HomeMy WebLinkAboutLD23-5575Permit Number: LD23-5575
LD - Utilities/ Access to Utility Agency Facilities
Issued: 12/18/2023
Expired: 11/11/2024
Job Address: 30690 Rancho California Rd
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Frontier California Inc.
401 Merritt 7
Norwalk, CT 06851
(000) 000-0000
Applicant:
Gulbranson Services Inc.
15371 Bonanza Rd Unit A,
Victorville, CA 92392
(760) 843-0330
Contractor:
Utility Work Order Number: 70116-5331910
Description:
Frontier 70116-5331910
WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am
Location:
MH140 - Rancho California Rd N/S 100' W/O Margarita Rd
MH169 - Rancho California Rd S/S 75' W/O Butterfield Stage Rd
MH1005 - Rancho California Rd N/S 570' W/O Tee Dr
Proposed work:
Access three (3) manholes as shown on Frontier "SITE PLAN RANCHO CALIFORNIA RD, LD23-5575".
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD23-5575
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
Public Works Inspector.
Page 1 of 3
Permit Number: LD23-5575
LD - Utilities/ Access to Utility Agency Facilities
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Page 2 of 3
Permit Number: LD23-5575
LD - Utilities/ Access to Utility Agency Facilities
Permitee Date
City Engineer or Authorized Representative Date
12/18/2023
Page 3 of 3
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
PERMIT#
SHEET OF
4 SHEETS
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
WO #70116-5331910
W.TRACY LENOCKER
P.O. BOX 2672
LAKE ARROWHEAD, CA 92352
(909) 337-0315
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
LD23-5575
C12(CA)NARROWLANE LEFT LANECLOSEDAHEADC20(LT)W24 (CA)
SHOULDERWORKAHEADC27(CA)
OPENTRENCH C30(CA)
LANECLOSED
C30A(CA)SHOULDERCLOSED
C9A(CA)ROAD WORKENDG20-2
DETOURM4-10
DETOURM4-10
DETOURM4-8ENDDETOURM4-8A
C L O S E DR O A DR11-2TOTHRU TRAFFICROAD CLOSED
R11-4AHEADLOCAL TRAFFIC ONLYROAD CLOSEDR11-4
R3-1
R3-17BIKE LANE
AHEADR3-17AENDSR3-17B
R3-18
R3-2
R3-4
ONLYR3-5L
ONLYR3-5R
R3-6L
TURN LEFTM U S TLEFT LANE
R3-7L
TURN RIGHTM U S TRIGHT LANE
R3-7R
NOTPASSDO
R4-1BEGINRIGHT TURN LANEYIELD TO BIKESR4-4
R4-7 R4-7A
KEEP
RIGHT
R4-8 R4-8A
KEEPLEFT
R5-6 R7-1
NOPARKINGANYTIME
USE OTHER SIDESIDEWALK CLOSEDR9-10
R9-3A
SIDEWALK
R9-9CLOSED
WORKROAD
CLOSEDBIKE
SC11 (MOD)LANE
W1-1
W1-2
W1-3
W1-4
W1-4R
KEEPRIGHTW1-6W1-6(RT)
W1-8W1-8A
W12-1 XXMPHW13-1WORKROADAHEADW20-1
W20-2
DETOURAHEAD
CLOSEDROADAHEADW20-3ONE LANEROADAHEADW20-4
RIGHT LANECLOSEDAHEADW20-5R
W21-1A
W21-2
FRESHOIL
W21-3MACHINERYROADAHEAD
W21-5
SHOULDERWORK
W21-5AR
SHOULDERCLOSED
RIGHT
W21-6
SURVEYCREW
W21-7
UTILITYWORKAHEAD
W24-1TO STOPPREPAREDBE
W3-4
W4-1
W4-2R
LEFTTRAFFICMERGEW4-7L
THRU
W5-1
ROADNARROWS W6-3
W6-4
W8-3PAVEMENTENDS
W8-4
SOFTSHOULDER
W8-7LOOSEGRAVEL
W8-8
ROUGHROAD
W4-2L
PLANEBIKE
EXCEPTBUSES
BIKE LANE
W11-10
50LIMITSPEED
W3-3
BEGINRIGHT TURN LANEYIELD TO BIKES
STOP
R60B (CA)
RAIL
ROADCROSSING
CROSS HERESIDEWALK CLOSEDR9-11(RT)AHEAD
CROSS HERESIDEWALK CLOSEDR9-11(LT)AHEAD YIELD
111R3-6R
sunbus998
SPEEDCHECKEDRADARBY
NOPEDESTRIANCROSSING
SHARETHESIDEWALK
NO
W10-11b (MOD)TURNON RED
55LIMITSPEED
MAY USER4-11FULL LANE
G20-5aPWORKZONE
W1-6 (LT)
W1-7
AHEAD
SHOULDERCLOSEDAHEADW21-5bL
LEFT
R10-11
NOTURNON RED
W1-3
RIGHTTRAFFICMERGEW4-7R
THRU
AHEADSPEEDREDUCED
R2-5a
35LIMITSPEED
W3-5a
35 MPHSPEED ZONEAHEAD 40LIMITSPEED
END
R2-12
WORKZONESPEEDLIMIT
SC11 (CA)CLOSEDLANER26S
NOPARKINGANYTIME
W21-5bRSHOULDERCLOSEDRIGHTAHEAD
W9-3LANECLOSEDCENTERAHEAD
SHOULDER
ROAD WO
R
KENDG20-2
WORKROADAHEADW20-1
WORKROADAHEADW20-1
ROAD WOR
KENDG20-2
MANHOLELOCATION
WORKROAD
W21-
5
SHO
U
L
D
E
R
WORK C30A
(
C
A
)
SHOULD
E
R
CLOSE
D
100'SIGN SPACING 100'SIGN SPACING 45'SHOULDERTAPER
CURB
50'BUFFER
CURB
WORK AREA
300' TO C/L
45' TO
C
/
L
72 HOURS PRIOR TO COMMENCING WORKINSTALL TEMP. NO PARKING SIGNS
*STREET NAME*(## MPH)
W11-1W16-1
SHARETHE RO
A
D
125'MERGING TAPER WORK AREA
ROAD WO
R
KENDG20-2
RIGHT L
A
N
ECLOSEDAHEADC20(R
T
)
100'SIGNSPACING
MANHOLELOCATION
WORKROADAHEADW20-1 W4-2R C30(C
A
)
LANECLOSED
WORKROADAHEADW20-1
ROAD WO
R
KENDG20-2
72 HOURS PRIOR TO COMMENCING WORKINSTALL TEMP. NO PARKING SIGNS
C30(C
A
)
LANECLOSED
400' TO C/L
CURB
100'SIGNSPACING 100'SIGNSPACING 50'BUFFER
*STREET NAME*(## MPH)CURB
55' T
O
C
/
L
W11-1W16-1
SHARE
THE RO
A
D
365' TO C/L
CURB
12'MIN.
12'MIN.
65'SHIFTING TAPER 50'BUFFER
R4-7AKEEPRIGH
T
R4-7A KEEPRIGHT
ROAD WOR
KENDG20-2
ROAD WO
R
KENDG20-2
WORKROADAHEADW20-1
C12(C
A
)
NARRO
WLANE
WORKAREA
MANHOLELOCATION
WORKROAD
100'SIGNSPACING 100'SIGNSPACING 100'SIGNSPACING
W1-3
CURB
65'SHIFTING TAPER WORKROADAHEADW20-1C12(CA
)
NARRO
WLANE 100'SIGNSPACING100'SIGNSPACING100'SIGNSPACING
W1-3
*STREET NAME*(## MPH)
20'TO C/L
WORKROADAHEAD
W20-1
ROAD WOR
KENDG20-2
C30A(C
A
)
SHOULDE
R
CLOSED
W21-
5
A
R
SHO
U
L
D
E
R
CLOSE
D
RIGH
T
INSTALL TEMP. NO PARKING72 HOURS PRIOR TO COMMENCING WORK
WORKAREA
MANHOLELOCATION
35'TO C/
L
CURB
SHOULDER
125'TO C/L
12'MIN.
45'SHOULDERTAPER
WORKROADAHEAD
W20-1
ROAD W
O
R
K
ENDG20-2
WORKROAD
INSTALL TEMP. NO PARKING72 HOURS PRIOR TO COMMENCING WORK
*STREET NAME*(## MPH)
CURB
100'SIGNSPACING100'SIGNSPACING
SHOULDER
ROAD WO
R
KENDG20-2
WORKROADAHEAD
W20-1
CURB
CURB *STREET NAME*
100'SIGN SPACING
125' TO C/L
C9A(CA)
C9A(C
A
)
TO STOP
PREPA
R
E
DBEW3-4
TO STO
P
PREPAR
E
DBEW3-4
ONE LA
N
EROADAHEADW20-4
100'BUFFER 50'BUFFER
FACILITYLOCATION
WORK AREA
ONE LAN
E
ROADAHEADW20-4
CURB
29'TO C/L
100'SIGNSPACING 100'SIGNSPACING 100'SIGNSPACING WORKROADAHEAD
W20-1
100'SIGNSPACING100'SIGNSPACING100'SIGNSPACING
*STREET NAME*(## MPH)
WORKROADAHEADW20-1
ROAD WO
R
KENDG20-2
CURB C30(CA
)
LANECLOSE
D ROAD WO
R
KENDG20-2
SHOULDER CLOSURE
LANE CLOSURE
SHIFTING CLOSURE
SHOULDER BEYOND CLOSURE
LANE BEYOND CLOSURE W/ TURN LANE CHANNELIZER
2 LANE CLOSURE
FLAGGER CLOSURE
CROSS STREET
CROSS HE
R
E
SIDEWA
L
K
C
L
O
S
E
D
AHEADR9-11
(
R
T
)
STREET NAME
STR
E
E
T
N
A
M
E
SIDEWALK
SIDEW
A
L
K
ADA APPROVED CROSSWALKCROSSWALK DETOUR CLOSURE
72 HOURS PRIOR TO COMMENCING WORKINSTALL TEMP. NO PARKING
35'TO C/
L
245'MERGING TAPER 50'BUFFER WORKAREA85'BIKE LANE TAPER 50'TANGENT
BIKE LANE
WORKROADAHEADW20-1
W11-1W16-1W11-1 A
S
S
E
M
B
L
Y
SHARETHE RO
A
D
CLOSE
DBIKESC11 (M
O
D
)
LANE ROAD W
O
R
KENDG20-2
WORKROADAHEADW20-1
ROAD WO
R
KENDG20-2
LANECLOSEDAHEAD
C20 (C
A
)BIKE1 C30(C
A
)
LANE
CLOS
E
D
MANHOLELOCATION
WORKROAD
12'MIN.
RIGHT L
A
N
ECLOSEDAHEADC20(R
T
)
CURB
100'SIGNSPACING100'SIGNSPACING100'SIGNSPACING
*STREET NAME*(## MPH)
CURB BIKE LANE
50'TO C/L
BIKE LANE & LANE CLOSURE
CENTER LANE CLOSURE
200' TO C/L
5'TO C/
L
65'SHIFTING TAPER
MANHOLELOCATION
WORK AREA
WORKROADAHEAD
W20-1
R4-7A KEEPRIGH
T
R4-7AKEEPRIGHT
ROAD WO
R
KENDG20-2
ROAD W
O
R
K
ENDG20-2
C30(CA)
LANECLOSE
D
C30(C
A
)
LANE
CLOS
E
D
PAINTED MEDIAN
50'BUFFER
50'BUFFER
100'SIGNSPACING100'SIGNSPACING
CURB
*STREET NAME*(## MPH)
LANECLOSEDAHEAD
W9-3
CENTER
65'SHIFTING TAPER WORKROADAHEADW20-1
100'SIGNSPACING 100'SIGNSPACINGLANECLOSEDAHEADW9-3
CENTER
PAINTED MEDIAN
CURB
INSTALL TEMP. NO PARKING72 HRS. PRIOR TO COMMENCING WORK
WORKAREAWORKROADAHEAD
W20-1
R4-7AKEEPRIGH
T
125'MERGING TAPER 100'TANGENT 125'MERGING TAPER 50'BUFFER
12'MIN.
WORKROADAHEADW20-1
125'MERGING TAPER
ROAD WO
R
KENDG20-2
ROAD WOR
KENDG20-2
R4-7A KEEPRIGH
TCURB
200'TO C/L
MANHOLELOCATION
*STREET NAME*(## MPH)
CURB
100'SIGNSPACING100'SIGNSPACING100'SIGNSPACING
100'SIGNSPACING 100'SIGNSPACING 100'SIGNSPACING
LEFT LA
N
E
CLOSE
D
AHEADC20 (C
A
)
INTERCH
A
N
G
E
A
B
L
E
WITH W2
0
-
5 1
LEFT L
A
N
ECLOSEDAHEADC20(L
T
)
W4-2R
W4-2R
C30(CA
)
LANECLOSE
D
C30(CA
)
LANECLOSE
D
12'MIN.
20'TO C/L
INSTALL TEMP. NO PARKING72 HOURS PRIOR TO COMMENCING WORKINSTALL TEMP. NO PARKING72 HOURS PRIOR TO COMMENCING WORK
WORKAREA125'MERGING TAPER
25'TO C/L
130' TO C/L
WORKROADAHEADW20-1
WORKROADAHEADW20-1
ROAD WO
R
KENDG20-2
ROAD WOR
KENDG20-2
TURN R
I
G
H
T
M U S TRIGHT LA
N
E
R3-7R
12'MIN.
W4-2R
R10-11
NOTURNON RED MANHOLELOCATIONW12-1
RIGHT LA
N
E
CLOSE
DAHEADC20(R
T
)
100'SIGNSPACING
CURB
CURB
100'SIGNSPACING100'SIGNSPACING
*STREET NAME*(## MPH)
100'MIN. CHANNELIZER
C30(CA
)
LANECLOSE
D
LANECLOSEDAHEADW20-5INTERCHANGEABLE WITHC20A (CA)
RIGHT1
R9-3BUSECROSSWALK
DYNAMICLABEL BLOCK(USE DROPDOWN)
MANHOLELOCATION
LANE BEYOND CLOSURE W/O TURN LANE CHANNELIZER
INSTALL TEMP. NO PARKING72 HOURS PRIOR TO COMMENCING WORKINSTALL TEMP. NO PARKING72 HOURS PRIOR TO COMMENCING WORK
WORKAREA125'MERGING TAPER
25'
TO C
/
L
130' TO C/L
WORKROADAHEADW20-1
WORKROADAHEADW20-1
ROAD WO
R
KENDG20-2
ROAD WOR
KENDG20-2
12'MIN.
W4-2R
R10-11
NOTURNON RED MANHOLELOCATION
RIGHT LA
N
E
CLOSE
DAHEADC20(R
T
)
100'SIGNSPACING
CURB
CURB
100'SIGNSPACING100'SIGNSPACING
*STREET NAME*(## MPH)
C30(CA
)
LANECLOSE
D
50'
50'
CURB / EOP:SIDEWALK:STRIPING:
PAINTED MEDIAN
BIKE LANE
PAINTED MEDIAN BIKE LANE
SHOULDER
ROAD W
O
R
K
ENDG20-2
WORKROADAHEADW20-1
WORKROADAHEAD
W20-1
ROAD W
O
R
KENDG20-2
MANHOLELOCATION
WORKROAD
W21-5
SHOU
L
D
E
R
WORK
C30A(C
A
)
SHOULDE
R
CLOSED
100'SIGN SPACING 100'SIGN SPACING 45'SHOULDERTAPER
CURB
50'BUFFER
CURB
WORK AREA
300' TO C/L
45' T
O
C
/
L
72 HOURS PRIOR TO COMMENCING WORKINSTALL TEMP. NO PARKING SIGNS
*STREET NAME*(## MPH)
W11-1W16-1
SHARETHE ROAD
200'SHOULDER TAPER
RANCHO CALIFORNIA R
D
(50 MPH)
67'SHOULDER TAPER 350'SIGN SPACING 350'SIGN SPACING 350'SIGN SPACING
SIDEWALK
522'BUFFER
MANHOLE #397LOCATION
LEFT LANECLOSEDAHEADC20 (CA)INTERCHANGEABLEWITH W20-5
1
CLOSEDAHEADC20 (CA)INTERCHANGEABLEWITH W20-5
1BIKE LANE
ROAD WORKENDG20-2
C12(CA)NARROWLANEW5-1ROADNARROWS
12'
12'
WORKROADAHEADW20-1
ROAD WORKENDG20-2
COS
M
I
C
D
R
(25
M
P
H
)
HU
M
B
E
R
D
R
(25
M
P
H
)
100'
SIGN
S
P
A
C
I
N
G
100'
SIGN S
P
A
C
I
N
G
WORKROADAHEADW20-1ROAD WORKENDG20-2
WORKROADAHEADW20-1
ROAD WORKENDG20-2
12'
BIKE LANE
BIKE LANE
BIKE LANE
R9-3AR9-3A
RANCHO CALIFO
R
N
I
A
R
D
MOR
A
G
A
R
D
CROSS HERESIDEWALK CLOSEDR9-11(RT)AHEAD
CROSS HERESIDEWALK CLOSEDR9-11(LT)AHEAD
9'
601' TO C/L
VICINITY MAP
NTS
PROJECT LOCATION
TRAFFIC CONTROL PLANS
1
REGULATORY SIGNS
BIKE LANE
R3-17
R5-6
WARNING SIGNS
MISCELLANEOUS DEVICES
DETAIL SHEET LEGEND
CONE SPACING-25' MAXIMUM
STOP
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178 TRAFFIC CONTROL PLANS
WORK HOURS
SUNDAY-THURSDAY
9:00 PM - 5:00 AM
ENGINEER OF WORK'S CERTIFICATE
I, , hereby declare that I am the engineer of Work for this project, that I have
exercised responsible charge over the design of the project as defined in Section 6703 of the
Business and Professions Code, and the design is consistent with current standards and City of
Temecula.
I understand that the check of project drawings and specifications by the City of Temecula is
confined to a review only and does not relieve me of responsibilities for project design.
Signed Date_______________
R.C.E. Exp.________________
Firm___________________________________
Address________________________________
Telephone______________________________
C 28043
(909) 337-0315
3/31/24
W. TRACY LENOCKER
WORK TO BE DONE:
FRONTIER TO ACCESS 3 EX. MANHOLES TO SPLICE EX. CABLE TO
SERVICE A CUSTOMER LOCATED AT 40620 CALLE CONTENTO.
TRAFFIC CONTROL GENERAL NOTES (REV'D 08/26/20):
1. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2. THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY.
3. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4. WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS
APPROVED OTHERWISE, WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY.
5. TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM
ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM THE STREET AT END OF EACH DAY AND AT THE END OF THE JOB.
THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES.
6. PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7. TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK.
8. ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING
MAY BE REPLACED TEMPORARILY WITH TAPE.)
11. ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT.) ALL FLAGGERS SHALL ALSO BE
EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC.
12. ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA'S TRAFFIC
DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT (951) 694-6411.
13. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK.
14. A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC
WORKS.
15. ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD
CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING
SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION.
16. A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17. IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,THE TRENCH PATCH FOR THE UTILITY
OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE
RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407
(SHEET 1 AND 2) FOR TRENCH PATCH.
18. ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC
ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT.
19. CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20. IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES.
Lenocker Consulting Group, LLC
PO BOX 2672, LAKE ARROWHEAD,CA 923252
9/19/2023
9/19/2023
12/11/23
12/11/23
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
PERMIT#
SHEET OF
4 SHEETS
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
WO #70116-5331910
W.TRACY LENOCKER
P.O. BOX 2672
LAKE ARROWHEAD, CA 92352
(909) 337-0315
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
LD23-5575
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178 2
DURATION OF WORK:
1 DAY
ROAD WORK
END
G20-2
C30A(CA)
SHOULDER
CLOSED
CLOSED
BIKE
SC11 (MOD)
LANE
W11-1
W16-1
W11-1 ASSEMBLY
SHARE
THE ROAD
350'
SIGN
SPACING
INSTALL TEMP. NO PARKING
72 HOURS PRIOR TO COMMENCING WORK
30' X 8' WORK
AREA
MH #140
LOCATION
52' TO C/L
CURB
CONCRETE MEDIAN
104' TO C/L
CURB
CURB
WO
R
K
RO
A
D
BIKE LANE
200'
BIKE LANE
TAPER
S
300'
SHIFTING TAPER
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
350'
SIGN
SPACING
CURB
350'
SIGN
SPACING
WORK
ROAD
AHEAD
W20-1C12(CA)
NARROW
LANE
W5-1
ROAD
NARROWS
R9-3A
RANCHO CALIFORNIA RD (50 MPH)
MA
R
G
A
R
I
T
A
R
D
BIKE LANE
BIKE LANE
BIKE LANE
CONCRETE MEDIAN
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
R3-4
100'
OPENING
140' TURN LANE W12-1
SCALE: NTS
TRAFFIC CONTROL PLANS
FOR
RANCHO CALIFORNIA RD & MARGARITA RD
TURN RIGHT
M U S T
RIGHT LANE
R3-7R
BIKE LANE
CLOSED
AHEAD
C20(CA)BIKE
25' MAX
CROSS HERE
SIDEWALK CLOSED
AHEAD
R9-11(RT)
CROSS HERE
SIDEWALK CLOSED
AHEAD
R9-11(RT)
R9-11(RT) AT INTERSECTION OF
RANCHO CALIFORNIA RD & YUKON RD
NORMAL OPERATION
R9-3A
DURATION OF WORK: 1 DAY
FRONTIER TO ACCESS MH#140 TO SPLICE
NIGHT WORK ONLY
SUN- THURS 9PM-5AM
12' MIN12' MIN
12' MIN
9/19/2023
12/11/23
12/11/23
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
PERMIT#
SHEET OF
4 SHEETS
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
WO #70116-5331910
W.TRACY LENOCKER
P.O. BOX 2672
LAKE ARROWHEAD, CA 92352
(909) 337-0315
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
LD23-5575
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178 3
DURATION OF WORK:
1 DAY
SCALE: NTS
TRAFFIC CONTROL PLANS
FOR
RANCHO CALIFORNIA RD & BUTTERFIELD STAGE RD
RANCHO CALIFORNIA RD (50 MPH)
CURB
PAINTED MEDIAN
77' TO C/L
72 HOURS PRIOR TO COMMENCING WORK
INSTALL TEMP. NO PARKING
CURB
40' TO C/L
350'
SIGN
SPACING
600'
MERGING TAPER
495'
BUFFER
BU
T
T
E
R
F
I
E
L
D
S
T
A
G
E
R
D
350'
SIGN
SPACING
350'
SIGN
SPACING
BIKE LANE
WORK
ROAD
AHEAD
W20-1
W11-1
W16-1
W11-1 ASSEMBLY
SHARE
THE ROAD
ROAD WORK
END
G20-2
WORK
ROAD
AHEAD
W20-1
ROAD WORK
END
G20-2
C30(CA)
LANE
CLOSED
MH #169
LOCATION
WO
R
K
RO
A
D
12' MIN.
1
RIGHT LANE
CLOSED
AHEAD
C20 (CA)
INTERCHANGEABLE
WITH W20-5
W4-2
200'
BIKE TAPER
NIGHT WORK ONLY
SUN- THURS 9PM-5AM
BIKE LANE
CLOSED
AHEAD
C20(CA)BIKE
30' X 8' WORK
AREA
9/19/2023
12/11/23
12/11/23
ENGINEER'S INFORMATIONCONTRACTOR:
MARK REVISIONS BY APPR.DATE FOR CITY USE ONLY:
PERMIT#
SHEET OF
4 SHEETS
CITY OF TEMECULA
PUBLIC WORKS-TRAFFIC ENGINEERING DIVISION
WO #70116-5331910
W.TRACY LENOCKER
P.O. BOX 2672
LAKE ARROWHEAD, CA 92352
(909) 337-0315
NICOLAS M. MINICILLI
TRAFFIC ENGINEER
2647
LD23-5575
4
CONSTRUCTION NOTE:
ALL DRIVEWAYS TO REMAIN OPEN (WHENEVER
POSSIBLE) THROUGHOUT TRAFFIC CONTROL ZONE.
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178
Traffic Cone
Temporary Sign
Direction of Travel
Portable Flashing Beacon
LEGEND
Flashing Arrow Sign (FAS)
FAS Support or Trailer
Work Area
Flagger
Work Vehicle
Signalized Intersection
Type III Barricade with sign
WORK
ROAD HLWD High Level Warning Device
S
DURATION OF WORK:
1 DAY
SCALE: NTS
TRAFFIC CONTROL PLANS
FOR
RANCHO CALIFORNIA RD & TEE DR
NIGHT WORK ONLY
SUN- THURS 9PM-5AM
MH#1005
LOCATION
568'
TO C/L
51' TO C/L
CURB
CURB
CURB
CURB
200'
SHOULDER TAPER
DOWNSTREAM
TAPER
50' MIN./
100' MAX.
350'
SIGN
SPACING
350'
SIGN
SPACING
BIKE LANEBIKE LANE
(50' MIN.)
425' BUFFER
200'
BIKE LANE
TAPER
SHOULDER SHOULDER
RANCHO CALIFORNIA RD (50 MPH)
TE
E
D
R
12' MIN
PAINTED MEDIAN
350'
SIGN
SPACING
350'
SIGN
SPACING
30' X 8' WORK
AREA
WORK
ROAD
AHEAD
W20-1
WORK
ROAD
AHEAD
W20-1
BIKE LANE
CLOSED
AHEAD
C20(CA)BIKEW21-5
SHOULDER
WORK
ROAD WORK
END
G20-2
ROAD WORK
END
G20-2
CLOSED
BIKE
SC11 (MOD)
LANE
W11-1
W16-1
W11-1 ASSEMBLY
SHARE
THE ROAD
C30(CA)
LANE
CLOSED
9/19/2023
12/11/23
12/11/23
CONTRACTOR:
FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
3 SHEET
CITY OF TEMECULA
PUBLIC WORKS
70116-5331910
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
SITE PLAN
FOR
RANCHO CALIFORNIA RD & TEE DR
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178
MARK REVISIONS BY APPR.DATE
B
U
T
T
E
R
F
I
E
L
D
S
T
A
G
E
R
D
4
3
'
4
7
'
9
0
'
6
2
'
6
2
'
1
2
4
'
RANC
H
O
C
A
L
I
F
O
R
N
I
A
R
D
120'
60'
60'
76'
38'
38'
MANHOLE #169
LOCATION
77'
4
0
'
SITE PLAN
RANCHO CALIFORNIA RD
1
VICINITY MAP
1.The City Engineer or their representative has the
authority to initiate field changes to assure public safety.
2.BEFORE YOU DIG – CALL (TOLL FREE)
(800)422-4133
3.Where there is conflict with the permit language and
approved plans, the approved plans shall govern.
4.Trench repair shall be in accordance with City
Standard Drawing 407.
5.All facilities shall be installed in accordance with City
Standard Drawing 117.
6.Concrete curbs, walks, gutters, cross gutters and
driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance
with City Standards and the Greenbook.
7.All disturbed landscaping and other improvements
shall be removed or repaired and replaced to the
satisfaction of Public Works.
8.Access ramps shall be removed joint to joint and
reconstructed in accordance with City Standard Drawing
402 and meet current ADA Standards.
9.Any survey monuments damaged or destroyed shall
be reset per City Standards by a qualified professional
pursuant to the California Business and Professions Code
Section 8771.
10.Final compaction test results shall be provided by a
soils engineer.
11.A pre-construction meeting is required two (2)
business days prior to any scheduled work. Permittee shall
contact LDInspections@temeculaca.gov to schedule a
meeting.
12.All U.S.A. mark outs shall be removed prior to
completion of project.
13.A final inspection is required for all projects.
Permittee must contact LDInspections@temeculaca.gov to
verify completion of project.
SCALE: 1"=60'
PROJECT LOCATION
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
Tricia.ortega 09/13/2023
09/13/2023 09/13/2023
09/13/20
LD23-5575
CONTRACTOR:
FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
3 SHEET
CITY OF TEMECULA
PUBLIC WORKS
70116-5331910
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
SITE PLAN
FOR
RANCHO CALIFORNIA RD & TEE DR
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178
MARK REVISIONS BY APPR.DATE
MANHOLE #140
LOCATION
MA
R
G
A
R
I
T
A
R
D
RANCH
O
C
A
L
I
F
O
R
N
I
A
R
D
52
'
104'
42
'
42
'84
'53
'
53
'
10
6
'
RANCH
O
C
A
L
I
F
O
R
N
I
A
R
D
2
VICINITY MAP
1.The City Engineer or their representative has the
authority to initiate field changes to assure public safety.
2.BEFORE YOU DIG – CALL (TOLL FREE)
(800)422-4133
3.Where there is conflict with the permit language and
approved plans, the approved plans shall govern.
4.Trench repair shall be in accordance with City
Standard Drawing 407.
5.All facilities shall be installed in accordance with City
Standard Drawing 117.
6.Concrete curbs, walks, gutters, cross gutters and
driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance
with City Standards and the Greenbook.
7.All disturbed landscaping and other improvements
shall be removed or repaired and replaced to the
satisfaction of Public Works.
8.Access ramps shall be removed joint to joint and
reconstructed in accordance with City Standard Drawing
402 and meet current ADA Standards.
9.Any survey monuments damaged or destroyed shall
be reset per City Standards by a qualified professional
pursuant to the California Business and Professions Code
Section 8771.
10.Final compaction test results shall be provided by a
soils engineer.
11.A pre-construction meeting is required two (2)
business days prior to any scheduled work. Permittee shall
contact LDInspections@temeculaca.gov to schedule a
meeting.
12.All U.S.A. mark outs shall be removed prior to
completion of project.
13.A final inspection is required for all projects.
Permittee must contact LDInspections@temeculaca.gov to
verify completion of project.
SCALE: 1"=60'
SITE PLAN
RANCHO CALIFORNIA RD
PROJECT LOCATION
LD23-5575
CONTRACTOR:
FOR CITY USE ONLY:
DRAWING
NO.
SHEET OF
3 SHEET
CITY OF TEMECULA
PUBLIC WORKS
70116-5331910
ENGINEER'S INFORMATION
D. LYNN PARKER
P.O. BOX 1666
COTTONWOOD, AZ 86326
(909) 472-9983
SITE PLAN
FOR
RANCHO CALIFORNIA RD & TEE DR
FRONTIER ENGINEER:
RAUL RIVAS 909-406-3178
MARK REVISIONS BY APPR.DATE
5
1
'
84'
42'
66'
42'
33'
33'
568'
1
0
6
'
5
3
'
5
3
'
8
6
'
4
3
'
4
3
'
3
VICINITY MAP
1.The City Engineer or their representative has the
authority to initiate field changes to assure public safety.
2.BEFORE YOU DIG – CALL (TOLL FREE)
(800)422-4133
3.Where there is conflict with the permit language and
approved plans, the approved plans shall govern.
4.Trench repair shall be in accordance with City
Standard Drawing 407.
5.All facilities shall be installed in accordance with City
Standard Drawing 117.
6.Concrete curbs, walks, gutters, cross gutters and
driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance
with City Standards and the Greenbook.
7.All disturbed landscaping and other improvements
shall be removed or repaired and replaced to the
satisfaction of Public Works.
8.Access ramps shall be removed joint to joint and
reconstructed in accordance with City Standard Drawing
402 and meet current ADA Standards.
9.Any survey monuments damaged or destroyed shall
be reset per City Standards by a qualified professional
pursuant to the California Business and Professions Code
Section 8771.
10.Final compaction test results shall be provided by a
soils engineer.
11.A pre-construction meeting is required two (2)
business days prior to any scheduled work. Permittee shall
contact LDInspections@temeculaca.gov to schedule a
meeting.
12.All U.S.A. mark outs shall be removed prior to
completion of project.
13.A final inspection is required for all projects.
Permittee must contact LDInspections@temeculaca.gov to
verify completion of project.
SCALE: 1"=60'
SITE PLAN
RANCHO CALIFORNIA RD
PROJECT LOCATION
MH#1005
LOCATION
LD23-5575
LD23-5575
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
Tricia.ortega 09/05/2023
09/05/2023 09/05/2023
09/05/20