Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LD24-1302
Permit Number: LD24-1302 LD - Utilities/ Excavation - Parallel Issued: 03/29/2024 Expired: 03/04/2025 Job Address: 27901 Jefferson Ave Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Chad Walton 29970 Technology Drive, 104 Murrieta, CA 92563 (951) 652-0903 Applicant: Colorado West Construction 25780 Washington Ave. Murrieta, CA 92562 (951) 514-4942 Contractor: Utility Work Order Number: Description: Hendo's Brewery; New Gas Service WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am Contractor: Colorado West Construction Location: 27901 Jefferson Ave All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD24-1302 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of project. Page 1 of 2*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD24-1302 LD - Utilities/ Excavation - Parallel Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date City Engineer or Authorized Representative Date 03/29/2024 Page 2 of 2 5'x5' opening for tie-in. 12"- 18" trench 100' from PL 20 ' f r o m P L 2 067 1 PORTABLE DELINEATOR TYPE III BARRICADE WITH SIGN TYPE II BARRICADE WITH SIGN DIRECTION OF TRAVEL SIGNALIZED INTERSECTIONS SPRING STAND AREA OF CONSTRUCTION N.T.S. NN PROJECT VICINITY MAP PROJECT TRAFFIC CONTROL PLAN GENERAL NOTES 1. All traffic control devices shall conform to the latest edition of the California Manual on Uniform Traffic Control Devices (California MUTCD) and the Standard Specifications for Public Works Construction. 2. The City Engineer or his representative has the authority to initiate field changes to assure public safety. 3. All traffic control devices shall be removed from view when not in use. 4. Work hours shall be restricted to the period between 7:00 a.m. and 5:00 p.m., Monday through Friday, unless approved otherwise. When night work is required, work hours shall be 9 p.m. to 5 a.m., Sunday through Thursday. 5. Trenches must be back filled or plated during non-working hours. Steel plates shall have asphaltic concrete berm on all edges. All dirt, dust, and debris shall be removed from street at end of each day and at the end of the job. The street shall be in driveable condition at all times. 6. Pedestrian controls shall be provided as shown on the plans. 7. Temporary "NO PARKING" signs will be posted 24 hours prior to commencing work. 8. Access to driveways will be maintained at all times unless other arrangements are made. 9. The contractor shall replace within 72 hours, all traffic signal loop detectors damaged during construction. 10. The contractor shall replace within 24 hours, all striping removed or damaged by construction work. (Striping may be replaced temporarily with tape.) 11. All Workers shall be equipped with an orange vest (or a reflective vest at night). All flaggers shall also be equipped with a hard hat, C28 "Stop/Slow" paddle and shall be trained in the proper fundamentals of flagging traffic. 12. Any work that disturbs normal traffic signal operations shall be coordinated with the City of Temecula’s Traffic Division, 48 hours prior to beginning construction. Contact the City’s Traffic Division at (951) 694 -6411. 13. The contractor shall maintain all traffic control devices 24 hours per day and 7 days per week. 14. A minimum of (12) foot travel lanes must be maintained unless otherwise approved by the Department of Public Works. 15. All night work will require written approval from the Department of Public Works. Lane closures, road detours, road closures, and traffic signal modifications associated with overnight construction activities will require warning signs be placed at least one week in advance of starting construction. 16. A solar powered flashing arrow board shall be required on all arterial street lane closures. 17. If the permit applicant determines that conduit installation will be by the boring machine method, the trench patch for the utility observation excavation will be the same as for open trench excavation method. This will provide a single continuous surface restoration eliminating the multiple penetration into the public roadway to all requirements in City Standard Drawing # 407 (sheet 1 and 2) for trench patch. 18. Any work that creates an undue safety risk or creates severe congestion may be shut down by City Traffic Engineers, City Field Inspection, or the Police Department. 19. Cones and delineators shall have reflectorized sleeves for night work. 20. If parking is allowed in advance warning area, advance warning signs shall be mounted on high level devices. TEMPORARY TRAFFIC CONTROL PLANS CITY OF TEMECULA ALLIED TRAFFIC AND EQUIPMENT RENTALS INC. 03/21/2024 951-696-6950 040 MIKE MAR 21 2024 PROJECT NO. PA19-0928 DESIGNED BY: 24 LOCATION R.C. JOB # ACCOUNT # DATE:PHONE: PRIME CONTRACTOR: PROJECT NAME:SEAL OF DRAWING NO ORIGINAL SHEET J.R. / B.C. ENGINEER INFORMATION MARK REVISIONS BY APPR DATE NICOLAS M. MINICILLI TRAFFIC ENGINEER CHECKED BY: CITY OF TEMECULA PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION TRAFFIC CONTROL PLANS FOR PROJECT NO. PA19-0928 BRIAN WELLINGTON 63545 122 CALISTOGA RD STE 591 SANTA ROSA, CA 95409 707-595-5423 J.R. / B.C ACCEPTED BY:DATE: RECOMMENCED BY:DATE:ALLIED TRAFFIC & EQUIPMENT RENTALS, INC. LD 20-1114 WORK HOURS MONDAY - FRIDAY 8:30 AM - 3:30 PM R.T.E. NO.2647 PERMIT #: LD23-6698 -SCOPE OF WORK: GAS D I RT 811 Sunday - Thursday 9:00 PM - 5:00 AM 3/29/2024 2 067 ALLIED TRAFFIC AND EQUIPMENT RENTALS INC. 03/21/2024 951-696-6950 040 MIKE MAR 21 2024 PROJECT NO. PA19-0928 DESIGNED BY: 24 LOCATION R.C. JOB # ACCOUNT # DATE:PHONE: PRIME CONTRACTOR: PROJECT NAME:SEAL OF DRAWING NO ORIGINAL SHEET J.R. / B.C. ENGINEER INFORMATION MARK REVISIONS BY APPR DATE NICOLAS M. MINICILLI TRAFFIC ENGINEER CHECKED BY: CITY OF TEMECULA PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION TRAFFIC CONTROL PLANS FOR PROJECT NO. PA19-0928 BRIAN WELLINGTON 63545 122 CALISTOGA RD STE 591 SANTA ROSA, CA 95409 707-595-5423 J.R. / B.C ACCEPTED BY:DATE: RECOMMENCED BY:DATE:ALLIED TRAFFIC & EQUIPMENT RENTALS, INC. LD 20-1114 WORK HOURS MONDAY - FRIDAY 8:30 AM - 3:30 PM R.T.E. NO.2647 PERMIT #: LD23-6698 -SCOPE OF WORK: GAS D I RT 811 GRAPHIC SCALE [ IN FEET ] 060 30 60 120 1 INCH = 60 FEET 2 NN STOP COMMERCE CENTER DR 30 MPH VIA MONTEZUMA 30 MPH S JEFFERSON AVE 40 MPH JEFFERSON AVE 40 MPH STOP COMMERCE CENTER DR 30 MPH VIA MONTEZUMA 30 MPH S JEFFERSON AVE 40 MPH JEFFERSON AVE 40 MPH 100’90’ SHIFT TAPER 250’ W20-1 ROAD WORK AHEAD 25’ MAX 11’ MIN 11’ MIN C30(CA) LANE CLOSED R3-2 250’ W20-1 ROAD WORK AHEAD G20-2 END ROAD WORK G20-2 END ROAD WORK W20-1 ROAD WORK AHEAD 250’ W1-3(L) W6-4W6-4 G20-2 END ROAD WORK R3-2 12’ 100’ 250’ W20-1 ROAD WORK AHEAD G20-2 END ROAD WORK C12(CA) NARROW LANE 250’250’60’ SHOULDER TAPER R3-2 *TRAFFIC LIGHT SET TO FLASHING RED. 11’ MIN 11’ MIN 100’90’ SHIFT TAPER 250’ W20-1 ROAD WORK AHEAD 25’ MAX 11’ MIN 11’ MIN C30(CA) LANE CLOSED R3-2 250’ W20-1 ROAD WORK AHEAD G20-2 END ROAD WORK G20-2 END ROAD WORK W20-1 ROAD WORK AHEAD 250’ W1-3( R) W6-4 W6-4 G20-2 END ROAD WORK R3-2 100’ 250’ W20-1 ROAD WORK AHEAD G20-2 END ROAD WORK C12(CA) NARROW LANE 250’250’ R3-2 *TRAFFIC LIGHT SET TO FLASHING RED.11’ MIN 11’ MIN W6-4W1-3( R) R4-7a KEEP RIGHT R4-7a KEEP RIGHT 3/29/2024 Sunday - Thursday 9:00 PM - 5:00 AM INSR ADDLSUBR LTR INSR WVD DATE (MM/DD/YYYY) PRODUCER CONTACTNAME: FAXPHONE (A/C, No):(A/C, No, Ext): E-MAIL ADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY) COMMERCIAL GENERAL LIABILITY AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE INSURER(S) AFFORDING COVERAGE NAIC # Y / N N / A (Mandatory in NH) ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? EACH OCCURRENCE $ DAMAGE TO RENTED $PREMISES (Ea occurrence)CLAIMS-MADE OCCUR MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ $ PRO- OTHER: LOCJECT COMBINED SINGLE LIMIT $(Ea accident) BODILY INJURY (Per person) $ANY AUTO OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS AUTOS ONLY HIRED PROPERTY DAMAGE $AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE $ CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ PER OTH- STATUTE ER E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYEE $ If yes, describe under E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below POLICY NON-OWNED SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORDACORD 25 (2016/03) ACORDTM CERTIFICATE OF LIABILITY INSURANCE United Specialty Insurance Company Palomar Excess and Surplus Insurance Co Infinity Select Insurance Company 10/12/2023 Temecula Insurance, div of USI 41923 2nd Street, Suite 201 Temecula, CA 92590 951 694-5200 Brad Salute 951 694-5200 951-302-0470 brad.salute@usi.com Walton Bros Enterprises, Inc. 29970 Technology Drive Suite 104 Murrieta, CA 92563 12537 16754 20260 A X X X Y ATN2326682 07/30/2023 07/30/2024 1,000,000 50,000 5,000 1,000,000 2,000,000 2,000,000 C X X X 5046101250190014 07/30/2023 07/30/2024 1,000,000 A X X BTN2320518 07/30/2023 07/30/2024 4,000,000 4,000,000 B N PSIC0916404 11/01/2022 11/01/2023 X 1,000,000 1,000,000 1,000,000 B Contr Equip IMFLP20202113001 11/01/2022 11/01/2023 $5,059,739 Re: Job #23120 - Hendo's Brewing & Spirits Sewer/Water - 27901 Jefferson Ave., Temecula, CA 92590 - Certificate Holder, Hendo Management, Inc. and Colorado West Construction are named as Additional Insured per the attached Endorsements. Per project aggregate applies per the attached Endorsement. City of Temecula 41000 Main Street Temecula, CA 92590 1 of 1 #S42275954/M41087970 WALTOBRO1Client#: 1997644 KASSL 1 of 1 #S42275954/M41087970