LINFIELD CHRISTIAN SCHOOL January 21, 2025
31950 Pauba Road Project No. 1-0155-B
Temecula, California 92592
Attention: Mr. Marc Horton
Subject: UPDATED GEOTECHNICAL REPORT
Linfield Way Extension and Mass Grading Area,
City of Temecula, California
References: See Appendix A.
Dear Mr. Horton:
Presented herein is Alta California Geotechnical Inc.’s (Alta) updated geotechnical report for the
proposed Linfield Way extension and associated mass grading, located in the City of Temecula,
California. This letter is based on a review of the mass grading plans, the precise grading plans,
and the referenced reports.
1.0 PREVIOUS INVESTIGATION
Alta conducted a geotechnical investigation of the Linfield Property, Tract 36098-1,
Parcels 1 through 3 and Tract 36098-2, Parcel 1 in 2015 consisting of the excavation,
logging, and sampling of five (5) bucket-auger borings, fifteen (15) backhoe test pits, and
associated laboratory testing (Alta, 2015). The proposed development at that time
consisted of mixed-use and residential construction. Locations of test pits and borings
within the proposed development are shown on Plates 1 through 3, and their logs are
presented in Appendix B.
APPROVED BY
CITY OF TEMECULA
PUBLIC WORKS
david.pina 01/31/2025
01/31/2025 01/31/2025
01/31/20
Project Number 1-0155-B Page 2
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
2.0 PROPOSED DEVELOPMENT
Based on a review of the plans and our discussions with you, the proposed development
consists of extending Linfield Way north to Rancho Vista Road. As part of the proposed
work, mass grading efforts will create a stockpile for future use. It is anticipated that
conventional cut/fill grading techniques will be utilized in site development.
Recommendations pertaining to the mass grading and street improvements are
included herein.
3.0 GEOLOGIC CONDITIONS
3.1 Stratigraphy
Based on Alta’s review of geologic literature and the previous subsurface
investigation the project site is underlain by surficial units of artificial fill,
topsoil, and alluvium. Underlying these surficial deposits is the Pleistocene-
aged Pauba Formation. The approximate distribution of the geologic units
are shown on Plates 1 through 3. The following is a brief description of these
geologic units in order of oldest to youngest.
3.1.1 Pauba Formation (Map Symbol Qp)
The Pauba Formation, which consists of early Pleistocene-aged deposits,
underly the site. The Pauba Formation observed onsite consists primarily
of reddish brown, fine grained clayey sands in a moist, dense condition.
Bedding is massive with horizontal, gradational contacts.
Project Number 1-0155-B Page 3
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
3.1.2 Alluvium (Map symbol Qal)
Holocene-aged alluvium was encountered during our previous
investigation primarily within south-flowing drainage areas. The alluvium
within the areas of the proposed development are estimated to range
approximately 2.5 to 6 feet thick. The alluvium generally consists of
brown silty and clayey sands in a moist, loose to medium dense
condition.
3.1.3 Topsoil (no map symbol)
Relatively thin topsoil blankets most of the site. It consists primarily of
brown to yellowish brown silty and clayey sands in a moist, loose to
medium dense condition. The average thickness of the topsoil is
approximately one (1) foot.
3.1.4 Artificial Fill (Map symbol af)
Artificial fill exists primarily within areas recently used as overflow
parking; however artificial fill is anticipated to be encountered within the
approximate area previously occupied by a single-family home. The
artificial fill consists primarily of yellowish brown silty sands in a moist,
loose condition.
4.0 MASS GRADING AND STOCKPILE
As previously mentioned, mass grading efforts will create a temporary stockpile of soils
to be utilized or sold. In preparing the recommendations presented herein, Alta
reviewed the mass grading plan prepared by KWC Engineers (Plate 1).
Project Number 1-0155-B Page 4
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
4.1 Site Preparation
A significant amount of vegetation, debris, and all other deleterious
materials should be removed from the proposed stockpile area prior to
stockpile operation.
4.2 Fill Placement
As presented on the mass grading plans, an initial estimate of 10,889 CY will
be stockpiled. It is our understanding that the soils will be placed as
uncompacted, non-certified fill within the limits presented on Plate 1.
Gently sloped (5:1) fill slopes are proposed along the south side of the
stockpile area. As an erosion mitigation strategy, the faces of the proposed
slope should be “track-walked” or otherwise compacted. Additional erosion
mitigation strategies may include planting, hydro-seeding, and jute netting.
5.0 STREET IMPROVEMENTS
The proposed Linfield Way extension consists of rough grading, curb and gutter, and
asphalt paving operations. Based on a review of the precise grading plans (Plate 2 and
3), the majority of the proposed Linfield Way extension is in cut. The approximate
maximum amount of cut is approximately 16-feet, in the vicinity of Finish Surface
1212.19. Minor amounts of fill are proposed, on the order of approximately 5 feet. Fill
slopes on the order of 12 feet tall and cut slopes on the order of 15 feet tall are
proposed to support the Linfield Way Extension.
5.1 General Earthwork Recommendations
All grading shall be accomplished under the observation and testing of the
project geotechnical consultant in accordance with the recommendations
contained herein and the City of Temecula criteria.
Project Number 1-0155-B Page 5
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
5.1.1 Site Preparation
Vegetation, construction debris, and other deleterious materials are
unsuitable as structural fill material and should be disposed of offsite
prior to commencing grading/construction. Any septic tanks, seepage
pits or wells should be abandoned as per the County of Riverside
Department of Health Services.
5.1.2 Unsuitable Soil Removals
For fill areas underlain by Pauba Formation, removal and recompaction of
the upper two (2) feet is recommended. For cuts greater than two (2)
feet in street areas, removals are not required. For cuts less than two (2)
feet, the two (2) foot removal and recompaction applies.
For fill areas underlain by alluvium, the alluvium shall be removed to
expose competent Pauba Formation. It is anticipated that removals will
range between approximately 2.5 to 6 feet in depth within alluvial areas.
Based on a review of the precise grading plans, the proposed fill slope is
underlain by Pauba Formation. The upper one (1) to three (3) feet of the
Pauba Formation are highly weathered and therefore not suitable for the
support of compacted fill. As such, this material should be removed and
recompacted to project specifications prior to the placement of
engineered fill.
Material removed as part of the unsuitable soil removals can be used as
artificial fill, provided it is free of deleterious materials.
5.1.3 Compaction Standards
All fill and processed natural ground shall be compacted to a minimum
relative compaction of 90 percent, as determined by ASTM Test Method:
Project Number 1-0155-B Page 6
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
D-1557. Fill placed within the upper 1-foot of proposed subgrade shall be
compacted to a minimum 95%, as determined by ASTM Test Method: D-
1557.
Fill material should be moisture conditioned to optimum moisture or
above. Compaction shall be achieved with the use of sheepsfoot rollers
or similar kneading type equipment. Mixing and moisture conditioning
will be required in order to achieve the recommended moisture
conditions.
5.1.4 Documentation of Removals
All removal/over-excavation bottoms should be observed and approved
by the project Geotechnical Consultant prior to fill placement.
Consideration should be given to surveying the removal bottoms and
undercuts after approval by the geotechnical consultant and prior to the
placement of fill. Staking should be provided in order to verify undercut
locations and depths.
5.1.5 Treatment of Removal Bottoms
At the completion of removals/over-excavation, the exposed removal
bottom should be ripped to a minimum depth of eight (8) inches,
moisture-conditioned to above optimum moisture content and
compacted in-place to the project standards.
5.1.6 Fill Placement
After removals, scarification, and compaction of in-place materials are
completed, additional fill may be placed. Fill should be placed in eight-
inch bulk maximum lifts, moisture conditioned to optimum moisture
Project Number 1-0155-B Page 7
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
content or above, compacted and tested as grading/construction
progresses until final grades are attained.
5.2 Slope Construction
5.2.1 Fill Slope Construction
Fill slopes should be overfilled to an extent determined by the contractor,
but not less than two (2) feet measured perpendicular to the slope face,
so that when trimmed back to the compacted core a minimum 90
percent relative compaction is achieved.
Compaction of each fill lift should extend out to the temporary slope
face. Back-rolling during mass filling at intervals not exceeding four (4)
feet in height is recommended, unless more extensive overfilling is
undertaken.
As an alternative to overfilling, fill slopes may be built to the finish slope
face in accordance with the following recommendations:
1. Compaction of each fill lift should extend to the face of the slopes.
2. Back-rolling during mass grading should be undertaken at
intervals not exceeding four (4) feet in height. Back-rolling at
more frequent intervals may be required.
3. Care should be taken to avoid spillage of loose materials down the
face of any slopes during grading. Spill fill will require complete
removal prior to compaction, shaping, and grid rolling.
4. At completion of mass filling, the slope surface should be
watered, shaped, and compacted by track walking with a D-8
bulldozer, or equivalent, such that compaction to project
standards is achieved to the slope face.
Project Number 1-0155-B Page 8
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
Proper seeding and planting of the slopes should follow as soon as
practical to inhibit erosion and deterioration of the slope surfaces.
Proper moisture control will enhance the long-term stability of the finish
slope surface.
5.3 Slope Stability
5.3.1 Fill Slopes
It is anticipated that the proposed fill slope will be designed at a slope
ratio of 3:1 (horizontal:vertical) or flatter to vertical heights of up to
approximately 12-feet. Fill slopes, when properly constructed with onsite
materials, are expected to be grossly stable as designed.
Skin-fill slope conditions should be avoided. If these conditions exist or
are created during grading, they should be evaluated. Typical
remediation for skin fill conditions are shown on Plate G-11 (Appendix D).
5.3.2 Cut Slopes
It is anticipated that the proposed cut slopes will be designed at slope
ratio of 3:1 (horizontal:vertical) or flatter to vertical heights of up to
approximately 15-feet. Alta anticipates that cut slopes will primarily be
excavated in the Pauba Formation. Upon exposing competent Pauba
Formation, the cut slopes are expected to be grossly stable as designed.
All cut slopes should be observed during grading by the Project
Geotechnical Consultant. If adverse bedding, fracture or joint patterns, or
other unstable geological conditions are exposed, then cut slopes may
need to be replaced with a drained stabilization fill, as generally depicted
on Plates G-8, G-9 and G-10 in Appendix D.
Project Number 1-0155-B Page 9
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
5.4 Preliminary Pavement Design Recommendations
The design recommendations presented herein are based on an assumed R-
Value and Traffic Index for the proposed extension. Preliminarily, based on
an assumed R-value of 25, the pavement may be designed utilizing the
sections presented in Table 4-1. These sections should be verified upon the
completion of grading, based on R-value testing. The ultimate pavement
section design for public streets is under the City of Temecula’s purview.
Table 4-1
Preliminary Pavement Sections
Traffic Index Pavement Section Options
6.0 4.0 inches AC over 7.5 inches AB
AC-Asphalt Concrete
AB-Caltrans Class II Base
Construction of the streets should be accomplished in accordance with the
current criteria of the City of Temecula. Prior to the placement of base
material, the subgrade should be suitably moisture conditioned, processed
and compacted to a minimum 95 percent of the laboratory maximum
density (ASTM: D 1557) to at least twelve (12) inches below subgrade. After
subgrade compaction, the exposed grade should then be "proof"-rolled with
heavy equipment to ensure the grade does not "pump" and is verified as
non-yielding. Aggregate base material should be placed on the compacted
subgrade and compacted in-place to a minimum 95 percent of the
laboratory standard obtained per ASTM: D 1557.
5.5 Utility Trenches
Based on a review of the precise grading plans, storm drain / drainage
improvements are proposed along the intersection of the proposed Linfield
Way extension and Rancho Vista Road.
Project Number 1-0155-B Page 10
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
5.5.1 Excavation
Utility trenches should be supported, either by laying back excavations or
shoring, in accordance with applicable OSHA standards. The existing site
soils are classified as Soil Types "B" and “C” per OSHA standards. Upon
completion of the recommended removals and recompaction, the
artificial fill will be classified as Soil Type “B”. The Project Geotechnical
Consulting should be consulted if geologic conditions vary from what is
presented in this report.
5.5.2 Backfill
Trench backfill should be compacted to at least 90 percent of maximum
dry density as determined by ASTM D-1557. Onsite soils will not be
suitable for use as bedding material but will be suitable for use in backfill
provided oversized materials are removed. No surcharge loads should be
imposed above excavations. This includes spoil piles, lumber, concrete
trucks, or other construction materials and equipment. Drainage above
excavations should be directed away from the banks. Care should be
taken to avoid saturation of the soils. Compaction should be
accomplished by mechanical means. Jetting of native soils will not be
acceptable.
5.6 Exterior Slabs and Walkways
Exterior concrete slabs and walkways should be designed and constructed in
consideration of the following recommendations.
Project Number 1-0155-B Page 11
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
5.6.1 Subgrade Compaction
The subgrade below exterior concrete slabs should be compacted to a
minimum of 90 percent relative compaction as determined by ASTM Test
Method: D 1557.
Per City of Temecula Standard No. 200, the subgrade below curb and
gutter should be suitably moisture conditioned, processed and
compacted to a minimum 95 percent relative compaction.
5.6.2 Subgrade Moisture
The subgrade below concrete slabs should be moisture conditioned to a
minimum of 110 percent of optimum moisture prior to concrete
placement for areas with very low to low expansion potential, and 120
percent of optimum moisture content prior to concrete placement for
areas with medium expansion potential.
5.6.3 Concrete Slab Thickness
Concrete flatwork and driveways should be designed utilizing four-inch
minimum thickness.
5.6.4 Concrete Slab Reinforcement
Utilization of reinforcement for flatwork and driveways is subject to a
cost/benefit analysis. Reinforcement will decrease the amount of
cracking that may occur in flatwork, however, planning for occasional
repairs may be more cost effective. Utilizing closely spaced control joints
is likely more cost-effective than utilizing reinforcement. The majority of
the soils onsite are classified as very low in expansion potential.
Consideration should be given to reinforcing flatwork with irregular (non-
square/rectangular) shapes.
Project Number 1-0155-B Page 12
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
5.6.5 Control Joints
Weakened plane joints should be installed on walkways at intervals of
approximately eight feet (maximum) or less. Exterior slabs should be
designed to withstand shrinkage of the concrete.
5.7 Concrete Design
As stated in Alta, 2015, negligible concentrations of sulfates were detected
in the onsite soils (Class S0). Therefore, the use of sulfate resistant concrete
is not required per ACI 318-14 at this time. Post-grading conditions should
be evaluated, and final recommendations made at that time.
Alta California Geotechnical, Inc., appreciates the opportunity to be of service to you and your
organization. Should you have any questions or need additional information, please contact
the undersigned at (951) 509-7090.
Respectfully submitted,
Alta California Geotechnical, Inc.
_______________________________
LOGAN A. MARQUETTE
Civil Engineering Associate
_______________________________
SCOTT A. GRAY/RGE 2857
Reg. Exp.: 12-31-26
Registered Geotechnical Engineer
President
Distribution: (1) Addressee
SAG: 1-0155-B, January 21, 2025 (Updated Geotechnical Report, Linfield Way Extension, Temecula)
ALTA CALIFORNIA GEOTECHNICAL, INC.
APPENDIX A
REFERENCES
Project Number 1-0155-B Page A-1
January 21, 2025
ALTA CALIFORNIA GEOTECHNICAL, INC.
APPENDIX A
Selected References
Alta California Geotechnical, Inc., 2017, Updated Preliminary Pavement Design
Recommendations, Linfield Village, APN 955-020-006, City of Temecula, California, dated
November 10, 2017 (Project No. 1-0155-A).
Alta California Geotechnical, Inc., 2015, Geotechnical Investigation, Linfield Property, Tract
36098-1, Parcels 1 through 3, and Tract 36098-2, Parcel 1, City of Temecula, California,
dated June 15, 2015 (Project No. 1-0155-A).
ALTA CALIFORNIA GEOTECHNICAL, INC.
APPENDIX B
PREVIOUS SUBSURFACE INVESTIGATION
(ALTA, 2015)
UNIFIED SOI L CLASSIFIICATION SYSTEM
Major Divisions lfl tr Description Major Divisions an tr
Coarse
Grained
Soils
N4ore than
50%
retained on
No 200
steve
Gravel
and
Sravelly
Soils
han 50%
frachon
relained
on No, 4
'l
ts*
,-l*
EIF
GW
Well-graded grcvels or gravel sand
mixtures, little or no fines
Fine
(lrained
isoils
l\lore than
Silts
And
Clays
LL,<50 n
ML
Inorganic silts and very fine sands,
rock flour, silty or clayey fine sands
or clavev silts with slioht olasticitv
GP
Poorly-graded gravels or gravel
sand mixture, little or no fines CL
Inorganic clays of low to medium
plasticity, gravelly clays, sandy
clays, silty clays, lean claysSilty gravels, gravel-sand-silt
mixtures
OL
Organic silts and organic silt-clays
of low plasticity
Clayey gravels, gravel-sand-clay
mixtures
Silts
And
Clays
LL,<50
MF
Inorganic silts, micaceous or
diatomaceous fine or silty soils,
elastic siltsSand
and
Sandy
Soils
than 50%
fraclion
Passes
on No, 4
i'+.
3_'.JV!
Well-graded sands or gravelly
sands, little or no fines
on No 200
steve VH
Inorganic clays of high plasticity,
fat claysSP
Poorly-graded sands or gravelly
sands, little or no fines
SM Silty sands, sarrd-silt mixtures OF
Organic clays of medium to high
plasticity
sc Clayey sands, and-clay mixtures Highly Organic
Soils PT Peat and other highly organic soils
BoUNDARY CLASSIFICATIoN: Soils possessing characteristics of two groups are designated by combinations of group symbols
PARTICLE SIZ:E LIMITS
U.S. STANDA,RD SiERIES SIEVE
200 40 10 4
CLEAR SQUARE SIEVE OPENINGS
3t4" 3,, ,t2"
LABORATORY TESTS
Symbol Tesl
DS
DSR
cc)N
SA
MAX
RV
EI
SE
AL
CHEM
HY
Direct Shear
Direct Shear
(Remolded)
Sieve Analysis
Maximum Density
Resistance (R) Value
Expansion Index
Sand Equivalent
Atterberg Limits
Chemical Analysis
Hydrometer Analysis
SOIL MOISTURE SIZE PROPORTIONS
Trace - <5%
Few-5to10%
Some - 15 to 25%
Increasing \/isual Moisture Content
Silts
an0
Clays
Sand Gravel
Cobbles Boulders
Fine Medium Coarsi€r Fine Coarse
RELATIVE DENSITY
Sands and Gravels Blows/Foot (SPT)
Very Loose
Loose
Medium Dense
Dense
Very Dense
<4
4-10
11-30
31 -50
>50
CON SI STENCY C IASSI FI CATI ON
Silts and Clays Criteria
Very Soft
Soft
Firm
stiff
Very Stiff
Thumb penetrates soil >1 in.
Thumb penetrates soil 1 in,
Thumb penetrates soil 1/4 in
Readily indented with thumbnail
Thumbnail will not indent soil
HARDNESS
KEY TO EXPLORATORY BORING LOGS}
,n
/L>//J, ALTA CALIFORNTA GEOTECHNTCAL tNC.
/\
PI-ATE B
ALTA CALIFORNIA GEOTECHNICAL, INC.
APPENDIX C
EARTHWORK SPECIFICATIONS
ALTA CALIFORNIA GEOTECHNICAL, INC.
APPENDIX D
GRADING DETAILS
Qp
Qp Qp
af
Qal
Qal
af
(Qal)
af
(Qal)
T-19
af
(Qp)
af
(Qp)
B-5
0-1.5' Topsoil
1.5-31' Qp
T.D. = 31'
No G.W.
0-2.5' Qal
2.5-4.5' Qp
T.D. = 4.5'
No G.W.
T-21
0-6' Qal
6-8' Qp
T.D. = 8'
No G.W.
T-18
0-2.5' Qp
T.D. = 2.5'
No G.W.
170 N. MAPLE STREET, STE 108, CORONA, CA 92880
TELEPHONE: (951) 509-7090
ALTA CALIFORNIA GEOTECHNICAL, INC.
LEGEND
ARTIFICIAL FILL
ALLUVIUM (BRACKETED WHERE BURIED)
PAUBA FORMATION (BRACKETED WHERE BURIED)
APPROXIMATE LOCATION OF GEOLOGIC CONTACT
(DOTTED WHERE BURIED)
APPROXIMATE LOCATION OF BACKHOE TEST PIT
(ALTA, 2015)
APPROXIMATE LOCATION OF BORING (ALTA, 2015)
af
Qal
PLATE 1
T-19
Qp
B-5
Qp
Qp
af
(Qp)
af
(Qal)
Qal
Qal
0-2.5' Qal
2.5-4.5' Qp
T.D. = 4.5'
No G.W.
T-21
170 N. MAPLE STREET, STE 108, CORONA, CA 92880
TELEPHONE: (951) 509-7090
ALTA CALIFORNIA GEOTECHNICAL, INC.
PLATE 2See Plate 1 for Legend
Qp
Qp
af
B-5
0-1.5' Topsoil
1.5-31' Qp
T.D. = 31'
T.E. No G.W.