Basemap 2023. Map created on 5/16/2023. EXHIBIT AJPR Log No. 23-05-12-01 - Regional01,000 2,000Feet r14524Permittee: City of TemeculaLR23-0196 Warehouse/Office G:\RCA\JOINT_PROJECT_REVIEW\JPR_FILES_2023\JPR23051201\JPR23051201-ExhibitA_Regional.mxd OrangeCounty San DiegoCounty San Bernardino County EasternRiversideCounty WesternRiversideCounty JPR Proposed Project Boundary Private Development Public Development Proposed/Future MSHCP Conservation Other ConservationAvoidance Area MSHCP Conserved ARL (Land) MSHCP Conserved Public/Quasi-Public Land MSHCP Covered Road Rough Step Unit Cell GroupCriteria Cell City Boundary Parcel Boundary Highway Centerline !!! !!! ! ! ! ! ! ! ! !!! !! ! !! !!! !! ! !!! ·|}þ17 !"#$51 !"#$51 !"#$51 !"#$512 ·|}þ06 !"#$10 !"#$10 ·|}þ47 ·|}þ247 ·|}þ243 ·|}þ47 ·|}þ19 ·|}þ19 !"#$51 ·|}þ47 ·|}þ97 ·|}þ06 ·|}þ173 ·|}þ47 ·|}þ243 ·|}þ97 !"#$512 !"#$512 ·|}þ06 ·|}þ97 ·|}þ47 !"#$51 16 20 3 21 65 8 1 15 6 6 20 18 1 14 8 4 5 21 17 9 7 1 21 22 10 15 11 14 4 11 1 17 13 11 24 19 18 14 7 7 16 9 12 10 12 3 4 23 13 8 D D K B EB EA L MA I A A B A K C F A LG H D J B K C B B C 1 2 3 4 3 5 4 7 1 2 6 1 2 4 7 65 3 5 6 7 7 JPR Log No. 23-05-12-01 - Vicinity Map with MSHCP Schematic Cores and LinkagesEXHIBIT B SOURCE: Western Riverside County Regional Conservation Authority (WRC-RCA). Map created on 5/16/2023 r14524Permittee: City of TemeculaLR23-0196 Warehouse/Office G:\RCA\JOINT_PROJECT_REVIEW\JPR_FILES_2023\JPR23051201\JPR23051201-ExhibitB_MSHCP_SchematicCoresLinkages.mxd JPR Log No. 23-05-12-01 Proposed Link age s Constrained Linkage Linkage !!!!!!Existing Channel Existing Cores & Linkages Constrained Linkage Core Linkage Noncontiguous Habitat Block Proposed Cores & Habitat Blocks Core Proposed Extension of Existing Cores Noncontiguous Habitat Block I 0 2 4Miles ROUGHSTEP 5 VIA INDUSTRIA W I N C H E S T E R R D REMI NGTON AVE ROICK DR W ES TERN BYPASS C ORRIDOR Z E V O D R 6781 6782 6888 JPR Log No. 23-05-12-01 - MSHCP 1994 Baseline VegetationEXHIBIT C SOURCE: WRC-RCA MSHCP Baseline Vegetation (1994). Map created on 5/16/2023. I 0 100 200Feet r14524Permittee: City of TemeculaLR23-0196 Warehouse/Office G:\RCA\JOINT_PROJECT_REVIEW\JPR_FILES_2023\JPR23051201\JPR23051201-ExhibitC_Vegetation.mxd JPR Proposed Project Boundary Vegetation Ty pe s Chaparral Coastal Sage Scru b* Developed or Disturb ed Lan d Grassland* Water MSHCP Conserved ARL (Land) Rough Step Unit Criteria Cell Centerline *Vegetation types that occur within the JPR Proposed Project Boundary VIA INDUSTRIA W I N C H E S T E R R D REMI NGTON AVE ROICK DR W ES TERN BYPASS C ORRIDOR Z E V O D R 6781 6782 6888 JPR Log No. 23-05-12-01 - SoilEXHIBIT DI0125250Feet r14524Permittee: City of TemeculaLR23-0196 Warehouse/Office SOURCE: Western Riverside County Regional Conservation Authority 2023; County of Riverside 2023; USDA/NRCS Soils 2020 G:\RCA\JOINT_PROJECT_REVIEW\JPR_FILES_2023\JPR23051201\JPR23051201-ExhibitD_Soil.mxd JPR Proposed Project Boundary Soil Type s Arbuckle gravelly loa m, 15 to 25 perce nt slope s Greenfield san dy lo am, 15 to 25 pe rcent slop es, ero ded* Greenfield san dy lo am, 2 to 8 percen t slo pes, erode d Lodo rocky loa m, 25 to 50 pe rcent slop es, ero ded Ysidora gravelly very fine sa ndy lo am, 8 to 25 pe rce nt slope s, ero ded MSHCP Conserved ARL (Land) Criteria Cell Centerline *Soil types that occur within the JPR Proposed Project Boundary City ofTemecula Via Industria Winchester R d R e m i n g t o n A v e Roick Dr W estern Bypass Corridor Z e v o D r 0 6781 6782 6888 JPR Log No. 23-05-12-01 - Project DetailEXHIBIT E G:\RCA\JOINT_PROJECT_REVIEW\JPR_FILES_2023\JPR23051201\JPR23051201-ExhibitE_ProjectDetail.mxd I 0 110 220Feet r14524Permittee: City of TemeculaLR23-0196 Warehouse/Office SOURCE: Western Riverside County Regional Conservation Authority 2023; County of Riverside 2023; Esri Basemap 2023. Map created on 5/16/2023. JPR Proposed Project Boundary Developm ent Im pact On-Site Permanen t MSHCP Covered Road Criteria Cell City Boundary Parcel Boundary Centerline DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 owner/consultants sheet indexdata table T1.1 roick temecula industrial office 42974 roick drive, temecula ca 92590 ADDRESS: 42079 ROICK DR, TEMECULA CA 92590 ASSESSOR PARCEL NUMBER: 909-320-056 GENERAL LAND USE: IP - INDUSTRIAL PARK ZONING DISTRICT: LI - LIGHT INDUSTRIAL CONSTRUCTION TYPE: TYPE II-B (SPRINKLERED IN ACCORDANCE WITH NFPA 13) OCCUPANCY: F-2/S-1 PROJECT TYPE: CONSTRUCT NEW 1 STORY WAREHOUSE AND OFFICE SPACE ON A VACANT LOT NEW PARKING AREA TRASH ENCLOSURE, TRUCK RAMP AND VEHICLE STORAGE YARD APPLICABLE CODES: THIS PROJECT SHALL COMPLY WITH: 2019 CALIFORNIA BUILDING CODE 2019 CALIFORNIA MECHANICAL CODE 2019 CALIFORNIA PLUMBING CODE 2019 CALIFORNIA ELECTRICAL CODE 2019 CALIFORNIA FIRE CODE 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE 2019 CALIFORNIA ENERGY EFFICIENCY STANDARD CODE 2019 CALIFORNIA RESIDENTIAL CODE 2019 CALIFORNIA EXISTING BUILDING CODE AND ALL LOCAL AND STATE AMENDMENTS SIZE ALLOWED/ REQ'D CITY LOT SIZE PROPOSED SQUARE FOOTAGE TABULATIONS OFFICES WAREHOUSE TOTAL SETBACKS FRONT (WINCHESTER RD) REQUIRED PROPOSED CITY SIDES REAR REMARKS PARKING NUMBER SPACES REQUIRED PROPOSED CITY DIMENSIONS REMARKS 0' 20' (1) 10' GENERAL MINIMUM LANDSCAPED AREA 84,338 S.F. 0' 20' 10' (1)ARTERIAL STREET AND COLLECTOR STREET (2)5' ADDT'L SETBACK FOR EVERY 10' OF BUILDING HEIGHT OVER 30' 20(1) or 19 (2) or 10 (3)20 9" X 18' (2) (1) R&D - 1 SPACE /350 S.F. GROSS FLOOR AREA LEGAL DESCRIPTION: PARCEL 7 OF PARCEL MAP 28471, ON FILE IN BOOK 195, PAGES 7, 8, AND 9 OF PARCEL MAPS, RECORDS OF RIVERSIDE COUNTY, CALIFORNIA ACCESSIBLE SPACES DIMENSIONS 1 (4)2 MAXIMUM LOT COVERAGE 7,057 SF33,735.2 S.F. (1) 16,867.6 S.F. (2) (2) MANUFACTURING - 1 SPACE /400 S.F. INDUSTRIAL + 1 SPACE /300 S.F. OFFICE (3) WAREHOUSE - 1 SPACE /1000 S.F. WAREHOUSE + 1 SPACE /300 S.F. OFFICE (4) 1 DISABLED SPACE FOR 1-25 SPACES 2 DISABLED SPACES PER 26-50 SPACES 9' X 18' FRONT (ROICK RD)20' (1)20' HEIGHTS MAXIMUM BUILDING HEIGHT ALLOWED PROPOSED CITY 40' WALL HEIGHT 22' MAX ACCESSORY BUILDING HEIGHT 12'x' (4) 975 SF 6,045 SF 7,057 SF x.xx' (2)MIN 6' / MAX 12' F.A.R.0.40 0.21 FRONT PARKING AREA REAR YARD AREA (secured area behind gate)47,165 SF (1.08 acres) HARDSCAPED AREA 54,984 SF 4,928 SF 22,436 SF ELECTRICAL 37 SF 3 A2 3 A2 NORTH ARROW ELEVATION REFERENCE DETAIL REFERENCE KEYNOTE REFERENCE DOOR REFERENCE WINDOW REFERENCE SECTION REFERENCE 4 4 A PAINT COLOR4 B SUN NORTH H/A6.3 10'-0"CEILING HEIGHT legend vicinity map title sheet ARCHITECTURAL TITLE SHEET / SHEET INDEX / PROJECT DATAT1.1 A1.1 CONSTRUCTION FLOOR PLANS A5.1 ROOF PLAN ELEVATIONS SITE PLAN T1.2 3D IMAGES A3.1 DAVID R. OLSON ARCHITECTS 470 WALD IRVINE, CA 92618 TEL. (949)450-0093 FAX (949)450-0094 CONTACT: DAVID R. OLSON, A.I.A. LICENSE: C19424 DAVID@OLSONARCHITECT.COM ARCHITECT OWNER SITE CIVIL ENGINEER (DRPC) ELECTRICAL ENGINEER SURVEY ENGINEER SPIRO LAND SURVEYING INC. 26100 NEWPORT RD. #415, MENIFEE, CA 92584 TEL. (951) 334-3174 CONTACT: MATT SPIRO EMAIL: MATT@SPIROLANDSURVEYING.COM SAILHOUSE 170 NEWPORT CENTER DRIVE, SUITE 260 NEWPORT BEACH, CA 92660 TEL. (949) 281-6044 CONTACT: PAT PATTERSON EMAIL: PAT@SAILHOUSE.COM RPM ENGINEERS, INC. 102 DISCOVERY IRVINE, CA 92618 TEL. (949) 450-1229 EXT 208 CONTACT: JAY KIM, PE, CXA, LEED AP EMAIL: JAYK@RPMPE.COM 4M ENGINEERING & DEVELOPMENT 41635 ENTERPRISE CIRCLE NORTH, SUITE B TEMECULA, CA 92590 TEL. (951) 296-3466 X213 CONTACT: SHERRIE MUNROE EMAIL: SHERIE@4MED.NET LOCATION ASSESSOR PARCEL NUMBER: 909-320-056 ADDRESS: 42974 ROICK DRIVE, TEMECULA, CA 92590 LEGAL DESCRIPTION: PARCEL 7 OF PARCEL MAP NO. 28471, ON FILE IN BOOK 195, PAGES 7 THROUGH 9, INCLUSIVE OF PARCEL MAPS, RECORDS OF RIVERSIDE COUNTY GENERAL PLANNING & ZONING ZONING DESIGNATION: L.I. - LIGHT INDUSTRIAL GENERAL PLAN DESIGNATION: I.P. SPECIFIC PLAN AREA: N/A EXISTING LAND USE: VACANT COMMERCIAL LAND PROPOSED LAND USE: INDUSTRIAL PARK DENSITY PROPOSED DWELLING UNITS PER ACRE: PERMITTED DWELLING UNITS PER ACRE:N/A N/A 22,739 SF LOT DATA TOTAL GROSS AREA TOTAL NET AREA TOTAL BUILDING AREA FLOOR AREA RATIO LOT COVERAGE 0.082 BUILDING AREA PARKING AREA LANDSCAPING AREA HARDSCAPE AREA PERCENTAGESQUARE FEET 1.94 AC PARKING PARKING RATIO / SQUARE FOOT OF USES (TOTAL) 20 20 (1) SPACES REQUIRED SPACES PROVIDED ALL RESEARCH & DEVELOPMENT (1:350) GENERAL MANUFACTURING (1:400) + OFFICE 20 15 + (4) = 19 6 + (4) = 10 84,506 SF 1.94 AC84,506 SF WAREHOUSE (1:1000) + OFFICE 7,057 SF 51,369 SF 3,319 SF 7,057 SF 8.4% 60.8% 26.9% 3.9% OFFICE (1:300)(4) A5.2 A4.1 ELEVATIONS H G F C D E A B J K L general building/department notes GENERAL CONTRACTOR SHALL VISIT THE BUILDING SITE AND SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO STARTING ANY WORK AND SHALL BE RESPONSIBLE FOR COORDINATION OF ALL WORK AND MATERIALS. THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES FOUND. THE GENERAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SHORING, EXCAVATIONS, TEMPORARY STRUCTURES AND PARTIALLY COMPLETED PORTIONS OF WORK TO ASSURE SAFE WORKING CONDITIONS. ALL MATERIAL AND WORKMANSHIP SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL STANDARDS AND TO APPLICABLE PROVISIONS IN THE LATEST EDITIONS OF THE CBC, CPC, CMC, CEC, LOCAL ORDINANCES SUCH AS BUT NOT LIMITED TO CITY, COUNTY, FIRE AND ZONING CODES WITH THE BEST PRACTICES OF THE TRADE. GENERAL CONTRACTOR SHALL VERIFY ALL CODE REQUIREMENTS BEFORE COMMENCEMENT OF CONSTRUCTION AND BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE ARCHITECT. GENERAL CONTRACTOR SHALL PROVIDE SAFE AND ADEQUATE TEMPORARY ERECTION BRACING ON ALL BEAMS, WALLS, ETC. TO PROVIDE FULL STRUCTURAL STABILITY. TEMPORARY BRACING SHALL NOT BE REMOVED UNTIL THE PERMANENT BRACING HAS BEEN COMPLETELY INSTALLED AND SECURED AND THE ELEMENT SUPPORTED IS CAPABLE OF SUPPORTING THE DESIGN LOADING. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE, UNLESS OTHERWISE SHOWN THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE GENERAL CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES. ASBESTOS REMOVAL AND DISPOSAL, WHERE REQUIRED SHALL BE PERFORMED BY FIRMS DULY LICENSED FOR SUCH WORK AND SHALL COMPLY WITH ALL APPLICABLE AGENCY REQUIREMENTS. SHEETMETAL AND FLASHING REQUIREMENTS SHALL CONFORM WITH THE LATEST EDITIONS OF SMACNA AND NRCA MANUALS. GLAZING SHALL CONFORM WITH CBC CHAPTER 24. HARDWARE SHALL BE DESIGN-BUILD AND SHALL CONFORM WITH THE SECURITY REQUIREMENTS OF CBC CHAPTER 4. WALLBOARD AND PLASTERING SHALL CONFORM WITH THE LATEST EDITION OF THE LATHING AND PLASTERING SPECIFICATIONS OF THE CALIFORNIA LATHING AND PLASTERING CONTRACTOR'S ASSOCIATION, INC. CASEWORK SHALL CONFORM WITH THE LATEST EDITION OF THE W.I.C. MANUAL, CUSTOM GRADE UNLESS HIGHER GRADE IS SELECTED BY OWNER. ALL EXITS ARE TO BE OPENABLE FROM INSIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE X W Q V U T S R P O N M Y A SEPARATE SPRINKLER PERMIT SHALL BE REQUIRED FOR THIS BUILDING OR MODIFICATION TO THIS EXISTING BUILDING. PLANS SHALL BE SUBMITTED TO THE FIRE DEPARTMENT FOR APPROVAL. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS ON THE DRAWINGS AND ON THE JOB SITE PRIOR TO EXECUTION OF ANY WORK AND SHALL NOTIFY THE ARCHITECT AND OWNER IN WRITING OF ANY DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS REQUIRED DUE TO HIS FAILURE TO DO SO. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES AND COSTS FOR LICENSES, PERMITS, SERVICE CHARGES, ETC. ASSESSED BY ANY GOVERNMENTAL AGENCY OR UTILITY COMPANY. CONTRACTOR'S INSTALLATION OF ALL UTILITIES AND SUBSEQUENT HOOK-UP SHALL BE AS NECESSARY TO ASSURE CONFORMANCE WITH UTILITY COMPANY. GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL PROVIDE A WRITTEN GUARANTEE FOR ALL MATERIALS AND EQUIPMENT SUPPLIED TO THE JOB FOR A PERIOD OF ONE YEAR FROM ACCEPTANCE OF WORK BY OWNER. ALL REVISIONS TO THE DRAWINGS MUST PROCEED THROUGH THE OWNER AND ARCHITECT. CONTRACTOR REVISIONS MAY BE CONSIDERED INVALID IF NOT APPROVED BY THE OWNER. OWNER SHALL BE ALLOWED TO DO WORK PRIOR TO THE GENERAL CONTRACTOR'S COMPLETION. CONTRACTOR TO VERIFY FLOOR SLAB AND NOTIFY THE OWNER IN WRITING IF THE SLAB IS NOT LEVEL AND SMOOTH. TWO COMPLETE SETS OF DRAWINGS SHALL BE PROVIDED TO THE CONTRACTOR AND SHALL BE MAINTAINED IN GOOD ORDER AT THE JOB SITE. ANY DIFFERENCES BETWEEN THE WORK INDICATED ON THESE DRAWINGS AND THE ACTUAL WORK PERFORMED SHALL BE RECORDED IN RED PENCIL. AT THE TIME OF PROJECT CLOSEOUT AND AS A CONDITION OF FINAL PAYMENT, THE CONTRACTOR SHALL SIGN, DATE AND LABEL EACH "AS-BUILT" DRAWING AS BEING CORRECT AND AN ACCURATE REPRESENTATION OF THE WORK AND SHALL DELIVER THE COMPLETE SET TO THE OWNER. ALL TENANT SPACES AND ALL PATHS OF ACCESS TO THE TENANT SPACES SHALL BE ACCESSIBLE TO THE PHYSICALLY HANDICAPPED PER THE STATE AND LOCAL ORDINANCES. CONTRACTOR SHALL PROVIDE PUBLIC PROTECTION AS REQUIRED PER CITY AND LOCAL CODE REQUIREMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL TEMPORARY SHORING AND BRACING TO ENSURE THE SAFETY OF THE WORK. THE SIGN CONTRACTOR SHALL OBTAIN SEPARATE PERMITS AND APPROVALS FROM GOVERNING AGENCIES FOR SIGNS. ALL COMBUSTIBLE RUBBISH SHALL BE STORED IN FIRE DEPARTMENT APPROVED CONTAINERS IN A LOCATION APPROVED BY THE FIRE DEPARTMENT FIELD INSPECTOR. PROVIDE ADDITIONAL FIRE EXTINGUISHERS PER FIRE DEPARTMENT FIELD INSPECTOR'S INSTRUCTIONS. PROVIDE A 2A 10:B-C RATED FIRE EXTINGUISHER ADJACENT TO ALL EXITS AND WITHIN 75' OF ANY LOCATION WITHIN THE LEASE SPACE. (VERIFY EXISTING EXTINGUISHERS). MAINTAIN A MINIMUM OF 44" CLEAR AT ALL AISLES AND EXITWAYS. CONTRACTOR TO BUILD OFF OF SETS MARKED "CONSTRUCTION SET" ONLY. ALL INTERIOR FINISHES SHALL COMPLY WITH CBC CHAPTER 8: CLASS III OR BETTER FLAME SPREAD RATING. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND SERVICES NECESSARY FOR THE SATISFACTORY COMPLETION OF WORK SHOWN AND DESCRIBED ON THE DRAWINGS. deferred submittals FIRE SPRINKLERS FIRE ALARM SYSTEM DEFERRED SUBMITTALS TO BE REVIEWED BY PROJECT ARCHITECT OR ENGINEER OF RECORD AND CERTIFIED PRIOR TO SUBMITTAL FOR PLAN CHECK OR APPROVAL BY THE CITY PROVIDE A MANUAL FIRE ALARM SYSTEM AS REQUIRED BY CBC 907.2.2 1 A6.1 BUILDING SECTIONS A7.1 REFLECTED CEILING PLAN T1.3 3D IMAGES 2 3 3 A6.2 SITE SECTIONS D1.1 ACCESSIBILITY DETAILS D1.2 DETAILS D1.3 DETAILS D1.4 DETAILS DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 3 4 1 2 5 6 site photos 3 4 1 2 5 6 T1.3 3d images & site photos DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 3 4 1 2 5 6 T1.2 3d images & site photos site photos TRASH 20 ' - 0 " FR O N T S E T B A C K 20'-0" FRONT SET B A C K 10'-0" REAR SETBACK WINCH E S T E R R D RO I C K D R 39'-0" R.O.W. 1105 1100 1095 1090 1105 1110 1100 1095 1115 50 ' - 0 " R.O . W . N 19º 5 0 ' 4 6 " W 4 2 2 . 7 4 ' N 3 8 º 5 0 ' 2 7 " E 3 0 3 . 7 6 ' N 35º 47' 28" W 321.99' D= 6 2 º 1 0 ' 5 2 " L= 1 5 0 ' R = 5 3 9 . 0 0 ' CL CL N 2 3 º 5 6 ' 6 " E 3 3 . 2 4 ' EMPLOYEE BREAK AREA R47'- 0 " T U R N I N G R A D I U S 11 - 12x25 SPACES 9 - 12x40 SPACES 9 - 15x50 SPACES RAMP 20'-0" DRA I N A G E EASEMENT VE H I C U L A R IN G R E S S / E G R E S S EA S E M E N T ZONING: L.I. LAND USE: DEVELOPED ZONING: L.I. LAND USE: VACANT ramp 5'-0" VAN EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE CONCRETE PAVED YARD VAN 4cu.yd. 4cu.yd. 37 SF 14 SF 47'-3" 35'-9" 30 ' - 0 " 34'-8"33'-4"33'-4" 8' - 0 " 8' - 0 " 54 ' - 0 " 10 ' - 0 " 78 ' - 0 " 31 ' - 5 " 44 ' - 8 1 / 2 " 12'-8"37'-4"51'-4" 2' - 0 " 20'-0" 10 ' - 0 " 2' - 1 0 " 14 ' - 6 " 18 ' - 6 " 4' - 1 1 " 7' - 7 " 6' - 6 " 38 ' - 1 0 1 / 2 " 13'-1 1/2" 10'-0" 16 ' - 0 " 62'-0" 49 ' - 8 " 10'-10"13 ' - 4 " R 3 7 ' - 0 " R5 6 ' - 0 " R56'-0" R37' - 0 " 30 ' - 0 " 34 ' - 4 " 32 ' - 1 0 1 / 2 " 4' - 6 " 262'-6 1/2" 6 7 ' - 9 " 1 7 4 ' - 3 1 / 2 " 204'-7 1/2" 24 ' - 8 " 4' - 0 " 6' - 0 " 9'-0" 12'-0"5'-0" 5'-0"9'-2" 9'-2" 37'-8" 18 ' - 1 1 " 30 ' - 6 " 7' - 7 " 12'-0" 37 SF 14 SF > > > > > > > > > > > > > >>>> > > > 117'-3 1 / 2 " 9 2 ' - 1 " 37 SF 14 SF DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 0 2 5 10 15 A1.1 site plan site plan A1/16"=1'-0" B OCCUPANCY - OFFICE O.L. = 1/100 F-2 OCCUPANCY ; MANUFACTURING - LOW HAZARD O.L. = 1 / 100 OCC.FLOOR AREA OCCU- PANTSUSAGE 1 2 EXITS REQ'D EXITS PROVIDEDSPACE 5,844 S.F. OCCUPANT LOAD F-1 INDUSTRIAL/WAREHOUSE 59 TOTAL 69 3 4 2 3 (6,819 S.F. CPC O.L. PLUMB FIX. OCCUPANCY 1/500 11.7 (9 MEN AND 9 WOMEN) 7 8 9 13 12 11 10 2 1 4 5 6 3 exiting diagram occupancy / exiting / fixture tabulations MAXIMUM PATH OF TRAVEL 1 250'80' occupancy diagram 17 69 OCC. x .2" = 14.8" EXIT WIDTH REQUIRED 180" EXIT WIDTH PROVIDEDTOILET URINALS SINKS 1 0 1 1 0 1 MEN TOILET SINKS 1 1 1 1 WOMEN DRINKING FOUNTAIN 1 1 REQUIRED PROVIDED OFFICE AND OPEN OFFICEB 975 S.F.10 1/200 4.912 TOTAL NET INTERIOR FLOOR AREA (EXCL. INT WALLS) EXISTING PROPERTY LINE ACCESSIBLE RAMP EXISTING SIDEWALK LANDSCAPED AREA STANDARD 9x218 PARKING SPACES, TYP. NEW TRASH ENCLOSURE TO ACCOMMODATE 3 TRASH BINS A.D.A. COMPLIANT PATH OF TRAVEL FROM H.C. ACCESSIBLE PARKING SPACES OR TRASH ENCLOSURE 9'X18' VAN ACCESSIBLE PARKING SPACE AND SIGNAGE 5' WIDE ACCESSIBLE PASSENGER LOADING AISLE. 9'X18' H.C. ACCESSIBLE PARKING SPACE AND SIGNAGE A.D.A. COMPLIANT PATH OF TRAVEL FROM PUBLIC RIGHT OF WAY (48" MIN. WIDTH W/ 2% MAX. CROSS SLOPE). (V.I.F.) FIRE DEPARTMENT KNOX BOX & KEY SWITCH NEW DRIVEWAY PER CITY STANDARD NO.207A site plan keynotes 719 7 2 2 1 1 >>>>>>>>>>>>> > > > > > > > > >>>>>>>>> > > 8 910 EV CAPABLE PARKING SPACES; PROVIDE ELECTRICAL CHASE AND 40 AMP BRANCH CIRCUIT FOR EACH PARKING SPACE FOR FUTURE EV CHARGER. 5 5 6 12 16 15 14 15'X50' TRUCK PARKING SPACE 15' WIDE TRUCK LOADING RAMP EMPLOYEE BREAK AREA WITH PICNIC TABLES AND UMBRELLAS; PROVIDE TRASH RECEPTACLE 17 19 18 15'X40' TRUCK PARKING SPACE 12'X25' TRUCK PARKING SPACE 16 16 1718 17 18 13 15 3 32 14 4 4 4 4 4 4 4 4 8' HIGH CMU WALL PER 5/A5.12020 RETRACTABLE VEHICULAR SECURITY GATE W/ KNOX KEY PAD - RAPID ENTRY SYSTEM21 21 20 20 1/100 1/100 DAVID R. OLSON ARCHITECTS 470 WALD IRVINE, CA 92618 TEL. (949)450-0093 FAX (949)450-0094 CONTACT: DAVID R. OLSON, A.I.A. LICENSE: C19424 DAVID@OLSONARCHITECT.COM CIVIL ENGINEER ELECTRICAL ENGINEER SURVEY ENGINEER SPIRO LAND SURVEYING INC. 26100 NEWPORT RD. #415, MENIFEE, CA 92584 TEL. (951) 334-3174 CONTACT: MATT SPIRO EMAIL: MATT@SPIROLANDSURVEYING.COM SAILHOUSE 170 NEWPORT CENTER DRIVE, SUITE 260 NEWPORT BEACH, CA 92660 TEL. (949) 281-6044 CONTACT: PAT PATTERSON EMAIL: PAT@SAILHOUSE.COM RPM ENGINEERS, INC. 102 DISCOVERY IRVINE, CA 92618 TEL. (949) 450-1229 EXT 208 CONTACT: JAY KIM, PE, CXA, LEED AP EMAIL: JAYK@RPMPE.COM 4M ENGINEERING & DEVELOPMENT 41635 ENTERPRISE CIRCLE NORTH, SUITE B TEMECULA, CA 92590 TEL. (951) 296-3466 CONTACT: SHERRIE MUNROE EMAIL: INFO@4MED.NET contact information LANDSCAPE ARCHITECT 1 1 1 1 vicinity map SITE 20 >> > 6 14X14 LOADING DOORS22 22 22 22,739 SF LOCATION ASSESSOR PARCEL NUMBER: 909-320-056 ADDRESS: 42974 ROICK DRIVE, TEMECULA, CA 92590 LEGAL DESCRIPTION: PARCEL 7 OF PARCEL MAP NO. 28471, ON FILE IN BOOK 195, PAGES 7 THROUGH 9, INCLUSIVE OF PARCEL MAPS, RECORDS OF RIVERSIDE COUNTY GENERAL PLANNING & ZONING ZONING DESIGNATION: L.I. - LIGHT INDUSTRIAL GENERAL PLAN DESIGNATION: I.P. SPECIFIC PLAN AREA: N/A EXISTING LAND USE: VACANT COMMERCIAL LAND PROPOSED LAND USE: INDUSTRIAL PARK DENSITY PROPOSED DWELLING UNITS PER ACRE: PERMITTED DWELLING UNITS PER ACRE: LOT DATA TOTAL GROSS AREA TOTAL NET AREA TOTAL BUILDING AREA FLOOR AREA RATIO LOT COVERAGE 0.082 BUILDING AREA PARKING AREA LANDSCAPING AREA HARDSCAPE AREA PERCENTAGESQUARE FEET 1.94 AC PARKING PARKING RATIO / SQUARE FOOT OF USES (TOTAL) 20 20 (1) SPACES REQUIRED SPACES PROVIDED ALL RESEARCH & DEVELOPMENT (1:350) GENERAL MANUFACTURING (1:400) + OFFICE 20 15 + (4) = 19 NUMBER OF ADA SPACES (1-25 STD. SPACES) 6 + (4) = 10 N/A N/A 84,506 SF 1.94 AC84,506 SF 1 3 (1 VAN) WAREHOUSE (1:1000) + OFFICE 7,057 SF 51,369 SF 3,319 SF 7,057 SF 8.4% 60.8% 26.9% 3.9% OFFICE (1:300)(4) MOTORCYCLE SPACES (1 PER OVER 25 SPACES) NOT REQ'D PER 17.24.040 G(1) - UNDER THRESHOLD 0 0 BICYCLE SPACES (1 PER 20 SPACES, 4 MIN)4 4 (1) NUMBER OF SPACES PROVIDED BASED ON THE MOST RESTRICTIVE USE. data table 7 8 ARCHITECT (DRPC) OWNER 4 4 42" HIGH GUARDRAIL AS REQUIRED23 23 PROPOSED LIGHTING STANDARDS24 24 24 24 24 EXISTING UTILITIES, VERIFY WITH GRADING PLAN25 25 25 CLASS II BICYCLE RACK TO ACCOMMODATE 4 BIKES26 26 27 DOUBLE DETECTOR CHECK VALVE LOCATION27 LEGEND 4 4 4 LANDSCAPE FINGERS TO HAVE A 12" CONCRETE STEP-OUT ADJACENT TO PARKING SPACES.28 28 28 28 28 28 10 11 1 1 1 1 1 1 1 1 1 1 1 27 1 FIRE DEPARTMENT CONNECTION LOCATION29 29 1 PROVIDE DETECTABLE WARNING SURFACE PER 11B-705 TO EXISTING CURB RAMPS AT INTERSECTION30 30 1 1 2 2 2 31 NEW STREET LIGHTING STANDARD PER CIVIL PLANS31 2 2 2 31 19 2 2 2 29 A 20 FOOT WIDE EASEMENT FOR DRAINAGE, SLOPES, AND PUBLIC UTILITIES AND INCIDENTAL PURPOSES. RECORDED 06-21-78 AS SHOWN INST. NO. 1978-127011 OF OFFICIAL RECORDS AN EASEMENT FOR VEHICULAR INGRESS AND EGRESS, INSTALLATION AND USE OF ACCESS ROADWAY FOR HAULING AND INCIDENTAL PURPOSES. RECORDED 02-23-90 AS INST. NO. 1990-68101 OF OFFICIAL RECIRDS. THE EASEMENT CANNOT BE DETERMINED FROM RECORD INFORMATION. A B A B 3 3 3 INSIDE FACE) 1 2 office 1 7.2x7.5 office 2 open office toilet 1 toilet 2 7.2x7.5 14x1214x12 manufacturing / industrial / warehouse / 6,045 SF 983 SF elec fire riser 12x30 34'-8" 80 ' - 0 " 103'-4" 37'-4" 20 ' - 1 " 68 ' - 4 " 15 ' - 0 " 33'-4" 33'-4" 6' - 0 " 8' - 0 " 9' - 8 " 8' - 0 " 14 ' - 0 " 8' - 0 " 14 ' - 0 " 4' - 6 " 17 ' - 0 " 6'-6"12'-4"6'-11"2'-0"11'-4" 37'-9" 30 ' - 7 " 10 ' - 9 1 2" 7' - 6 " 8' - 6 " 8'-01 2" 4'-10" 29'-81 2" 14 ' - 0 " 40 ' - 0 " 38 ' - 8 " 20'-0"20'-0"20'-0"20'-0"20'-0" 32 ' - 9 " 11 ' - 0 " 51'-4" 1' - 4 " 3' - 0 " 2'-0" 1'-4" 9'-8"11'-0" 9'-8" 9'-8"9'-8" 9'-8" 20 ' - 7 " 8" 14 ' - 4 " 2'-41 2" 4' - 1 0 " 6' - 8 " 12'-8"12'-7"12'-6" 6'-0" 24 ' - 0 " 8' - 9 " 3' - 1 1 " 1' - 4 " 10 ' - 0 " 4' - 6 " 14 ' - 3 1 2" 4' - 1 0 " 8' - 5 " 3'-5" 3' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " 2'-0" 54 ' - 0 " 2' - 0 " 3'-2" 3'-2" 3'-2" 3' - 9 1 2" 3'-71 2"7'-31 2" 2' - 0 " 6' - 0 " 2' - 0 " 3' - 0 " 14'-8" DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 A3.1 first floor plan A1/4"=1'-0"first floor 0 1 2 4 plan keynoteswall legend 1 2 3 4 5 NEW FULL HEIGHT 600S125-18 METAL STUDS AT 16" O.C. FASTEN TO CONCRETE FLOOR WITH "HILTI" OR EQUAL 1/4" SHOTPINS AT 32" O.C. WITH 3/4" EMBEDMENT AND 20 GA CHANNEL. PROVIDE 5/8" TYP X GYP BD; PAINT PER FINISH SCHEDULE. SEE DET. 8&12/D1.2 NEW FURRED CONDITION; 150F125-18 FURRING CHANNELS AT 24" O.C. WITH 5/8" TYPE "X" GYP. BD. NEW 362S125-18 METAL STUDS AT 24" O.C.; 6" ABOVE CELING. FASTEN TO CONCRETE FLOOR WITH "HILTI" OR EQUAL 1/4" SHOTPINS AT 32" O.C. WITH 3/4" EMBEDMENT AND 20 GA CHANNEL. PROVIDE 5/8" TYP X GYP BD; PAINT PER FINISH SCHEDULE. SEE DETAIL 11/D1.2 NEW 600S125-18 METAL STUDS AT 16" O.C.; 6" ABOVE CEILING. FASTEN TO CONCRETE FLOOR WITH "HILTI" OR EQUAL 1/4" SHOTPINS AT 32" O.C. WITH 3/4" EMBEDMENT AND 20 GA CHANNEL. PROVIDE 5/8" TYP X GYP BD; PAINT PER FINISH SCHEDULE. SEE DET. 11/D1.2 SPLIT FACE CMU BLOCK WALL NEW CMU WALL PER LEGEND1 NEW WALL PER LEGEND2 ADA COMPLIANT SINGLE USE RESTROOM PER DETAILS3 NEW DOOR OR WINDOW PER CHEDULE4 NEW BAR SINK. PROVIDE UTILTIES5 REFRIGERATOR AS SELECTED BY TENANT, PROVIDE UTILITIES6 HIGH/LOW DRINKING FOUNTAIN7 7 6 5 3 3 2 2 1 1 1 1 1 ROLL UP DOOR PER SCHEDULE8 8 8 8 24 4 4 4 4 4 4 4 4 4 44 FIRE RISER ROOM9 KNOX BOX LOCATION10 ELECTRICAL CLOSET11 11 9 FIRE DEPARTMENT KNOX BOX AND KEY SWITCH12 12 10 FIRE ALARM CONTROL PANEL13 13 1 11 1 1 1 1 3 3 4 5 4 14 ROOF ACCESS LADDER14 1 1 1 1 1 office 1 7.2x7.5 office 2 open office toilet 1 toilet 2 7.2x7.5 14x1214x12 manufacturing / industrial / warehouse / 6,045 SF 983 SF elec fire riser 37 SF 14 SF 12x30 34'-8" 78 ' - 8 " 88'-8" 33'-4" 33'-4" 8' - 0 " 8' - 0 " 51'-4" 12'-8"2'-0" 14'-8" 11 ' - 6 " 53 ' - 4 " 2' - 0 " 51 ' - 4 " 3' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " 2'-0" 7' - 2 " 10 ' - 0 " T. O . P L T . = 1 7 ' - 6 " ( 1 1 2 3 . 5 ) / T . O . P A R . = 1 2 ' - 6 " ( 1 1 2 7 . 5 ) T.O. PAR.= 9'-7" (183.22) T. O . P L T . = 1 7 ' - 6 " ( 1 1 2 3 . 5 ) / T . O . P A R . = 1 2 ' - 6 " ( 1 1 2 7 . 5 ) T.O. PLT. = 17'-6" (1123.5)/ T.O. PAR.=12'-6" (1127.5) T.O. PLT. = 17'-6" (1123.5)/ T.O. PAR.=12'-6" (1127.5) T.O. SCREEN. = 26'-0" (1131.5) T.O. SCREEN. = 26'-0" (1131.5) T. O . S C R E E N . = 2 6 ' - 0 " ( 1 1 3 1 . 5 ) T. O . S C R E E N . = 2 6 ' - 0 " ( 1 1 3 1 . 5 ) DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 B1/4"=1'-0"roof plan 0 1 2 4 plan keynotes NEW BUILT-UP ROOF, SLOPE 1/4" PER FT MIN.1 DRAINAGE CROWN FOR POSITIVE DRAINAGE2 3 ROOF AND OVERFLOW DRAINS; DOWNSPOUTS TO BE ROUTED INTERNALLY.4 THROUGH WALL SCUPPER5 LOCATION OF MECHANICAL UNITS BY MECHANICAL ENGINEER6 CMU PARAPET WALL 4 4 44 4 4 4 4 2 2 2 2 2 2 2 6 6 6 6 A4.1 roof plan 1 1 1 1 1 3 3 3 3 3 3 3 ROOF ACCESS HATCH7 7 METAL SCREEN TO MATCH MECHNICAL UNIT HEIGHT. PAINT TO MATCH PARAPET COLOR8 8 8 8 8 14 D1.4 15 D1.4 1 D1.4 1 D1.4 2 D1.4 5 D1.4 17 D1.4 14 D1.4 15 D1.4 warehouse 56'-0" TRASH 20 ' - 0 " FR O N T S E T B A C K 20'-0" FRONT SET B A C K WINCHE S T E R R D RO I C K D R 39'-0" R.O.W. 1105 1100 1095 1090 1095 50 ' - 0 " R.O . W . N 19º 5 0 ' 4 6 " W 4 2 2 . 7 4 ' D= 6 2 º 1 0 ' 5 2 " L= 1 5 0 ' R = 5 3 9 . 0 0 ' CL CL N 2 3 º 5 6 ' 6 " E 3 3 . 2 4 ' EMPLOYEE BREAK AREA VE H I C U L A R IN G R E S S / E G R E S S EA S E M E N T ramp CONCRETE PAVED YARD VAN 4cu.yd. 4cu.yd. open office warehouse 76'-0" DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 A6.2 site sections section a section b site plan 1/4"=1'-0"A 1/4"=1'-0"B 1/4"=1'-0"C A1/4"=1'-0" B1/4"=1'-0" C1/4"=1'-0" 2 office 1 7.2x7.5 office 2 open office toilet 1 toilet 2 7.2x7.5 14x1214x12 manufacturing / industrial / warehouse / 6,045 SF 983 SF elec 1 1 fire riser 12x30 DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 A7.1 reflected ceiling plan A1/4"=1'-0"reflected ceiling plan 1 2 3 4 5 6 plan keynotes rcp general notes rcp legend 12'-0"INDICATES CEILING HEIGHT DIRECTLY ABOVE THAT FLOOR AREA EX.FAN FL WP ALL FIXTURE TRIMS TO BE PAINTED TO MATCH CEILING FINISH. VERIFY COLOR WITH DROA OR OWNER; VERIFY FIXTURE MODEL DECORATIVE PENDANT AS SELECTED BY OWNER OR I.D. CEILING FAN AS SELECTED BY OWNER WITH VARIABLE SPEED SWITCH WALL SCONCE AS SELECTED BY OWNER. VERIFY HEIGHT. EXHAUST FAN/LIGHT COMBO; BROAN SILOFLUE W/ DOUBLE TWIN TUBE FLUORESCENT BULB; LT. AND FAN SWITCHED SEPARATELY EXHAUST FAN; MIN. 5 AIR CHG'S / HR. SURFACE MOUNT FLUORESCENT DOWNLIGHT HALO 2551 22W RECESSED MOUNT FLUORESCENT DOWNLIGHT HALO H25ICAT S.D. C.M. LED UNDERCABINET STRIP ROPE LIGHT ELECTRONICALLY BALLASTED FLUORESCENT; COOL WHITE WRAP AROUND AT GARAGE; SPX 35 AT INTERIOR HONEYWELL OR EQUAL SMOKE DETECTOR CARBON MONOXIDE ALARM NOTE - 2 1 3 JUNO IC1LEDG4-27K WHITE BAFFLE JUNO IC1ALEDG4-27K WHITE BAFFLE JUNO IC91LWDG4 WHITE 440LEDG4 ADJUSTABLE TRIM MODULE 12W 120V 3000K LED 12W 120V 2700K LED 12W 120V 2700K LED ALIGN WITH CENTER OF DOOR OR OPENING ALIGN WITH CENTER OF ROOM T-BAR ACOUSTIC CEILING 2X4 LIGHTING FIXTURES PER ELECTRICAL PLANS ROOF ACCESS PANEL AND LADDER OPEN CEILING 7 GYP BD CEILING B H G F E C D 12'-0" A K L M N J ATTIC F.A.U.'S MUST BE POSITIONED IN SUCH A MANNER THAT THE REQUIRED DISTANCE FROM THE VENT OUTLET TO THE TOP OF THE FLUE CAP IS WITHIN THE ATTIC, ALLOWING THE EXTERIOR HEIGHT OF THE FLUE CAP ABOVE THE FINISHED ROOFING TO BE THE MINIMUM ALLOWED BY CODE. COORDINATE ALL LIGHTING PLACEMENT WITH ROOF AND CEILING FRAMING VERIFY ALL INTERIOR LIGHTING WITH INTERIOR DESIGNER DRAWINGS. INDICATES CEILING HEIGHT DIRECTLY ABOVE THAT FLOOR AREA GENERAL LIGHTING IN KITCHEN AND BATHROOMS SHALL PROVIDE A MINIMUM OF 40 LUMENS PER WATT PROVIDE GROUNDING ELECTRODE SYSTEM PER CEC ARTICLE 250-81 LIGHTING FIXTURES IN CLOTHES CLOSETS SHALL CONFORM CEC ARTICLE 410-8 OPENINGS AROUND ELECTRICAL PENETRATIONS THROUGH FIRE RESISTIVE RATED WALLS, PARTITIONS, FLOORS, OR CEILINGS SHALL BE FIRE STOPPED USING APPROVED METHODS TO MAINTAIN THE FIRE RESISTIVE RATING ALL 2 GANG OR MORE SWITCH FACE PLATES SHALL RECEIVE ENGRAVING AS DIRECTED BY ARCHITECT ALUMINUM CONDUCTORS ARE PERMITTED ONLY IF SIZE 1/0 OR LARGER, AND ONLY TO FEED MAIN OR SUB-PANELS. ALL OTHER CURRENT CARRYING CONDUCTORS SHALL BE COPPER. REFER TO SPECIFICATIONS FOR PROPOSED TYPE. FAU CLOSET OR ALCOVE MUST BE 12" WIDER THAN THE FURNACE OR FURNACES BEING INSTALLED. CMC SECTION 304.7 COMBUSTION AIR FOR FUEL BURNING WATER HEATERS WILL BE PROVIDED IN ACCORDANCE WITH CPC SECTION 505.1 AND 507.4 CLOTH BACKED DUCT TAPE IS NO LONGER PERMITTED TO BE USED AS THE SOLE CONNECTION FOR MECHANICAL DUCTING. DUCT TAPE, AS A MINIMUM, MEETING THE REQUIREMENTS UF UL 181, 181A, OR 181B SHALL BE USED OR ADDITIONAL DUCT ATTACHMENT DEVICES SUCH AS TIE WRAPS OR MASTIC WILL BE REQUIRED FOR INSTALLING MECH. DUCTING. RETURN AIR PLENUM SERVING THE MECHANICAL EQUIPMENT MUST BE FULLY DUCTED FROM THE EQUIPMENT TO CONDITIONED SPACE. DROP CEILINGS WALL CAVITIES AND EQUIPMENT PLATFORMS MAY NOT USED AS PLENUMS O P BOND GROUNDING ELECTRODE TO METAL GAS AND WATER PIPING. CEC SECTION 250.104(A) & (B) Q PROVIDE AT LEAST TWO 20-AMPERE SMALL APPLIANCE BRANCH CIRCUITS TO SERVE KITCHEN, BREAKFAST ROOM, AND DINING ROOM. SUCH CIRCUITS SHALL HAVE NO OTHER OUTLETS. CEC SECTION 210.52(B)(1) THROUGH 210.52(B)(3) R PROVIDE AT LEAST ONE 20-AMPERE BRANCH CIRCUITS TO SERVE LAUNDRY APPLIANCES. SUCH CIRCUIT(S) SHALL HAVE NO OTHER OUTLETS. CEC SECTION 210.11(C)(2), 210.52(F), 220.16(B) S PROVIDE AT LEAST ONE 20-AMPERE BRANCH CIRCUITS TO BATHROOM RECEPTACLES. SUCH CIRCUIT(S) SHALL HAVE NO OTHER OUTLETS. CEC SECTION 210.11(C)(3), 210.52(D) T BRANCH CIRCUITS THAT SUPPLY 125-VOLT, SINGLE PHASE, 15 AND 20-AMPERE OUTLETS INSTALLED IN DWELLING UNIT BATHOOMS, KITCHENS, GARAGES, & OUDOOR LOCATIONS SHALL BE PROTECTED BY AN ARC-FAULT CIRCUIT INTERRUPTER PER NEC 210.8 U LUMINAIRES (LIGHT FIXTURES) IN TUB OR SHOWER ENCLOSURES SHALL BE LABELED "SUITABLE FOR DAMP LOCATION." CEC SECTION 410.4(A) V SMOKE DETECTORS SHALL BE "HARDWIRED" AND SHALL BE EQUIPPED WITH A BATTERY BACKUP. SMOKE DETECTORS SHALL SOUND AN ALARM AUDIBLE IN ALL SLEEPING AREAS PER CBC 907.2. W CARBON MONOXIDE ALARMS SHALL BE "HARDWIRED" AND SHALL BE EQUIPPED WITH A BATTERY BACKUP. CARBON MONOXIDE ALARMS SHALL BE INTERCONNECTED IN SUCH A MANNER THAT THE ACTUATION OF ONE ALARM WILL ACTIVATE ALL ALARMS IN THE UNIT. X Y ALL 125-VOLT, 15- AND 20-AMPERE RECEPTACLES SHALL BE LISTED TAMPER-RESISTANT RECEPTACLES PER NEC 406.11 A RECEPTACLE INSTALLED OUTDOORS IN A LOCATION PROTECTED FROM THE WEATHER OR IN OTHER DAMP LOCATIONS SHALL HAVE AN ENCLOSURE FOR THE RECEPTACLE THAT IS WEATHERPROOF WHEN THE RECEPTACLE IS COVERED. 15- AND 20-AMPERE, 125- AND 250-VOLT RECEPTACLES INSTALLED 70-260 IN A WET LOCATION SHALL HAVE AN ENCLOSURE THAT IS WEATHERPROOF WHETHER OR NOT THE ATTACHMENT PLUG CAP IS INSERTED. PER NEC 406.8 (A)&(B) Z ALL 120-VOLT, SINGLE PHASE, 15- AND 20-AMPERE BRANCH CIRCUITS SUPPLYING OUTLETS INSTALLED IN DWELLING UNIT FAMILY ROOMS, DINING ROOMS, LIVING ROOMS, PARLORS, LIBRARIES, DENS, BEDROOMS, SUNROOMS, RECREATION ROOMS, CLOSETS, HALLWAYS, OR SIMILAR ROOMS OR AREAS SHALL BE PROTECTED BY A LISTED ARC-FAULT CIRCUIT INTERRUPTER, COMBINATION-TYPE, INSTALLED TO PROVIDE PROTECTION OF THE BRANCH CIRCUIT. PER NEC 210.12 8 EXTERIOR CEMENT PLASTER SOFFIT 9 BREAK METAL WRAPPED EYEBROW 10'-0" 17'-0" 9'-0" 9'-0" 10'-0"10'-0" 17'-6" 12'-0" 8 5 4 4 3 6 6 7 9 9 9 10'-0" 10'-0" 8' - 0 " 2' - 0 " 10 ' - 8 " 1' - 4 " 20 ' - 0 " T.O. ROOF 22 ' - 0 " T.O. PAR 10 ' - 0 " 17 ' - 4 " T.O. COL. . 4' - 0 " T.O. SCREEN ORCO SPLIT FACE MASONRY WHEAT - 250 MW BLACK PAINTED IRON RAILING OMEGA BASE 2 PLASTER - 1C420 TAVERN TAUPE 22 ' - 0 " T.O. ROOF 12 ' - 0 " 3' - 4 " 12 ' - 8 " 7' - 6 " 22 ' - 0 " T.O. PAR BLACK PAINTED IRON GATES OMEGA BASE 2 PLASTER - 1C420 TAVERN TAUPE 4' - 0 " T.O. SCREEN ORCO SPLIT FACE MASONRY WHEAT - 250 MW CHARCOAL KYNAR DOORS AND WINDOW FRAMES ORCO PRECISION MASONRY - NATURAL GREY - MW ORCO BURNISHED MASONRY - OTAY BROWN - MW CHARCOAL KYNAR FASCIA CHARCOAL KYNAR PANELS AND BRAKE METAL EYEBROW ORCO SPLIT FACE MASONRY WHEAT - 250 MW ORCO BURNISHED MASONRY - OTAY BROWN - MW 42 " 1'-0"11" 7' - 1 " 7' - 6 " 7" 6" 1' - 1 " 1'-0"11" 4'-1" 5" 7" 7" 7" 7" 7" 7" 7" 6" 2" 4'-0"4'-0"4'-1" 2" 8' - 0 " 8" ORCO SPLIT FACE MASONRY - WHEAT - 250 MW 10"x2" CAST CONCRETE CAP 2" T.S. FRAME 1" T.S. HORIZONTAL BARS 1" T.S. VERTICAL BARS 3' - 6 " 2" T.S. POSTS 1" T.S. HORIZONTAL BARS 2" T.S. TOP RAIL 7" 6" 7" 7" 7" 7" 2" 11" 101 2" 7' - 1 " 7' - 6 " 7" 6" 1' - 1 " 101 2"3'-0" 5" 7" 7" 7" 7" 7" 7" 7" 6" 2" 2" T.S. POSTS 1" T.S. HORIZONTAL BARS A B C DGUARDRAILPEDESTRIAN GATE VEHICULAR GATE YARD WALL 10" BLACK PAINTED FINISH DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 left elevation front elevation (roick st)B1/4"=1'-0" A5.1 elevations C1/4"=1'-0" gate fence and wall elevations A1/4"=1'-0" 1 2 2 8' - 0 " 2' - 0 " 10 ' - 8 " 1' - 4 " 20 ' - 0 " T.O. ROOF 22 ' - 0 " T.O. PAR 3' - 4 " 12 ' - 8 " 8' - 6 " ORCO PRECISION MASONRY - NATURAL GREY - MW CHARCOAL KYNAR DOORS AND WINDOW FRAMES ORCO SPLIT FACE MASONRY WHEAT - 250 MW 4' - 0 " T.O. SCREEN CHARCOAL KYNAR PANELS AND BRAKE METAL EYEBROW ORCO SPLIT FACE MASONRY WHEAT - 250 MW ORCO BURNISHED MASONRY - OTAY BROWN - MW ORCO BURNISHED MASONRY - OTAY BROWN - MW 8' - 0 " 2' - 0 " 10 ' - 8 " 1' - 4 " 14 ' - 0 " 8' - 0 " 20 ' - 0 " T.O. ROOF 22 ' - 0 " T.O. PAR 14 ' - 0 " 8' - 0 " 4' - 0 " T.O. SCREEN CHARCOAL KYNAR DOORS CHARCOAL KYNAR DOORS & FASCIA ORCO SPLIT FACE MASONRY WHEAT - 250 MW ORCO SPLIT FACE MASONRY WHEAT - 250 MW 6' - 8 " 6' - 8 " 7' - 1 1 " 6' - 8 " 7' - 9 " 8' - 7 " BLACK PAINTED WROUGHT IRON GRILLE ORCO SPLIT FACE MASONRY WHEAT - 250 MW CHARCOAL KYNAR PAINTED DOORS CHARCOAL KYNAR PANELS AND BRAKE METAL EYEBROW TRASH 4cu.yd. 4cu.yd. 12'-2" 3'-0" 14 ' - 8 " 12'-2" 12 ' - 0 " 10'-91 2" 13 ' - 4 " 1'-0" 1' - 0 " 1'-0" 1'-0" 1' - 0 " PLANTER CUTOUTS PER LANDSCAPE 1'-6" 2' - 6 " 4"x36" HIGH BOLLARDS SPLIT FACE MASONRY WALLS DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 rear elevation right elevation (winchester rd)E1/4"=1'-0" A5.2 elevations F1/4"=1'-0" trash enclosure plans & elevations D1/4"=1'-0" 1 2 2 2 2 2 17 " - 1 9 " 19 " M I N 12"24" MIN 54" MIN 12"MIN 36" MIN PAPER TOILET PAPER TOWEL DISPENSER SEAT COVER 40 " M A X & WASTE PAPER TOWEL DISPENSER SOAP DISPENSER VENDOR NAPKIN 24" MIN 60 " M I N 48 " M I N 24" MIN. 54" MIN 19 " M I N 17 " - 1 9 " 18"MIN 40 " M A X 34 " M A X 30" MIN. CLEAR FLOOR SOAP DISPENSER 27 " M I N . 48" MIN CLR. MAX 19" 9" M I N . 9" 18"MIN 27 " C L E A R 34 " M A X 30" MIN. CLEAR 27 " M I N . 34 " M A X 48" MIN CLR. MAX 19" LEVER HANDLE FOR FAUCET CONTROL OPEN FLOOR AREA MAX6" MI N . 8"MIN FLOOR SPACE 29 " M I N . 29 " M I N . 27 " M I N . 11"MIN INSULATED. (5-1504b) FAUCET CONTROLS AND OPERATING MECHANISM (OPERABLE WITH ONE HAND) SHALL BE OF THE TYPE NOT REQUIRING THE TIGHT BUSINESS AND PROFESSIONAL OFFICES, PERSONAL AND AND BOTTOM AND THE ENDS RETURNED. (2-3307e) BE LESS THAN 32" WIDE BY 18" DEEP. (2-511c, FIG. 2-5-3) NOTE: DRINKING FOUNTAIN SHALL CONFORM TO REQUIREMENTS OF EMPLOYEE AT WORK AREAS SHALL HAVE A MINIMUM 36" CLEAR HANDRAILS SHALL BE SPACED A MINIMUM OF 1 1/2" FROM WALL. HEIGHT ABOVE RAMP SURFACES, WITH 12" EXTENSIONS BEYOND TOP RAMP HANDRAILS SHALL BE CONTINUOUS LOCATED 34"-38" IN RAMP HANDRAILS ARE REQUIRED ON EACH SIDE OF RAMP WHEN A PATH OF TRAVEL WITH A SLOPE GREATER THAN 1 IN 20 SHALL BE A 2" HIGH CURB OR WHEEL GUIDE CENTERED 3" PLUS/MINUS 1" BOTTOM EDGE OF MIRROR SHALL BE LOCATED 40" MINIMUM ABOVE THE FRONT EDGE OF THE TOILET SEAT. (2-511b-3, FIG. 2-5-1A) TOILET TISSUE DISPENSERS SHALL BE MOUNTED WITHIN 12" FROM OPERATING PARTS OF DISPENSING AND DISPOSAL FIXTURES (TOWELS, WASTE COIN SLOTS, ETC.) SHALL BE WITHIN 40" OF THE FLOOR. CIRCLE FOR WOMEN AND 1/4" THICK CENTERED ON DOOR 60" HIGH BE PROVIDED ARE 12" EQUILATERAL TRIANGLE FOR MEN, 12" DIAMETER ON DOORWAYS LEADING TO SANITARY FACILITIES, THE SYMBOLS TO THE ALCOVE IN WHICH THE WATER FOUNTAIN IS LOCATED SHALL NOT SELF-CLOSING VALVES TO REMAIN OPEN FOR AT LEAST 10 SECONDS. GRASPING, PINCHING, TWISTING OF THE WRIST AND AN OPERATING ALSO DUPLICATED ON PARKING SURFACES. (2-7102e) ALL PRIMARY ENTRANCES TO THE BUILDING ARE TO BE OTHERWISE BOUNDED BY WALL WHEN THE RAMP EXCEEDS 10 FEET ABOVE RAMP SURFACES IS REQUIRED ON BOTH SIDES WHERE NOT PARKING SPACES SHALL BE IDENTIFIED WITH THE INTERNATIONAL SYMBOL OF ACCESSIBILITY MOUNTED ON POSTER OR WALL AND WIDE OF 1/4" X 1/4" GROOVES, 3/4" APART, LOCATED AT TOP AND SURFACE TO BE SLIP RESISTANT. BOARD MARKINGS SHALL BE 12" LANDING IS PROVIDED, FLARED SIDES SHOULD BE SLOPED 1 IN 12. REQUIRED AT THE TOP OVER THE ENTIRE RAMP WIDTH. IF NO MAXIMUM SLOPE OF 1:2 . A LEVEL 48" MINIMUM DEPTH LANDING IS CROSSES CURB. CURB RAMP SHALL BE 48" MINIMUM WIDTH WITH A CURB RAMPS SHALL BE LOCATED WHEREVER PEDESTRIAN PATH WALK WIDTH TO BE 48" MINIMUM. THE MAXIMUM CROSS SLOPE SHALL NOT EXCEED 1/4" PER FOOT. GRATINGS ARE NOT ALLOWED. IN LENGTH. (2-3307h) ACCESSIBLE TO THE HANDICAPPED. (2-3301f) (2-3324) PARKING AND ACCESS TO BUILDING: SIDES. (2-7103) CONSIDERED A RAMP. (2-3307a) SLOPE EXCEEDS 1 TO 20. (2-3307a) THE WIDTH SHALL BE 48" MINIMUM. (2-3307b-3) (2-3307e) SEC. 2-511c AND 5-1507. PUBLIC SERVICE FACILITIES: ACCESS. (2-712b-2C) PEDESTRIAN RAMPS: IN CONTRASTING COLOR. (2-511a-5C) SANITARY FACILITIES IDENTIFICATION: DRINKING FOUNTAIN: (2-511b-2) TOILET ROOM ACCESSORIES: THE FLOOR. (2-511b-1B) FORCE NOT EXCEEDING 5 LBS. (5-1504c) (5-1504c) EDGE TO BE BEVELED WITH A SLOPE NO GREATER THAN 1 IN 2 IF THRESHOLD SHALL BE NO HIGHER THAN 1/2" ABOVE THE FLOOR. 34" TO 44" ABOVE THE FLOOR AND BE OPERABLE WITH A MAXIMUM ALL REQUIRED EXIT DOORS SHALL HAVE 32" CLEAR OPENING AT (NO RECESS OR TRAP), EXCEPT AT AUTOMATIC OR SLIDING DOORS. DEEP IN DIRECTION OF DOOR SWING AND 44" DEEP IN OPPOSITE THERE SHALL BE A CLEAR AREA ON EACH SIDE OF THE DOOR 60" STRIKE JAMB FOR INTERIOR DOORS. (2-3304h-2) EXTEND 24" PAST STRIKE JAMB FOR EXTERIOR DOORS AND 18" PAST WIDTH OF CLEAR AREA ON THE SWING SIDE OF THE DOOR SHALL AWAY FROM THE SPACE BETWEEN THEM. (2-3304h-2D) A SERIES AT A VESTIBULE SHALL SWING IN THE SAME DIRECTION, OR AND A SECOND CLOSED DOOR. (2-3304h-2D, FIG. 2-33-5A0. DOORS IN PROVIDE A MINIMUM OF 48" CLEAR DEPTH BETWEEN THE OPEN DOOR THE SPACE BETWEEN TWO CONSECUTIVE DOORS (VESTIBULE) SHALL FLOOR OF A GIVEN STORY SHALL BE OF A COMMON LEVEL THROUGHOUT OR SHALL BE CONNECTED BY PEDESTRIAN RAMPS, BE MADE ACCESSIBLE TO THE PHYSICALLY HANDICAPPED. (2-511a3) DOORWAYS SHALL HAVE A MINIMUM 32" CLEAR WIDTH. (2-511a-5A) OR 32" CLEAR SPACE BETWEEN WATER CLOSET AND WALL. PROVIDE 28" CLEAR SPACE BETWEEN WATER CLOSET AND FIXTURE WATER CLOSET COMPARTMENT SHALL BE EQUIPPED WITH A DOOR THAT HAS AN AUMATICALLY CLOSING DEVICE AND SHALL HAVE A CLEAR, WATER CLOSET SHALL BE LOCATED 28" FROM A FIXTURE OR 32" PASSENGER ELEVATORS, OR SPECIAL ACCESS LIFTS. (2-522e) EFFORT OF 5 LBS. TO OPERATE THE DOOR PER CBC 11B-404 WHEN LOCATED ON ACCESSIBLE FLOORS, SANITARY FACILITIES SHALL DOOR HARDWARE SHALL BE OF THE LEVER OF PUSHED TYPE MOUNTED THE LOWER 10" OF THE DOOR SHALL BE OF SMOOTH PLANE SURFACE, BAR FASTENERS AND MOUNTING SUPPORT SHALL BE ABLE TO BARS SHALL BE 1 1/4" TO 1/2" IN DIAMETER WITH 1 1/2" WITHSTAND 250 LBS./FT. IN BENDING, SHEAR, AND TENSION. THE FORCE REQUIRED TO ACTIVATE THE FLUSH VALVE SHALL BE 5 LBS. MAXIMUM AND BE LOCATED 44" MAXIMUM ABOVE THE FINISH THE FORCE REQUIRED TO ACTIVATE THE FLUSH VALVE SHALL BE ONE OR MORE WALL HUNG URINALS ARE PROVIDED, AT LEAST ONE WITH URINALS SHALL BE FLOOR MOUNTED, STALL TYPE, OR WALL HUNG. WHERE BOTTOM FROM FRONT OF LAVATORY. (2-511b-1A) HOT WATER AND DRAIN PIPES UNDER LAVATORIES SHALL BE PROVIDE 30" X 48" CLEAR FLOOR SPACE FOR FORWARD APPROACH AND A CLEAR SPACE BENEATH LAVATORIES 29" HIGH BY 30" WIDE BY 8" DEEP AT TOP AND 9" HIGH BY 30" WIDE BY 17" DEEP AT AN ELONGATED RIM PROJECTING A MINIMUM 13-1/2" FROM THE WALL AND A A. FLOOR (5-103b) LAVATORIES: B. CLEARANCE TO WALL. (2-511a-8B) 5 LBS. MAXIMUM. (2-511a-8C) WATER CLOSET: URINALS: A. A. (2-511a-8C) B. A. UNOBSTRUCTED OPENING WIDTH OF 32 INCHES WHEN LOCATED AT THE END SINGLE ACCOMODATION TOILET FACILITIES: FROM A WALL (2-511a-7, FIG. 25-1A) GRAB BARS AT WATER CLOSET: A. (2-511a-6B) B. A. MULTIPLE ACCOMODATION TOILET FACILITIES: SANITARY FACILITIES: B. A. FLOORS: A. DIRECTION OF DOOR SWING. (2-3304h-2) G. F. (2-3304m) E. D. GREATER THAN 1/4". (2-3304h-1, FIG. 2-33-5) 90 DEGREES (36" DOOR). (2-3304a-1) ENTRANCE DOORS, VESTIBULES, AND CORRIDORS: C. A. B. MAXIMUM OF 17" ABOVE THE FLOOR SHALL BE PROVIDED. CBC 11B-605.2 AND 34 INCHES WHEN LOCATED AT THE SIDE WITH THE DOOR POSITIONED AT AN ANGLE OF 90 DEGREES FROM ITS CLOSED POSITION. AT LEAST ONE PARTITION SHALL PROVIDE A TOE CLEARANCE OF 9" MINIMUM ABOVE THE FINISH FLOOR AND 6" DEEP MINIMUM BEYOND THE COMPARTMENT SIDE FACE OF THE PARTITION, EXCLUSIVE OF PARTITION SUPPORT MEMBERS. C. PARTITION COMPONENTS AT TOE CLEARANCES SHALL BE SMOOTH WITHOUT SHARP EDGES OR ABRASIVE SURFACES. TOE CLEARANCE AT THE SIDE PARTITION IS NOT REQUIRED IN A COMPARTMENT GREATER THAN 66" WIDE 34 " M A X 9" MAX6" MI N . 8"MIN 11"MIN9" M I N . 60 " M I N 36 " M I N 56" MIN WALL MOUNTED 12" MAX 24" MIN 12 " MI N 24 " MI N 48" MIN 59" MIN FLOOR MOUNTED 7"MIN 9"MAX TOILET PAPER 33 " M I N - 3 6 " M A X ` 7"MIN 9"MAX 18"MIN ADD 6" AT EXTERIOR SIDE X 60 " M I N OF EXTERIOR DOOR 48 " M I N I F D O O R PR O V I D E D W I T H CL O S E R 22" MIN. 44 " M I N 60 " M I N 36" MIN. 48 " M I N I F D O O R PR O V I D E D W I T H CL O S E R 44 " M I N ME A S U R E D A T TO P O F G R I P P I N G SU R F A C E 24" MIN MAX 33 " M I N - 3 6 " M A X ` ME A S U R E D A T TO P O F G R I P P I N G SU R F A C E 33 " M I N - 3 6 " M A X ` ME A S U R E D A T TO P O F G R I P P I N G SU R F A C E 12" MAX accessories lavatory cabinet mounted sink 90 degree turn space requirementsgrab barstoilet paper location single accomodation international accessibility symbol door requirements accessibility general notes WOMENMEN 60 " A . F . F . M A X ( T Y P I C A L ) MEN WOMEN ALL GENDER RESTROOM 60 " A . F . F . M A X . ALL GENDER RESTROOM 60 " A . F . F . M A X 48 " A . F . F . M I N 60 " A . F . F . M A X ( T Y P I C A L ) 60 " A . F . F . M A X ( T Y P I C A L ) 60 " A . F . F . M A X ( T Y P I C A L ) 48 " A . F . F . M I N 48 " A . F . F . M I N TO P O F S E A T (M A X 2 " H I G H ) DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 D1.1 accessibility details and notes 4 DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 81216 13 711 10 9 3 2 117 20 15 6 5 14 D1.2 exterior details DOOR PER SCHEDULE 3"=1'-0"DOOR HEAD/JAMB SEALANT STEEL ANGLE FRAME PER STRUCTURAL DWGS. CMU WALL PER PLANS GI FLASHING OVER BITUTHENE 1/4" SHIM FURRING WHERE SHOWN ON PLANS STOREFRONT THRESHOLD 10 " 1/ 2 " M A X . SLAB PER STRUCTURAL SWING ADA-COMPLIANT SADDLE W/ EXPANSION ANCHORS TO CONC. PERIMETER THRESHOLD ATTACHED DOOR - SEE PLAN FOR SIZE AND DIRECTION OF FOR TYPE AND THICKNESS AS GLAZING - SEE SCHEDULE RECOMMENDED BY MFR. INTERIOREXTERIOR STOREFRONT DR JAMB @ MULLION 3"=1'-0" MULLION SWING ALUMINUM STOREFRONT SIZE AND DIRECTION OF DOOR - SEE PLAN FOR EXTERIOR INTERIOR GLAZING - SEE SCHEDULE RECOMMENDED BY MFR. FOR TYPE AND THICKNESS AS STOREFRONT DOOR HEAD 3"=1'-0" EXTERIOR INTERIOR SWING MULLION DOOR - SEE PLAN FOR SIZE AND DIRECTION OF ALUMINUM STOREFRONT GLAZING - SEE SCHEDULE RECOMMENDED BY MFR. FOR TYPE AND THICKNESS AS TYP. WINDOW SILL 3"=1'-0" INTERIOR EXTERIORINTERIOREXTERIOR SILL CAP SHIM AS REQ'D CMU WALL PER PLANS G.I. FLASHING O/ BITUTHENE SEALANT GLAZING - SEE SCHEDULE FOR TYPE AND THICKNESS AS RECOMMENDED BY MFR. FURRING WHERE SHOWN ON PLANS GLAZING - SEE SCHEDULE FOR TYPE AND THICKNESS AS RECOMMENDED BY MFR. ALUMINUM STOREFRONT SECTION INTERIOR EXTERIOR STOREFRONT WIN. HD/JMB 3"=1'-0" SEALANT STEEL ANGLE FRAME PER STRUCTURAL DWGS. GLAZING - SEE SCHEDULE FOR TYPE AND THICKNESS AS RECOMMENDED BY MFR. CMU WALL PER PLANS GI FLASHING OVER BITUTHENE 1/4" SHIM ALUMINUM STOREFRONT SECTION FURRING WHERE SHOWN ON PLANS PER PLANS 3"=1'-0"EXTERIOR DOOR SILL EXPANSION JOINT DOOR FRAME BEYOND FINISH FLOOR DOOR PER SCHEDULE WEATHERSTRIP METAL THRESHOLD SET IN MASTIC CONCRETE SLAB SLOPE ROLL-UP DOOR PER SCHEDULE ROLL UP DOOR HARDWARE PER SCHEDULE CMU WALL PER PLANS 3"=1'-0"ROLL-UP DOOR JAMB 18 19 3"=1'-0"ROLL-UP DOOR SILL ROLL-UP DOOR PER SCHEDULE TRACK BEYOND SLOPE CONCRETE SLAB; SEE STRUCTURAL DRAWINGS COLORED SEALANT W/ BACKER ROD AND FIBER EXPAN. JT. 1/4" LEVEL CHANGE FROM INTERIOR CONC. FLOOR TO DRIVEWAY INTERIOR EXTERIOR ROLL UP DOOR HEAD 3"=1'-0" STEEL ANGLE FRAME PER STRUCTURAL DWGS. CMU WALL PER PLANS ROLL-UP DOOR PER SCHEDULE 4 gyp bd./mtl. stud soffit 4" X 25GA 24" 9'-1" 4" X 20GA 24" 9'-8" 4" X 20GA 16" 10'-10" 4" X 20GA 12" 11'-9" 6" X 20GA 16" 12'-2" 6" X 20GA 12" 13'-2" 6" X 20GA 24" 10'-11" 6" X 22GA 24" 10'-4" 6" X 22GA 16" 11'-5" 6" X 22GA 12" 12'-4" SOFFIT HUNG FROM WALL 4" X 25GA 12" 11'-0" 3-5/8" X 25GA 24" 7'-8" 3-5/8" X 25GA 16" 8'-8" 3-5/8" X 25GA 12" 9'-4" SIZE SPACING MAXIMUM SPAN 3-5/8" X 20GA 12" 11'-4" 3-5/8" X 20GA 16" 10'-6" 3-5/8" X 20GA 24" 9'-4" 4" X 25GA 16" 10'-2" REFERENCE: SSMA PRODUCT TECH MANUAL PG 42 METAL STUD WALL PER PLAN CEILING JOISTS PER SCHEDULE 5/8" TYPE 'X' GYPSUM BOARD SHEATHING FINISH PER FINISH SCHEDULE LAP STUD AND PROVIDE (3) 8 SMS AT EACH JOIST CONNECTION 1 1/2"=1'-0"suspended ceiling at end wall NONE suspended clg. connection none CROSS RUNNER WITH 8" MAX.8" MAX.12 WIRE HANGER PERIMETER MEMBER @ STARTER WALLS MAIN RUNNER TYP. MEMBER @ PERIMETER HEAVY DUTY MAIN RUNNER 12 WIRE SPLAYED IN THE 12 WIRE SUPPORT OTHER ITEMS. SYSTEM SHALL NOT CORNERS. CEILING (2) TWO HANGERS @ OPP. SUPPORTED BY A MIN. OF REGISTERS SHALL BE AND 24"x24" HVAC AIR CEILING LIGHT FIXTURES NOTE: ALL 24"x48" @ 45 DEGREES. PLANE OF EA. RUNNER HANGER 45° 45° 45° 45° SECTION AT 12' O.C. MAX. MAX. HT.EMT 4'-6"3/4"Ø 1"Ø6'-0" 1 1/2"Ø9'-6" 2"Ø12'-0" NOTCH BTM. OF EMT OVER RUNNER COMPRESSION STRUT @ 12'-0" O.C. EA. DIRECTION WITH FIRST POINT WITHIN 6' OF EACH WALL; OR EVERY 144 S.F. OF CEILING AREA PER C.B.C. 803.9.11 AND 1613.1. RUN TIGHT TO STRUCTURE ABOVE 7/8" CONT. ANGLE @ PERIMETER WALLS HEAVY DUTY 0.75" CLEARANCE FROM WALL. OPPOSITE WALLS ATTACH CEIL. GRID TO PERIMETER ANGLE THIS END. ICC# ESR-1308 FREE TO SLIDE ON CLOSURE ANGLE THIS ENDARMSTRONG BERC2 CLIP PER 5/D2.1 ARMSTRONG BERC2 CLIP PER 5/D2.1 ARMSTRONG BERC2 CLIP 7 8"CLOSURE ANGLE BERC2 CLIP ICC-ESR-1308 HEAVY DUTY EXPOSED TEE SEISMIC CATEGORY D, E, F ARMSTRONG BERC2 CLIP DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 81216 14 13 7 6 5 11 10 9 3 2 1 19 20 DOOR PER SCHEDULE BATT INSULATION WHERE NOTED ON PLAN 3"=1'-0"door head/jamb METAL STUD WALL PER PLANS METAL FRAME WITH METAL STUD ANCHORS GYP.BD. - SEE FINISH SCHEDULE FOR WALL FINISH METAL STUD HEADER SEE DETAIL 2/D2.1 SEE 17/D1.2 FOR CONTINUATION TO COMPLY WITH: ASCE 7-10 SECTION 13.5.6.2.2 D1.3 interior details wall to underside of ceiling wall to underside of roof office partition wall GYPSUM BOARD PER PLAN AND/OR FINISH SCHEDULE ATTACH W/ NO. 6, TYPE S, 11 8" LONG STEEL SCREWS @ 12" O.C. PER ASTM C 1002 PER ICC NO. 3064P SE E C E I L I N G P L A N NON-BEARING METAL STUD WALL PER PLAN. I.C.B.O. NO. 4943P. STABILIZE UNSHEATHED METAL STUD FLANGES WHERE OCCURS PER ICBO REPORT. TO U N D E R S I D E O F S T R U C T U R E EXISTING PURLINS (N) 2X6 BLOCKING @24" O.C. W/2-16d @ EA END 16 GA.x 3" CONT. DEEP TRACK 20 G.A. TOP TRACK TYPE 'S' SCREW TYP. 1/4"Ø LAG BOLTS @ 24" O.C. AT CENTER OF BLOCKING NON-COMBUSTIBLE SUSPENDED ACOUSTIC CEILING TILE 1/4" DIA. POWDER DRIVEN FASTENERS AT 32" O.C. TO SLAB. ON 1ST FLOOR. ICC. NO. 1663 1/4", 3" LONG SCREWS AT 16" O.C. THROUGH PREDRILLED HOLES AT WOOD FLOOR CONDITION ON 2ND FLOOR GYPSUM BOARD PER PLAN AND/OR FINISH SCHEDULE ATTACH W/ NO. 6, TYPE S, 11 8" LONG STEEL SCREWS @ 16" O.C. PER ASTM C 1002 SE E C E I L I N G P L A N STEEL RUNNER TRACK WITH MIN. 1" LONG FLANGES; SAME GAUGE AS WALL, U.N.O. SE E C E I L I N G P L A N NON-BEARING METAL STUD WALL PER PLAN. I.C.B.O. NO. 4943P. STABILIZE UNSHEATHED METAL STUD FLANGES WHERE OCCURS PER ICBO REPORT. NON-COMBUSTIBLE SUSPENDED ACOUSTIC CEILING TILE 6" M I N . TO U N D E R S I D E O F S T R U C T U R E 8 SCREWS TYP. 4 5 °MA X WALL BRACING, USE 25 GA. x 3 5/8" PUNCHED METAL STUDS AT 4'-0" O.C. MAX. ALTERNATE BRACES. EXISTING PURLINS (N) 2X6 BLOCKING @24" O.C. W/2-16d @ EA END WHERE REQUIRED EXIST'G. SHEATHING 1/4"Ø X 2 1/2" LAG SCREWS AT EACH 1/4" DIA. POWDER DRIVEN FASTENERS AT 32" O.C. TO SLAB. ON 1ST FLOOR. ICC. NO. 1663 1/4", 3" LONG SCREWS AT 16" O.C. THROUGH PREDRILLED HOLES AT WOOD FLOOR CONDITION ON 2ND FLOOR GYPSUM BOARD PER PLAN AND/OR FINISH SCHEDULE ATTACH W/ NO. 6, TYPE S, 11 8" LONG STEEL SCREWS @ 16" O.C. PER ASTM C 1002 PER ICC NO. 3064P 1/4" DIA. POWDER DRIVEN FASTENERS AT 32" O.C. TO SLAB. ON 1ST FLOOR. ICC. NO. 1663 SE E C E I L I N G P L A N NON-BEARING METAL STUD WALL PER PLAN. I.C.B.O. NO. 4943P. STABILIZE UNSHEATHED METAL STUD FLANGES WHERE OCCURS PER ICBO REPORT. EXISTING GYP BD CEILING. TO U N D E R S I D E O F S T R U C T U R E 8 SCREWS TYP.4 5 ° M A X WALL BRACING, USE 25 GA. x 3 5/8" PUNCHED METAL STUDS AT 4'-0" O.C. MAX. ALTERNATE BRACES. EXISTING PURLINS (N) 2X6 BLOCKING @24" O.C. W/2-16d @ EA END WHERE REQUIRED EXIST'G. ROOF SHEATHING 1/4"Ø X 2 1/2" LAG SCREWS AT EACH 1/4", 3" LONG SCREWS AT 16" O.C. THROUGH PREDRILLED HOLES AT WOOD FLOOR CONDITION ON 2ND FLOOR 5" 5/ 8 " 5/ 8 " 1/2" MIN. (BRAILLE) EXIT ROUTE 1/ 2 " 1" 5/ 8 " 1/ 4 " 1/ 4 " 5/ 8 " EQ. 6" EQ. LC 1/ 2 " tactile egress signage none 60 " A . F . F . ( T Y P I C A L ) 5" 5/ 8 " 5/ 8 " 1/2" MIN. (BRAILLE) EXIT 1/ 2 " 1" 5/ 8 " 1/ 4 " 1/ 4 " 5/ 8 " EQ. 6" EQ.LC 1/ 2 " tactile egress signage none 60 " A . F . F . ( T Y P I C A L ) BOLTS AT 3" 0.C. (2) 1/4"Ø X 2 1/2" LAG 16 GA.x 3" CONT. AT EACH VERTICAL TRACK AT HUNG WALLS / CLGS. NO.8 SMS EA. CROSS STUD (ALTERNATE 4x CONT. BLK'G. W/2-16d EA. END) METAL CROSS STUD, COPE FLANGES AS REQ'D. EXIST'G. FRAMING NO. 8 SCREW EACH SIDE DEEP TRACK OR PURLIN STUD 1" EXIST'G. GLB FRAMING EXIST'G. ROOF NONEconnection at roof framing EXISTING CONCRETE DECK NOTCH WALL WHEN SSMA COLD FORMED STEEL DETAILS PG 30) PER ICC ESR-1166P (REF. DIETRICH CONSTRUCTION DETAIL N1A3 AND SCREW TYP. TYPE 'S' SLIP CONNECTION ROOF FRAMING VERIFY EXISTING MEMBER SIZES OCCURS GLB OR PURLIN SLIP CONNECTION NOTE: TOP TRACK SAME AS STUDS DEEP TRACK FRAMING OR PURLIN OR PURLIN OF BLK'G.,GLB, 1/4"Ø LAG BOLTS @ 24" O.C. AT C 16 GA.x 3" CONT. EXIST'G. ROOF EXIST'G. GLB 2" MI N . 5" SLIP CONNECTION 16 GA X 3" CONT. DEEP TRACK TOP TRACK SAME AS STUD wall sections 1-1/2"=1'-0" non-structural header framing NONE CRIPPLE STUD ANCHORAGE JAMB ANGLE HEADER TRACKS HEADER MEMBERS INFILL STUD ssma 6" METAL STUDS PER FLOOR PLANS 400S137-33 BOX HEADER FOR OPENINGS FROM 4'-0" TO 6'-0" 600S137-33 BOX HEADER FOR OPENINGS FROM 6'-1" TO 8'-0" 800S162-33 BOX HEADER FOR OPENINGS FROM 8'-1 TO 12'-0" 1200S162-54 BOX HEADER FOR OPENINGS FROM 12'-1 TO 16'-0" HEADER TRACK DBL. STUDS EA. SIDE OF OPENING S-12 SCREWS TYP. DOOR /WINDOW FRAME WHEN OCCURS PROVIDE "E" WEB STIFFENERS AT ENDS PER ICC ER-3064P (REF. SSMA COLD FORMED STEEL DETAILS PG 21) 5 4 2 3"=1'-0"1hr interior wall INSULATION WHERE INDICATED ON PLANS TYPE "X" GYP. BD. METAL STUD FRAMING PER PLANS HEAVY DUTY 2" 2" DIA. OVERSIZE RING/SLEEVE DIA. T-BAR CEILINGFIRE SPRINKLER BY OTHERS sprinkler head penetration NONE TO ALLOW FOR FREE MOVEMENT OF AT LEAST 1" IN ALL HORIZONTAL DIRECTIONS 6"=1'-0"occupant load sign MAXIMUM OCCUPANCY 10" 7" 60 " A . F . F . ( T Y P I C A L ) PERSONS 1" 1/ 2 " 1" 1/ 2 " 1" 1/ 2 " XXX 30" MIN. CLR. LANDING AREA 18 " M A X . 6" M I N . SIZELADDER UNDER 12'-0" OVER 12'-0" LENGTH 2X FRAMING 1/2" x 2" BAR 1/2" x 2 1/2" BAR ATTACH BAR TO WALL BLOCKING W/ 1/2" DIA. LAG FRAME SIZES 7" SCREW. 2 PER SUPPORT STEEL ACCESS LADDER N.T.S. 1/4" X 2" BENT STEEL BAR WELDED TO STILE @ 8' O.C. VERTICALLY W/ PRE DRILLED HOLES. ATTACH W/ (2) 1/2"X5" LAG BOLTS. 1" DIA. RUNGS, UNIFORMLY SPACED @ 12" O.C. TOP SURFACE TO BE NON-SLIP DRILL OR PUNCH HOLES IN LADDER FRAME TO SUIT RUNGS & WELD RUNGS TO THE FRAME ON THE OUTSIDE. GRIND OUTSIDE OF FRAME SMOOTH. 22" CLR. WIDTH BETWEEN FRAME MEMBERS BOTTOM CLIP ANGLE OR BENT PLATE W/ 1/2" EXPANSION BOLTS W/3" MIN. EMBEDMENT PROVIDE EXTENSION SAFETY POST AT TOP OF LADDER NOTE: carpet to tile transition, typ. FLOOR LINE DOOR WHERE OCCURS HARD SURFACE BULL NOSE CARPET none 1/ 4 " - 1 / 2 " 1/ 4 " MA X 4 DESCRIPTIONISSUE DATE pr o g r e s s s e t 12 - 0 2 - 2 2 10/20/17 4 7 0 w a l d ir v i n e , c a 9 2 6 1 8 (9 4 9 ) 4 5 0 . 0 0 9 3 in f o @ o l s o n a r c h i t e c t . c o m JOB NO. IN-HOUSE XX/XX/XX 2212 PLAN CHECK :PA23-0227 PLOT DATE 3/11/24 ro i c k t e m e c u l a 1 LANDLORD SUB 1 42 9 7 4 r o i c k d r i v e , te m e c u l a c a 9 2 5 9 0 in d u s t r i a l o f f i c e ALL DRAWINGS, DESIGNS AND WRITTEN MATERIAL APPEARING HEREIN CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF DAVID R OLSON ARCHITECTS AND THE SAME SHALL NOT BE DUPLICATED, USED, OR ASSIGNED TO ANY THIRD PARTY WITHOUT THE WRITTEN CONSENT OF DAVID R. OLSON ARCHITECTS. 10/27/17CITY SUB 1 11/20/17CITY SUB 2 2 12/06/17CITY SUB 3 1 11/28/23DESIGN SUB 2 2 3/11/24DESIGN SUB 3 3 6/28/24DESIGN SUB 4 81216 13 711 10 9 3 2 117 20 15 6 5 D1.4 site details 14 detectable warning surfaces 1.67" SPACING 2. 3 5 " SP A C I N G .9" BASE .45" TOP 2.35" SPACING PLAN SECTION A .2 " A A TAPER EXPOSED EDGES TAPER EXPOSED EDGES CONTRASTING COLOR, DETECTABLE WARNING SURFACE TO EXTEND THE FULL WIDTH THE CURB RAMP INSIDE THE GROOVED BORDER WIDTH OF CURB RAMP 36 " M I N accessible parking signage 1 1/2"=1'-0" REFLECTORIZED PORCELAIN STEEL SIGN WITH BEADED TEXT OR EQUIVALENT. MIN. 70 SQ. IN. AREA. 17" MIN. 22 " M I N 1" HIGH CONTRASTING LETTERS GALVANIZED POLE. 80 " M I N . A F F FR E E S T A N D I N G 12" MIN RADIUS CORNERS accessible parking signage 11 2"=1'-0" REFLECTORIZED PORCELAIN STEEL SIGN WITH BEADED TEXT OR EQUIVALENT. MIN. 70 SQ. IN. AREA. TEXT: WHITE FIELD: BLUE 3" 2" 3" HIGH CONTRASTING LETTERS 12X8 VAN ACCESSIBLE SIGN AT VAM ACCESSIBLE SPACES. TEXT: WHITE FIELD: BLUE CENTER MOUNT BELOW ACCESSIBLE PARKING SIGN 1 1 / 2 " 1 1 / 4 " 2" HIGH CONTRASTING LETTERS 11 2" HIGH CONTRASTING LETTERS 3" DIA GALVANIZED POLE AT FREESTANDING CONDITIONS 60 " M I N . A F F FR E E S T A N D I N G 60 " M I N . A F F WA L L M O U N T E D SIGN TO BE CENTERED AT THE INTERIOR END OF PARKING SPACE NOTE: 1 2" MIN RADIUS CORNERS 1-1/4" TO 1-1/2" DIA. T.S. HANDRAIL T.S. METAL RAILING 34 " - 3 8 " GUARDRAIL/RETAINING WALL SECTION WALKWAY SLAB PER STRUCTURAL DRAWINGS R TAINING WALL PER STRUCTURAL PLANS PARKING LOT SURFACE 3/4"=1'-0" 1" M A X . 1'-3"44/SD-2 BLOCKING PER 4" FIBER CANT POCKET FILLED w/ 24 GA. G.I. PITCH ROOFING ALL AROUND PITCH ANGLE BRACE REFER TO 6" 6" T Y P . AROUND TYP. ALL 4" 4" 8" PITCH POCKET 24 GA. G.I. PITCH POCKET 1 1/2"=1'-0" STRUCTURAL BASE OF ISOLATOR 6X SHAPED CURB, 12" HIGH MIN. SIMPSON A-35, (2) PER EACH SIDE AND ENDS #8 X 1 1/2" RHWS TO PLYWOOD SELF SEALING W.P. MEMBRANE (GRACE ICE AND WATERSHIELD OR EQ.) ROOF SHEATHING (2) 3/8" DIA. LAG SCREWS WITH CORNER OF MECH. UNIT) LOCK WASHERS AT EACH BASE PLATE 12" X 3" X 3/16" PL WELDED TO SIZE FOR MECH. UNIT WEIGHT PRE-DRILL HOLES AND FILL W/ SEALANT PRIOR TO LAG INSERTION VIBRATION CONTROL (ONE AT EACH PROVIDE SOLID BLOCKING FOR PLATFORM ANCHORAGE 3/8" FILLET WELD MECHANICAL UNIT FRAME MECH. UNIT equipment platform 3"=1'-0" MASON INDUSTRIES SKYLIGHT 3"=1'-0"skylight curb INSULATION AS REQUIRED NEW ROOFING TO MATCH EXISTING 3" CANT STRIP 2X8 CURB 2X STUD FRAMING ROOF FRAMING PER STRUCTURAL DRAWINGS 3"=1'-0"BUILT-UP ROOF @ TILT-UP PANEL 4" CANT STRIP PARAPET FLASHING O/ BITUTHENE B.U.R. OVER PLYWOOD SHEATHING CMU WALL SLOPE 1X NAILER COINTINUOUS G.I. COPING SET IN MASTIC 3" 1 1 2"=1'-0"VENT PIPE FLASHING SEALANT ALL AROUND PIPE FOR VENT OPENINGS 10" DIAMETER OR LESS SEE MECHANICAL DRAWINGS FOR LOCATIONS NOTE: FLASHING COLLAR GALV. SHEET METAL 1/2" CLEAR C.L. OF VENT PIPE OR STACK BATT INSULATION WHERE OCCURS ROOF FRAMING PER STRUCTURAL 2X6 BLOCKING EACH SIDE OF PIPE 6" MIN.6" MIN. BUILT-UP ROOFING OVER PLYWOOD DECK SET IN CONT. MASTIC, TYP. SLOPE TO DRAIN PER ROOF PLAN. 2' - 6 " EQ U A L 2" WATER DAM COLLAR ZUREN - CAST IRON ROOF DRAIN COMPLETE w/ FLASHING RING & GRAVEL STOP - REFER PLUMBING DWG'S OR ROOF PLAN EQ U A L REFER TO PLUMBING DWG'S OVER FLOW LINES DOWN- CAST IRON ROOF DRAIN & OR ROOF PLAN 2" FIBER CANT STRIP - REFER TO SPEC'S - TYP. BUILT-UP ROOFING - REFER TO ROOF PLAN 1'-3" 4'-0" ROOF DRAIN AND OVERFLOW DRAIN PLAN 1 1/2"=1'-0" 1'-3" D1.4 14 ROOF SHEATHING & FRAMING - REFER TO STRUCT'L DWG'S CAST IRON ROOF DRAIN & OVER FLOW LINES DOWN- REFER TO PLUMBING DWG'S OR ROOF PLAN 2x4 FRAMING - TYP. BUILT-UP ROOFING - REFER WOOD CANT STRIP - TYP. PLUMBING DWG'S OR ROOF PLAN RING & GRAVEL STOP - REFER ROOF DRAIN COMPLETE w/ FLASHING ZUREN - CAST IRON 2" RECESSED BELOW ROOF SHEATHING TO ROOF PLAN 2" WATER DAM COLLAR ROOF DRAIN AND OVERFLOW DRAIN 1 1/2"=1'-0" ROOF ACCESS HATCH 3"=1'-0" 1" FIBER CANT STRIP BUILT-UP ROOFING OVER PLYWOOD SHEATHING GYP. BD. SHAFT - SEE FINISH SCHEDULE FOR WALL FINISH 30" CLEAR N.T.S. PAINT OUT TOP OF GYP. BD. STOP NOTE: STEEL ACCESS LADDER FRAMING PER STRUCTURAL INTEGRAL METAL CAP FLASHING. OVERLAP ROOFING AT CURB NYSTROM RHG SINGLE OR EQUAL, 30"X36" CLEAR INSIDE HATCH; POWDER COAT FINISH GYP. BD. STOP INTEGRAL INSULATED CURB LOCATE DOOR HINGE OPPOSITE LADDER 3"=1'-0"THROUGH WALL SCUPPER 24 GA. GALV. ROOF SCUPPER PER SMACNA STANDARDS BUILT-UP ROOF. LAP FELT OVER METAL SCUPPER 2 LAYERS GRADE "D" BLDG PAPER PLYWOOD SHTG. EXTERIOR CEMENT PLASTER GRAVEL STOP PLASTER STOP. LAP FELT OVER 2 LAYERS GRADE "D" BLDG PAPER 1 1/2" 4" open office 975 SF elec fire riser RAMP EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE VAN E-2.1 SITE PHOTOMETRIC PLAN ELECTRICAL SITE PHOTOMETRIC PLAN 1 WINCHESTER ROAD N EN G I N E E R S , I N C . 10 2 D I S C O V E R Y IR V I N E , C A L I F O R N I A 9 2 6 1 8 94 9 . 4 5 0 . 1 2 2 9 42 9 7 4 R O I C K D R , TE M E C U L A , C A RO I C K T E M E C U L A REV.DATE DESCRIPTION E/ E C 7 R I C $ / 0 E C + $ N I C $ / 3 / 8 0 % I N G All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by the Architect and RPM Engineers are Instruments of Service. Architect and RPM Engineers shall be deemed the authors and owners of their respective Instruments of Service and shall retain all common law, statutory and other reserved rights, including copyrights. Any unauthorized use of the Instruments of Service shall be at the parties sole risk and parties agree to indemnify and hold harmless the Architect and RPM Engineers from all costs and expenses. C 2016 RPM ENGINEERS, Inc. PROJECT NO. DRAWN BY: REVIEWED BY: SCALE: RPM #23-001B1 RO I C K D R I V E s FHsFHs s FH V V V V V s s s V V V s s V V ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊ X X X X X X X X X X X ◊ ◊◊◊ ◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊◊ ◊ 1095 1100 1105 1110 1095 1100 1105 1110 11 0 0 1 1 0 5 1085 1090 1095 1100 1105 1110 10851090 1085 1085 1090 1095 1100 1105 1110 1110 1110 1 1 0 5 1 1 0 5 1 1 1 0 1 1 1 5 1 1 1 5 1 1 1 0 1105 1110 1115 1 1 0 5 1095 1100 1105 1090 1095 1100 1105 1085 1090 1080 1085 1080 1090 A P N . 9 0 9 - 3 2 1 - 0 0 1 P A R . 1 P M 2 8 4 7 1 P . M . B . 1 9 5 / 7 - 9 E X I S T . Z O N I N G : L . I . E X I S T . L A N D U S E : V A C A N T E X . 2 4 " S D WINCHESTER ROAD D R I V E R O I C K APN. 909-370-017 PAR. 1 PM 24085-2 P.M.B. 189/92-94 EX. ZONING: L. I. EXIST. LAND USE: DEVELOPED A P N . 9 0 9 - 3 7 0 - 0 4 4 L O T 3 T M 3 5 1 8 1 M . B . 4 3 0 / 6 6 - 7 2 E X I S T . Z O N I N G : L . I . E X I S T . L A N D U S E : V A C A N T APN. 909 - 3 2 0 - 0 5 5 PAR. 6 PM 2 8 4 7 1 P . M . B . 1 9 5 / 7 - 9 EXIST. ZO N I N G : L . I . EXIST. LAN D U S E : D E V E L O P E D 32 ' 50 ' 50 ' 35 ' 1 8 ' 7 ' 1 8 ' 11'28'11' 39'39' 78' 12 ' 12 ' 28' 1 3 ' 8 7 ' APN. 909-320-056 PAR. 7 PM 28471 P.M.B. 195/7-9 EXIST. ZONING: L. I. EXIST. LAND USE: VACANT RAMP EXIST SW P/L P/L P/L E X I S T S W TE G B WAREHOUSE / INDUSTRIAL 5785 sf FF=1105.5 PAD=1104.83 R I D G E FH FH PIV/FDC RISER DCDA PROPOSED STREET LIGHT EXIST SLOPE EXIST SLOPE RETAINING WALL BY SEPARATE PERMIT EXIST METER BOX EXIST METER BOX EXIST ELEC TRANS E X . W M EX. FH EX. FH EX. 48" SD E X . 4 8 " S D BIO RETENTION BASIN SEE WQMP 1105.00 TOP CB-110 CB 94.0 INV CB-110 CB 95.8 INV CB-110 CB VAN VAN EV CAPABLE EV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLE CONNECT TO EX. SD. INLET (92.00IE±) DRIVEWAY PER CITY STD. 207A EX. LIGHT POLE EX. LIGHT POLE EX. LIGHT POLE (TYP) ALL RAMPS IN PUBLIC R/W TO BE UPGRADED FOR ADA COMPLIANCE. BROOKS B O X TG 03.0 INV 01.5 5 C B B C A A D D PROPOSED STREET LIGHT BI O - R E T E N T I O N A B A S I N TO P = 1 1 0 1 24 " S O I L M E D I A 1 5 " GR A V E L FH FH 8"WATER 8"WATER 8 " W A T E R BIO-RETENTION A BASIN TOP=1101 24" SOIL MEDIA 15" GRAVEL TRENCH DRAIN PKWY DRAIN PER COT STD 301 INV 01.4 12"PVC S D FOR WA L L DRAINAG E PAVED STORAGE YARD 41,319 sf 5' 10' 28' 10' 78' 13'10' 6'6'5' 11'11'56' 28' 13' 2'2' 6' 19' 38' 19' 100' 12'14' 6'6'6' 12'12'76' 38' 12' 2'2' ENGINEER: PURPOSES. NOT BE RELIED ON FOR CONSTRUCTION PLAN IS CONCEPTUAL IN NATURE AND SHALL ANY DESIGN INFORMATION SHOWN ON THIS AUTHORIZED TO PERFORM SUCH WORK. SHALL BE FIELD VERIFIED BY PERSONS SURVEY INFORMATION. ALL MEASUREMENTS SHOULD NOT BE RELIED UPON FOR ACCURATETHIS MAP IS BASED ON RECORD DATA AND DATA TABLE: EASEMENT NOTES: ENGINEERING AND DEVELOPMENT, INC.4M VICINITY MAP LEGAL DESCRIPTION BASIS OF BEARINGS STATEMENT OF UTILITIES FLOOD INFORMATION LEGEND UTILITY PURVEYORS: BENCHMARK OWNER ENGINEER WATER SEWER SCHOOL DISTRICT ELECTRIC GAS TELEPHONE/ INTERNET CABLE CITY OF TEMECULA, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA PARCEL 7 OF PARCEL MAP NO. 28471 ARCHITECT LAND SURVEYOR CONCEPT GRADE PLAN PROJECTSITE 15 79 APPLICANT EARTHWORKS: LANDSCAPE ARCHITECT EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE VAN EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE VAN Notice of Public Hearing The CITY OF TEMECULA - 41000 Main Street- Temecula, CA 92590 – TemeculaCA.gov A PUBLIC HEARING has been scheduled before the City of Temecula DIRECTOR OF COMMUNITY DEVELOPMENT to consider the matter described below: CASE NO: PA23-0227 APPLICANT: Sherrie Munroe PROPOSAL: A Development Plan for an approximately 7,066 square foot warehouse building with office space. The project is located at 42974 Roick Drive. ENVIRONMENTAL: In accordance with the California Environmental Quality Act (CEQA), staff has determined that the proposed project is categorically exempt from environmental review and recommends that a Notice of Exemption be adopted in compliance with CEQA (Section 15332, Class 32, In-Fill Development Projects) CASE PLANNER: Eric Jones, (951) 506-5115 PLACE OF HEARING: 41000 Main St., Temecula, CA 92590, City of Temecula, Council Chambers DATE OF HEARING: February 20, 2025 TIME OF HEARING: 1:30 p.m. The complete agenda packet (including any supplemental materials) will be available for viewing in the Main Reception area at the Temecula Civic Center (41000 Main Street, Temecula) after 4:00 p.m. the Friday before the Director of Community Development Meeting. At that time, the packet may also be accessed on the City’s website – TemeculaCA.gov and will be available for public review at the respective meeting. Any writing distributed to the Director regarding any item on the Agenda, after the posting of the Agenda, will be available for public review in the Main Reception area at the Temecula Civic Center (41000 Main Street, Temecula), 8:00 a.m. – 5:00 p.m. In addition, such material will be made available on the City’s website – TemeculaCA.gov – and will be available for public review at the meeting. Any petition for judicial review of a decision of the Director of Community Development shall be filed within time required by, and controlled by, Sections 1094.5 and 1094.6 of the California Code of Civil Procedure. In any such action or proceeding seeking judicial review of, which attacks or seeks to set aside, or void any decision of the Director of Community Development shall be limited to those issues raised at the hearing or in written correspondence delivered to the City Clerk at, or prior to, the public hearing described in this notice. Questions? Please call the Community Development Department at (951) 694-6400. City of Temecula Community Development 41000 Main Street • Temecula, CA 92590 Phone (951) 694-6400 • TemeculaCA.gov VIA-ELECTRONIC SUBMITTAL CEQAProcessing@asrclkrec.com February 21, 2025 Supervising Legal Certification Clerk County of Riverside P.O. Box 751 Riverside, CA 92501-0751 SUBJECT: Filing of a Notice of Exemption for Planning Application Number PA23-0227, a Development Plan for an approximately 7,066 square foot warehouse building with office space located at 42974 Roick Drive. Dear Sir/Madam: Enclosed is the Notice of Exemption for the above referenced project. In addition, pursuant to Assembly Bill 3158 (Chapter 1706) the Applicant will pay for the County Administrative fee to enable the City to file the Notice of Exemption required under Public Resources Code Section 21152 and 14 California Code Regulations 1507. The payment of the $50.00 filing fee is under protest. It is the opinion of the City that the administrative fee has been increased in a manner inconsistent with the provisions of State Law. Under Public Resources Code Section 21152 and 14 California Code Regulations 1507, the County is entitled to receive a $25.00 filing fee. Also, please email a stamped copy of the Notice of Exemption within five working days after the 30-day posting to the email listed below. If you have any questions regarding this matter, please contact Eric Jones at email: eric.jones@TemeculaCA.gov. Sincerely, Matt Peters Interim Director of Community Development Enclosures: Notice of Exemption Form Electronic Payment - Filing Fee Receipt City of Temecula Community Development Planning Division Notice of Exemption TO: County Clerk and Recorders Office FROM: Planning Division County of Riverside City of Temecula P.O. Box 751 41000 Main Street Riverside, CA 92501-0751 Temecula, CA 92590 Project Title: Sailhouse (PA23-0227) Description of Project: A Development Plan for an approximately 7,066 square foot warehouse building with office space. Project Location: 42974 Roick Drive Applicant/Proponent: Sherrie Munroe The Community Development Director approved the above-described project on February 20, 2025 and found that the project is exempt from the provisions of the California Environmental Quality Act, as amended. Exempt Status: (check one) Ministerial (Section 21080(b)(1); Section 15268); Declared Emergency (Section 21080(b)(3); Section 15269(a)); Emergency Project (Section 21080(b)(4); Section 15269(b)(c)); Statutory Exemptions (Section Number: ) Categorical Exemption: (Section 15332, Class 32, In- Fill Development Projects) Other: Section 15162 Categorical Exemption Statement of Reasons Supporting the Finding that the Project is Exempt: The project is consistent with all applicable General Plan requirements and is located on a site within city limits that total less than five acres. In addition, the applicant completed the HANS process through the Regional Conservation Authority and the site was found to have no suitable habitat for endangered, rare, or threatened species. Finally, the site will not have any significant effects related to traffic, air, noise, or water quality, and the site can be serviced by all utilities. Contact Person/Title: Eric Jones, Associate Planner II Telephone Number (951) 506-5115 Signature: Date: Matt Peters, Interim Director of Community Development Date received for filing at the County Clerk and Recorders Office: