HomeMy WebLinkAboutLD24-1751Permit Number: LD24-1751
LD - Utilities/ Access to Utility Agency Facilities
Issued: 05/16/2024
Expired: 11/12/2024
Job Address: 41000 Main St
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Cynthia Fearn
321 Hunter St
Ramona, CA 92065
Applicant:
Contractor:
Utility Work Order Number: TD2195384
Description:
SCE TD2195384 (DIRECTLY OUTSIDE CITY LIMITS)
4 Traffic Signs within the city's right-of-way at the intersection of Butterfield Stage Rd. and Rancho California
RD (Plans Attached)
Wilson construction work to be within Riverside County's right-of-way
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
Page 1 of 2
Permit Number: LD24-1751
LD - Utilities/ Access to Utility Agency Facilities
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
City Engineer or Authorized Representative Date
05/16/2024
Page 2 of 2
THIS PLAN IS NOT
APPLICABLE TO THE
CITY OF TEMECULA
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020
APPLICATION INFORMATION PERMIT NO.:
Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching
Signing & Striping Traffic Signal Miscellaneous (SPECIFY BELOW)
The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as
follows:
Name(s) of street(s) and/or street address:
Utility Work Order #: Start Date: End Date:
In consideration of granting this application, all applicants including utility companies hereby agree to:
1. If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties
involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control
Plan Checklist for details.
2. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from
and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident,
loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application. (See below for specific liability insurance requirements.)
3. Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City
Engineer.
4. Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working
days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The
developer/general contractor must be present for the timely request of inspections.
5. Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works
Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all
applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction.
LIABILITY INSURANCE REQUIREMENTS
PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED
EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE
CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED.
THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR
BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT
ENCROACHMENT PERMIT.
Wilson Construction to remove and replace 9 poles and maintenance on 4 existing structures
Traffic Control and Signage to impede in Temecula Right-of-Way (TCP Attached)
Butterfield Stage Rd. and Rancho California Rd.
TD2195384 TBD TBD
4
LD24-1751
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
Tricia.ortega 05/16/2024
05/16/2024 05/16/2024
05/16/20
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020
Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum
limits of insurance coverage shall be as follows:
a. General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If
Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it
shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
b. Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage.
c. Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident
for bodily injury or disease.
d. Course of Construction: Completed value of the project.
There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approac h
located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at
least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the
encroachment permit:
BODILY INJURY $250,000.00 EACH PERSON
$500,000.00 EACH OCCURANCE
$500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
PROPERTY DAMAGE $100,000.00 EACH OCCURANCE
$250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to
the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing
the City named as an additional insured shall be attached to the application.
The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this
application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges
that this application will be made a part of the encroachment permit.
APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED)
Company Name:
Mailing Address:
Contact: Phone #: E-mail:
I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the
permittee and bind the permittee to the agreements contained herein and any conditions of the permit.
Authorized Signature: Date Applied:
CONTRACTOR’S INFORMATION
Company Name:
Mailing Address:
Contact: Phone #: 24-HR Emergency #:
State Contractor’s License #: Class: City Business License #:
Regina Rivera - Pro Traffic Services on behalf of Wilson Construction
321 Hunter Street
Regina Rivera (760) 497-9512 TCPM@PTATS.com
4/16/24
Wilson Construction
PO Box 1190 Canby, OR 97013
Regina Rivera (760) 497-9512
753014 C10 A C61/D31
TD2195384
Pole Replacements- 4130700E, 4130697E,
4130696E, 4130686E, 4130685E, 4130681E,
4130676E, 4130673E, 4130630E
Existing Structures-4130688E, 4130677E, 4130675E,
4130668E
FOR CITY USE ONLY: FILE NO.REVISIONREV. #DATE W.O. NO.
ENGINEER'S INFORMATIONENG. SEAL
ENG. NAME:
RCE #:DATE:
WILLIAM RAYMOND
PROJECT:
ADDRESS:
TD/SAP NO.
TCP NO.
CONTACT
CLIENT:SHEET
57580
DATE:04.15.24
NICOLAS RAPTIS
REV. 1
SOUTHERN CALIFORNIA EDISON COMPAN<
TD 2195384RELOCATE FACILITIES
0314-WIL-24PMXX.XX.XXXXDESIGNED BY:
PRO TRAFFIC SERVICES
WBE CERTIFEID
LIC. # 978979 CITY OF
TEMECULA
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
TEMPORARY TRAFFIC CONTROL PLANS
RANCHO CALIFORNIA RD. BETWEEN
CALLEN CONTENTO & BUTTERFILED STAGE RD.
C
FLASHING ARROW SIGN TRAILER (TYP.)
(FAS)
(HLWD)
HIGH LEVEL WARNING DEVICE
TRAFFIC CONE
POST TUBE
(CMS)
CHANGEABLE MESSAGE SIGN TRAILER (TYP.)
TYPE II BARRICADE
1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC
SAFETY.
3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE.
4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY,
UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY
THROUGH THURSDAY.
5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC
CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND
AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES.
6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS.
7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK.
8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE.
9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING
CONSTRUCTION.
10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION
WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.)
11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL
ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS
OF FLAGGING TRAFFIC.
12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF
TEMECULA'S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY'S TRAFFIC DIVISION AT
(951) 694 -6411.
13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK.
14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE
DEPARTMENT OF PUBLIC WORKS.
15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES,
ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION
ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION.
16.A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES.
17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD,
THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION
METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION
INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (SHEET 1 AND 2) FOR TRENCH
PATCH.
18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY
TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT.
19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK.
20.IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH
LEVEL DEVICES.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON
THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES.
ORDINANCE NO. 90-10
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TEMECULA GRANTING TO
SOUTHERN CALIFORNIA EDISON COMPANY, ITS SUCCESSORS AND ASSIGN, A
FRANCHISE TO USE AND TO CONSTRUCT AND USE, FOR TRANSMITTING AND
DISTRIBUTING ELECTRICITY FOR ANY AND ALL PURPOSES, POLES, WIRES,
CONDUITS AND APPURTENANCES, INCLUDING COMMUNICATIONS CIRCUITS
NECESSARY OR PROPER THEREFOR, IN, ALONG, ACROSS, UPON, OVER AND
UNDER THE PUBLIC STREETS, WAYS, ALLEYS, AND PLACES WITHIN THE CITY OF
TEMECULA.
THE CITY COUNCIL OF THE CITY OF TEMECULA DOES NOT HEREBY ORDAIN AS
FOLLOWS:
SECTIONS 8. Grantee of the franchise granted hereby shall indemnify, save, defend and
hold harmless the City and any duly established City redevelopment agency and the
respective officers and employees thereof from all liability for damages proximately resulting
from and operations under the franchise.
NOT TO SCALE
Luci Smith
300 N. Pepper Ave
Rialto, CA 92376
January 04, 2023
Re: Letter of Authorization
Southern California Edison and our Contractors have been operating in Southern California for
over 100 years and enjoys a productive working relationship with its 202 cities, 15 counties
including the State of California Department of Transportation. Good communication and cooperation
are the key to
maintaining and further improving this valuable relationship.
This letter is to serve as an authorization letter for SCE Approved Contractors California Traffic Control
and Wilson Construction to sign for permits and work under our franchise agreement on Southern
California Edison’s behalf. Our franchise agreement provides SCE and our contractors the right to install,
maintain, repair, replace and operate utility equipment and facilities in, on and under the public right-of-
way in its function of transmitting and distributing electric service.
This authorization shall remain in effect until written notification is provided to your agency.
If you have any questions, please feel free to call me at 840-210-3553
Sincerely,
Luci Smith
Luci Smith
Bus Ops Anlys, Advisor
Southern California Edison
FOR CITY USE ONLY: FILE NO.REVISIONREV. #DATE W.O. NO.
ENGINEER'S INFORMATIONENG. SEAL
ENG. NAME:
RCE #:DATE:
WILLIAM RAYMOND
PROJECT:
ADDRESS:
TD/SAP NO.
TCP NO.
CONTACT
CLIENT:SHEET
57580
DATE:04.15.24
NICOLAS RAPTIS
REV. 1
SOUTHERN CALIFORNIA EDISON COMPAN<
TD 2195384RELOCATE FACILITIES
0314-WIL-24PMXX.XX.XXXXDESIGNED BY:
PRO TRAFFIC SERVICES
WBE CERTIFEID
LIC. # 978979 CITY OF
TEMECULA
PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION
TEMPORARY TRAFFIC CONTROL PLANS
RANCHO CALIFORNIA RD. BETWEEN
CALLEN CONTENTO & BUTTERFILED STAGE RD.
RANCHO CALIFORNIA RD. 50 M
P
H
BUTTERFIELD STAGE RD. 55 MPH
ARMADA PL. 25 MPH
BUTTERFIELD STAGE RD. 55 MPH
35
SPEED
LIMIT
50
SPEED
LIMIT
ADDITIONAL NOTES:RANCHO CALIFORNIA RD. 50 MPH
1
MA
T
C
H
L
I
N
E
MA
T
C
H
L
I
N
E
SE
E
A
B
O
V
E
R
I
G
H
T
SE
E
B
E
L
O
W
L
E
F
T