Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LD24-1903
Permit Number: LD24-1903 LD - Utilities/ Excavation - Parallel Issued: 08/08/2024 Expired: 06/09/2025 Job Address: 28371 Equity Dr Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Spectrum/ Charter Communications 7337 Central Ave Riverside, CA 92504 (951) 406-1689 Owner: Optimum Inc 17890 Valley Blvd Bloomington, CA 92316 (909) 990-0767 Contractor: Utility Work Order Number: 5052938 Description: Charter Prism 5052938 WORK HOURS SHALL BE SUNDAY – THURSDAY, NO HOLIDAYS, 9:00pm – 5:00am Location: Ynez Rd W/S 370' N/O County Center Dr to Equity Dr Proposed work: Install four (4) new Charter vaults per "CONSTRUCTION DESIGN, LD24-1903" All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD24-1903 Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Public Works Inspector. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of Page 1 of 3*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD24-1903 LD - Utilities/ Excavation - Parallel project Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date Page 2 of 3 Permit Number: LD24-1903 LD - Utilities/ Excavation - Parallel City Engineer or Authorized Representative Date 08/08/2024 Page 3 of 3 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULAENGINEER'S SEAL FOR TRAFFIC CONTROL PLANS CONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. Updated Traffic Control Notes to rev -AJP AJP 1/26/12 TRAFFIC CONTROL GENERAL NOTES (REV'D. 06/06/24): CENTRAL AVE RIVERSIDE CA2 OFFICE () 26-6 CHARTER 1 2 UTILITY COMPANY: EXISTING NO TURN LANE TRAFFIC CONE FLASHING ARROW SIGN (FAS) EXISTING TURN ONLY LANE BARRICADE WORK ZONE TRAFFIC SIGNAL HIGH LEVEL WARNING DEVICE (WITH CALTRANS & MUTCD CODE) SIGN (WITH CALTRANS CODE) TRAFFIC FLOW DIRECTION FLAGGER S DETAIL SHEET LEGEND CONE SPACING - 45' MAXIMUM AT LEAST TWO DAYS UG SERVICE ALERT OF SOUTHERN CALIFORNIA BEFORE YOU DIG DIGALERT Call TOLL FREE 1-800-227-2600 CROSS STREETS YNEZ RD & EQUITY DR PRISM#: 5052938 NTS N DESIGN ORIENTATION VICINITY MAP 1.ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CALIFORNIA MUTCD) AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 2.THE CITY ENGINEER OR HIS REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO ASSURE PUBLIC SAFETY. 3.ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW WHEN NOT IN USE. 4.WORK HOURS SHALL BE RESTRICTED TO THE PERIOD BETWEEN 8:30 A.M. AND 3:30 P.M., MONDAY THROUGH FRIDAY, UNLESS APPROVED OTHERWISE. WHEN NIGHT WORK IS REQUIRED, WORK HOURS SHALL BE 9 P.M. TO 5 A.M., SUNDAY THROUGH THURSDAY. 5.TRENCHES MUST BE BACK FILLED OR PLATED DURING NON-WORKING HOURS. STEEL PLATES SHALL HAVE ASPHALTIC CONCRETE BERM ON ALL EDGES. ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM STREET AT END OF EACH DAY AND AT THE END OF THE JOB. THE STREET SHALL BE IN DRIVABLE CONDITION AT ALL TIMES. 6.PEDESTRIAN CONTROLS SHALL BE PROVIDED AS SHOWN ON THE PLANS. 7.TEMPORARY "NO PARKING" SIGNS WILL BE POSTED 24 HOURS PRIOR TO COMMENCING WORK. 8.ACCESS TO DRIVEWAYS WILL BE MAINTAINED AT ALL TIMES UNLESS OTHER ARRANGEMENTS ARE MADE. 9.THE CONTRACTOR SHALL REPLACE WITHIN 72 HOURS, ALL TRAFFIC SIGNAL LOOP DETECTORS DAMAGED DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL REPLACE WITHIN 24 HOURS, ALL STRIPING REMOVED OR DAMAGED BY CONSTRUCTION WORK. (STRIPING MAY BE REPLACED TEMPORARILY WITH TAPE.) 11.ALL WORKERS SHALL BE EQUIPPED WITH AN ORANGE VEST (OR A REFLECTIVE VEST AT NIGHT). ALL FLAGGERS SHALL ALSO BE EQUIPPED WITH A HARD HAT, C28 "STOP/SLOW" PADDLE AND SHALL BE TRAINED IN THE PROPER FUNDAMENTALS OF FLAGGING TRAFFIC. 12.ANY WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL OPERATIONS SHALL BE COORDINATED WITH THE CITY OF TEMECULA’S TRAFFIC DIVISION, 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. CONTACT THE CITY’S TRAFFIC DIVISION AT (951) 694 -6411. 13.THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES 24 HOURS PER DAY AND 7 DAYS PER WEEK. 14.A MINIMUM OF TWELVE (12) FOOT TRAVEL LANES MUST BE MAINTAINED UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS. 15.ALL NIGHT WORK WILL REQUIRE WRITTEN APPROVAL FROM THE DEPARTMENT OF PUBLIC WORKS. LANE CLOSURES, ROAD DETOURS, ROAD CLOSURES, AND TRAFFIC SIGNAL MODIFICATIONS ASSOCIATED WITH OVERNIGHT CONSTRUCTION ACTIVITIES WILL REQUIRE WARNING SIGNS BE PLACED AT LEAST ONE WEEK IN ADVANCE OF STARTING CONSTRUCTION. 16. A SOLAR POWERED FLASHING ARROW BOARD SHALL BE REQUIRED ON ALL ARTERIAL STREET LANE CLOSURES. 17.IF THE PERMIT APPLICANT DETERMINES THAT CONDUIT INSTALLATION WILL BE BY THE BORING MACHINE METHOD, THE TRENCH PATCH FOR THE UTILITY OBSERVATION EXCAVATION WILL BE THE SAME AS FOR OPEN TRENCH EXCAVATION METHOD. THIS WILL PROVIDE A SINGLE CONTINUOUS SURFACE RESTORATION ELIMINATING THE MULTIPLE PENETRATION INTO THE PUBLIC ROADWAY TO ALL REQUIREMENTS IN CITY STANDARD DRAWING # 407 (REFERENCE ALL SHEETS) FOR TRENCH PATCH. 18.ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR CREATES SEVERE CONGESTION MAY BE SHUT DOWN BY CITY TRAFFIC ENGINEERS, CITY FIELD INSPECTION, OR THE POLICE DEPARTMENT. 19.CONES AND DELINEATORS SHALL HAVE REFLECTORIZED SLEEVES FOR NIGHT WORK. 20.IF PARKING IS ALLOWED IN ADVANCE WARNING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES. APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES. HHS OFFICE () 21- CSLB 16 _ CLASS A C1 C1 B C- 22 S GROVE AVENUE ONTARIO CA 161 ENGINEER'S INFORMATION PTIMUM INC GENERAL ENGINEERING CONTRACTORS OFFICE () -6 CSLB 121 _ CLASS C- A C1 1 VALLEY BLVD BLOOMINGTON CA EMAIL PERMITSOPTIMUM#GMAILCOM PERMIT ENG HENRY HOPKINS (1) 6- TCP ENGINEER CHIDI ONUMONU WORK HOURS SUNDAY - THURSDAY NO HOLIDAYS AM - PM YNEZ RD & E4UITY DR TEMECULA - OPTIMUM INC PENDING H HOPKINS CITY OF TEMECULA PO#: 4502212840 PRISM#: 5052938 PUBLIC WORKS DEPARTMENT AKIDA L WARMLEY -26-22 YNEZ RD & E4UITY DR V V V V WORK DURATION ·5 DAYS FOR EXCAVATION / BORE / TRENCH WORK ·2 DAY FOR RESTORATION ·2 DAY TO PULL CABLE ·9 DAYS OF TRAFFIC CONTROL SET UP TOTAL # OF WORK DAYS: 9 SCOPE OF WORK: ·BORE TO INSTALL CONDUITS FOR CHARTER SPECTRUM (1,369'). ·SET NEW CHARTER VAULTS (4). NEW VAULT NEW VAULT NEW VAULT V NEW VAULT EX VAULT BORE (16 ) TCP 11 12 WORK AREA MUTCD MODIFED (SEE PAGE 2) PROPOSED SIGNS ERICK ESCOBEDO TRAFFIC ENGINEER 3002 TYPICAL DRIVEWAY APPROACH TYPICAL DRIVEWAY APPROACH TYPICAL DRIVEWAY APPROACH AHEAD CLOSED RIGHT LANE C20(CA) LANE CLOSED END ROAD WORK G20-2 W4-2R 1 C(CA) SHARE THE ROAD SC11(BIKE) W11-1 W16-1 ROAD AHEAD W20-1 WORK AHEAD CLOSED BIKE LANE C20(BIKE) 07/29/24 8/4/20 24 ENGINEER'S INFORMATIONENGINEER'S SEALCONTRACTOR: RECOMMENDED BY:DATE: ACCEPTED BY:DATE: R.T.E. NO. Updated Traffic Control Notes to rev -AJP AJP 1/26/12 C(NT5A/ A9( 5,9(5S,'( CA2 2)),C( 26-6 CHARTER PT,0U0 ,NC *(N(5A/ (N*,N((5,N* C2NT5ACT25S 2)),C( -6 CS/% 121 _ C/ASS C- A C1 1 9A//(< %/9' %/220,N*T2N CA 2 2 UTILITY COMPANY: AT /(AST T:2 'A<S U* S(59,C( A/(5T 2) S2UT+(5N CA/,)25N,A %()25( <2U ',* DIGALERT Call T2// )5(( 1-800-227-2600 ++S 2)),C( 21- CS/% 16 _ C/ASS A C1 C1 % C- 22 S *529( A9(NU( 2NTA5,2 CA 161 PUBLIC WORKS - TRAFFIC ENGINEERING DIVISION CITY OF TEMECULA FOR TRAFFIC CONTROL PLANS CROSS STREETS N2T( S,'(:A/.S S+A// 5(0A,N 2P(N 'U5,N* C2NST5UCT,2N SC2P( 2) :25. :,// N2T A))(CT P('(ST5,ANS P/AC( N2 PA5.,N* S,*NS 2 +2U5S P5,25 T2 :25. NTS N DESIGN ORIENTATION PROPOSED TCP 1.1 (0A,/ P(50,TS2PT,0U0#*0A,/C20 P(50,T (N* +(N5< +2P.,NS 1 6- TCP (N*,N((5 C+,', 2NU02NU YNEZ RD & EQUITY DR WORK HOURS SUN'A< - T+U5S'A< N2 +2/,'A<S A0 - P0 <N(= 5' (4U,T< '5 T(0(CU/A - 2PT,0U0 ,NC P(N',N* + +2P.,NS CITY OF TEMECULA PO#: 4502212840 PRISM#: 5052938 PUBLIC WORKS DEPARTMENT A.,'A / :A50/(< -26-22 1 %, . ( / A N ( TA P ( 5 1 2 :2 5 . = 2 N ( 0( 5 * , N * T A P ( 5 CU 5 % 2 5 ( P CU 5 % 2 5 ( P '2 : N ST 5 ( A 0 0 , N / 1 0 A ; S, * N SP A C , N * S, * N SP A C , N * S, * N SP A C , N * S P52P2S(' S,*NS AHEAD CLOSED RIGHT LANE C20(CA) LANE CLOSED END ROAD WORK G20-2 W4-2R 1 CCA S+A5( T+( 52A' SC11(BIKE) W11-1 W16-1 ROAD AHEAD W20-1 WORK AHEAD CLOSED BIKE LANE C20(BIKE) S, * N SP A C , N * PRISM#: 5052938 ERICK ESCOBEDO TRAFFIC ENGINEER 3002 12 0 , N / A N ( 6 S T 5 ( ( T 22 0 A ; 1 % U ) ) ( 5 07/29/24 8/4/20 24 PRISM#: 5052938 JOB NOTES: 1.The existence and location of any underground utility pipes or structures was obtained by a search of the available records and field conditions. Additional underground facilities may exist, or the location of the facilities may differ from the locations shown on these plans. The contractor shall, at his own expense, determine the exact location of all such underground facilities prior to commencement of any work or any action which may damage such facilities or interfere with their continuous and proper operation. 2.All plans must be checked and approved by the governmental agency, or agencies, having jurisdiction over the roadways shown on this plan being put into effect. All plans are intended to conform to the Manual on Uniform Traffic Control Devices. The customer/contractor is responsible for ascertaining addition agency requirements for work hours allowed, noise abatement, and other rules and regulations. 3.The temporary traffic controls must be installed per the agency approved plan to be effective. Field changes, other than minor adjustment, must be authorized in writing be a representative of the governmental agency, or agencies, having jurisdiction over the roadway. 4.Plan implementation and device placement should be performed by experienced and trained personnel. 5.Temporary traffic control must be monitored and maintained by the customer/contractor to remain effective. Monitoring and maintenance frequency is dictated by field conditions, but not less than daily. 6.Optimum Inc. has no control over, or responsibility for traffic control plan implementation and inspections performed by others. Users agree to indemnify Optimum Inc. for claims made regarding failure to install, maintain or remove controls per approved traffic control plans. PTIMUM, INC. GENERAL ENGINEERING CONTRACTORS OFFICE: (909) 990-0767 CSLB#: 817291 | CLASS: C-7 A C31 17890 VALLEY BLVD BLOOMINGTON CA CONSTRUCTION SHEET 1 OF 4 7337 CENTRAL AVE RIVERSIDE CA.92504 OFFICE: (833) 267-6097 CHARTER TP TELEPHONE PEDESTAL T TELEPHONE VAULT EV ELECTRIC VAULT CATV VAULT IV IRRIGATION VAULT UTILITY POLE FIRE HYDRANT UNDERGROUND VALVE MAN HOLE F M SL STREET LIGHT VAULT TS TRAFFIC SIGNAL VAULT WV WATER VAULT CATV PEDESTALABOVE GROUND VALVE GV GAS VAULT FO FIBER OPTIC VAULT CV COMMUNICATIONS VAULT ELECTRIC LINEE GAS LINEG TELEPHONE LINET WATER LINEW CATV LINETV TRAFFIC SIGNAL LINETS SEWER LINES STORM DRAIN LINESD FIBER OPTIC LINEFO PETROLUEM LINEP STREET LIGHTSSL INDUSTRIAL WASTEIW OIL LINEO FUEL LINEF RECLAIMED WATERRC T PROPOSED CONSTRUCTION PROPOSED HDD BORE / CONDUIT INSTALLATION PROPOSED TRENCH / CONDUIT INSTALLATION PROPOSED POTHOLE (2'x2') PROPOSED EXIT / MISSILE BORE PIT (2'x4') PROPOSED BORE PIT (3'x6') CATV PROPOSED NEW CATV VAULT (2'x3') UTILITY / LINE LEGENDEXISTING OBJECTS CF EOP EDGE OF PAVEMENT CURB FACE RIGHT OF WAY (CITY) CENTERLINE (C/L) N DESIGN ORIENTATIONREVISIONS REV#DATE DESCRIPTION 36" L E N G T H 24" W I D T H 18 " H E I G H T 3" CONDUIT 36 " T Y P . CO N D U I T D E P T H 18 " D E P T H EXISTING GRADE OR SURFACE OF CONCRETE MOUNT FLUSH WITH GRADE 6" ROCK BASE (3/4" GRAVEL) 36" L E N G T H 18" W I D T H 20 " H E I G H T CO V E R 18 " H E I G H T BA S E 21 " A B O V E GR A D E COVER 3" CONDUIT 36 " T Y P . CO N D U I T D E P T H EXISTING GRADE OR SURFACE OF CONCRETE 17 " D E P T H BASE 6" ROCK BASE (3/4" GRAVEL) Ø 2. 8 6 4 " Ø 3 . 1 6 4 " 0. 3 0 0 " TYPICAL CATV 2'x3' VAULT DETAIL TYPICAL CATV PEDESTAL DETAIL CONDUIT DETAIL 6' 3'2' 4' 3" HDPE MIN. 36" EXIST. GRADESEND BORE PIT RECEIVE BORE PIT 3" CONDUIT FIBER OPTIC CABLE TRACER WIRE 3" HDPE FIBER OPTIC CABLE 3/8" TRACER WIRE 3" CONDUIT 3" CONDUIT TYPICAL DIRECTIONAL BORE DETAIL TRACER WIRE DETAIL INTERDUCT DETAIL EXISTING GRADE HORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 4' 36" - 48" COVER C/ L O F S T R E E T 12" CLEARANCE PLACE 1-3" CONDUIT AT 36" - 48" DEPTH EXISTING UTILITIES (NOTE: DEPTH MAY VARY FOR DIFFERENT UTILITIES) TYPICAL UTILITY CLEARANCE (PROTECT IN PLACE AT ALL EX. UTILITY CROSSINGS) N.T.S. S/W D/W PH R/W EX C/L EOP CF ABBREVIATIONS V PED · · · · · · PIPE AND WIRE TRENCHING:STANDARD NO 117: VICINITY MAP WORK DURATION: ·5 DAYS FOR EXCAVATION / BORE / TRENCH WORK ·2 DAY FOR RESTORATION ·2 DAY TO PULL CABLE ·9 DAYS OF TRAFFIC CONTROL SET UP TOTAL # OF WORK DAYS: 9 SCOPE OF WORK: ·BORE TO INSTALL CONDUITS FOR CHARTER SPECTRUM (1,369'). ·SET NEW CHARTER VAULTS (4). YNEZ RD & EQUITY DR TEMECULA - OPTIMUM INC PENDING H HOPKINS CITY OF TEMECULA PO#: 4502212840 PRISM#: 5052938 PUBLIC WORKS DEPARTMENT AKIDA L WARMLEY 04-26-2024 YNEZ RD & EQUITY DR CONSTRUCTION TOTALS (TOTAL AMOUNTS FOR ENTIRE ROUTE) V V V V NEW VAULT NEW VAULT NEW VAULT V NEW VAULT EX. VAULT BORE (1,369') – ➢ ➢ ➢ ➢ ➢ ➢ ➢ ➢ UTILITY PLAN GENERAL NOTES:REV 03-13-2024 CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 06/26/2024 06/26/2024 06/26/2024 06/26/20 ELECTRIC LINEE GAS LINEG TELEPHONE LINET WATER LINEW CATV LINETV TRAFFIC SIGNAL LINETS SEWER LINES STORM DRAIN LINESD FIBER OPTIC LINEFO PETROLUEM LINEP STREET LIGHTSSL INDUSTRIAL WASTEIW OIL LINEO FUEL LINEF RECLAIMED WATERRC PROPOSED CONSTRUCTION PROPOSED HDD BORE / CONDUIT INSTALLATION PROPOSED TRENCH / CONDUIT INSTALLATION PROPOSED POTHOLE (2'x2') PROPOSED EXIT / MISSILE BORE PIT (2'x4') PROPOSED BORE PIT (3'x6') CATV PROPOSED NEW CATV VAULT (2'x3') UTILITY / LINE LEGEND CF EOP EDGE OF PAVEMENT CURB FACE RIGHT OF WAY (CITY) CENTERLINE (C/L) N DESIGN ORIENTATIONREVISIONS REV#DATE DESCRIPTION 00 40'80' CONSTRUCTION SHEET 2 OF 4 JOB NOTES: 1.The existence and location of any underground utility pipes or structures was obtained by a search of the available records and field conditions. Additional underground facilities may exist, or the location of the facilities may differ from the locations shown on these plans. The contractor shall, at his own expense, determine the exact location of all such underground facilities prior to commencement of any work or any action which may damage such facilities or interfere with their continuous and proper operation. 2.All plans must be checked and approved by the governmental agency, or agencies, having jurisdiction over the roadways shown on this plan being put into effect. All plans are intended to conform to the Manual on Uniform Traffic Control Devices. The customer/contractor is responsible for ascertaining addition agency requirements for work hours allowed, noise abatement, and other rules and regulations. 3.The temporary traffic controls must be installed per the agency approved plan to be effective. Field changes, other than minor adjustment, must be authorized in writing be a representative of the governmental agency, or agencies, having jurisdiction over the roadway. 4.Plan implementation and device placement should be performed by experienced and trained personnel. 5.Temporary traffic control must be monitored and maintained by the customer/contractor to remain effective. Monitoring and maintenance frequency is dictated by field conditions, but not less than daily. 6.Optimum Inc. has no control over, or responsibility for traffic control plan implementation and inspections performed by others. Users agree to indemnify Optimum Inc. for claims made regarding failure to install, maintain or remove controls per approved traffic control plans. TP TELEPHONE PEDESTAL T TELEPHONE VAULT EV ELECTRIC VAULT CATV VAULT IV IRRIGATION VAULT UTILITY POLE FIRE HYDRANT UNDERGROUND VALVE MAN HOLE F M SL STREET LIGHT VAULT TS TRAFFIC SIGNAL VAULT WV WATER VAULT CATV PEDESTALABOVE GROUND VALVE GV GAS VAULT FO FIBER OPTIC VAULT CV COMMUNICATIONS VAULT T EXISTING OBJECTS S/W D/W PH R/W EX C/L EOP CF ABBREVIATIONS V PED · · · · · · PTIMUM, INC. GENERAL ENGINEERING CONTRACTORS OFFICE: (909) 990-0767 CSLB#: 817291 | CLASS: C-7 A C31 17890 VALLEY BLVD BLOOMINGTON CA 7337 CENTRAL AVE RIVERSIDE CA.92504 OFFICE: (833) 267-6097 CHARTER #-C #-A #-D _____ IN CONCRETE _____ IN ASPHALT _____ IN DIRT/GREENBELT CALLOUT ABBREVIATIONS TREN (TRENCH TO INSTALL 3" UG CONDUIT) BORE (BORE TO INSTALL 3" UG CONDUIT) BP (BORE PIT 3'x6') MBP (MISSILE BORE PIT 2'x4') PH (POTHOLE 2'x2') V (CATV VAULT) | P (CATV PEDESTAL) R&R (REMOVE & REPLACE) ##' ##- CALLOUT DETAILS XX-X ##' #-EX _____ EXISTING CONSTRUCTION TOTALS (TOTAL AMOUNTS FOR ENTIRE ROUTE) YNEZ RD & EQUITY DR TEMECULA - OPTIMUM INC PENDING H HOPKINS CITY OF TEMECULA PO#: 4502212840 PRISM#: 5052938 PUBLIC WORKS DEPARTMENT AKIDA L WARMLEY 04-26-2024 CF CF EO P EO P CF CF EO P EO P EO P V 2'x4' MBP-D 2'x4' MBP-D 2'x3' V4-D 2'x4' MBP-D 1 | 3" 304' BORE 1 | 3" 25' BORE 1 | 3" 8' BORE 13' ROW 2' 2' 13' ROW 2' PRISM#: 5052938 ELECTRIC LINEE GAS LINEG TELEPHONE LINET WATER LINEW CATV LINETV TRAFFIC SIGNAL LINETS SEWER LINES STORM DRAIN LINESD FIBER OPTIC LINEFO PETROLUEM LINEP STREET LIGHTSSL INDUSTRIAL WASTEIW OIL LINEO FUEL LINEF RECLAIMED WATERRC PROPOSED CONSTRUCTION PROPOSED HDD BORE / CONDUIT INSTALLATION PROPOSED TRENCH / CONDUIT INSTALLATION PROPOSED POTHOLE (2'x2') PROPOSED EXIT / MISSILE BORE PIT (2'x4') PROPOSED BORE PIT (3'x6') CATV PROPOSED NEW CATV VAULT (2'x3') UTILITY / LINE LEGEND CF EOP EDGE OF PAVEMENT CURB FACE RIGHT OF WAY (CITY) CENTERLINE (C/L) N DESIGN ORIENTATIONREVISIONS REV#DATE DESCRIPTION 00 40'80' CONSTRUCTION SHEET 3 OF 4 JOB NOTES: 1.The existence and location of any underground utility pipes or structures was obtained by a search of the available records and field conditions. Additional underground facilities may exist, or the location of the facilities may differ from the locations shown on these plans. The contractor shall, at his own expense, determine the exact location of all such underground facilities prior to commencement of any work or any action which may damage such facilities or interfere with their continuous and proper operation. 2.All plans must be checked and approved by the governmental agency, or agencies, having jurisdiction over the roadways shown on this plan being put into effect. All plans are intended to conform to the Manual on Uniform Traffic Control Devices. The customer/contractor is responsible for ascertaining addition agency requirements for work hours allowed, noise abatement, and other rules and regulations. 3.The temporary traffic controls must be installed per the agency approved plan to be effective. Field changes, other than minor adjustment, must be authorized in writing be a representative of the governmental agency, or agencies, having jurisdiction over the roadway. 4.Plan implementation and device placement should be performed by experienced and trained personnel. 5.Temporary traffic control must be monitored and maintained by the customer/contractor to remain effective. Monitoring and maintenance frequency is dictated by field conditions, but not less than daily. 6.Optimum Inc. has no control over, or responsibility for traffic control plan implementation and inspections performed by others. Users agree to indemnify Optimum Inc. for claims made regarding failure to install, maintain or remove controls per approved traffic control plans. TP TELEPHONE PEDESTAL T TELEPHONE VAULT EV ELECTRIC VAULT CATV VAULT IV IRRIGATION VAULT UTILITY POLE FIRE HYDRANT UNDERGROUND VALVE MAN HOLE F M SL STREET LIGHT VAULT TS TRAFFIC SIGNAL VAULT WV WATER VAULT CATV PEDESTALABOVE GROUND VALVE GV GAS VAULT FO FIBER OPTIC VAULT CV COMMUNICATIONS VAULT T EXISTING OBJECTS S/W D/W PH R/W EX C/L EOP CF ABBREVIATIONS V PED · · · · · · PTIMUM, INC. GENERAL ENGINEERING CONTRACTORS OFFICE: (909) 990-0767 CSLB#: 817291 | CLASS: C-7 A C31 17890 VALLEY BLVD BLOOMINGTON CA 7337 CENTRAL AVE RIVERSIDE CA.92504 OFFICE: (833) 267-6097 CHARTER #-C #-A #-D _____ IN CONCRETE _____ IN ASPHALT _____ IN DIRT/GREENBELT CALLOUT ABBREVIATIONS TREN (TRENCH TO INSTALL 3" UG CONDUIT) BORE (BORE TO INSTALL 3" UG CONDUIT) BP (BORE PIT 3'x6') MBP (MISSILE BORE PIT 2'x4') PH (POTHOLE 2'x2') V (CATV VAULT) | P (CATV PEDESTAL) R&R (REMOVE & REPLACE) ##' ##- CALLOUT DETAILS XX-X ##' #-EX _____ EXISTING CONSTRUCTION TOTALS (TOTAL AMOUNTS FOR ENTIRE ROUTE) YNEZ RD & EQUITY DR TEMECULA - OPTIMUM INC PENDING H HOPKINS CITY OF TEMECULA PO#: 4502212840 PRISM#: 5052938 PUBLIC WORKS DEPARTMENT AKIDA L WARMLEY 04-26-2024 CF CF CF CF CF CF EO P EO P EO P EO P EO P EO P CF CF CF EO P EO P EO P EO P EO P EO P EO P EO P CF CF CF CF CF CF EO P EO P EO P V V 2'x3' V2-D 2'x3' V3-D 3'x6' BP-D 3'x6' BP-D 1 | 3" 358' BORE 2' 13' ROW 2' 13' ROW 2' 13' ROW 2' 14' ROW PRISM#: 5052938 ELECTRIC LINEE GAS LINEG TELEPHONE LINET WATER LINEW CATV LINETV TRAFFIC SIGNAL LINETS SEWER LINES STORM DRAIN LINESD FIBER OPTIC LINEFO PETROLUEM LINEP STREET LIGHTSSL INDUSTRIAL WASTEIW OIL LINEO FUEL LINEF RECLAIMED WATERRC PROPOSED CONSTRUCTION PROPOSED HDD BORE / CONDUIT INSTALLATION PROPOSED TRENCH / CONDUIT INSTALLATION PROPOSED POTHOLE (2'x2') PROPOSED EXIT / MISSILE BORE PIT (2'x4') PROPOSED BORE PIT (3'x6') CATV PROPOSED NEW CATV VAULT (2'x3') UTILITY / LINE LEGEND CF EOP EDGE OF PAVEMENT CURB FACE RIGHT OF WAY (CITY) CENTERLINE (C/L) N DESIGN ORIENTATIONREVISIONS REV#DATE DESCRIPTION 00 40'80' CONSTRUCTION SHEET 4 OF 4 JOB NOTES: 1.The existence and location of any underground utility pipes or structures was obtained by a search of the available records and field conditions. Additional underground facilities may exist, or the location of the facilities may differ from the locations shown on these plans. The contractor shall, at his own expense, determine the exact location of all such underground facilities prior to commencement of any work or any action which may damage such facilities or interfere with their continuous and proper operation. 2.All plans must be checked and approved by the governmental agency, or agencies, having jurisdiction over the roadways shown on this plan being put into effect. All plans are intended to conform to the Manual on Uniform Traffic Control Devices. The customer/contractor is responsible for ascertaining addition agency requirements for work hours allowed, noise abatement, and other rules and regulations. 3.The temporary traffic controls must be installed per the agency approved plan to be effective. Field changes, other than minor adjustment, must be authorized in writing be a representative of the governmental agency, or agencies, having jurisdiction over the roadway. 4.Plan implementation and device placement should be performed by experienced and trained personnel. 5.Temporary traffic control must be monitored and maintained by the customer/contractor to remain effective. Monitoring and maintenance frequency is dictated by field conditions, but not less than daily. 6.Optimum Inc. has no control over, or responsibility for traffic control plan implementation and inspections performed by others. Users agree to indemnify Optimum Inc. for claims made regarding failure to install, maintain or remove controls per approved traffic control plans. TP TELEPHONE PEDESTAL T TELEPHONE VAULT EV ELECTRIC VAULT CATV VAULT IV IRRIGATION VAULT UTILITY POLE FIRE HYDRANT UNDERGROUND VALVE MAN HOLE F M SL STREET LIGHT VAULT TS TRAFFIC SIGNAL VAULT WV WATER VAULT CATV PEDESTALABOVE GROUND VALVE GV GAS VAULT FO FIBER OPTIC VAULT CV COMMUNICATIONS VAULT T EXISTING OBJECTS S/W D/W PH R/W EX C/L EOP CF ABBREVIATIONS V PED · · · · · · PTIMUM, INC. GENERAL ENGINEERING CONTRACTORS OFFICE: (909) 990-0767 CSLB#: 817291 | CLASS: C-7 A C31 17890 VALLEY BLVD BLOOMINGTON CA 7337 CENTRAL AVE RIVERSIDE CA.92504 OFFICE: (833) 267-6097 CHARTER #-C #-A #-D _____ IN CONCRETE _____ IN ASPHALT _____ IN DIRT/GREENBELT CALLOUT ABBREVIATIONS TREN (TRENCH TO INSTALL 3" UG CONDUIT) BORE (BORE TO INSTALL 3" UG CONDUIT) BP (BORE PIT 3'x6') MBP (MISSILE BORE PIT 2'x4') PH (POTHOLE 2'x2') V (CATV VAULT) | P (CATV PEDESTAL) R&R (REMOVE & REPLACE) ##' ##- CALLOUT DETAILS XX-X ##' #-EX _____ EXISTING CONSTRUCTION TOTALS (TOTAL AMOUNTS FOR ENTIRE ROUTE) YNEZ RD & EQUITY DR TEMECULA - OPTIMUM INC PENDING H HOPKINS CITY OF TEMECULA PO#: 4502212840 PRISM#: 5052938 PUBLIC WORKS DEPARTMENT AKIDA L WARMLEY 04-26-2024 CF CF CF CF CF CF EO P EO P EO P EO P EO P EO P CF CF CF CF CF EO P EO P E O P EO P EO P EO P EO PCF CF EO P V V 2'x4' MBP-D 2'x4' MBP-D 2'x4' MBP-D 2'x4' MBP-D 2'x4' MBP-D 2'x4' MBP-D 2'x4' MBP-D 2'x4' MBP-D 2'x3' V1-D 1 | 3" 31' BORE 1 | 3" 40' BORE 1 | 3" 73' BORE 1 | 3" 73' BORE 1 | 3" 108' BORE 1 | 3" 15' BORE 1 | 3" 48' BORE 1 | 3" 18' BORE 1 | 3" 268' BORE 2'x3' V-EX 17' ROW 2' 9.5' 13' 15' ROW 12' ROW 3' 14' ROW 3' 3' PRISM#: 5052938 ACORD® CERTIFICATE OF LIABILITY INSURANCE I DATE (MM/DD/YYYY) � 03/27/2024 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER S & L Risk Management and Insurance Solutions 144 7 Ford St. #103 Redlands, CA 92374 INSURED Optimum, Inc. 17890 Valley Blvd. Bloomington CA 92316 COVERAGES CERTIFICATE NUMBER: CONTACT NAME: PHONE 909-253-77 42IA/C No Extl: E-MAIL service@sandlinsurance.com ADDRESS: INSURER(Sl AFFORDING COVERAGE INSURER A: Insurance Company of the West I rffc Nol: 909-253-7748 NAIC# 27847 INSURER B : Liberty Mutual Fire Insurance Company 23035 INsURERc: Liberty Insurance Corporation 23043 INSURER D : The Ohio Casualty Insurance Co. 24074 INSURER E : Technology Insurance Company 42376 INSURER F: Lloyds of London 32727 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR B B C A E F TYPE OF INSURANCE X COMMERCIAL GENERAL LIABILITY 1 CLAIMS.MADE 0 OCCUR--GEN'L AGGREGATE LIMIT APPLIES PER: Fl 0 PRO-POLICY X JECT OTHER: AUTOMOBILE LIABILITY -X ANY AUTO - DLoc OWNED SCHEDULED AUTOS ONLY AUTOS -HIRED NON-OWNED -AUTOS ONLY -AUTOS ONLY X UMBRELLA LIAB �OCCUR-EXCESS LIAB CLAIMS-MADE OED I I RETENTION $ 10,000 WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y/N ANYPROPRIETOR/PARTNER/EXECUTIVE □ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below Cyber Liability Professional Liabilitv ADDL IM<>n X N/A SUBR POLICY EFF POLICY EXP wvn POLICY NUMBER IMM/DD/YYYYl IMM/DD/YYYYl X TB2-Z91-472786-034 04/01/2024 04/01/2025 AS2-Z91-4 72786-024 04/01/2024 04/01/2025 TH7-Z91-472786-014 04/01/2024 04/01/2025 WSD 5029619 09 04/01/2024 04/01/2025 TCL 1727341 8/1/23 8/1/24 ANE4907 405.23 8/1/23 8/1/24 LIMITS EACH OCCURRENCE DAMAGE TO RENTED PREMISES (Ea occurrence) MED EXP (Any one person) PERSONAL & ADV INJURY GENERAL AGGREGATE PRODUCTS -COMP/OP AGG /E������tflNGLE LIMIT BODILY INJURY (Per person) BODILY INJURY (Per accidenl) PROPERTY DAMAGE !Per accidenll EACH OCCURRENCE AGGREGATE XI �f:TUTE I IOTH-ER E.L. EACH ACCIDENT E.L. DISEASE -EA EMPLOYEE E.L. DISEASE -POLICY LIMITAggregate: Each Occurrenc1 : $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,000,000 50,000 5,000 1,000,000 2,000,000 2,000,000 1,000,000 5,000,000 5,000,000 1,000,000 1,000,000 1,000,000 $1.000,000 $1,000,000 Each Claim/Anni <>nate: $1 000 000 DESCRIPTION OF OPERATIONS/ LOCATIONS/ VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) RE: Proof of Coverage CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE City of Temecula 41000 Main Street Temecula, CA 92590 /ff!'��-I © 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 1 of 2 Revised: 06/16/2020 APPLICATION INFORMATION PERMIT NO.: Type of Encroachment: Street/Storm Drain Sewer/Water Utility Trenching Signing & Striping Traffic Signal Miscellaneous (SPECIFY BELOW) The undersigned hereby applies to excavate, construct and otherwise encroach on City street right-of-way, as follows: Name(s) of street(s) and/or street address: Utility Work Order #: Start Date: End Date: In consideration of granting this application, all applicants including utility companies hereby agree to: 1. If applicable, submit a set of Construction Drawings, Traffic Control Plans, proof of City Business License for all parties involved, proof of Contractor’s License along with this application at the time of submittal. See the Traffic Control Plan Checklist for details. 2. Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. (See below for specific liability insurance requirements.) 3. Remove/relocate any encroachment installed/maintained under this permit, upon written notice from the City Engineer. 4. Notify the Land Development Inspection Division via email at LDInspections@temeculaca.gov at least two (2) working days prior to commencing construction. Hold a pre-construction meeting prior to the start of construction. The developer/general contractor must be present for the timely request of inspections. 5. Comply with the Standard Specifications, most current Improvement Standard Drawings for Public Works Construction, City of Temecula Municipal Code Chapters 13.04 and 18.12, terms and conditions of the permit and all applicable rules and regulations for the City of Temecula and other public agencies having jurisdiction. LIABILITY INSURANCE REQUIREMENTS PROVIDE PROOF OF INSURANCE COVERAGE MEETING THE REQURIEMENTS STATED BELOW OR A CITY ATTORNEY APPROVED EQUIVALENT WITH THE CITY NAMED AS ADDITIONAL INSURED. IN THE EVENT THAT THE INSURANCE IS PROVIDED BY THE CONTRACTOR, THE CITY AND THE OWNER/DEVELOPER MUST BE NAMED AS ADDITIONAL INSURED. THIS REQUREMENT SHALL BE MET BY EITHER THE APPLICANT (DEVELOPER, OWNER, PUBLIC UTILITY AGENCY OR FRANCHISE) OR BY THE CONTRACTOR PERFORMING THE SUBJECT WORK, PRIOR TO BEGININNG ANY WORK PROPOSED UNDER THE SUBJECT ENCROACHMENT PERMIT. BORE TO INSTALL CONDUITS FOR CHARTER SPECTRUM (1,369') and SET NEW CHARTER VAULTS (4) on the West S/O Ynez Rd Equity Dr & Ynez Rd, Temecula, CA 92591 P_5052938 05-17-2024 07-19-2023 LD24-1903 CLEARED BY CITY OF TEMECULA PUBLIC WORKS Tricia.ortega 06/10/2024 06/10/2024 06/10/2024 06/10/20 Land Development Encroachment Permit 41000 Main Street Temecula, Ca 92590 Phone: 951-694-6444 www.temeculaca.gov R:\LAND DEVELOPMENT DIVISION\Forms\Permit Applications\Word\Encroachment Permit App.docx Page 2 of 2 Revised: 06/16/2020 Proof of coverage shall be by certificate (Accord or equivalent) naming the City of Temecula as certificate holder and the minimum limits of insurance coverage shall be as follows: a. General Liability: One million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate lim it shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b. Automobile Liability: One million dollars ($1,000,000) per accident for bodily injury and property damage. c. Worker’s Compensation as required by the State of California; Employer’s Liability: One million dollars ($1,000,000) per accident for bodily injury or disease. d. Course of Construction: Completed value of the project. There is a limited exception to this requirement. Owners of single family homes doing work on the home’s driveway approac h located in the public right-of-way, may use their homeowners insurance with public liability and property damage coverage in at least the following minimum limits and which will name the City of Temecula as an additional insured for the duration of the encroachment permit: BODILY INJURY $250,000.00 EACH PERSON $500,000.00 EACH OCCURANCE $500,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS PROPERTY DAMAGE $100,000.00 EACH OCCURANCE $250,000.00 AGGREGATE PRODUCTS AND COMPLETED OPERATIONS A combined single limit homeowner’s policy with aggregate limits in the amount of $1,000,000.00 will be considered equivalent to the required minimum limits. Homeowners: a copy of the required homeowners insurance and a Certificate of Insurance showing the City named as an additional insured shall be attached to the application. The undersigned applicant and/or contractor states that they have read and agrees to meet all the conditions on this application, including provisions of required liability insurance or a City Attorney approved equivalent, and acknowledges that this application will be made a part of the encroachment permit. APPLICANT’S INFORMATION (THIS SECTION MUST BE COMPLETED) Company Name: Mailing Address: Contact: Phone #: E-mail: I hereby warrant and represent to the City that I am authorized to execute this permit application on behalf of the permittee and bind the permittee to the agreements contained herein and any conditions of the permit. Authorized Signature: Date Applied: CONTRACTOR’S INFORMATION Company Name: Mailing Address: Contact: Phone #: 24-HR Emergency #: State Contractor’s License #: Class: City Business License #: Charter Spectrum Stephen Wade (818) 427-4947 Stephan.wade1@charter.com 7337 Central Ave Riverside, CA 92504 Optimum Inc 17890 Valley Blvd, Bloomington, CA 92316 Henry Hopkins (951) 963-5994 Doug Newell (951) 634-0386 817391 C-7, A, C31 042865 05-03-2024