HomeMy WebLinkAboutLD24-4148Permit Number: LD24-4148
LD - Utilities/ Utility Maintenance
Issued: 09/19/2024
Expired: 03/18/2025
Job Address: 27462 Enterprise Cir West
Legal Description: Tract Map 16178:17
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Southern California Edison
(Utility Billing)
24487 Prielipp
Wildomar, CA 92595
(951) 440-9074
Applicant:
Contractor:
Utility Work Order Number: TD2286519
Description:
SCE TD2286519: 27462 Enterprise Cir
WORK HOURS SHALL BE MONDAY – FRIDAY, NO HOLIDAYS, 8:30am - 3:30pm
Proposed work:
Replace lid for vault V5342488
Permitee Date
City Engineer or Authorized Representative Date
09/19/2024
Page 1 of 1
G20-2 C12(CA)C12(CA)W20-1
G20-2C12(CA)W20-1 W1-3L OR
W1-4L
CURB OR E.P.
50' MIN.
48-72 HRS PRIOR TO COMMENCING WORK
(IF REQUIRED)
INSTALL TEMP. NO PARKING SIGNS
SHIFTING TAPER L/2
SEE TABLE B SEE TABLE A SEE TABLE A SEE TABLE A
A B C
50' MIN.
R4-7a
R4-7a
CURB OR E.P.
50' MIN.48-72 HRS PRIOR TO COMMENCING WORK
(IF REQUIRED)
INSTALL TEMP. NO PARKING SIGNS
SHIFTING TAPER L/2
SEE TABLE BSEE TABLE ASEE TABLE ASEE TABLE A
ABC
50' MIN.
BUFFER SPACE
DOWNSTREAM
TAPER
50' MIN. /
100' MAX.
12
'
M
I
N
.
*
ROAD
WORK
AHEAD
W20-1
NARROW
LANE
C12 (CA)
KEEP
RIGHT
R4-7a
W1-3L
(USED FOR 30 MPH)
W1-4L
(USED FOR 35 MPH)
S
A
LEGEND
TYPE III BARRICADE W/SIGN
TYPE III BARRICADE W/O SIGN
TYPE II BARRICADE W/SIGN
TYPE II BARRICADE W/O SIGN
CHANNELIZING DEVICE - SEE TABLE F FOR SPACING
TRAFFIC CONE WITH CLIP ON SIGN
SIGN
SIGNALIZED INTERSECTION
[FAS] ARROW PANEL (FLASHING ARROW)
HIGH LEVEL WARNING DEVICE (FLAGTREE) (OPTIONAL)
FLAGGER
TANS
TANSAT
TOW AWAY NO STOPPING___TO___(SHOW HOURS)
TOW AWAY NO STOPPING ANY TIME
WORK ZONE (ACTIVITY AREA) LIMITS
DIRECTION OF TRAFFIC (NOT PAVEMENT MARKING)
ROADWAY DESIGNATION
INDICATE NORTH WITH A "N"
AND AN ARROW POINT
NOT TO SCALE
ENTERPRISE CIRCLE WEST
TD2286519
100'100'100'
100'100'100'63'
63'
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TEMECULA GRANTING TO SOUTHERN
CALIFORNIA EDISON COMPANY, ITS SUCCESSORS AND ASSIGN, A FRANCHISE TO USE AND
TO CONSTRUCT AND USE, FOR TRANSMITTING AND DISTRIBUTING ELECTRICITY FOR ANY
AND ALL PURPOSES, POLES, WIRES, CONDUITS AND APPURTENANCES, INCLUDING
COMMUNICATIONS CIRCUITS NECESSARY OR PROPER THEREFOR, IN, ALONG, ACROSS,
UPON, OVER AND UNDER THE PUBLIC STREETS, WAYS, ALLEYS, AND PLACES WITHIN THE
CITY OF TEMECULA.
THE CITY COUNCIL OF THE CITY OF TEMECULA DOES NOT HEREBY ORDAIN AS FOLLOWS:
ORDINANCE NO. 90-10
SECTIONS 8. Grantee of the franchise granted hereby shall indemnify, save, defend and
hold harmless the City and any duly established City redevelopment agency and the
respective officers and employees thereof from all liability for damages proximately resulting
from and operations under the franchise.
TRAFFIC CONTROL GENERAL NOTES (REV'D. 06/06/2024):
1. All traffic control devices shall conform to the latest edition of the California Manual on
Uniform Traffic Control Devices (California MUTCD) and the Standard Specifications
for Public Works Construction.
2. The City Engineer or his representative has the authority to initiate field changes to assure
public safety.
3. All traffic control devices shall be removed from view when not in use.
4. Work hours shall be restricted to the period between 8:30 a.m. and 3:30 p.m., Monday
through Friday, unless approved otherwise. When night work is required, work hours shall
be 9 p.m. to 5 a.m., Sunday through Thursday.
5. Trenches must be back filled or plated during non-working hours. Steel plates shall have
asphaltic concrete berm on all edges. All dirt, dust, and debris shall be removed from the street
at end of each day and at the end of the job. The street shall be in drivable condition at all times.
6. Pedestrian controls shall be provided as shown on the plans.
7. Temporary "NO PARKING" signs will be posted 24 hours prior to commencing work.
8. Access to driveways will be maintained at all times unless other arrangements are made.
9. The contractor shall replace within 72 hours, all traffic signal loop detectors damaged
during construction.
10. The contractor shall replace within 24 hours, all striping removed or damaged by
construction work. (Striping may be replaced temporarily with tape.)
11. All Workers shall be equipped with an orange vest (or a reflective vest at night). All
flaggers shall also be equipped with a hard hat, C28 "Stop/Slow" paddle and shall be
trained in the proper fundamentals of flagging traffic.
12. Any work that disturbs normal traffic signal operations shall be coordinated with the City of
Temecula’s Traffic Division, 48 hours prior to beginning construction. Contact the City’s
Traffic Division at (951) 694 -6411.
13. The contractor shall maintain all traffic control devices 24 hours per day and 7 days per
week.
14. A minimum of twelve (12) foot travel lanes must be maintained unless otherwise
approved by the Department of Public Works.
15. All night work will require written approval from the Department of Public Works. Lane
closures, road detours, road closures, and traffic signal modifications associated with
overnight construction activities will require warning signs be placed at least one week in
advance of starting construction.
16. A solar powered flashing arrow board shall be required on all arterial street lane closures.
17. If the permit applicant determines that conduit installation will be by the boring machine
method, the trench patch for the utility observation excavation will be the same as for open
trench excavation method. This will provide a single continuous surface restoration eliminating
the multiple penetration into the public roadway to all requirements in City Standard # 407
(ALL SHEETS) for trench patch.
18. Any work that creates an undue safety risk or creates sever congestion may be shut down
by City Traffic Engineers, City Field Inspection, or the Police Department.
19. Cones and delineators shall have reflectorized sleeves for night work.
20. If parking is allowed in advanced warning area, advance warning signs shall be mounted
on high level devices.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE
ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO
EXISITING STRIPING, SIGNING, SIDEWALK, AND BIKE LANES.
All driveways to remain
open at all times
N
RIDER WY
50' MIN. OR
TABLE D **
30'
WORK AREA
250'
W11-1/W16-1
SPEED
LIMIT25
SPEED
LIMIT25
SPEED
LIMIT25
245'
OVERLAND DR
W20-1
SE
E
T
A
B
L
E
A
A
10
0
'
W20-1
SE
E
T
A
B
L
E
A
10
0
'
A
12' MIN. FOR E.P.
12' MIN. FOR CURB*
**TO BE DETERMINED BY
THE CITY OF TEMECULA
SHARE
THE
ROAD
W11-1/W16-1
(USE IF APPLICABLE
SEE DWG NO. 49
FOR DETAILS)
END
ROAD WORK
G20-2
www.invarion.com
UNDERGROUND SERVICE ALERT
Contact USA
Dial 811 or 800-422-4133
www.digalert.org/contact