HomeMy WebLinkAboutLD24-1448Permit Number: LD24-1448
LD - Utilities/ Access to Utility Agency Facilities
Issued: 12/19/2024
Expired: 08/12/2025
Job Address: 28418 Felix Valdez Ave
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Megan Webb
20372 E. Amapola Ave
Orange, CA 92869
(714) 501-1518
Applicant:
Webb Construction
20372 E. Amapola Ave
Orange, CA 92869
(949) 370-0947
Contractor:
Utility Work Order Number:
Description:
Fire Line Install
WORK HOURS SHALL BE MONDAY THRU FRIDAY, NO HOLIDAYS, 9:00 AM -2:00 PM
Location: Felix Valdez E/S 260' N/O Baldaray Cir
Proposed work:
Install fire line from main line to backflow as shown on Pagel Fire Protection "SITE PLAN, LD24-1448"
All facilities shall be installed in accordance with City Standard Drawing 117.
Traffic Control shall be in accordance with approved Traffic Control Plan LD24-1448
Permittee shall comply with all applicable Traffic Control General Notes.
Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times.
Concrete repair shall be in accordance with City Standards and the Greenbook.
Trench repair shall be in accordance with City Standard Drawing 407.
Final compaction test results shall be provided by a soils engineer.
Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be
removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook.
All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of
the City Engineer or their designated assignee.
Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work.
Permittee must also request a final inspection, via LDInspections@temeculaca.gov, to verify completion of
Page 1 of 3
Permit Number: LD24-1448
LD - Utilities/ Access to Utility Agency Facilities
project.
Permittee Responsibilities
This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees,
harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any
accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under
the permit granted pursuant to this application.
Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407.
3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction
area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and
Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the
City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element
streets.
2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133
A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee
shall contact LDInspections@TemeculaCA.gov to schedule a meeting.
1.
4.
Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance.
Contractor is required to provide protection of the City storm drain system.
5.
Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted.
No work shall be allowed during City-recognized holidays."
6.
THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED
PROVISIONS:
All U.S.A. mark outs shall be removed prior to completion of project.7.
8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of
Liability prior to start of work.
9.Should there be any claim against the City and the property owner with the encroachment being the proximate
cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will
remove and bill the owner.
10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is
understood that this permit is limited to the work described herein and that all work is to be done in compliance
with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible
for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or
replacement of any existing improvement damaged by the doing of the work
I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of
Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether
herein stated or not.
11.
12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of
the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit.
******Contractor and all subcontractors shall be present at the pre-construction
meeting; otherwise, the meeting will be rescheduled to a later date******
Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall
be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13.
Permitee Date
Page 2 of 3
Permit Number: LD24-1448
LD - Utilities/ Access to Utility Agency Facilities
City Engineer or Authorized Representative Date
12/19/2024
Page 3 of 3
Call: TOLL FREE 1-800-227-2600
AT LEAST TWO DAYSBEFORE YOU DIG
UG SERVICE ALERT OF SOUTHERN CALIFORNIA
Land Development
Traffic Control Plan General Notes
41000 Main Street
Temecula, CA 92590 Phone: 951-694-6444
www.temeculaca.gov
1.All traffic control devices shall conform to the latest edition of the California Manual on Uniform Traffic ControlDevices (California MUTCD) and the Standard Specifications for Public Works Construction.
2.The City Engineer or his representative has the authority to initiate field changes to assure public safety.
3.All traffic control devices shall be removed from view when not in use.
4.Work hours shall be restricted to the period between 8:30 a.m. and 3:30 p.m., Monday through Friday, unlessapproved otherwise. When night work is required, work hours shall be 9 p.m. to 5 a.m., Sunday throughThursday.
5.Trenches must be back filled or plated during non-working hours. Steel plates shall have asphaltic concreteberm on all edges. All dirt, dust, and debris shall be removed from street at end of each day and at the endof the job. The street shall be in drivable condition at all times.
6.Pedestrian controls shall be provided as shown on the plans.
7.Temporary "NO PARKING" signs will be posted 24 hours prior ta commencing work.
8.Access ta driveways will be maintained at all times unless other arrangements are made.
9.The contractor shall replace within 72 hours. all traffic signal loop detectors damaged during construction.
10.The contractor shall replace within 24 hours, all striping removed or damaged by construction work. (Stripingmay be replaced temporarily with tape.)
11.All Workers shall be equipped with an orange vest (or a reflective vest at night). All flaggers shall also beequipped with a hard hat, C28 "Stop/Slow" paddle and shall be trained in the proper fundamentals of flaggingtraffic.
12.Any work that disturbs normal traffic signal operations shall be coordinated with the City af Temecula's TrafficDivision, 48 hours prior to beginning construction. Contact the City's Traffic Division at (951) 694 -6411.
13.The contractor shall maintain all traffic control devices 24 hours per day and 7 days per week.
14.A minimum af twelve (12) foot travel lanes must be maintained unless otherwise approved by theDepartment of Public Works.
15.All night work will require written approval from the Department af Public Works. Lane closures, road
detours, road closures, and traffic signal modifications associated with overnight construction activities will
require warning signs be placed at least one week in advance of starting construction.
END I ROADWORK I
SCALE: 1 "=40'
0 20' 40' 60'
?2• T.A.N.S.A.T. Rk ZONt=----,r �---------250' BOTH SIDES OF ROAD,--------------------/._�BUFFER;-----------,lkt__ ___________ _ W24-1L
•
@ W6-4 (CONEMOUNTED) C30(C A) @ W6-4 (CONEMOUNTED )
16.A solar powered flashing arrow board shall be required on all arterial street lane closures.
17.If the permit applicant determines that conduit installation will be by the boring machine method, the trenchpatch for the utility observation excavation will be the same as for open trench excavation method. This willprovide a single continuous surface restoration eliminating the multiple penetration into the public roadway toall requirements in City Standard Drawing# 407 (reference all sheets) far trench patch.
18.Any work that creates an undue safety risk or creates severe congestion may be shut down by City TrafficEngineers, City Field Inspection, or the Police Department.
19.Cones and delineators shall have reflectorized sleeves far night work.
20.If parking is allowed in advance warning area, advance warning signs shall be mounted on high level devices.
APPLICANT IS RESPONSIBLE FOR FULL AND COMPLETE REPRESENTATION OF THE ACTUAL ROAD CONDITIONS SHOWN ON THIS PLAN INCLUDING, BUT NOT LIMITED TO EXISTING STRIPING, SIGNING, SIDEWALKS, AND BIKE LANES.
I I
, 1 31 o· SHIF TING TAPER AVE. FELIX V ALDEZ
► •
11 '
KEEP -+ RIGHl R 4-7a (CONE MOUNTED) ..,. ..,. ... iROADWORK G20-2 I
(35 M.P.
� LANE
CLOSED
0 0 C30(CA ) �
•
H)
••
C 30(CA)
KEEP -+ RIGH R4-7a (CONE MOUNTE D)
W20-1 BALDARA y CIR
(25 M.P.H)
SCOPE OF WORK: INSTALL A FIRE LINE FROM MAIN LINE TO THE BACK THE FLOW
WORK HOURS:
SUNDAY THURSDAY NO HOLIDAYS. 9:00AM 2:00PM
DURATION OF WORK:
2 WEEKS
CONTRACTOR SHALL OPEN
ALL DRIVEWAYS TO BE
ACCESSIBLE FOR TRAFFIC
DURING WORKING HOURS
(TYP. FOR ALL DWYS)
LANE CLOSED SCI/ (BIKE)
I
50'NTS 250'NTS
19'
13'
5 7'
◄
/ ENO I
1 ROADWOR K
W11-1 Wl6-1'
<§> W20-1
0 W1-4R
A V C30(CA)
I • I W1-6R
KEEP
RIGHI
R4-7a (CONE MOUNTED)
LANE SCII
CLOSED (BIKE)
i:;20�2-,
W20-5R
LEGEND
<S> W1-4L
WS-4 (CONEMOUNTED)
I • I W1-6L
W11-1, W16-1
PERMIT NO. LD24-1448
250'NTS
w20-1
•
♦,♦
T
♦-
• •
6TH ST. (25 M.P.H)
LEGEND
FLASHING ARROW SIGN
CHANNELIZING DEVICE
HIGH LEVEL WARNING DEVICE {FLAG TREE) W/ PROPOSED SIGN
PROPOSED SIGN AND POST
1YPE I BARRICADE
1YPE I BARRICADE W/ PROPOSED SIGNS
1YPE Ill BARRICADE
1YPE Ill BARRICADE W/ PROPOSED SIGNS
PROPOSED SIGN TO BE POSTED
SIGNALIZED INTERSECTION
CONSTRUCTION AREA
DIRECTION OF TRAFFIC
FLAGGER
TEMPORARY NO PARKING SIGNS T.A.N.S.A.T W/ DATE & TIME OF CONSTRUCTION
CONTRACTOR: WEBB CONSTRUCTION ENGINEER'S SEAL ENGINEER'S INFORMATION CITY OF TEMECULA DRAWING NO.
TRAFFIC CONTROL PLAN
28418 FELIX VALDEZ AVE.
CITY OF TEMECULA
RIVERSIDE COUNTY, CA MARK REVISIONS BY APPR, DATE
RECOMMENDED BY: DATE: ------------
ACCEPTED BY: ___________ DATE: __ _
ERICK ESCOBEDO
TRAFFIC ENGINEER
R.T.E. NO. _______ _
PUBLIC WORKS -TRAFFIC ENGINEERING DIVISION
TRAFFIC CONTROL PLANS
FOR FIRE LINE TO MAIN LINE TO THE BACK FLOW SHEET 1 OF
FELIX VALDEZ A VE. __ 1 __ SI l[[TS
FOR CITY USE ONLY: FILE NO. W.O. NO.
12/17/24
12/18/
24