HomeMy WebLinkAboutLD24-2088Permit Number: LD24-2088
LD - Utilities/ Excavation - Parallel
Issued: 06/10/2024
Expired: 12/07/2024
Job Address: Margarita Rd - Avenida Barca To Solana Way
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Jeff Dixon
42135 Winchester Rd
Temecula, CA 92590
Applicant:
Rancho California Water District
42135 Winchester Rd
Temecula, CA 92590
(951) 296-6900
Contractor:
Utility Work Order Number: 391381
Description:
RCWD WO391381
WORK HOURS SHALL BE MONDAY – FRIDAY, NO HOLIDAYS, 7:00am - 2:00pm
Location: Margarita Rd - Avenida Barca to Solana Way
Proposed work:
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD24-2088
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
Public Works Inspector.
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities*****
Permit Number: LD24-2088
LD - Utilities/ Excavation - Parallel
project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
Page 2 of 3
Permit Number: LD24-2088
LD - Utilities/ Excavation - Parallel
City Engineer or Authorized Representative Date
06/10/2024
Page 3 of 3
X
NONE
EXISTING TO REMAIN
PROPOSED
LEGEND:
VICINITY MAP
SUBMITTAL TO:
SHEET NO.
OF
PREPARED BY
PROJECT ENGINEER
CHECKED
DRAWN
SCALE
PREPARED DATE
REVISION DATE
5
Traffic & Environmental Group
COASTAL
1519 E Chapman Ave. #14
Fullerton, CA 92831
Office (714) 941-9255
www.ctaeg.com
B.H.
M.G.S.
M.G.S.
LOCATION:
CONTRACTOR INFO:
TYPE OF WORK:
TRAFFIC STAMP
CIVIL STAMP
FULL TRAFFIC MAINTENANCE
217 LEWIS COURT
CORONA, CA 92882
OFFICE: 951-520-9990
STREET IMPROVEMENTS
PROJECT #:C1160
J.A.A.
05/13/2024
CITY OF TEMECULA
MARGARITA ROAD
1
TC-01
N
TRAFFIC CONTROL PLANS FOR:
MARGARITA RD. & SOLANA WAY
CITY OF TEMECULA
TRAFFIC CONTROL PLAN GENERAL NOTES:
ENGINEER OF RECORD (EOR) NOTES:
WORK AREA
MA
R
G
A
R
I
T
A
R
D
.
SOLO
N
A
W
A
Y
RANCHO CALIFORN
I
A
R
D
.
Y
N
E
Z
R
D
.
1. All traffic control devices shall conform to the latest edition of the California Manual on
Uniform Traffic Control Devices (California MUTCD) and the Standard Specifications for Public
Works Construction.
2. The City Engineer or his representative has the authority to initiate field changes to assure
public safety.
3. All traffic control devices shall be removed from view when not in use.
4. Work hours shall be restricted to the period between 8:30 a.m. and 3:30 p.m., Monday
through Friday, unless approved otherwise. When night work is required, work hours shall be
9 p.m. to 5 a.m., Sunday through Thursday.
5. Trenches must be back filled or plated during non-working hours. Steel plates shall have
asphaltic concrete berm on all edges. All dirt, dust, and debris shall be removed from street at
end of each day and at the end of the job. The street shall be in drivable condition at all times.
6. Pedestrian controls shall be provided as shown on the plans.
7. Temporary "NO PARKING" signs will be posted 24 hours prior to commencing work.
8. Access to driveways will be maintained at all times unless other arrangements are made.
9. The contractor shall replace within 72 hours, all traffic signal loop detectors damaged during
construction.
10.The contractor shall replace within 24 hours, all striping removed or damaged by construction
work. (Striping may be replaced temporarily with tape.)
11.All Workers shall be equipped with an orange vest (or a reflective vest at night). All flaggers
shall also be equipped with a hard hat, C28 "Stop/Slow" paddle and shall be trained in the
proper fundamentals of flagging traffic.
12.Any work that disturbs normal traffic signal operations shall be coordinated with the City of
Temecula's Traffic Division, 48 hours prior to beginning construction. Contact the City's Traffic
Division at (951) 694 -6411.
13.The contractor shall maintain all traffic control devices 24 hours per day and 7 days per week.
14.A minimum of twelve (12) foot travel lanes must be maintained unless otherwise
approved by the Department of Public Works.
15.All night work will require written approval from the Department of Public Works. Lane
closures, road detours, road closures, and traffic signal modifications associated with overnight
construction activities will require warning signs be placed at least one week in advance of
starting construction.
16.A solar powered flashing arrow board shall be required on all arterial street lane closures.
17.If the permit applicant determines that conduit installation will be by the boring machine
method, the trench patch for the utility observation excavation will be the same as for open
trench excavation method. This will provide a single continuous surface restoration eliminating
the multiple penetration into the public roadway to all requirements in City Standard Drawing
# 407 (sheet 1 and 2) for trench patch.
18.Any work that creates an undue safety risk or creates severe congestion may be shut down by
City Traffic Engineers, City Field Inspection, or the Police Department.
19.Cones and delineators shall have reflectorized sleeves for night work.
20.If parking is allowed in advance warning area, advance warning signs shall be mounted on high
level devices.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD
CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING,
SIDEWALKS, AND BIKE LANES.
WORK HOURS
MONDAY - FRIDAY
7:00 AM - 2:00 PM
N
I
C
O
L
E
L
N
.
(
2
5
M
.
P
.
H
.
)
M
A
R
G
A
R
I
T
A
R
D
.
(
4
0
M
.
P
.
H
.
)
M
A
R
G
A
R
I
T
A
R
D
.
(
4
0
M
.
P
.
H
.
)
M
A
R
G
A
R
I
T
A
R
D
.
(
4
5
M
.
P
.
H
.
)
M
A
R
G
A
R
I
T
A
R
D
.
(
4
5
M
.
P
.
H
.
)
SOL
A
N
A
W
A
Y
(40
M
.
P
.
H
.
)
V
I
A
L
A
V
I
D
A
(
3
0
M
.
P
.
H
.
)
SOL
A
N
A
W
A
Y
(40
M
.
P
.
H
.
)
SOLA
N
A
W
A
Y
(40 M
.
P
.
H
.
)
1" = 50'
2
TC-02
SUBMITTAL TO:
SHEET NO.
OF
PREPARED BY
PROJECT ENGINEER
CHECKED
DRAWN
SCALE
PREPARED DATE
REVISION DATE
5
Traffic & Environmental Group
COASTAL
1519 E Chapman Ave. #14
Fullerton, CA 92831
Office (714) 941-9255
www.ctaeg.com
B.H.
M.G.S.
M.G.S.
LOCATION:
CONTRACTOR INFO:
TYPE OF WORK:
TRAFFIC STAMP
CIVIL STAMP
FULL TRAFFIC MAINTENANCE
217 LEWIS COURT
CORONA, CA 92882
OFFICE: 951-520-9990
STREET IMPROVEMENTS
PROJECT #:C1160
J.A.A.
05/13/2024
CITY OF TEMECULA
MARGARITA ROAD
00 50'100'25'
1"1/2"1/4"0
SCALE: 1" = 50'-0"
2"
N
MATCH LINE - SEE A-A
MATCH LINE - SEE A-A
MATCH LINE - SEE C-C ON SHEET TC-03
MA
T
C
H
L
I
N
E
-
S
E
E
B
-
B
MA
T
C
H
L
I
N
E
-
S
E
E
B
-
B
COORDINATE WITH THE CITY OF TEMECULA
PUBLIC WORKS DEPARTMENT TO PLACE THE
SIGNALIZED INTERSECTION ON FLASH
OPERATION.
THIS REQUIRES A DUAL LANE CLOSURE
DESIGN. TWO LANE TAPERS REQUIRED.
(SEE CITY STANDARD TCP #21 FOR
REFERENCE).
INSTALL R3-5R
OR R3-2 SIGN.
PER MEETING, THIS WILL BE FIRST VALVE
CAN REPAIRED. THEN ALL TRAFFIC CONTROL
WILL BE SHIFTED SOUTH OF THIS
INTERSECTION
WORK HOURS
MONDAY - FRIDAY
7:00 AM - 2:00 PM
DO NOT SETUP TRAFFIC CONTROL IN
INTERSECTIONS UNTIL WORK BEING IS
PERFORMED IN AREA SO THAT WE CAN
MAINTAIN DRIVEWAY ACCESS. (TYP.)
M
A
R
G
A
R
I
T
A
R
D
.
(4
5
M
.
P
.
H
.
)
R
A
M
S
E
Y
C
T
.
(
2
5
M
.
P
.
H
.
)
C
A
R
A
W
A
Y
(
2
5
M
.
P
.
H
.
)
C
O
U
R
T
N
E
Y
P
L
.
(
2
5
M
.
P
.
H
.
)
ST
O
N
E
W
O
O
D
R
D
.
(2
5
M
.
P
.
H
.
)
MAR
G
A
R
I
T
A
R
D
.
(45
M
.
P
.
H
.
)
M
A
R
G
A
R
I
T
A
R
D
.
(
4
5
M
.
P
.
H
.
)
MARGARIT
A
R
D
.
(45 M.P.H.)
PASEO BRILL
A
N
T
E
(25 M.P.H.)
MARGARIT
A
R
D
.
(45 M.P.H.)
MARGARIT
A
R
D
.
(45 M.P.H
.
)
MORAGA RD.
(40 M.P.H.)
1" = 50'
3
TC-03
SUBMITTAL TO:
SHEET NO.
OF
PREPARED BY
PROJECT ENGINEER
CHECKED
DRAWN
SCALE
PREPARED DATE
REVISION DATE
5
Traffic & Environmental Group
COASTAL
1519 E Chapman Ave. #14
Fullerton, CA 92831
Office (714) 941-9255
www.ctaeg.com
B.H.
M.G.S.
M.G.S.
LOCATION:
CONTRACTOR INFO:
TYPE OF WORK:
TRAFFIC STAMP
CIVIL STAMP
FULL TRAFFIC MAINTENANCE
217 LEWIS COURT
CORONA, CA 92882
OFFICE: 951-520-9990
STREET IMPROVEMENTS
PROJECT #:C1160
J.A.A.
05/13/2024
CITY OF TEMECULA
MARGARITA ROAD
00 50'100'25'
1"1/2"1/4"0
SCALE: 1" = 50'-0"
2"
N
MATCH LINE - SEE C-C ON SHEET TC-02
MA
T
C
H
L
I
N
E
-
S
E
E
D
-
D
MA
T
C
H
L
I
N
E
-
S
E
E
D
-
D
MA
T
C
H
L
I
N
E
-
S
E
E
E
-
E
MA
T
C
H
L
I
N
E
-
S
E
E
E
-
E
MA
T
C
H
L
I
N
E
-
S
E
E
F
-
F
O
N
S
H
E
E
T
T
C
-
0
4
WORK HOURS
MONDAY - FRIDAY
7:00 AM - 2:00 PM
INSTALL R3-5R
OR R3-2 SIGN.
INSTALL R3-5R
OR R3-2 SIGN.
COORDINATE WITH THE CITY OF TEMECULA
PUBLIC WORKS DEPARTMENT TO PLACE THE
SIGNALIZED INTERSECTION ON FLASH
OPERATION.
INSTALL R3-5R
OR R3-2 SIGN.
PROVIDE LT POCKET GAP
AND KEEP OPEN UNTIL WORK
BEING PERFORMED AT THIS
LOCATION.
PROVIDE LT POCKET GAP
AND KEEP OPEN UNTIL WORK
BEING PERFORMED AT THIS
LOCATION.
KEEP OPEN TO MAINTAIN
DRIVEWAY ACCESS UNTIL
WORK BEING PERFORMED AT
THIS LOCATION.
KEEP OPEN TO MAINTAIN
DRIVEWAY ACCESS UNTIL
WORK BEING PERFORMED AT
THIS LOCATION.
COM
M
U
N
I
T
Y
ENTR
A
N
C
E
/
E
X
I
T
COM
M
U
N
I
T
Y
ENT
R
A
N
C
E
/
E
X
I
T
CAL
A
B
R
I
A
D
R
.
(25
M
.
P
.
H
.
)
AVE
N
I
D
A
C
I
M
A
D
E
L
S
O
L
(25
M
.
P
.
H
.
)
CO
M
M
U
N
I
T
Y
ENT
R
A
N
C
E
/
E
X
I
T
MAR
G
A
R
I
T
A
R
D
.
(45
M
.
P
.
H
.
)
AVE
N
I
D
A
C
I
M
A
D
E
L
S
O
L
MAR
G
A
R
I
T
A
R
D
.
(45
M
.
P
.
H
.
)
CHESNUT DR.
(25 M.P.H.)
AVENIDA
S
O
N
O
M
A
(25 M.P.
H
.
)
MARG
A
R
I
T
A
R
D
.
(45
M
.
P
.
H
.
)
1" = 50'
4
TC-04
SUBMITTAL TO:
SHEET NO.
OF
PREPARED BY
PROJECT ENGINEER
CHECKED
DRAWN
SCALE
PREPARED DATE
REVISION DATE
5
Traffic & Environmental Group
COASTAL
1519 E Chapman Ave. #14
Fullerton, CA 92831
Office (714) 941-9255
www.ctaeg.com
B.H.
M.G.S.
M.G.S.
LOCATION:
CONTRACTOR INFO:
TYPE OF WORK:
TRAFFIC STAMP
CIVIL STAMP
FULL TRAFFIC MAINTENANCE
217 LEWIS COURT
CORONA, CA 92882
OFFICE: 951-520-9990
STREET IMPROVEMENTS
PROJECT #:C1160
J.A.A.
05/13/2024
CITY OF TEMECULA
MARGARITA ROAD
00 50'100'25'
1"1/2"1/4"0
SCALE: 1" = 50'-0"
2"
N
MA
T
C
H
L
I
N
E
-
S
E
E
F
-
F
O
N
S
H
E
E
T
T
C
-
0
3
MATCH LINE - SEE G-G
MATCH LINE - SEE G-G
WORK HOURS
MONDAY - FRIDAY
7:00 AM - 2:00 PM
INSTALL R3-5R
OR R3-2 SIGN.
INSTALL R3-5R
OR R3-2 SIGN.
PERFORM THIS VALVE CAN REPAIR AS PART
OF PHASE 2 (OUTSIDE LANE CLOSURE
DESIGN) IF POSSIBLE TO AVOID JOG IN LANE
ALIGNMENT AT INTERSECTION.
MARGA
R
I
T
A
R
D
.
(45 M.
P
.
H
.
)
COM
M
U
N
I
T
Y
ENTR
A
N
C
E
/
E
X
I
T
COM
M
U
N
I
T
Y
ENT
R
A
N
C
E
/
E
X
I
T
CAL
A
B
R
I
A
D
R
.
(25
M
.
P
.
H
.
)
AVE
N
I
D
A
C
I
M
A
D
E
L
S
O
L
(25
M
.
P
.
H
.
)
CO
M
M
U
N
I
T
Y
ENT
R
A
N
C
E
/
E
X
I
T
MAR
G
A
R
I
T
A
R
D
.
(45
M
.
P
.
H
.
)
1" = 50'
5
TC-05
SUBMITTAL TO:
SHEET NO.
OF
PREPARED BY
PROJECT ENGINEER
CHECKED
DRAWN
SCALE
PREPARED DATE
REVISION DATE
5
Traffic & Environmental Group
COASTAL
1519 E Chapman Ave. #14
Fullerton, CA 92831
Office (714) 941-9255
www.ctaeg.com
B.H.
M.G.S.
M.G.S.
LOCATION:
CONTRACTOR INFO:
TYPE OF WORK:
TRAFFIC STAMP
CIVIL STAMP
FULL TRAFFIC MAINTENANCE
217 LEWIS COURT
CORONA, CA 92882
OFFICE: 951-520-9990
STREET IMPROVEMENTS
PROJECT #:C1160
J.A.A.
05/13/2024
CITY OF TEMECULA
MARGARITA ROAD
00 50'100'25'
1"1/2"1/4"0
SCALE: 1" = 50'-0"
2"
N
WORK HOURS
MONDAY - FRIDAY
7:00 AM - 2:00 PM
CLOSE LT POCKET AND ADD
APPROPRIATE SIGNS DURING
THIS WORK.
SEE COMMENT ON PREVIOUS SHEET.
EXTEND TRAFFIC CONTROL TO
REPAIR VALVE CAN AT CHESTNUT DR.
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\FORMS\Permit Applications\EP App.docx Page 1 of 2 Revised: 05/13/2019
APPLICATION INFORMATION PA No.: PERMIT NO.:
Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching
Signing & Striping Traffic Signal Miscellaneous (SPECIFY BELOW)
The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as
follows:
Name(s) of street(s) and/or street address:
Utility Work Order #: Start Date: End Date:
In consideration of granting this application, all applicants including utility companies hereby agree to:
1. If applicable, submit two (2) sets of Construction Drawings along with two (2) sets of the appropriate Traffic Control Plans, proof
of City Business License for all parties involved, proof of Contractor’s License along with this application at the time of submittal.
See the Traffic Control Plan Checklist for details.
2. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against
any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or dam age to
persons or property happening or occurring as a proximate result of any work under taken under the permit granted pursuant to
this application. (See below for specific liability insurance requirements.)
3. Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City Engineer.
4. Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working days prior
to commencing construction. Hold a pre-construction meeting prior to the start of construction. The developer/general
contractor must be present for the timely request of inspections.
5. Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works Construction, City of
Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all applicable rules and regulations
for the City of Temecula and other public agencies having jurisdiction.
LIABILITY INSURANCE REQUIREMENTS
PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED EQUIVALENT WITH
THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE CONTRACTOR, THE CITY AND THE
OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED.
THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR BY THE
CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT ENCROACH MENT PERMIT.
LD24-0289
x
6/10/2024 6/10/2024
WO391381
Margarita Rd from Solano Way to Avenida Barca
NPG will be resurfacing 20 valve lids that are failing causing a safety issue on Margarita Rd from Solano Way to Avenida Barca
I spoke with Ryan and we want to schedule this work after school is out for summer break.
LD24-2088
CLEARED BY
CITY OF TEMECULA
PUBLIC WORKS
Tricia.ortega 06/10/2024
06/10/2024 06/10/2024
06/10/20
Land Development
Encroachment Permit
41000 Main Street
Temecula, Ca 92590
Phone: 951-694-6444
www.temeculaca.gov
R:\LAND DEVELOPMENT DIVISION\FORMS\Permit Applications\EP App.docx Page 2 of 2 Revised: 05/13/2019
Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum
limits of insurance coverage shall be as follows:
a. General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If
Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it
shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
b. Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage.
c. Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident
for bodily injury or disease.
d. Course of Construction: Completed value of the project.
There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approach
located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at
least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the
encroachment permit:
BODILY INJURY $250,000.00 EACH PERSON
$500,000.00 EACH OCCURANCE
$500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
PROPERTY DAMAGE $100,000.00 EACH OCCURANCE
$250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS
A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to
the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing
the City named as an additional insured shall be attached to the application.
The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this
application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges
that this application will be made a part of the encroachment permit.
APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED)
Company Name:
Mailing Address:
Contact: Phone #: E-mail:
I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the
permittee and bind the permittee to the agreements contained herein and any conditions of the permit.
Authorized Signature: Date Applied:
CONTRACTOR’S INFORMATION
Company Name:
Mailing Address:
Contact: Phone #: 24-HR Emergency #:
State Contractor’s License #: Class: City Business License #:
Rancho California Water District
P.O. Box 9017 Temecula Ca. 92589-9017
Jeff Dixon
NPG INC.
1354 Jet Way Perris Ca. 92571
Jeff Nelson 951-9400200 951 491 1808
664779 A,B, C-12
Jeff Dixon 909-322-8549 dixonj@ranchowater.com
5/13/2024